Vous êtes sur la page 1sur 22

7/11/2003

7/11/2003

INDEX
PRESSURE PARTS SCHEDULE

Page No.

Rev.No.

1.

Basis for Thickness Calculation

03

2.

Design Pressure for Pressure Parts

03

3.

SH, RH and Economiser Pressure Drops

03

4.

Pressure Parts Schedule:

4.1

Economiser System

03

4.2

Circulating System

7-9

03

4.3

Superheater System

10 14

03

15

03

16 17

03

18

03

4.4

Reheater System

4.5

Steam Cooled Spacer

5.

Unit Material Diagram:

SH Division Panellette

19

03

SH Platen

20

03

LTSH

21

03

Reheater

22

03

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Prepared by :

GA

Reviewed by :
Approved by:

VBR
VBR

Date

TITLE : Pressure parts schedule for Eco,


Circ,SH,RH,Drum with tube metal temp. calculation
TP-SC-209-100-0014
Sheet

of 22

PRESSURE PARTS SCHEDULE

BASIS FOR THICKNESS CALCULATION

1.

Design Code

: IBR

2.

Margins over IBR Code Requirement

2.1

Water Walls:

i.

0.6 mm provided for all water wall tubes over the thickness required as per IBR.
Further, an additional tube thickness of 1.0 mm over and above the tube thickness
of waterwall tubes calculated as per the above shall be provided on all water wall
tubes coming within a radius of half a meter each wall blower.

ii.

Thinning allowance for bends : 10%

2.2

Superheaters & Reheaters:

i.

Erosion allowance (Leading tubes)

: 1.0 mm

ii.

Erosion allowance (Balance of Tubes)

: 0.6 mm

iii.

Thinning allowance for bends

: 10%

2.3

Economiser

i.

Erosion allowance

: 1.0 mm

ii.

Thinning allowance for bends

: 10%

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Prepared by :
Reviewed by :
Approved by:

GA
VBR
VBR

Date

TITLE : Pressure parts schedule for Eco,


Circ,SH,RH,Drum with tube metal temp. calculation
TP-SC-209-100-0014
Sheet 3 of 22

PRESSURE PARTS SCHEDULE

DESIGN PRESSURE FOR PRESSURE PARTS


1.
2.

Design Code
Drum
SHO pressure at BMCR
SH System pressure drop at BMCR
Drum operating pressure
Design pressure

IBR

:
:
:
:
:
:
:

178 kg/cm2(g)
17.50 kg/cm2
195.5 kg/cm2(g)
1.05 x Max. operating pressure
1.05 x 195.5
205.3 kg/cm2(g)
208.5 kg/cm2(g)

Drum Design pressure - Pressure


drop in preceeding sections (or)
1.05 x Max. operating pressure
whichever is higher.

:
:
:
:
:

47.41 kg/cm2(g)
1.05 x Max. operating pressure
1.05 x 47.4
49.8 kg/cm2(g)
52.4 kg/cm2(g)

:
:
:
:
:

201 kg/cm2(g)
1.05 x Max. operating pressure
1.05 x 201
211.1kg/cm2(g)
214.0 kg/cm2(g)

Circulation system
Design pressure upto pump

Design pressure after pump

Drum design pressure + Static head (or)


1.05 x Max. operating pressure whichever
is higher.
Drum design pressure + Static head +
Pump head (or)
1.05 x Max. Operating pressure whichever
is higher.

Drum design pressure used


3.

SH system
Design pressure

4.

RH system
Max. operating pressure
Design pressure

RH design pressure used


5.

Economiser system
Max. operating pressure
Design pressure

Economiser coil design pressure


used.
6.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Prepared by :
Reviewed by :
Approved by:

GA
VBR
VBR

Date

TITLE : Pressure parts schedule for Eco,


Circ,SH,RH,Drum with tube metal temp. calculation
TP-SC-209-100-0014
Sheet 4 of 22

PRESSURE PARTS SCHEDULE

SH, RH AND ECONOMISER PRESSURE DROP


(Load : BMCR)
I.

SUPERHEATER SYSTEM
Saturated connecting links
Radiant Roof
Back Pass SCW

0.25

0.65

2.45

2.08

kg/cm
kg/cm
kg/cm

LTSH outlet Tee

kg/cm

0.20

Links to DESH

kg/cm2

0.25

0.37

DESH

kg/cm

Links to Panel SH

kg/cm

0.40

Panel SH inlet Tee

kg/cm2

0.25

SH Division Panel

kg/cm2

3.48

Panel SH Outlet Tee

kg/cm

0.30

Links to Platen

kg/cm2

1.34

0.30

4.93

Platen SH inlet Tee

kg/cm

Platen SH

kg/cm

SH outlet Tee

kg/cm2

0.25

kg/cm

17.5

kg/cm2

1.70

kg/cm2

0.40

Economiser Coils

kg/cm

2.80

Static Head

kg/cm2

2.30

Total SH Pressure Drop


REHEATER SYSTEM
RH Pressure Drop
III.

kg/cm2

LTSH

II.

ECONOMISER SYSTEM
Economiser Links

Economiser pressure drop including static


head

kg/cm

5.5

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Prepared by :
Reviewed by :
Approved by:

GA
VBR
VBR

Date

TITLE : Pressure parts schedule for Eco,


Circ,SH,RH,Drum with tube metal temp. calculation
TP-SC-209-100-0014
Sheet 5 of 22

PRESSURE PARTS SCHEDULE


(Economiser System)

Sl.

Description

no.

1.
2.
3.
4.
5.
6.

Eco. inlet
lead
Eco. inlet
header
Eco. coils
Eco. outlet
header
Eco. outlet
links
Eco. outlet
links to
drum

No.
off

Size
OD
mm

Thick.
mm

Min.order Min. insitu Erosion


thickness thickness allowance
mm
mm
mm

Material
specification

Pressure
Kg/cm2(g)
Design Working

Temperature
oC
Design Working

Gas side
metal
temp.
0C

457.2

50

43.8

SA106Gr.C

219.7

201.0

282

254

508

75

65.6

SA106Gr.C

214.0

201.0

282

254

296

552

38.1

5.3

4.1

1.0

SA210Gr.A1

214.0

201.0

319

308

321

406.4

5.3
(Bend)
60

52.5

SA106Gr.C

210.2

197.2

336

308

350

368

40

35.0

SA106Gr.C

210.2

197.2

336

308

323.9

36

31.5

SA106Gr.C

210.2

197.2

336

308

Notes: $ - Outside gas path.


@ After generation of Drawing.
Data for Main pipes and tubes are furnished. For other components the product drawings may be referred.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 6 of 22
Approved by : VBR/KR

PRESSURE PARTS SCHEDULE


(Circulation System)

Sl.
no.

`Description

1.

2.
3.

No.
off

Size OD
mm

Thickness.
mm

Min. order
thickness
mm

Drum

ID=1778

170 (min) / 205


(min) ## (F)
160(min) / 190
(min) ## (S)

165(min) / 200
(min) # (F)
155(min) /185
(min) # (S)

Downcomer

368

36

31.5

Min. Insitu
thickness
mm
149.74/
179.79 (F)
149.74 /
180.3 (S)
27.8

Suction
1
508
55
48.1
@
manifold
4. Suction spool
3
457.2
45
39.38
34.3
5. Circulating
3
<--- Sub -delivery Components --->
pumps
6. Discharge
6
<--- Sub -delivery Components --->
valves
7. Discharge
6
323.9
36
31.5
27.14
lines
8. Waterwall
1
914
90 (min) ##
85 (min) #
@
bottom ring
(Front&Rear)
heade
@(Sides)
Notes: $ - Outside gas path
@ - To be supplied after generation of drawings.
## Raw plate thickness # Finished shell thickness
(F) For the First boiler (Vindhyachal-9)
(S) For the Second boiler (Vindhyachal-10)

Erosion
allowance
mm

Material
specification

Pressure kg/cm2(g)
Design Working

Temperature
Gas side
oC
metal temp.
oC
Design Working

SA 299

208.5

195.5

368

363

SA106GrC

211.5

198.5

368

354

SA106Gr.C

211.5

198.5

368

354

SA106Gr.C

211.5

198.5

368

354

$
$
$

SA106Gr.C

213.5

200.5

368

354

SA 299

213.5

200.5

368

354

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 7 of 22
Approved by : VBR/PSG

PRESSURE PARTS SCHEDULE


(Circulation System)

Sl.
no.

`Description

No.
off

Size OD
mm

9.

Waterwall rifle
tubes

1062

51

Waterwall
smooth tubes

Waterwall
hanger rifle
tubes

Min. order
thickness
mm

Min. Insitu
thickness
mm

Erosion
allowance
mm

Material
specification

5.6 (Straight)

5.6

5.25

0.6

SA210Gr.C

213.5

200.5

396

363

448

51

6.0 (Bend)

6.0

5.25

0.6

SA210Gr.C

213.5

200.5

396

363

448

51

7.1 (WB opgs)

7.1

6.25

1.6

SA210Gr.C

213.5

200.5

396

363

448

63.5

7.1 (Straight)

7.1

6.32

0.6

SA210Gr.C

210.8

198.0

396

363

448

63.5

7.1 (Bend)

7.1

6.32

0.6

SA210Gr.C

210.8

198.0

396

363

448

63.5

7.1 (Straight)

7.1

6.32

0.6

SA210Gr.C

210.8

198.0

396

363

448

63.5

7.1 (Bend)

7.1

6.32

0.6

SA210Gr.C

210.8

198.0

396

363

448

51

5.6 (Straight)

5.6

5.25

0.6

SA210Gr.C

213.5

200.5

396

363

448

51

6.0 (Bend)

6.0

5.25

0.6

SA210Gr.C

213.5

200.5

396

363

448

51

8.8 (Straight)

8.8

3.88

SA210Gr.C

213.5

200.5

368

363

8.8 (Bend)
12

8.8
12

3.88
6.32

0.6

SA210Gr.C
SA210Gr.C

213.5
210.8

200.5
198.0

368
396

363
363

$
448

51
63.5

Thickness.
mm

Pressure kg/cm2(g)
Design Working

Temperature
Gas side
oC
metal temp.
oC
Design Working

Notes: $ - Outside gas path

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 8 of 22
Approved by : VBR/PSG

PRESSURE PARTS SCHEDULE


(Circulation System)

Sl.
no.

`Description

No.
off

Size OD
mm

Thickness.
mm

Min. order
thickness
mm

Min. Insitu
thickness
mm

Erosion
allowance
mm

Material
specification

10.

Top headers

273

40

35

@
(Hanger)
@
(Screen)
@
(Front)
@
(Side)
13.4

SA106Gr.C

208.5

195.5

368

363

SA106Gr.C

208.5

195.5

368

363

SA106Gr.C

208.5

195.5

368

363

SA106Gr.C

208.5

195.5

368

363

SA106Gr.C

208.5

195.5

368

363

11.

Relief Pipes

273

50

43.75

68

159

18

15.75

Pressure kg/cm2(g)
Design Working

Temperature
Gas side
oC
metal temp.
oC
Design Working

Notes :
$ - Outside gas path
@ - To be supplied after generation of drawings.
Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 9 of 22
Approved by : VBR/PSG

PRESSURE PARTS SCHEDULE


(Superheater System)
Sl.
no.

Description

No.
off

1.

SH
saturated
connecting
links
Radiant roof
inlet header
Radiant
tubes front
Radiant
tubes -rear
Radiant roof
outlet header
Backpass
sidewall inlet
header
Backpass
sidewall
tubes (front)

2.
3.
4.
5.
6.
7.

Thick mm.

21

Size
OD
mm
159.0

18.0

Min. order
thickness
mm
15.8

Min. Insitu
thickness
mm
@

Erosion
allowance
mm
-

SA106Gr.C

208.5

195.5

368

363

273.0

50.0

43.8

SA106Gr.C

208.3

195.3

368

363

150

63.5

6.3(Straight)

6.3

5.9

SA213T11

208.3

195.3

414

364

424

150

57.0

6.0(Bend)

6.0

5.3

SA213T11

208.3

195.3

414

364

420

406.4

60.0

52.5

SA106Gr.C

207.6

194.6

368

364

368.0

50.0

43.8

SA106Gr.C

207.5

194.5

368

364

120

63.5
63.5
76.1

6.3 (Straight)
7.1 (Bend)
12.5
(Bifurcate)

6.3
7.1
12.5

5.5
5.5
6.6

SA210Gr.C
SA210Gr.C
SA210Gr.C

207.5
207.5
207.5

194.5
194.5
194.5

393
393
393

365
365
365

397
397
397

Material
specification

Pressure Kg/cm2 (g)


Design Working

Temperature oC
Design Working

Outside gas path

@ After generation of Drawing.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 10 of 22
Approved by : VBR/KR

Gas side
metal
temp. oC
$

PRESSURE PARTS SCHEDULE


(Superheater System)
Sl.
no.
8.

Description

No.
off

Size
OD
mm
51.0

Thick mm.

Min. order
thickness
mm
5.0

Min. Insitu
thickness
mm
4.4

Erosion
allowance
mm
-

SA210Gr.C

207.5

194.5

393

365

51.0

5.6 (Bend)

5.6

4.4

SA210Gr.C

207.5

194.5

393

365

397

Pressure Kg/cm2 (g)


Design Working

Temperature oC
Design Working

Gas side
metal
temp. oC
397

Backpass
sidewall
tubes (rear)

62

9.

Backpass
lower side
header Front

406.4

60.0

52.5

SA106Gr.C

206.9

193.9

393

365

$$

10.

Backpass
lower side
header Rear

323.9

50.0

43.8

SA106Gr.C

205.6

192.6

393

365

$$

11.

Backpass
lower front
header

406.4

60.0

52.5

SA106Gr.C

206.9

193.9

393

365

$$

12.

Backpass
Front wall
tubes

126

51.0

5.0(Straight)

5.0

4.4

SA210Gr.C

206.9

193.9

393

365

397

51.0

5.6(Bend)

5.6

4.4

SA210Gr.C

206.9

193.9

393

365

397

Backpass
screen tubes

126

51.0

6.3 (Bend)

6.3

5.4

1.0

SA210Gr.C

206.9

193.9

394

366

398

126
Backpass
roof tubes
$$ Partially gas touched.

51.0

5.0(Straight)

5.0

4.4

SA210Gr.C

206.3

193.3

394

366

398

13.
14.

5.0 (Straight)

Material
specification

@ After generation of Drawing.


Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW
Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 11 of 22
Approved by : VBR/KR

PRESSURE PARTS SCHEDULE


(Superheater System)
Sl.
no.
15.

Description

No.
off

Backpass
368
Economiser
support
tubes lower
16. Backpass
4
support
tubes inter
header
17. Backpass SH 248
support
tubes
inter/Lower
18. Backpass SH 248
support
248
tubes upper
19. Backpass
1
upper rear
Junction
header
20. Backpass
137
upper rear
wall tubes
$$ Partially gas touched.

Size
OD
mm
38.1
44.5

Thick mm.

Min. order
thickness
mm
5.0
7.1

Min. Insitu
thickness
mm
4.3
4.9

Erosion
allowance
mm
1.0
1.0

SA210Gr.C
SA210Gr.C

206.9
206.9

193.9
193.9

393
393

365
365

219.1

28.0

24.5

SA106Gr.C

206.7

193.7

393

365

407

51.0

11.0(Straight)

11.0

5.4

1.0

SA210Gr.C

206.7

193.7

393

365

397

51.0
51.0

11.0
6.3(Bend)

11.0
6.3

5.4
3.7

1.0
-

SA210Gr.C
SA210Gr.C

206.7
206.7

193.7
193.7

393
365

365
365

398
$

273.0

50.0

43.8

SA106Gr.C

206.0

193.0

394

366

$$

51.0
51.0

5.0(Straight)
5.6 (Bend)

5.0
5.6

4.4
4.4

SA210Gr.C
SA210Gr.C

206.0
206.0

193.0
193.0

394
394

366
366

398
398

5.0 (Bend)
7.1 (Straight)

$ Outside gas path

Material
specification

Pressure Kg/cm2 (g)


Design Working

Temperature oC
Design Working

@ After generation of Drawing

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 12 of 22
Approved by : VBR/KR

Gas side
metal
temp. oC
397
397

PRESSURE PARTS SCHEDULE


(Superheater System)
Sl.
no.

Description

21.

Backpass
lower rear
header
Backpass
lower rear
wall tubes
LTSH inlet
header
LTSH
Horizontal
coils
LTSH
terminal tubes
LTSH outlet
header
SH links to
DESH
SH DESH
Links to
Division
panellettes

22.
23.
24.
25.
26.
27.
28.
29.

No.
off

Thick mm.

Size
OD
mm
323.9

50.0

Min. order
thickness
mm
43.8

Min. Insitu
thickness
mm
@

Erosion
allowance
mm
-

137

SA106Gr.C

205.6

192.6

393

365

44.5

5.0

5.0

3.9

SA210Gr.C

205.6

192.6

394

366

398

323.9

50.0

43.8

SA106Gr.C

205.2

192.2

394

366

$$

744

47.63
47.63

6.0 (Bend)
6.6 (Bend)

6.0
6.6

5.0
5.5

0.6
1.0

SA213T11
SA213T11

205.2
205.2

192.2
192.2

418
458

379
419

428
467

744

47.63

6.6 (Bend)

6.6

5.6

1.0

SA213T11

205.2

192.2

476

437

484

457.2

65.0

56.9

SA335P12

203.2

190.2

434

424

508.0

60.0

52.5

SA335P12

203.0

190.0

434

424

2
2

508.0
508.0

65.0
60.0

56.9
52.5

@
@

SA335P12
SA335P12

202.7
202.3

189.7
189.3

434
416

424
406

$
$

Outside gas path

$$ Partially gas touched.

Material
specification

Pressure Kg/cm2 (g)


Design Working

Temperature oC
Design Working

@ After generation of Drawing.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 13 of 22
Approved by : VBR/KR

Gas side
metal
temp. oC
$$

PRESSURE PARTS SCHEDULE


(Superheater System)
Sl.
no.

Description

No.
off

30.

SH Division
Panellette
inlet headers

31.

SH Division
Panellettes

432

Size
OD
mm
406.4

Thick mm.

Min. order
thickness
mm
52.5

Min. Insitu
thickness
mm
@

Erosion
allowance
mm
-

SA335P12

201.7

188.7

416

406

44.5
44.5

5.0 (Bend)
5.0 (Straight)

5.0
5.0

4.0
4.5

0.6

SA213T11
SA213T22

201.7
201.7

188.7
188.7

406
471

406
421

$
485

44.5

5.0 (Bend)

5.0

4.2

SA213T22

201.7

188.7

482

482

44.5

7.1 (Bend)

7.1

4.1

SA213T22

201.7

188.7

476

476

44.5

7.1 (Straight)

7.1

6.3

0.6

SA213T22

201.7

188.7

521

471

538

44.5

7.1 (Bend)

7.1

5.3

0.6

SA213T22

201.7

188.7

496

446

514

51.0

7.1 (Straight)

7.1

5.8

1.0

SA213T22

201.7

188.7

481

431

499

44.5

5.6 (Straight)

5.6

4.1

0.6

SA213T91

201.7

188.7

532

482

547

51.0

7.1 (Bend)

7.1

5.0

1.0

SA213T91

201.7

188.7

526

476

543

60.0

Material
specification

Pressure Kg/cm2 (g)


Design Working

Temperature oC
Design Working

Gas side
metal
temp. oC
$

32.

SH Division
Panellette
outlet hdrs

406.4

70.0

61.3

SA335P12

198.2

185.2

485

475

33.

Links to
Platen SH

508.0

60.0

52.5

SA335P12

197.9

184.9

485

475

Outside gas path

@ After generation of Drawing.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 14 of 22
Approved by : VBR/KR

PRESSURE PARTS SCHEDULE


(Superheater System)
Sl.
no.

Description

34.

Platen SH
inlet header

35.

Platen SH
coils

400

36.

Platen SH
outlet hdr.

No.
off

Size
OD
mm
406.4

Thick mm.

Min. order
thickness
mm
52.5

Min. Insitu
thickness
mm
@

Erosion
allowance
mm
-

SA335P12

196.3

183.3

485

475

51.0
51.0
51.0
51.0
63.5

6.3 (Bend)
9.0 (Bend)
9.0 (Straight)
11.0 (Bend)
6.3 (Bend)

6.3
9.0
9.0
11.0
6.3

4.5
4.5
8.8
8.3
5.6

0.6
-

SA213T22
SA213T22
SA213T22
SA213T22
SA213T22

196.3
196.3
196.3
196.3
196.3

183.3
183.3
183.3
183.3
183.3

475
475
547
548
475

475
475
497
548
475

$
$
565
$
$

63.5
51.0
51.0
51.0
63.5
63.5
51.0

12.0 (Bend)
7.1 (Bend)
7.1 (Straight)
7.1 (Bend)
8.0 (Straight)
12.5 (Bend)
12.0

12.0
7.1
7.1
7.1
8.0
12.5
12.0

8.8
5.3
6.3
5.4
6.4
6.0
5.7

0.6
0.6
0.6
1.0
1.0
-

SA213T22
SA213T91
SA213T91
SA213TP347H
SA213TP347H
SA213TP347H
SA213T91

196.3
196.3
196.3
196.3
196.3
196.3
196.3

183.3
183.3
183.3
183.3
183.3
183.3
183.3

531
568
588
598
581
562
588

531
518
538
548
531
512
538

$
583
603
610
601
587
Insert

51.0
508.0

12.0
110.0

12.0
96.3

4.8
@

SA213TP347H
SA335P22

196.3
191.3

183.3
178.0

598
540

548
540

Insert
$

60.0

Material
specification

Pressure Kg/cm2 (g)


Design Working

Temperature oC
Design Working

Notes:
$
Outside gas path
@ After generation of Drawing.
Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.
Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW
Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 15 of 22
Approved by : VBR/KR

Gas side
metal
temp. oC
$

PRESSURE PARTS SCHEDULE


(Reheater System)
Sl.
no.

Description

No.
off

Size
OD
mm

Thick.
mm

Min. order
thickness
mm

1.
2.

RH DESH
RH Pendant
inlet header
RH front
coils

2
1

660.0
457.2

20.0
28.0

814

44.5
44.5
44.5
63.5
54.0
54.0
54.0
54.0
54.0
54.0
54.0
63.5
63.5
63.5

3.

5.0 (Bend)
6.3 (Bend)
8.0 (Bend)
4.5 (Bend)
4.0 (Bend)
4.0 (Bend)
4.5 (Bend)
4.5 (Bend)
4.5 (Straight)
6.3 (Bend)
4.0 (Straight)
4.0 (Bend)
4.0 (Bend)
4.0 (Bend)

Erosion
allowance
mm

17.5
24.5

Min.
Insitu
thickness
mm
@
@

5.0
6.3
8.0
6.3
4.0
4.0
4.5
4.5
4.5
6.3
4.0
4.0
4.0
4.0

1.8
1.8
1.8
2.3
2.5
3.1
2.2
3.1
3.7
3.1
2.6
2.1
3.2
3.0

0.6
0.6
0.6
0.6
0.6
1.0
-

Material
specification

Pressure
Kg/cm2(g)
Design Working

Temperature oC
Design Working

Gas side
metal
temp. 0C

SA106Gr.C
SA106Gr.C

54.0
52.4

44.7
44.7

361
361

351
351

$
$

SA213T11
SA213T11
SA213T11
SA213T11
SA213T22
SA213T22
SA213T22
SA213T22
SA213T22
SA213T22
SA213T91
SA213T91
SA213TP347H
SA213T22

52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4

44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7

352
352
352
352
506
507
483
507
535
508
545
517
556
517

352
352
352
352
506
468
483
468
496
469
506
517
517
517

$
$
$
$
$
509
$
517
537
511
547
$
558
$

$ Outside gas path

@ After Generation of Drawing.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 16 of 22
Approved by : VBR/KR

PRESSURE PARTS SCHEDULE


(Reheater System)
Sl.
no.

Description

No.
off

Size
OD
mm

4.

RH Rear
Coils

814

5.

RH Outlet
Header
(Siamese)

54.0
54.0
54.0
54.0
54.0
54.0
54.0
54.0
63.5
54.0
54.0
558.8

Notes: $ Outside gas path

Thick.
mm
4.5 (Bend)
4.0 (Bend)
4.5 (Bend)
6.3 (Bend)
6.3 (Bend)
4.0 (Bend)
4.0 (Bend)
4.0 (Bend)
4.0 (Bend)
3.6 (Bend)
3.6 (Straight)
60.0

Min. order
thickness
mm
4.5
4.0
4.5
6.3
6.3
4.0
4.0
4.0
4.0
3.6
3.6
52.5

Min.
Insitu
thickness
mm
2.4
2.5
3.8
3.8
3.7
3.4
2.7
2.1
2.1
2.6
2.8
@

Erosion
allowance
mm

Material
specification

0.6
0.6
1.0
1.0
0.6
0.6
0.6
-

SA213T22
SA213T22
SA213T22
SA213T22
SA213T22
SA213T91
SA213T91
SA213T91
SA213T91
SA213TP347H
SA213TP347H
SA335P22

Pressure
Kg/cm2(g)
Design Working
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4
52.4

44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
44.7
42.5

Temperature oC
Design Working
498
506
538
540
519
582
552
556
517
571
595
540

498
506
499
501
480
543
513
556
517
532
556
540

@ After generation of Drawing.

Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev 03
Date
TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
Prepared by :
GA
TP-SC-209-100-0014
Reviewed by :
VBR
Sheet 17 of 22
Approved by : VBR/KR

Gas side
metal
temp. 0C
$
$
540
543
522
585
555
$
$
573
597
$

PRESSURE PARTS SCHEDULE


(Steam Cooled Spacer)
Sl.
No.

Description

No.
off

1.

Steam
cooled
spacers for
Platen SH

51

Steam
cooled
spacers for
RH
Steam
cooled
spacers for
Panellette
SH

2.

Size
OD
mm

Thick mm.

Min. order
thickness
mm

Min. Insitu
thickness
mm

Erosion
allowance
mm

5 (Bend)

5.0

3.8

51

7.1 (Bend)

7.1

5.9

1.0

51

5 (Bend)

5.0

3.8

51

7.1 (Bend)

7.1

5.8

63.5

9.0 (Bend)

9.0

63.5

8.0 (Bend)

51.0

Material
specification

Pressure Kg/cm2 (g)


Design Working

SA210 GR C

206.9

193.9

367

367

Gas side
metal
temp.
oC
$

SA213T11

206.9

193.9

456

406

477

SA210 GR C

206.9

193.9

368

368

1.0

SA213T11

206.9

193.9

445

406

460

5.5

SA213T22

201.7

188.7

469

469

8.0

6.1

1.0

SA213TP347H

201.7

188.7

519

469

542

7.1 (Bend)

7.1

5.1

1.0

SA213TP347H

201.7

188.7

501

451

522

63.5

7.1 (Bend)

7.1

5.1

SA213T22

201.7

188.7

406

406

63.5

12.5

12.5

6.1

1.0

SA213TP347H

201.7

188.7

519

469

INSERT

Temperature oC
Design
Working

Notes:
$
Outside gas path
Data for main pipes and tubes are furnished. For other components the product drawings may please be referred.

Project : NTPC / VINDHYACHAL STPP - STAGE III - 2 x 500 MW


Rev. 03
Prepared by
Reviewed by
Approved by

:
:
:

GA
VBR
VBR/KR

Date

TITLE : Pressure parts schedule for Eco, Circ,SH,RH,Drum with tube metal temp. calculation
TP-SC-209-100-0014
Sheet 18 of 22