Vous êtes sur la page 1sur 6

Daniel G. Oro Jr.

Mina Port SSBD-JV Camp


Abu Dhabi, United Arab, Emirates.
Mob: +971557366021
E-mail add: orodaniel_08@yahoo.com

Position Desired:
Objective :

To obtain a challenging position that suit to my qualification, preferences and interest thereby gaining
knowledge and experiences that will bring a profound change in terms of my career and personal
advancement.

Summary:

Plans, assigns, schedule, and supervise the work of power lines, electricians, and helpers engaged in the construction
installation, maintenance and repair power lines electrical system and participate in the more difficult work.

Trains and instruct subordinates on detailed procedure.

Conduct daily inspection and gives on site supervision over hazardous or unusual work assignment; assures availability of
equipment, materials and supplies.

Estimate the time and materials costs required for project; initiates requisition for supplies, tools, and equipment.
Enforces safety regulation, rules, and working condition.

Trains personnel in the safe operation of equipment and tools.

Inspecting the work of electrical subcontractor to insure that they comply with electrical codes and standards.

Assist the planning department for the development of design, Shop drawing and detailed drawing of embedded electrical
works.

Ensure implementation of quality, environment, safety and health rules and regulations at the project site.

Ensure that the approved construction drawing

are strictly followed and brought to the managers attention should some

discrepancies and mistake arises.

Ensure that the electrical materials to be use on site comply with the approved submittals and shop drawings.

Conducts learning season to all project personnel and sub-contractors on agreed quality work standards and specification.

Prepare material estimate and equipment take-off and request.

Prepares report and inspection request to consultant and client for the acceptance of work.

Monitoring of project deficiencies and its rectification.

Monitoring and leads the testing and commissioning report as part of hand over documents.

Plan, Check and constant monitoring on finished electrical work as part of the maintenance program.

Work Experience:

Career Objective
To be associated with a company which can further develop, enhance and diversify my skills and harness my potential and
contribute to the success of an international company.
Qualifications Summary

An Electrical General Foreman working in fast-paced working environments demanding strong organizational, technical and
interpersonal skills. Highly trustworthy, ethical, detail oriented, resourceful on finishing projects, techno savvy and committed to
superior customer service. Can multi-task and provide solutions/finished projects on time. Confident in dealing with customers to
ensure high quality of consumer experience. Capabilities include:

Hvac Interfacing system

Fire Alarm System

Technical Operations

Access Control System

Power Distribution System

Structured Cabling System

Socket outlet and lightings

CCTV

Ventilation System

Building Management System

Fire Fighting System

Knowledgeable in Auto-Cad

UPS System

Oct. 10, 2009-Mar. 10, 2012.


Electrical supervisor
Samsung C & T - Saif Bin Darwish JV.
Project involved

Al Salam Tunnel Abu Dhabi UAE (Infrastructure)

Supervised of removal and relocation all existing street lighting pole, Street lighting Control Cabinet, Decorative panel,
Service turret, and Feeder pillar, and re-cover power cables and turn-over to the store.
Supervised and complete the construction of Temporary Street lighting pole foundation using in all detour.
Supervise the installation of temporary street lighting pole in all de tours and submit request for consultant then guide
inspector during inspection at site.
Supervised and completed the installation of power supply for all new installed LED Street lighting pole in Al Salam Street.
Supervised and completed the construction of feeding points for 17 units of control cabinet for street lighting.
Supervised and completed the testing and commissioning of all street lighting poles and all control cabinet.
Supervised and completed the excavation for 11kv development works for main distribution system of the tunnel.
Supervised and complete the excavation for the relocation of existing main cable such as 11kv, 33kv, 132kv, and 400kv.
Supervised and completed the construction of fabrication for UPS controller cabinet foundation, Traffic control cabinet
foundation, and CCTV controller cabinet foundation.
Supervised and completed the construction of concrete pull-boxes type 1, type 2, type 3, and type 4, using in street
lightings and traffic controls.
Handle the preparation of ISR/RFI submitted to consultant and guide the inspector during inspection at site.

Jan.2009-Aug.2009
Electrical Supervisor
Shimizu Corporation (Dubai Branch)
Project Involved:

Palm Jumeirah Residence tower (six towers).

Supervised and complete the installation of Low voltage switch gear, Capacitor bank, Automatic transfer switch and Main
distribution board.
Completed the installation of lightning protection, and grounding equipment.
Supervised and completed the installation of, BMS system, fire alarm equipment, Access control equipment, UPS
equipment, fire pump controller equipment, and ventilation controller equipment.
Supervised and completed the fabrication of support for cable tray, and buzduct.
Supervised and completed the Installation of Cable tray riser, for power distribution system.
Supervised and completed the Installation of buzduct for power distribution system.
Supervised and completed cable pulling, insulation testing, glanding, and termination for low voltage switchgear,
generator, capacitor bank, main distribution board and Main control center.
Assist commissioning engineer to conduct testing and commissioning for firefighting system, ventilation system,fire alarm
system.

Mar.2006-Jan.2009
Electrical Group Leader
Al Jaber Electro-Mechanical Co. WLL(Qatar Branch)
Project Involved

1).Al Alawi Tower Qatar (Hi-rise bldg.).

2).Qreic Office tower Qatar (Hi-rise bldg.).


3).Messaeid International School Qatar
4) Messaeid Housing development Qatar
Duties and Responsibilities:

Supervise and completed installation of main power distribution system of 2 hi-rise building, start from roughing
installation, cabling, insulation testing, glanding, and termination, Installation of monitoring system in switch gear room via
BMS system.
Supervised and completed lightning protection and grounding equipment for 2 towers.
Supervised and completed installation of power supply for 2 main pump plus 1 jockey pump, Installation of individual
controller, Installation of monitoring system for both pumps together with pipe lines.
Supervised and completed installation of power supply for ventilation system, Installation of C.O. detector as
management pollution, Installation of MCC as controller of all ventilation equipment.
Supervised and completed installation of BMS system for 2 towers plus international school and conduct as-built
drawings.
Supervised and completed installation of power supply for 200 hundred villas in messaeid housing project, start from
roughing installation, wirings, cabling, insulation testing, and termination.
Supervised and completed testing and commissioning of all electrical system for 200 hundred villas in messaeid housing
project.

Nov.07, 2006-Feb.26, 2007


Electrical Foreman
Thaison Builder and Developer
No.1229 Unit D, Ocampo Street.
Malate, Metro, Manila, Phillipines.
Project Involved:

Southern Luzon Hospital and Medical Center


(Sta Rosa Laguna Philippines).

Supervised and completed the construction of 2 MVA Power distribution system for 8 floors + 2 basements Southern
Hospital and Medical Center.
Supervised and completed installation of power supply of all medical equipments and installation of double protection for
all systems.
Supervised and completed power supply of all air-conditioning equipments, fire
Protection equipments, ventilation system.
Supervised the power supply of special and normal socket outlets, lightings fixtures emergency and normal, then
installation of different kinds of lighting fixture dedicated to health care hospital building.
Supervised and completed the installation of Stractured cabling, fire alarm system, Public address , Access control
system, Nurses call, Building management system and Un-interrupting power supply and the CCTV.
Conduct meeting to all sub-contractor regarding the method of statement for testing and commissioning for all electrical
equipment, Monitoring equipment, Security equipment, and communication equipment.
Assist the medical consultant during testing and commissioning for all medical equipment in SHLMC.

Jul.01, 2005-Oct.31, 2006


Electrical Foreman
BB Son Technology Incorporated
Bldg. B, Unit 1, FCIE Langkaan
Dasmarinas, Cavite, Phillipines.
Tel: +63-4-464020958
Project Involved

BB Son Technology Incorporated (Industrial).

Supervised and completed the installation of Low voltage switchgear, Capacitor bank, Automatic transfer switch, and
100% back-up power generator during power failure, Completed installation of power cables, insulation testing,
termination in all equipment and testing commissioning.
Supervised and completed the installation of lighting fixtures and socket outlet designated to the production area.
Supervised and completed installation of power supply for heavy motor loads for production equipment.
Supervised and completed the installation of ventilation system, firefighting equipment, and fire alarm system.

June 5, 2001 -April 19, 2005.


Electrical Foreman
Financial Building Corporation
Project Involved

1.0) Amkor-Anam Philippines (Industrial)


2.0) DOST- Philippines (Research Facility)

Amkor-Anam:

Supervised and completed the construction of 80m.ductbank and 3 sets of manhole for normal supply of industrial
building.
Supervised and completed cabling for normal supply, Insulation testing, and termination in low voltage switchgear.
Supervised the installation of grounding system, sump pump for 3 manhole and installation of control and monitoring by
using of scada.
Supervised and completed the construction of 150m.ductbank for emergency power supply.
Supervised and completed the construction of 4 sets of manhole with grounding rod and equipped with the sump pump
and monitoring system.
Supervised and completed the cable pulling, Insulation, testing, termination in generator and ATS equipment.
Assist commissioning engineer to conduct the testing and commissioning of generator and transfer switch.

Department of Science and Technology.

Supervised and complete the construction of duct bank for upgrading power supply of Department of Science and
Technology in the Philippines.
Supervised and complete the installation of cabling, insulation testing, and termination in Low voltage switch gear.
Supervised and complete the power supply for additional researched equipment.
Assist the commissioning engineer for all electrical equipment.

Mar. 05,1998-Feb.14, 2001 .


Electrical leadman
SW Power Corporation (Philippines)
Project Involved

1).Read-Rite Philippines (Industrial)


2).Robinson mall Imus Philippines (Commercial)

Read-Rite Philippines:
Supervised the lay-outing of 140m.overhead cable tray from automatic transfer switch to generator room.
Supervised cabling, Insulation testing, termination and assist testing commissioning for generator, automatic transfer
switch, and low voltage switchgear.
Supervised the installation of lighting fixtures, normal and emergency power supply.
Supervised the Installation of GFCI socket outlet dedicated to production, normal and emergency power supply.
Supervised the cabling of bare cooper wire for grounding equipment.
Supervised the installation of emergency light in all exit doors, entrance, stairs, and basement area.
Robinson Cavite:

Supervised the arrangement of electrical equipment in electrical room of supermarket, Installation of dry type step-down
transformer, Main circuit breaker, Lighting panel boards normal and emergency, power panel boards normal and
emergency.
Supervised the installation of overhead cable tray from LVSG to electrical room of supermarket.
Supervised the cabling from LVSG to electrical room in supermarket, insulation testing, termination, and testing
commissioning.
Supervised and complete the wiring for lightings, power, and freezer, refrigerator, equipment of supermarket.
Supervised the termination of all panel boards testing and commissioning,
Supervised and complete the Lay-outing and installation of wire way for lighting fixtures normal and emergency.
Supervised and completed the installation of normal and emergency lighting fixtures in supermarket.
Supervised and completed the installation of socket outlet in all counter area.
Conduct testing and commissioning for all system.

Seminars and training attended:

At Sept. 1999 attend seminar and training in SIEMENS PHILIPPINES regarding the proper installation of Heavy
Electrical equipment such as Low voltage switch gear, Dry type step-down transformer.

At Dec. 2006, attend seminar and training in SCHNEIDER ELECTRIC PHILIPPINES for familiarization of all Heavy
Electrical Equipment using for Southern Luzon Hospital and medical Center.

At March 2007 I attend seminar and training in LJ switchgear distributor for the installation of HENEKWON busway
system riser of Southern Luzon Hospital and Medical Center.

Character reference:
Engr. Bum J. Lee
Mob. 0503215765
Email: first@samsung.com

Utility Electrical Manager


Samsung C & T (Abu Dhabi Branch).
P.O. box 73410 Abu Dhabi UAE.
Tel. # +971-2-642 2902-Fax # +971-2-6422903

Engr. Joselito Dedeles


Mob.No.00971501095796
joselito.dedeles@parson.com

Senior Civil Inspector


Parson International Ltd.
P.O. Box 5498 Abu Dhabi, UAE.

Educational Attainment:

Personal Information:
Birthday
Age
Birth place
Nationality
Passport no.

September 21, 1979


32 years old
Matnog Sorsogon, Philippines.
Filipino

Vous aimerez peut-être aussi