BGR Energy Systems Ltd.

POWER PROJECT DIVISION

DOCUMENT NO: GID-091-CV-CAL-3481C


WAGON TIPPLER DESIGN OF FOUNDATION

KHAPERKHEDA TPS (1X500 MW ) EXPANSION PROJECT


WAGON TIPPLER COMPLEX DESIGN OF FOUNDATION

BGR ENERGY SYSTEMS LIMITED


POWER PROJECTS DIVISION
443, ANNA SALAI
TEYNAMPET, CHENNAI - 600018
PH 044 24326171, FAX 044 24315678
E Mail ppd@bgrenergy.com

01.07.08

KSB

NR

TVBSSM

09.05.08

KSB

NR

TVBSSM

DATE

Rev

PREPARED BY

CLEARED BY

APPROVED BY

BGR Energy Systems Ltd.


POWER PROJECT DIVISION

DOCUMENT NO: GID-091-CV-CAL-3481C


WAGON TIPPLER DESIGN OF FOUNDATION

REVISION HISTORY
Rev_A

First Submission

Rev_B

Revised as per DCPL Comments vide


DCPL_K5V14/KHP-BOP-C/V6/257 DATED 23-06-08
AND MEETING HELD AT DCPL VASHI FROM 24-0608 TO 26-06-08

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
1 of

Rev

292

CONTENTS
1 GENERAL ................................................................................................................................................4
1.1 SCOPE.......................................................................................................................................................4
1.2 UNITS OF MEASUREMENTS...................................................................................................................4
1.3 CODES AND REFERENCES ....................................................................................................................4
1.4 MATERIAL PROPERTIES ........................................................................................................................5
1.5 PLANT SITE INFORMATION....................................................................................................................5
1.6 MACHINE DATA .......................................................................................................................................5
1.7 SOFTWARE REFERENCE .......................................................................................................................5
2 DESCRIPTION OF STRUCTURE & GEOMETRY...................................................................................6
3 ANALYSIS OF STRUCTURAL SHED .....................................................................................................9
3.1 STAAD INPUT FILE ................................................................................................................................11
3.2 SUPPORT REACTIONS..........................................................................................................................14
4 ANALYSIS OF FOUNDATION...............................................................................................................15
4.1 PRIMARY LOADS ...................................................................................................................................16
4.1.1

DEAD LOAD - (DL)...............................................................................................................16

4.1.2

LIVE LOADS.........................................................................................................................17

4.2 COAL LOAD(HOPPER FULL ) ...............................................................................................................18


Refer D.M walkers theory ........................................................................................................................18
4.3 EARTH PRESSURE & HYDROSTATIC PRESSURE LOADS...............................................................21
4.4 LOADS FROM APRON FEEDOR ON RAFT BEAM ..............................................................................26
4.5 Loads from WAGON TIPPLER ..............................................................................................................26
5 LOAD COMBINATIONS ........................................................................................................................27
5.1 COMBINATION-1 ....................................................................................................................................27
5.2 COMBINATION-2 ....................................................................................................................................27
5.3 COMBINATION-3 ....................................................................................................................................27
6 ANALYSIS OF SUB STRUCTURE........................................................................................................28
6.1 FRAME - 1 ...............................................................................................................................................28
6.1.1

STAAD SKETCHES .............................................................................................................28

6.1.2

STAAD-Pro Analysis Input For Frame 1 ...........................................................................38

6.1.3

Support Reactions For Frame 1 ........................................................................................44

6.2 FRAME 1a ............................................................................................................................................46


6.2.1

STAAD SKETCHES .............................................................................................................46

6.2.2

STAAD-Pro Analysis Input For Frame 1a .........................................................................55

6.2.3

Support Reactions For Frame 1a ......................................................................................60

6.3 FRAME - 2 ...............................................................................................................................................62


6.3.1

STAAD SKETCHES .............................................................................................................62

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
2 of

Rev

292

6.3.2

STAAD-Pro Analysis Input For Frame 2 ...........................................................................75

6.3.3

Support Reactions For Frame 2 ........................................................................................83

6.4 FRAME - 3 ...............................................................................................................................................88


6.4.1

STAAD SKETCHES .............................................................................................................88

6.4.2

STAAD-Pro Analysis Input For Frame 3 .........................................................................101

6.4.3

Support Reactions For Frame 3 ......................................................................................110

6.5 FRAME - 4 .............................................................................................................................................111


6.5.1

STAAD SKETCHES ...........................................................................................................111

6.5.2

STAAD-Pro Analysis Input For Frame 4 .........................................................................123

6.5.3

Support Reactions For Frame 4 ......................................................................................131

6.6 FRAME - 5 .............................................................................................................................................133


6.6.1

STAAD SKETCHES ...........................................................................................................133

6.6.2

STAAD-Pro Analysis Input For Frame 5 .........................................................................142

6.6.3

Support Reactions For Frame 5 ......................................................................................146

7 ANALYSIS FOR COUNTERFORTS ....................................................................................................147


7.1 CF 8.....................................................................................................................................................147
7.1.1

STAAD SKETCHES ...........................................................................................................147

7.1.2

STAAD-Pro Analysis Input For CF - 8................................................................................151

7.1.3

Support Reactions For CF 8............................................................................................152

7.2 CF 9 153
7.2.1

STAAD SKETCHES ...........................................................................................................153

7.2.2

STAAD-Pro Analysis Input For CF - 9................................................................................157

7.2.3

Support Reactions For CF 9............................................................................................158

7.3 CF 10....................................................................................................................................................159
7.3.1

STAAD SKETCHES ...........................................................................................................159

7.3.2

STAAD-Pro Analysis Input For CF - 10..............................................................................163

7.3.3

Support Reactions For CF 10..........................................................................................164

7.4 CF 11....................................................................................................................................................165
7.4.1

STAAD SKETCHES ...........................................................................................................165

7.4.2

STAAD-Pro Analysis Input For CF - 11..............................................................................169

7.4.3

Support Reactions For CF 11..........................................................................................170

7.5 CF 12....................................................................................................................................................171
7.5.1

STAAD SKETCHES ...........................................................................................................171

7.5.2

STAAD-Pro Analysis Input For CF - 12..............................................................................175

7.5.3

Support Reactions For CF 12..........................................................................................176

7.6 CF 13....................................................................................................................................................177
7.6.1

STAAD SKETCHES ...........................................................................................................177

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
3 of

Rev

292

7.6.2

STAAD-Pro Analysis Input For CF - 13..............................................................................181

7.6.3

Support Reactions For CF 13..........................................................................................182

8 ANALYSIS OF BASE RAFT ................................................................................................................183


8.1 STAAD SKETCHES ..............................................................................................................................183
8.2 STAAD-Pro ANALYSIS INPUT ............................................................................................................186
9 ANALYSIS RESULTS PRESSURE ON SOIL:.................................................................................232
10 DESIGN OF BASE RAFT ....................................................................................................................234
10.1

CHECK FOR PUNCHING SHEAR .............................................................................................237

11 DESIGN OF COUNTERFORTS ...........................................................................................................239


11.1

DESIGN OF CF8.........................................................................................................................239

11.2

DESIGN OF CF9.........................................................................................................................245

11.3

DESIGN OF CF11.......................................................................................................................253

11.4

DESIGN OF CF12.......................................................................................................................258

11.5

DESIGN OF CF13.......................................................................................................................263

12 DESIGN OF WALLS ............................................................................................................................268


13 CHECK FOR BUOYANCY IN BUILDING PORTION ..........................................................................271
14 CHECK FOR CRACKWIDTH IN RAFT ...............................................................................................275
15 DESIGN OF COLUMNS276

7/1/08 7:13 PM

BGR Energy Systems Ltd.

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
4 of

Rev

292

GENERAL

1.1

SCOPE

This document covers the design of Base Raft, Columns, Walls & Counterforts for Wagon tippler
complex for 1x500 MW Expansion project for Khaparkheda TPS.

1.2

UNITS OF MEASUREMENTS

Units of measurements used in analysis shall be of SI Units.

1.3

CODES AND REFERENCES

The following codes and standards have been referred:


Project Reference Drawings / Documents
1
2
3
4
5
6
7

GID-091-CV-DWG3001
207060-II
GID-091-CHP-1503
SHT 1 OF 2
GID-091-CHP-1503
SHT 2 OF 2
TP8674/OS
GID-091-CV-DWG3481
GID-091-CV-DWG3482-REV C

TP8674/OS

9
10

IS 456 - 2000
IS 1893-Part12002
IS 875 Part-1
IS 875 Part-2

11
12

Civil Design Basis Report


Interim Geotechnical Investigation Report
MECH GA & LAYOUT OF WAGON TIPPLER COMPLEX
MECH GA & LAYOUT OF WAGON TIPPLER COMPLEX
WAGON TIPPLER-FOUNDATION DETAILS OF SIDE DISCHARGE
CIVIL GA OF WAGON TIPPLER COMPLEX
WAGON TIPPLER-NUMERATION & RC DETAILS OF BASE RAFT
Machine Manufacturers Drawings
WAGON TIPPLER-FOUNDATION DETAILS OF SIDE DISCHARGE
CODES FOR DESIGN OF FOUNDATION
Plain and Reinforced Concrete Indian Standard Code of Practice
Criteria for Earthquake Resistant Structures
Code of practice for design loads Dead loads
Code of practice for design loads Imposed loads

7/1/08 7:13 PM

BGR Energy Systems Ltd.

1.4

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

5 of
Rev

292

MATERIAL PROPERTIES
Material

Property

Value

Units

25

kN/ cum

Concrete,
M25

Density
Characteristic
Strength
Modulus of
Elasticity

25

N/ Sq mm

Reinforcing
Steel

1.5

Page

Density
Characteristic
Strength
Modulus of
Elasticity

25000

Remarks
IS : 875 Part - 1

N/ sq mm

78.5

kN/ cum

500

N/ sq mm

200000

N/ sq mm

IS-456 (2000)
IS-456 (2000)

PLANT SITE INFORMATION

Location of the Site

:Khaparkheda, Maharashtra

Plant Elevation

:RL (+) 292.100 corresponds to FFL(+)0.000 of Power Block

Seismic zone

:Zone II as per IS : 1893 - 2002

1.6

MACHINE DATA

The machine and foundation arrangement with the loads are specified in ELECON drawings/Documents,
Ref. [3] to [10].

1.7

SOFTWARE REFERENCE

STAAD - Pro, Research Engineers Inc., Bentley, USA


The above software package is renowned and well used and accepted internationally for similar type of
structural analysis carried out in this document.

7/1/08 7:13 PM

BGR Energy Systems Ltd.

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
6 of

Rev

292

DESCRIPTION OF STRUCTURE & GEOMETRY

The geometry is considered as per ELECON drawings Ref [3] to [9]. Wagon Tippler complex Comprises
of an Underground RCC portion and a structural steel shed with sheeting. The Underground portion
( Coal Hopper and machinery Hatches) consists of RCC frames spaced at 3.5m c/c with RCC wall panels
on the sides and RCC raft at the bottom fixed to the frames.
The counterfort columns along the sides and the raft beam forms a closed continuous structural frame
placed at the stated intervals. The intermediate space is filled by RCC panels all around except at the
top. The coal hopper arrangement can be seen from the GA drawing as below
Basic geometric dimensions assumed for counterforts, coulmns and beams are furnished in the figures
shown below. :

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
7 of

Rev

292

Soil Support Below Foundation:

The soil support is modeled as spring supports and details of spring stiffness used in the analysis are as
below.
The foundation for the structure has been modeled as a raft on elastic soil. The soil spring value for the
frame spaced at 3.5 m c/c and support placed at 0.9965 m c/c has been calculated as follows
As the soil investigation report allowable bearing pressure at 10 m below FGL is 300 kN/m2 corresponds
to 25 mm settlement. In the Hopper portion
As the soil investigation report allowable bearing pressure at 20 m below FGL is 400 kN/m2 corresponds
to 25 mm settlement in the Tunnel portion
For Frame 1 & Frame 1a spring constants are calculated as follows
The soil spring constants are estimated using cross hole shear test results furnished by client.
From test results,
Shear modulus of soil below the foundation, G

= 1.11E+6 KN/m2

Poissons ratio of soil

= 0.33

Depth of embedment below ground level

= 13.5m

Total area of the raft

= 384.048 m2

Average horizontal dimension perpendicular to rocking axis(L)

= Raft area/length = 384.048/22.86


= 16.8m

Raft dimension parallel to rocking

= 22.86m

From fig. 4.12 of Hand Book of Machine Foundations by Sri P. Srinivasulu and C.V Vaidyanathan
z

= 2.1

=1

Vertical stiffness of soil for raft, Kz

= G z Sqrt(BL) / (1-) = 6.81E+07 KN/m

Horizontal stiffness of soil for raft, Kx

= 2(1+)G x Sqrt(BL) = 5.78E+07 KN/m

Vertical stiffness of soil for raft, Kz


=6.81E+07 X 3.5 * 0.9965/384.048 =
( for influence width of 3.5m & 0.9965m)

618453.3 KN/m

Horizontal stiffness of soil for raft, Kx


=5.78E+07 X 3.5 * 0.9965/384.048 =
( for influence width of 3.5m & 0.9965m)

524913.4 KN/m

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
8 of

Rev

292

For Base Raft spring constants are calculated as follows

The soil spring constants are estimated using cross hole shear test results furnished by client.
From test results,
Shear modulus of soil below the foundation, G

= 1.095E+6 KN/m2

Poissons ratio of soil

= 0.3386

Depth of embedment below ground level

= 17.6m

Total area of the raft

= 353.187 m2

Average horizontal dimension perpendicular to rocking axis(L)

= Raft area/length = 353.187/22.86


= 15.45m

Raft dimension parallel to rocking

= 22.86m

From fig. 4.12 of Hand Book of Machine Foundations by Sri P. Srinivasulu and C.V Vaidyanathan
z

= 2.1

=1

Vertical stiffness of soil for raft, Kz

= G z Sqrt(BL) / (1-) = 6.53E+07 KN/m

Horizontal stiffness of soil for raft, Kx

= 2(1+)G x Sqrt(BL) = 5.51E+07 KN/m

7/1/08 7:13 PM

BGR Energy Systems Ltd.

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Title

WAGON TIPPLER Design of Foundation

Doc. No.

GID-091-CV-CAL-3481C

Page
9 of

Rev

292

ANALYSIS OF STRUCTURAL SHED

Loading on Portal Roof


Spacing of Portal
Spacing of Purlins

=
=

1.00m

14.75m

1.00m

14.75m

7.0 m
1.3 m

1.00m

13.15m
16.15m

Y
Z

Load 1

LOAD COMPUTATION
a) DEAD LOAD
1) Selfweight of Sheeting + Fixtures
2) Selfweight of Purlin (MC150)
3) Dust Load
4) Selfweight of Truss & Bracings
Threfore ,Total load of sheeting + fixtures + truss + bracings =
Additional Selfweight of Purlin

0.06 + 0.15 + 0.25

0.060
0.168
0.250
0.150

=
=

2
0.460 kN / m
2
0.168 kN / m

LOAD DISTRIBUTION AT NODES

AT NODE 101 TO 120


O

0.46 X 7.0 X ( 1.3/2 + 1.3/2 ) X COS 18 + 0.168 X 7.0 = 5.157 KN


AT NODE 99 100

=
=
=
=

0.46 X 7.0 X ( 1.05/2 + 1.3/2 ) X COS 18 + 0.168 X 7.0 = 4.775 KN


AT NODE 96, 97, 121, 122

0.46 X 7.0 X ( 1.31/2 ) X COS 18O + 0.168 X 7.0 = 3.182 KN


AT NODE 95 98
O

0.46 X 7.0 X ( 1.05/2 ) X COS 18 + 0.168 X 7.0 = 2.784 KN

7/1/08 7:13 PM

kN / m
2
kN / m
2
kN / m
2
kN / m

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

10 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

b) LIVE LOAD
1) Live load = 0.59 KN/m2

0.59 kN / m2

LOAD DISTRIBUTION AT NODES


AT NODE 101 TO 120

0.59 X 7.0 X ( 1.3/2 + 1.3/2 ) X COS 18O = 5.132 KN


AT NODE 99 100

0.59 X 7.0 X ( 1.05/2 + 1.3/2 ) X COS 18O = 4.638 KN

AT NODE 96, 97, 121, 122

0.59 X 7.0 X ( 1.31/2 ) X COS 18O = 2.585 KN


AT NODE 95, 98

0.59 X 7.0 X ( 1.05/2 ) X COS 18O = 2.062 KN

C) WIND LOADS
k1
=
k2
=
k3
=
Vb
=
Vz
=

1.07
1.06
1
44
49.905

=
wind pressure on first span(a)
=
wind pressure on next span(b)
wind pressure on first inter span(c) =
wind pressure on first inter span(d) =

FORCE
COMP.

Pcos

Psin

P COS

External pressure coeff (cpe)


b
a
c
d
-0.60
-0.78
-0.3 -0.48

(for category II & class B structure)


m/sec
m/sec
Design pressure Pd
1.49 (-0.78+-0.7)
1.49 (-0.6+-0.7)
1.49 (-0.3+-0.7)
1.49 (-0.48+-0.7)
FORCE AT
FORCE AT
NODE 95
NODE 99

=
=
=
=
=
FORCE AT
119

1.49
-2.21
-1.94
-1.49
-1.76
NODE
FORCE AT
120
121

cpi
-0.7

As per Table 16
of IS: 875 (Part-3)

kN / m2
kN / m2
kN / m2
kN / m2
kN / m2
FORCE AT
NODE 96
NODE
97
121

2.21X7(1.2 1.76X7(1.2
2.21X7X(0.52
2.21X7(1.2/2)0.9
2.21X7(1.21/ 1.94X7(1.2
1/2+1.3/2)0 1/2+m/2)0.
5+1.3/2)X0.95
1.94X7X(0 1.49X7X(0.07
51=
2)0.951=
1/2)0.951=
.951=
951=
1=
.075+1.3/2 5+1.3/2)X0.95
)X0.951=
1=
7.19
17.29 KN 8.83
18.46
KN
14.704 KN 8.9
7.81 KN 9.36
FORCE AT FORCE AT NODE
FORCE AT
FORCE AT
NODE
NODE 101 105 102 106 110
FORCE AT
NODE 122
NODE 103
104 108
109 113 117
122
114 118
100
112 116
98
107 111 115
2.21X7X(1.3/2
1.49X7X(1. 1.76X7X(1. 1.76X7X(1.3/ 1.76X7X(0/ 1.49X7X(0
1.94X7X(1.3/2+
1.76X7X(0/2+
+1.3/2)X0.951
3/2+1.3/2) 3/2+1.05/2) 2+1.3/2)X0.9 2+1.05/2)X /2+1.3/2)X
1.3/2)X0.951=
1.3/2)X0.951=
=
X0.951=
51=
0.951=
0.951=
X0.951=

= 18
cos =0.951
sin = 0.309

19.13 KN
FORCE AT
NODE 99

P SIN

KN
13.767
12.89
15.23
FORCE AT
FORCE AT
NODE
NODE 95
FORCE AT
119
120
2.22
1.81
2.26
KN
KN

6.2 KN

6.50
7.67
FORCE AT
NODE 96
97
NODE 121
KN
2.21X7X(1.05
1.94X7(0.
2.21X7(1.21/ 1.76X7(1.21/
+1.3/2)X0.309 2.21X7(0+1.2/2)0.
2.21X7(0+1.21/ 1.94X7(0+1.
075+1.3/2) 1.49X7(0.075
2+1.3/2)0.30 2+1.3/2)0.30
309=
2)0.309=
21/2)0.309=
=
9=
9=
0.309= +1.3/2)0.309=
3.04
2.54
6.00
5.62
2.89
KN 2.87
KN
4.78 KN
2.34
FORCE AT
FORCE AT FORCE AT NODE
FORCE AT NODE
FORCE AT
NODE 122
NODE 103
NODE 101 105 102 106 110
104 108
122
100
112 116
98
107 111 115
109 113 117 114 118
16.79

2.21X7X(1.3/2
1.49X7X(1. 1.76X7X(1. 1.76X7X(1.3/ 1.76X7X(0/ 1.49X7X(0
1.76X7X(0/2+
1.94X7X(1.3/2+
+1.3/2)X0.309
3/2+1.3/2) 05/2+1.3/2) 2+1.3/2)X0.3 2+1.05/2)X /2+1.3/2)X
1.3/2)X0.309=
1.3/2)X0.309=
0.309=
0.309=
=
X0.309=
X0.309=
09=
6.21
KN 5.46
Wind load due to side cladding runners =

KN 4.19
1.2X7X1.49=

4.47 KN

4.95

KN 2.09
12.52 kN/m

The Analysis of the Portal has been done in STAAD & the forces against each member has been obtained from the
STAAD output against each load cases based on which the structural design of individual members of the Portal is done
which is presented in the following pages of this design document.

7/1/08 7:13 PM

2.47

BGR Energy Systems Ltd.

3.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

11 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD INPUT FILE

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 03-APR-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 1 0 0; 5 31.5 0 0; 6 32.5 0 0; 7 0 1.5 0; 8 1 1.5 0; 11 31.5 1.5 0;
12 32.5 1.5 0; 13 0 3 0; 14 1 3 0; 15 15.75 3 0; 16 16.75 3 0; 17 31.5 3 0;
18 32.5 3 0; 19 0 4.5 0; 20 1 4.5 0; 21 15.75 4.5 0; 22 16.75 4.5 0;
23 31.5 4.5 0; 24 32.5 4.5 0; 25 0 6 0; 26 1 6 0; 27 15.75 6 0; 28 16.75 6 0;
29 31.5 6 0; 30 32.5 6 0; 31 0 7.5 0; 32 1 7.5 0; 33 15.75 7.5 0;
34 16.75 7.5 0; 35 31.5 7.5 0; 36 32.5 7.5 0; 37 0 9 0; 38 1 9 0; 39 15.75 9 0;
40 16.75 9 0; 41 31.5 9 0; 42 32.5 9 0; 43 0 10.5 0; 44 1 10.5 0;
45 15.75 10.5 0; 46 16.75 10.5 0; 47 31.5 10.5 0; 48 32.5 10.5 0; 49 0 12 0;
50 1 12 0; 51 15.75 12 0; 52 16.75 12 0; 53 31.5 12 0; 54 32.5 12 0;
55 0 13.5 0; 56 1 13.5 0; 57 15.75 13.5 0; 58 16.75 13.5 0; 59 31.5 13.5 0;
60 32.5 13.5 0; 61 0 15 0; 62 1 15 0; 63 15.75 15 0; 64 16.75 15 0;
65 31.5 15 0; 66 32.5 15 0; 67 0 16.15 0; 68 1 16.15 0; 69 2.24321 16.15 0;
70 3.48641 16.15 0; 71 4.72968 16.15 0; 72 5.97289 16.15 0; 73 7.2161 16.15 0;
74 8.375 16.15 0; 75 9.60942 16.15 0; 76 10.8375 16.15 0; 77 12.0657 16.15 0;
78 13.2938 16.15 0; 79 14.5219 16.15 0; 80 15.75 16.15 0; 81 16.75 16.15 0;
82 17.9781 16.15 0; 83 19.2062 16.15 0; 84 20.4343 16.15 0; 85 21.6625 16.15 0;
86 22.8906 16.15 0; 87 24.125 16.15 0; 88 25.2839 16.15 0; 89 26.5271 16.15 0;
90 27.7703 16.15 0; 91 29.0136 16.15 0; 92 30.2568 16.15 0; 93 31.5 16.15 0;
94 32.5 16.15 0; 95 0 17.15 0; 96 15.75 17.15 0; 97 16.75 17.15 0;
98 32.5 17.15 0; 99 1 17.4557 0; 100 31.5 17.4557 0; 101 14.5219 17.5763 0;
102 17.9781 17.5763 0; 103 2.24322 17.8357 0; 104 30.2568 17.8357 0;
105 13.2938 18.0026 0; 106 19.2062 18.0026 0; 107 3.48643 18.2157 0;
108 29.0136 18.2157 0; 109 12.0657 18.4289 0; 110 20.4343 18.4289 0;
111 4.72965 18.5957 0; 112 27.7703 18.5957 0; 113 10.8375 18.8552 0;
114 21.6625 18.8552 0; 115 5.97287 18.9757 0; 116 26.5271 18.9757 0;
117 9.60942 19.2815 0; 118 22.8906 19.2815 0; 119 7.21608 19.3558 0;
120 25.2839 19.3558 0; 121 8.375 19.71 0; 122 24.125 19.71 0; 123 9.75 16.15 0;
124 22.7496 16.15 0;
MEMBER INCIDENCES
1 1 7; 2 1 8; 3 2 8; 7 5 11; 8 6 11; 9 6 12; 10 7 8; 12 12 11; 13 7 13;
14 8 13; 15 8 14; 19 11 17; 20 11 18; 21 12 18; 22 13 14; 24 18 17; 25 13 19;
26 13 20; 27 14 20; 28 15 21; 29 15 22; 30 16 22; 31 17 23; 32 18 23; 33 18 24;
34 19 20; 35 21 22; 36 24 23; 37 19 25; 38 20 25; 39 20 26; 40 21 27; 41 22 27;
42 22 28; 43 23 29; 44 23 30; 45 24 30; 46 25 26; 47 27 28; 48 30 29; 49 25 31;
50 25 32; 51 26 32; 52 27 33; 53 27 34; 54 28 34; 55 29 35; 56 30 35; 57 30 36;
58 31 32; 59 33 34; 60 36 35; 61 31 37; 62 32 37; 63 32 38; 64 33 39; 65 34 39;
66 34 40; 67 35 41; 68 35 42; 69 36 42; 70 37 38; 71 39 40; 72 42 41; 73 37 43;
74 37 44; 75 38 44; 76 39 45; 77 39 46; 78 40 46; 79 41 47; 80 42 47; 81 42 48;
82 43 44; 83 45 46; 84 48 47; 85 43 49; 86 44 49; 87 44 50; 88 45 51; 89 46 51;
90 46 52; 91 47 53; 92 47 54; 93 48 54; 94 49 50; 95 51 52; 96 54 53; 97 49 55;
98 49 56; 99 50 56; 100 51 57; 101 51 58; 102 52 58; 103 53 59; 104 54 59;
105 54 60; 106 55 56; 107 57 58; 108 60 59; 109 55 61; 110 56 61; 111 56 62;
112 57 63; 113 58 63; 114 58 64; 115 59 65; 116 59 66; 117 60 66; 118 61 62;
119 63 64; 120 66 65; 121 61 67; 122 61 68; 123 62 68; 124 63 80; 125 63 81;
126 64 81; 127 65 93; 128 66 93; 129 66 94; 130 67 68; 131 68 69; 132 69 70;
133 70 71; 134 71 72; 135 72 73; 136 73 74; 137 74 75; 139 76 77; 140 77 78;
141 78 79; 142 79 80; 143 80 81; 144 82 81; 145 83 82; 146 84 83; 147 85 84;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

12 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

149 87 86; 150 88 87; 151 89 88; 152 90 89; 153 91 90; 154 92 91; 155 93 92;
156 94 93; 157 95 67; 158 95 68; 159 96 79; 160 96 80; 161 81 97; 162 97 82;
163 98 93; 164 94 98; 165 68 99; 166 99 69; 167 100 92; 168 93 100; 169 101 78;
170 79 101; 171 82 102; 172 102 83; 173 69 103; 174 103 70; 175 104 91;
176 92 104; 177 105 77; 178 78 105; 179 83 106; 180 106 84; 181 96 97;
182 70 107; 183 107 71; 184 108 90; 185 91 108; 186 109 76; 187 77 109;
188 84 110; 189 110 85; 190 95 99; 191 98 100; 192 96 101; 193 97 102;
194 71 111; 195 111 72; 196 112 89; 197 90 112; 198 113 75; 199 76 113;
200 85 114; 201 114 86; 202 72 115; 203 115 73; 204 116 88; 205 89 116;
206 99 103; 207 100 104; 208 117 74; 209 75 117; 210 86 118; 211 118 87;
212 73 119; 213 119 74; 214 120 87; 215 88 120; 216 101 105; 217 102 106;
218 74 121; 219 87 122; 220 103 107; 221 104 108; 222 105 109; 223 106 110;
224 107 111; 225 108 112; 226 109 113; 227 110 114; 228 111 115; 229 112 116;
230 113 117; 231 114 118; 232 115 119; 233 116 120; 234 117 121; 235 118 122;
236 119 121; 237 120 122; 240 123 76; 241 124 85; 242 75 123; 243 124 86;
MEMBER PROPERTY INDIAN
181 TABLE ST ISMB250
143 TABLE ST ISMB450
130 TO 137 139 TO 142 144 TO 147 149 TO 156 240 TO 243 TABLE ST ISMB600
190 TO 193 206 207 216 217 220 TO 237 TABLE LD ISA65X65X6 SP 0.008
158 159 162 163 165 TO 180 182 TO 189 194 TO 205 208 TO 215 218 219 TABLE LD ISA50X50X6 SP 0.008
2 8 14 20 26 29 32 38 41 44 50 53 56 62 65 68 74 77 80 86 89 92 98 101 104 110 113 116 122 125 128 TABLE LD ISA50X50X6 SP 0.008
10 12 22 24 34 TO 36 46 TO 48 58 TO 60 70 TO 72 82 TO 84 94 TO 96 106 TO 108 118 TO 120 TABLE LD ISA50X50X6 SP 0.008
MEMBER PROPERTY EUROPEAN
1 3 7 9 13 15 19 21 25 27 28 30 31 33 37 39 40 42 43 45 49 51 52 54 55 57 61 63 64 66 67 69 73 75 76 78 79 81 85 87 88 90 91 93 97 99 100 102 103 105 109 111 112 114 115 117 121 123 124 126 127 129 157 160 161 164 TABLE ST IPE400
SUPPORTS
1 2 5 6 15 16 PINNED
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 78.5
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
CONSTANTS
BETA 90 MEMB 1 3 7 9 13 15 19 21 25 27 28 30 31 33 37 39 40 42 43 45 49 51 52 54 55 57 61 63 64 66 67 69 73 75 76 78 79 81 85 87 88 90 91 93 97 99 100 102 103 105 109 111 112 114 115 117 121 123 124 126 127 129 157 160 161 164
MATERIAL STEEL ALL
CUT OFF MODE SHAPE 25
**--------------------------------------LOAD 1 DEAD LOAD
SELFWEIGHT Y -1
JOINT LOAD
101 TO 120 FY -5.157
99 100 FY -4.775
95 98 FY -2.784
96 97 121 FY -3.182
121 122 FY -3.182

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

13 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

*DUE TO MONORAIL LOAD


123 FY -150
124 FY -150
**-------------LOAD 2 LIVE LOAD
JOINT LOAD
101 TO 120 FY -5.11
99 100 FY -4.62
95 98 FY -2.06
96 97 121 FY -2.57
121 122 FY -2.57
**-------------LOAD 3 WIND LOAD
JOINT LOAD
103 107 111 115 FX -6.21 FY 19.13
101 105 109 113 117 FX 5.46 FY 16.79
102 106 110 114 118 FX -4.19 FY 12.89
104 108 112 116 FX 4.95 FY 15.23
99 FX -5.62 FY 17.29
95 FX -2.87 FY 8.83
119 FX -6 FY 18.46
121 FX 2.89 FY 8.9
121 FX -2.54 FY 7.81
96 FX 3.04 FY 9.36
97 FX -2.34 FY 7.19
122 FX 2.09 FY 6.5
122 FX -2.47 FY 7.67
120 FX 4.78 FY 14.704
100 FX 4.47 FY 13.767
98 FX 2 FY 6.15
MEMBER LOAD
1 13 25 37 49 61 73 85 97 109 121 157 UNI GX 12.52
**------------------------LOAD COMB 4 DL + LL
1 1.0 2 1.0
LOAD COMB 5 DL + WL
1 1.0 3 1.0
LOAD COMB 6 DL +LL + WL
1 1.0 2 1.0 3 1.0
**---------------------------------PERFORM ANALYSIS PRINT STATICS CHECK
LOAD LIST 1 TO 3
PRINT SUPPORT REACTION
PARAMETER 1
CODE INDIAN
BEAM 1 MEMB 1 3 7 9 13 15 19 21 25 27 28 30 31 33 37 39 40 42 43 45 49 51 52 54 55 57 61 63 64 66 67 69 73 75 76 78 79 81 85 87 88 90 91 93 97 99 100 102 103 105 109 111 112 114 115 117 121 123 124 126 127 129 157 160 161 164
MAIN 180 MEMB 1 3 7 9 13 15 19 21 25 27 28 30 31 33 37 39 40 42 43 45 49 51 52 54 55 57 61 63 64 66 67 69 73 75 76 78 79 81 85 87 88 90 91 93 97 99 100 102 103 105 109 111 112 114 115 117 121 123 124 126 127 129 TO 137 139 TO 147 149 TO 157 160 161 164 181 240 241
MAIN 250 MEMB 2 8 10 12 14 20 22 24 26 29 32 34 TO 36 38 41 44 46 TO 48 50 53 56 58 TO 60 62 65 68 70 TO 72 74 77 80 82 TO 84 86 89 92 94 TO 96 98 101 104 106 TO 108 110 113 116 118 TO 120 122 125 128 158 159 162 163 165 TO 180 182 TO 237

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

14 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

CMY 0.85 MEMB 1 TO 3 7 TO 10 12 TO 15 19 TO 22 24 TO 137 139 TO 147 149 TO 237 240 241
CMZ 0.85 MEMB 1 TO 3 7 TO 10 12 TO 15 19 TO 22 24 TO 137 139 TO 147 149 TO 237 240 241
KY 0.85 MEMB 2 8 10 12 14 20 22 24 26 29 32 34 TO 36 38 41 44 46 TO 48 50 53 56 58 TO 60 62 65 68 70 TO 72 74 77 80 82 TO 84 86 89 92 94 TO 96 98 101 104 106 TO 108 110 113 116 118 TO 120 122 125 128 130 143 156 TO 237
KZ 0.85 MEMB 2 8 10 12 14 20 22 24 26 29 32 34 TO 36 38 41 44 46 TO 48 50 53 56 58 TO 60 62 65 68 70 TO 72 74 77 80 82 TO 84 86 89 92 94 TO 96 98 101 104 106 TO 108 110 113 116 118 TO 120 122 125 128 130 143 156 TO 237
*LY 3.35 MEMB 1 13 25 37 49 61 73 85 97 109 121 161
*LZ 3.35 MEMB 1 22 31 60 78 89
*DEFLECTION CHECK
*DFF 500 MEMB 7 19 31 43 55 67 79 91 103 115 127
TRACK 0 MEMB 1 TO 3 7 TO 10 12 TO 15 19 TO 22 24 TO 137 139 TO 147 149 TO 237 240 241
*RATIO 1 ALL
RATIO 1.33 ALL
CHECK CODE ALL
STEEL TAKE OFF ALL
FINISH

3.2

SUPPORT REACTIONS

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT
1

15

16

LOAD
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3

FORCE-X
9.11
2.33
-150.03
-0.25
-0.06
0.53
0.25
0.06
0.40
-9.06
-2.24
-21.36
0.46
0.02
-44.03
-0.51
-0.10
1.03

FORCE-Y
96.66
25.08
-695.75
29.62
8.02
567.36
28.37
7.55
-298.78
96.34
24.25
223.76
154.70
31.71
-483.68
153.14
31.79
274.62

FORCE-Z
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM-X
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM-Y
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM Z
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

15 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

ANALYSIS OF FOUNDATION

The loading pattern and magnitudes for various structural components are given below :The side wall panels are subjected to lateral thrust due to earth pressure at rest, hydrostatic pressure
and a surcharge load.
The vertical walls of coal hopper is subjected to normal pressure from confined coal, assumed filled
To the top. The inclined hopper wall and the supporting beams is not only subjected to normal pressure
but also a tangential force acting downwards along the slope.
Effects of dead load and live load from the superstructure also been taken into consideration.
Counterforts supporting the Tippler table are designed for the load from wagon tippler.
A 2-D frame is modeled for the Coal hopper including counterforts by staad pro software, all the loads
As stated above have been incorporated into the model and appropriate boundary conditions have
been considered in the model.

7/1/08 7:13 PM

BGR Energy Systems Ltd.

4.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

16 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

PRIMARY LOADS

Following load cases are considered in the static analysis of WAGON TIPPLER foundation.

4.1.1

DEAD LOAD - (DL)

1. Self weight of the Structure


The self weight of the structure is considered in STAAD-Pro internally for the modeled members. The
weight of the soil has been applied on the modeled members at corresponding locations.
The density of the soil is considered as 18 KN/cum.

Self weight of Grizzly over Hopper Beam HB1 assumed@150kg/m2

1.5x 3.0 =4.5 kN/m

1. Self weight of the Hopper vertical wall on hopper rib beam HB2
Given hopper wall thickness
Liner thickness

=
=

350
10

mm
mm

Height of vertical wall

3.859

Load due to wall = 0.35 x 3x25


Load due to liner= 0.01x3x 78.5

=
=

26.25 kN/m
2.4745 kN/m

Total

28.99 say

30

kN/m

2. Self weight of the Hopper inclined wall on hopper rib beam HB2

Self weight of wall


Self weight of liner

=0.35 x 3 x 25 =
=0.01x3.5x78.5 =

26.25 kN/m
2.7475 kN/m

Total

28.99 say

0.8x0.8x25x3.5

56

kN

130
310

kN
kN

17.5

kN/m

Self weight of HB6 at top of HB2

30

kN/m

3. Dead load from steel shed


Dead load from superstructure at endCol. =
Dead load from superstructure at midCol. =

4. Dead load from Pit slab on HB3


Assumed as 200 thk = 0.2x 3.5 x2.5

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

17 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

5. Load on the Drive pit wall


Height of wall
Thickness of wall

=
=

1.975
250

m
mm

Load due to wall

3.5x 1.975 x 0.25 x25

43.2

kN

=
=
=
=
=

52.5
58
6.3
13.125
4.2

kN/m
kN/m
kN/m
kN/m
kN/m

Total load on raft beam

134.2

kN/m say 135 kN/m

Load due to short post


=
of Apron feedor
Dead load due to Apron =
Pedestals supporting beams

75X2

=150

36

kN

6. Load due to raft and filling on raft beam


All loads are calculated for 3.5 m width
Self weight of raft
Weight of SOIL fill
Weight of pcc
Weight of grade slab
Weight of Floorf finish

=
=
=
=
=

0.7x 3 x 25
1.075x3x18
0.075x3.5x24
0.15x3.5x25
0.05x3.5x24

0.6X0.8*3.0X25

kN (vertical)

7. Load due to self weight of wall & kern + soil on kern + surcharge 20 kN/m2
Assuming the wall thickness of varying from 500 mm to 700 mm
Self weight of wall

0.5(0.5+0.7)x10.4x25x3 =

468

Self weight of kern

2.23 x0.7x3x25

117.07 kN

Self weight of soil

2.23 x3.0x10.4x18

1252.4 kN

Surcharge

20x3.5x2.23

156.1

1993.5 say

Total

4.1.2

kN

kN

2000

kN

LIVE LOADS

8. Live load from steel shed


Live load from superstructure at endCol. =
Live load from superstructure at midCol. =

33
65

kN
Kn

17.5
17.5

kN/m
kN/m

9. Live load from Pit slab


Assumed as 500 kg/m2 = 5 x 3.5
Live load on raft Beam =5 x 3.5

=
=

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

4.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

18 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

COAL LOAD(HOPPER FULL )


Refer D.M walkers theory

Bulk density of coal

1.1 T/m3

Angle of Internal friction(repose)

35 degrees

Angle of coal concrete friction

32 degrees(0.9 times of internal friction)

25 degrees

Hopper half-apex angle

0.5[ + sin-1(sin/sin )]

0.5[32 + sin-1(sin32/sin35)]

sin sin 2( + )

11

49.75

kN/m3

degrees

1- sin .cos 2( + )
B

sin 35 sin 2(25 +49.75)


1- sin 35.cos 2(25 + 49.75)

0.195

BD/tan

0.195x1/tan25 =

Vo

surcharge at the top of inclined hopper = h

Taking D = 1 for accurate results

0.418

=11 (5.06)

=55.66 kN/m2

Vertical pressure at any point in hopper at a height h from the apex

Normal stress W =

h[1-(h/ho)C-1] + Vo[h/ho]C
C-1

V x

1+ sin cos (2 )

0.605 V

1- sin cos 2( + )

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

19 of

Doc. No.

GID-091-CV-CAL-3481C

V
kN/m2

Rev

h (m)

ho(m)

h/ho

Vo
kN/m2

W
kN/m2

N
kN/m2

2.058

5.2

0.4

55.66

65.60

39.69

67.41

59.45

3.879

5.2

0.75

55.66

62.88

38.04

64.61

56.99

5.2

5.2

55.66

55.66

33.67

57.20

50.45

292

T
kN/m2

VERTICAL STRESS IS DIVIDED INTO TWO COMPONENTS ONE IS NORMAL AND ANOTHER IS
TANGENTIAL.
N

V x SIN 25 + W

V x COS 25

V
T

W
B

1.457

A
250

1.457

Total tangential force along slope at B

1/2x(59.45+56.99)x1.457

84.82 kN/m

Total tangential force along slope at C

1/2x(50.45+56.99)x1.457

78.27 kN/m

Vertical wall
K

1-sin
1+ sin

1-sin 35
1+ sin 35

0.271

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

20 of

Doc. No.

GID-091-CV-CAL-3481C

Horizontal pressure at Top

Horizontal pressure at Bottom =

Rev

0.27 x 11 X 0

0.27x 11 X 5.061

15.087 kN/m2

kN/m2

Frame -1 Load calculation ( 3.5 m c/c of frames)


Horizontal UDL at top of vertical portion

3.5x0

kN/m2

Horizontal UDL at bottom of vertical portion

3.5x15.087

52.8

kN/m

Inclined UDL at C (top of inclined portion)

3.5x57.2

200.2

kN/m

Inclined UDL at B (middle of inclined portion)

3.5x64.61

226.13 kN/m

Inclined UDL at A (bottom of inclined portion)

3.5x67.41

235.93 kN/m

Total tangential force along slope at B

3.5x84.82

296.87 kN

Total tangential force along slope at C

3.5x78.27

273.94 kN

For Frame -2 & Frame-3 the Half of the above Loads are Considered

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

4.3

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

21 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE & HYDROSTATIC PRESSURE LOADS

UNIT WEIGHT OF SOIL

18 kN/m3

UNIT WEIGHT OF WATER

10 kN/m3

WATER PRESSURE AT BOTTOM OF RAFT

SURCHARGE

10X(13.076-6) =

70.76 kN/m2
10 kN/m2

EARTH PRESSURE CALCULATION FOR FRAME-1 & FRAME 1a

Ph kN/m2-CASE-2

3.5
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1
EP WITH
SURCHARGE &
SUB SOIL
PRESSURE

1.975
3.325
4.325
5.325
6.325
7.325
8.325
9.325
10.325
11.325
13.075

32.78
42.43
50.43
57.93
68.55
82.55
96.55
110.55
124.55
138.55
163.05

17.78
29.93
38.93
47.93
56.93
65.93
74.93
83.93
92.93
101.93
117.68

114.7
148.5
176.5
202.7
239.9
288.9
337.9
386.9
435.9
484.9
570.7

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2
EP WITHOUT
SURCHARGE &
SUB SOIL
PRESSURE
62.21
104.7
136.2
167.7
199.2
230.7
262.2
293.7
325.2
356.7
411.9

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

22 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATION FOR FRAME-2

Ph kN/m2-CASE-2

2.85
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERF
ORT-CASE-1
EP WITH
SURCHARG
E & SUB
SOIL
PRESSURE

1.975
3.325
4.325
5.325
6.325
7.325
8.325
9.325
10.325
11.325
13.075

32.78
42.43
50.43
57.93
68.55
82.55
96.55
110.55
124.55
138.55
163.05

17.78
29.93
38.93
47.93
56.93
65.93
74.93
83.93
92.93
101.93
117.68

93.41
120.9
143.7
165.1
195.4
235.3
275.2
315.1
355
394.9
464.7

m
Mpa
Mpa
mm

UDL ON
COUNTERFO
RT-CASE-2
EP WITHOUT
SURCHARGE
& SUB SOIL
PRESSURE
50.66
85.29
110.9
136.6
162.2
187.9
213.5
239.2
264.8
290.5
335.4

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

23 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATION FOR FRAME-3

Ph kN/m2-CASE-2

2.85
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1
EP WITH
SURCHARGE &
SUB SOIL
PRESSURE

1.975
3.325
4.325
5.325
6.325
7.325
8.325
9.325
10.325
11.325
12.325
13.325
14.325
15.325
16.325
18.075

32.78
42.43
50.43
57.93
68.55
82.55
96.55
110.55
124.55
138.55
152.55
166.55
180.55
194.55
208.55
233.05

17.78
29.93
38.93
47.93
56.93
65.93
74.93
83.93
92.93
101.93
110.93
119.93
128.93
137.93
146.93
162.68

93.41
120.9
143.7
165.1
195.4
235.3
275.2
315.1
355
394.9
434.8
475
515
554.5
594
664

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2
EP WITHOUT
SURCHARGE &
SUB SOIL
PRESSURE
50.66
85.29
110.9
136.6
162.2
187.9
213.5
239.2
264.8
290.5
316.1
341.8
367.4
393.1
418.7
463.6

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

24 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATION FOR FRAME-4

Ph kN/m2-CASE-2

3.413
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1
EP WITH
SURCHARGE &
SUB SOIL
PRESSURE

0
1.2
2.2
3.55
4.55
5.55
6.55
7.55
8.55
9.55
10.55
11.55
12.55
13.55
14.55
15.55
16.55
17.3
18.3

15.00
25.80
34.80
44.45
52.45
59.95
71.70
85.70
99.70
113.70
127.70
141.70
155.70
169.70
183.70
197.70
211.70
222.20
236.20

0.00
10.80
19.80
31.95
40.95
49.95
58.95
67.95
76.95
85.95
94.95
103.95
112.95
121.95
130.95
139.95
148.95
155.70
164.70

51.2
88.06
118.8
151.7
179
204.6
244.7
292.5
340.3
388.1
435.8
483.6
531.4
579
627
674.8
723
758
806

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2
EP WITHOUT
SURCHARGE &
SUB SOIL
PRESSURE
0
36.86
67.58
109
139.8
170.5
201.2
231.9
262.6
293.3
324.1
354.8
385.5
416.2
446.9
477.6
508.4
531.4
562.1

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

25 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATION FOR FRAME-5

Ph kN/m2-CASE-2

3.588
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1
EP WITH
SURCHARGE &
SUB SOIL
PRESSURE

0
1.2
2.2
3.55
4.55
5.55
6.55
7.55
8.55
9.55
10.55
11.55
12.55
13.55
14.55
15.55
16.55
17.3
18.3

15.00
25.80
34.80
44.45
52.45
59.95
71.70
85.70
99.70
113.70
127.70
141.70
155.70
169.70
183.70
197.70
211.70
222.20
236.20

0.00
10.80
19.80
31.95
40.95
49.95
58.95
67.95
76.95
85.95
94.95
103.95
112.95
121.95
130.95
139.95
148.95
155.70
164.70

53.81
92.56
124.8
159.5
188.2
215.1
257.2
307.4
357.7
407.9
458.1
508.3
558.6
609
659
709.2
759
797
847

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2
EP WITHOUT
SURCHARGE &
SUB SOIL
PRESSURE
0
38.75
71.03
114.6
146.9
179.2
211.5
243.8
276.1
308.3
340.6
372.9
405.2
437.5
469.8
502.1
534.4
558.6
590.9

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

4.4

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

26 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

LOADS FROM APRON FEEDOR ON RAFT BEAM

Load due to Apron feeder (ref Mech G.A) Horizontal load

20

kN

Torsional Moment due to Apron feeder load =

12.5

kN.m

4.5

20x0.625

Loads from WAGON TIPPLER

FOR LOADS & LOADCOMBINATIONS OF WAGON TIPPLER REFER ELECON DRAWINGS


DRAWING NO TP8674 / OS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

5.1

Page

Title

WAGON TIPPLER Design of Foundation

27 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

COMBINATION-1

Dead load
Live load
Hopper full load
Maximum Load from Railway Track
Earth pressure without surcharge and sub-soil water pressure
Maximum load from steel column shed
Maximum load from Apron feeder support

COMBINATION-2

i)
ii)
iii)
iv)
v)
vi)
vii)

5.3

KHAPARKHEDA TPS 1X500MW Expansion Project

LOAD COMBINATIONS

i)
ii)
iii)
iv)
v)
vi)
vii)

5.2

Project

Dead load
Live load
Hopper full
Maximum Load from Railway Track
Earth pressure with surcharge and subsoil water pressure
Maximum load from steel column shed
Maximum Load from Apron feeder

COMBINATION-3

i)
ii)
iii)
iv)
v)
vi)
vii)

Dead load
Live load
Hopper full
No load from Railway Track
Earth pressure with surcharge and subsoil water pressure
No load from steel column shed
DL only from Apron feeder

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

28 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

ANALYSIS OF SUB STRUCTURE

6.1
6.1.1

FRAME - 1
STAAD SKETCHES

THREE DIMENSIONAL VIEW OF FRAME - 1

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

29 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

6
10
51

11
52
53

50

75

76

77

78

79

46

47

54

49

12

22

48

73

62

13

55

63
23

25

27

26

24

56

64
14
15

57

16
17

18
19

20
21

65

58

66

59

67

60

68

61

69

74

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

NODE NUMBERS

7/1/08 7:13 PM

72

71

70

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

30 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

62

60

64

54
88

57
6

59
89

90

292

61

63

87

86

56

55

58

65

13

81
73

14

66

74
16

18 30 20

67

27

31

24

68

22

32

26

17

69

75

29
28

19

25
21

76

23

77

70

78

71

79

72

80

1 4

85

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52 2

MEMBER NUMBERS

7/1/08 7:13 PM

84

83

82

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

31 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-310.000 kN
-56.000 kN
-4.500 kN/m

-56.000 kN
-4.500 kN/m

-43.200 kN
-35.000
kN/m
-35.000
kN/m
kN/m
-130.000 -35.000
kN -35.000
kN/m
-35.000
kN/m
-30.000 kN/m
-17.500 kN/m
-43.200 kN
-30.000 kN/m

-43.200 kN
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-130.000 kN
-35.000
kN/m
-35.000
kN/m
-30.000 kN/m
-17.500 kN/m
-30.000 kN/m

-30.000 kN/m

-30.000 kN/m -30.000-30.000


kN/m kN/m -30.000 kN/m
-30.000 kN/m
-30.000 kN/m-30.000 kN/m
-30.000 kN/m
-2e+003 kN

-2e+003 kN

-135.000
-135.000
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
kN/m
kN/m

-190.000 kN-190.000 kN-190.000 kN-190.000 kN

Loading Diagram Load Case -1 - Dead Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

32 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-65.000 kN

-33.000 kN

-33.000 kN
-17.500 kN/m

-17.500 kN/m

-17.500
-17.500
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
kN/m
kN/m

Loading Diagram Load Case - 2 - Live Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

33 of

Doc. No.

GID-091-CV-CAL-3481C

0 kN/m
-4.170 kN/m

Rev

-496.540 kN
0 kN/m

-248.270 kN
-269.000
kN
-39.130
kN/m
-200.200 kN/m
115.770
-52.800
kN kN/m

292

0 kN/m
4.170 kN/m

-248.270 kN
-269.000-269.000
kN
kN
-200.200
-200.200
kN/m kN/m
115.770
52.800
-52.800
kN-115.770
kN/m
kN/m kN

-269.000
39.130kN
kN/m
-200.200 kN/m
52.800-115.770
kN/m kN

-226.130 kN/m -226.130 kN/m


-226.130 kN/m
-226.130 kN/m
125.500 kN
125.500
-125.500
kN kN
-125.500 kN
-235.930
kN/m
-235.930
kN/m

-235.930
kN/m
-235.930
kN/m

Loading Diagram Load Case - 3 Coal Load (Hopper Full)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

34 of

Doc. No.

GID-091-CV-CAL-3481C

114.700 kN/m
148.500 kN/m
176.500 kN/m
202.700 kN/m
239.900 kN/m
288.900
kN/m kN
-430.000
337.900 kN/m
386.900 kN/m
435.900 kN/m
484.900 kN/m

Rev

292

-114.700 kN/m
-148.500 kN/m
-176.500 kN/m
-202.700 kN/m
-239.900 kN/m
-288.900
-430.000
kN kN/m
-337.900 kN/m
-386.900 kN/m
-435.900 kN/m
-484.900 kN/m

570.700 kN/m
-570.700 kN/m
242.990
242.990
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
242.990
kN/m
kN/m
kN/m

Loading Diagram Load Case - 5 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

35 of

Doc. No.

GID-091-CV-CAL-3481C

62.210 kN/m
104.700 kN/m
136.200 kN/m
167.700 kN/m
199.200 kN/m
230.700 kN/m
262.200 kN/m
293.700 kN/m
325.200 kN/m
356.700 kN/m

411.900 kN/m

Rev

292

-62.210 kN/m
-104.700 kN/m
-136.200 kN/m
-167.700 kN/m
-199.200 kN/m
-230.700 kN/m
-262.200 kN/m
-293.700 kN/m
-325.200 kN/m
-356.700 kN/m

-411.900 kN/m

Loading Diagram Load Case - 6 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

36 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

20.000 kN
12.500 kNm

20.000 kN
12.500 kNm

20.000 kN
12.500 kNm

20.000 kN
12.500 kNm

Load 7

Loading Diagram Load Case - 7 Apron Feeder Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

37 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

44.000 kN

150.000 kN

210.000 kN

21.400 kN
75.000 kN

129.000 kN

Loading Diagram Load Case - 8 Wind On Shed

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.1.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

38 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

STAAD-PRO ANALYSIS INPUT FOR FRAME 1

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 12-Mar-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0.875 0; 2 19.93 0.875 0; 3 9.965 0.875 0; 5 19.93 11.226 0;
6 9.965 14.226 0; 10 4.483 13.626 0; 11 15.447 13.626 0; 12 4.483 8.566 0;
13 15.447 8.566 0; 14 5.94 5.925 0; 15 5.94 5.425 0; 16 8.29 5.925 0;
17 8.29 5.425 0; 18 11.64 5.925 0; 19 11.64 5.425 0; 20 13.99 5.925 0;
21 13.99 5.425 0; 22 9.965 8.566 0; 23 5.2115 7.2455 0; 24 14.7185 7.2455 0;
25 9.1275 7.2455 0; 26 10.8025 7.2455 0; 27 9.965 7.2455 0; 28 0.9965 0.875 0;
29 1.993 0.875 0; 30 2.9895 0.875 0; 31 3.986 0.875 0; 32 4.9825 0.875 0;
33 5.979 0.875 0; 34 6.9755 0.875 0; 35 7.972 0.875 0; 36 8.9685 0.875 0;
37 10.9615 0.875 0; 38 11.958 0.875 0; 39 12.9545 0.875 0; 40 13.951 0.875 0;
41 14.9475 0.875 0; 42 15.944 0.875 0; 43 16.9405 0.875 0; 44 17.937 0.875 0;
45 18.9335 0.875 0; 46 0 9.876 0; 47 4.483 9.876 0; 48 19.93 9.876 0;
49 15.447 9.876 0; 50 0 11.226 0; 51 4.483 13.226 0; 52 15.447 13.226 0;
53 9.965 12.826 0; 54 0 8.876 0; 55 0 7.876 0; 56 0 6.876 0; 57 0 5.876 0;
58 0 4.876 0; 59 0 3.876 0; 60 0 2.876 0; 61 0 1.876 0; 62 19.93 8.876 0;
63 19.93 7.876 0; 64 19.93 6.876 0; 65 19.93 5.876 0; 66 19.93 4.876 0;
67 19.93 3.876 0; 68 19.93 2.876 0; 69 19.93 1.876 0; 70 26.395 9.876 0;
71 25.395 9.876 0; 72 24.395 9.876 0; 73 23.395 9.876 0; 74 22.395 9.876 0;
75 -6.465 9.876 0; 76 -5.465 9.876 0; 77 -4.465 9.876 0; 78 -3.465 9.876 0;
79 -2.465 9.876 0;
MEMBER INCIDENCES
1 1 61; 2 2 69; 3 3 27; 4 1 28; 5 3 37; 6 22 53; 13 12 47; 14 13 49; 16 12 23;
17 14 15; 18 22 25; 19 16 17; 20 22 26; 21 18 19; 22 13 24; 23 20 21; 24 23 14;
25 24 20; 26 25 16; 27 23 25; 28 26 18; 29 24 26; 30 27 22; 31 25 27; 32 27 26;
35 28 29; 36 29 30; 37 30 31; 38 31 32; 39 32 33; 40 33 34; 41 34 35; 42 35 36;
43 36 3; 44 37 38; 45 38 39; 46 39 40; 47 40 41; 48 41 42; 49 42 43; 50 43 44;
51 44 45; 52 45 2; 54 47 51; 55 46 47; 56 48 5; 57 49 52; 58 48 49; 59 46 50;
60 51 10; 61 52 11; 62 53 6; 63 51 53; 64 53 52; 65 54 46; 66 55 54; 67 56 55;
68 57 56; 69 58 57; 70 59 58; 71 60 59; 72 61 60; 73 62 48; 74 63 62; 75 64 63;
76 65 64; 77 66 65; 78 67 66; 79 68 67; 80 69 68; 81 48 74; 82 71 70; 83 72 71;
84 73 72; 85 74 73; 86 46 79; 87 76 75; 88 77 76; 89 78 77; 90 79 78;
DEFINE MATERIAL START
ISOTROPIC CONCRETE

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

39 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 2 56 59 65 TO 80 PRIS YD 2.93 ZD 0.5
3 6 30 62 PRIS YD 1.4 ZD 0.5
13 14 16 TO 29 31 32 54 57 60 61 63 64 PRIS YD 0.8 ZD 0.5
4 5 35 TO 52 PRIS YD 1.5 ZD 0.5
MEMBER PROPERTY INDIAN
55 58 81 86 PRIS YD 2.7 ZD 0.5
MEMBER PROPERTY INDIAN
85 90 PRIS YD 2.36 ZD 0.5
84 89 PRIS YD 2.02 ZD 0.5
83 88 PRIS YD 1.68 ZD 0.5
82 87 PRIS YD 1.34 ZD 0.5
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER OFFSET
1 2 START 0 -0.75 0
55 81 START 1.465 0 0
58 86 START -1.465 0 0
85 90 START 0 0.17 0
85 90 END 0 0.17 0
84 89 START 0 0.34 0
84 89 END 0 0.34 0
83 88 START 0 0.51 0
83 88 END 0 0.51 0
82 87 START 0 0.68 0
82 87 END 0 0.68 0
3 START 0 0.75 0
SUPPORTS
3 28 TO 45 FIXED BUT MY MZ KFX 524913 KFY 618453
1 2 FIXED BUT MY MZ KFX 262456 KFY 309226
*****************************************************
LOAD 1 DL DEAD LOAD
*****************************************************
SELFWEIGHT Y -1

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

40 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

*LOAD DUE TO SELF WEIGHT OF WALL+LOAD DUE TO SELF WEIGHT OF SOIL & KERN
JOINT LOAD
1 2 FY -2000
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
JOINT LOAD
6 FY -310
* AT END COLUMNS
MEMBER LOAD
82 87 CON GY -130
* LOAD DUE TO SELF WEIGHT OF HOPPER INCLINED WALL +
*LOAD DUE TO SELF WEIGHT OF HOPPER VERTICAL WALL
MEMBER LOAD
6 13 14 16 TO 26 28 54 57 UNI GY -30
*LOAD DUE TO SELF WEIGHT OF RAFT+SANDFILL+PCC+GRADE SLAB ON RAFT BEAM
5 36 TO 50 UNI GY -135
35 UNI GY -135 0.5 0.9965
51 UNI GY -135 0 0.5
*LOAD DUE TO APRON FEEDER pedestals + supporting beams ON BOTTOM RAFT BEAM
39 42 44 47 CON GY -190
* LOAD DUE TO PIT SLAB
55 58 UNI GY -17.5
* LOAD DUE TO PIT WALL
JOINT LOAD
5 47 50 FY -43.2
*LOAD DUE TO SELFWEIGHT OF LONGITUDINAL BEAM HB6 ON TOP OF HB2
10 11 FY -56
MEMBER LOAD
63 64 UNI GY -4.5
*DEAD LOAD DUE TO SOIL & SURCHARGE N BRACKET BEAM
81 TO 90 UNI GY -35
****************************************
LOAD 2 LL LIVE LOAD
***************************************
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
JOINT LOAD
6 FY -65
* AT END COLUMNS
MEMBER LOAD

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

41 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

82 87 CON GY -33
*LOAD DUE TO WALKWAY PIT SLAB @ 5 kN/m2
55 58 UNI GY -17.5
*LIVE LOAD ON RAFT BEAM
5 36 TO 50 UNI GY -17.5
35 UNI GY -17.5 0.5 0.9965
51 UNI GY -17.5 0 0.5
***************************************
LOAD 3 COAL LOAD (HOPPER FULL)
****************************************
*LOAD DUE TO COAL
MEMBER LOAD
6 TRAP GX 52.8 0
6 TRAP GX -52.8 0
14 TRAP GX 52.8 39.13
16 18 20 22 TRAP Y -200.2 -226.13
24 TO 26 28 TRAP Y -226.13 -235.93
JOINT LOAD
12 13 FY -248.27
22 FY -496.54
12 22 FX 115.77
13 22 FX -115.77
23 TO 26 FY -269
23 26 FX 125.5
24 25 FX -125.5
MEMBER LOAD
57 TRAP GX 39.13 4.17
61 TRAP GX 4.17 0
13 TRAP GX -52.8 -39.13
54 TRAP GX -39.13 -4.17
60 TRAP GX -4.17 0
*******************************************
LOAD 4 TRACK LOAD
*LOAD DUE TO RAIL TRACK
******************************************************************
LOAD 5 LOADTYPE None TITLE EARTH PRESSURE INCLUDING SURCHARGE(W.TAT6MBELOWFGL)
******************************************************************
*LOAD DUE TO EARTH PRESSURE
MEMBER LOAD
1 TRAP GX 570.7 484.9

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

42 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

72 TRAP GX 484.9 435.9


71 TRAP GX 435.9 386.9
70 TRAP GX 386.9 337.9
69 TRAP GX 337.9 288.9
68 TRAP GX 288.9 239.9
67 TRAP GX 239.9 202.7
66 TRAP GX 202.7 176.5
65 TRAP GX 176.5 148.5
59 TRAP GX 148.5 114.7
2 TRAP GX -570.7 -484.9
80 TRAP GX -484.9 -435.9
79 TRAP GX -435.9 -386.9
78 TRAP GX -386.9 -337.9
77 TRAP GX -337.9 -288.9
76 TRAP GX -288.9 -239.9
75 TRAP GX -239.9 -202.7
74 TRAP GX -202.7 -176.5
73 TRAP GX -176.5 -148.5
56 TRAP GX -148.5 -114.7
*************************************
*LOAD DUE TO WATER PRESSURE
* 7.076 x 9.81 = 242.99
4 5 35 TO 52 UNI GY 242.99
*LOAD DUE TO DOUNWARD WATER PRESUURE WHEN WTABLE IS AT 6 M BELOW FGL
JOINT LOAD
1 2 FY -430
**********************************************************
LOAD 6 EARTH PRESSURE WITHOUT SURCHARGE (WATER TABLE BELOW RAFT)
**********************************************************
MEMBER LOAD
1 TRAP GX 411.9 356.7
72 TRAP GX 356.7 325.2
71 TRAP GX 325.2 293.7
70 TRAP GX 293.7 262.2
69 TRAP GX 262.2 230.7
68 TRAP GX 230.7 199.2
67 TRAP GX 199.2 167.7
66 TRAP GX 167.7 136.2
65 TRAP GX 136.2 104.7
59 TRAP GX 104.7 62.21

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

43 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

2 TRAP GX -411.9 -356.7


80 TRAP GX -356.7 -325.2
79 TRAP GX -325.2 -293.7
78 TRAP GX -293.7 -262.2
77 TRAP GX -262.2 -230.7
76 TRAP GX -230.7 -199.2
75 TRAP GX -199.2 -167.7
74 TRAP GX -167.7 -136.2
73 TRAP GX -136.2 -104.7
56 TRAP GX -104.7 -62.21
********************************************
LOAD 7 APRON FEEDER LOAD
***********************************************
MEMBER LOAD
39 42 44 47 CON GZ 20
39 42 44 47 CMOM X 12.5
********************************************
LOAD 8 WIND ON SHED
***********************************************
JOINT LOAD
6 FX 44 FY 210
* AT END COLUMNS
MEMBER LOAD
87 CON GX 150
87 CON GY 129
82 CON GX 21.4
82 CON GY 75
***********************************************
*LOAD COMBINATIONS
*unfactored
LOAD COMB 9 DL + LL + HOP.FULL + TRACK + E.P(W.OSUR) + A.FLOAD+MAXLOADFROMSHED
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 7 1.0 8 1.0
LOAD COMB 10 DL + LL + HOP.FULL + TRACK + E.P(WTHSUR) + A.FLOAD+MAXLOADFROMSHED
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 7 1.0 8 1.0
LOAD COMB 11 DL + LL + HOP.FULL + E.P(WTHSUR)
1 1.0 2 1.0 3 1.0 5 1.0
*factored
LOAD COMB 12 DL + LL + HOP.FULL + TRACK + E.P(W.OSUR) + A.FLOAD+MAXLOADFROMSHED
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2 7 1.2 8 1.2
LOAD COMB 13 DL + LL + HOP.FULL + TRACK + E.P(WTHSUR) + A.FLOAD+MAXLOADFROMSHED

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

44 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 7 1.2 8 1.2


LOAD COMB 14 DL + LL + HOP.FULL + E.P(WTHSUR)
1 1.5 2 1.5 3 1.5 5 1.5
*LOAD COMB 12 IRC:DL +LL+ H0P.FULL + TR.LOAD + E.P(W.OSUR) + P.FLOAD + COALTRAY
*1 1.4 2 2.0 3 2.0 4 2.0 6 1.7 7 1.0
*LOAD COMB 13 IRC:DL + LL + H.FULL + T.LOAD + E.P.(WTH SUR) + P.FLOAD + COALTRAY
*1 1.4 2 2.0 3 2.0 4 2.0 5 1.7 7 1.0
PERFORM ANALYSIS PRINT STATICS CHECK
LOAD LIST 9 TO 11
PRINT SUPPORT REACTION
FINISH

6.1.3

SUPPORT REACTIONS FOR FRAME 1

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT LOAD
FORCE-X
FORCE-Y
FORCE-Z
MOM-X
MOM-Y
3

28

29

30

31

32

33

34

9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9

-15.57
-15.57
-0.49
-249.97
-335.48
-332.64
-206.43
-276.66
-273.19
-169.53
-226.72
-222.52
-138.07
-184.06
-178.99
-111.05
-147.31
-141.22
-87.59
-115.29
-107.97
-66.94

1175.20
955.56
991.50
1538.44
1435.63
1568.89
998.90
852.93
891.91
573.53
385.26
379.19
317.16
98.57
79.63
217.01
-18.69
-31.88
232.73
-9.48
-6.74
350.76

3.71
3.71
0.00
-0.01
-0.01
0.00
0.04
0.04
0.00
-0.26
-0.26
0.00
1.86
1.86
0.00
-11.59
-11.59
0.00
-11.89
-11.89
0.00
3.72

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM Z
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

35

36

37

38

39

40

41

42

43

44

45

10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

45 of

Doc. No.

GID-091-CV-CAL-3481C

-86.97
-78.20
-48.44
-61.45
-50.94
-31.50
-37.90
-25.31
4.38
10.78
24.56
24.47
37.48
50.39
45.35
65.38
77.85
67.68
95.38
107.80
92.18
128.45
141.22
119.65
165.63
179.17
150.96
208.14
222.87
187.11
257.33
273.73
229.27
314.79
333.39
-150.76
-202.54
-201.38
139.40
191.18
201.87

109.54
133.31
580.30
344.98
389.59
883.90
656.97
712.21
946.10
719.18
715.57
645.22
409.90
393.39
392.32
151.10
136.30
243.40
1.19
-5.00
198.96
-36.74
-31.65
280.27
61.68
77.88
539.71
351.43
374.76
1011.00
865.03
884.10
1670.08
1567.28
1557.86
992.23
947.66
1092.40
1171.44
1126.87
1086.61

3.72
0.00
-11.86
-11.86
0.00
-11.86
-11.86
0.00
-11.86
-11.86
0.00
-11.86
-11.86
0.00
3.72
3.72
0.00
-11.89
-11.89
0.00
-11.59
-11.59
0.00
1.86
1.86
0.00
-0.26
-0.26
0.00
0.04
0.04
0.00
-0.01
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
0.00
0.00
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

292

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.2
6.2.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

46 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

FRAME 1a
STAAD SKETCHES

Load 1

THREE DIMENSIONAL VIEW OF FRAME 1a

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

47 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

6
10
51

11
52

53

50

46

47

54

49

12

22

48
62

13

55

63
23

56

25 27 26
14
15

57

16
17

24
18
19

64

20
21

65

58

66

59

67

60

68

61

69

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

Load 1

NODE NUMBERS

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

48 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

62

60

292

61

63

64

54

57
6

59

56

55

58

65

13

73

14

66

74
16

18 30 20

67

27

31

24

68

32

26
17

22
75

29
28

19

25
21

76

23

69

77
3

70

78

71

79

72

80

1 4

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

Load 1

MEMBER NUMBERS

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

49 of

Doc. No.

GID-091-CV-CAL-3481C

-56.000 kN
-4.500 kN/m

Rev

292

-56.000 kN
-4.500 kN/m

-43.200 kN

-43.200 kN

kN/m
-17.500 kN/m -30.000
-43.200 kN
-30.000 kN/m
-30.000 kN/m

-30.000 kN/m -17.500 kN/m


-30.000 kN/m
-30.000 kN/m
-30.000 kN/m

-30.000 kN/m
-30.000 kN/m

-30.000 kN/m
-30.000 kN/m

-30.000 kN/m
-30.000 kN/m

-2e+003 kN

-2e+003 kN

-135.000
-135.000
-135.000
kN/m
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/m
-135.000
kN/mkN/m

-190.000 kN

-190.000 kN

-190.000 kN

-190.000 kN
Load 1

Loading Diagram Load Case -1 - Dead Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

50 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

-17.500 kN/m

292

-17.500 kN/m

-17.500
-17.500
-17.500
kN/m
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/m
-17.500
kN/mkN/m

Load 2

Loading Diagram Load Case - 2 - Live Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

51 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

0 kN/m
-4.170 kN/m

292

0 kN/m
4.170 kN/m
0 kN/m
-496.540 kN

-248.270
-39.130 kN
kN/m

-248.270
kN
39.130
kN/m

-200.200 kN/m
-269.000 kN
115.770
-52.800
kN kN/m

-200.200 kN/m
-200.200 kN/m
-269.000 kN
-269.000 kN
115.770
52.800
-52.800
-115.770
kN
kN/m
kN/m
kN

-226.130 kN/m
-226.130 kN/m
125.500 kN

-200.200 kN/m
-269.000 kN
52.800-115.770
kN/m kN

-226.130 kN/m
-226.130 kN/m

-125.500
125.500 kN
kN
-235.930kN/m
kN/m
-235.930

-125.500 kN
-235.930
-235.930kN/m
kN/m

Loading Diagram Load Case - 3 Coal Load (Hopper Full)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

52 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

114.700 kN/m

-114.700 kN/m

148.500 kN/m

-148.500 kN/m

176.500 kN/m

-176.500 kN/m

202.700 kN/m

-202.700 kN/m

239.900 kN/m

-239.900 kN/m

288.900 kN/m

-288.900 kN/m

337.900 kN/m

-337.900 kN/m

386.900 kN/m
-430.000 kN
435.900 kN/m
484.900 kN/m

-386.900 kN/m
-430.000 kN
-435.900 kN/m
-484.900 kN/m

242.900
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
242.900
kN/m
kN/m
570.700242.900
kN/m
-570.700 kN/m
Load
5 kN/m

Loading Diagram Load Case - 5 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

53 of

Doc. No.

GID-091-CV-CAL-3481C

62.210 kN/m

Rev

292

-62.210 kN/m

104.700 kN/m

-104.700 kN/m

136.200 kN/m

-136.200 kN/m

167.700 kN/m

-167.700 kN/m

199.200 kN/m

-199.200 kN/m

230.700 kN/m

-230.700 kN/m

262.200 kN/m

-262.200 kN/m

293.700 kN/m

-293.700 kN/m

325.200 kN/m

-325.200 kN/m

356.700 kN/m

-356.700 kN/m

411.900 kN/m

Load 6

-411.900 kN/m

Loading Diagram Load Case - 6 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

54 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

20.000 kN
12.500 kNm

20.000 kN
12.500 kNm

20.000 kN
12.500 kNm

20.000 kN
12.500 kNm

Load 7

Loading Diagram Load Case - 7 Apron Feeder Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.2.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

55 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

STAAD-PRO ANALYSIS INPUT FOR FRAME 1A

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 12-Mar-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0.875 0; 2 19.93 0.875 0; 3 9.965 0.875 0; 5 19.93 11.226 0;
6 9.965 14.226 0; 10 4.483 13.626 0; 11 15.447 13.626 0; 12 4.483 8.566 0;
13 15.447 8.566 0; 14 5.94 5.925 0; 15 5.94 5.425 0; 16 8.29 5.925 0;
17 8.29 5.425 0; 18 11.64 5.925 0; 19 11.64 5.425 0; 20 13.99 5.925 0;
21 13.99 5.425 0; 22 9.965 8.566 0; 23 5.2115 7.2455 0; 24 14.7185 7.2455 0;
25 9.1275 7.2455 0; 26 10.8025 7.2455 0; 27 9.965 7.2455 0; 28 0.9965 0.875 0;
29 1.993 0.875 0; 30 2.9895 0.875 0; 31 3.986 0.875 0; 32 4.9825 0.875 0;
33 5.979 0.875 0; 34 6.9755 0.875 0; 35 7.972 0.875 0; 36 8.9685 0.875 0;
37 10.9615 0.875 0; 38 11.958 0.875 0; 39 12.9545 0.875 0; 40 13.951 0.875 0;
41 14.9475 0.875 0; 42 15.944 0.875 0; 43 16.9405 0.875 0; 44 17.937 0.875 0;
45 18.9335 0.875 0; 46 0 9.876 0; 47 4.483 9.876 0; 48 19.93 9.876 0;
49 15.447 9.876 0; 50 0 11.226 0; 51 4.483 13.226 0; 52 15.447 13.226 0;
53 9.965 12.826 0; 54 0 8.876 0; 55 0 7.876 0; 56 0 6.876 0; 57 0 5.876 0;
58 0 4.876 0; 59 0 3.876 0; 60 0 2.876 0; 61 0 1.876 0; 62 19.93 8.876 0;
63 19.93 7.876 0; 64 19.93 6.876 0; 65 19.93 5.876 0; 66 19.93 4.876 0;
67 19.93 3.876 0; 68 19.93 2.876 0; 69 19.93 1.876 0;
MEMBER INCIDENCES
1 1 61; 2 2 69; 3 3 27; 4 1 28; 5 3 37; 6 22 53; 13 12 47; 14 13 49; 16 12 23;
17 14 15; 18 22 25; 19 16 17; 20 22 26; 21 18 19; 22 13 24; 23 20 21; 24 23 14;
25 24 20; 26 25 16; 27 23 25; 28 26 18; 29 24 26; 30 27 22; 31 25 27; 32 27 26;
35 28 29; 36 29 30; 37 30 31; 38 31 32; 39 32 33; 40 33 34; 41 34 35; 42 35 36;
43 36 3; 44 37 38; 45 38 39; 46 39 40; 47 40 41; 48 41 42; 49 42 43; 50 43 44;
51 44 45; 52 45 2; 54 47 51; 55 46 47; 56 48 5; 57 49 52; 58 48 49; 59 46 50;
60 51 10; 61 52 11; 62 53 6; 63 51 53; 64 53 52; 65 54 46; 66 55 54; 67 56 55;
68 57 56; 69 58 57; 70 59 58; 71 60 59; 72 61 60; 73 62 48; 74 63 62; 75 64 63;
76 65 64; 77 66 65; 78 67 66; 79 68 67; 80 69 68;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

56 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 2 56 59 65 TO 80 PRIS YD 2.93 ZD 0.5
3 6 30 62 PRIS YD 1.4 ZD 0.5
13 14 16 TO 29 31 32 54 57 60 61 63 64 PRIS YD 0.8 ZD 0.5
4 5 35 TO 52 PRIS YD 1.5 ZD 0.5
MEMBER PROPERTY INDIAN
55 58 PRIS YD 2.7 ZD 0.5
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER OFFSET
1 2 START 0 -0.75 0
55 START 1.465 0 0
58 START -1.465 0 0
3 START 0 0.75 0
SUPPORTS
3 28 TO 45 FIXED BUT MY MZ KFX 542168 KFY 634800
1 2 FIXED BUT MY MZ KFX 271084 KFY 317400
*****************************************************
LOAD 1 DL DEAD LOAD
*****************************************************
SELFWEIGHT Y -1
*LOAD DUE TO SELF WEIGHT OF WALL+LOAD DUE TO SELF WEIGHT OF SOIL & KERN
JOINT LOAD
1 2 FY -2000
* LOAD DUE TO SELF WEIGHT OF HOPPER INCLINED WALL +
*LOAD DUE TO SELF WEIGHT OF HOPPER VERTICAL WALL
MEMBER LOAD
6 13 14 16 TO 26 28 54 57 UNI GY -30
*LOAD DUE TO SELF WEIGHT OF RAFT+SAND/SOILFILL+PCC+GRADE SLAB ON RAFT BEAM
5 36 TO 50 UNI GY -135
35 UNI GY -135 0.5 0.9965
51 UNI GY -135 0 0.5
*LOAD DUE TO APRON FEEDER pedestals + supporting beams ON BOTTOM RAFT BEAM
39 42 44 47 CON GY -190
* LOAD DUE TO PIT SLAB
55 58 UNI GY -17.5
* LOAD DUE TO PIT WALL

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

57 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

JOINT LOAD
5 47 50 FY -43.2
*LOAD DUE TO SELFWEIGHT OF LONGITUDINAL BEAM HB6 ON TOP OF HB2
10 11 FY -56
MEMBER LOAD
63 64 UNI GY -4.5
*DEAD LOAD DUE TO SOIL & SURCHARGE N BRACKET BEAM
****************************************
LOAD 2 LL LIVE LOAD
***************************************
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
*JOINT LOAD
*6 FY -65
* AT END COLUMNS
MEMBER LOAD
*LOAD DUE TO WALKWAY PIT SLAB @ 5 kN/m2
55 58 UNI GY -17.5
*LIVE LOAD ON RAFT BEAM
5 36 TO 50 UNI GY -17.5
35 UNI GY -17.5 0.5 0.9965
51 UNI GY -17.5 0 0.5
***************************************
LOAD 3 COAL LOAD (HOPPER FULL)
****************************************
*LOAD DUE TO COAL
MEMBER LOAD
6 TRAP GX 52.8 0
6 TRAP GX -52.8 0
14 TRAP GX 52.8 39.13
16 18 20 22 TRAP Y -200.2 -226.13
24 TO 26 28 TRAP Y -226.13 -235.93
JOINT LOAD
12 13 FY -248.27
22 FY -496.54
12 22 FX 115.77
13 22 FX -115.77
23 TO 26 FY -269
23 26 FX 125.5
24 25 FX -125.5

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

58 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

MEMBER LOAD
57 TRAP GX 39.13 4.17
61 TRAP GX 4.17 0
13 TRAP GX -52.8 -39.13
54 TRAP GX -39.13 -4.17
60 TRAP GX -4.17 0
*******************************************
LOAD 4 TRACK LOAD
*LOAD DUE TO RAIL TRACK
******************************************************************
LOAD 5 LOADTYPE None TITLE EARTH PRESSURE INCLUDING SURCHARGE(W.TAT6MBELOWFGL)
******************************************************************
*LOAD DUE TO EARTH PRESSURE
MEMBER LOAD
1 TRAP GX 570.7 484.9
72 TRAP GX 484.9 435.9
71 TRAP GX 435.9 386.9
70 TRAP GX 386.9 337.9
69 TRAP GX 337.9 288.9
68 TRAP GX 288.9 239.9
67 TRAP GX 239.9 202.7
66 TRAP GX 202.7 176.5
65 TRAP GX 176.5 148.5
59 TRAP GX 148.5 114.7
2 TRAP GX -570.7 -484.9
80 TRAP GX -484.9 -435.9
79 TRAP GX -435.9 -386.9
78 TRAP GX -386.9 -337.9
77 TRAP GX -337.9 -288.9
76 TRAP GX -288.9 -239.9
75 TRAP GX -239.9 -202.7
74 TRAP GX -202.7 -176.5
73 TRAP GX -176.5 -148.5
56 TRAP GX -148.5 -114.7
*************************************
4 5 35 TO 52 UNI GY 242.9
*LOAD DUE TO DOUNWARD WATER PRESUURE WHEN WTABLE IS AT 6 M BELOW FGL
JOINT LOAD
1 2 FY -430
**********************************************************

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

59 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

LOAD 6 EARTH PRESSURE WITHOUT SURCHARGE (WATER TABLE BELOW RAFT)


**********************************************************
MEMBER LOAD
1 TRAP GX 411.9 356.7
72 TRAP GX 356.7 325.2
71 TRAP GX 325.2 293.7
70 TRAP GX 293.7 262.2
69 TRAP GX 262.2 230.7
68 TRAP GX 230.7 199.2
67 TRAP GX 199.2 167.7
66 TRAP GX 167.7 136.2
65 TRAP GX 136.2 104.7
59 TRAP GX 104.7 62.21
2 TRAP GX -411.9 -356.7
80 TRAP GX -356.7 -325.2
79 TRAP GX -325.2 -293.7
78 TRAP GX -293.7 -262.2
77 TRAP GX -262.2 -230.7
76 TRAP GX -230.7 -199.2
75 TRAP GX -199.2 -167.7
74 TRAP GX -167.7 -136.2
73 TRAP GX -136.2 -104.7
56 TRAP GX -104.7 -62.21
********************************************
LOAD 7 APRON FEEDER LOAD
***********************************************
MEMBER LOAD
39 42 44 47 CON GZ 20
39 42 44 47 CMOM X 12.5
***********************************************
*LOAD COMBINATIONS
*unfactored
LOAD COMB 9 DL + LL + HOP.FULL + TRACK + E.P(W.OSUR) + A.FLOAD
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 7 1.0
LOAD COMB 10 DL + LL + HOP.FULL + TRACK + E.P(WTHSUR) + A.FLOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 7 1.0
LOAD COMB 11 DL + LL + HOP.FULL + E.P(WTHSUR)
1 1.0 2 1.0 3 1.0 5 1.0
*factored
LOAD COMB 12 DL + LL + HOP.FULL + TRACK + E.P(W.OSUR) + A.FLOAD

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

60 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

1 1.2 2 1.2 3 1.2 4 1.2 6 1.2 7 1.2


LOAD COMB 13 DL + LL + HOP.FULL + TRACK + E.P(WTHSUR) + A.FLOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 7 1.2
LOAD COMB 14 DL + LL + HOP.FULL + E.P(WTHSUR)
1 1.5 2 1.5 3 1.5 5 1.5
PERFORM ANALYSIS PRINT STATICS CHECK
LOAD LIST 9 TO 11
PRINT SUPPORT REACTION
FINISH

6.2.3

SUPPORT REACTIONS FOR FRAME 1A

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

28

29

30

31

32

33

34

LOAD

3
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11

FORCE-X

FORCE-Y

FORCE-Z

9
-0.50
1159.65
-0.50
940.33
3.71
-0.50
940.33
0.00
-219.70
1453.08
-0.01
-306.64
1350.91
-0.01
-306.64
1350.91
0.00
-180.04
919.15
0.04
-251.28
773.38
0.04
-251.28
773.38
0.00
-146.35
517.72
-0.26
-204.24
329.31
-0.26
-204.24
329.31
0.00
-117.52
287.34
1.86
-163.98
68.52
1.86
-163.98
68.52
0.00
-92.59
208.83
-11.59
-129.16
-27.06
-11.59
-129.16
-27.06
0.00
-70.72
240.47
-11.89
-98.62
-1.83
-11.89
-98.62
-1.83
0.00
-51.20
369.35
3.72
-71.36
128.13
3.72
-71.36
128.13
0.00

MOM-X

3.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
0.00
0.00
0.00

MOM-Y

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM Z

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

35

36

37

38

39

40

41

42

43

44

45

9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11
9
10
11

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

61 of

Doc. No.

GID-091-CV-CAL-3481C

-33.38
-46.46
-46.46
-16.67
-23.10
-23.10
15.90
22.33
22.33
32.82
45.90
45.90
50.84
70.99
70.99
70.54
98.44
98.44
92.59
129.16
129.16
117.70
164.16
164.16
146.72
204.60
204.60
180.60
251.83
251.83
220.47
307.41
307.41
-133.32
-186.09
-186.09
133.83
186.60
186.60

603.92
368.69
368.69
900.55
673.83
673.83
903.96
677.24
677.24
607.76
372.54
372.54
372.36
131.14
131.14
242.22
-0.08
-0.08
209.06
-26.83
-26.83
285.61
66.79
66.79
513.29
324.89
324.89
911.33
765.56
765.56
1442.02
1339.85
1339.85
970.91
926.59
926.59
965.11
920.80
920.80

-11.86
-11.86
0.00
-11.86
-11.86
0.00
-11.86
-11.86
0.00
-11.86
-11.86
0.00
3.72
3.72
0.00
-11.89
-11.89
0.00
-11.59
-11.59
0.00
1.86
1.86
0.00
-0.26
-0.26
0.00
0.04
0.04
0.00
-0.01
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

-6.25
-6.25
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
0.00
0.00
0.00
-6.25
-6.25
0.00
-6.25
-6.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rev
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

292

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.3
6.3.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

62 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

FRAME - 2
STAAD SKETCHES

THREE DIMENSIONAL VIEW OF FRAME - 2

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

63 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

6
10
51

11
52
53

50

75

76

77

78

79

46
54

47

80

49

12

81

13

48

73

62

55

63
23

82

86

24

56

64
14
15

57

83
84

87
88

20
21

65

58

66

59

67

60

68

61

69

74

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

NODE NUMBERS

7/1/08 7:13 PM

72

71

70

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

64 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

62

60

64

54
88

89

292

61

63

87

57

91

59
90

56

86

55

58

65

92

94

93

102

81

85

73

95

66

74
16

96 99

22

67

75
24

68

98

17

69

101

97

25

100

76

23

77

3
70

78

71

79

72

80

1 4

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52 2

MEMBER NUMBERS

7/1/08 7:13 PM

84

83

82

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

65 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-310.000 kN

-28.000 kN
-4.500 kN/m

-28.000 kN
-4.500 kN/m

-130.000 kN
-43.200 kN
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-35.000 kN/m
-43.200
kN
-15.000
kN/m
-37.000
-14.250 kN/m
-25.000
kN

-15.000 kN/m
-37.000

-130.000 kN
-43.200 kN
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-15.000
kN/m
-14.250
kN/m
-25.000
kN

-15.000 kN/m

-15.000 kN/m

-15.000 kN/m

-15.000 kN/m -15.000-15.000


kN/m kN/m -15.000 kN/m
-15.000 kN/m
-15.000 kN/m-15.000 kN/m
-15.000 kN/m
-403.000 kN

-403.000 kN

-110.000
-110.000
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
-110.000
kN/m
kN/m
kN/m
-175.000 kN-175.000 kN-175.000 kN-175.000 kN

Loading Diagram Load Case -1 - Dead Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

66 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-65.000 kN

-33.000 kN

-14.250 kN/m

-5.000 kN/m

-14.250 kN/m

-33.000 kN

-5.000 kN/m

-12.500
-12.500
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
-12.500
kN/m
kN/m
kN/m

Loading Diagram Load Case - 2 - Live Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

67 of

Doc. No.

GID-091-CV-CAL-3481C

0 kN/m
-2.085 kN/m

Rev

292

0 kN/m
2.085 kN/m

-270.000 kN
2.085
-2.085kN/m
kN/m
38.080 kNm

-135.000 kN

38.080 kNm
-135.000 kN

-19.565 kN/m
-19.565
kN/m
19.565
kN/m
19.565 kN/m
-2.540 kNm
-2.540 kNm
-120.000
-120.000
-120.000
kNkN/mkN
-120.000 kN
-36.120
kN/mkN
-36.120
-92.505 kN/m
-92.505
-92.505
kN/m kN/m
-92.505 kN/m
63.150 -26.400
kN
kN/m
63.150
26.400
-26.400
kN -63.150
kN/m
kN/mkN
26.400 -63.150
kN/m kN
-107.290kN/m
kN/m
-107.290
-107.290kN/m
kN/m
-107.290
-107.290
-107.290kN/m
kN/m-107.290
-107.290kN/m
kN/m
56.100 kN
56.100
-56.100
kN kN
-56.100 kN
-117.600
-117.600
kN/m
kN/m

-117.600
-117.600
kN/m
kN/m

Loading Diagram Load Case - 3 Coal Load (Hopper Full)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

68 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-152.500
-900.000kNm
kN

-450.000 kN 55.350 kNm


-152.500
-900.000kNm
kN

-450.000 kN
-55.350 kNm

Loading Diagram Load Case - 4 Wagon Load Case-1

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

69 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

240.000 kNm
150.000 kN

240.000 kNm

250.000 kN150.000 kN
270.000 kN

65.000 kNm

45.000 kN
250.000 kN
150.000 kN
150.000 kN
-65.000 kNm
270.000 kN

45.000 kN

Loading Diagram Load Case - 5 Wagon Load Case-2

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

70 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

240.000 kNm
250.000 kN

240.000 kNm
250.000 kN

45.000 kN

45.000 kN

Load 6

Loading Diagram Load Case - 6 Wagon Load Case-3

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

71 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

93.410 kN/m

-93.410 kN/m

120.900 kN/m

-120.900 kN/m

143.700 kN/m

-143.700 kN/m

165.100 kN/m

-165.100 kN/m

195.400 kN/m
235.300 kN/m
275.200-103.000
kN/m kN
315.100 kN/m
355.000 kN/m
394.900 kN/m

-195.400 kN/m
-235.300 kN/m
-103.000
kN kN/m
-275.200
-315.100 kN/m
-355.000 kN/m
-394.900 kN/m

464.700 kN/m
-464.700 kN/m
198.000
198.000
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
198.000
kN/m
kN/m
kN/m

Loading Diagram Load Case - 7 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

72 of

Doc. No.

GID-091-CV-CAL-3481C

50.650 kN/m
85.300 kN/m
110.900 kN/m
136.600 kN/m
162.200 kN/m
187.900 kN/m
213.500 kN/m
239.200 kN/m
264.900 kN/m
290.500 kN/m

335.400 kN/m

Rev

292

-50.650 kN/m
-85.300 kN/m
-110.900 kN/m
-136.600 kN/m
-162.200 kN/m
-187.900 kN/m
-213.500 kN/m
-239.200 kN/m
-264.900 kN/m
-290.500 kN/m

-335.400 kN/m

Loading Diagram Load Case - 8 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

73 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

20.000 kN
20.000 kN
20.000 kN
20.000 kN

12.500 kNm
12.500 kNm

12.500 kNm
12.500 kNm

Load 9

Loading Diagram Load Case - 9 Apron Feeder Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

74 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

44.000 kN

150.000 kN

21.400 kN
210.000 kN

75.000 kN

129.000 kN

Loading Diagram Load Case - 10 Wind On Shed

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.3.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

75 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

STAAD-PRO ANALYSIS INPUT FOR FRAME 2

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 12-Mar-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0.875 0; 2 19.93 0.875 0; 3 9.965 0.875 0; 5 19.93 11.226 0;
6 9.965 14.226 0; 10 4.483 13.626 0; 11 15.447 13.626 0; 12 4.483 8.566 0;
13 15.447 8.566 0; 14 5.94 5.925 0; 15 5.94 5.425 0; 20 13.99 5.925 0;
21 13.99 5.425 0; 23 5.2115 7.2455 0; 24 14.7185 7.2455 0; 28 0.9965 0.875 0;
29 1.993 0.875 0; 30 2.9895 0.875 0; 31 3.986 0.875 0; 32 4.9825 0.875 0;
33 5.979 0.875 0; 34 6.9755 0.875 0; 35 7.972 0.875 0; 36 8.9685 0.875 0;
37 10.9615 0.875 0; 38 11.958 0.875 0; 39 12.9545 0.875 0; 40 13.951 0.875 0;
41 14.9475 0.875 0; 42 15.944 0.875 0; 43 16.9405 0.875 0; 44 17.937 0.875 0;
45 18.9335 0.875 0; 46 0 9.876 0; 47 4.483 9.876 0; 48 19.93 9.876 0;
49 15.447 9.876 0; 50 0 11.226 0; 51 4.483 13.226 0; 52 15.447 13.226 0;
53 9.965 12.826 0; 54 0 8.876 0; 55 0 7.876 0; 56 0 6.876 0; 57 0 5.876 0;
58 0 4.876 0; 59 0 3.876 0; 60 0 2.876 0; 61 0 1.876 0; 62 19.93 8.876 0;
63 19.93 7.876 0; 64 19.93 6.876 0; 65 19.93 5.876 0; 66 19.93 4.876 0;
67 19.93 3.876 0; 68 19.93 2.876 0; 69 19.93 1.876 0; 70 26.395 9.876 0;
71 25.395 9.876 0; 72 24.395 9.876 0; 73 23.395 9.876 0; 74 22.395 9.876 0;
75 -6.465 9.876 0; 76 -5.465 9.876 0; 77 -4.465 9.876 0; 78 -3.465 9.876 0;
79 -2.465 9.876 0; 80 9.965 9.876 0; 81 9.967 8.566 0; 82 9.2385 7.2455 0;
83 8.51 5.925 0; 84 8.51 5.425 0; 86 10.6915 7.2455 0; 87 11.42 5.925 0;
88 11.42 5.425 0;
MEMBER INCIDENCES
1 1 61; 2 2 69; 3 3 81; 4 1 28; 5 3 37; 16 12 23; 17 14 15; 22 13 24; 23 20 21;
24 23 14; 25 24 20; 35 28 29; 36 29 30; 37 30 31; 38 31 32; 39 32 33; 40 33 34;
41 34 35; 42 35 36; 43 36 3; 44 37 38; 45 38 39; 46 39 40; 47 40 41; 48 41 42;
49 42 43; 50 43 44; 51 44 45; 52 45 2; 54 47 51; 55 46 47; 56 48 5; 57 49 52;
58 48 49; 59 46 50; 60 51 10; 61 52 11; 62 53 6; 63 51 53; 64 53 52; 65 54 46;
66 55 54; 67 56 55; 68 57 56; 69 58 57; 70 59 58; 71 60 59; 72 61 60; 73 62 48;
74 63 62; 75 64 63; 76 65 64; 77 66 65; 78 67 66; 79 68 67; 80 69 68; 81 48 74;
82 71 70; 83 72 71; 84 73 72; 85 74 73; 86 46 79; 87 76 75; 88 77 76; 89 78 77;
90 79 78; 91 80 53; 92 47 80; 93 80 49; 94 12 47; 95 13 49; 96 81 82; 97 83 84;
98 82 83; 99 81 86; 100 87 88; 101 86 87; 102 81 80;

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

76 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

DEFINE MATERIAL START


ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
1 2 56 59 65 TO 80 PRIS YD 2.93 ZD 2.145
3 62 91 102 PRIS YD 1.6 ZD 0.6
16 22 54 57 60 61 63 64 94 TO 96 99 PRIS YD 0.8 ZD 0.5
4 5 35 TO 52 PRIS YD 1.5 ZD 0.6
MEMBER PROPERTY INDIAN
55 58 81 86 PRIS YD 2.7 ZD 0.5
MEMBER PROPERTY INDIAN
85 90 PRIS YD 2.36 ZD 0.5
84 89 PRIS YD 2.02 ZD 0.5
83 88 PRIS YD 1.68 ZD 0.5
82 87 PRIS YD 1.34 ZD 0.5
MEMBER PROPERTY INDIAN
17 23 TO 25 97 98 100 101 PRIS YD 0.35 ZD 0.5
MEMBER PROPERTY INDIAN
92 93 PRIS YD 3.87 ZD 0.5
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER OFFSET
55 81 START 1.465 0 0
58 86 START -1.465 0 0
85 90 START 0 0.17 0
85 90 END 0 0.17 0
84 89 START 0 0.34 0
84 89 END 0 0.34 0
83 88 START 0 0.51 0
83 88 END 0 0.51 0
82 87 START 0 0.68 0
82 87 END 0 0.68 0
17 24 25 98 100 101 START LOCAL 0 0.225 0
17 24 25 98 100 101 END LOCAL 0 0.225 0
23 97 START -0.175 0 0

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

77 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

23 97 END -0.175 0 0
*54 57 START 0 1.35 0
56 59 65 TO 80 START 0 0 0.8225
56 59 65 TO 80 END 0 0 0.8225
*94 95 END 0 -1.35 0
1 2 START 0 -0.75 0.8225
1 2 END 0 0 0.8225
92 93 START 0 -0.585 0
92 93 END 0 -0.585 0
3 TO 5 35 TO 52 91 102 START 0 0 0.05
3 TO 5 35 TO 52 91 102 END 0 0 0.05
SUPPORTS
3 28 TO 45 FIXED BUT MY MZ KFY 503597 KFZ 427429
1 2 FIXED BUT MY MZ KFY 251799 KFZ 213715
*****************************************************
LOAD 1 DL DEAD LOAD
*****************************************************
SELFWEIGHT Y -1
*LOAD DUE TO SELF WEIGHT OF WALL+LOAD DUE TO SELF WEIGHT OF SOIL & KERN
JOINT LOAD
1 2 FY -403
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
JOINT LOAD
6 FY -310
* AT END COLUMNS
MEMBER LOAD
82 87 CON GY -130
* LOAD DUE TO SELF WEIGHT OF HOPPER INCLINED WALL +
*LOAD DUE TO SELF WEIGHT OF HOPPER VERTICAL WALL
MEMBER LOAD
16 17 22 TO 25 54 57 91 94 TO 102 UNI GY -15
*LOAD DUE TO SELF WEIGHT OF RAFT+SANDFILL+PCC+GRADE SLAB ON RAFT BEAM
5 36 TO 50 UNI GY -110
35 UNI GY -110 0.5 0.9965
51 UNI GY -110 0 0.5
*LOAD DUE TO APRON FEEDER pedestals + supporting beams ON BOTTOM RAFT BEAM
39 42 44 47 CON GY -175
* LOAD DUE TO PIT SLAB
55 58 UNI GY -14.25

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

78 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

* LOAD DUE TO PIT WALL


JOINT LOAD
5 47 50 FY -43.2
*LOAD DUE TO SELFWEIGHT OF LONGITUDINAL BEAM HB6 ON TOP OF HB2
10 11 FY -28
*LOAD DUE TO GRIZZLY ON HB1
MEMBER LOAD
63 64 UNI GY -4.5
MEMBER LOAD
* SELFWEIGHT LOAD DUE TO DRIVE BASE BEAM
55 58 CON GY -25 2.222
*SELFWEIGHT OF HOPPER WALL ON TOP OF BEAM+ DEADLOAD DUE TO PIT SLAB &
*SELF WEIGHT OF HOPPER INCLINED WALL ON BEAM IN HOPPER PORTION
MEMBER LOAD
92 93 UNI GY -37
*DEAD LOAD DUE TO SOIL & SURCHARGE N BRACKET BEAM
81 TO 90 UNI GY -35
****************************************
LOAD 2 LL LIVE LOAD
***************************************
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
JOINT LOAD
6 FY -65
* AT END COLUMNS
MEMBER LOAD
82 87 CON GY -33
*LOAD DUE TO WALKWAY PIT SLAB @ 5 kN/m2
55 58 UNI GY -14.25
92 93 UNI GY -5
*LIVE LOAD ON RAFT BEAM
5 36 TO 50 UNI GY -14.25
35 UNI GY -14.25 0.5 0.9965
51 UNI GY -14.25 0 0.5
***************************************
LOAD 3 COAL LOAD (HOPPER FULL)
****************************************
*LOAD DUE TO COAL
JOINT LOAD
12 13 FY -135

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

79 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

12 81 FX 63.15
13 81 FX -63.15
23 24 82 86 FY -120
23 86 FX 56.1
24 82 FX -56.1
MEMBER LOAD
57 91 TRAP GX 19.565 2.085
61 TRAP GX 2.085 0
54 91 TRAP GX -19.565 -2.085
60 TRAP GX -2.085 0
94 102 TRAP GX -26.4 -19.565
95 102 TRAP GX 26.4 19.565
JOINT LOAD
81 FY -270
MEMBER LOAD
16 22 96 99 TRAP Y -92.505 -107.29
24 25 98 101 TRAP Y -107.29 -117.6
MEMBER LOAD
*LOAD DUE TO TOP WALL ON CLOSURE BEAM
92 93 UMOM GX -2.54
*LOAD DUE TO SIDE WALL PRESSURE
92 93 UNI GZ -36.12
*LOAD DUE TO BOTTOM INCLINED WALL
92 93 UMOM GX 38.08
*******************************************
LOAD 4 LOADTYPE None TITLE WAGON LOAD CASE-1
*******************************************
*******************************************
*WAGONTIPPLER AT REST WITH WAGON i.e WAGON JUST KEEP ON TIPPLER TABLE
********************************************************
*lOAD g IS ACTING AT LOCATION B OF 450 KN EACH
JOINT LOAD
5 50 FY -900
MEMBER LOAD
55 58 CON GY -450 0.5
*LOAD DUE TO ECCENTRICITY OF LOAD CELL B
JOINT LOAD
50 MX -152.5 MZ -55.35
5 MX -152.5 MZ 55.35
*****************************************************

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

80 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

LOAD 5 LOADTYPE None TITLE WAGON LOAD CASE-2


****************************************************
*WAGON JUST LIFTED FROM REST POSITION BUT IT IS STILL CONNECTED TO LOADCELL
***********************************************************
*lOAD h IS ACTING AT LOCATION C OF 150 KN EACH ALONG THE RAIL
*lOAD I IS ACTING AT LOCATION A OF 135 KN EACH ACROSS THE RAIL
*LOAD M.N,O ARE ACTING AT DRIVE BASE LOCATION
JOINT LOAD
*LOAD h
5 50 FZ 150
MEMBER LOAD
55 58 CON GZ 150 0.3
JOINT LOAD
*LOAD I
5 50 FX 270
*5 50 FX -270
MEMBER LOAD
* LOAD M
55 58 CON GY 45 2.222
* LOAD N
55 58 CON GZ 250 2.222
*55 58 CON GZ -250 2.222
* LOAD O
55 58 CMOM GX 240 2.222
*55 58 CMOM GX -240 2.222
*LOAD DUE TO ECCENTRIC EFFECTS OF LOAD CELLS C & A
JOINT LOAD
5 MY 65
50 MY -65
****************************************************
LOAD 6 LOADTYPE None TITLE WAGON LOAD CASE-3
****************************************************
*WAGON TIPPLER IN OPERATION
****************************************************
*LOAD M.N,O ARE ACTING AT DRIVE BASE LOCATION
MEMBER LOAD
* LOAD M
55 58 CON GY 45 2.222
* LOAD N
55 58 CON GZ 250 2.222

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

81 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

*55 58 CON GZ -250 2.222


* LOAD O
55 58 CMOM GX 240 2.222
*55 58 CMOM GX -240 2.222
******************************************************************
LOAD 7 LOADTYPE None TITLE EARTH PRESSURE INCLUDING SURCHARGE(W.TAT6MBELOWFGL)
******************************************************************
*LOAD DUE TO EARTH PRESSURE
MEMBER LOAD
1 TRAP GX 464.7 394.9
72 TRAP GX 394.9 355
71 TRAP GX 355 315.1
70 TRAP GX 315.1 275.2
69 TRAP GX 275.2 235.3
68 TRAP GX 235.3 195.4
67 TRAP GX 195.4 165.1
66 TRAP GX 165.1 143.7
65 TRAP GX 143.7 120.9
59 TRAP GX 120.9 93.41
**********
2 TRAP GX -464.7 -394.9
80 TRAP GX -394.9 -355
79 TRAP GX -355 -315.1
78 TRAP GX -315.1 -275.2
77 TRAP GX -275.2 -235.3
76 TRAP GX -235.3 -195.4
75 TRAP GX -195.4 -165.1
74 TRAP GX -165.1 -143.7
73 TRAP GX -143.7 -120.9
56 TRAP GX -120.9 -93.41
4 5 35 TO 52 UNI GY 198
*LOAD DUE TO DOUNWARD WATER PRESUURE WHEN WTABLE IS AT 6 M BELOW FGL
JOINT LOAD
1 2 FY -103
**********************************************************
LOAD 8 EARTH PRESSURE WITHOUT SURCHARGE (WATER TABLE BELOW RAFT)
**********************************************************
MEMBER LOAD
1 TRAP GX 335.4 290.5
72 TRAP GX 290.5 264.9

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

82 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

71 TRAP GX 264.9 239.2


70 TRAP GX 239.2 213.5
69 TRAP GX 213.5 187.9
68 TRAP GX 187.9 162.2
67 TRAP GX 162.2 136.6
66 TRAP GX 136.6 110.9
65 TRAP GX 110.9 85.3
59 TRAP GX 85.3 50.65
****************************
2 TRAP GX -335.4 -290.5
80 TRAP GX -290.5 -264.9
79 TRAP GX -264.9 -239.2
78 TRAP GX -239.2 -213.5
77 TRAP GX -213.5 -187.9
76 TRAP GX -187.9 -162.2
75 TRAP GX -162.2 -136.6
74 TRAP GX -136.6 -110.9
73 TRAP GX -110.9 -85.3
56 TRAP GX -85.3 -50.65
********************************************
LOAD 9 APRON FEEDER LOAD
***********************************************
MEMBER LOAD
39 42 44 47 CON Z 20
39 42 44 47 CMOM X 12.5
********************************************
LOAD 10 WIND ON SHED
***********************************************
JOINT LOAD
6 FX 44 FY 210
* AT END COLUMNS
MEMBER LOAD
87 CON GX 150
87 CON GY 129
82 CON GX 21.4
82 CON GY 75
***********************************************
*LOAD COMBINATIONS
**************************
LOAD COMB 11 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

83 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 9 1.0 10 1.0


LOAD COMB 12 DL + LL + HOP.FULL + TRKCASE-2 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 13 DL + LL + HOP.FULL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 6 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 14 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 15 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 5 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 16 DL + LL + HOP.FULL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 6 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 17 DL + LL + HOP.FULL + E.P(WTHSUR)
1 1.0 2 1.0 3 1.0 7 1.0
*LOAD COMB 12 IRC:DL +LL+ H0P.FULL + TR.LOAD + E.P(W.OSUR) + P.FLOAD + COALTRAY
*1 1.4 2 2.0 3 2.0 4 2.0 6 1.7 7 1.0
*LOAD COMB 13 IRC:DL + LL + H.FULL + T.LOAD + E.P.(WTH SUR) + P.FLOAD + COALTRAY
*1 1.4 2 2.0 3 2.0 4 2.0 5 1.7 7 1.0
PERFORM ANALYSIS PRINT STATICS CHECK
LOAD LIST 11 TO 17
PRINT SUPPORT REACTION
FINISH

6.3.3

SUPPORT REACTIONS FOR FRAME 2

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

28

LOAD

11
12
13
14
15
16
17
11
12
13

FORCE-X

-58.12
-193.61
-58.22
-58.10
-193.59
-58.20
-0.72
-1001.72
-381.13
-608.94

FORCE-Y

1081.56
904.83
923.84
890.01
713.29
732.30
786.83
1504.23
1017.42
1128.73

FORCE-Z

44.97
29.09
33.47
51.47
35.59
39.97
58.03
-40.15
-254.48
-122.93

MOM-X

849.46
507.99
590.71
986.09
644.63
727.34
981.22
-75.21
-50.87
-56.44

MOM-Y

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MOM Z

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

29

30

31

32

33

34

14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

84 of

Doc. No.

GID-091-CV-CAL-3481C

-1216.20
-595.61
-823.42
-1212.50
-831.59
-514.79
-587.23
-1025.44
-708.64
-781.08
-1023.07
-446.47
-344.77
-343.55
-555.79
-454.09
-452.87
-554.32
-160.08
-160.38
-138.87
-201.15
-201.45
-179.94
-197.70
-20.08
-48.28
-30.04
-25.45
-53.65
-35.41
-19.54
36.24
12.45
22.18
42.80
19.01
28.74
35.37
31.72
17.88

1336.38
849.57
960.88
1075.66
1042.21
762.09
799.68
866.46
586.34
623.94
683.80
652.33
520.91
520.47
468.42
337.00
336.56
360.37
396.68
352.05
338.92
206.44
161.81
148.67
153.91
283.89
273.15
263.44
89.67
78.92
69.22
69.88
293.98
276.30
279.14
97.98
80.30
83.14
89.72
411.14
357.35

-67.77
-282.10
-150.55
-68.32
262.10
80.11
151.26
316.64
134.65
205.79
315.44
240.31
141.70
166.63
296.05
197.43
222.37
296.08
133.31
98.85
100.38
166.61
132.15
133.69
169.15
44.33
42.39
36.60
57.60
55.66
49.86
63.27
-0.86
6.84
1.53
1.44
9.13
3.83
8.37
-10.04
-4.76

-66.82
-42.48
-48.04
-53.78
-52.11
-38.10
-39.98
-43.32
-29.32
-31.20
-34.19
-32.62
-26.05
-26.02
-23.42
-16.85
-16.83
-18.02
-19.83
-17.60
-16.95
-10.32
-8.09
-7.43
-7.70
-20.44
-19.91
-19.42
-10.73
-10.20
-9.71
-3.49
-20.95
-20.07
-20.21
-11.15
-10.27
-10.41
-4.49
-20.56
-17.87

Rev
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

292

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

35

36

37

38

39

40

13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

85 of

Doc. No.

GID-091-CV-CAL-3481C

21.82
39.29
25.45
29.39
38.51
29.38
17.76
20.88
36.54
24.92
28.04
42.98
73.80
51.77
58.77
84.31
62.28
69.28
79.57
-76.60
-60.58
-61.56
-87.12
-71.10
-72.08
-79.60
-30.76
-22.11
-22.26
-37.93
-29.28
-29.43
-43.00
-32.04
-18.86
-22.14
-39.61
-26.43
-29.71
-38.52
-36.05

376.36
215.11
161.32
180.33
200.20
621.85
515.28
548.42
427.01
320.45
353.59
390.50
875.29
717.47
754.72
682.25
524.43
561.68
613.56
894.45
780.72
773.85
701.41
587.68
580.81
614.14
641.31
580.14
567.86
446.48
385.31
373.02
391.30
421.70
393.33
386.89
225.68
197.30
190.86
200.98
293.37

-7.00
-11.01
-5.74
-7.98
-4.27
1.98
-0.39
0.77
2.43
0.06
1.22
10.11
25.97
14.75
18.65
29.90
18.67
22.58
37.62
26.94
17.80
19.62
30.87
21.72
23.54
37.63
2.86
2.39
1.65
3.31
2.83
2.10
10.11
-9.53
-3.14
-6.49
-10.50
-4.12
-7.47
-4.27
-0.71

-18.82
-10.76
-8.07
-9.02
-10.01
-37.34
-32.01
-33.67
-27.60
-22.27
-23.93
-19.52
-50.01
-42.12
-43.99
-40.36
-32.47
-34.33
-30.68
-50.97
-45.29
-44.94
-41.32
-35.63
-35.29
-30.71
-38.32
-35.26
-34.64
-28.57
-25.52
-24.90
-19.57
-21.09
-19.67
-19.34
-11.28
-9.86
-9.54
-10.05
-20.92

Rev
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

292

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

41

42

43

44

45

12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17
11
12
13
14
15
16
17

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

86 of

Doc. No.

GID-091-CV-CAL-3481C

-11.83
-21.99
-42.61
-18.39
-28.55
-35.38
20.22
48.73
30.18
25.60
54.11
35.55
19.54
159.53
158.57
138.33
200.60
199.65
179.40
197.73
444.44
338.12
341.53
553.77
447.45
450.85
554.40
827.50
501.40
583.14
1021.35
695.25
776.99
1023.23
996.37
363.65
603.59
1210.85
578.12
818.07
1212.69

275.12
278.51
97.37
79.11
82.51
90.20
275.45
244.13
255.00
81.22
49.91
60.77
69.66
389.57
322.70
331.81
199.32
132.45
141.56
152.40
662.89
541.41
531.04
478.98
357.51
347.14
356.80
1095.52
910.94
853.02
919.78
735.19
677.27
677.34
1633.88
1402.23
1258.39
1466.03
1234.38
1090.54
1065.81

7.32
1.68
1.59
9.61
3.98
8.37
44.12
41.69
36.38
57.39
54.96
49.65
63.28
132.62
96.60
99.70
165.92
129.91
133.00
169.18
239.07
137.63
165.39
294.81
193.37
221.13
296.13
260.65
75.36
149.81
315.18
129.90
204.34
315.49
-40.34
-255.07
-123.12
-67.96
-282.69
-150.74
-68.32

-20.01
-20.18
-11.12
-10.21
-10.38
-4.51
-20.02
-18.46
-19.00
-10.31
-8.75
-9.29
-3.48
-19.48
-16.13
-16.59
-9.97
-6.62
-7.08
-7.62
-33.14
-27.07
-26.55
-23.95
-17.88
-17.36
-17.84
-54.78
-45.55
-42.65
-45.99
-36.76
-33.86
-33.87
-81.69
-70.11
-62.92
-73.30
-61.72
-54.53
-53.29

Rev
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

292

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

11
12
13
14
15
16
17
11
12
13
14
15
16
17

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

87 of

Doc. No.

GID-091-CV-CAL-3481C

420.09
-539.79
-111.69
505.80
-454.08
-25.98
678.50
-561.20
30.40
-29.34
-646.90
-55.31
-115.05
-678.18

937.99
579.54
693.59
855.57
497.12
611.17
703.00
1059.59
951.76
815.19
977.17
869.34
732.77
696.69

-521.91
-533.00
-455.10
-660.08
-671.16
-593.26
-658.48
-519.68
-525.66
-452.86
-657.84
-663.83
-591.03
-658.57

-9.97
-5425.34
-2576.94
-64.22
-5479.59
-2631.19
-263.56
-21.18
-5462.79
-2588.13
-75.44
-5517.06
-2642.39
-263.71

Rev
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

292

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.4
6.4.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

88 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

FRAME - 3
STAAD SKETCHES

Load 1

THREE DIMENSIONAL VIEW OF FRAME - 3

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

89 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

6
10
51

11
52
53

50

75

76

77

78

79

46
54

47

80

49

12

81

13

55
82

86

73

72

71

62

24

56

64
14
15

83
84

87
88

20
21

65

58

66

59

67

60

68

61

69

89

74

63
23

57

48

90

91

92

93

94

95

96

97

98

102

103

Y
Z

99

101

100

Load 1

NODE NUMBERS

7/1/08 7:13 PM

70

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

90 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

62

60

64

54
88

89

292

61

63

87

57

91

59
90

86

56
55

65

58
92

94

93

102

95

66
96 99

70

84

83

73

22

67

69

85

74
16

68

81

75
24

98

17

101

97

100
3

25
23

76
77
78

71

79

72

80

108

114

107

113

106

112

105

111
115

Y
Z

104

110

116

117

103

109

MEMBER NUMBERS

7/1/08 7:13 PM

82

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

91 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-310.000 kN

-28.000 kN
-4.500 kN/m
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-35.000 kN/m
-130.000 kN -35.000 kN/m
-43.200 kN -37.000 kN/m
-15.000 kN/m
-14.250 kN/m
-43.200
-25.000
kNkN
-15.000 kN/m

-28.000 kN
-4.500 kN/m
-37.000 kN/m
-15.000 kN/m
-15.000 kN/m

-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-35.000
kN/m
-130.000 kN
-43.200 kN
-15.000 kN/m
-14.250 kN/m
-25.000 kN
-15.000 kN/m

-15.000 kN/m
-15.000
-15.000
kN/m kN/m
-15.000 kN/m
-15.000-15.000
kN/m kN/m
-15.000-15.000
kN/m kN/m

-150.000 kN

Loading Diagram Load Case -1 - Dead Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

92 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-65.000 kN

-33.000 kN

-14.250 kN/m
-5.000 kN/m

-14.250 kN/m

-33.000 kN

-5.000 kN/m

Loading Diagram Load Case - 2 - Live Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

93 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

0 kN/m
-2.085 kN/m

-2.540 kNm

-135.000 kN
-19.565 kN/m
-120.000
-20.000
kN/mkN
-92.505 kN/m
63.150-26.400
kN
kN/m

292

0 kN/m
2.085 kN/m

-270.000 kN
2.085
-2.085kN/m
kN/m
-2.540 kNm

-135.000 kN
19.565
-19.565
kN/m
kN/m
-120.000
-120.000
kNkN/mkN
-20.000
-92.505
-92.505
kN/mkN/m
63.150
26.400
-26.400
kN-63.150
kN/m
kN/mkN

19.565 kN/m
-120.000 kN
-92.505 kN/m
26.400-63.150
kN/m kN

-107.290kN/m
kN/m
-107.290
-107.290kN/m
kN/m
-107.290
-107.290
-107.290kN/m
kN/m
-107.290
-107.290kN/m
kN/m
56.100 kN
56.100
-56.100
kN kN
-56.100 kN
-117.600
-117.600
kN/m
kN/m

-117.600
-117.600
kN/m
kN/m

Load 3

Loading Diagram Load Case - 3 Coal Load (Hopper Full)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

94 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-152.500
-900.000kNm
kN

-450.000 kN 55.350 kNm


-152.500
-900.000kNm
kN

-450.000 kN
-55.350 kNm

Loading Diagram Load Case - 4 Wagon Load Case-1

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

95 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

240.000 kNm
150.000 kN

240.000 kNm

250.000 kN
150.000 kN -65.000 kNm
270.000 kN
45.000 kN

250.000 kN
150.000 kN
150.000 kN
65.000 kNm
45.000 kN
270.000 kN

Loading Diagram Load Case - 5 Wagon Load Case-2

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

96 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

240.000 kNm
250.000 kN

240.000 kNm
250.000 kN

45.000 kN

45.000 kN

Loa

Loading Diagram Load Case - 6 Wagon Load Case-3

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

97 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

93.410 kN/m

-93.410 kN/m

120.900 kN/m

-120.900 kN/m

143.700 kN/m

-143.700 kN/m

165.100 kN/m

-165.100 kN/m

195.400 kN/m

-190.400 kN/m

235.300 kN/m
275.200 kN/m
315.100 kN/m
355.000 kN/m
394.900 kN/m
434.800 kN/m
475.000 kN/m
515.000 kN/m
554.500 kN/m

-235.300 kN/m
-275.200 kN/m
-315.100 kN/m
-355.000 kN/m
-394.900 kN/m
-434.800 kN/m
-475.000 kN/m
-515.000 kN/m
-554.500 kN/m

594.000 kN/m

-594.000 kN/m

624.023 kN/m

-624.023 kN/m
Load 7
-664.000 kN/m

664.000 kN/m

Loading Diagram Load Case - 7 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

98 of

Doc. No.

GID-091-CV-CAL-3481C

50.650 kN/m

Rev

292

-50.650 kN/m

85.300 kN/m

-85.300 kN/m

110.900 kN/m

-110.900 kN/m

136.600 kN/m

-136.600 kN/m

162.200 kN/m

-162.200 kN/m

187.900 kN/m

-187.900 kN/m

213.500 kN/m

-213.500 kN/m

239.200 kN/m

-239.200 kN/m

264.900 kN/m

-264.900 kN/m

290.500 kN/m

-290.500 kN/m

316.100 kN/m

-316.100 kN/m

341.800 kN/m

-341.800 kN/m

367.400 kN/m

-367.400 kN/m

393.100 kN/m

-393.100 kN/m

418.700 kN/m

-418.700 kN/m

437.958 kN/m

-437.958 kN/m
Load 8
-463.600 kN/m

463.600 kN/m

Loading Diagram Load Case - 8 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

99 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-150.000 kN

Load 9

Loading Diagram Load Case - 9 Apron Feeder Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

100 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

44.000 kN

150.000 kN

21.400 kN

210.000 kN

75.000 kN
129.000 kN

Load 10

Loading Diagram Load Case - 10 Wind On Shed

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.4.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

101 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

STAAD-PRO ANALYSIS INPUT FOR FRAME 3

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 12-Mar-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
3 9.965 0.875 0; 5 19.93 11.226 0; 6 9.965 14.226 0; 10 4.483 13.626 0;
11 15.447 13.626 0; 12 4.483 8.566 0; 13 15.447 8.566 0; 14 5.94 5.925 0;
15 5.94 5.425 0; 20 13.99 5.925 0; 21 13.99 5.425 0; 23 5.2115 7.2455 0;
24 14.7185 7.2455 0; 46 0 9.876 0; 47 4.483 9.876 0; 48 19.93 9.876 0;
49 15.447 9.876 0; 50 0 11.226 0; 51 4.483 13.226 0; 52 15.447 13.226 0;
53 9.965 12.826 0; 54 0 8.876 0; 55 0 7.876 0; 56 0 6.876 0; 57 0 5.876 0;
58 0 4.876 0; 59 0 3.876 0; 60 0 2.876 0; 61 0 1.876 0; 62 19.93 8.876 0;
63 19.93 7.876 0; 64 19.93 6.876 0; 65 19.93 5.876 0; 66 19.93 4.876 0;
67 19.93 3.876 0; 68 19.93 2.876 0; 69 19.93 1.876 0; 70 26.395 9.876 0;
71 25.395 9.876 0; 72 24.395 9.876 0; 73 23.395 9.876 0; 74 22.395 9.876 0;
75 -6.465 9.876 0; 76 -5.465 9.876 0; 77 -4.465 9.876 0; 78 -3.465 9.876 0;
79 -2.465 9.876 0; 80 9.965 9.876 0; 81 9.967 8.566 0; 82 9.2385 7.2455 0;
83 8.51 5.925 0; 84 8.51 5.425 0; 86 10.6915 7.2455 0; 87 11.42 5.925 0;
88 11.42 5.425 0; 89 0 0.876 0; 90 19.93 0.876 0; 91 0 -0.124 0;
92 19.93 -0.124 0; 93 0 -1.124 0; 94 19.93 -1.124 0; 95 0 -2.124 0;
96 19.93 -2.124 0; 97 0 -3.124 0; 98 19.93 -3.124 0; 99 0 -4.875 0;
100 19.93 -4.875 0; 101 9.965 -4.875 0; 102 0 -3.875 0; 103 19.93 -3.875 0;
MEMBER INCIDENCES
3 3 81; 16 12 23; 17 14 15; 22 13 24; 23 20 21; 24 23 14; 25 24 20; 54 47 51;
55 46 47; 56 48 5; 57 49 52; 58 48 49; 59 46 50; 60 51 10; 61 52 11; 62 53 6;
63 51 53; 64 53 52; 65 54 46; 66 55 54; 67 56 55; 68 57 56; 69 58 57; 70 59 58;
71 60 59; 72 61 60; 73 62 48; 74 63 62; 75 64 63; 76 65 64; 77 66 65; 78 67 66;
79 68 67; 80 69 68; 81 48 74; 82 71 70; 83 72 71; 84 73 72; 85 74 73; 86 46 79;
87 76 75; 88 77 76; 89 78 77; 90 79 78; 91 80 53; 92 47 80; 93 80 49; 94 12 47;
95 13 49; 96 81 82; 97 83 84; 98 82 83; 99 81 86; 100 87 88; 101 86 87;
102 81 80; 103 99 102; 104 97 95; 105 95 93; 106 93 91; 107 91 89; 108 89 61;
109 100 103; 110 98 96; 111 96 94; 112 94 92; 113 92 90; 114 90 69; 115 101 3;
116 102 97; 117 103 98;
DEFINE MATERIAL START
ISOTROPIC CONCRETE

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

102 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
56 59 65 TO 80 103 TO 114 116 117 PRIS YD 2.93 ZD 2.145
3 62 91 102 115 PRIS YD 1.6 ZD 0.6
16 22 54 57 60 61 63 64 94 TO 96 99 PRIS YD 0.8 ZD 0.5
MEMBER PROPERTY INDIAN
55 58 81 86 PRIS YD 2.7 ZD 0.5
MEMBER PROPERTY INDIAN
85 90 PRIS YD 2.36 ZD 0.5
84 89 PRIS YD 2.02 ZD 0.5
83 88 PRIS YD 1.68 ZD 0.5
82 87 PRIS YD 1.34 ZD 0.5
MEMBER PROPERTY INDIAN
17 23 TO 25 97 98 100 101 PRIS YD 0.35 ZD 0.5
MEMBER PROPERTY INDIAN
92 93 PRIS YD 3.87 ZD 0.5
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER OFFSET
55 81 START 1.465 0 0
58 86 START -1.465 0 0
85 90 START 0 0.17 0
85 90 END 0 0.17 0
84 89 START 0 0.34 0
84 89 END 0 0.34 0
83 88 START 0 0.51 0
83 88 END 0 0.51 0
82 87 START 0 0.68 0
82 87 END 0 0.68 0
17 24 25 98 100 101 START LOCAL 0 0.225 0
17 24 25 98 100 101 END LOCAL 0 0.225 0
23 97 START -0.175 0 0
23 97 END -0.175 0 0
*54 57 START 0 1.35 0
56 59 65 TO 80 103 TO 114 START 0 0 0.8225

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

103 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

56 59 65 TO 80 104 TO 108 110 TO 114 116 117 END 0 0 0.8225


*94 95 END 0 -1.35 0
92 93 START 0 -0.585 0
92 93 END 0 -0.585 0
3 62 91 102 115 START 0 0 0.05
3 62 91 102 115 END 0 0 0.05
103 END 0 0 0.8225
116 START 0 0 0.8225
109 END 0 0 0.8225
117 START 0 0 0.8225
SUPPORTS
99 TO 101 FIXED
*****************************************************
LOAD 1 DL DEAD LOAD
*****************************************************
SELFWEIGHT Y -1
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
JOINT LOAD
6 FY -310
* AT END COLUMNS
MEMBER LOAD
82 87 CON GY -130
* LOAD DUE TO SELF WEIGHT OF HOPPER INCLINED WALL +
*LOAD DUE TO SELF WEIGHT OF HOPPER VERTICAL WALL
MEMBER LOAD
16 17 22 TO 25 54 57 91 94 TO 102 UNI GY -15
* LOAD DUE TO PIT SLAB
55 58 UNI GY -14.25
* LOAD DUE TO PIT WALL
JOINT LOAD
5 47 50 FY -43.2
*LOAD DUE TO SELFWEIGHT OF LONGITUDINAL BEAM HB6 ON TOP OF HB2
10 11 FY -28
*LOAD DUE TO GRIZZLY ON HB1
MEMBER LOAD
63 64 UNI GY -4.5
MEMBER LOAD
* SELFWEIGHT LOAD DUE TO DRIVE BASE BEAM
55 58 CON GY -25 2.222

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

104 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

*SELFWEIGHT OF HOPPER WALL ON TOP OF BEAM+ DEADLOAD DUE TO PIT SLAB &
*SELF WEIGHT OF HOPPER INCLINED WALL ON BEAM IN HOPPER PORTION
MEMBER LOAD
92 93 UNI GY -37
*DEAD LOAD DUE TO SOIL & SURCHARGE N BRACKET BEAM
81 TO 90 UNI GY -35
*LOAD DUE TO SELF WEIGHT OF FLOORSLAB & BEAMS
JOINT LOAD
3 FY -150
****************************************
LOAD 2 LL LIVE LOAD
***************************************
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
JOINT LOAD
6 FY -65
* AT END COLUMNS
MEMBER LOAD
82 87 CON GY -33
*LOAD DUE TO WALKWAY PIT SLAB @ 5 kN/m2
55 58 UNI GY -14.25
92 93 UNI GY -5
***************************************
LOAD 3 COAL LOAD (HOPPER FULL)
****************************************
*LOAD DUE TO COAL
JOINT LOAD
12 13 FY -135
12 81 FX 63.15
13 81 FX -63.15
23 24 82 86 FY -120
23 86 FX 56.1
24 82 FX -56.1
MEMBER LOAD
57 91 TRAP GX 19.565 2.085
61 TRAP GX 2.085 0
54 91 TRAP GX -19.565 -2.085
60 TRAP GX -2.085 0
94 102 TRAP GX -26.4 -19.565
95 102 TRAP GX 26.4 19.565

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

105 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

JOINT LOAD
81 FY -270
MEMBER LOAD
16 22 96 99 TRAP Y -92.505 -107.29
24 25 98 101 TRAP Y -107.29 -117.6
MEMBER LOAD
*LOAD DUE TO TOP WALL ON CLOSURE BEAM
92 93 UMOM GX -2.54
*LOAD DUE TO SIDE WALL PRESSURE
92 93 UNI GZ -20
*LOAD DUE TO BOTTOM INCLINED WALL
*******************************************
LOAD 4 LOADTYPE None TITLE WAGON LOAD CASE-1
*******************************************
*WAGONTIPPLER AT REST WITH WAGON i.e WAGON JUST KEEP ON TIPPLER TABLE
********************************************************
*lOAD g IS ACTING AT LOCATION B OF 450 KN EACH
JOINT LOAD
5 50 FY -900
MEMBER LOAD
55 58 CON GY -450 0.5
*LOAD DUE TO ECCENTRICITY OF LOAD CELL B
JOINT LOAD
50 MX -152.5 MZ -55.35
5 MX -152.5 MZ 55.35
*****************************************************
LOAD 5 LOADTYPE None TITLE WAGON LOAD CASE-2
****************************************************
*WAGON JUST LIFTED FROM REST POSITION BUT IT IS STILL CONNECTED TO LOADCELL
***********************************************************
*lOAD h IS ACTING AT LOCATION C OF 150 KN EACH ALONG THE RAIL
*lOAD I IS ACTING AT LOCATION A OF 135 KN EACH ACROSS THE RAIL
*LOAD M.N,O ARE ACTING AT DRIVE BASE LOCATION
JOINT LOAD
*LOAD h
5 50 FZ 150
MEMBER LOAD
55 58 CON GZ 150 0.3
JOINT LOAD
*LOAD I

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

106 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

5 50 FX 270
*5 50 FX -270
MEMBER LOAD
* LOAD M
55 58 CON GY 45 2.222
* LOAD N
55 58 CON GZ 250 2.222
*55 58 CON GZ -250 2.222
* LOAD O
55 58 CMOM GX 240 2.222
*LOAD DUE TO ECCENTRIC EFFECTS OF LOAD CELLS C & A
JOINT LOAD
5 MY -65
50 MY 65
*55 58 CMOM GX -240 2.222
****************************************************
LOAD 6 LOADTYPE None TITLE WAGON LOAD CASE-3
****************************************************
*WAGON TIPPLER IN OPERATION
****************************************************
*LOAD M.N,O ARE ACTING AT DRIVE BASE LOCATION
MEMBER LOAD
* LOAD M
55 58 CON GY 45 2.222
* LOAD N
55 58 CON GZ 250 2.222
*55 58 CON GZ -250 2.222
* LOAD O
55 58 CMOM GX 240 2.222
*55 58 CMOM GX -240 2.222
******************************************************************
LOAD 7 LOADTYPE None TITLE EARTH PRESSURE INCLUDING SURCHARGE(W.TAT6MBELOWFGL)
******************************************************************
*LOAD DUE TO EARTH PRESSURE
MEMBER LOAD
116 TRAP GX 624.023 594 0 0.751
103 TRAP GX 664 624.023 0 1
104 TRAP GX 594 554.5
105 TRAP GX 554.5 515
106 TRAP GX 515 475

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

107 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

107 TRAP GX 475 434.8


108 TRAP GX 434.8 394.9
72 TRAP GX 394.9 355
71 TRAP GX 355 315.1
70 TRAP GX 315.1 275.2
69 TRAP GX 275.2 235.3
68 TRAP GX 235.3 195.4
67 TRAP GX 195.4 165.1
66 TRAP GX 165.1 143.7
65 TRAP GX 143.7 120.9
59 TRAP GX 120.9 93.41
********************************
117 TRAP GX -624.023 -594 0 0.751
109 TRAP GX -664 -624.023 0 1
110 TRAP GX -594 -554.5
111 TRAP GX -554.5 -515
112 TRAP GX -515 -475
113 TRAP GX -475 -434.8
114 TRAP GX -434.8 -394.9
80 TRAP GX -394.9 -355
79 TRAP GX -355 -315.1
78 TRAP GX -315.1 -275.2
77 TRAP GX -275.2 -235.3
76 TRAP GX -235.3 -190.4
75 TRAP GX -190.4 -165.1
74 TRAP GX -165.1 -143.7
73 TRAP GX -143.7 -120.9
56 TRAP GX -120.9 -93.41
**********************************************************
LOAD 8 EARTH PRESSURE WITHOUT SURCHARGE (WATER TABLE BELOW RAFT)
**********************************************************
MEMBER LOAD
116 TRAP GX 437.958 418.7 0 0.751
103 TRAP GX 463.6 437.958 0 1
104 TRAP GX 418.7 393.1
105 TRAP GX 393.1 367.4
106 TRAP GX 367.4 341.8
107 TRAP GX 341.8 316.1
108 TRAP GX 316.1 290.5
72 TRAP GX 290.5 264.9

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

108 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

71 TRAP GX 264.9 239.2


70 TRAP GX 239.2 213.5
69 TRAP GX 213.5 187.9
68 TRAP GX 187.9 162.2
67 TRAP GX 162.2 136.6
66 TRAP GX 136.6 110.9
65 TRAP GX 110.9 85.3
59 TRAP GX 85.3 50.65
****************************
117 TRAP GX -437.958 -418.7 0 0.751
109 TRAP GX -463.6 -437.958 0 1
110 TRAP GX -418.7 -393.1
111 TRAP GX -393.1 -367.4
112 TRAP GX -367.4 -341.8
113 TRAP GX -341.8 -316.1
114 TRAP GX -316.1 -290.5
80 TRAP GX -290.5 -264.9
79 TRAP GX -264.9 -239.2
78 TRAP GX -239.2 -213.5
77 TRAP GX -213.5 -187.9
76 TRAP GX -187.9 -162.2
75 TRAP GX -162.2 -136.6
74 TRAP GX -136.6 -110.9
73 TRAP GX -110.9 -85.3
56 TRAP GX -85.3 -50.65
********************************************
LOAD 9 APRON FEEDER LOAD
***********************************************
JOINT LOAD
3 FY -150
********************************************
LOAD 10 WIND ON SHED
***********************************************
JOINT LOAD
6 FX 44 FY 210
* AT END COLUMNS
MEMBER LOAD
87 CON GX 150
87 CON GY 129
82 CON GX 21.4

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

109 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

82 CON GY 75
*****************************************
*LOAD COMBINATIONS
**************************
*UNFACTORED
LOAD COMB 11 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 12 DL + LL + HOP.FULL + TRKCASE-2 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 13 DL + LL + HOP.FULL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 6 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 14 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 15 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 5 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 16 DL + LL + HOP.FULL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.0 2 1.0 3 1.0 6 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 17 DL + LL + HOP.FULL + E.P(WTHSUR)
1 1.0 2 1.0 3 1.0 7 1.0
*FACTORED
* AS PER BRIDGE CODE
LOAD COMB 21 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.4 2 2.0 3 1.5 4 2.0 8 1.7 9 1.5 10 1.5
LOAD COMB 22 DL + LL + HOP.FULL + TRKCASE-2 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.4 2 2.0 3 1.5 5 2.0 8 1.7 9 1.5 10 1.5
LOAD COMB 23 DL + LL + HOP.FULL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD+LOADFROMSHED
1 1.4 2 2.0 3 1.5 6 2.0 8 1.7 9 1.5 10 1.5
LOAD COMB 24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.4 2 2.0 3 1.5 4 2.0 7 1.7 9 1.5 10 1.5
LOAD COMB 25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.4 2 2.0 3 1.5 5 2.0 7 1.7 9 1.5 10 1.5
LOAD COMB 26 DL + LL + HOP.FULL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD+LOADFROMSHED
1 1.4 2 2.0 3 1.5 6 2.0 7 1.7 9 1.5 10 1.5
LOAD COMB 27 DL + LL + HOP.FULL + E.P(WTHSUR)
1 1.4 2 2.0 3 1.5 7 1.7
PERFORM ANALYSIS PRINT STATICS CHECK
LOAD LIST 1 TO 10
PRINT SUPPORT REACTION
FINISH

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.4.3

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

110 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

SUPPORT REACTIONS FOR FRAME 3

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

99

100

101

LOAD

1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10

FORCE-X

22.84
-1.48
75.98
29.99
-154.19
53.16
-4098.88
-2960.75
2.99
-67.78
-22.40
1.47
-76.10
-30.02
-351.45
-53.14
4094.11
2960.76
-2.99
-134.00
-0.44
0.01
0.12
0.03
-34.36
-0.03
-0.22
-0.01
0.00
-13.62

FORCE-Y

3676.75
93.19
282.68
1219.40
39.48
73.26
81.26
62.12
8.63
-258.57
3649.61
93.18
282.62
1219.37
335.63
73.29
82.77
62.14
8.63
-56.28
1746.25
85.47
1073.06
261.23
-465.11
-236.55
-164.03
-124.26
132.73
-99.15

FORCE-Z

0.95
0.05
104.25
-0.04
-543.58
-248.19
-1.75
-1.32
0.28
1.27
1.10
0.05
104.25
-0.04
-549.18
-248.19
-1.75
-1.32
0.28
-1.42
-2.06
-0.10
10.78
0.09
-7.25
-3.61
3.50
2.64
-0.56
0.14

MOM-X

-2054.06
1.92
1543.34
151.82
-8458.06
-3897.24
-18.16
-13.78
3.18
20.46
-2051.04
1.92
1543.34
151.82
-8547.80
-3897.24
-18.33
-13.78
3.18
-24.79
-82.55
-3.84
47.49
1.37
-105.24
-61.03
36.48
27.56
-6.36
4.33

MOM-Y

MOM Z

-3.57
-46.24
-0.25
8.39
-471.25
-212.06
0.92
-141.16
952.92
2148.95
793.38
-387.27
-4612.35 10699.93
-3371.40
7862.38
-1.36
-10.99
-11.09
986.83
4.89
77.87
0.25
-8.27
471.25
213.45
-0.92
141.53
-1003.73
3355.42
-793.38
386.94
4608.18 -10657.65
3371.40 -7862.56
1.36
10.97
-13.16
1246.89
0.15
3.25
0.00
-0.02
0.00
-0.26
0.00
-0.06
-5.02
239.03
0.00
0.06
-0.02
1.49
0.00
0.03
0.00
0.00
-2.54
96.06

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.5
6.5.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

111 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

FRAME - 4
STAAD SKETCHES

THREE DIMENSIONAL VIEW OF FRAME - 4

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

112 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

115

102

113

292

116

105

107

114

104

101

103

50

46

48

54

117

118

62

55

63

56

64

57

65

58

66

59

67

60

68

61

109

110

69

89

90

91

92

93

94

95

96

97

98

111

112

99

106

108

100

NODE NUMBERS

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

113 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

133

292

134

116
115

118
126

131

127
135

128

132

117

137

59

56

65

73
136

138

66

74

67

75

68

76

69

121

123

77

70

78

71

79

72

80
122

124

125

108

114

107

113

106

112

105

119

120

111

104

110

129

130

103

109

MEMBER NUMBERS

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

114 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

-36.750
kN
-15.000
kN/m
-15.000 kN/m
-15.000 kN/m

-36.750 kN

-25.000 kN

-150.000 kN

-257.500 kN

292

-15.000
-15.000
kN/m
kN/m

-25.000 kN

-18.000 kN/m

-150.000 kN

-257.500 kN -257.500 kN

-257.500 kN

-18.000 kN/m

-18.000 kN/m

Load 1

Loading Diagram Load Case -1 - Dead Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

115 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

-15.000 kN/m
-15.000 -15.000
kN/m kN/m

-18.000 kN/m

-18.000 kN/m

292

-15.000
-15.000
kN/m
kN/m

-18.000 kN/m

Loading Diagram Load Case - 2 - Live Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

116 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-320.000 kNm

-320.000 kNm

Loading Diagram Load Case - 3 Wagon Load Case-1

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

117 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-1.16e+003
-320.000 kNm
kN

-1.16e+003
-320.000 kNm
kN
-240.000 kNm
250.000 kN
90.000 kN
-240.000 kNm
250.000 kN
90.000 kN

Load 4

Loading Diagram Load Case - 4 Wagon Load Case-2


7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

118 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-320.000
-2e+003kNm
kN

-320.000
-2e+003kNm
kN

190.000 kN
-240.000 kNm

190.000 kN

250.000 kN
90.000 kN

-240.000 kNm

250.000 kN
90.000 kN

Load 5

Loading Diagram Load Case - 5 Wagon Load Case-3

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

119 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

51.200 kN/m

-51.200 kN/m

88.060 kN/m

-88.060 kN/m

118.800 kN/m

-118.800 kN/m

151.700 kN/m

-151.700 kN/m

179.000 kN/m

-179.000 kN/m

204.600 kN/m

-204.600 kN/m

244.700 kN/m

-244.700 kN/m

292.500 kN/m

-292.500 kN/m

340.300 kN/m

-340.300 kN/m

388.100 kN/m

-388.100 kN/m

435.800 kN/m

-435.800 kN/m

483.600 kN/m

-483.600 kN/m

531.400 kN/m

-531.400 kN/m

579.000 kN/m

-579.000 kN/m

627.000 kN/m

-627.000 kN/m

674.800 kN/m

-674.800 kN/m

723.000 kN/m
758.000 kN/m
806.000 kN/m

-723.000 kN/m
Load 6
-758.000 kN/m
-806.000 kN/m

Loading Diagram Load Case - 6 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

120 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

0 kN/m

0 kN/m

36.860 kN/m

-36.860 kN/m

67.580 kN/m

-67.580 kN/m
-67.560

109.000 kN/m

-109.000 kN/m

139.800 kN/m

-139.800 kN/m

170.500 kN/m

-170.500 kN/m

201.200 kN/m

-201.200 kN/m

231.900 kN/m

-231.900 kN/m

262.600 kN/m

-262.600 kN/m

293.300 kN/m

-293.300 kN/m

324.140 kN/m
324.100

-324.100 kN/m

354.800 kN/m

-354.800 kN/m

385.500 kN/m

-385.500 kN/m

416.200 kN/m

-416.200 kN/m

446.900 kN/m

-446.900 kN/m

477.600 kN/m

-477.600 kN/m

508.400 kN/m
531.400 kN/m

-508.400 kN/m
-531.400 kN/mLoad 7

562.100 kN/m

-562.100 kN/m

Loading Diagram Load Case - 7 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

121 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-30.000 kNm
-30.000 kNm
-30.000 kNm
30.000 kNm

Loading Diagram Load Case - 8 Apron Feeder Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

122 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

-229.000 kN

292

-229.000 kN

Loading Diagram Load Case - 9 Track Wheel Load


7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.5.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

123 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

STAAD-PRO ANALYSIS INPUT FOR FRAME 4

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 12-Mar-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
5 19.93 11.226 0; 46 0 9.876 0; 48 19.93 9.876 0; 50 0 11.226 0; 54 0 8.876 0;
55 0 7.876 0; 56 0 6.876 0; 57 0 5.876 0; 58 0 4.876 0; 59 0 3.876 0;
60 0 2.876 0; 61 0 1.876 0; 62 19.93 8.876 0; 63 19.93 7.876 0;
64 19.93 6.876 0; 65 19.93 5.876 0; 66 19.93 4.876 0; 67 19.93 3.876 0;
68 19.93 2.876 0; 69 19.93 1.876 0; 89 0 0.876 0; 90 19.93 0.876 0;
91 0 -0.124 0; 92 19.93 -0.124 0; 93 0 -1.124 0; 94 19.93 -1.124 0;
95 0 -2.124 0; 96 19.93 -2.124 0; 97 0 -3.124 0; 98 19.93 -3.124 0;
99 0 -4.875 0; 100 19.93 -4.875 0; 101 0 12.226 0; 102 0 13.426 0;
103 19.93 12.226 0; 104 19.93 13.426 0; 105 4.89 13.426 0; 106 4.89 -4.875 0;
107 15.04 13.426 0; 108 15.04 -4.875 0; 109 4.89 1.876 0; 110 15.04 1.876 0;
111 0 -3.875 0; 112 19.93 -3.875 0; 113 3.38171 13.426 0; 114 16.5483 13.426 0;
115 3.38171 15.536 0; 116 16.5483 15.536 0; 117 4.89 8.876 0;
118 15.04 8.876 0;
MEMBER INCIDENCES
56 48 5; 59 46 50; 65 54 46; 66 55 54; 67 56 55; 68 57 56; 69 58 57; 70 59 58;
71 60 59; 72 61 60; 73 62 48; 74 63 62; 75 64 63; 76 65 64; 77 66 65; 78 67 66;
79 68 67; 80 69 68; 103 99 111; 104 97 95; 105 95 93; 106 93 91; 107 91 89;
108 89 61; 109 100 112; 110 98 96; 111 96 94; 112 94 92; 113 92 90; 114 90 69;
115 50 101; 116 101 102; 117 5 103; 118 103 104; 119 106 109; 120 108 110;
121 109 117; 122 61 109; 123 110 118; 124 69 110; 125 109 110; 126 102 113;
127 105 107; 128 107 114; 129 111 97; 130 112 98; 131 113 105; 132 114 104;
133 113 115; 134 114 116; 135 117 105; 136 54 117; 137 118 107; 138 62 118;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.05e+008

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

124 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

POISSON 0.3
DENSITY 76.8195
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
56 59 65 TO 80 103 TO 118 129 130 PRIS YD 2.93 ZD 1.2
125 PRIS YD 1.25 ZD 0.525
122 124 PRIS YD 0.5 ZD 0.9
MEMBER PROPERTY INDIAN
126 TO 128 131 132 PRIS YD 3 ZD 0.9
MEMBER PROPERTY INDIAN
119 TO 121 123 135 137 PRIS YD 0.9 ZD 0.9
MEMBER PROPERTY INDIAN
133 134 PRIS YD 1.825 ZD 0.9
MEMBER PROPERTY INDIAN
136 138 PRIS YD 0.55 ZD 0.9
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER OFFSET
*54 57 START 0 1.35 0
*94 95 END 0 -1.35 0
127 128 START 0.45 -1.5 0
127 131 END -0.45 -1.5 0
126 START 1.465 -1.5 0
132 END -1.465 -1.5 0
125 START 0.45 -0.375 -0.1625
125 END -0.45 -0.375 -0.1625
122 136 START 1.465 0 0
124 138 START -1.465 0 0
122 136 END -0.45 0 0
124 138 END 0.45 0 0
126 END 0.25729 -1.5 0
131 START 0.25729 -1.5 0
128 END -0.25729 -1.5 0
132 START -0.25729 -1.5 0
SUPPORTS
99 100 106 108 FIXED
*****************************************************
LOAD 1 DL DEAD LOAD

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

125 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

*****************************************************
SELFWEIGHT Y -1
* DEAD LOAD DUE TO APRON FEEDOR
* A21 & A22 + 1/2 OF A19 & A20
* 200 + 75/2 = 237.5
MEMBER LOAD
125 CON GY -257.5 0.275
125 CON GY -257.5 3.275
125 CON GY -257.5 5.975
125 CON GY -257.5 8.975
*DEAD LOAD DUE TO FLOOR SLAB @ 11.076M LVL
122 124 125 UNI GY -18
*DEAD LOAD DUE TO FLOOR SLAB @ 0.00M LVL
126 TO 128 131 132 UNI GY -15
*DEAD LOAD DUE TO RAIL TRACK SUPPORTING BEAM
JOINT LOAD
102 104 FY -36.75
*LOAD DUE TO MONORAIL OF 10 T CAPACITY
MEMBER LOAD
136 138 CON GY -150 2
*SELFWEIGHT OF DRIVE BASE BEAM
131 CON GY -25 0.048
128 CON GY -25 0.753
****************************************
LOAD 2 LL LIVE LOAD
***************************************
MEMBER LOAD
*LIVE LOAD DUE TO FLOOR SLAB @ 11.076M LVL
122 124 125 UNI GY -18
*LIVE LOAD DUE TO FLOOR SLAB @ 0.00M LVL
126 TO 128 131 132 UNI GY -15
***************************************
LOAD 3 LOADTYPE None TITLE WAGON LOAD CASE-1
***************************************
*WAGONTIPPLER AT REST WITH WAGON i.e WAGON JUST KEEP ON TIPPLER TABLE
********************************************************
*lOAD d IS ACTING AT END FRAME LOCATION 320 KN.M EACH
*****************************************************
JOINT LOAD
115 116 MX -320

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

126 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

*******************************************
LOAD 4 LOADTYPE None TITLE WAGON LOAD CASE-2
****************************************************
*WAGON JUST LIFTED FROM REST POSITION BUT IT IS STILL CONNECTED TO LOADCELL
***********************************************************
*LOAD b & d IS ACTING AT END FRAME LOCATION
JOINT LOAD
115 116 FY -1160 MX -320
*115 116 FY -1160 MX 320
MEMBER LOAD
*LOAD M.N,O ARE ACTING AT DRIVE BASE LOCATION
131 CON GY 90 0.048
128 CON GY 90 0.753
131 CMOM GX -240 0.048
128 CMOM GX -240 0.753
*131 CMOM GX 240 0.048
*128 CMOM GX 240 0.753
131 CON GZ 250 0.048
128 CON GZ 250 0.753
*131 CON GZ -250 0.048
*128 CON GZ -250 0.753
****************************************************
LOAD 5 LOADTYPE None TITLE WAGON LOAD CASE-3
****************************************************
*WAGON TIPPLER IN OPERATION
****************************************************
*LOAD a c & d IS ACTING AT END FRAME LOCATION
JOINT LOAD
115 116 FX 190 FY -2000 MX -320
*115 116 FY -2000 FX -190 MX 320
MEMBER LOAD
*LOAD M.N,O ARE ACTING AT DRIVE BASE LOCATION
131 CON GY 90 0.048
128 CON GY 90 0.753
131 CMOM GX -240 0.048
128 CMOM GX -240 0.753
*131 CMOM GX 240 0.048
*128 CMOM GX 240 0.753
131 CON GZ 250 0.048
128 CON GZ 250 0.753

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

127 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

*131 CON GZ -250 0.048


*128 CON GZ -250 0.753
******************************************************************
LOAD 6 LOADTYPE None TITLE EARTH PRESSURE INCLUDING SURCHARGE(W.TAT6MBELOWFGL)
******************************************************************
*LOAD DUE TO EARTH PRESSURE
MEMBER LOAD
129 TRAP GX 758 723 0 0.751
103 TRAP GX 806 758 0 1
104 TRAP GX 723 674.8
105 TRAP GX 674.8 627
106 TRAP GX 627 579
107 TRAP GX 579 531.4
108 TRAP GX 531.4 483.6
72 TRAP GX 483.6 435.8
71 TRAP GX 435.8 388.1
70 TRAP GX 388.1 340.3
69 TRAP GX 340.3 292.5
68 TRAP GX 292.5 244.7
67 TRAP GX 244.7 204.6
66 TRAP GX 204.6 179
65 TRAP GX 179 151.7
59 TRAP GX 151.7 118.8
115 TRAP GX 118.8 88.06
116 TRAP GX 88.06 51.2
********************************
109 TRAP GX -806 -758 0 1
130 TRAP GX -758 -723 0 0.751
110 TRAP GX -723 -674.8
111 TRAP GX -674.8 -627
112 TRAP GX -627 -579
113 TRAP GX -579 -531.4
114 TRAP GX -531.4 -483.6
80 TRAP GX -483.6 -435.8
79 TRAP GX -435.8 -388.1
78 TRAP GX -388.1 -340.3
77 TRAP GX -340.3 -292.5
76 TRAP GX -292.5 -244.7
75 TRAP GX -244.7 -204.6
74 TRAP GX -204.6 -179

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

128 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

73 TRAP GX -179 -151.7


56 TRAP GX -151.7 -118.8
117 TRAP GX -118.8 -88.06
118 TRAP GX -88.06 -51.2
**********************************************************
LOAD 7 EARTH PRESSURE WITHOUT SURCHARGE (WATER TABLE BELOW RAFT)
**********************************************************
MEMBER LOAD
129 TRAP GX 531.4 508.4 0 0.751
103 TRAP GX 562.1 531.4 0 1
104 TRAP GX 508.4 477.6
105 TRAP GX 477.6 446.9
106 TRAP GX 446.9 416.2
107 TRAP GX 416.2 385.5
108 TRAP GX 385.5 354.8
72 TRAP GX 354.8 324.1
71 TRAP GX 324.14 293.3
70 TRAP GX 293.3 262.6
69 TRAP GX 262.6 231.9
68 TRAP GX 231.9 201.2
67 TRAP GX 201.2 170.5
66 TRAP GX 170.5 139.8
65 TRAP GX 139.8 109
59 TRAP GX 109 67.58
****************************
130 TRAP GX -531.4 -508.4 0 0.751
109 TRAP GX -562.1 -531.4 0 1
110 TRAP GX -508.4 -477.6
111 TRAP GX -477.6 -446.9
112 TRAP GX -446.9 -416.2
113 TRAP GX -416.2 -385.5
114 TRAP GX -385.5 -354.8
80 TRAP GX -354.8 -324.1
79 TRAP GX -324.1 -293.3
78 TRAP GX -293.3 -262.6
77 TRAP GX -262.6 -231.9
76 TRAP GX -231.9 -201.2
75 TRAP GX -201.2 -170.5
74 TRAP GX -170.5 -139.8
73 TRAP GX -139.8 -109

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

129 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

56 TRAP GX -109 -67.58


115 TRAP GX 67.58 36.86
116 TRAP GX 36.86 0
117 TRAP GX -67.56 -36.86
118 TRAP GX -36.86 0
********************************************
LOAD 8 APRON FEEDER LOAD
***********************************************
* AS THE LATERAL LOAD IS DIRECTLY TAKING THE LONGITUDINAL BEAM
* ONLY MOMENT DUE TO LATERAL LOAD AT THE SUPPORTS IS APPLIED
*BY TAKING THE PEDESTAL HEIGHT TO CENTE OF BEAM AS 0.75 M
*= 40 X 0.75 = 30 kN.M
MEMBER LOAD
125 CMOM GX -30 0.275
125 CMOM GX -30 3.275
125 CMOM GX -30 5.975
125 CMOM GX -30 8.975
********************************************
LOAD 9 TRACK WHEEL LOAD
***********************************************
JOINT LOAD
102 104 FY -229
***********************************************
****************************************************
LOAD 10 LOADTYPE None TITLE WAGON LOAD CASE-4
****************************************************
*LOCOMOTIVE MOVING OVER RAIL TABLE FROM OUTHAUL TO INHAUL
****************************************************
*LOAD J IS ACTING AT COUNTERFORT LOCATION OF COUNTERFORT
JOINT LOAD
102 104 FZ 60 MX 138
*LOAD DUE TO G
102 104 FY -450
*LOAD COMBINATIONS
**************************
* UNFACTORED
***************
LOAD COMB 11 DL + LL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD
1 1.0 2 1.0 3 1.0 7 1.0 8 1.0
LOAD COMB 12 DL + LL + TRKCASE-2 + E.P(W.OSUR)+ A.FLOAD

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

130 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

1 1.0 2 1.0 4 1.0 7 1.0 8 1.0


LOAD COMB 13 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
1 1.0 2 1.0 5 1.0 7 1.0 8 1.0
LOAD COMB 14 DL + LL + TRKCASE-4 + E.P(W.OSUR)+ A.FLOAD
1 1.0 2 1.0 10 1.0 7 1.0 8 1.0
LOAD COMB 15 DL + LL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD
1 1.0 2 1.0 3 1.0 6 1.0 8 1.0
LOAD COMB 16 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
1 1.0 2 1.0 4 1.0 6 1.0 8 1.0
LOAD COMB 17 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
1 1.0 2 1.0 5 1.0 6 1.0 8 1.0
LOAD COMB 18 DL + LL + TRKCASE-4 + E.P(WTHSUR)+ A.FLOAD
1 1.0 2 1.0 10 1.0 6 1.0 8 1.0
LOAD COMB 19 DL + LL + E.P(WTHSUR) + WAGON AXEL LOAD
1 1.0 2 1.0 6 1.0 9 1.0
*****************
* FACTORED
***************
LOAD COMB 20 DL + LL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD
1 1.4 2 2.0 3 2.0 7 1.7 8 1.5
LOAD COMB 21 DL + LL + TRKCASE-2 + E.P(W.OSUR)+ A.FLOAD
1 1.4 2 2.0 4 2.0 7 1.7 8 1.5
LOAD COMB 22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
1 1.4 2 2.0 5 2.0 7 1.7 8 1.5
LOAD COMB 23 DL + LL + TRKCASE-4 + E.P(W.OSUR)+ A.FLOAD
1 1.4 2 2.0 10 2.0 7 1.7 8 1.5
LOAD COMB 24 DL + LL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD
1 1.4 2 2.0 3 2.0 6 1.7 8 1.5
LOAD COMB 25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
1 1.4 2 2.0 4 2.0 6 1.7 8 1.5
LOAD COMB 26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
1 1.4 2 2.0 5 2.0 6 1.7 8 1.5
LOAD COMB 27 DL + LL + TRKCASE-4 + E.P(WTHSUR)+ A.FLOAD
1 1.4 2 2.0 10 2.0 6 1.7 8 1.5
LOAD COMB 28 DL + LL + E.P(WTHSUR) + WAGON AXEL LOAD
1 1.4 2 2.0 6 1.7 9 2.0
PERFORM ANALYSIS PRINT STATICS CHECK
LOAD LIST 1 TO 10
PRINT SUPPORT REACTION
FINISH

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.5.3

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

131 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

SUPPORT REACTIONS FOR FRAME 4

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

99

100

106

LOAD

1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9

FORCE-X

-91.46
-6.90
0.61
35.08
-119.68
-3796.48
-2713.11
-1.08
-1.46
-3.31
91.46
6.90
-0.61
-35.08
-224.60
3796.48
2713.09
1.08
1.46
3.31
74.26
9.17
0.06
1.03
-17.00
22.17
16.45
-0.10
0.01

FORCE-Y

2179.11
85.31
-0.11
596.02
786.62
253.17
197.44
0.20
207.11
407.07
2179.11
85.31
-0.11
596.02
1341.17
253.17
197.46
0.20
207.11
407.07
1523.50
165.49
0.11
473.98
958.18
-253.17
-197.45
-0.20
21.89

FORCE-Z

12.24
1.52
0.06
-210.10
-209.50
-24.05
-17.89
5.09
-0.06
-53.56
12.24
1.52
0.06
-210.10
-209.27
-24.05
-17.89
5.09
-0.06
-53.56
-12.24
-1.52
-0.06
-39.90
-40.40
24.05
17.89
-5.09
0.06

MOM-X

124.12
15.36
284.52
-3154.23
-3152.39
-93.11
-69.25
61.72
-0.23
-1096.65
124.12
15.36
284.52
-3154.23
-3150.50
-93.11
-69.25
61.72
-0.23
-1096.65
-14.57
-1.83
35.48
-486.02
-488.44
93.11
69.25
-1.72
0.23

MOM-Y

-19.77
-2.42
2.91
358.64
360.10
-47.42
-35.27
-14.02
-0.12
-13.99
19.77
2.42
-2.91
-358.64
-360.02
47.42
35.27
14.02
0.12
13.99
4.58
0.59
0.92
22.22
24.08
-61.74
-45.92
-1.64
-0.15

MOM Z

259.68
24.44
-2.38
-208.04
1283.93
8259.31
6022.97
4.26
10.20
21.76
-259.68
-24.44
2.38
208.04
1947.39
-8259.31
-6022.77
-4.26
-10.20
-21.76
-156.84
-19.37
-0.17
-4.77
62.52
-5.13
-3.73
0.30
0.09

7/1/08 7:13 PM

BGR Energy Systems Ltd.

108

10
1
2
3
4
5
6
7
8
9
10

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

132 of

Doc. No.

GID-091-CV-CAL-3481C

-0.03
-74.26
-9.17
-0.06
-1.03
-18.73
-22.17
-16.45
0.10
-0.01
0.03

42.93
1523.50
165.49
0.11
473.98
734.03
-253.17
-197.45
-0.20
21.89
42.93

-6.44
-12.24
-1.52
-0.06
-39.90
-40.84
24.05
17.89
-5.09
0.06
-6.44

-139.41
-14.57
-1.83
35.48
-486.02
-489.17
93.11
69.25
-1.72
0.23
-139.41

Rev
-0.97
-4.58
-0.59
-0.92
-22.22
-24.05
61.74
45.92
1.64
0.15
0.97

292

0.30
156.84
19.37
0.17
4.77
73.76
5.13
3.73
-0.30
-0.09
-0.30

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.6
6.6.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

133 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

FRAME - 5
STAAD SKETCHES

Load 1

THREE DIMENSIONAL VIEW OF FRAME - 5

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

134 of

Doc. No.

GID-091-CV-CAL-3481C

119 121 122 123 124

102

Rev

105

107

292

104

101

103

50

46

48

54

117

118

62

55

63

56

64

57

65

58

66

59

67

60

68

61

109

110

69

89

90

91

92

93

94

95

96

97

98

111

112

99

106

108

128 127 126 125 120

100

Load 1

NODE NUMBERS

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

135 of

Doc. No.

GID-091-CV-CAL-3481C

139 141
142 143
144

Rev

292

116
115

118
126

127
135

132

117

137

59

56

65

73
136

138

66

74

67

75

68

76

69

121

123

77

70

78

71

79

72

80
122

124

125

108

114

107

113

106

112

105

145
147 146
140 148

119

120

111

104

110

129

130

103

109

Load 1

MEMBER NUMBERS

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

136 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-310.000 kN
-53.800 kN/m
-35.000
kN/m
-130.000
kNkN/m -53.800 kN/m
-35.000
kN/m
-35.000
-36.750 kN
-35.000
kN/m
-35.000
kN/m
-53.800
-15.000
kN/mkN/m
-15.000 kN/m
-53.800 kN/m
-150.000 kN
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-18.000
-53.800
kN/mkN/m
-18.000 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m

-53.800 kN/m
-35.000
kN/m
-130.000
kN
-35.000
kN/m
-35.000
kN/m
-53.800
kN/m
-36.750
kN
-35.000
kN/m
-35.000
kN/m
-15.000 kN/m -53.800 kN/m
-53.800 kN/m
-150.000 kN
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-18.000
kN/mkN/m
-53.800
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m
-53.800 kN/m

Loading Diagram Load Case -1 - Dead Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

137 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

-65.000 kN
-33.000 kN

-15.000 kN/m-15.000 kN/m

-18.000 kN/m
-18.000 kN/m

-15.000 kN/m

-33.000 kN

-18.000 kN/m

Loading Diagram Load Case - 2 - Live Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

138 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

53.810 kN/m

-53.810 kN/m

92.560 kN/m

-92.560 kN/m

124.800 kN/m

-124.800 kN/m

159.500 kN/m

-159.500 kN/m

188.200 kN/m

-188.200 kN/m

215.100 kN/m

-215.100 kN/m

257.200 kN/m

-257.200 kN/m

307.400 kN/m

-307.400 kN/m

357.700 kN/m

-357.700 kN/m

407.900 kN/m

-407.900 kN/m

458.100 kN/m

-458.100 kN/m

508.300 kN/m

-508.300 kN/m

558.600 kN/m

-558.600 kN/m

609.000 kN/m

-609.000 kN/m

659.000 kN/m

-659.000 kN/m

709.200 kN/m

-709.200 kN/m

759.000 kN/m
797.000 kN/m
847.000 kN/m

-759.000 kN/m
-797.000 kN/m
-847.000 Load
kN/m3

Loading Diagram Load Case - 3 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

139 of

Doc. No.

GID-091-CV-CAL-3481C

0 kN/m

Rev

292

0 kN/m

38.750 kN/m

-38.750 kN/m

71.030 kN/m

-71.030 kN/m

114.600 kN/m

-114.600 kN/m

146.900 kN/m

-146.900 kN/m

179.200 kN/m

-179.200 kN/m

211.500 kN/m

-211.500 kN/m

243.800 kN/m

-243.800 kN/m

276.100 kN/m

-276.100 kN/m

308.300 kN/m

-308.300 kN/m

340.600 kN/m

-340.600 kN/m

372.900 kN/m

-372.900 kN/m

405.200 kN/m

-405.200 kN/m

437.500 kN/m

-437.500 kN/m

469.800 kN/m

-469.800 kN/m

502.100 kN/m

-502.100 kN/m

534.400 kN/m
558.600 kN/m
590.900 kN/m

-534.400 kN/m
-558.600 kN/m
-590.900Load
kN/m4

Loading Diagram Load Case - 4 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

140 of

Doc. No.

GID-091-CV-CAL-3481C

-229.000 kN

Rev

292

-229.000 kN

Load 5

Loading Diagram Load Case - 5 Track Wheel Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

141 of

Doc. No.

GID-091-CV-CAL-3481C

150.000 kN

Rev

44.000 kN

292

21.400 kN
75.000 kN

129.000 kN
210.000 kN

Loading Diagram Load Case - 6 Wind Load From Shed Column Load

7/1/08 7:13 PM

BGR Energy Systems Ltd.

6.6.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

142 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-PRO ANALYSIS INPUT FOR FRAME 5

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 12-Mar-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
5 19.93 11.226 0; 46 0 9.876 0; 48 19.93 9.876 0; 50 0 11.226 0; 54 0 8.876 0;
55 0 7.876 0; 56 0 6.876 0; 57 0 5.876 0; 58 0 4.876 0; 59 0 3.876 0;
60 0 2.876 0; 61 0 1.876 0; 62 19.93 8.876 0; 63 19.93 7.876 0;
64 19.93 6.876 0; 65 19.93 5.876 0; 66 19.93 4.876 0; 67 19.93 3.876 0;
68 19.93 2.876 0; 69 19.93 1.876 0; 89 0 0.876 0; 90 19.93 0.876 0;
91 0 -0.124 0; 92 19.93 -0.124 0; 93 0 -1.124 0; 94 19.93 -1.124 0;
95 0 -2.124 0; 96 19.93 -2.124 0; 97 0 -3.124 0; 98 19.93 -3.124 0;
99 0 -4.875 0; 100 19.93 -4.875 0; 101 0 12.226 0; 102 0 13.426 0;
103 19.93 12.226 0; 104 19.93 13.426 0; 105 4.89 13.426 0; 106 4.89 -4.875 0;
107 15.04 13.426 0; 108 15.04 -4.875 0; 109 4.89 1.876 0; 110 15.04 1.876 0;
111 0 -3.875 0; 112 19.93 -3.875 0; 117 4.89 8.876 0; 118 15.04 8.876 0;
119 -6.465 13.426 0; 120 26.395 13.426 0; 121 -5.465 13.426 0;
122 -4.465 13.426 0; 123 -3.465 13.426 0; 124 -2.465 13.426 0;
125 25.395 13.426 0; 126 24.395 13.426 0; 127 23.395 13.426 0;
128 22.395 13.426 0;
MEMBER INCIDENCES
56 48 5; 59 46 50; 65 54 46; 66 55 54; 67 56 55; 68 57 56; 69 58 57; 70 59 58;
71 60 59; 72 61 60; 73 62 48; 74 63 62; 75 64 63; 76 65 64; 77 66 65; 78 67 66;
79 68 67; 80 69 68; 103 99 111; 104 97 95; 105 95 93; 106 93 91; 107 91 89;
108 89 61; 109 100 112; 110 98 96; 111 96 94; 112 94 92; 113 92 90; 114 90 69;
115 50 101; 116 101 102; 117 5 103; 118 103 104; 119 106 109; 120 108 110;
121 109 117; 122 61 109; 123 110 118; 124 69 110; 125 109 110; 126 102 105;
127 105 107; 129 111 97; 130 112 98; 132 107 104; 135 117 105; 136 54 117;
137 118 107; 138 62 118; 139 119 121; 140 104 128; 141 121 122; 142 122 123;
143 123 124; 144 124 102; 145 125 120; 146 126 125; 147 127 126; 148 128 127;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
56 59 65 TO 80 103 TO 118 129 130 PRIS YD 2.93 ZD 0.9
125 PRIS YD 1.25 ZD 0.525
122 124 PRIS YD 0.5 ZD 0.9
MEMBER PROPERTY INDIAN
126 127 132 140 144 PRIS YD 3 ZD 0.9
MEMBER PROPERTY INDIAN
119 TO 121 123 135 137 PRIS YD 0.9 ZD 0.9
MEMBER PROPERTY INDIAN
136 138 PRIS YD 0.55 ZD 0.9
MEMBER PROPERTY INDIAN
139 145 PRIS YD 1.8 ZD 0.9

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

143 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

MEMBER PROPERTY INDIAN


143 148 PRIS YD 2.7 ZD 0.9
142 147 PRIS YD 2.4 ZD 0.9
141 146 PRIS YD 2.1 ZD 0.9
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER OFFSET
*54 57 START 0 1.35 0
*94 95 END 0 -1.35 0
127 START 0.45 -1.5 0
127 END -0.45 -1.5 0
126 START 1.465 -1.5 0
132 END -1.465 -1.5 0
125 START 0.45 -0.375 -0.1625
125 END -0.45 -0.375 -0.1625
122 136 START 1.465 0 0
124 138 START -1.465 0 0
122 136 END -0.45 0 0
124 138 END 0.45 0 0
144 START 0 -1.5 0
140 END 0 -1.5 0
143 148 START 0 -1.35 0
143 148 END 0 -1.35 0
142 147 START 0 -1.2 0
142 147 END 0 -1.2 0
141 146 START 0 -1.05 0
141 146 END 0 -1.05 0
139 145 START 0 -0.9 0
139 145 END 0 -0.9 0
144 END -1.465 -1.5 0
140 START 1.465 -1.5 0
126 END -0.45 -1.5 0
132 START 0.45 -1.5 0
SUPPORTS
99 100 106 108 FIXED
*****************************************************
LOAD 1 DL DEAD LOAD
*****************************************************
SELFWEIGHT Y -1
* DEAD LOAD DUE TO APRON FEEDOR
MEMBER LOAD
*DEAD LOAD DUE TO FLOOR SLAB @ 11.076M LVL
122 124 125 UNI GY -18
*DEAD LOAD DUE TO FLOOR SLAB @ 0.00M LVL
126 127 132 UNI GY -15
*DEAD LOAD DUE TO RAIL TRACK SUPPORTING BEAM
JOINT LOAD
102 104 FY -36.75
*LOAD DUE TO MONORAIL OF 10 T CAPACITY
MEMBER LOAD
136 138 CON GY -150 2
*DEAD LOAD DUE TO WEIGHT OF WALL
56 59 65 TO 80 103 TO 118 129 130 UNI GY -53.8
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
MEMBER LOAD
127 CON GY -310
* AT END COLUMNS
MEMBER LOAD
139 145 CON GY -130
*DEAD LOAD DUE TO SOIL & SURCHARGE N BRACKET BEAM
139 TO 148 UNI GY -35

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

144 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

****************************************
LOAD 2 LL LIVE LOAD
***************************************
MEMBER LOAD
*LIVE LOAD DUE TO FLOOR SLAB @ 11.076M LVL
122 124 125 UNI GY -18
*LIVE LOAD DUE TO FLOOR SLAB @ 0.00M LVL
126 127 132 UNI GY -15
*LOAD DUE TO SUPERSTRUCTURE
*AT MIDDLE COLUMN
MEMBER LOAD
127 CON GY -65
* AT END COLUMNS
MEMBER LOAD
139 145 CON GY -33
***************************************
LOAD 3 LOADTYPE None TITLE EARTH PRESSURE INCLUDING SURCHARGE(W.TAT6MBELOWFGL)
******************************************************************
*LOAD DUE TO EARTH PRESSURE
MEMBER LOAD
103 TRAP GX 847 797 0 1
129 TRAP GX 797 759 0 0.751
104 TRAP GX 759 709.2
105 TRAP GX 709.2 659
106 TRAP GX 659 609
107 TRAP GX 609 558.6
108 TRAP GX 558.6 508.3
72 TRAP GX 508.3 458.1
71 TRAP GX 458.1 407.9
70 TRAP GX 407.9 357.7
69 TRAP GX 357.7 307.4
68 TRAP GX 307.4 257.2
67 TRAP GX 257.2 215.1
66 TRAP GX 215.1 188.2
65 TRAP GX 188.2 159.5
59 TRAP GX 159.5 124.8
115 TRAP GX 124.8 92.56
116 TRAP GX 92.56 53.81
********************************
109 TRAP GX -847 -797 0 1
130 TRAP GX -797 -759 0 0.751
110 TRAP GX -759 -709.2
111 TRAP GX -709.2 -659
112 TRAP GX -659 -609
113 TRAP GX -609 -558.6
114 TRAP GX -558.6 -508.3
80 TRAP GX -508.3 -458.1
79 TRAP GX -458.1 -407.9
78 TRAP GX -407.9 -357.7
77 TRAP GX -357.7 -307.4
76 TRAP GX -307.4 -257.2
75 TRAP GX -257.2 -215.1
74 TRAP GX -215.1 -188.2
73 TRAP GX -188.2 -159.5
56 TRAP GX -159.5 -124.8
117 TRAP GX -124.8 -92.56
118 TRAP GX -92.56 -53.81
**********************************************************
LOAD 4 EARTH PRESSURE WITHOUT SURCHARGE (WATER TABLE BELOW RAFT)
**********************************************************
MEMBER LOAD
103 TRAP GX 590.9 558.6 0 1

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

145 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

129 TRAP GX 558.6 534.4 0 0.751


104 TRAP GX 534.4 502.1
105 TRAP GX 502.1 469.8
106 TRAP GX 469.8 437.5
107 TRAP GX 437.5 405.2
108 TRAP GX 405.2 372.9
72 TRAP GX 372.9 340.6
71 TRAP GX 340.6 308.3
70 TRAP GX 308.3 276.1
69 TRAP GX 276.1 243.8
68 TRAP GX 243.8 211.5
67 TRAP GX 211.5 179.2
66 TRAP GX 179.2 146.9
65 TRAP GX 146.9 114.6
59 TRAP GX 114.6 71.03
115 TRAP GX 71.03 38.75
116 TRAP GX 38.75 0
********************************
109 TRAP GX -590.9 -558.6 0 1
130 TRAP GX -558.6 -534.4 0 0.751
110 TRAP GX -534.4 -502.1
111 TRAP GX -502.1 -469.8
112 TRAP GX -469.8 -437.5
113 TRAP GX -437.5 -405.2
114 TRAP GX -405.2 -372.9
80 TRAP GX -372.9 -340.6
79 TRAP GX -340.6 -308.3
78 TRAP GX -308.3 -276.1
77 TRAP GX -276.1 -243.8
76 TRAP GX -243.8 -211.5
75 TRAP GX -211.5 -179.2
74 TRAP GX -179.2 -146.9
73 TRAP GX -146.9 -114.6
56 TRAP GX -114.6 -71.03
117 TRAP GX -71.03 -38.75
118 TRAP GX -38.75 0
********************************************
LOAD 5 TRACK WHEEL LOAD
***********************************************
JOINT LOAD
102 104 FY -229
***********************************************
LOAD 6 WIND LOAD FROM SHED COLUMN LOAD
************************************************
*AT MIDDLE COLUMN
MEMBER LOAD
127 CON GY 210
127 CON GX 44
* AT END COLUMNS
MEMBER LOAD
139 CON GY 129
139 CON GX 150
145 CON GY 75
145 CON GX 21.4
****************************
*LOAD COMBINATIONS
**************************
*UNFACTORED
LOAD COMB 7 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD FROM SHED
1 1.0 2 1.0 5 1.0 4 1.0 6 1.0
LOAD COMB 8 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD FROM SHED
1 1.0 2 1.0 5 1.0 3 1.0 6 1.0

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

146 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

LOAD COMB 9 DL + LL + E.P(WTHSUR)


1 1.0 2 1.0 3 1.0
*FACTORED
LOAD COMB 17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD FROM SHED
1 1.4 2 2.0 5 2.0 4 1.7 6 1.5
LOAD COMB 18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD FROM SHED
1 1.4 2 2.0 5 2.0 3 1.7 6 1.5
LOAD COMB 19 DL + LL + E.P(WTHSUR)
1 1.5 2 1.5 3 1.5
PERFORM ANALYSIS PRINT STATICS CHECK
LOAD LIST 1 TO 6
PRINT SUPPORT REACTION
FINISH

6.6.3

SUPPORT REACTIONS FOR FRAME 5

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

LOAD

99

1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6

100

106

108

FORCE-X

-23.95
-7.02
-3782.81
-2697.81
-1.17
-93.01
23.95
7.02
3782.81
2697.81
1.17
-97.02
19.51
9.23
26.65
19.77
0.00
-12.74
-19.51
-9.23
-26.65
-19.77
0.00
-12.63

FORCE-Y

3316.15
132.69
256.09
200.48
202.16
-340.38
3316.15
132.69
256.09
200.48
202.16
1.84
1072.25
183.61
-256.09
-200.48
26.84
27.65
1072.25
183.61
-256.09
-200.48
26.84
-103.11

FORCE-Z

1.94
1.23
-27.23
-20.25
-0.07
0.03
1.94
1.23
-27.23
-20.25
-0.07
0.17
-1.94
-1.23
27.23
20.25
0.07
0.04
-1.94
-1.23
27.23
20.25
0.07
-0.25

MOM-X

23.16
12.96
-106.14
-78.92
-0.28
-0.14
23.16
12.96
-106.14
-78.92
-0.28
0.94
2.70
0.57
106.14
78.92
0.28
-0.20
2.70
0.57
106.14
78.92
0.28
-0.60

MOM-Y

-3.55
-1.51
-43.25
-32.16
-0.11
0.13
3.55
1.51
43.25
32.16
0.11
-0.19
-0.38
0.40
-76.36
-56.78
-0.20
0.28
0.38
-0.40
76.36
56.78
0.20
-0.29

MOM Z

121.82
29.99
7808.18
5681.26
9.26
854.87
-121.82
-29.99
-7808.18
-5681.26
-9.26
883.54
-40.12
-19.37
-6.44
-4.69
0.12
48.42
40.12
19.37
6.44
4.69
-0.12
48.55

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

147 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

ANALYSIS FOR COUNTERFORTS

7.1
7.1.1

CF 8
STAAD SKETCHES

2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
2

Load 1

NODE & MEMBER NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

148 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATIONS FOR COUNTERFORT CF8

Ph kN/m2-CASE-2

2.375
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17.076

10.00
19.00
28.00
37.00
46.00
55.00
64.00
78.00
92.00
106.00
120.00
134.00
148.00
162.00
176.00
190.00
204.00
219.06

0.00
9.00
18.00
27.00
36.00
45.00
54.00
63.00
72.00
81.00
90.00
99.00
108.00
117.00
126.00
135.00
144.00
153.68

23.75
45.13
66.5
87.88
109.3
130.6
152
185.3
218.5
251.8
285
318.3
351.5
385
418
451.3
485
520

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2

0
21.38
42.75
64.13
85.5
106.9
128.3
149.6
171
192.4
213.8
235.1
256.5
277.9
299.3
320.6
342
365

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

149 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

23.750 kN/m
45.130 kN/m
66.500 kN/m
87.880 kN/m
109.300 kN/m
130.600 kN/m
152.000 kN/m
185.300 kN/m
218.500 kN/m
251.800 kN/m
285.000 kN/m
318.300 kN/m
351.500 kN/m
385.000 kN/m
418.000 kN/m
451.300 kN/m
485.000 kN/m

520.000 kN/m

Loading Diagram Load Case - 1 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

150 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

0 kN/m
21.380 kN/m
42.750 kN/m
64.130 kN/m
85.500 kN/m
106.900 kN/m
128.300 kN/m
149.600 kN/m
171.000 kN/m
192.400 kN/m
213.800 kN/m
235.100 kN/m
256.500 kN/m
277.900 kN/m
299.300 kN/m
320.600 kN/m
342.000 kN/m

365.000 kN/m

Loading Diagram Load Case - 2 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.

7.1.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

151 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-PRO ANALYSIS INPUT FOR CF - 8

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 09-May-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 1 -4.7 0; 2 1 12.65 0; 3 1 12.376 0; 4 1 11.376 0; 5 1 10.376 0; 6 1 9.376 0;
7 1 8.376 0; 8 1 7.376 0; 9 1 6.376 0; 10 1 5.376 0; 11 1 4.376 0;
12 1 3.376 0; 13 1 2.376 0; 14 1 1.376 0; 15 1 0.376 0; 16 1 -0.624 0;
17 1 -1.624 0; 18 1 -2.624 0; 19 1 -3.624 0;
MEMBER INCIDENCES
2 1 19; 3 3 2; 4 4 3; 5 5 4; 6 6 5; 7 7 6; 8 8 7; 9 9 8; 10 10 9; 11 11 10;
12 12 11; 13 13 12; 14 14 13; 15 15 14; 16 16 15; 17 17 16; 18 18 17; 19 19 18;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 5.5e-006
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
2 PRIS YD 2.75 ZD 0.7
19 PRIS YD 2.623 ZD 0.7
18 PRIS YD 2.505 ZD 0.7
17 PRIS YD 2.387 ZD 0.7
16 PRIS YD 2.269 ZD 0.7
15 PRIS YD 2.151 ZD 0.7
14 PRIS YD 2.033 ZD 0.7
13 PRIS YD 1.915 ZD 0.7
12 PRIS YD 1.797 ZD 0.7
11 PRIS YD 1.679 ZD 0.7
10 PRIS YD 1.561 ZD 0.7
9 PRIS YD 1.443 ZD 0.7
8 PRIS YD 1.325 ZD 0.7
7 PRIS YD 1.206 ZD 0.7
6 PRIS YD 1.088 ZD 0.7
5 PRIS YD 0.969 ZD 0.7
4 PRIS YD 0.851 ZD 0.7
3 PRIS YD 0.732 ZD 0.7
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 FIXED
14 FIXED BUT FY FZ MX MY MZ
LOAD 1 EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE
SELFWEIGHT Y -1
MEMBER LOAD
2 TRAP GX 520 485
19 TRAP GX 485 451.3
18 TRAP GX 451.3 418
17 TRAP GX 418 385
16 TRAP GX 385 351.5
15 TRAP GX 351.5 318.3
14 TRAP GX 318.3 285
13 TRAP GX 285 251.8
12 TRAP GX 251.8 218.5
11 TRAP GX 218.5 185.3
10 TRAP GX 185.3 152

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

152 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

9 TRAP GX 152 130.6


8 TRAP GX 130.6 109.3
7 TRAP GX 109.3 87.88
6 TRAP GX 87.88 66.5
5 TRAP GX 66.5 45.13
4 TRAP GX 45.13 23.75
LOAD 2 EARTH PRESSURE WITHOUT SURCHARGE & SUBSOIL WATER PRESSURE
SELFWEIGHT Y -1
MEMBER LOAD
2 TRAP GX 365 342
19 TRAP GX 342 320.6
18 TRAP GX 320.6 299.3
17 TRAP GX 299.3 277.9
16 TRAP GX 277.9 256.5
15 TRAP GX 256.5 235.1
14 TRAP GX 235.1 213.8
13 TRAP GX 213.8 192.4
12 TRAP GX 192.4 171
11 TRAP GX 171 149.6
10 TRAP GX 149.6 128.3
9 TRAP GX 128.3 106.9
8 TRAP GX 106.9 85.5
7 TRAP GX 85.5 64.13
6 TRAP GX 64.13 42.75
5 TRAP GX 42.75 21.38
4 TRAP GX 21.38 0
**********************************************
PERFORM ANALYSIS
LOAD LIST 1 2
PRINT SUPPORT REACTION
FINISH

7.1.3

SUPPORT REACTIONS FOR CF 8

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

1
14

LOAD

1
2
1
2

FORCE-X

-195.53
-98.39
-4055.65
-3018.14

FORCE-Y

541.83
541.83
0.00
0.00

FORCE-Z

0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00

MOM-Y

0.00
0.00
0.00
0.00

MOM Z

-748.56
-598.49
0.00
0.00

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

7.2
7.2.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

153 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

CF 9
STAAD SKETCHES

2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19

NODE & MEMBER NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

154 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATIONS FOR COUNTERFORT CF9 FOR PART-1

Ph kN/m2-CASE-2

1.188
25
500
1000
Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERF
ORT-CASE1

11
12.5
13.5
14.5
15.5
17.076

134.00
155.00
169.00
183.00
197.00
219.06

99.00
112.50
121.50
130.50
139.50
153.68

159.1
184.1
201
217
233.9
260

m
Mpa
Mpa
mm
UDL
ON
COUN
TERFO
RTCASE2
117.6
133.6
144.3
155
165.7
182.5

EARTH PRESSURE CALCULATIONS FOR COUNTERFORT CF9 FOR PART-2

Ph kN/m2-CASE-2

2.425
25
500
1000
Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1

0
1
2
3
4
5
6
7
8
9
10
11

10.00
19.00
28.00
37.00
46.00
55.00
64.00
78.00
92.00
106.00
120.00
134.00

0.00
9.00
18.00
27.00
36.00
45.00
54.00
63.00
72.00
81.00
90.00
99.00

24.25
46.08
67.9
89.73
111.6
133.4
155.2
189.2
223.1
257.1
291
325

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2

0
21.83
43.65
65.48
87.3
109.1
131
152.8
174.6
196.4
218.3
240.1

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

155 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

390.740
24.250kN
kN/m
46.075 kN/m
67.900 kN/m
89.725 kN/m
111.550 kN/m
133.375 kN/m
155.200 kN/m
189.150 kN/m
223.100 kN/m
257.050 kN/m
-2.12e+003 kN
291.000 kN/m
324.950
159.100
kN/m kN/m
-2.98e+003 kNm
184.100 kN/m
201.000 kN/m
217.000 kN/m
233.890 kN/m

260.000 kN/m

Loading Diagram Load Case - 1 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

156 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

0 kN/m
276.880
kN
21.825 kN/m
43.650 kN/m
65.475 kN/m
87.300 kN/m
109.125 kN/m
130.950 kN/m
152.775 kN/m
174.600 kN/m
196.425 kN/m
-2.12e+003 kN
218.250 kN/m
240.075
117.600
kN/m kN/m
-2.33e+003 kNm
133.600 kN/m
144.300 kN/m
155.000 kN/m
165.700 kN/m

182.500 kN/m

Loading Diagram Load Case - 2 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.

7.2.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

157 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-PRO ANALYSIS INPUT FOR CF - 9

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 09-May-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
2 1 12.65 0; 3 1 12.376 0; 4 1 11.376 0; 5 1 10.376 0; 6 1 9.376 0;
7 1 8.376 0; 8 1 7.376 0; 9 1 6.376 0; 10 1 5.376 0; 11 1 4.376 0;
12 1 3.376 0; 13 1 2.376 0; 14 1 1.376 0; 15 1 -0.124 0; 16 1 -1.124 0;
17 1 -2.124 0; 18 1 -3.124 0; 19 1 -4.7 0;
MEMBER INCIDENCES
3 3 2; 4 4 3; 5 5 4; 6 6 5; 7 7 6; 8 8 7; 9 9 8; 10 10 9; 11 11 10; 12 12 11;
13 13 12; 14 14 13; 15 14 15; 16 15 16; 17 16 17; 18 17 18; 19 18 19;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 5.5e-006
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
14 15 PRIS YD 2 ZD 0.7
13 PRIS YD 1.885 ZD 0.7
12 PRIS YD 1.77 ZD 0.7
11 PRIS YD 1.655 ZD 0.7
10 PRIS YD 1.54 ZD 0.7
9 PRIS YD 1.425 ZD 0.7
8 PRIS YD 1.309 ZD 0.7
7 PRIS YD 1.194 ZD 0.7
6 PRIS YD 1.078 ZD 0.7
5 PRIS YD 0.963 ZD 0.7
4 PRIS YD 0.847 ZD 0.7
3 PRIS YD 0.732 ZD 0.7
MEMBER PROPERTY INDIAN
16 TO 19 PRIS YD 2.75 ZD 0.7
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
19 FIXED
14 FIXED BUT FY FZ MX MY MZ
******************************
LOAD 1 EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE
*****************************
SELFWEIGHT Y -1
MEMBER LOAD
14 TRAP GX 324.95 291
13 TRAP GX 291 257.05
12 TRAP GX 257.05 223.1
11 TRAP GX 223.1 189.15
10 TRAP GX 189.15 155.2
9 TRAP GX 155.2 133.375
8 TRAP GX 133.375 111.55
7 TRAP GX 111.55 89.725
6 TRAP GX 89.725 67.9
5 TRAP GX 67.9 46.075
4 TRAP GX 46.075 24.25

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

158 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

19 TRAP GX 233.89 260


18 TRAP GX 217 233.89
17 TRAP GX 201 217
16 TRAP GX 184.1 201
15 TRAP GX 159.1 184.1
*LOAD DUE TO PROP REACTION OF CF10
JOINT LOAD
3 FX 390.74
*LOAD DUE TO TUNNEL SUPPORTING BEAM REACTIONS
MEMBER LOAD
15 CON GY -2117.83
15 CMOM GZ -2976.43
****************************************
LOAD 2 EARTH PRESSURE WITHOUT SURCHARGE & SUBSOIL WATER PRESSURE
***************************************
SELFWEIGHT Y -1
MEMBER LOAD
14 TRAP GX 240.075 218.25
13 TRAP GX 218.25 196.425
12 TRAP GX 196.425 174.6
11 TRAP GX 174.6 152.775
10 TRAP GX 152.775 130.95
9 TRAP GX 130.95 109.125
8 TRAP GX 109.125 87.3
7 TRAP GX 87.3 65.475
6 TRAP GX 65.475 43.65
5 TRAP GX 43.65 21.825
4 TRAP GX 21.825 0
19 TRAP GX 165.7 182.5
18 TRAP GX 155 165.7
17 TRAP GX 144.3 155
16 TRAP GX 133.6 144.3
15 TRAP GX 117.6 133.6
*LOAD DUE TO PROP REACTION OF CF10
JOINT LOAD
3 FX 276.88
*LOAD DUE TO TUNNEL SUPPORTING BEAM REACTIONS
MEMBER LOAD
15 CON GY -2117.83
15 CMOM GZ -2331.4
**********************************************
PERFORM ANALYSIS
LOAD LIST 1 2
PRINT SUPPORT REACTION
FINISH

7.2.3

SUPPORT REACTIONS FOR CF 9

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

LOAD

19

1
2
1
2

14

FORCE-X

2437.83
1827.60
-5840.88
-4336.63

FORCE-Y

2668.22
2668.22
0.00
0.00

FORCE-Z

0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00

MOM-Y

0.00
0.00
0.00
0.00

MOM Z

-5155.62
-3855.56
0.00
0.00

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

7.3
7.3.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

159 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

CF 10
STAAD SKETCHES

2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14

NODE & MEMBER NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

160 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATIONS FOR COUNTERFORT CF10

Ph kN/m2-CASE-2

2.513
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1

0
1
2
3
4
5
6
7
8
9
10
11

10.00
19.00
28.00
37.00
46.00
55.00
64.00
78.00
92.00
106.00
120.00
134.00

0.00
9.00
18.00
27.00
36.00
45.00
54.00
63.00
72.00
81.00
90.00
99.00

25.13
47.74
70.35
92.96
115.6
138.2
160.8
196
231.2
266.3
301.5
336.7

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2

0
22.61
45.23
67.84
90.45
113.1
135.7
158.3
180.9
203.5
226.1
248.7

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

161 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

25.125 kN/m

47.737 kN/m

70.350 kN/m

92.963 kN/m

115.575 kN/m

138.188 kN/m

160.800 kN/m

195.975 kN/m

231.150 kN/m

266.325 kN/m

301.500 kN/m

336.600 kN/m

Loading Diagram Load Case - 1 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

162 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

0 kN/m

22.612 kN/m

45.225 kN/m

67.838 kN/m

90.450 kN/m

113.063 kN/m

135.675 kN/m

158.288 kN/m

180.900 kN/m

203.512 kN/m

226.125 kN/m

248.738 kN/m

Loading Diagram Load Case - 2 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.

7.3.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

163 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-PRO ANALYSIS INPUT FOR CF - 10

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 08-May-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
2 1 12.65 0; 3 1 12.376 0; 4 1 11.376 0; 5 1 10.376 0; 6 1 9.376 0;
7 1 8.376 0; 8 1 7.376 0; 9 1 6.376 0; 10 1 5.376 0; 11 1 4.376 0;
12 1 3.376 0; 13 1 2.376 0; 14 1 1.376 0;
MEMBER INCIDENCES
3 3 2; 4 4 3; 5 5 4; 6 6 5; 7 7 6; 8 8 7; 9 9 8; 10 10 9; 11 11 10; 12 12 11;
13 13 12; 14 14 13;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 5.5e-006
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
14 PRIS YD 2 ZD 0.7
13 PRIS YD 1.885 ZD 0.7
12 PRIS YD 1.77 ZD 0.7
11 PRIS YD 1.655 ZD 0.7
10 PRIS YD 1.54 ZD 0.7
9 PRIS YD 1.425 ZD 0.7
8 PRIS YD 1.309 ZD 0.7
7 PRIS YD 1.194 ZD 0.7
6 PRIS YD 1.078 ZD 0.7
5 PRIS YD 0.963 ZD 0.7
4 PRIS YD 0.847 ZD 0.7
3 PRIS YD 0.732 ZD 0.7
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
14 FIXED
2 FIXED BUT FY FZ
******************************
LOAD 1 EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE
*****************************
SELFWEIGHT Y -1
MEMBER LOAD
14 TRAP GX 336.6 301.5
13 TRAP GX 301.5 266.325
12 TRAP GX 266.325 231.15
11 TRAP GX 231.15 195.975
10 TRAP GX 195.975 160.8
9 TRAP GX 160.8 138.1875
8 TRAP GX 138.1875 115.575
7 TRAP GX 115.575 92.9625
6 TRAP GX 92.9625 70.35
5 TRAP GX 70.35 47.7375
4 TRAP GX 47.7375 25.125
****************************************
LOAD 2 EARTH PRESSURE WITHOUT SURCHARGE & SUBSOIL WATER PRESSURE
***************************************
SELFWEIGHT Y -1
MEMBER LOAD

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

164 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

14 TRAP GX 248.7375 226.125


13 TRAP GX 226.125 203.5125
12 TRAP GX 203.5125 180.9
11 TRAP GX 180.9 158.2875
10 TRAP GX 158.2875 135.675
9 TRAP GX 135.675 113.0625
8 TRAP GX 113.0625 90.45
7 TRAP GX 90.45 67.8375
6 TRAP GX 67.8375 45.225
5 TRAP GX 45.225 22.6125
4 TRAP GX 22.6125 0
**********************************************8
PERFORM ANALYSIS
LOAD LIST 1 2
PRINT SUPPORT REACTIONS
FINISH

7.3.3

SUPPORT REACTIONS FOR CF 10

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

LOAD

14

1
2
1
2

FORCE-X

-1410.68
-1091.18
-390.74
-276.88

FORCE-Y

277.66
277.66
0.00
0.00

FORCE-Z

0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00

MOM-Y

0.00
0.00
0.00
0.00

MOM Z

2976.43
2331.40
-583.70
-436.75

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

7.4
7.4.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

165 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

CF 11
STAAD SKETCHES

NODE & MEMBER NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

166 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATIONS FOR COUNTERFORT CF11

Ph kN/m2-CASE-2

2.85
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1

11.026
11.976
12.976
13.976
14.976
15.976
17.076

274.36
287.66
301.66
315.66
329.66
343.66
359.06

99.23
107.78
116.78
125.78
134.78
143.78
153.68

781.9
819.8
859.7
899.6
939.5
979.4
1023

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2

282.8
307.2
332.8
358.5
384.1
409.8
438

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

167 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

710.700 kN/m

748.600 kN/m

788.500 kN/m

828.400 kN/m

868.300 kN/m

908.200 kN/m

952.300 kN/m

Loading Diagram Load Case - 1 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

168 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

282.800 kN/m

307.200 kN/m

332.800 kN/m

358.500 kN/m

384.100 kN/m

409.800 kN/m

438.000 kN/m

Loading Diagram Load Case - 2 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.

7.4.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

169 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-PRO ANALYSIS INPUT FOR CF - 11

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 08-May-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 1 0 0; 2 1 6.05 0; 3 1 5.1 0; 4 1 4.1 0; 5 1 3.1 0; 6 1 2.1 0; 7 1 1.1 0;
MEMBER INCIDENCES
3 1 7; 4 3 2; 5 4 3; 6 5 4; 7 6 5; 8 7 6;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 5.5e-006
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
3 PRIS YD 2 ZD 0.85
8 PRIS YD 1.683 ZD 0.85
7 PRIS YD 1.386 ZD 0.85
6 PRIS YD 1.049 ZD 0.85
4 5 PRIS YD 0.7 ZD 0.85
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 FIXED
2 FIXED BUT FY FZ MX MY MZ
****************************
LOAD 1 EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE
*****************************
SELFWEIGHT Y -1
MEMBER LOAD
3 TRAP GX 1023 979.4
8 TRAP GX 979.4 939.5
7 TRAP GX 939.5 899.6
6 TRAP GX 899.6 859.6
5 TRAP GX 859.6 819.8
4 TRAP GX 819.8 781.9
******************************************
LOAD 2 EARTH PRESSURE WITHOUT SURCHARGE & SUBSOIL WATER PRESSURE
****************************************
SELFWEIGHT Y -1
MEMBER LOAD
3 TRAP GX 438 409.8
8 TRAP GX 409.8 384.1
7 TRAP GX 384.1 358.5
6 TRAP GX 358.5 332.8
5 TRAP GX 332.8 307.2
4 TRAP GX 307.2 282.8
******************************************
LOAD 3 APRON FEEDER LOAD
*****************************************
JOINT LOAD
*DEAD LOAD DUE TO APRON FEEDER & FLOOR SLAB LOAD ON TOP OF COUNTERFORT
*75 KN FROM APRON FEEDER LOAD
* 100 KN FROM FLOOR SLAB& BEAMS
2 FY -175
2 FX 20

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

170 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

*****************************************
*LOAD COMBINATIONS
*********************************
LOAD COMB 6 EP WITH SUR & SUBSOIL PRESUURE + APRON FEDER LOAD
1 1.0 3 1.0
LOAD COMB 7 EP WITHOUT SUR & SUBSOIL PRESUURE + APRON FEDER LOAD
2 1.0 3 1.0
PERFORM ANALYSIS
LOAD LIST 1 2 3
PRINT SUPPORT REACTION
FINISH

7.4.3

SUPPORT REACTIONS FOR CF 11

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

LOAD

1
2
3
1
2
3

FORCE-X

-4088.28
-1659.51
0.00
-1372.15
-520.93
-20.00

FORCE-Y

153.87
153.87
175.00
0.00
0.00
0.00

FORCE-Z

0.00
0.00
0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00
0.00
0.00

MOM-Y

0.00
0.00
0.00
0.00
0.00
0.00

MOM Z

7480.32
2970.85
0.00
0.00
0.00
0.00

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

7.5
7.5.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

171 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

CF 12
STAAD SKETCHES

NODE & MEMBER NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

172 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATIONS FOR COUNTERFORT CF12

Ph kN/m2-CASE-2

2.388
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1

11.026
11.976
12.976
13.976
14.976
15.976
17.076

274.36
287.66
301.66
315.66
329.66
343.66
359.06

99.23
107.78
116.78
125.78
134.78
143.78
153.68

655
686.8
720.2
753.6
787.1
820.5
857.3

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2

236.9
257.3
278.8
300.3
321.8
343.3
366.9

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

173 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

595.400 kN/m

627.100 kN/m

660.500 kN/m

694.000 kN/m

727.400 kN/m

760.800 kN/m

797.600 kN/m

Loading Diagram Load Case - 1 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

174 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

236.900 kN/m

257.300 kN/m

278.800 kN/m

300.300 kN/m

321.800 kN/m

343.300 kN/m

366.900 kN/m

Loading Diagram Load Case - 2 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.

7.5.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

175 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-PRO ANALYSIS INPUT FOR CF - 12

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 08-May-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 1 0 0; 2 1 6.05 0; 3 1 5.1 0; 4 1 4.1 0; 5 1 3.1 0; 6 1 2.1 0; 7 1 1.1 0;
MEMBER INCIDENCES
3 1 7; 4 3 2; 5 4 3; 6 5 4; 7 6 5; 8 7 6;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 5.5e-006
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
3 PRIS YD 2 ZD 0.7
8 PRIS YD 1.683 ZD 0.7
7 PRIS YD 1.386 ZD 0.7
6 PRIS YD 1.049 ZD 0.7
4 5 PRIS YD 0.7 ZD 0.7
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 FIXED
2 FIXED BUT FY FZ MX MY MZ
****************************
LOAD 1 EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE
*****************************
SELFWEIGHT Y -1
MEMBER LOAD
3 TRAP GX 857 820.5
8 TRAP GX 820.5 787.1
7 TRAP GX 787.1 753.6
6 TRAP GX 753.6 720.2
5 TRAP GX 720.2 686.8
4 TRAP GX 686.8 655
******************************************
LOAD 2 EARTH PRESSURE WITHOUT SURCHARGE & SUBSOIL WATER PRESSURE
****************************************
SELFWEIGHT Y -1
MEMBER LOAD
3 TRAP GX 366.9 343.3
8 TRAP GX 343.3 321.8
7 TRAP GX 321.8 300.3
6 TRAP GX 300.3 278.8
5 TRAP GX 278.8 257.3
4 TRAP GX 257.3 236.9
******************************************
LOAD 3 APRON FEEDER LOAD
*****************************************
JOINT LOAD
*DEAD LOAD DUE TO APRON FEEDER & FLOOR SLAB LOAD ON TOP OF COUNTERFORT
*75 KN FROM APRON FEEDER LOAD
* 100 KN FROM FLOOR SLAB& BEAMS
2 FY -175
2 FX 20

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

176 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

*****************************************
*LOAD COMBINATIONS
*********************************
LOAD COMB 6 EP WITH SUR & SUBSOIL PRESUURE + APRON FEDER LOAD
1 1.0 3 1.0
LOAD COMB 7 EP WITHOUT SUR & SUBSOIL PRESUURE + APRON FEDER LOAD
2 1.0 3 1.0
PERFORM ANALYSIS
LOAD LIST 1 2
PRINT SUPPORT REACTION
FINISH

7.5.3

SUPPORT REACTIONS FOR CF 12

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

1
2

LOAD

1
2
1
2

FORCE-X

-3425.00
-1390.19
-1149.53
-436.36

FORCE-Y

126.72
126.72
0.00
0.00

FORCE-Z

0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00

MOM-Y

0.00
0.00
0.00
0.00

MOM Z

6266.77
2488.70
0.00
0.00

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

7.6
7.6.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

177 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

CF 13
STAAD SKETCHES

NODE & MEMBER NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

178 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

EARTH PRESSURE CALCULATIONS FOR COUNTERFORT CF13

Ph kN/m2-CASE-2

2.075
25
500
1000

Ph kN/m2-CASE-1

=
=
=
=
DEPTH BELOW FGL

L
fck
fy
b

UDL ON
COUNTERFORTCASE-1

11.026
11.976
12.976
13.976
14.976
15.976
17.076

274.36
287.66
301.66
315.66
329.66
343.66
359.06

99.23
107.78
116.78
125.78
134.78
143.78
153.68

569.3
596.9
626
655
684.1
713.1
745.1

m
Mpa
Mpa
mm

UDL ON
COUNTERFORTCASE-2

205.9
223.7
242.3
261
279.7
298.4
318.9

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

179 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

517.400 kN/m

545.000 kN/m

574.100 kN/m

603.100 kN/m

632.200 kN/m

661.200 kN/m

693.200 kN/m

Loading Diagram Load Case - 1 Earth Pressure Including Surcharge (W.TAT6M Below FGL)

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

180 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

205.900 kN/m

223.700 kN/m

242.300 kN/m

261.000 kN/m

279.700 kN/m

298.400 kN/m

318.900 kN/m

Loading Diagram Load Case - 2 Earth Pressure Without Surcharge (Water Table Below Raft)

7/1/08 7:13 PM

BGR Energy Systems Ltd.

7.6.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

181 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-PRO ANALYSIS INPUT FOR CF - 13

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 08-May-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 1 0 0; 2 1 6.05 0; 3 1 5.1 0; 4 1 4.1 0; 5 1 3.1 0; 6 1 2.1 0; 7 1 1.1 0;
MEMBER INCIDENCES
3 1 7; 4 3 2; 5 4 3; 6 5 4; 7 6 5; 8 7 6;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 5.5e-006
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
3 PRIS YD 2 ZD 0.7
8 PRIS YD 1.683 ZD 0.7
7 PRIS YD 1.386 ZD 0.7
6 PRIS YD 1.049 ZD 0.7
4 5 PRIS YD 0.7 ZD 0.7
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 FIXED
2 FIXED BUT FY FZ MX MY MZ
****************************
LOAD 1 EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE
*****************************
SELFWEIGHT Y -1
MEMBER LOAD
3 TRAP GX 745.1 713.1
8 TRAP GX 713.1 684.1
7 TRAP GX 684.1 655
6 TRAP GX 655 626
5 TRAP GX 626 596.9
4 TRAP GX 596.9 569.3
******************************************
LOAD 2 EARTH PRESSURE WITHOUT SURCHARGE & SUBSOIL WATER PRESSURE
****************************************
SELFWEIGHT Y -1
MEMBER LOAD
3 TRAP GX 318.9 298.4
8 TRAP GX 298.4 279.7
7 TRAP GX 279.7 261
6 TRAP GX 261 242.3
5 TRAP GX 242.3 223.7
4 TRAP GX 223.7 205.9
******************************************
LOAD 3 FLOOR SLAB LOAD
*****************************************
JOINT LOAD
* 100 KN FROM FLOOR SLAB& BEAMS
2 FY -100
*****************************************
*LOAD COMBINATIONS
*********************************

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

182 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

LOAD COMB 6 EP WITH SUR & SUBSOIL PRESUURE + APRON FEDER LOAD
1 1.0 3 1.0
LOAD COMB 7 EP WITHOUT SUR & SUBSOIL PRESUURE + APRON FEDER LOAD
2 1.0 3 1.0
PERFORM ANALYSIS
LOAD LIST 1 2
PRINT SUPPORT REACTION
FINISH

7.6.3

SUPPORT REACTIONS FOR CF 13

SUPPORT REACTIONS -UNIT KN


METER
STRUCTURE TYPE = TRUSS
----------------------------------------------------------JOINT

1
2

LOAD

1
2
1
2

FORCE-X

-2976.95
-1208.33
-999.11
-379.30

FORCE-Y

134.45
134.45
0.00
0.00

FORCE-Z

0.00
0.00
0.00
0.00

MOM-X

0.00
0.00
0.00
0.00

MOM-Y

0.00
0.00
0.00
0.00

MOM Z

5446.81
2163.12
0.00
0.00

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

8
8.1

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

183 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

ANALYSIS OF BASE RAFT


STAAD SKETCHES

15.45m

22.86m

PLAN

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

184 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1 7 96

142 188 234 280 326 372418464510 556 602 648 694 740 786 832 878 924 970 1016106211081154 1200
124612921338
2 1428

5 6 95

141 187 233 279 325 371417463509 555 601 647 693 739 785 831 877 923 969 1015106111071153 1199
124512911337
1383
1427

8 9 97

143 189 235 281 327 373419465511 557 603 649 695 741 787 833 879 925 971 1017106311091155 1201
124712931339
1384
1429

10 11 98

144 190 236 282 328 374420466512 558 604 650 696 742 788 834 880 926 972 1018106411101156 1202
124812941340
1385
1430

12 13 99
14 15 100
16 17 101

145 191 237 283 329 375421467513 559 605 651 697 743 789 835 881 927 973 1019106511111157 1203
124912951341
1386
1431
146 192 238 284 330 376422468514 560 606 652 698 744 790 836 882 928 974 1020106611121158 1204
125012961342
1387
1432
147 193 239 285 331 377423469515 561 607 653 699 745 791 837 883 929 975 1021106711131159 1205
125112971343
1388
1433

18 19 102

148 194 240 286 332 378424470516 562 608 654 700 746 792 838 884 930 976 1022106811141160 1206
125212981344
1389
1434

20 21 103

149 195 241 287 333 379425471517 563 609 655 701 747 793 839 885 931 977 1023106911151161 1207
125312991345
1390
1435

22 23 104

150 196 242 288 334 380426472518 564 610 656 702 748 794 840 886 932 978 1024107011161162 1208
125413001346
1391
1436

24 25 105

151 197 243 289 335 381427473519 565 611 657 703 749 795 841 887 933 979 1025107111171163 1209
125513011347
1392
1437

26 27 106

152 198 244 290 336 382428474520 566 612 658 704 750 796 842 888 934 980 1026107211181164 1210
125613021348
1393
1438

28 29 107

153 199 245 291 337 383429475521 567 613 659 705 751 797 843 889 935 981 1027107311191165 1211
125713031349
1394
1439

30 31 108

154 200 246 292 338 384430476522 568 614 660 706 752 798 844 890 936 982 1028107411201166 1212
125813041350
1395
1440

32 33 109

155 201 247 293 339 385431477523 569 615 661 707 753 799 845 891 937 983 1029107511211167 1213
125913051351
1396
1441

34 35 110
36 37 111

156 202 248 294 340 386432478524 570 616 662 708 754 800 846 892 938 984 1030107611221168 1214
126013061352
1397
1442
157 203 249 295 341 387433479525 571 617 663 709 755 801 847 893 939 985 1031107711231169 1215
126113071353
1398
1443

38 39 112

158 204 250 296 342 388434480526 572 618 664 710 756 802 848 894 940 986 1032107811241170 1216
126213081354
1399
1444

40 41 113

159 205 251 297 343 389435481527 573 619 665 711 757 803 849 895 941 987 1033107911251171 1217
126313091355
1400
1445

42 43 114

160 206 252 298 344 390436482528 574 620 666 712 758 804 850 896 942 988 1034108011261172 1218
126413101356
1401
1446

44 45 115

161 207 253 299 345 391437483529 575 621 667 713 759 805 851 897 943 989 1035108111271173 1219
126513111357
1402
1447

46 47 116
48 49 117

162 208 254 300 346 392438484530 576 622 668 714 760 806 852 898 944 990 1036108211281174 1220
126613121358
1403
1448
163 209 255 301 347 393439485531 577 623 669 715 761 807 853 899 945 991 1037108311291175 1221
126713131359
1404
1449

50 51 118

164 210 256 302 348 394440486532 578 624 670 716 762 808 854 900 946 992 1038108411301176 1222
126813141360
1405
1450

52 53 119

165 211 257 303 349 395441487533 579 625 671 717 763 809 855 901 947 993 1039108511311177 1223
126913151361
1406
1451

54 55 120

166 212 258 304 350 396442488534 580 626 672 718 764 810 856 902 948 994 1040108611321178 1224
127013161362
1407
1452

56 57 121

167 213 259 305 351 397443489535 581 627 673 719 765 811 857 903 949 995 1041108711331179 1225
127113171363
1408
1453

58 59 122

168 214 260 306 352 398444490536 582 628 674 720 766 812 858 904 950 996 1042108811341180 1226
127213181364
1409
1454

60 61 123

169 215 261 307 353 399445491537 583 629 675 721 767 813 859 905 951 997 1043108911351181 1227
127313191365
1410
1455

62 63 124

170 216 262 308 354 400446492538 584 630 676 722 768 814 860 906 952 998 1044109011361182 1228
127413201366
1411
1456

64 65 125

171 217 263 309 355 401447493539 585 631 677 723 769 815 861 907 953 999 1045109111371183 1229
127513211367
1412
1457

66 67 126

172 218 264 310 356 402448494540 586 632 678 724 770 816 862 908 954 10001046109211381184 1230
127613221368
1413
1458

68 69 127

173 219 265 311 357 403449495541 587 633 679 725 771 817 863 909 955 10011047109311391185 1231
127713231369
1414
1459

70 71 128

174 220 266 312 358 404450496542 588 634 680 726 772 818 864 910 956 10021048109411401186 1232
127813241370
1415
1460

72 73 129

175 221 267 313 359 405451497543 589 635 681 727 773 819 865 911 957 10031049109511411187 1233
127913251371
1416
1461

74 75 130

176 222 268 314 360 406452498544 590 636 682 728 774 820 866 912 958 10041050109611421188 1234
128013261372
1417
1462

76 77 131

177 223 269 315 361 407453499545 591 637 683 729 775 821 867 913 959 10051051109711431189 1235
128113271373
1418
1463

78 79 132

178 224 270 316 362 408454500546 592 638 684 730 776 822 868 914 960 10061052109811441190 1236
128213281374
1419
1464

80 81 133

179 225 271 317 363 409455501547 593 639 685 731 777 823 869 915 961 10071053109911451191 1237
128313291375
1420
1465

82 83 134
84 85 135
86 87 136

180 226 272 318 364 410456502548 594 640 686 732 778 824 870 916 962 10081054110011461192 1238
128413301376
1421
1466
181 227 273 319 365 411457503549 595 641 687 733 779 825 871 917 963 10091055110111471193 1239
128513311377
1422
1467
182 228 274 320 366 412458504550 596 642 688 734 780 826 872 918 964 10101056110211481194 1240
128613321378
1423
1468

88 89 137

183 229 275 321 367 413459505551 597 643 689 735 781 827 873 919 965 10111057110311491195 1241
128713331379
1424
1469

90 91 138

184 230 276 322 368 414460506552 598 644 690 736 782 828 874 920 966 10121058110411501196 1242
128813341380
1425
1470

92 93 139

185 231 277 323 369 415461507553 599 645 691 737 783 829 875 921 967 10131059110511511197 1243
128913351381
1426
1471

3 94 140

186 232 278 324 370 416462508554 600 646 692 738 784 830 876 922 968 10141060110611521198 1244
129013361382
4 1472

NODE NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

185 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1 46 91 136181226271316
361
406
451496541 5866316767217668118569019469911036
1081
1126
1171
1216
1261
1306
1351
2 47 92 137182227272317
362
407
452497542 5876326777227678128579029479921037
1082
1127
1172
1217
1262
1307
1352
3 48 93 138183228273318
363
408
453498543 5886336787237688138589039489931038
1083
1128
1173
1218
1263
1308
1353
4 49
5 50
6 51
7 52
8 53
9 54
1055
1156
1257
1358

94 139184229274319
364
409
454499544 5896346797247698148599049499941039
1084
1129
1174
1219
1264
1309
1354
95 140185230275320
365
410
455500545 5906356807257708158609059509951040
1085
1130
1175
1220
1265
1310
1355
96 141186231276321
366
411
456501546 5916366817267718168619069519961041
1086
1131
1176
1221
1266
1311
1356
97 142187232277322
367
412
457502547 5926376827277728178629079529971042
1087
1132
1177
1222
1267
1312
1357
98 143188233278323
368
413
458503548 5936386837287738188639089539981043
1088
1133
1178
1223
1268
1313
1358
99 144189234279324
369
414
459504549 5946396847297748198649099549991044
1089
1134
1179
1224
1269
1314
1359
100145190235280325
370
415
460505550 5956406857307758208659109551000
1045
1090
1135
1180
1225
1270
1315
1360
101146191236281326
371
416
461506551 5966416867317768218669119561001
1046
1091
1136
1181
1226
1271
1316
1361
102147192237282327
372
417
462507552 5976426877327778228679129571002
1047
1092
1137
1182
1227
1272
1317
1362
103148193238283328
373
418
463508553 5986436887337788238689139581003
1048
1093
1138
1183
1228
1273
1318
1363

1459 104149194239284329
374
419
464509554 5996446897347798248699149591004
1049
1094
1139
1184
1229
1274
1319
1364
1560
1661
1762
1863
1964
2065
2166
2267
2368
2469

105150195240285330
375
420
465510555 6006456907357808258709159601005
1050
1095
1140
1185
1230
1275
1320
1365
106151196241286331
376
421
466511556 6016466917367818268719169611006
1051
1096
1141
1186
1231
1276
1321
1366
107152197242287332
377
422
467512557 6026476927377828278729179621007
1052
1097
1142
1187
1232
1277
1322
1367
108153198243288333
378
423
468513558 6036486937387838288739189631008
1053
1098
1143
1188
1233
1278
1323
1368
109154199244289334
379
424
469514559 6046496947397848298749199641009
1054
1099
1144
1189
1234
1279
1324
1369
110155200245290335
380
425
470515560 6056506957407858308759209651010
1055
1100
1145
1190
1235
1280
1325
1370
111156201246291336
381
426
471516561 6066516967417868318769219661011
1056
1101
1146
1191
1236
1281
1326
1371
112157202247292337
382
427
472517562 6076526977427878328779229671012
1057
1102
1147
1192
1237
1282
1327
1372
113158203248293338
383
428
473518563 6086536987437888338789239681013
1058
1103
1148
1193
1238
1283
1328
1373
114159204249294339
384
429
474519564 6096546997447898348799249691014
1059
1104
1149
1194
1239
1284
1329
1374

2570 115160205250295340
385
430
475520565 6106557007457908358809259701015
1060
1105
1150
1195
1240
1285
1330
1375
2671
2772
2873
2974
3075
3176

116161206251296341
386
431
476521566 6116567017467918368819269711016
1061
1106
1151
1196
1241
1286
1331
1376
117162207252297342
387
432
477522567 6126577027477928378829279721017
1062
1107
1152
1197
1242
1287
1332
1377
118163208253298343
388
433
478523568 6136587037487938388839289731018
1063
1108
1153
1198
1243
1288
1333
1378
119164209254299344
389
434
479524569 6146597047497948398849299741019
1064
1109
1154
1199
1244
1289
1334
1379
120165210255300345
390
435
480525570 6156607057507958408859309751020
1065
1110
1155
1200
1245
1290
1335
1380
121166211256301346
391
436
481526571 6166617067517968418869319761021
1066
1111
1156
1201
1246
1291
1336
1381

3277 122167212257302347
392
437
482527572 6176627077527978428879329771022
1067
1112
1157
1202
1247
1292
1337
1382
3378
3479
3580
3681
3782
3883
3984
4085
4186
4287

123168213258303348
393
438
483528573 6186637087537988438889339781023
1068
1113
1158
1203
1248
1293
1338
1383
124169214259304349
394
439
484529574 6196647097547998448899349791024
1069
1114
1159
1204
1249
1294
1339
1384
125170215260305350
395
440
485530575 6206657107558008458909359801025
1070
1115
1160
1205
1250
1295
1340
1385
126171216261306351
396
441
486531576 6216667117568018468919369811026
1071
1116
1161
1206
1251
1296
1341
1386
127172217262307352
397
442
487532577 6226677127578028478929379821027
1072
1117
1162
1207
1252
1297
1342
1387
128173218263308353
398
443
488533578 6236687137588038488939389831028
1073
1118
1163
1208
1253
1298
1343
1388
129174219264309354
399
444
489534579 6246697147598048498949399841029
1074
1119
1164
1209
1254
1299
1344
1389
130175220265310355
400
445
490535580 6256707157608058508959409851030
1075
1120
1165
1210
1255
1300
1345
1390
131176221266311356
401
446
491536581 6266717167618068518969419861031
1076
1121
1166
1211
1256
1301
1346
1391
132177222267312357
402
447
492537582 6276727177628078528979429871032
1077
1122
1167
1212
1257
1302
1347
1392

4388 133178223268313358
403
448
493538583 6286737187638088538989439881033
1078
1123
1168
1213
1258
1303
1348
1393
4489 134179224269314359
404
449
494539584 6296747197648098548999449891034
1079
1124
1169
1214
1259
1304
1349
1394
4590 135180225270315360
405
450
495540585 6306757207658108559009459901035
1080
1125
1170
1215
1260
1305
1350
1395

PLATE NUMBERS

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

8.2

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

186 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

STAAD-Pro ANALYSIS INPUT


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 08-May-08
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 -0.5 0 0; 2 14.6 0 0; 3 -0.5 0 22.86; 4 14.6 0 22.86; 5 -0.5 0 0.508;
6 0.2 0 0.508; 7 0.2 0 0; 8 -0.5 0 1.016; 9 0.2 0 1.016; 10 -0.5 0 1.524;
11 0.2 0 1.524; 12 -0.5 0 2.232; 13 0.2 0 2.232; 14 -0.5 0 2.54; 15 0.2 0 2.54;
16 -0.5 0 2.928; 17 0.2 0 2.928; 18 -0.5 0 3.521; 19 0.2 0 3.521;
20 -0.5 0 3.967; 21 0.2 0 3.967; 22 -0.5 0 4.413; 23 0.2 0 4.413;
24 -0.5 0 4.859; 25 0.2 0 4.859; 26 -0.5 0 5.305; 27 0.2 0 5.305;
28 -0.5 0 5.92634; 29 0.2 0 5.92634; 30 -0.5 0 6.35568; 31 0.2 0 6.35568;
32 -0.5 0 7.07708; 33 0.2 0 7.07708; 34 -0.5 0 7.6817; 35 0.2 0 7.6817;
36 -0.5 0 8.0714; 37 0.2 0 8.0714; 38 -0.5 0 8.5511; 39 0.2 0 8.5511;
40 -0.5 0 9.0908; 41 0.2 0 9.0908; 42 -0.5 0 9.5105; 43 0.2 0 9.5105;
44 -0.5 0 10.0915; 45 0.2 0 10.0915; 46 -0.5 0 10.624; 47 0.2 0 10.624;
48 -0.5 0 10.945; 49 0.2 0 10.945; 50 -0.5 0 11.444; 51 0.2 0 11.444;
52 -0.5 0 11.967; 53 0.2 0 11.967; 54 -0.5 0 12.79; 55 0.2 0 12.79;
56 -0.5 0 13.283; 57 0.2 0 13.283; 58 -0.5 0 13.816; 59 0.2 0 13.816;
60 -0.5 0 14.269; 61 0.2 0 14.269; 62 -0.5 0 14.762; 63 0.2 0 14.762;
64 -0.5 0 15.185; 65 0.2 0 15.185; 66 -0.5 0 15.7929; 67 0.2 0 15.7929;
68 -0.5 0 16.5063; 69 0.2 0 16.5063; 70 -0.5 0 17.0026; 71 0.2 0 17.0026;
72 -0.5 0 17.559; 73 0.2 0 17.559; 74 -0.5 0 18.0096; 75 0.2 0 18.0096;
76 -0.5 0 18.4602; 77 0.2 0 18.4602; 78 -0.5 0 18.9108; 79 0.2 0 18.9108;
80 -0.5 0 19.3614; 81 0.2 0 19.3614; 82 -0.5 0 19.932; 83 0.2 0 19.932;
84 -0.5 0 20.32; 85 0.2 0 20.32; 86 -0.5 0 20.628; 87 0.2 0 20.628;
88 -0.5 0 21.336; 89 0.2 0 21.336; 90 -0.5 0 21.844; 91 0.2 0 21.844;
92 -0.5 0 22.352; 93 0.2 0 22.352; 94 0.2 0 22.86; 95 0.8 0 0.508; 96 0.8 0 0;
97 0.8 0 1.016; 98 0.8 0 1.524; 99 0.8 0 2.232; 100 0.8 0 2.54;
101 0.8 0 2.928; 102 0.8 0 3.521; 103 0.8 0 3.967; 104 0.8 0 4.413;
105 0.8 0 4.859; 106 0.8 0 5.305; 107 0.8 0 5.92634; 108 0.8 0 6.35568;
109 0.8 0 7.07708; 110 0.8 0 7.6817; 111 0.8 0 8.0714; 112 0.8 0 8.5511;
113 0.8 0 9.0908; 114 0.8 0 9.5105; 115 0.8 0 10.0915; 116 0.8 0 10.624;
117 0.8 0 10.945; 118 0.8 0 11.444; 119 0.8 0 11.967; 120 0.8 0 12.79;
121 0.8 0 13.283; 122 0.8 0 13.816; 123 0.8 0 14.269; 124 0.8 0 14.762;
125 0.8 0 15.185; 126 0.8 0 15.7929; 127 0.8 0 16.5063; 128 0.8 0 17.0026;
129 0.8 0 17.559; 130 0.8 0 18.0096; 131 0.8 0 18.4602; 132 0.8 0 18.9108;
133 0.8 0 19.3614; 134 0.8 0 19.932; 135 0.8 0 20.32; 136 0.8 0 20.628;
137 0.8 0 21.336; 138 0.8 0 21.844; 139 0.8 0 22.352; 140 0.8 0 22.86;
141 1.5 0 0.508; 142 1.5 0 0; 143 1.5 0 1.016; 144 1.5 0 1.524;
145 1.5 0 2.232; 146 1.5 0 2.54; 147 1.5 0 2.928; 148 1.5 0 3.521;
149 1.5 0 3.967; 150 1.5 0 4.413; 151 1.5 0 4.859; 152 1.5 0 5.305;
153 1.5 0 5.92634; 154 1.5 0 6.35568; 155 1.5 0 7.07708; 156 1.5 0 7.6817;
157 1.5 0 8.0714; 158 1.5 0 8.5511; 159 1.5 0 9.0908; 160 1.5 0 9.5105;
161 1.5 0 10.0915; 162 1.5 0 10.624; 163 1.5 0 10.945; 164 1.5 0 11.444;
165 1.5 0 11.967; 166 1.5 0 12.79; 167 1.5 0 13.283; 168 1.5 0 13.816;
169 1.5 0 14.269; 170 1.5 0 14.762; 171 1.5 0 15.185; 172 1.5 0 15.7929;
173 1.5 0 16.5063; 174 1.5 0 17.0026; 175 1.5 0 17.559; 176 1.5 0 18.0096;
177 1.5 0 18.4602; 178 1.5 0 18.9108; 179 1.5 0 19.3614; 180 1.5 0 19.932;
181 1.5 0 20.32; 182 1.5 0 20.628; 183 1.5 0 21.336; 184 1.5 0 21.844;
185 1.5 0 22.352; 186 1.5 0 22.86; 187 1.96 0 0.508; 188 1.96 0 0;
189 1.96 0 1.016; 190 1.96 0 1.524; 191 1.96 0 2.232; 192 1.96 0 2.54;
193 1.96 0 2.928; 194 1.96 0 3.521; 195 1.96 0 3.967; 196 1.96 0 4.413;
197 1.96 0 4.859; 198 1.96 0 5.305; 199 1.96 0 5.92634; 200 1.96 0 6.35568;
201 1.96 0 7.07708; 202 1.96 0 7.6817; 203 1.96 0 8.0714; 204 1.96 0 8.5511;
205 1.96 0 9.0908; 206 1.96 0 9.5105; 207 1.96 0 10.0915; 208 1.96 0 10.624;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

187 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

209 1.96 0 10.945; 210 1.96 0 11.444; 211 1.96 0 11.967; 212 1.96 0 12.79;
213 1.96 0 13.283; 214 1.96 0 13.816; 215 1.96 0 14.269; 216 1.96 0 14.762;
217 1.96 0 15.185; 218 1.96 0 15.7929; 219 1.96 0 16.5063; 220 1.96 0 17.0026;
221 1.96 0 17.559; 222 1.96 0 18.0096; 223 1.96 0 18.4602; 224 1.96 0 18.9108;
225 1.96 0 19.3614; 226 1.96 0 19.932; 227 1.96 0 20.32; 228 1.96 0 20.628;
229 1.96 0 21.336; 230 1.96 0 21.844; 231 1.96 0 22.352; 232 1.96 0 22.86;
233 2.45 0 0.508; 234 2.45 0 0; 235 2.45 0 1.016; 236 2.45 0 1.524;
237 2.45 0 2.232; 238 2.45 0 2.54; 239 2.45 0 2.928; 240 2.45 0 3.521;
241 2.45 0 3.967; 242 2.45 0 4.413; 243 2.45 0 4.859; 244 2.45 0 5.305;
245 2.45 0 5.92634; 246 2.45 0 6.35568; 247 2.45 0 7.07708; 248 2.45 0 7.6817;
249 2.45 0 8.0714; 250 2.45 0 8.5511; 251 2.45 0 9.0908; 252 2.45 0 9.5105;
253 2.45 0 10.0915; 254 2.45 0 10.624; 255 2.45 0 10.945; 256 2.45 0 11.444;
257 2.45 0 11.967; 258 2.45 0 12.79; 259 2.45 0 13.283; 260 2.45 0 13.816;
261 2.45 0 14.269; 262 2.45 0 14.762; 263 2.45 0 15.185; 264 2.45 0 15.7929;
265 2.45 0 16.5063; 266 2.45 0 17.0026; 267 2.45 0 17.559; 268 2.45 0 18.0096;
269 2.45 0 18.4602; 270 2.45 0 18.9108; 271 2.45 0 19.3614; 272 2.45 0 19.932;
273 2.45 0 20.32; 274 2.45 0 20.628; 275 2.45 0 21.336; 276 2.45 0 21.844;
277 2.45 0 22.352; 278 2.45 0 22.86; 279 2.94 0 0.508; 280 2.94 0 0;
281 2.94 0 1.016; 282 2.94 0 1.524; 283 2.94 0 2.232; 284 2.94 0 2.54;
285 2.94 0 2.928; 286 2.94 0 3.521; 287 2.94 0 3.967; 288 2.94 0 4.413;
289 2.94 0 4.859; 290 2.94 0 5.305; 291 2.94 0 5.92634; 292 2.94 0 6.35568;
293 2.94 0 7.07708; 294 2.94 0 7.6817; 295 2.94 0 8.0714; 296 2.94 0 8.5511;
297 2.94 0 9.0908; 298 2.94 0 9.5105; 299 2.94 0 10.0915; 300 2.94 0 10.624;
301 2.94 0 10.945; 302 2.94 0 11.444; 303 2.94 0 11.967; 304 2.94 0 12.79;
305 2.94 0 13.283; 306 2.94 0 13.816; 307 2.94 0 14.269; 308 2.94 0 14.762;
309 2.94 0 15.185; 310 2.94 0 15.7929; 311 2.94 0 16.5063; 312 2.94 0 17.0026;
313 2.94 0 17.559; 314 2.94 0 18.0096; 315 2.94 0 18.4602; 316 2.94 0 18.9108;
317 2.94 0 19.3614; 318 2.94 0 19.932; 319 2.94 0 20.32; 320 2.94 0 20.628;
321 2.94 0 21.336; 322 2.94 0 21.844; 323 2.94 0 22.352; 324 2.94 0 22.86;
325 3.43 0 0.508; 326 3.43 0 0; 327 3.43 0 1.016; 328 3.43 0 1.524;
329 3.43 0 2.232; 330 3.43 0 2.54; 331 3.43 0 2.928; 332 3.43 0 3.521;
333 3.43 0 3.967; 334 3.43 0 4.413; 335 3.43 0 4.859; 336 3.43 0 5.305;
337 3.43 0 5.92634; 338 3.43 0 6.35568; 339 3.43 0 7.07708; 340 3.43 0 7.6817;
341 3.43 0 8.0714; 342 3.43 0 8.5511; 343 3.43 0 9.0908; 344 3.43 0 9.5105;
345 3.43 0 10.0915; 346 3.43 0 10.624; 347 3.43 0 10.945; 348 3.43 0 11.444;
349 3.43 0 11.967; 350 3.43 0 12.79; 351 3.43 0 13.283; 352 3.43 0 13.816;
353 3.43 0 14.269; 354 3.43 0 14.762; 355 3.43 0 15.185; 356 3.43 0 15.7929;
357 3.43 0 16.5063; 358 3.43 0 17.0026; 359 3.43 0 17.559; 360 3.43 0 18.0096;
361 3.43 0 18.4602; 362 3.43 0 18.9108; 363 3.43 0 19.3614; 364 3.43 0 19.932;
365 3.43 0 20.32; 366 3.43 0 20.628; 367 3.43 0 21.336; 368 3.43 0 21.844;
369 3.43 0 22.352; 370 3.43 0 22.86; 371 3.929 0 0.508; 372 3.929 0 0;
373 3.929 0 1.016; 374 3.929 0 1.524; 375 3.929 0 2.232; 376 3.929 0 2.54;
377 3.929 0 2.928; 378 3.929 0 3.521; 379 3.929 0 3.967; 380 3.929 0 4.413;
381 3.929 0 4.859; 382 3.929 0 5.305; 383 3.929 0 5.92634; 384 3.929 0 6.35568;
385 3.929 0 7.07708; 386 3.929 0 7.6817; 387 3.929 0 8.0714;
388 3.929 0 8.5511; 389 3.929 0 9.0908; 390 3.929 0 9.5105;
391 3.929 0 10.0915; 392 3.929 0 10.624; 393 3.929 0 10.945;
394 3.929 0 11.444; 395 3.929 0 11.967; 396 3.929 0 12.79; 397 3.929 0 13.283;
398 3.929 0 13.816; 399 3.929 0 14.269; 400 3.929 0 14.762; 401 3.929 0 15.185;
402 3.929 0 15.7929; 403 3.929 0 16.5063; 404 3.929 0 17.0026;
405 3.929 0 17.559; 406 3.929 0 18.0096; 407 3.929 0 18.4602;
408 3.929 0 18.9108; 409 3.929 0 19.3614; 410 3.929 0 19.932;
411 3.929 0 20.32; 412 3.929 0 20.628; 413 3.929 0 21.336; 414 3.929 0 21.844;
415 3.929 0 22.352; 416 3.929 0 22.86; 417 4.228 0 0.508; 418 4.228 0 0;
419 4.228 0 1.016; 420 4.228 0 1.524; 421 4.228 0 2.232; 422 4.228 0 2.54;
423 4.228 0 2.928; 424 4.228 0 3.521; 425 4.228 0 3.967; 426 4.228 0 4.413;
427 4.228 0 4.859; 428 4.228 0 5.305; 429 4.228 0 5.92634; 430 4.228 0 6.35568;
431 4.228 0 7.07708; 432 4.228 0 7.6817; 433 4.228 0 8.0714;
434 4.228 0 8.5511; 435 4.228 0 9.0908; 436 4.228 0 9.5105;
437 4.228 0 10.0915; 438 4.228 0 10.624; 439 4.228 0 10.945;
440 4.228 0 11.444; 441 4.228 0 11.967; 442 4.228 0 12.79; 443 4.228 0 13.283;
444 4.228 0 13.816; 445 4.228 0 14.269; 446 4.228 0 14.762; 447 4.228 0 15.185;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

188 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

448 4.228 0 15.7929; 449 4.228 0 16.5063; 450 4.228 0 17.0026;


451 4.228 0 17.559; 452 4.228 0 18.0096; 453 4.228 0 18.4602;
454 4.228 0 18.9108; 455 4.228 0 19.3614; 456 4.228 0 19.932;
457 4.228 0 20.32; 458 4.228 0 20.628; 459 4.228 0 21.336; 460 4.228 0 21.844;
461 4.228 0 22.352; 462 4.228 0 22.86; 463 4.627 0 0.508; 464 4.627 0 0;
465 4.627 0 1.016; 466 4.627 0 1.524; 467 4.627 0 2.232; 468 4.627 0 2.54;
469 4.627 0 2.928; 470 4.627 0 3.521; 471 4.627 0 3.967; 472 4.627 0 4.413;
473 4.627 0 4.859; 474 4.627 0 5.305; 475 4.627 0 5.92634; 476 4.627 0 6.35568;
477 4.627 0 7.07708; 478 4.627 0 7.6817; 479 4.627 0 8.0714;
480 4.627 0 8.5511; 481 4.627 0 9.0908; 482 4.627 0 9.5105;
483 4.627 0 10.0915; 484 4.627 0 10.624; 485 4.627 0 10.945;
486 4.627 0 11.444; 487 4.627 0 11.967; 488 4.627 0 12.79; 489 4.627 0 13.283;
490 4.627 0 13.816; 491 4.627 0 14.269; 492 4.627 0 14.762; 493 4.627 0 15.185;
494 4.627 0 15.7929; 495 4.627 0 16.5063; 496 4.627 0 17.0026;
497 4.627 0 17.559; 498 4.627 0 18.0096; 499 4.627 0 18.4602;
500 4.627 0 18.9108; 501 4.627 0 19.3614; 502 4.627 0 19.932;
503 4.627 0 20.32; 504 4.627 0 20.628; 505 4.627 0 21.336; 506 4.627 0 21.844;
507 4.627 0 22.352; 508 4.627 0 22.86; 509 5.026 0 0.508; 510 5.026 0 0;
511 5.026 0 1.016; 512 5.026 0 1.524; 513 5.026 0 2.232; 514 5.026 0 2.54;
515 5.026 0 2.928; 516 5.026 0 3.521; 517 5.026 0 3.967; 518 5.026 0 4.413;
519 5.026 0 4.859; 520 5.026 0 5.305; 521 5.026 0 5.92634; 522 5.026 0 6.35568;
523 5.026 0 7.07708; 524 5.026 0 7.6817; 525 5.026 0 8.0714;
526 5.026 0 8.5511; 527 5.026 0 9.0908; 528 5.026 0 9.5105;
529 5.026 0 10.0915; 530 5.026 0 10.624; 531 5.026 0 10.945;
532 5.026 0 11.444; 533 5.026 0 11.967; 534 5.026 0 12.79; 535 5.026 0 13.283;
536 5.026 0 13.816; 537 5.026 0 14.269; 538 5.026 0 14.762; 539 5.026 0 15.185;
540 5.026 0 15.7929; 541 5.026 0 16.5063; 542 5.026 0 17.0026;
543 5.026 0 17.559; 544 5.026 0 18.0096; 545 5.026 0 18.4602;
546 5.026 0 18.9108; 547 5.026 0 19.3614; 548 5.026 0 19.932;
549 5.026 0 20.32; 550 5.026 0 20.628; 551 5.026 0 21.336; 552 5.026 0 21.844;
553 5.026 0 22.352; 554 5.026 0 22.86; 555 5.5636 0 0.508; 556 5.5636 0 0;
557 5.5636 0 1.016; 558 5.5636 0 1.524; 559 5.5636 0 2.232; 560 5.5636 0 2.54;
561 5.5636 0 2.928; 562 5.5636 0 3.521; 563 5.5636 0 3.967; 564 5.5636 0 4.413;
565 5.5636 0 4.859; 566 5.5636 0 5.305; 567 5.5636 0 5.92634;
568 5.5636 0 6.35568; 569 5.5636 0 7.07708; 570 5.5636 0 7.6817;
571 5.5636 0 8.0714; 572 5.5636 0 8.5511; 573 5.5636 0 9.0908;
574 5.5636 0 9.5105; 575 5.5636 0 10.0915; 576 5.5636 0 10.624;
577 5.5636 0 10.945; 578 5.5636 0 11.444; 579 5.5636 0 11.967;
580 5.5636 0 12.79; 581 5.5636 0 13.283; 582 5.5636 0 13.816;
583 5.5636 0 14.269; 584 5.5636 0 14.762; 585 5.5636 0 15.185;
586 5.5636 0 15.7929; 587 5.5636 0 16.5063; 588 5.5636 0 17.0026;
589 5.5636 0 17.559; 590 5.5636 0 18.0096; 591 5.5636 0 18.4602;
592 5.5636 0 18.9108; 593 5.5636 0 19.3614; 594 5.5636 0 19.932;
595 5.5636 0 20.32; 596 5.5636 0 20.628; 597 5.5636 0 21.336;
598 5.5636 0 21.844; 599 5.5636 0 22.352; 600 5.5636 0 22.86;
601 6.1509 0 0.508; 602 6.1509 0 0; 603 6.1509 0 1.016; 604 6.1509 0 1.524;
605 6.1509 0 2.232; 606 6.1509 0 2.54; 607 6.1509 0 2.928; 608 6.1509 0 3.521;
609 6.1509 0 3.967; 610 6.1509 0 4.413; 611 6.1509 0 4.859; 612 6.1509 0 5.305;
613 6.1509 0 5.92634; 614 6.1509 0 6.35568; 615 6.1509 0 7.07708;
616 6.1509 0 7.6817; 617 6.1509 0 8.0714; 618 6.1509 0 8.5511;
619 6.1509 0 9.0908; 620 6.1509 0 9.5105; 621 6.1509 0 10.0915;
622 6.1509 0 10.624; 623 6.1509 0 10.945; 624 6.1509 0 11.444;
625 6.1509 0 11.967; 626 6.1509 0 12.79; 627 6.1509 0 13.283;
628 6.1509 0 13.816; 629 6.1509 0 14.269; 630 6.1509 0 14.762;
631 6.1509 0 15.185; 632 6.1509 0 15.7929; 633 6.1509 0 16.5063;
634 6.1509 0 17.0026; 635 6.1509 0 17.559; 636 6.1509 0 18.0096;
637 6.1509 0 18.4602; 638 6.1509 0 18.9108; 639 6.1509 0 19.3614;
640 6.1509 0 19.932; 641 6.1509 0 20.32; 642 6.1509 0 20.628;
643 6.1509 0 21.336; 644 6.1509 0 21.844; 645 6.1509 0 22.352;
646 6.1509 0 22.86; 647 6.8218 0 0.508; 648 6.8218 0 0; 649 6.8218 0 1.016;
650 6.8218 0 1.524; 651 6.8218 0 2.232; 652 6.8218 0 2.54; 653 6.8218 0 2.928;
654 6.8218 0 3.521; 655 6.8218 0 3.967; 656 6.8218 0 4.413; 657 6.8218 0 4.859;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

189 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

658 6.8218 0 5.305; 659 6.8218 0 5.92634; 660 6.8218 0 6.35568;


661 6.8218 0 7.07708; 662 6.8218 0 7.6817; 663 6.8218 0 8.0714;
664 6.8218 0 8.5511; 665 6.8218 0 9.0908; 666 6.8218 0 9.5105;
667 6.8218 0 10.0915; 668 6.8218 0 10.624; 669 6.8218 0 10.945;
670 6.8218 0 11.444; 671 6.8218 0 11.967; 672 6.8218 0 12.79;
673 6.8218 0 13.283; 674 6.8218 0 13.816; 675 6.8218 0 14.269;
676 6.8218 0 14.762; 677 6.8218 0 15.185; 678 6.8218 0 15.7929;
679 6.8218 0 16.5063; 680 6.8218 0 17.0026; 681 6.8218 0 17.559;
682 6.8218 0 18.0096; 683 6.8218 0 18.4602; 684 6.8218 0 18.9108;
685 6.8218 0 19.3614; 686 6.8218 0 19.932; 687 6.8218 0 20.32;
688 6.8218 0 20.628; 689 6.8218 0 21.336; 690 6.8218 0 21.844;
691 6.8218 0 22.352; 692 6.8218 0 22.86; 693 7.2927 0 0.508; 694 7.2927 0 0;
695 7.2927 0 1.016; 696 7.2927 0 1.524; 697 7.2927 0 2.232; 698 7.2927 0 2.54;
699 7.2927 0 2.928; 700 7.2927 0 3.521; 701 7.2927 0 3.967; 702 7.2927 0 4.413;
703 7.2927 0 4.859; 704 7.2927 0 5.305; 705 7.2927 0 5.92634;
706 7.2927 0 6.35568; 707 7.2927 0 7.07708; 708 7.2927 0 7.6817;
709 7.2927 0 8.0714; 710 7.2927 0 8.5511; 711 7.2927 0 9.0908;
712 7.2927 0 9.5105; 713 7.2927 0 10.0915; 714 7.2927 0 10.624;
715 7.2927 0 10.945; 716 7.2927 0 11.444; 717 7.2927 0 11.967;
718 7.2927 0 12.79; 719 7.2927 0 13.283; 720 7.2927 0 13.816;
721 7.2927 0 14.269; 722 7.2927 0 14.762; 723 7.2927 0 15.185;
724 7.2927 0 15.7929; 725 7.2927 0 16.5063; 726 7.2927 0 17.0026;
727 7.2927 0 17.559; 728 7.2927 0 18.0096; 729 7.2927 0 18.4602;
730 7.2927 0 18.9108; 731 7.2927 0 19.3614; 732 7.2927 0 19.932;
733 7.2927 0 20.32; 734 7.2927 0 20.628; 735 7.2927 0 21.336;
736 7.2927 0 21.844; 737 7.2927 0 22.352; 738 7.2927 0 22.86;
739 7.7636 0 0.508; 740 7.7636 0 0; 741 7.7636 0 1.016; 742 7.7636 0 1.524;
743 7.7636 0 2.232; 744 7.7636 0 2.54; 745 7.7636 0 2.928; 746 7.7636 0 3.521;
747 7.7636 0 3.967; 748 7.7636 0 4.413; 749 7.7636 0 4.859; 750 7.7636 0 5.305;
751 7.7636 0 5.92634; 752 7.7636 0 6.35568; 753 7.7636 0 7.07708;
754 7.7636 0 7.6817; 755 7.7636 0 8.0714; 756 7.7636 0 8.5511;
757 7.7636 0 9.0908; 758 7.7636 0 9.5105; 759 7.7636 0 10.0915;
760 7.7636 0 10.624; 761 7.7636 0 10.945; 762 7.7636 0 11.444;
763 7.7636 0 11.967; 764 7.7636 0 12.79; 765 7.7636 0 13.283;
766 7.7636 0 13.816; 767 7.7636 0 14.269; 768 7.7636 0 14.762;
769 7.7636 0 15.185; 770 7.7636 0 15.7929; 771 7.7636 0 16.5063;
772 7.7636 0 17.0026; 773 7.7636 0 17.559; 774 7.7636 0 18.0096;
775 7.7636 0 18.4602; 776 7.7636 0 18.9108; 777 7.7636 0 19.3614;
778 7.7636 0 19.932; 779 7.7636 0 20.32; 780 7.7636 0 20.628;
781 7.7636 0 21.336; 782 7.7636 0 21.844; 783 7.7636 0 22.352;
784 7.7636 0 22.86; 785 8.2345 0 0.508; 786 8.2345 0 0; 787 8.2345 0 1.016;
788 8.2345 0 1.524; 789 8.2345 0 2.232; 790 8.2345 0 2.54; 791 8.2345 0 2.928;
792 8.2345 0 3.521; 793 8.2345 0 3.967; 794 8.2345 0 4.413; 795 8.2345 0 4.859;
796 8.2345 0 5.305; 797 8.2345 0 5.92634; 798 8.2345 0 6.35568;
799 8.2345 0 7.07708; 800 8.2345 0 7.6817; 801 8.2345 0 8.0714;
802 8.2345 0 8.5511; 803 8.2345 0 9.0908; 804 8.2345 0 9.5105;
805 8.2345 0 10.0915; 806 8.2345 0 10.624; 807 8.2345 0 10.945;
808 8.2345 0 11.444; 809 8.2345 0 11.967; 810 8.2345 0 12.79;
811 8.2345 0 13.283; 812 8.2345 0 13.816; 813 8.2345 0 14.269;
814 8.2345 0 14.762; 815 8.2345 0 15.185; 816 8.2345 0 15.7929;
817 8.2345 0 16.5063; 818 8.2345 0 17.0026; 819 8.2345 0 17.559;
820 8.2345 0 18.0096; 821 8.2345 0 18.4602; 822 8.2345 0 18.9108;
823 8.2345 0 19.3614; 824 8.2345 0 19.932; 825 8.2345 0 20.32;
826 8.2345 0 20.628; 827 8.2345 0 21.336; 828 8.2345 0 21.844;
829 8.2345 0 22.352; 830 8.2345 0 22.86; 831 8.7004 0 0.508; 832 8.7004 0 0;
833 8.7004 0 1.016; 834 8.7004 0 1.524; 835 8.7004 0 2.232; 836 8.7004 0 2.54;
837 8.7004 0 2.928; 838 8.7004 0 3.521; 839 8.7004 0 3.967; 840 8.7004 0 4.413;
841 8.7004 0 4.859; 842 8.7004 0 5.305; 843 8.7004 0 5.92634;
844 8.7004 0 6.35568; 845 8.7004 0 7.07708; 846 8.7004 0 7.6817;
847 8.7004 0 8.0714; 848 8.7004 0 8.5511; 849 8.7004 0 9.0908;
850 8.7004 0 9.5105; 851 8.7004 0 10.0915; 852 8.7004 0 10.624;
853 8.7004 0 10.945; 854 8.7004 0 11.444; 855 8.7004 0 11.967;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

190 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

856 8.7004 0 12.79; 857 8.7004 0 13.283; 858 8.7004 0 13.816;


859 8.7004 0 14.269; 860 8.7004 0 14.762; 861 8.7004 0 15.185;
862 8.7004 0 15.7929; 863 8.7004 0 16.5063; 864 8.7004 0 17.0026;
865 8.7004 0 17.559; 866 8.7004 0 18.0096; 867 8.7004 0 18.4602;
868 8.7004 0 18.9108; 869 8.7004 0 19.3614; 870 8.7004 0 19.932;
871 8.7004 0 20.32; 872 8.7004 0 20.628; 873 8.7004 0 21.336;
874 8.7004 0 21.844; 875 8.7004 0 22.352; 876 8.7004 0 22.86; 877 9.31 0 0.508;
878 9.31 0 0; 879 9.31 0 1.016; 880 9.31 0 1.524; 881 9.31 0 2.232;
882 9.31 0 2.54; 883 9.31 0 2.928; 884 9.31 0 3.521; 885 9.31 0 3.967;
886 9.31 0 4.413; 887 9.31 0 4.859; 888 9.31 0 5.305; 889 9.31 0 5.92634;
890 9.31 0 6.35568; 891 9.31 0 7.07708; 892 9.31 0 7.6817; 893 9.31 0 8.0714;
894 9.31 0 8.5511; 895 9.31 0 9.0908; 896 9.31 0 9.5105; 897 9.31 0 10.0915;
898 9.31 0 10.624; 899 9.31 0 10.945; 900 9.31 0 11.444; 901 9.31 0 11.967;
902 9.31 0 12.79; 903 9.31 0 13.283; 904 9.31 0 13.816; 905 9.31 0 14.269;
906 9.31 0 14.762; 907 9.31 0 15.185; 908 9.31 0 15.7929; 909 9.31 0 16.5063;
910 9.31 0 17.0026; 911 9.31 0 17.559; 912 9.31 0 18.0096; 913 9.31 0 18.4602;
914 9.31 0 18.9108; 915 9.31 0 19.3614; 916 9.31 0 19.932; 917 9.31 0 20.32;
918 9.31 0 20.628; 919 9.31 0 21.336; 920 9.31 0 21.844; 921 9.31 0 22.352;
922 9.31 0 22.86; 923 9.8 0 0.508; 924 9.8 0 0; 925 9.8 0 1.016;
926 9.8 0 1.524; 927 9.8 0 2.232; 928 9.8 0 2.54; 929 9.8 0 2.928;
930 9.8 0 3.521; 931 9.8 0 3.967; 932 9.8 0 4.413; 933 9.8 0 4.859;
934 9.8 0 5.305; 935 9.8 0 5.92634; 936 9.8 0 6.35568; 937 9.8 0 7.07708;
938 9.8 0 7.6817; 939 9.8 0 8.0714; 940 9.8 0 8.5511; 941 9.8 0 9.0908;
942 9.8 0 9.5105; 943 9.8 0 10.0915; 944 9.8 0 10.624; 945 9.8 0 10.945;
946 9.8 0 11.444; 947 9.8 0 11.967; 948 9.8 0 12.79; 949 9.8 0 13.283;
950 9.8 0 13.816; 951 9.8 0 14.269; 952 9.8 0 14.762; 953 9.8 0 15.185;
954 9.8 0 15.7929; 955 9.8 0 16.5063; 956 9.8 0 17.0026; 957 9.8 0 17.559;
958 9.8 0 18.0096; 959 9.8 0 18.4602; 960 9.8 0 18.9108; 961 9.8 0 19.3614;
962 9.8 0 19.932; 963 9.8 0 20.32; 964 9.8 0 20.628; 965 9.8 0 21.336;
966 9.8 0 21.844; 967 9.8 0 22.352; 968 9.8 0 22.86; 969 10.29 0 0.508;
970 10.29 0 0; 971 10.29 0 1.016; 972 10.29 0 1.524; 973 10.29 0 2.232;
974 10.29 0 2.54; 975 10.29 0 2.928; 976 10.29 0 3.521; 977 10.29 0 3.967;
978 10.29 0 4.413; 979 10.29 0 4.859; 980 10.29 0 5.305; 981 10.29 0 5.92634;
982 10.29 0 6.35568; 983 10.29 0 7.07708; 984 10.29 0 7.6817;
985 10.29 0 8.0714; 986 10.29 0 8.5511; 987 10.29 0 9.0908; 988 10.29 0 9.5105;
989 10.29 0 10.0915; 990 10.29 0 10.624; 991 10.29 0 10.945;
992 10.29 0 11.444; 993 10.29 0 11.967; 994 10.29 0 12.79; 995 10.29 0 13.283;
996 10.29 0 13.816; 997 10.29 0 14.269; 998 10.29 0 14.762; 999 10.29 0 15.185;
1000 10.29 0 15.7929; 1001 10.29 0 16.5063; 1002 10.29 0 17.0026;
1003 10.29 0 17.559; 1004 10.29 0 18.0096; 1005 10.29 0 18.4602;
1006 10.29 0 18.9108; 1007 10.29 0 19.3614; 1008 10.29 0 19.932;
1009 10.29 0 20.32; 1010 10.29 0 20.628; 1011 10.29 0 21.336;
1012 10.29 0 21.844; 1013 10.29 0 22.352; 1014 10.29 0 22.86;
1015 10.78 0 0.508; 1016 10.78 0 0; 1017 10.78 0 1.016; 1018 10.78 0 1.524;
1019 10.78 0 2.232; 1020 10.78 0 2.54; 1021 10.78 0 2.928; 1022 10.78 0 3.521;
1023 10.78 0 3.967; 1024 10.78 0 4.413; 1025 10.78 0 4.859; 1026 10.78 0 5.305;
1027 10.78 0 5.92634; 1028 10.78 0 6.35568; 1029 10.78 0 7.07708;
1030 10.78 0 7.6817; 1031 10.78 0 8.0714; 1032 10.78 0 8.5511;
1033 10.78 0 9.0908; 1034 10.78 0 9.5105; 1035 10.78 0 10.0915;
1036 10.78 0 10.624; 1037 10.78 0 10.945; 1038 10.78 0 11.444;
1039 10.78 0 11.967; 1040 10.78 0 12.79; 1041 10.78 0 13.283;
1042 10.78 0 13.816; 1043 10.78 0 14.269; 1044 10.78 0 14.762;
1045 10.78 0 15.185; 1046 10.78 0 15.7929; 1047 10.78 0 16.5063;
1048 10.78 0 17.0026; 1049 10.78 0 17.559; 1050 10.78 0 18.0096;
1051 10.78 0 18.4602; 1052 10.78 0 18.9108; 1053 10.78 0 19.3614;
1054 10.78 0 19.932; 1055 10.78 0 20.32; 1056 10.78 0 20.628;
1057 10.78 0 21.336; 1058 10.78 0 21.844; 1059 10.78 0 22.352;
1060 10.78 0 22.86; 1061 11.27 0 0.508; 1062 11.27 0 0; 1063 11.27 0 1.016;
1064 11.27 0 1.524; 1065 11.27 0 2.232; 1066 11.27 0 2.54; 1067 11.27 0 2.928;
1068 11.27 0 3.521; 1069 11.27 0 3.967; 1070 11.27 0 4.413; 1071 11.27 0 4.859;
1072 11.27 0 5.305; 1073 11.27 0 5.92634; 1074 11.27 0 6.35568;
1075 11.27 0 7.07708; 1076 11.27 0 7.6817; 1077 11.27 0 8.0714;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

191 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1078 11.27 0 8.5511; 1079 11.27 0 9.0908; 1080 11.27 0 9.5105;


1081 11.27 0 10.0915; 1082 11.27 0 10.624; 1083 11.27 0 10.945;
1084 11.27 0 11.444; 1085 11.27 0 11.967; 1086 11.27 0 12.79;
1087 11.27 0 13.283; 1088 11.27 0 13.816; 1089 11.27 0 14.269;
1090 11.27 0 14.762; 1091 11.27 0 15.185; 1092 11.27 0 15.7929;
1093 11.27 0 16.5063; 1094 11.27 0 17.0026; 1095 11.27 0 17.559;
1096 11.27 0 18.0096; 1097 11.27 0 18.4602; 1098 11.27 0 18.9108;
1099 11.27 0 19.3614; 1100 11.27 0 19.932; 1101 11.27 0 20.32;
1102 11.27 0 20.628; 1103 11.27 0 21.336; 1104 11.27 0 21.844;
1105 11.27 0 22.352; 1106 11.27 0 22.86; 1107 11.76 0 0.508; 1108 11.76 0 0;
1109 11.76 0 1.016; 1110 11.76 0 1.524; 1111 11.76 0 2.232; 1112 11.76 0 2.54;
1113 11.76 0 2.928; 1114 11.76 0 3.521; 1115 11.76 0 3.967; 1116 11.76 0 4.413;
1117 11.76 0 4.859; 1118 11.76 0 5.305; 1119 11.76 0 5.92634;
1120 11.76 0 6.35568; 1121 11.76 0 7.07708; 1122 11.76 0 7.6817;
1123 11.76 0 8.0714; 1124 11.76 0 8.5511; 1125 11.76 0 9.0908;
1126 11.76 0 9.5105; 1127 11.76 0 10.0915; 1128 11.76 0 10.624;
1129 11.76 0 10.945; 1130 11.76 0 11.444; 1131 11.76 0 11.967;
1132 11.76 0 12.79; 1133 11.76 0 13.283; 1134 11.76 0 13.816;
1135 11.76 0 14.269; 1136 11.76 0 14.762; 1137 11.76 0 15.185;
1138 11.76 0 15.7929; 1139 11.76 0 16.5063; 1140 11.76 0 17.0026;
1141 11.76 0 17.559; 1142 11.76 0 18.0096; 1143 11.76 0 18.4602;
1144 11.76 0 18.9108; 1145 11.76 0 19.3614; 1146 11.76 0 19.932;
1147 11.76 0 20.32; 1148 11.76 0 20.628; 1149 11.76 0 21.336;
1150 11.76 0 21.844; 1151 11.76 0 22.352; 1152 11.76 0 22.86;
1153 12.2 0 0.508; 1154 12.2 0 0; 1155 12.2 0 1.016; 1156 12.2 0 1.524;
1157 12.2 0 2.232; 1158 12.2 0 2.54; 1159 12.2 0 2.928; 1160 12.2 0 3.521;
1161 12.2 0 3.967; 1162 12.2 0 4.413; 1163 12.2 0 4.859; 1164 12.2 0 5.305;
1165 12.2 0 5.92634; 1166 12.2 0 6.35568; 1167 12.2 0 7.07708;
1168 12.2 0 7.6817; 1169 12.2 0 8.0714; 1170 12.2 0 8.5511; 1171 12.2 0 9.0908;
1172 12.2 0 9.5105; 1173 12.2 0 10.0915; 1174 12.2 0 10.624;
1175 12.2 0 10.945; 1176 12.2 0 11.444; 1177 12.2 0 11.967; 1178 12.2 0 12.79;
1179 12.2 0 13.283; 1180 12.2 0 13.816; 1181 12.2 0 14.269; 1182 12.2 0 14.762;
1183 12.2 0 15.185; 1184 12.2 0 15.7929; 1185 12.2 0 16.5063;
1186 12.2 0 17.0026; 1187 12.2 0 17.559; 1188 12.2 0 18.0096;
1189 12.2 0 18.4602; 1190 12.2 0 18.9108; 1191 12.2 0 19.3614;
1192 12.2 0 19.932; 1193 12.2 0 20.32; 1194 12.2 0 20.628; 1195 12.2 0 21.336;
1196 12.2 0 21.844; 1197 12.2 0 22.352; 1198 12.2 0 22.86; 1199 12.9 0 0.508;
1200 12.9 0 0; 1201 12.9 0 1.016; 1202 12.9 0 1.524; 1203 12.9 0 2.232;
1204 12.9 0 2.54; 1205 12.9 0 2.928; 1206 12.9 0 3.521; 1207 12.9 0 3.967;
1208 12.9 0 4.413; 1209 12.9 0 4.859; 1210 12.9 0 5.305; 1211 12.9 0 5.92634;
1212 12.9 0 6.35568; 1213 12.9 0 7.07708; 1214 12.9 0 7.6817;
1215 12.9 0 8.0714; 1216 12.9 0 8.5511; 1217 12.9 0 9.0908; 1218 12.9 0 9.5105;
1219 12.9 0 10.0915; 1220 12.9 0 10.624; 1221 12.9 0 10.945;
1222 12.9 0 11.444; 1223 12.9 0 11.967; 1224 12.9 0 12.79; 1225 12.9 0 13.283;
1226 12.9 0 13.816; 1227 12.9 0 14.269; 1228 12.9 0 14.762; 1229 12.9 0 15.185;
1230 12.9 0 15.7929; 1231 12.9 0 16.5063; 1232 12.9 0 17.0026;
1233 12.9 0 17.559; 1234 12.9 0 18.0096; 1235 12.9 0 18.4602;
1236 12.9 0 18.9108; 1237 12.9 0 19.3614; 1238 12.9 0 19.932;
1239 12.9 0 20.32; 1240 12.9 0 20.628; 1241 12.9 0 21.336; 1242 12.9 0 21.844;
1243 12.9 0 22.352; 1244 12.9 0 22.86; 1245 13.23 0 0.508; 1246 13.23 0 0;
1247 13.23 0 1.016; 1248 13.23 0 1.524; 1249 13.23 0 2.232; 1250 13.23 0 2.54;
1251 13.23 0 2.928; 1252 13.23 0 3.521; 1253 13.23 0 3.967; 1254 13.23 0 4.413;
1255 13.23 0 4.859; 1256 13.23 0 5.305; 1257 13.23 0 5.92634;
1258 13.23 0 6.35568; 1259 13.23 0 7.07708; 1260 13.23 0 7.6817;
1261 13.23 0 8.0714; 1262 13.23 0 8.5511; 1263 13.23 0 9.0908;
1264 13.23 0 9.5105; 1265 13.23 0 10.0915; 1266 13.23 0 10.624;
1267 13.23 0 10.945; 1268 13.23 0 11.444; 1269 13.23 0 11.967;
1270 13.23 0 12.79; 1271 13.23 0 13.283; 1272 13.23 0 13.816;
1273 13.23 0 14.269; 1274 13.23 0 14.762; 1275 13.23 0 15.185;
1276 13.23 0 15.7929; 1277 13.23 0 16.5063; 1278 13.23 0 17.0026;
1279 13.23 0 17.559; 1280 13.23 0 18.0096; 1281 13.23 0 18.4602;
1282 13.23 0 18.9108; 1283 13.23 0 19.3614; 1284 13.23 0 19.932;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

192 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1285 13.23 0 20.32; 1286 13.23 0 20.628; 1287 13.23 0 21.336;


1288 13.23 0 21.844; 1289 13.23 0 22.352; 1290 13.23 0 22.86;
1291 13.72 0 0.508; 1292 13.72 0 0; 1293 13.72 0 1.016; 1294 13.72 0 1.524;
1295 13.72 0 2.232; 1296 13.72 0 2.54; 1297 13.72 0 2.928; 1298 13.72 0 3.521;
1299 13.72 0 3.967; 1300 13.72 0 4.413; 1301 13.72 0 4.859; 1302 13.72 0 5.305;
1303 13.72 0 5.92634; 1304 13.72 0 6.35568; 1305 13.72 0 7.07708;
1306 13.72 0 7.6817; 1307 13.72 0 8.0714; 1308 13.72 0 8.5511;
1309 13.72 0 9.0908; 1310 13.72 0 9.5105; 1311 13.72 0 10.0915;
1312 13.72 0 10.624; 1313 13.72 0 10.945; 1314 13.72 0 11.444;
1315 13.72 0 11.967; 1316 13.72 0 12.79; 1317 13.72 0 13.283;
1318 13.72 0 13.816; 1319 13.72 0 14.269; 1320 13.72 0 14.762;
1321 13.72 0 15.185; 1322 13.72 0 15.7929; 1323 13.72 0 16.5063;
1324 13.72 0 17.0026; 1325 13.72 0 17.559; 1326 13.72 0 18.0096;
1327 13.72 0 18.4602; 1328 13.72 0 18.9108; 1329 13.72 0 19.3614;
1330 13.72 0 19.932; 1331 13.72 0 20.32; 1332 13.72 0 20.628;
1333 13.72 0 21.336; 1334 13.72 0 21.844; 1335 13.72 0 22.352;
1336 13.72 0 22.86; 1337 14.21 0 0.508; 1338 14.21 0 0; 1339 14.21 0 1.016;
1340 14.21 0 1.524; 1341 14.21 0 2.232; 1342 14.21 0 2.54; 1343 14.21 0 2.928;
1344 14.21 0 3.521; 1345 14.21 0 3.967; 1346 14.21 0 4.413; 1347 14.21 0 4.859;
1348 14.21 0 5.305; 1349 14.21 0 5.92634; 1350 14.21 0 6.35568;
1351 14.21 0 7.07708; 1352 14.21 0 7.6817; 1353 14.21 0 8.0714;
1354 14.21 0 8.5511; 1355 14.21 0 9.0908; 1356 14.21 0 9.5105;
1357 14.21 0 10.0915; 1358 14.21 0 10.624; 1359 14.21 0 10.945;
1360 14.21 0 11.444; 1361 14.21 0 11.967; 1362 14.21 0 12.79;
1363 14.21 0 13.283; 1364 14.21 0 13.816; 1365 14.21 0 14.269;
1366 14.21 0 14.762; 1367 14.21 0 15.185; 1368 14.21 0 15.7929;
1369 14.21 0 16.5063; 1370 14.21 0 17.0026; 1371 14.21 0 17.559;
1372 14.21 0 18.0096; 1373 14.21 0 18.4602; 1374 14.21 0 18.9108;
1375 14.21 0 19.3614; 1376 14.21 0 19.932; 1377 14.21 0 20.32;
1378 14.21 0 20.628; 1379 14.21 0 21.336; 1380 14.21 0 21.844;
1381 14.21 0 22.352; 1382 14.21 0 22.86; 1383 14.6 0 0.508; 1384 14.6 0 1.016;
1385 14.6 0 1.524; 1386 14.6 0 2.232; 1387 14.6 0 2.54; 1388 14.6 0 2.928;
1389 14.6 0 3.521; 1390 14.6 0 3.967; 1391 14.6 0 4.413; 1392 14.6 0 4.859;
1393 14.6 0 5.305; 1394 14.6 0 5.92634; 1395 14.6 0 6.35568;
1396 14.6 0 7.07708; 1397 14.6 0 7.6817; 1398 14.6 0 8.0714;
1399 14.6 0 8.5511; 1400 14.6 0 9.0908; 1401 14.6 0 9.5105;
1402 14.6 0 10.0915; 1403 14.6 0 10.624; 1404 14.6 0 10.945;
1405 14.6 0 11.444; 1406 14.6 0 11.967; 1407 14.6 0 12.79; 1408 14.6 0 13.283;
1409 14.6 0 13.816; 1410 14.6 0 14.269; 1411 14.6 0 14.762; 1412 14.6 0 15.185;
1413 14.6 0 15.7929; 1414 14.6 0 16.5063; 1415 14.6 0 17.0026;
1416 14.6 0 17.559; 1417 14.6 0 18.0096; 1418 14.6 0 18.4602;
1419 14.6 0 18.9108; 1420 14.6 0 19.3614; 1421 14.6 0 19.932;
1422 14.6 0 20.32; 1423 14.6 0 20.628; 1424 14.6 0 21.336; 1425 14.6 0 21.844;
1426 14.6 0 22.352; 1427 14.95 0 0.508; 1428 14.95 0 0; 1429 14.95 0 1.016;
1430 14.95 0 1.524; 1431 14.95 0 2.232; 1432 14.95 0 2.54; 1433 14.95 0 2.928;
1434 14.95 0 3.521; 1435 14.95 0 3.967; 1436 14.95 0 4.413; 1437 14.95 0 4.859;
1438 14.95 0 5.305; 1439 14.95 0 5.92634; 1440 14.95 0 6.35568;
1441 14.95 0 7.07708; 1442 14.95 0 7.6817; 1443 14.95 0 8.0714;
1444 14.95 0 8.5511; 1445 14.95 0 9.0908; 1446 14.95 0 9.5105;
1447 14.95 0 10.0915; 1448 14.95 0 10.624; 1449 14.95 0 10.945;
1450 14.95 0 11.444; 1451 14.95 0 11.967; 1452 14.95 0 12.79;
1453 14.95 0 13.283; 1454 14.95 0 13.816; 1455 14.95 0 14.269;
1456 14.95 0 14.762; 1457 14.95 0 15.185; 1458 14.95 0 15.7929;
1459 14.95 0 16.5063; 1460 14.95 0 17.0026; 1461 14.95 0 17.559;
1462 14.95 0 18.0096; 1463 14.95 0 18.4602; 1464 14.95 0 18.9108;
1465 14.95 0 19.3614; 1466 14.95 0 19.932; 1467 14.95 0 20.32;
1468 14.95 0 20.628; 1469 14.95 0 21.336; 1470 14.95 0 21.844;
1471 14.95 0 22.352; 1472 14.95 0 22.86;
ELEMENT INCIDENCES SHELL
1 1 5 6 7; 2 5 8 9 6; 3 8 10 11 9; 4 10 12 13 11; 5 12 14 15 13; 6 14 16 17 15;
7 16 18 19 17; 8 18 20 21 19; 9 20 22 23 21; 10 22 24 25 23; 11 24 26 27 25;
12 26 28 29 27; 13 28 30 31 29; 14 30 32 33 31; 15 32 34 35 33; 16 34 36 37 35;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

193 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

17 36 38 39 37; 18 38 40 41 39; 19 40 42 43 41; 20 42 44 45 43; 21 44 46 47 45;


22 46 48 49 47; 23 48 50 51 49; 24 50 52 53 51; 25 52 54 55 53; 26 54 56 57 55;
27 56 58 59 57; 28 58 60 61 59; 29 60 62 63 61; 30 62 64 65 63; 31 64 66 67 65;
32 66 68 69 67; 33 68 70 71 69; 34 70 72 73 71; 35 72 74 75 73; 36 74 76 77 75;
37 76 78 79 77; 38 78 80 81 79; 39 80 82 83 81; 40 82 84 85 83; 41 84 86 87 85;
42 86 88 89 87; 43 88 90 91 89; 44 90 92 93 91; 45 92 3 94 93; 46 7 6 95 96;
47 6 9 97 95; 48 9 11 98 97; 49 11 13 99 98; 50 13 15 100 99; 51 15 17 101 100;
52 17 19 102 101; 53 19 21 103 102; 54 21 23 104 103; 55 23 25 105 104;
56 25 27 106 105; 57 27 29 107 106; 58 29 31 108 107; 59 31 33 109 108;
60 33 35 110 109; 61 35 37 111 110; 62 37 39 112 111; 63 39 41 113 112;
64 41 43 114 113; 65 43 45 115 114; 66 45 47 116 115; 67 47 49 117 116;
68 49 51 118 117; 69 51 53 119 118; 70 53 55 120 119; 71 55 57 121 120;
72 57 59 122 121; 73 59 61 123 122; 74 61 63 124 123; 75 63 65 125 124;
76 65 67 126 125; 77 67 69 127 126; 78 69 71 128 127; 79 71 73 129 128;
80 73 75 130 129; 81 75 77 131 130; 82 77 79 132 131; 83 79 81 133 132;
84 81 83 134 133; 85 83 85 135 134; 86 85 87 136 135; 87 87 89 137 136;
88 89 91 138 137; 89 91 93 139 138; 90 93 94 140 139; 91 96 95 141 142;
92 95 97 143 141; 93 97 98 144 143; 94 98 99 145 144; 95 99 100 146 145;
96 100 101 147 146; 97 101 102 148 147; 98 102 103 149 148; 99 103 104 150 149;
100 104 105 151 150; 101 105 106 152 151; 102 106 107 153 152;
103 107 108 154 153; 104 108 109 155 154; 105 109 110 156 155;
106 110 111 157 156; 107 111 112 158 157; 108 112 113 159 158;
109 113 114 160 159; 110 114 115 161 160; 111 115 116 162 161;
112 116 117 163 162; 113 117 118 164 163; 114 118 119 165 164;
115 119 120 166 165; 116 120 121 167 166; 117 121 122 168 167;
118 122 123 169 168; 119 123 124 170 169; 120 124 125 171 170;
121 125 126 172 171; 122 126 127 173 172; 123 127 128 174 173;
124 128 129 175 174; 125 129 130 176 175; 126 130 131 177 176;
127 131 132 178 177; 128 132 133 179 178; 129 133 134 180 179;
130 134 135 181 180; 131 135 136 182 181; 132 136 137 183 182;
133 137 138 184 183; 134 138 139 185 184; 135 139 140 186 185;
136 142 141 187 188; 137 141 143 189 187; 138 143 144 190 189;
139 144 145 191 190; 140 145 146 192 191; 141 146 147 193 192;
142 147 148 194 193; 143 148 149 195 194; 144 149 150 196 195;
145 150 151 197 196; 146 151 152 198 197; 147 152 153 199 198;
148 153 154 200 199; 149 154 155 201 200; 150 155 156 202 201;
151 156 157 203 202; 152 157 158 204 203; 153 158 159 205 204;
154 159 160 206 205; 155 160 161 207 206; 156 161 162 208 207;
157 162 163 209 208; 158 163 164 210 209; 159 164 165 211 210;
160 165 166 212 211; 161 166 167 213 212; 162 167 168 214 213;
163 168 169 215 214; 164 169 170 216 215; 165 170 171 217 216;
166 171 172 218 217; 167 172 173 219 218; 168 173 174 220 219;
169 174 175 221 220; 170 175 176 222 221; 171 176 177 223 222;
172 177 178 224 223; 173 178 179 225 224; 174 179 180 226 225;
175 180 181 227 226; 176 181 182 228 227; 177 182 183 229 228;
178 183 184 230 229; 179 184 185 231 230; 180 185 186 232 231;
181 188 187 233 234; 182 187 189 235 233; 183 189 190 236 235;
184 190 191 237 236; 185 191 192 238 237; 186 192 193 239 238;
187 193 194 240 239; 188 194 195 241 240; 189 195 196 242 241;
190 196 197 243 242; 191 197 198 244 243; 192 198 199 245 244;
193 199 200 246 245; 194 200 201 247 246; 195 201 202 248 247;
196 202 203 249 248; 197 203 204 250 249; 198 204 205 251 250;
199 205 206 252 251; 200 206 207 253 252; 201 207 208 254 253;
202 208 209 255 254; 203 209 210 256 255; 204 210 211 257 256;
205 211 212 258 257; 206 212 213 259 258; 207 213 214 260 259;
208 214 215 261 260; 209 215 216 262 261; 210 216 217 263 262;
211 217 218 264 263; 212 218 219 265 264; 213 219 220 266 265;
214 220 221 267 266; 215 221 222 268 267; 216 222 223 269 268;
217 223 224 270 269; 218 224 225 271 270; 219 225 226 272 271;
220 226 227 273 272; 221 227 228 274 273; 222 228 229 275 274;
223 229 230 276 275; 224 230 231 277 276; 225 231 232 278 277;
226 234 233 279 280; 227 233 235 281 279; 228 235 236 282 281;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

194 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

229 236 237 283 282; 230 237 238 284 283; 231 238 239 285 284;
232 239 240 286 285; 233 240 241 287 286; 234 241 242 288 287;
235 242 243 289 288; 236 243 244 290 289; 237 244 245 291 290;
238 245 246 292 291; 239 246 247 293 292; 240 247 248 294 293;
241 248 249 295 294; 242 249 250 296 295; 243 250 251 297 296;
244 251 252 298 297; 245 252 253 299 298; 246 253 254 300 299;
247 254 255 301 300; 248 255 256 302 301; 249 256 257 303 302;
250 257 258 304 303; 251 258 259 305 304; 252 259 260 306 305;
253 260 261 307 306; 254 261 262 308 307; 255 262 263 309 308;
256 263 264 310 309; 257 264 265 311 310; 258 265 266 312 311;
259 266 267 313 312; 260 267 268 314 313; 261 268 269 315 314;
262 269 270 316 315; 263 270 271 317 316; 264 271 272 318 317;
265 272 273 319 318; 266 273 274 320 319; 267 274 275 321 320;
268 275 276 322 321; 269 276 277 323 322; 270 277 278 324 323;
271 280 279 325 326; 272 279 281 327 325; 273 281 282 328 327;
274 282 283 329 328; 275 283 284 330 329; 276 284 285 331 330;
277 285 286 332 331; 278 286 287 333 332; 279 287 288 334 333;
280 288 289 335 334; 281 289 290 336 335; 282 290 291 337 336;
283 291 292 338 337; 284 292 293 339 338; 285 293 294 340 339;
286 294 295 341 340; 287 295 296 342 341; 288 296 297 343 342;
289 297 298 344 343; 290 298 299 345 344; 291 299 300 346 345;
292 300 301 347 346; 293 301 302 348 347; 294 302 303 349 348;
295 303 304 350 349; 296 304 305 351 350; 297 305 306 352 351;
298 306 307 353 352; 299 307 308 354 353; 300 308 309 355 354;
301 309 310 356 355; 302 310 311 357 356; 303 311 312 358 357;
304 312 313 359 358; 305 313 314 360 359; 306 314 315 361 360;
307 315 316 362 361; 308 316 317 363 362; 309 317 318 364 363;
310 318 319 365 364; 311 319 320 366 365; 312 320 321 367 366;
313 321 322 368 367; 314 322 323 369 368; 315 323 324 370 369;
316 326 325 371 372; 317 325 327 373 371; 318 327 328 374 373;
319 328 329 375 374; 320 329 330 376 375; 321 330 331 377 376;
322 331 332 378 377; 323 332 333 379 378; 324 333 334 380 379;
325 334 335 381 380; 326 335 336 382 381; 327 336 337 383 382;
328 337 338 384 383; 329 338 339 385 384; 330 339 340 386 385;
331 340 341 387 386; 332 341 342 388 387; 333 342 343 389 388;
334 343 344 390 389; 335 344 345 391 390; 336 345 346 392 391;
337 346 347 393 392; 338 347 348 394 393; 339 348 349 395 394;
340 349 350 396 395; 341 350 351 397 396; 342 351 352 398 397;
343 352 353 399 398; 344 353 354 400 399; 345 354 355 401 400;
346 355 356 402 401; 347 356 357 403 402; 348 357 358 404 403;
349 358 359 405 404; 350 359 360 406 405; 351 360 361 407 406;
352 361 362 408 407; 353 362 363 409 408; 354 363 364 410 409;
355 364 365 411 410; 356 365 366 412 411; 357 366 367 413 412;
358 367 368 414 413; 359 368 369 415 414; 360 369 370 416 415;
361 372 371 417 418; 362 371 373 419 417; 363 373 374 420 419;
364 374 375 421 420; 365 375 376 422 421; 366 376 377 423 422;
367 377 378 424 423; 368 378 379 425 424; 369 379 380 426 425;
370 380 381 427 426; 371 381 382 428 427; 372 382 383 429 428;
373 383 384 430 429; 374 384 385 431 430; 375 385 386 432 431;
376 386 387 433 432; 377 387 388 434 433; 378 388 389 435 434;
379 389 390 436 435; 380 390 391 437 436; 381 391 392 438 437;
382 392 393 439 438; 383 393 394 440 439; 384 394 395 441 440;
385 395 396 442 441; 386 396 397 443 442; 387 397 398 444 443;
388 398 399 445 444; 389 399 400 446 445; 390 400 401 447 446;
391 401 402 448 447; 392 402 403 449 448; 393 403 404 450 449;
394 404 405 451 450; 395 405 406 452 451; 396 406 407 453 452;
397 407 408 454 453; 398 408 409 455 454; 399 409 410 456 455;
400 410 411 457 456; 401 411 412 458 457; 402 412 413 459 458;
403 413 414 460 459; 404 414 415 461 460; 405 415 416 462 461;
406 418 417 463 464; 407 417 419 465 463; 408 419 420 466 465;
409 420 421 467 466; 410 421 422 468 467; 411 422 423 469 468;
412 423 424 470 469; 413 424 425 471 470; 414 425 426 472 471;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

195 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

415 426 427 473 472; 416 427 428 474 473; 417 428 429 475 474;
418 429 430 476 475; 419 430 431 477 476; 420 431 432 478 477;
421 432 433 479 478; 422 433 434 480 479; 423 434 435 481 480;
424 435 436 482 481; 425 436 437 483 482; 426 437 438 484 483;
427 438 439 485 484; 428 439 440 486 485; 429 440 441 487 486;
430 441 442 488 487; 431 442 443 489 488; 432 443 444 490 489;
433 444 445 491 490; 434 445 446 492 491; 435 446 447 493 492;
436 447 448 494 493; 437 448 449 495 494; 438 449 450 496 495;
439 450 451 497 496; 440 451 452 498 497; 441 452 453 499 498;
442 453 454 500 499; 443 454 455 501 500; 444 455 456 502 501;
445 456 457 503 502; 446 457 458 504 503; 447 458 459 505 504;
448 459 460 506 505; 449 460 461 507 506; 450 461 462 508 507;
451 464 463 509 510; 452 463 465 511 509; 453 465 466 512 511;
454 466 467 513 512; 455 467 468 514 513; 456 468 469 515 514;
457 469 470 516 515; 458 470 471 517 516; 459 471 472 518 517;
460 472 473 519 518; 461 473 474 520 519; 462 474 475 521 520;
463 475 476 522 521; 464 476 477 523 522; 465 477 478 524 523;
466 478 479 525 524; 467 479 480 526 525; 468 480 481 527 526;
469 481 482 528 527; 470 482 483 529 528; 471 483 484 530 529;
472 484 485 531 530; 473 485 486 532 531; 474 486 487 533 532;
475 487 488 534 533; 476 488 489 535 534; 477 489 490 536 535;
478 490 491 537 536; 479 491 492 538 537; 480 492 493 539 538;
481 493 494 540 539; 482 494 495 541 540; 483 495 496 542 541;
484 496 497 543 542; 485 497 498 544 543; 486 498 499 545 544;
487 499 500 546 545; 488 500 501 547 546; 489 501 502 548 547;
490 502 503 549 548; 491 503 504 550 549; 492 504 505 551 550;
493 505 506 552 551; 494 506 507 553 552; 495 507 508 554 553;
496 510 509 555 556; 497 509 511 557 555; 498 511 512 558 557;
499 512 513 559 558; 500 513 514 560 559; 501 514 515 561 560;
502 515 516 562 561; 503 516 517 563 562; 504 517 518 564 563;
505 518 519 565 564; 506 519 520 566 565; 507 520 521 567 566;
508 521 522 568 567; 509 522 523 569 568; 510 523 524 570 569;
511 524 525 571 570; 512 525 526 572 571; 513 526 527 573 572;
514 527 528 574 573; 515 528 529 575 574; 516 529 530 576 575;
517 530 531 577 576; 518 531 532 578 577; 519 532 533 579 578;
520 533 534 580 579; 521 534 535 581 580; 522 535 536 582 581;
523 536 537 583 582; 524 537 538 584 583; 525 538 539 585 584;
526 539 540 586 585; 527 540 541 587 586; 528 541 542 588 587;
529 542 543 589 588; 530 543 544 590 589; 531 544 545 591 590;
532 545 546 592 591; 533 546 547 593 592; 534 547 548 594 593;
535 548 549 595 594; 536 549 550 596 595; 537 550 551 597 596;
538 551 552 598 597; 539 552 553 599 598; 540 553 554 600 599;
541 556 555 601 602; 542 555 557 603 601; 543 557 558 604 603;
544 558 559 605 604; 545 559 560 606 605; 546 560 561 607 606;
547 561 562 608 607; 548 562 563 609 608; 549 563 564 610 609;
550 564 565 611 610; 551 565 566 612 611; 552 566 567 613 612;
553 567 568 614 613; 554 568 569 615 614; 555 569 570 616 615;
556 570 571 617 616; 557 571 572 618 617; 558 572 573 619 618;
559 573 574 620 619; 560 574 575 621 620; 561 575 576 622 621;
562 576 577 623 622; 563 577 578 624 623; 564 578 579 625 624;
565 579 580 626 625; 566 580 581 627 626; 567 581 582 628 627;
568 582 583 629 628; 569 583 584 630 629; 570 584 585 631 630;
571 585 586 632 631; 572 586 587 633 632; 573 587 588 634 633;
574 588 589 635 634; 575 589 590 636 635; 576 590 591 637 636;
577 591 592 638 637; 578 592 593 639 638; 579 593 594 640 639;
580 594 595 641 640; 581 595 596 642 641; 582 596 597 643 642;
583 597 598 644 643; 584 598 599 645 644; 585 599 600 646 645;
586 602 601 647 648; 587 601 603 649 647; 588 603 604 650 649;
589 604 605 651 650; 590 605 606 652 651; 591 606 607 653 652;
592 607 608 654 653; 593 608 609 655 654; 594 609 610 656 655;
595 610 611 657 656; 596 611 612 658 657; 597 612 613 659 658;
598 613 614 660 659; 599 614 615 661 660; 600 615 616 662 661;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

196 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

601 616 617 663 662; 602 617 618 664 663; 603 618 619 665 664;
604 619 620 666 665; 605 620 621 667 666; 606 621 622 668 667;
607 622 623 669 668; 608 623 624 670 669; 609 624 625 671 670;
610 625 626 672 671; 611 626 627 673 672; 612 627 628 674 673;
613 628 629 675 674; 614 629 630 676 675; 615 630 631 677 676;
616 631 632 678 677; 617 632 633 679 678; 618 633 634 680 679;
619 634 635 681 680; 620 635 636 682 681; 621 636 637 683 682;
622 637 638 684 683; 623 638 639 685 684; 624 639 640 686 685;
625 640 641 687 686; 626 641 642 688 687; 627 642 643 689 688;
628 643 644 690 689; 629 644 645 691 690; 630 645 646 692 691;
631 648 647 693 694; 632 647 649 695 693; 633 649 650 696 695;
634 650 651 697 696; 635 651 652 698 697; 636 652 653 699 698;
637 653 654 700 699; 638 654 655 701 700; 639 655 656 702 701;
640 656 657 703 702; 641 657 658 704 703; 642 658 659 705 704;
643 659 660 706 705; 644 660 661 707 706; 645 661 662 708 707;
646 662 663 709 708; 647 663 664 710 709; 648 664 665 711 710;
649 665 666 712 711; 650 666 667 713 712; 651 667 668 714 713;
652 668 669 715 714; 653 669 670 716 715; 654 670 671 717 716;
655 671 672 718 717; 656 672 673 719 718; 657 673 674 720 719;
658 674 675 721 720; 659 675 676 722 721; 660 676 677 723 722;
661 677 678 724 723; 662 678 679 725 724; 663 679 680 726 725;
664 680 681 727 726; 665 681 682 728 727; 666 682 683 729 728;
667 683 684 730 729; 668 684 685 731 730; 669 685 686 732 731;
670 686 687 733 732; 671 687 688 734 733; 672 688 689 735 734;
673 689 690 736 735; 674 690 691 737 736; 675 691 692 738 737;
676 694 693 739 740; 677 693 695 741 739; 678 695 696 742 741;
679 696 697 743 742; 680 697 698 744 743; 681 698 699 745 744;
682 699 700 746 745; 683 700 701 747 746; 684 701 702 748 747;
685 702 703 749 748; 686 703 704 750 749; 687 704 705 751 750;
688 705 706 752 751; 689 706 707 753 752; 690 707 708 754 753;
691 708 709 755 754; 692 709 710 756 755; 693 710 711 757 756;
694 711 712 758 757; 695 712 713 759 758; 696 713 714 760 759;
697 714 715 761 760; 698 715 716 762 761; 699 716 717 763 762;
700 717 718 764 763; 701 718 719 765 764; 702 719 720 766 765;
703 720 721 767 766; 704 721 722 768 767; 705 722 723 769 768;
706 723 724 770 769; 707 724 725 771 770; 708 725 726 772 771;
709 726 727 773 772; 710 727 728 774 773; 711 728 729 775 774;
712 729 730 776 775; 713 730 731 777 776; 714 731 732 778 777;
715 732 733 779 778; 716 733 734 780 779; 717 734 735 781 780;
718 735 736 782 781; 719 736 737 783 782; 720 737 738 784 783;
721 740 739 785 786; 722 739 741 787 785; 723 741 742 788 787;
724 742 743 789 788; 725 743 744 790 789; 726 744 745 791 790;
727 745 746 792 791; 728 746 747 793 792; 729 747 748 794 793;
730 748 749 795 794; 731 749 750 796 795; 732 750 751 797 796;
733 751 752 798 797; 734 752 753 799 798; 735 753 754 800 799;
736 754 755 801 800; 737 755 756 802 801; 738 756 757 803 802;
739 757 758 804 803; 740 758 759 805 804; 741 759 760 806 805;
742 760 761 807 806; 743 761 762 808 807; 744 762 763 809 808;
745 763 764 810 809; 746 764 765 811 810; 747 765 766 812 811;
748 766 767 813 812; 749 767 768 814 813; 750 768 769 815 814;
751 769 770 816 815; 752 770 771 817 816; 753 771 772 818 817;
754 772 773 819 818; 755 773 774 820 819; 756 774 775 821 820;
757 775 776 822 821; 758 776 777 823 822; 759 777 778 824 823;
760 778 779 825 824; 761 779 780 826 825; 762 780 781 827 826;
763 781 782 828 827; 764 782 783 829 828; 765 783 784 830 829;
766 786 785 831 832; 767 785 787 833 831; 768 787 788 834 833;
769 788 789 835 834; 770 789 790 836 835; 771 790 791 837 836;
772 791 792 838 837; 773 792 793 839 838; 774 793 794 840 839;
775 794 795 841 840; 776 795 796 842 841; 777 796 797 843 842;
778 797 798 844 843; 779 798 799 845 844; 780 799 800 846 845;
781 800 801 847 846; 782 801 802 848 847; 783 802 803 849 848;
784 803 804 850 849; 785 804 805 851 850; 786 805 806 852 851;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

197 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

787 806 807 853 852; 788 807 808 854 853; 789 808 809 855 854;
790 809 810 856 855; 791 810 811 857 856; 792 811 812 858 857;
793 812 813 859 858; 794 813 814 860 859; 795 814 815 861 860;
796 815 816 862 861; 797 816 817 863 862; 798 817 818 864 863;
799 818 819 865 864; 800 819 820 866 865; 801 820 821 867 866;
802 821 822 868 867; 803 822 823 869 868; 804 823 824 870 869;
805 824 825 871 870; 806 825 826 872 871; 807 826 827 873 872;
808 827 828 874 873; 809 828 829 875 874; 810 829 830 876 875;
811 832 831 877 878; 812 831 833 879 877; 813 833 834 880 879;
814 834 835 881 880; 815 835 836 882 881; 816 836 837 883 882;
817 837 838 884 883; 818 838 839 885 884; 819 839 840 886 885;
820 840 841 887 886; 821 841 842 888 887; 822 842 843 889 888;
823 843 844 890 889; 824 844 845 891 890; 825 845 846 892 891;
826 846 847 893 892; 827 847 848 894 893; 828 848 849 895 894;
829 849 850 896 895; 830 850 851 897 896; 831 851 852 898 897;
832 852 853 899 898; 833 853 854 900 899; 834 854 855 901 900;
835 855 856 902 901; 836 856 857 903 902; 837 857 858 904 903;
838 858 859 905 904; 839 859 860 906 905; 840 860 861 907 906;
841 861 862 908 907; 842 862 863 909 908; 843 863 864 910 909;
844 864 865 911 910; 845 865 866 912 911; 846 866 867 913 912;
847 867 868 914 913; 848 868 869 915 914; 849 869 870 916 915;
850 870 871 917 916; 851 871 872 918 917; 852 872 873 919 918;
853 873 874 920 919; 854 874 875 921 920; 855 875 876 922 921;
856 878 877 923 924; 857 877 879 925 923; 858 879 880 926 925;
859 880 881 927 926; 860 881 882 928 927; 861 882 883 929 928;
862 883 884 930 929; 863 884 885 931 930; 864 885 886 932 931;
865 886 887 933 932; 866 887 888 934 933; 867 888 889 935 934;
868 889 890 936 935; 869 890 891 937 936; 870 891 892 938 937;
871 892 893 939 938; 872 893 894 940 939; 873 894 895 941 940;
874 895 896 942 941; 875 896 897 943 942; 876 897 898 944 943;
877 898 899 945 944; 878 899 900 946 945; 879 900 901 947 946;
880 901 902 948 947; 881 902 903 949 948; 882 903 904 950 949;
883 904 905 951 950; 884 905 906 952 951; 885 906 907 953 952;
886 907 908 954 953; 887 908 909 955 954; 888 909 910 956 955;
889 910 911 957 956; 890 911 912 958 957; 891 912 913 959 958;
892 913 914 960 959; 893 914 915 961 960; 894 915 916 962 961;
895 916 917 963 962; 896 917 918 964 963; 897 918 919 965 964;
898 919 920 966 965; 899 920 921 967 966; 900 921 922 968 967;
901 924 923 969 970; 902 923 925 971 969; 903 925 926 972 971;
904 926 927 973 972; 905 927 928 974 973; 906 928 929 975 974;
907 929 930 976 975; 908 930 931 977 976; 909 931 932 978 977;
910 932 933 979 978; 911 933 934 980 979; 912 934 935 981 980;
913 935 936 982 981; 914 936 937 983 982; 915 937 938 984 983;
916 938 939 985 984; 917 939 940 986 985; 918 940 941 987 986;
919 941 942 988 987; 920 942 943 989 988; 921 943 944 990 989;
922 944 945 991 990; 923 945 946 992 991; 924 946 947 993 992;
925 947 948 994 993; 926 948 949 995 994; 927 949 950 996 995;
928 950 951 997 996; 929 951 952 998 997; 930 952 953 999 998;
931 953 954 1000 999; 932 954 955 1001 1000; 933 955 956 1002 1001;
934 956 957 1003 1002; 935 957 958 1004 1003; 936 958 959 1005 1004;
937 959 960 1006 1005; 938 960 961 1007 1006; 939 961 962 1008 1007;
940 962 963 1009 1008; 941 963 964 1010 1009; 942 964 965 1011 1010;
943 965 966 1012 1011; 944 966 967 1013 1012; 945 967 968 1014 1013;
946 970 969 1015 1016; 947 969 971 1017 1015; 948 971 972 1018 1017;
949 972 973 1019 1018; 950 973 974 1020 1019; 951 974 975 1021 1020;
952 975 976 1022 1021; 953 976 977 1023 1022; 954 977 978 1024 1023;
955 978 979 1025 1024; 956 979 980 1026 1025; 957 980 981 1027 1026;
958 981 982 1028 1027; 959 982 983 1029 1028; 960 983 984 1030 1029;
961 984 985 1031 1030; 962 985 986 1032 1031; 963 986 987 1033 1032;
964 987 988 1034 1033; 965 988 989 1035 1034; 966 989 990 1036 1035;
967 990 991 1037 1036; 968 991 992 1038 1037; 969 992 993 1039 1038;
970 993 994 1040 1039; 971 994 995 1041 1040; 972 995 996 1042 1041;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

198 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

973 996 997 1043 1042; 974 997 998 1044 1043; 975 998 999 1045 1044;
976 999 1000 1046 1045; 977 1000 1001 1047 1046; 978 1001 1002 1048 1047;
979 1002 1003 1049 1048; 980 1003 1004 1050 1049; 981 1004 1005 1051 1050;
982 1005 1006 1052 1051; 983 1006 1007 1053 1052; 984 1007 1008 1054 1053;
985 1008 1009 1055 1054; 986 1009 1010 1056 1055; 987 1010 1011 1057 1056;
988 1011 1012 1058 1057; 989 1012 1013 1059 1058; 990 1013 1014 1060 1059;
991 1016 1015 1061 1062; 992 1015 1017 1063 1061; 993 1017 1018 1064 1063;
994 1018 1019 1065 1064; 995 1019 1020 1066 1065; 996 1020 1021 1067 1066;
997 1021 1022 1068 1067; 998 1022 1023 1069 1068; 999 1023 1024 1070 1069;
1000 1024 1025 1071 1070; 1001 1025 1026 1072 1071; 1002 1026 1027 1073 1072;
1003 1027 1028 1074 1073; 1004 1028 1029 1075 1074; 1005 1029 1030 1076 1075;
1006 1030 1031 1077 1076; 1007 1031 1032 1078 1077; 1008 1032 1033 1079 1078;
1009 1033 1034 1080 1079; 1010 1034 1035 1081 1080; 1011 1035 1036 1082 1081;
1012 1036 1037 1083 1082; 1013 1037 1038 1084 1083; 1014 1038 1039 1085 1084;
1015 1039 1040 1086 1085; 1016 1040 1041 1087 1086; 1017 1041 1042 1088 1087;
1018 1042 1043 1089 1088; 1019 1043 1044 1090 1089; 1020 1044 1045 1091 1090;
1021 1045 1046 1092 1091; 1022 1046 1047 1093 1092; 1023 1047 1048 1094 1093;
1024 1048 1049 1095 1094; 1025 1049 1050 1096 1095; 1026 1050 1051 1097 1096;
1027 1051 1052 1098 1097; 1028 1052 1053 1099 1098; 1029 1053 1054 1100 1099;
1030 1054 1055 1101 1100; 1031 1055 1056 1102 1101; 1032 1056 1057 1103 1102;
1033 1057 1058 1104 1103; 1034 1058 1059 1105 1104; 1035 1059 1060 1106 1105;
1036 1062 1061 1107 1108; 1037 1061 1063 1109 1107; 1038 1063 1064 1110 1109;
1039 1064 1065 1111 1110; 1040 1065 1066 1112 1111; 1041 1066 1067 1113 1112;
1042 1067 1068 1114 1113; 1043 1068 1069 1115 1114; 1044 1069 1070 1116 1115;
1045 1070 1071 1117 1116; 1046 1071 1072 1118 1117; 1047 1072 1073 1119 1118;
1048 1073 1074 1120 1119; 1049 1074 1075 1121 1120; 1050 1075 1076 1122 1121;
1051 1076 1077 1123 1122; 1052 1077 1078 1124 1123; 1053 1078 1079 1125 1124;
1054 1079 1080 1126 1125; 1055 1080 1081 1127 1126; 1056 1081 1082 1128 1127;
1057 1082 1083 1129 1128; 1058 1083 1084 1130 1129; 1059 1084 1085 1131 1130;
1060 1085 1086 1132 1131; 1061 1086 1087 1133 1132; 1062 1087 1088 1134 1133;
1063 1088 1089 1135 1134; 1064 1089 1090 1136 1135; 1065 1090 1091 1137 1136;
1066 1091 1092 1138 1137; 1067 1092 1093 1139 1138; 1068 1093 1094 1140 1139;
1069 1094 1095 1141 1140; 1070 1095 1096 1142 1141; 1071 1096 1097 1143 1142;
1072 1097 1098 1144 1143; 1073 1098 1099 1145 1144; 1074 1099 1100 1146 1145;
1075 1100 1101 1147 1146; 1076 1101 1102 1148 1147; 1077 1102 1103 1149 1148;
1078 1103 1104 1150 1149; 1079 1104 1105 1151 1150; 1080 1105 1106 1152 1151;
1081 1108 1107 1153 1154; 1082 1107 1109 1155 1153; 1083 1109 1110 1156 1155;
1084 1110 1111 1157 1156; 1085 1111 1112 1158 1157; 1086 1112 1113 1159 1158;
1087 1113 1114 1160 1159; 1088 1114 1115 1161 1160; 1089 1115 1116 1162 1161;
1090 1116 1117 1163 1162; 1091 1117 1118 1164 1163; 1092 1118 1119 1165 1164;
1093 1119 1120 1166 1165; 1094 1120 1121 1167 1166; 1095 1121 1122 1168 1167;
1096 1122 1123 1169 1168; 1097 1123 1124 1170 1169; 1098 1124 1125 1171 1170;
1099 1125 1126 1172 1171; 1100 1126 1127 1173 1172; 1101 1127 1128 1174 1173;
1102 1128 1129 1175 1174; 1103 1129 1130 1176 1175; 1104 1130 1131 1177 1176;
1105 1131 1132 1178 1177; 1106 1132 1133 1179 1178; 1107 1133 1134 1180 1179;
1108 1134 1135 1181 1180; 1109 1135 1136 1182 1181; 1110 1136 1137 1183 1182;
1111 1137 1138 1184 1183; 1112 1138 1139 1185 1184; 1113 1139 1140 1186 1185;
1114 1140 1141 1187 1186; 1115 1141 1142 1188 1187; 1116 1142 1143 1189 1188;
1117 1143 1144 1190 1189; 1118 1144 1145 1191 1190; 1119 1145 1146 1192 1191;
1120 1146 1147 1193 1192; 1121 1147 1148 1194 1193; 1122 1148 1149 1195 1194;
1123 1149 1150 1196 1195; 1124 1150 1151 1197 1196; 1125 1151 1152 1198 1197;
1126 1154 1153 1199 1200; 1127 1153 1155 1201 1199; 1128 1155 1156 1202 1201;
1129 1156 1157 1203 1202; 1130 1157 1158 1204 1203; 1131 1158 1159 1205 1204;
1132 1159 1160 1206 1205; 1133 1160 1161 1207 1206; 1134 1161 1162 1208 1207;
1135 1162 1163 1209 1208; 1136 1163 1164 1210 1209; 1137 1164 1165 1211 1210;
1138 1165 1166 1212 1211; 1139 1166 1167 1213 1212; 1140 1167 1168 1214 1213;
1141 1168 1169 1215 1214; 1142 1169 1170 1216 1215; 1143 1170 1171 1217 1216;
1144 1171 1172 1218 1217; 1145 1172 1173 1219 1218; 1146 1173 1174 1220 1219;
1147 1174 1175 1221 1220; 1148 1175 1176 1222 1221; 1149 1176 1177 1223 1222;
1150 1177 1178 1224 1223; 1151 1178 1179 1225 1224; 1152 1179 1180 1226 1225;
1153 1180 1181 1227 1226; 1154 1181 1182 1228 1227; 1155 1182 1183 1229 1228;
1156 1183 1184 1230 1229; 1157 1184 1185 1231 1230; 1158 1185 1186 1232 1231;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

199 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1159 1186 1187 1233 1232; 1160 1187 1188 1234 1233; 1161 1188 1189 1235 1234;
1162 1189 1190 1236 1235; 1163 1190 1191 1237 1236; 1164 1191 1192 1238 1237;
1165 1192 1193 1239 1238; 1166 1193 1194 1240 1239; 1167 1194 1195 1241 1240;
1168 1195 1196 1242 1241; 1169 1196 1197 1243 1242; 1170 1197 1198 1244 1243;
1171 1200 1199 1245 1246; 1172 1199 1201 1247 1245; 1173 1201 1202 1248 1247;
1174 1202 1203 1249 1248; 1175 1203 1204 1250 1249; 1176 1204 1205 1251 1250;
1177 1205 1206 1252 1251; 1178 1206 1207 1253 1252; 1179 1207 1208 1254 1253;
1180 1208 1209 1255 1254; 1181 1209 1210 1256 1255; 1182 1210 1211 1257 1256;
1183 1211 1212 1258 1257; 1184 1212 1213 1259 1258; 1185 1213 1214 1260 1259;
1186 1214 1215 1261 1260; 1187 1215 1216 1262 1261; 1188 1216 1217 1263 1262;
1189 1217 1218 1264 1263; 1190 1218 1219 1265 1264; 1191 1219 1220 1266 1265;
1192 1220 1221 1267 1266; 1193 1221 1222 1268 1267; 1194 1222 1223 1269 1268;
1195 1223 1224 1270 1269; 1196 1224 1225 1271 1270; 1197 1225 1226 1272 1271;
1198 1226 1227 1273 1272; 1199 1227 1228 1274 1273; 1200 1228 1229 1275 1274;
1201 1229 1230 1276 1275; 1202 1230 1231 1277 1276; 1203 1231 1232 1278 1277;
1204 1232 1233 1279 1278; 1205 1233 1234 1280 1279; 1206 1234 1235 1281 1280;
1207 1235 1236 1282 1281; 1208 1236 1237 1283 1282; 1209 1237 1238 1284 1283;
1210 1238 1239 1285 1284; 1211 1239 1240 1286 1285; 1212 1240 1241 1287 1286;
1213 1241 1242 1288 1287; 1214 1242 1243 1289 1288; 1215 1243 1244 1290 1289;
1216 1246 1245 1291 1292; 1217 1245 1247 1293 1291; 1218 1247 1248 1294 1293;
1219 1248 1249 1295 1294; 1220 1249 1250 1296 1295; 1221 1250 1251 1297 1296;
1222 1251 1252 1298 1297; 1223 1252 1253 1299 1298; 1224 1253 1254 1300 1299;
1225 1254 1255 1301 1300; 1226 1255 1256 1302 1301; 1227 1256 1257 1303 1302;
1228 1257 1258 1304 1303; 1229 1258 1259 1305 1304; 1230 1259 1260 1306 1305;
1231 1260 1261 1307 1306; 1232 1261 1262 1308 1307; 1233 1262 1263 1309 1308;
1234 1263 1264 1310 1309; 1235 1264 1265 1311 1310; 1236 1265 1266 1312 1311;
1237 1266 1267 1313 1312; 1238 1267 1268 1314 1313; 1239 1268 1269 1315 1314;
1240 1269 1270 1316 1315; 1241 1270 1271 1317 1316; 1242 1271 1272 1318 1317;
1243 1272 1273 1319 1318; 1244 1273 1274 1320 1319; 1245 1274 1275 1321 1320;
1246 1275 1276 1322 1321; 1247 1276 1277 1323 1322; 1248 1277 1278 1324 1323;
1249 1278 1279 1325 1324; 1250 1279 1280 1326 1325; 1251 1280 1281 1327 1326;
1252 1281 1282 1328 1327; 1253 1282 1283 1329 1328; 1254 1283 1284 1330 1329;
1255 1284 1285 1331 1330; 1256 1285 1286 1332 1331; 1257 1286 1287 1333 1332;
1258 1287 1288 1334 1333; 1259 1288 1289 1335 1334; 1260 1289 1290 1336 1335;
1261 1292 1291 1337 1338; 1262 1291 1293 1339 1337; 1263 1293 1294 1340 1339;
1264 1294 1295 1341 1340; 1265 1295 1296 1342 1341; 1266 1296 1297 1343 1342;
1267 1297 1298 1344 1343; 1268 1298 1299 1345 1344; 1269 1299 1300 1346 1345;
1270 1300 1301 1347 1346; 1271 1301 1302 1348 1347; 1272 1302 1303 1349 1348;
1273 1303 1304 1350 1349; 1274 1304 1305 1351 1350; 1275 1305 1306 1352 1351;
1276 1306 1307 1353 1352; 1277 1307 1308 1354 1353; 1278 1308 1309 1355 1354;
1279 1309 1310 1356 1355; 1280 1310 1311 1357 1356; 1281 1311 1312 1358 1357;
1282 1312 1313 1359 1358; 1283 1313 1314 1360 1359; 1284 1314 1315 1361 1360;
1285 1315 1316 1362 1361; 1286 1316 1317 1363 1362; 1287 1317 1318 1364 1363;
1288 1318 1319 1365 1364; 1289 1319 1320 1366 1365; 1290 1320 1321 1367 1366;
1291 1321 1322 1368 1367; 1292 1322 1323 1369 1368; 1293 1323 1324 1370 1369;
1294 1324 1325 1371 1370; 1295 1325 1326 1372 1371; 1296 1326 1327 1373 1372;
1297 1327 1328 1374 1373; 1298 1328 1329 1375 1374; 1299 1329 1330 1376 1375;
1300 1330 1331 1377 1376; 1301 1331 1332 1378 1377; 1302 1332 1333 1379 1378;
1303 1333 1334 1380 1379; 1304 1334 1335 1381 1380; 1305 1335 1336 1382 1381;
1306 1338 1337 1383 2; 1307 1337 1339 1384 1383; 1308 1339 1340 1385 1384;
1309 1340 1341 1386 1385; 1310 1341 1342 1387 1386; 1311 1342 1343 1388 1387;
1312 1343 1344 1389 1388; 1313 1344 1345 1390 1389; 1314 1345 1346 1391 1390;
1315 1346 1347 1392 1391; 1316 1347 1348 1393 1392; 1317 1348 1349 1394 1393;
1318 1349 1350 1395 1394; 1319 1350 1351 1396 1395; 1320 1351 1352 1397 1396;
1321 1352 1353 1398 1397; 1322 1353 1354 1399 1398; 1323 1354 1355 1400 1399;
1324 1355 1356 1401 1400; 1325 1356 1357 1402 1401; 1326 1357 1358 1403 1402;
1327 1358 1359 1404 1403; 1328 1359 1360 1405 1404; 1329 1360 1361 1406 1405;
1330 1361 1362 1407 1406; 1331 1362 1363 1408 1407; 1332 1363 1364 1409 1408;
1333 1364 1365 1410 1409; 1334 1365 1366 1411 1410; 1335 1366 1367 1412 1411;
1336 1367 1368 1413 1412; 1337 1368 1369 1414 1413; 1338 1369 1370 1415 1414;
1339 1370 1371 1416 1415; 1340 1371 1372 1417 1416; 1341 1372 1373 1418 1417;
1342 1373 1374 1419 1418; 1343 1374 1375 1420 1419; 1344 1375 1376 1421 1420;

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

200 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1345 1376 1377 1422 1421; 1346 1377 1378 1423 1422; 1347 1378 1379 1424 1423;
1348 1379 1380 1425 1424; 1349 1380 1381 1426 1425; 1350 1381 1382 4 1426;
1351 2 1383 1427 1428; 1352 1383 1384 1429 1427; 1353 1384 1385 1430 1429;
1354 1385 1386 1431 1430; 1355 1386 1387 1432 1431; 1356 1387 1388 1433 1432;
1357 1388 1389 1434 1433; 1358 1389 1390 1435 1434; 1359 1390 1391 1436 1435;
1360 1391 1392 1437 1436; 1361 1392 1393 1438 1437; 1362 1393 1394 1439 1438;
1363 1394 1395 1440 1439; 1364 1395 1396 1441 1440; 1365 1396 1397 1442 1441;
1366 1397 1398 1443 1442; 1367 1398 1399 1444 1443; 1368 1399 1400 1445 1444;
1369 1400 1401 1446 1445; 1370 1401 1402 1447 1446; 1371 1402 1403 1448 1447;
1372 1403 1404 1449 1448; 1373 1404 1405 1450 1449; 1374 1405 1406 1451 1450;
1375 1406 1407 1452 1451; 1376 1407 1408 1453 1452; 1377 1408 1409 1454 1453;
1378 1409 1410 1455 1454; 1379 1410 1411 1456 1455; 1380 1411 1412 1457 1456;
1381 1412 1413 1458 1457; 1382 1413 1414 1459 1458; 1383 1414 1415 1460 1459;
1384 1415 1416 1461 1460; 1385 1416 1417 1462 1461; 1386 1417 1418 1463 1462;
1387 1418 1419 1464 1463; 1388 1419 1420 1465 1464; 1389 1420 1421 1466 1465;
1390 1421 1422 1467 1466; 1391 1422 1423 1468 1467; 1392 1423 1424 1469 1468;
1393 1424 1425 1470 1469; 1394 1425 1426 1471 1470; 1395 1426 4 1472 1471;
START GROUP DEFINITION
ELEMENT
_SHEARELEMENTS 233 TO 244 252 TO 263 278 TO 289 297 TO 308 323 TO 334 342 343 TO 353 368 TO 370 376 TO 389 397 398 413 TO 415 421 TO 434 442 443 458 459 TO 460 466 TO 479 487 488 503 TO 505 511 TO 524 532 533 548 TO 550 556 557 TO 569 577 578 593 TO 595 601 TO 614 622 623 638 TO 668 683 TO 685 691 692 TO 704 712 713 728 TO 730 736 TO 749 757 758 773 TO 775 781 TO 785 787 788 TO 794 802 803 818 TO 820 826 TO 839 847 848 863 TO 865 871 TO 884 892 893 908 TO 910 916 TO 929 937 938 953 TO 983 998 TO 1028 1055 TO 1061 1100 1101 TO 1103 1105 1106 1145 TO 1151 1190 TO 1196 1235 TO 1241 1280 TO 1286 1325 1326 1328 1329 1331 1370 TO 1376
END GROUP DEFINITION
ELEMENT PROPERTY
1 TO 1140 1155 TO 1185 1200 TO 1230 1245 TO 1275 1290 TO 1320 1335 TO 1365 1380 TO 1395 THICKNESS 2
1141 TO 1154 1186 TO 1199 1231 TO 1244 1276 TO 1289 1321 TO 1334 1366 TO 1378 1379 THICKNESS 2.5
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE ALL
***************************************************************************
SUPPORTS
1 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
2 FIXED BUT MX MY MZ KFX 15149.7 KFY 17966.2 KFZ 15149.7
3 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
4 FIXED BUT MX MY MZ KFX 15149.7 KFY 17966.2 KFZ 15149.7
5 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
6 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
7 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
8 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
9 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
10 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
11 FIXED BUT MX MY MZ KFX 63661 KFY 75496.3 KFZ 63661
12 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
13 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
14 FIXED BUT MX MY MZ KFX 19662.4 KFY 23317.9 KFZ 19662.4
15 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
16 FIXED BUT MX MY MZ KFX 27720.7 KFY 32874.4 KFZ 27720.7

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

201 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

17 FIXED BUT MX MY MZ KFX 51412.3 KFY 60970.5 KFZ 51412.3


18 FIXED BUT MX MY MZ KFX 29332.4 KFY 34785.7 KFZ 29332.4
19 FIXED BUT MX MY MZ KFX 54474.5 KFY 64601.9 KFZ 54474.5
20 FIXED BUT MX MY MZ KFX 25142.1 KFY 29816.3 KFZ 25142.1
21 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
22 FIXED BUT MX MY MZ KFX 25142.1 KFY 29816.3 KFZ 25142.1
23 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
24 FIXED BUT MX MY MZ KFX 25142.1 KFY 29816.3 KFZ 25142.1
25 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
26 FIXED BUT MX MY MZ KFX 30138.3 KFY 35741.3 KFZ 30138.3
27 FIXED BUT MX MY MZ KFX 55925 KFY 66322.1 KFZ 55925
28 FIXED BUT MX MY MZ KFX 29654.8 KFY 35167.9 KFZ 29654.8
29 FIXED BUT MX MY MZ KFX 54958 KFY 65175.3 KFZ 54958
30 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
31 FIXED BUT MX MY MZ KFX 60276.5 KFY 71482.6 KFZ 60276.5
32 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
33 FIXED BUT MX MY MZ KFX 69463 KFY 82377 KFZ 69463
34 FIXED BUT MX MY MZ KFX 28043.1 KFY 33256.6 KFZ 28043.1
35 FIXED BUT MX MY MZ KFX 52057 KFY 61735 KFZ 52057
36 FIXED BUT MX MY MZ KFX 24497.4 KFY 29051.8 KFZ 24497.4
37 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
38 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
39 FIXED BUT MX MY MZ KFX 53346.3 KFY 63264 KFZ 53346.3
40 FIXED BUT MX MY MZ KFX 27076.1 KFY 32109.8 KFZ 27076.1
41 FIXED BUT MX MY MZ KFX 50284.1 KFY 59632.5 KFZ 50284.1
42 FIXED BUT MX MY MZ KFX 28204.3 KFY 33447.7 KFZ 28204.3
43 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
44 FIXED BUT MX MY MZ KFX 31427.6 KFY 37270.3 KFZ 31427.6
45 FIXED BUT MX MY MZ KFX 58342.5 KFY 69189 KFZ 58342.5
46 FIXED BUT MX MY MZ KFX 24013.9 KFY 28478.4 KFZ 24013.9
47 FIXED BUT MX MY MZ KFX 44643.3 KFY 52943 KFZ 44643.3
48 FIXED BUT MX MY MZ KFX 23046.9 KFY 27331.6 KFZ 23046.9
49 FIXED BUT MX MY MZ KFX 42870.5 KFY 50840.6 KFZ 42870.5
50 FIXED BUT MX MY MZ KFX 28848.9 KFY 34212.3 KFZ 28848.9
51 FIXED BUT MX MY MZ KFX 53507.5 KFY 63455.1 KFZ 53507.5
52 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
53 FIXED BUT MX MY MZ KFX 70430 KFY 83523.8 KFZ 70430
54 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
55 FIXED BUT MX MY MZ KFX 68979.5 KFY 81803.6 KFZ 68979.5
56 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
57 FIXED BUT MX MY MZ KFX 53668.7 KFY 63646.3 KFZ 53668.7
58 FIXED BUT MX MY MZ KFX 27881.9 KFY 33065.5 KFZ 27881.9
59 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
60 FIXED BUT MX MY MZ KFX 26753.7 KFY 31727.6 KFZ 26753.7
61 FIXED BUT MX MY MZ KFX 49478.3 KFY 58676.9 KFZ 49478.3
62 FIXED BUT MX MY MZ KFX 25786.7 KFY 30580.8 KFZ 25786.7
63 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
64 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
65 FIXED BUT MX MY MZ KFX 53991 KFY 64028.5 KFZ 53991
66 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
67 FIXED BUT MX MY MZ KFX 69140.7 KFY 81994.8 KFZ 69140.7
68 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
69 FIXED BUT MX MY MZ KFX 63338.7 KFY 75114.1 KFZ 63338.7
70 FIXED BUT MX MY MZ KFX 29654.8 KFY 35167.9 KFZ 29654.8
71 FIXED BUT MX MY MZ KFX 55119.2 KFY 65366.4 KFZ 55119.2
72 FIXED BUT MX MY MZ KFX 28365.4 KFY 33638.9 KFZ 28365.4
73 FIXED BUT MX MY MZ KFX 52701.7 KFY 62499.5 KFZ 52701.7
74 FIXED BUT MX MY MZ KFX 25464.4 KFY 30198.5 KFZ 25464.4
75 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222
76 FIXED BUT MX MY MZ KFX 25464.4 KFY 30198.5 KFZ 25464.4
77 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222
78 FIXED BUT MX MY MZ KFX 25464.4 KFY 30198.5 KFZ 25464.4

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

202 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

79 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222


80 FIXED BUT MX MY MZ KFX 28848.9 KFY 34212.3 KFZ 28848.9
81 FIXED BUT MX MY MZ KFX 53507.5 KFY 63455.1 KFZ 53507.5
82 FIXED BUT MX MY MZ KFX 27076.1 KFY 32109.8 KFZ 27076.1
83 FIXED BUT MX MY MZ KFX 50284.1 KFY 59632.5 KFZ 50284.1
84 FIXED BUT MX MY MZ KFX 19662.4 KFY 23317.9 KFZ 19662.4
85 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
86 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
87 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
88 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
89 FIXED BUT MX MY MZ KFX 63661 KFY 75496.3 KFZ 63661
90 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
91 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
92 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
93 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
94 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
95 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
96 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
97 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
98 FIXED BUT MX MY MZ KFX 63661 KFY 75496.3 KFZ 63661
99 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
100 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
101 FIXED BUT MX MY MZ KFX 51412.3 KFY 60970.5 KFZ 51412.3
102 FIXED BUT MX MY MZ KFX 54474.5 KFY 64601.9 KFZ 54474.5
103 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
104 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
105 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
106 FIXED BUT MX MY MZ KFX 55925 KFY 66322.1 KFZ 55925
107 FIXED BUT MX MY MZ KFX 54958 KFY 65175.3 KFZ 54958
108 FIXED BUT MX MY MZ KFX 60276.5 KFY 71482.6 KFZ 60276.5
109 FIXED BUT MX MY MZ KFX 69463 KFY 82377 KFZ 69463
110 FIXED BUT MX MY MZ KFX 52057 KFY 61735 KFZ 52057
111 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
112 FIXED BUT MX MY MZ KFX 53346.3 KFY 63264 KFZ 53346.3
113 FIXED BUT MX MY MZ KFX 50284.1 KFY 59632.5 KFZ 50284.1
114 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
115 FIXED BUT MX MY MZ KFX 58342.5 KFY 69189 KFZ 58342.5
116 FIXED BUT MX MY MZ KFX 44643.3 KFY 52943 KFZ 44643.3
117 FIXED BUT MX MY MZ KFX 42870.5 KFY 50840.6 KFZ 42870.5
118 FIXED BUT MX MY MZ KFX 53507.5 KFY 63455.1 KFZ 53507.5
119 FIXED BUT MX MY MZ KFX 70430 KFY 83523.8 KFZ 70430
120 FIXED BUT MX MY MZ KFX 68979.5 KFY 81803.6 KFZ 68979.5
121 FIXED BUT MX MY MZ KFX 53668.7 KFY 63646.3 KFZ 53668.7
122 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
123 FIXED BUT MX MY MZ KFX 49478.3 KFY 58676.9 KFZ 49478.3
124 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
125 FIXED BUT MX MY MZ KFX 53991 KFY 64028.5 KFZ 53991
126 FIXED BUT MX MY MZ KFX 69140.7 KFY 81994.8 KFZ 69140.7
127 FIXED BUT MX MY MZ KFX 63338.7 KFY 75114.1 KFZ 63338.7
128 FIXED BUT MX MY MZ KFX 55119.2 KFY 65366.4 KFZ 55119.2
129 FIXED BUT MX MY MZ KFX 52701.7 KFY 62499.5 KFZ 52701.7
130 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222
131 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222
132 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222
133 FIXED BUT MX MY MZ KFX 53507.5 KFY 63455.1 KFZ 53507.5
134 FIXED BUT MX MY MZ KFX 50284.1 KFY 59632.5 KFZ 50284.1
135 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
136 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
137 FIXED BUT MX MY MZ KFX 63661 KFY 75496.3 KFZ 63661
138 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
139 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
140 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

203 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

141 FIXED BUT MX MY MZ KFX 47544.3 KFY 56383.3 KFZ 47544.3


142 FIXED BUT MX MY MZ KFX 23691.6 KFY 28096.1 KFZ 23691.6
143 FIXED BUT MX MY MZ KFX 47544.3 KFY 56383.3 KFZ 47544.3
144 FIXED BUT MX MY MZ KFX 56892 KFY 67468.9 KFZ 56892
145 FIXED BUT MX MY MZ KFX 47544.3 KFY 56383.3 KFZ 47544.3
146 FIXED BUT MX MY MZ KFX 32555.8 KFY 38608.3 KFZ 32555.8
147 FIXED BUT MX MY MZ KFX 45771.5 KFY 54280.9 KFZ 45771.5
148 FIXED BUT MX MY MZ KFX 48511.3 KFY 57530.1 KFZ 48511.3
149 FIXED BUT MX MY MZ KFX 41742.3 KFY 49502.7 KFZ 41742.3
150 FIXED BUT MX MY MZ KFX 41742.3 KFY 49502.7 KFZ 41742.3
151 FIXED BUT MX MY MZ KFX 41742.3 KFY 49502.7 KFZ 41742.3
152 FIXED BUT MX MY MZ KFX 49961.8 KFY 59250.3 KFZ 49961.8
153 FIXED BUT MX MY MZ KFX 49156 KFY 58294.6 KFZ 49156
154 FIXED BUT MX MY MZ KFX 53829.8 KFY 63837.4 KFZ 53829.8
155 FIXED BUT MX MY MZ KFX 62049.4 KFY 73585 KFZ 62049.4
156 FIXED BUT MX MY MZ KFX 46416.1 KFY 55045.4 KFZ 46416.1
157 FIXED BUT MX MY MZ KFX 40614.1 KFY 48164.7 KFZ 40614.1
158 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
159 FIXED BUT MX MY MZ KFX 44804.5 KFY 53134.1 KFZ 44804.5
160 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
161 FIXED BUT MX MY MZ KFX 52057 KFY 61735 KFZ 52057
162 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
163 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
164 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
165 FIXED BUT MX MY MZ KFX 62855.2 KFY 74540.7 KFZ 62855.2
166 FIXED BUT MX MY MZ KFX 61565.8 KFY 73011.6 KFZ 61565.8
167 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
168 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
169 FIXED BUT MX MY MZ KFX 44159.8 KFY 52369.6 KFZ 44159.8
170 FIXED BUT MX MY MZ KFX 42870.5 KFY 50840.6 KFZ 42870.5
171 FIXED BUT MX MY MZ KFX 48189 KFY 57147.9 KFZ 48189
172 FIXED BUT MX MY MZ KFX 61727 KFY 73202.8 KFZ 61727
173 FIXED BUT MX MY MZ KFX 56569.7 KFY 67086.6 KFZ 56569.7
174 FIXED BUT MX MY MZ KFX 49156 KFY 58294.6 KFZ 49156
175 FIXED BUT MX MY MZ KFX 47060.8 KFY 55809.9 KFZ 47060.8
176 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
177 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
178 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
179 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
180 FIXED BUT MX MY MZ KFX 44804.5 KFY 53134.1 KFZ 44804.5
181 FIXED BUT MX MY MZ KFX 32555.8 KFY 38608.3 KFZ 32555.8
182 FIXED BUT MX MY MZ KFX 47544.3 KFY 56383.3 KFZ 47544.3
183 FIXED BUT MX MY MZ KFX 56892 KFY 67468.9 KFZ 56892
184 FIXED BUT MX MY MZ KFX 47544.3 KFY 56383.3 KFZ 47544.3
185 FIXED BUT MX MY MZ KFX 47544.3 KFY 56383.3 KFZ 47544.3
186 FIXED BUT MX MY MZ KFX 23691.6 KFY 28096.1 KFZ 23691.6
187 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
188 FIXED BUT MX MY MZ KFX 19501.2 KFY 23126.7 KFZ 19501.2
189 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
190 FIXED BUT MX MY MZ KFX 46577.3 KFY 55236.6 KFZ 46577.3
191 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
192 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
193 FIXED BUT MX MY MZ KFX 37551.9 KFY 44533.3 KFZ 37551.9
194 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
195 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
196 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
197 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
198 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
199 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
200 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
201 FIXED BUT MX MY MZ KFX 50767.7 KFY 60205.9 KFZ 50767.7
202 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

204 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

203 FIXED BUT MX MY MZ KFX 33200.4 KFY 39372.8 KFZ 33200.4


204 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
205 FIXED BUT MX MY MZ KFX 36746.1 KFY 43577.6 KFZ 36746.1
206 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
207 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
208 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
209 FIXED BUT MX MY MZ KFX 31427.6 KFY 37270.3 KFZ 31427.6
210 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
211 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
212 FIXED BUT MX MY MZ KFX 50445.3 KFY 59823.7 KFZ 50445.3
213 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
214 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
215 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
216 FIXED BUT MX MY MZ KFX 35134.4 KFY 41666.3 KFZ 35134.4
217 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
218 FIXED BUT MX MY MZ KFX 50606.5 KFY 60014.8 KFZ 50606.5
219 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
220 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
221 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
222 FIXED BUT MX MY MZ KFX 34489.8 KFY 40901.8 KFZ 34489.8
223 FIXED BUT MX MY MZ KFX 34489.8 KFY 40901.8 KFZ 34489.8
224 FIXED BUT MX MY MZ KFX 34489.8 KFY 40901.8 KFZ 34489.8
225 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
226 FIXED BUT MX MY MZ KFX 36746.1 KFY 43577.6 KFZ 36746.1
227 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
228 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
229 FIXED BUT MX MY MZ KFX 46577.3 KFY 55236.6 KFZ 46577.3
230 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
231 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
232 FIXED BUT MX MY MZ KFX 19501.2 KFY 23126.7 KFZ 19501.2
233 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
234 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
235 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
236 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
237 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
238 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
239 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
240 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
241 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
242 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
243 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
244 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
245 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
246 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
247 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
248 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
249 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
250 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
251 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
252 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
253 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
254 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
255 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
256 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
257 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
258 FIXED BUT MX MY MZ KFX 51895.8 KFY 61543.8 KFZ 51895.8
259 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
260 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
261 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
262 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
263 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
264 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

205 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

265 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5


266 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
267 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
268 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
269 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
270 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
271 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
272 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
273 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
274 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
275 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
276 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
277 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
278 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
279 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
280 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
281 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
282 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
283 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
284 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
285 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
286 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
287 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
288 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
289 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
290 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
291 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
292 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
293 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
294 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
295 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
296 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
297 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
298 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
299 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
300 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
301 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
302 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
303 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
304 FIXED BUT MX MY MZ KFX 51895.8 KFY 61543.8 KFZ 51895.8
305 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
306 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
307 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
308 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
309 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
310 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
311 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
312 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
313 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
314 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
315 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
316 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
317 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
318 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
319 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
320 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
321 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
322 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
323 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
324 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
325 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
326 FIXED BUT MX MY MZ KFX 20307.1 KFY 24082.4 KFZ 20307.1

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

206 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

327 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453


328 FIXED BUT MX MY MZ KFX 48511.3 KFY 57530.1 KFZ 48511.3
329 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
330 FIXED BUT MX MY MZ KFX 27720.7 KFY 32874.4 KFZ 27720.7
331 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
332 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
333 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
334 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
335 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
336 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
337 FIXED BUT MX MY MZ KFX 41903.5 KFY 49693.8 KFZ 41903.5
338 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6
339 FIXED BUT MX MY MZ KFX 52862.8 KFY 62690.6 KFZ 52862.8
340 FIXED BUT MX MY MZ KFX 39647.1 KFY 47018 KFZ 39647.1
341 FIXED BUT MX MY MZ KFX 34650.9 KFY 41092.9 KFZ 34650.9
342 FIXED BUT MX MY MZ KFX 40614.1 KFY 48164.7 KFZ 40614.1
343 FIXED BUT MX MY MZ KFX 38196.6 KFY 45297.8 KFZ 38196.6
344 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
345 FIXED BUT MX MY MZ KFX 44321 KFY 52560.7 KFZ 44321
346 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
347 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
348 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
349 FIXED BUT MX MY MZ KFX 53668.7 KFY 63646.3 KFZ 53668.7
350 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
351 FIXED BUT MX MY MZ KFX 40936.5 KFY 48547 KFZ 40936.5
352 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
353 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
354 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
355 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
356 FIXED BUT MX MY MZ KFX 52701.7 KFY 62499.5 KFZ 52701.7
357 FIXED BUT MX MY MZ KFX 48189 KFY 57147.9 KFZ 48189
358 FIXED BUT MX MY MZ KFX 41903.5 KFY 49693.8 KFZ 41903.5
359 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
360 FIXED BUT MX MY MZ KFX 35940.3 KFY 42622 KFZ 35940.3
361 FIXED BUT MX MY MZ KFX 35940.3 KFY 42622 KFZ 35940.3
362 FIXED BUT MX MY MZ KFX 35940.3 KFY 42622 KFZ 35940.3
363 FIXED BUT MX MY MZ KFX 40614.1 KFY 48164.7 KFZ 40614.1
364 FIXED BUT MX MY MZ KFX 38196.6 KFY 45297.8 KFZ 38196.6
365 FIXED BUT MX MY MZ KFX 27720.7 KFY 32874.4 KFZ 27720.7
366 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
367 FIXED BUT MX MY MZ KFX 48511.3 KFY 57530.1 KFZ 48511.3
368 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
369 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
370 FIXED BUT MX MY MZ KFX 20307.1 KFY 24082.4 KFZ 20307.1
371 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
372 FIXED BUT MX MY MZ KFX 16277.9 KFY 19304.1 KFZ 16277.9
373 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
374 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
375 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
376 FIXED BUT MX MY MZ KFX 22402.2 KFY 26567.1 KFZ 22402.2
377 FIXED BUT MX MY MZ KFX 31588.8 KFY 37461.5 KFZ 31588.8
378 FIXED BUT MX MY MZ KFX 33361.6 KFY 39563.9 KFZ 33361.6
379 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
380 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
381 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
382 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
383 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
384 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
385 FIXED BUT MX MY MZ KFX 42709.3 KFY 50649.4 KFZ 42709.3
386 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1
387 FIXED BUT MX MY MZ KFX 27881.9 KFY 33065.5 KFZ 27881.9
388 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

207 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

389 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9


390 FIXED BUT MX MY MZ KFX 32233.4 KFY 38226 KFZ 32233.4
391 FIXED BUT MX MY MZ KFX 35779.1 KFY 42430.8 KFZ 35779.1
392 FIXED BUT MX MY MZ KFX 27398.4 KFY 32492.1 KFZ 27398.4
393 FIXED BUT MX MY MZ KFX 26431.4 KFY 31345.3 KFZ 26431.4
394 FIXED BUT MX MY MZ KFX 32878.1 KFY 38990.5 KFZ 32878.1
395 FIXED BUT MX MY MZ KFX 43354 KFY 51414 KFZ 43354
396 FIXED BUT MX MY MZ KFX 42387 KFY 50267.2 KFZ 42387
397 FIXED BUT MX MY MZ KFX 33039.3 KFY 39181.6 KFZ 33039.3
398 FIXED BUT MX MY MZ KFX 31749.9 KFY 37652.6 KFZ 31749.9
399 FIXED BUT MX MY MZ KFX 30460.6 KFY 36123.6 KFZ 30460.6
400 FIXED BUT MX MY MZ KFX 29493.6 KFY 34976.8 KFZ 29493.6
401 FIXED BUT MX MY MZ KFX 33200.4 KFY 39372.8 KFZ 33200.4
402 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
403 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
404 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
405 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
406 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
407 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
408 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
409 FIXED BUT MX MY MZ KFX 32878.1 KFY 38990.5 KFZ 32878.1
410 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
411 FIXED BUT MX MY MZ KFX 22402.2 KFY 26567.1 KFZ 22402.2
412 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
413 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
414 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
415 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
416 FIXED BUT MX MY MZ KFX 16277.9 KFY 19304.1 KFZ 16277.9
417 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
418 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
419 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
420 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
421 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
422 FIXED BUT MX MY MZ KFX 19501.2 KFY 23126.7 KFZ 19501.2
423 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
424 FIXED BUT MX MY MZ KFX 29171.3 KFY 34594.5 KFZ 29171.3
425 FIXED BUT MX MY MZ KFX 25142.1 KFY 29816.3 KFZ 25142.1
426 FIXED BUT MX MY MZ KFX 25142.1 KFY 29816.3 KFZ 25142.1
427 FIXED BUT MX MY MZ KFX 25142.1 KFY 29816.3 KFZ 25142.1
428 FIXED BUT MX MY MZ KFX 29977.1 KFY 35550.2 KFZ 29977.1
429 FIXED BUT MX MY MZ KFX 29493.6 KFY 34976.8 KFZ 29493.6
430 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
431 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
432 FIXED BUT MX MY MZ KFX 28043.1 KFY 33256.6 KFZ 28043.1
433 FIXED BUT MX MY MZ KFX 24497.4 KFY 29051.8 KFZ 24497.4
434 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
435 FIXED BUT MX MY MZ KFX 26914.9 KFY 31918.7 KFZ 26914.9
436 FIXED BUT MX MY MZ KFX 28204.3 KFY 33447.7 KFZ 28204.3
437 FIXED BUT MX MY MZ KFX 31266.4 KFY 37079.2 KFZ 31266.4
438 FIXED BUT MX MY MZ KFX 24013.9 KFY 28478.4 KFZ 24013.9
439 FIXED BUT MX MY MZ KFX 23046.9 KFY 27331.6 KFZ 23046.9
440 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
441 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
442 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
443 FIXED BUT MX MY MZ KFX 28848.9 KFY 34212.3 KFZ 28848.9
444 FIXED BUT MX MY MZ KFX 27720.7 KFY 32874.4 KFZ 27720.7
445 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
446 FIXED BUT MX MY MZ KFX 25786.7 KFY 30580.8 KFZ 25786.7
447 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
448 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
449 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
450 FIXED BUT MX MY MZ KFX 29654.8 KFY 35167.9 KFZ 29654.8

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

208 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

451 FIXED BUT MX MY MZ KFX 28365.4 KFY 33638.9 KFZ 28365.4


452 FIXED BUT MX MY MZ KFX 25303.2 KFY 30007.4 KFZ 25303.2
453 FIXED BUT MX MY MZ KFX 25303.2 KFY 30007.4 KFZ 25303.2
454 FIXED BUT MX MY MZ KFX 25303.2 KFY 30007.4 KFZ 25303.2
455 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
456 FIXED BUT MX MY MZ KFX 26914.9 KFY 31918.7 KFZ 26914.9
457 FIXED BUT MX MY MZ KFX 19501.2 KFY 23126.7 KFZ 19501.2
458 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
459 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
460 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
461 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
462 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
463 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
464 FIXED BUT MX MY MZ KFX 16277.9 KFY 19304.1 KFZ 16277.9
465 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
466 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
467 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
468 FIXED BUT MX MY MZ KFX 22402.2 KFY 26567.1 KFZ 22402.2
469 FIXED BUT MX MY MZ KFX 31588.8 KFY 37461.5 KFZ 31588.8
470 FIXED BUT MX MY MZ KFX 33361.6 KFY 39563.9 KFZ 33361.6
471 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
472 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
473 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
474 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
475 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
476 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
477 FIXED BUT MX MY MZ KFX 42709.3 KFY 50649.4 KFZ 42709.3
478 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1
479 FIXED BUT MX MY MZ KFX 27881.9 KFY 33065.5 KFZ 27881.9
480 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
481 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
482 FIXED BUT MX MY MZ KFX 32233.4 KFY 38226 KFZ 32233.4
483 FIXED BUT MX MY MZ KFX 35779.1 KFY 42430.8 KFZ 35779.1
484 FIXED BUT MX MY MZ KFX 27398.4 KFY 32492.1 KFZ 27398.4
485 FIXED BUT MX MY MZ KFX 26431.4 KFY 31345.3 KFZ 26431.4
486 FIXED BUT MX MY MZ KFX 32878.1 KFY 38990.5 KFZ 32878.1
487 FIXED BUT MX MY MZ KFX 43354 KFY 51414 KFZ 43354
488 FIXED BUT MX MY MZ KFX 42387 KFY 50267.2 KFZ 42387
489 FIXED BUT MX MY MZ KFX 33039.3 KFY 39181.6 KFZ 33039.3
490 FIXED BUT MX MY MZ KFX 31749.9 KFY 37652.6 KFZ 31749.9
491 FIXED BUT MX MY MZ KFX 30460.6 KFY 36123.6 KFZ 30460.6
492 FIXED BUT MX MY MZ KFX 29493.6 KFY 34976.8 KFZ 29493.6
493 FIXED BUT MX MY MZ KFX 33200.4 KFY 39372.8 KFZ 33200.4
494 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
495 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
496 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
497 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
498 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
499 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
500 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
501 FIXED BUT MX MY MZ KFX 32878.1 KFY 38990.5 KFZ 32878.1
502 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
503 FIXED BUT MX MY MZ KFX 22402.2 KFY 26567.1 KFZ 22402.2
504 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
505 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
506 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
507 FIXED BUT MX MY MZ KFX 32716.9 KFY 38799.4 KFZ 32716.9
508 FIXED BUT MX MY MZ KFX 16277.9 KFY 19304.1 KFZ 16277.9
509 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
510 FIXED BUT MX MY MZ KFX 19178.9 KFY 22744.5 KFZ 19178.9
511 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
512 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

209 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

513 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8


514 FIXED BUT MX MY MZ KFX 26270.2 KFY 31154.2 KFZ 26270.2
515 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
516 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
517 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
518 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
519 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
520 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
521 FIXED BUT MX MY MZ KFX 39647.1 KFY 47018 KFZ 39647.1
522 FIXED BUT MX MY MZ KFX 43354 KFY 51414 KFZ 43354
523 FIXED BUT MX MY MZ KFX 49961.8 KFY 59250.3 KFZ 49961.8
524 FIXED BUT MX MY MZ KFX 37551.9 KFY 44533.3 KFZ 37551.9
525 FIXED BUT MX MY MZ KFX 32878.1 KFY 38990.5 KFZ 32878.1
526 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
527 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
528 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
529 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
530 FIXED BUT MX MY MZ KFX 32233.4 KFY 38226 KFZ 32233.4
531 FIXED BUT MX MY MZ KFX 30944.1 KFY 36697 KFZ 30944.1
532 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
533 FIXED BUT MX MY MZ KFX 50767.7 KFY 60205.9 KFZ 50767.7
534 FIXED BUT MX MY MZ KFX 49639.5 KFY 58868 KFZ 49639.5
535 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
536 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
537 FIXED BUT MX MY MZ KFX 35779.1 KFY 42430.8 KFZ 35779.1
538 FIXED BUT MX MY MZ KFX 34489.8 KFY 40901.8 KFZ 34489.8
539 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
540 FIXED BUT MX MY MZ KFX 49800.6 KFY 59059.2 KFZ 49800.6
541 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
542 FIXED BUT MX MY MZ KFX 39647.1 KFY 47018 KFZ 39647.1
543 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
544 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
545 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
546 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
547 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
548 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
549 FIXED BUT MX MY MZ KFX 26270.2 KFY 31154.2 KFZ 26270.2
550 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
551 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6
552 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
553 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
554 FIXED BUT MX MY MZ KFX 19178.9 KFY 22744.5 KFZ 19178.9
555 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
556 FIXED BUT MX MY MZ KFX 23046.9 KFY 27331.6 KFZ 23046.9
557 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
558 FIXED BUT MX MY MZ KFX 55119.2 KFY 65366.4 KFZ 55119.2
559 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
560 FIXED BUT MX MY MZ KFX 31588.8 KFY 37461.5 KFZ 31588.8
561 FIXED BUT MX MY MZ KFX 44482.1 KFY 52751.9 KFZ 44482.1
562 FIXED BUT MX MY MZ KFX 47060.8 KFY 55809.9 KFZ 47060.8
563 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
564 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
565 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
566 FIXED BUT MX MY MZ KFX 48350.1 KFY 57339 KFZ 48350.1
567 FIXED BUT MX MY MZ KFX 47544.3 KFY 56383.3 KFZ 47544.3
568 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
569 FIXED BUT MX MY MZ KFX 60115.3 KFY 71291.5 KFZ 60115.3
570 FIXED BUT MX MY MZ KFX 45126.8 KFY 53516.4 KFZ 45126.8
571 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
572 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
573 FIXED BUT MX MY MZ KFX 43515.1 KFY 51605.1 KFZ 43515.1
574 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

210 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

575 FIXED BUT MX MY MZ KFX 50445.3 KFY 59823.7 KFZ 50445.3


576 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
577 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
578 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
579 FIXED BUT MX MY MZ KFX 61082.3 KFY 72438.3 KFZ 61082.3
580 FIXED BUT MX MY MZ KFX 59631.8 KFY 70718.1 KFZ 59631.8
581 FIXED BUT MX MY MZ KFX 46577.3 KFY 55236.6 KFZ 46577.3
582 FIXED BUT MX MY MZ KFX 44643.3 KFY 52943 KFZ 44643.3
583 FIXED BUT MX MY MZ KFX 42870.5 KFY 50840.6 KFZ 42870.5
584 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
585 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
586 FIXED BUT MX MY MZ KFX 59954.2 KFY 71100.3 KFZ 59954.2
587 FIXED BUT MX MY MZ KFX 54796.8 KFY 64984.2 KFZ 54796.8
588 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
589 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
590 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
591 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
592 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
593 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
594 FIXED BUT MX MY MZ KFX 43515.1 KFY 51605.1 KFZ 43515.1
595 FIXED BUT MX MY MZ KFX 31588.8 KFY 37461.5 KFZ 31588.8
596 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
597 FIXED BUT MX MY MZ KFX 55119.2 KFY 65366.4 KFZ 55119.2
598 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
599 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
600 FIXED BUT MX MY MZ KFX 23046.9 KFY 27331.6 KFZ 23046.9
601 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
602 FIXED BUT MX MY MZ KFX 25786.7 KFY 30580.8 KFZ 25786.7
603 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
604 FIXED BUT MX MY MZ KFX 61565.8 KFY 73011.6 KFZ 61565.8
605 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
606 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
607 FIXED BUT MX MY MZ KFX 49800.6 KFY 59059.2 KFZ 49800.6
608 FIXED BUT MX MY MZ KFX 52701.7 KFY 62499.5 KFZ 52701.7
609 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
610 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
611 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
612 FIXED BUT MX MY MZ KFX 54152.2 KFY 64219.7 KFZ 54152.2
613 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
614 FIXED BUT MX MY MZ KFX 58342.5 KFY 69189 KFZ 58342.5
615 FIXED BUT MX MY MZ KFX 67206.7 KFY 79701.2 KFZ 67206.7
616 FIXED BUT MX MY MZ KFX 50445.3 KFY 59823.7 KFZ 50445.3
617 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
618 FIXED BUT MX MY MZ KFX 51734.7 KFY 61352.7 KFZ 51734.7
619 FIXED BUT MX MY MZ KFX 48672.5 KFY 57721.2 KFZ 48672.5
620 FIXED BUT MX MY MZ KFX 50767.7 KFY 60205.9 KFZ 50767.7
621 FIXED BUT MX MY MZ KFX 56408.5 KFY 66895.5 KFZ 56408.5
622 FIXED BUT MX MY MZ KFX 43192.8 KFY 51222.8 KFZ 43192.8
623 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
624 FIXED BUT MX MY MZ KFX 51734.7 KFY 61352.7 KFZ 51734.7
625 FIXED BUT MX MY MZ KFX 68173.7 KFY 80848 KFZ 68173.7
626 FIXED BUT MX MY MZ KFX 66723.2 KFY 79127.8 KFZ 66723.2
627 FIXED BUT MX MY MZ KFX 52057 KFY 61735 KFZ 52057
628 FIXED BUT MX MY MZ KFX 49961.8 KFY 59250.3 KFZ 49961.8
629 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
630 FIXED BUT MX MY MZ KFX 46416.1 KFY 55045.4 KFZ 46416.1
631 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
632 FIXED BUT MX MY MZ KFX 67045.5 KFY 79510.1 KFZ 67045.5
633 FIXED BUT MX MY MZ KFX 61404.7 KFY 72820.5 KFZ 61404.7
634 FIXED BUT MX MY MZ KFX 53346.3 KFY 63264 KFZ 53346.3
635 FIXED BUT MX MY MZ KFX 51090 KFY 60588.2 KFZ 51090
636 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

211 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

637 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3


638 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
639 FIXED BUT MX MY MZ KFX 51734.7 KFY 61352.7 KFZ 51734.7
640 FIXED BUT MX MY MZ KFX 48672.5 KFY 57721.2 KFZ 48672.5
641 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
642 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
643 FIXED BUT MX MY MZ KFX 61565.8 KFY 73011.6 KFZ 61565.8
644 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
645 FIXED BUT MX MY MZ KFX 51573.5 KFY 61161.6 KFZ 51573.5
646 FIXED BUT MX MY MZ KFX 25786.7 KFY 30580.8 KFZ 25786.7
647 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
648 FIXED BUT MX MY MZ KFX 23369.2 KFY 27713.8 KFZ 23369.2
649 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
650 FIXED BUT MX MY MZ KFX 55925 KFY 66322.1 KFZ 55925
651 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
652 FIXED BUT MX MY MZ KFX 32072.3 KFY 38034.9 KFZ 32072.3
653 FIXED BUT MX MY MZ KFX 45126.8 KFY 53516.4 KFZ 45126.8
654 FIXED BUT MX MY MZ KFX 47866.6 KFY 56765.6 KFZ 47866.6
655 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
656 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
657 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
658 FIXED BUT MX MY MZ KFX 49156 KFY 58294.6 KFZ 49156
659 FIXED BUT MX MY MZ KFX 48350.1 KFY 57339 KFZ 48350.1
660 FIXED BUT MX MY MZ KFX 52862.8 KFY 62690.6 KFZ 52862.8
661 FIXED BUT MX MY MZ KFX 61082.3 KFY 72438.3 KFZ 61082.3
662 FIXED BUT MX MY MZ KFX 45771.5 KFY 54280.9 KFZ 45771.5
663 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
664 FIXED BUT MX MY MZ KFX 46899.6 KFY 55618.8 KFZ 46899.6
665 FIXED BUT MX MY MZ KFX 44159.8 KFY 52369.6 KFZ 44159.8
666 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
667 FIXED BUT MX MY MZ KFX 51251.2 KFY 60779.3 KFZ 51251.2
668 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
669 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
670 FIXED BUT MX MY MZ KFX 47060.8 KFY 55809.9 KFZ 47060.8
671 FIXED BUT MX MY MZ KFX 61888.2 KFY 73393.9 KFZ 61888.2
672 FIXED BUT MX MY MZ KFX 60598.8 KFY 71864.9 KFZ 60598.8
673 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222
674 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
675 FIXED BUT MX MY MZ KFX 43515.1 KFY 51605.1 KFZ 43515.1
676 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
677 FIXED BUT MX MY MZ KFX 47383.1 KFY 56192.2 KFZ 47383.1
678 FIXED BUT MX MY MZ KFX 60760 KFY 72056 KFZ 60760
679 FIXED BUT MX MY MZ KFX 55602.7 KFY 65939.8 KFZ 55602.7
680 FIXED BUT MX MY MZ KFX 48350.1 KFY 57339 KFZ 48350.1
681 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
682 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
683 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
684 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
685 FIXED BUT MX MY MZ KFX 47060.8 KFY 55809.9 KFZ 47060.8
686 FIXED BUT MX MY MZ KFX 44159.8 KFY 52369.6 KFZ 44159.8
687 FIXED BUT MX MY MZ KFX 32072.3 KFY 38034.9 KFZ 32072.3
688 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
689 FIXED BUT MX MY MZ KFX 55925 KFY 66322.1 KFZ 55925
690 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
691 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
692 FIXED BUT MX MY MZ KFX 23369.2 KFY 27713.8 KFZ 23369.2
693 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
694 FIXED BUT MX MY MZ KFX 19340.1 KFY 22935.6 KFZ 19340.1
695 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
696 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
697 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
698 FIXED BUT MX MY MZ KFX 26431.4 KFY 31345.3 KFZ 26431.4

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

212 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

699 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6


700 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
701 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
702 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
703 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
704 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
705 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
706 FIXED BUT MX MY MZ KFX 43676.3 KFY 51796.2 KFZ 43676.3
707 FIXED BUT MX MY MZ KFX 50284.1 KFY 59632.5 KFZ 50284.1
708 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
709 FIXED BUT MX MY MZ KFX 33039.3 KFY 39181.6 KFZ 33039.3
710 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
711 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
712 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
713 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
714 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
715 FIXED BUT MX MY MZ KFX 31105.3 KFY 36888.1 KFZ 31105.3
716 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
717 FIXED BUT MX MY MZ KFX 51090 KFY 60588.2 KFZ 51090
718 FIXED BUT MX MY MZ KFX 49961.8 KFY 59250.3 KFZ 49961.8
719 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
720 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
721 FIXED BUT MX MY MZ KFX 35940.3 KFY 42622 KFZ 35940.3
722 FIXED BUT MX MY MZ KFX 34812.1 KFY 41284.1 KFZ 34812.1
723 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
724 FIXED BUT MX MY MZ KFX 50123 KFY 59441.4 KFZ 50123
725 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6
726 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
727 FIXED BUT MX MY MZ KFX 38196.6 KFY 45297.8 KFZ 38196.6
728 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
729 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
730 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
731 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
732 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
733 FIXED BUT MX MY MZ KFX 26431.4 KFY 31345.3 KFZ 26431.4
734 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
735 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
736 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
737 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
738 FIXED BUT MX MY MZ KFX 19340.1 KFY 22935.6 KFZ 19340.1
739 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
740 FIXED BUT MX MY MZ KFX 19340.1 KFY 22935.6 KFZ 19340.1
741 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
742 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
743 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
744 FIXED BUT MX MY MZ KFX 26431.4 KFY 31345.3 KFZ 26431.4
745 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
746 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
747 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
748 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
749 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
750 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
751 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
752 FIXED BUT MX MY MZ KFX 43676.3 KFY 51796.2 KFZ 43676.3
753 FIXED BUT MX MY MZ KFX 50284.1 KFY 59632.5 KFZ 50284.1
754 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
755 FIXED BUT MX MY MZ KFX 33039.3 KFY 39181.6 KFZ 33039.3
756 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
757 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
758 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
759 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
760 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

213 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

761 FIXED BUT MX MY MZ KFX 31105.3 KFY 36888.1 KFZ 31105.3


762 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
763 FIXED BUT MX MY MZ KFX 51090 KFY 60588.2 KFZ 51090
764 FIXED BUT MX MY MZ KFX 49961.8 KFY 59250.3 KFZ 49961.8
765 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
766 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
767 FIXED BUT MX MY MZ KFX 35940.3 KFY 42622 KFZ 35940.3
768 FIXED BUT MX MY MZ KFX 34812.1 KFY 41284.1 KFZ 34812.1
769 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
770 FIXED BUT MX MY MZ KFX 50123 KFY 59441.4 KFZ 50123
771 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6
772 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
773 FIXED BUT MX MY MZ KFX 38196.6 KFY 45297.8 KFZ 38196.6
774 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
775 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
776 FIXED BUT MX MY MZ KFX 34167.4 KFY 40519.6 KFZ 34167.4
777 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
778 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
779 FIXED BUT MX MY MZ KFX 26431.4 KFY 31345.3 KFZ 26431.4
780 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
781 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8
782 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
783 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
784 FIXED BUT MX MY MZ KFX 19340.1 KFY 22935.6 KFZ 19340.1
785 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
786 FIXED BUT MX MY MZ KFX 19178.9 KFY 22744.5 KFZ 19178.9
787 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
788 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6
789 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
790 FIXED BUT MX MY MZ KFX 26270.2 KFY 31154.2 KFZ 26270.2
791 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
792 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
793 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
794 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
795 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
796 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
797 FIXED BUT MX MY MZ KFX 39647.1 KFY 47018 KFZ 39647.1
798 FIXED BUT MX MY MZ KFX 43515.1 KFY 51605.1 KFZ 43515.1
799 FIXED BUT MX MY MZ KFX 50123 KFY 59441.4 KFZ 50123
800 FIXED BUT MX MY MZ KFX 37551.9 KFY 44533.3 KFZ 37551.9
801 FIXED BUT MX MY MZ KFX 32878.1 KFY 38990.5 KFZ 32878.1
802 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
803 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
804 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
805 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
806 FIXED BUT MX MY MZ KFX 32233.4 KFY 38226 KFZ 32233.4
807 FIXED BUT MX MY MZ KFX 30944.1 KFY 36697 KFZ 30944.1
808 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
809 FIXED BUT MX MY MZ KFX 50767.7 KFY 60205.9 KFZ 50767.7
810 FIXED BUT MX MY MZ KFX 49639.5 KFY 58868 KFZ 49639.5
811 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
812 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
813 FIXED BUT MX MY MZ KFX 35779.1 KFY 42430.8 KFZ 35779.1
814 FIXED BUT MX MY MZ KFX 34650.9 KFY 41092.9 KFZ 34650.9
815 FIXED BUT MX MY MZ KFX 38841.3 KFY 46062.3 KFZ 38841.3
816 FIXED BUT MX MY MZ KFX 49800.6 KFY 59059.2 KFZ 49800.6
817 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
818 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
819 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
820 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
821 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
822 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

214 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

823 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9


824 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
825 FIXED BUT MX MY MZ KFX 26270.2 KFY 31154.2 KFZ 26270.2
826 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
827 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6
828 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
829 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
830 FIXED BUT MX MY MZ KFX 19178.9 KFY 22744.5 KFZ 19178.9
831 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
832 FIXED BUT MX MY MZ KFX 22079.9 KFY 26184.8 KFZ 22079.9
833 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
834 FIXED BUT MX MY MZ KFX 52701.7 KFY 62499.5 KFZ 52701.7
835 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
836 FIXED BUT MX MY MZ KFX 30138.3 KFY 35741.3 KFZ 30138.3
837 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
838 FIXED BUT MX MY MZ KFX 44965.6 KFY 53325.3 KFZ 44965.6
839 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
840 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
841 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
842 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
843 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
844 FIXED BUT MX MY MZ KFX 49800.6 KFY 59059.2 KFZ 49800.6
845 FIXED BUT MX MY MZ KFX 57536.7 KFY 68233.4 KFZ 57536.7
846 FIXED BUT MX MY MZ KFX 43031.6 KFY 51031.7 KFZ 43031.6
847 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
848 FIXED BUT MX MY MZ KFX 44159.8 KFY 52369.6 KFZ 44159.8
849 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
850 FIXED BUT MX MY MZ KFX 43354 KFY 51414 KFZ 43354
851 FIXED BUT MX MY MZ KFX 48189 KFY 57147.9 KFZ 48189
852 FIXED BUT MX MY MZ KFX 36907.3 KFY 43768.8 KFZ 36907.3
853 FIXED BUT MX MY MZ KFX 35456.8 KFY 42048.6 KFZ 35456.8
854 FIXED BUT MX MY MZ KFX 44321 KFY 52560.7 KFZ 44321
855 FIXED BUT MX MY MZ KFX 58342.5 KFY 69189 KFZ 58342.5
856 FIXED BUT MX MY MZ KFX 57053.2 KFY 67660 KFZ 57053.2
857 FIXED BUT MX MY MZ KFX 44482.1 KFY 52751.9 KFZ 44482.1
858 FIXED BUT MX MY MZ KFX 42709.3 KFY 50649.4 KFZ 42709.3
859 FIXED BUT MX MY MZ KFX 40936.5 KFY 48547 KFZ 40936.5
860 FIXED BUT MX MY MZ KFX 39647.1 KFY 47018 KFZ 39647.1
861 FIXED BUT MX MY MZ KFX 44643.3 KFY 52943 KFZ 44643.3
862 FIXED BUT MX MY MZ KFX 57214.3 KFY 67851.1 KFZ 57214.3
863 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
864 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
865 FIXED BUT MX MY MZ KFX 43676.3 KFY 51796.2 KFZ 43676.3
866 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
867 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
868 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
869 FIXED BUT MX MY MZ KFX 44321 KFY 52560.7 KFZ 44321
870 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
871 FIXED BUT MX MY MZ KFX 30138.3 KFY 35741.3 KFZ 30138.3
872 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
873 FIXED BUT MX MY MZ KFX 52701.7 KFY 62499.5 KFZ 52701.7
874 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
875 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
876 FIXED BUT MX MY MZ KFX 22079.9 KFY 26184.8 KFZ 22079.9
877 FIXED BUT MX MY MZ KFX 44965.6 KFY 53325.3 KFZ 44965.6
878 FIXED BUT MX MY MZ KFX 22563.4 KFY 26758.2 KFZ 22563.4
879 FIXED BUT MX MY MZ KFX 44965.6 KFY 53325.3 KFZ 44965.6
880 FIXED BUT MX MY MZ KFX 53829.8 KFY 63837.4 KFZ 53829.8
881 FIXED BUT MX MY MZ KFX 44965.6 KFY 53325.3 KFZ 44965.6
882 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
883 FIXED BUT MX MY MZ KFX 43515.1 KFY 51605.1 KFZ 43515.1
884 FIXED BUT MX MY MZ KFX 46093.8 KFY 54663.2 KFZ 46093.8

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

215 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

885 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486


886 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
887 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
888 FIXED BUT MX MY MZ KFX 47222 KFY 56001.1 KFZ 47222
889 FIXED BUT MX MY MZ KFX 46577.3 KFY 55236.6 KFZ 46577.3
890 FIXED BUT MX MY MZ KFX 50928.8 KFY 60397.1 KFZ 50928.8
891 FIXED BUT MX MY MZ KFX 58826 KFY 69762.4 KFZ 58826
892 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
893 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9
894 FIXED BUT MX MY MZ KFX 45126.8 KFY 53516.4 KFZ 45126.8
895 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
896 FIXED BUT MX MY MZ KFX 44321 KFY 52560.7 KFZ 44321
897 FIXED BUT MX MY MZ KFX 49317.1 KFY 58485.8 KFZ 49317.1
898 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
899 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
900 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
901 FIXED BUT MX MY MZ KFX 59631.8 KFY 70718.1 KFZ 59631.8
902 FIXED BUT MX MY MZ KFX 58342.5 KFY 69189 KFZ 58342.5
903 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
904 FIXED BUT MX MY MZ KFX 43676.3 KFY 51796.2 KFZ 43676.3
905 FIXED BUT MX MY MZ KFX 41903.5 KFY 49693.8 KFZ 41903.5
906 FIXED BUT MX MY MZ KFX 40614.1 KFY 48164.7 KFZ 40614.1
907 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
908 FIXED BUT MX MY MZ KFX 58503.7 KFY 69380.2 KFZ 58503.7
909 FIXED BUT MX MY MZ KFX 53668.7 KFY 63646.3 KFZ 53668.7
910 FIXED BUT MX MY MZ KFX 46577.3 KFY 55236.6 KFZ 46577.3
911 FIXED BUT MX MY MZ KFX 44643.3 KFY 52943 KFZ 44643.3
912 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
913 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
914 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
915 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
916 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
917 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
918 FIXED BUT MX MY MZ KFX 44965.6 KFY 53325.3 KFZ 44965.6
919 FIXED BUT MX MY MZ KFX 53829.8 KFY 63837.4 KFZ 53829.8
920 FIXED BUT MX MY MZ KFX 44965.6 KFY 53325.3 KFZ 44965.6
921 FIXED BUT MX MY MZ KFX 44965.6 KFY 53325.3 KFZ 44965.6
922 FIXED BUT MX MY MZ KFX 22563.4 KFY 26758.2 KFZ 22563.4
923 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
924 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
925 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
926 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
927 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
928 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
929 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
930 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
931 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
932 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
933 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
934 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
935 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
936 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
937 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
938 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
939 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
940 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
941 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
942 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
943 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
944 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
945 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
946 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

216 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

947 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2


948 FIXED BUT MX MY MZ KFX 51895.8 KFY 61543.8 KFZ 51895.8
949 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
950 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
951 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
952 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
953 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
954 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
955 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
956 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
957 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
958 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
959 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
960 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
961 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
962 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
963 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
964 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
965 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
966 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
967 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
968 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
969 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
970 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
971 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
972 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
973 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
974 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
975 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
976 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
977 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
978 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
979 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
980 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
981 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
982 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
983 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
984 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
985 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
986 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
987 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
988 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
989 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
990 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
991 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
992 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
993 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
994 FIXED BUT MX MY MZ KFX 51895.8 KFY 61543.8 KFZ 51895.8
995 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
996 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
997 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
998 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
999 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
1000 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
1001 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
1002 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
1003 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
1004 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1005 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1006 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1007 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1008 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

217 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1009 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6


1010 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1011 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
1012 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1013 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1014 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
1015 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1016 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
1017 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1018 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
1019 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1020 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
1021 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
1022 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
1023 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1024 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1025 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1026 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
1027 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
1028 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
1029 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
1030 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
1031 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
1032 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1033 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
1034 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
1035 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
1036 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
1037 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
1038 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1039 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
1040 FIXED BUT MX MY MZ KFX 51895.8 KFY 61543.8 KFZ 51895.8
1041 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
1042 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
1043 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
1044 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1045 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
1046 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
1047 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
1048 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
1049 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
1050 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1051 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1052 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1053 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1054 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
1055 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
1056 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1057 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
1058 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1059 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1060 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
1061 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1062 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
1063 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1064 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
1065 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1066 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
1067 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
1068 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
1069 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1070 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

218 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1071 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6


1072 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
1073 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
1074 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
1075 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
1076 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
1077 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
1078 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1079 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
1080 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
1081 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
1082 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
1083 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
1084 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1085 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
1086 FIXED BUT MX MY MZ KFX 51895.8 KFY 61543.8 KFZ 51895.8
1087 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453
1088 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
1089 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
1090 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1091 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
1092 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
1093 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
1094 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
1095 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
1096 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1097 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1098 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1099 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1100 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
1101 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
1102 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1103 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
1104 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1105 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1106 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
1107 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1108 FIXED BUT MX MY MZ KFX 19017.7 KFY 22553.3 KFZ 19017.7
1109 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1110 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
1111 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1112 FIXED BUT MX MY MZ KFX 26109.1 KFY 30963.1 KFZ 26109.1
1113 FIXED BUT MX MY MZ KFX 36746.1 KFY 43577.6 KFZ 36746.1
1114 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4
1115 FIXED BUT MX MY MZ KFX 33361.6 KFY 39563.9 KFZ 33361.6
1116 FIXED BUT MX MY MZ KFX 33361.6 KFY 39563.9 KFZ 33361.6
1117 FIXED BUT MX MY MZ KFX 33361.6 KFY 39563.9 KFZ 33361.6
1118 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
1119 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
1120 FIXED BUT MX MY MZ KFX 43192.8 KFY 51222.8 KFZ 43192.8
1121 FIXED BUT MX MY MZ KFX 49639.5 KFY 58868 KFZ 49639.5
1122 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
1123 FIXED BUT MX MY MZ KFX 32555.8 KFY 38608.3 KFZ 32555.8
1124 FIXED BUT MX MY MZ KFX 38196.6 KFY 45297.8 KFZ 38196.6
1125 FIXED BUT MX MY MZ KFX 35940.3 KFY 42622 KFZ 35940.3
1126 FIXED BUT MX MY MZ KFX 37551.9 KFY 44533.3 KFZ 37551.9
1127 FIXED BUT MX MY MZ KFX 41742.3 KFY 49502.7 KFZ 41742.3
1128 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1
1129 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
1130 FIXED BUT MX MY MZ KFX 38357.8 KFY 45488.9 KFZ 38357.8
1131 FIXED BUT MX MY MZ KFX 50445.3 KFY 59823.7 KFZ 50445.3
1132 FIXED BUT MX MY MZ KFX 49317.1 KFY 58485.8 KFZ 49317.1

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

219 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1133 FIXED BUT MX MY MZ KFX 38518.9 KFY 45680.1 KFZ 38518.9


1134 FIXED BUT MX MY MZ KFX 36907.3 KFY 43768.8 KFZ 36907.3
1135 FIXED BUT MX MY MZ KFX 35456.8 KFY 42048.6 KFZ 35456.8
1136 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
1137 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
1138 FIXED BUT MX MY MZ KFX 49478.3 KFY 58676.9 KFZ 49478.3
1139 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
1140 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
1141 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
1142 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
1143 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
1144 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
1145 FIXED BUT MX MY MZ KFX 38196.6 KFY 45297.8 KFZ 38196.6
1146 FIXED BUT MX MY MZ KFX 35940.3 KFY 42622 KFZ 35940.3
1147 FIXED BUT MX MY MZ KFX 26109.1 KFY 30963.1 KFZ 26109.1
1148 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1149 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
1150 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1151 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1152 FIXED BUT MX MY MZ KFX 19017.7 KFY 22553.3 KFZ 19017.7
1153 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
1154 FIXED BUT MX MY MZ KFX 23369.2 KFY 27713.8 KFZ 23369.2
1155 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
1156 FIXED BUT MX MY MZ KFX 55925 KFY 66322.1 KFZ 55925
1157 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
1158 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1
1159 FIXED BUT MX MY MZ KFX 45126.8 KFY 53516.4 KFZ 45126.8
1160 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
1161 FIXED BUT MX MY MZ KFX 40936.5 KFY 48547 KFZ 40936.5
1162 FIXED BUT MX MY MZ KFX 40936.5 KFY 48547 KFZ 40936.5
1163 FIXED BUT MX MY MZ KFX 40936.5 KFY 48547 KFZ 40936.5
1164 FIXED BUT MX MY MZ KFX 48994.8 KFY 58103.5 KFZ 48994.8
1165 FIXED BUT MX MY MZ KFX 48189 KFY 57147.9 KFZ 48189
1166 FIXED BUT MX MY MZ KFX 52862.8 KFY 62690.6 KFZ 52862.8
1167 FIXED BUT MX MY MZ KFX 60921.2 KFY 72247.1 KFZ 60921.2
1168 FIXED BUT MX MY MZ KFX 45610.3 KFY 54089.8 KFZ 45610.3
1169 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
1170 FIXED BUT MX MY MZ KFX 46899.6 KFY 55618.8 KFZ 46899.6
1171 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
1172 FIXED BUT MX MY MZ KFX 45932.6 KFY 54472 KFZ 45932.6
1173 FIXED BUT MX MY MZ KFX 51090 KFY 60588.2 KFZ 51090
1174 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
1175 FIXED BUT MX MY MZ KFX 37713.1 KFY 44724.4 KFZ 37713.1
1176 FIXED BUT MX MY MZ KFX 46899.6 KFY 55618.8 KFZ 46899.6
1177 FIXED BUT MX MY MZ KFX 61888.2 KFY 73393.9 KFZ 61888.2
1178 FIXED BUT MX MY MZ KFX 60437.7 KFY 71673.7 KFZ 60437.7
1179 FIXED BUT MX MY MZ KFX 47060.8 KFY 55809.9 KFZ 47060.8
1180 FIXED BUT MX MY MZ KFX 45288 KFY 53707.5 KFZ 45288
1181 FIXED BUT MX MY MZ KFX 43515.1 KFY 51605.1 KFZ 43515.1
1182 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
1183 FIXED BUT MX MY MZ KFX 47383.1 KFY 56192.2 KFZ 47383.1
1184 FIXED BUT MX MY MZ KFX 60760 KFY 72056 KFZ 60760
1185 FIXED BUT MX MY MZ KFX 55602.7 KFY 65939.8 KFZ 55602.7
1186 FIXED BUT MX MY MZ KFX 48350.1 KFY 57339 KFZ 48350.1
1187 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
1188 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
1189 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
1190 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
1191 FIXED BUT MX MY MZ KFX 46899.6 KFY 55618.8 KFZ 46899.6
1192 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
1193 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

220 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1194 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5


1195 FIXED BUT MX MY MZ KFX 55925 KFY 66322.1 KFZ 55925
1196 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
1197 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
1198 FIXED BUT MX MY MZ KFX 23369.2 KFY 27713.8 KFZ 23369.2
1199 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
1200 FIXED BUT MX MY MZ KFX 21112.9 KFY 25038 KFZ 21112.9
1201 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
1202 FIXED BUT MX MY MZ KFX 50445.3 KFY 59823.7 KFZ 50445.3
1203 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
1204 FIXED BUT MX MY MZ KFX 28848.9 KFY 34212.3 KFZ 28848.9
1205 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
1206 FIXED BUT MX MY MZ KFX 43192.8 KFY 51222.8 KFZ 43192.8
1207 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
1208 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
1209 FIXED BUT MX MY MZ KFX 37068.4 KFY 43959.9 KFZ 37068.4
1210 FIXED BUT MX MY MZ KFX 44321 KFY 52560.7 KFZ 44321
1211 FIXED BUT MX MY MZ KFX 43676.3 KFY 51796.2 KFZ 43676.3
1212 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
1213 FIXED BUT MX MY MZ KFX 54958 KFY 65175.3 KFZ 54958
1214 FIXED BUT MX MY MZ KFX 41258.8 KFY 48929.3 KFZ 41258.8
1215 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1216 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
1217 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
1218 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
1219 FIXED BUT MX MY MZ KFX 46255 KFY 54854.3 KFZ 46255
1220 FIXED BUT MX MY MZ KFX 35456.8 KFY 42048.6 KFZ 35456.8
1221 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
1222 FIXED BUT MX MY MZ KFX 42387 KFY 50267.2 KFZ 42387
1223 FIXED BUT MX MY MZ KFX 55925 KFY 66322.1 KFZ 55925
1224 FIXED BUT MX MY MZ KFX 54635.7 KFY 64793.1 KFZ 54635.7
1225 FIXED BUT MX MY MZ KFX 42548.1 KFY 50458.3 KFZ 42548.1
1226 FIXED BUT MX MY MZ KFX 40936.5 KFY 48547 KFZ 40936.5
1227 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
1228 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1229 FIXED BUT MX MY MZ KFX 42709.3 KFY 50649.4 KFZ 42709.3
1230 FIXED BUT MX MY MZ KFX 54796.8 KFY 64984.2 KFZ 54796.8
1231 FIXED BUT MX MY MZ KFX 50123 KFY 59441.4 KFZ 50123
1232 FIXED BUT MX MY MZ KFX 43676.3 KFY 51796.2 KFZ 43676.3
1233 FIXED BUT MX MY MZ KFX 41742.3 KFY 49502.7 KFZ 41742.3
1234 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
1235 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
1236 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
1237 FIXED BUT MX MY MZ KFX 42387 KFY 50267.2 KFZ 42387
1238 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
1239 FIXED BUT MX MY MZ KFX 28848.9 KFY 34212.3 KFZ 28848.9
1240 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
1241 FIXED BUT MX MY MZ KFX 50445.3 KFY 59823.7 KFZ 50445.3
1242 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
1243 FIXED BUT MX MY MZ KFX 42225.8 KFY 50076 KFZ 42225.8
1244 FIXED BUT MX MY MZ KFX 21112.9 KFY 25038 KFZ 21112.9
1245 FIXED BUT MX MY MZ KFX 33522.8 KFY 39755 KFZ 33522.8
1246 FIXED BUT MX MY MZ KFX 16761.4 KFY 19877.5 KFZ 16761.4
1247 FIXED BUT MX MY MZ KFX 33522.8 KFY 39755 KFZ 33522.8
1248 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1249 FIXED BUT MX MY MZ KFX 33522.8 KFY 39755 KFZ 33522.8
1250 FIXED BUT MX MY MZ KFX 23046.9 KFY 27331.6 KFZ 23046.9
1251 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
1252 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
1253 FIXED BUT MX MY MZ KFX 29493.6 KFY 34976.8 KFZ 29493.6
1254 FIXED BUT MX MY MZ KFX 29493.6 KFY 34976.8 KFZ 29493.6
1255 FIXED BUT MX MY MZ KFX 29493.6 KFY 34976.8 KFZ 29493.6

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

221 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1256 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6


1257 FIXED BUT MX MY MZ KFX 34650.9 KFY 41092.9 KFZ 34650.9
1258 FIXED BUT MX MY MZ KFX 38035.4 KFY 45106.7 KFZ 38035.4
1259 FIXED BUT MX MY MZ KFX 43837.5 KFY 51987.3 KFZ 43837.5
1260 FIXED BUT MX MY MZ KFX 32878.1 KFY 38990.5 KFZ 32878.1
1261 FIXED BUT MX MY MZ KFX 28687.8 KFY 34021.1 KFZ 28687.8
1262 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
1263 FIXED BUT MX MY MZ KFX 31749.9 KFY 37652.6 KFZ 31749.9
1264 FIXED BUT MX MY MZ KFX 33039.3 KFY 39181.6 KFZ 33039.3
1265 FIXED BUT MX MY MZ KFX 36746.1 KFY 43577.6 KFZ 36746.1
1266 FIXED BUT MX MY MZ KFX 28204.3 KFY 33447.7 KFZ 28204.3
1267 FIXED BUT MX MY MZ KFX 27076.1 KFY 32109.8 KFZ 27076.1
1268 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
1269 FIXED BUT MX MY MZ KFX 44482.1 KFY 52751.9 KFZ 44482.1
1270 FIXED BUT MX MY MZ KFX 43515.1 KFY 51605.1 KFZ 43515.1
1271 FIXED BUT MX MY MZ KFX 33845.1 KFY 40137.3 KFZ 33845.1
1272 FIXED BUT MX MY MZ KFX 32555.8 KFY 38608.3 KFZ 32555.8
1273 FIXED BUT MX MY MZ KFX 31266.4 KFY 37079.2 KFZ 31266.4
1274 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1275 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
1276 FIXED BUT MX MY MZ KFX 43676.3 KFY 51796.2 KFZ 43676.3
1277 FIXED BUT MX MY MZ KFX 39969.5 KFY 47400.2 KFZ 39969.5
1278 FIXED BUT MX MY MZ KFX 34812.1 KFY 41284.1 KFZ 34812.1
1279 FIXED BUT MX MY MZ KFX 33200.4 KFY 39372.8 KFZ 33200.4
1280 FIXED BUT MX MY MZ KFX 29815.9 KFY 35359 KFZ 29815.9
1281 FIXED BUT MX MY MZ KFX 29815.9 KFY 35359 KFZ 29815.9
1282 FIXED BUT MX MY MZ KFX 29815.9 KFY 35359 KFZ 29815.9
1283 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
1284 FIXED BUT MX MY MZ KFX 31749.9 KFY 37652.6 KFZ 31749.9
1285 FIXED BUT MX MY MZ KFX 23046.9 KFY 27331.6 KFZ 23046.9
1286 FIXED BUT MX MY MZ KFX 33522.8 KFY 39755 KFZ 33522.8
1287 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1288 FIXED BUT MX MY MZ KFX 33522.8 KFY 39755 KFZ 33522.8
1289 FIXED BUT MX MY MZ KFX 33522.8 KFY 39755 KFZ 33522.8
1290 FIXED BUT MX MY MZ KFX 16761.4 KFY 19877.5 KFZ 16761.4
1291 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1292 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
1293 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1294 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
1295 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1296 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
1297 FIXED BUT MX MY MZ KFX 38680.1 KFY 45871.2 KFZ 38680.1
1298 FIXED BUT MX MY MZ KFX 41097.6 KFY 48738.1 KFZ 41097.6
1299 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1300 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1301 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1302 FIXED BUT MX MY MZ KFX 42064.6 KFY 49884.9 KFZ 42064.6
1303 FIXED BUT MX MY MZ KFX 41420 KFY 49120.4 KFZ 41420
1304 FIXED BUT MX MY MZ KFX 45449.1 KFY 53898.6 KFZ 45449.1
1305 FIXED BUT MX MY MZ KFX 52379.3 KFY 62117.2 KFZ 52379.3
1306 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
1307 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
1308 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1309 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
1310 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
1311 FIXED BUT MX MY MZ KFX 43998.6 KFY 52178.5 KFZ 43998.6
1312 FIXED BUT MX MY MZ KFX 33683.9 KFY 39946.2 KFZ 33683.9
1313 FIXED BUT MX MY MZ KFX 32394.6 KFY 38417.1 KFZ 32394.6
1314 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1315 FIXED BUT MX MY MZ KFX 53185.2 KFY 63072.9 KFZ 53185.2
1316 FIXED BUT MX MY MZ KFX 51895.8 KFY 61543.8 KFZ 51895.8
1317 FIXED BUT MX MY MZ KFX 40453 KFY 47973.6 KFZ 40453

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

222 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1318 FIXED BUT MX MY MZ KFX 39002.4 KFY 46253.4 KFZ 39002.4


1319 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
1320 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1321 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
1322 FIXED BUT MX MY MZ KFX 52218.2 KFY 61926.1 KFZ 52218.2
1323 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
1324 FIXED BUT MX MY MZ KFX 41581.1 KFY 49311.5 KFZ 41581.1
1325 FIXED BUT MX MY MZ KFX 39808.3 KFY 47209.1 KFZ 39808.3
1326 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1327 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1328 FIXED BUT MX MY MZ KFX 35617.9 KFY 42239.7 KFZ 35617.9
1329 FIXED BUT MX MY MZ KFX 40291.8 KFY 47782.5 KFZ 40291.8
1330 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
1331 FIXED BUT MX MY MZ KFX 27559.6 KFY 32683.2 KFZ 27559.6
1332 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1333 FIXED BUT MX MY MZ KFX 48027.8 KFY 56956.7 KFZ 48027.8
1334 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1335 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1336 FIXED BUT MX MY MZ KFX 19984.7 KFY 23700.1 KFZ 19984.7
1337 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1338 FIXED BUT MX MY MZ KFX 18050.7 KFY 21406.6 KFZ 18050.7
1339 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1340 FIXED BUT MX MY MZ KFX 43192.8 KFY 51222.8 KFZ 43192.8
1341 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1342 FIXED BUT MX MY MZ KFX 24658.6 KFY 29242.9 KFZ 24658.6
1343 FIXED BUT MX MY MZ KFX 34812.1 KFY 41284.1 KFZ 34812.1
1344 FIXED BUT MX MY MZ KFX 36907.3 KFY 43768.8 KFZ 36907.3
1345 FIXED BUT MX MY MZ KFX 31588.8 KFY 37461.5 KFZ 31588.8
1346 FIXED BUT MX MY MZ KFX 31588.8 KFY 37461.5 KFZ 31588.8
1347 FIXED BUT MX MY MZ KFX 31588.8 KFY 37461.5 KFZ 31588.8
1348 FIXED BUT MX MY MZ KFX 37874.3 KFY 44915.5 KFZ 37874.3
1349 FIXED BUT MX MY MZ KFX 37229.6 KFY 44151 KFZ 37229.6
1350 FIXED BUT MX MY MZ KFX 40775.3 KFY 48355.9 KFZ 40775.3
1351 FIXED BUT MX MY MZ KFX 47060.8 KFY 55809.9 KFZ 47060.8
1352 FIXED BUT MX MY MZ KFX 35295.6 KFY 41857.5 KFZ 35295.6
1353 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
1354 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1355 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
1356 FIXED BUT MX MY MZ KFX 35456.8 KFY 42048.6 KFZ 35456.8
1357 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
1358 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1359 FIXED BUT MX MY MZ KFX 29010.1 KFY 34403.4 KFZ 29010.1
1360 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
1361 FIXED BUT MX MY MZ KFX 47705.5 KFY 56574.5 KFZ 47705.5
1362 FIXED BUT MX MY MZ KFX 46738.5 KFY 55427.7 KFZ 46738.5
1363 FIXED BUT MX MY MZ KFX 36423.8 KFY 43195.4 KFZ 36423.8
1364 FIXED BUT MX MY MZ KFX 34973.3 KFY 41475.2 KFZ 34973.3
1365 FIXED BUT MX MY MZ KFX 33522.8 KFY 39755 KFZ 33522.8
1366 FIXED BUT MX MY MZ KFX 32555.8 KFY 38608.3 KFZ 32555.8
1367 FIXED BUT MX MY MZ KFX 36584.9 KFY 43386.5 KFZ 36584.9
1368 FIXED BUT MX MY MZ KFX 46899.6 KFY 55618.8 KFZ 46899.6
1369 FIXED BUT MX MY MZ KFX 42870.5 KFY 50840.6 KFZ 42870.5
1370 FIXED BUT MX MY MZ KFX 37390.8 KFY 44342.1 KFZ 37390.8
1371 FIXED BUT MX MY MZ KFX 35779.1 KFY 42430.8 KFZ 35779.1
1372 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1
1373 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1
1374 FIXED BUT MX MY MZ KFX 31911.1 KFY 37843.7 KFZ 31911.1
1375 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
1376 FIXED BUT MX MY MZ KFX 34006.3 KFY 40328.4 KFZ 34006.3
1377 FIXED BUT MX MY MZ KFX 24658.6 KFY 29242.9 KFZ 24658.6
1378 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1379 FIXED BUT MX MY MZ KFX 43192.8 KFY 51222.8 KFZ 43192.8

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

223 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1380 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4


1381 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1382 FIXED BUT MX MY MZ KFX 18050.7 KFY 21406.6 KFZ 18050.7
1383 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1384 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1385 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
1386 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1387 FIXED BUT MX MY MZ KFX 20790.6 KFY 24655.8 KFZ 20790.6
1388 FIXED BUT MX MY MZ KFX 29171.3 KFY 34594.5 KFZ 29171.3
1389 FIXED BUT MX MY MZ KFX 30944.1 KFY 36697 KFZ 30944.1
1390 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
1391 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
1392 FIXED BUT MX MY MZ KFX 26592.6 KFY 31536.4 KFZ 26592.6
1393 FIXED BUT MX MY MZ KFX 31749.9 KFY 37652.6 KFZ 31749.9
1394 FIXED BUT MX MY MZ KFX 31266.4 KFY 37079.2 KFZ 31266.4
1395 FIXED BUT MX MY MZ KFX 34328.6 KFY 40710.7 KFZ 34328.6
1396 FIXED BUT MX MY MZ KFX 39486 KFY 46826.8 KFZ 39486
1397 FIXED BUT MX MY MZ KFX 29654.8 KFY 35167.9 KFZ 29654.8
1398 FIXED BUT MX MY MZ KFX 25947.9 KFY 30771.9 KFZ 25947.9
1399 FIXED BUT MX MY MZ KFX 30460.6 KFY 36123.6 KFZ 30460.6
1400 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
1401 FIXED BUT MX MY MZ KFX 29815.9 KFY 35359 KFZ 29815.9
1402 FIXED BUT MX MY MZ KFX 33200.4 KFY 39372.8 KFZ 33200.4
1403 FIXED BUT MX MY MZ KFX 25464.4 KFY 30198.5 KFZ 25464.4
1404 FIXED BUT MX MY MZ KFX 24497.4 KFY 29051.8 KFZ 24497.4
1405 FIXED BUT MX MY MZ KFX 30460.6 KFY 36123.6 KFZ 30460.6
1406 FIXED BUT MX MY MZ KFX 40130.6 KFY 47591.4 KFZ 40130.6
1407 FIXED BUT MX MY MZ KFX 39163.6 KFY 46444.6 KFZ 39163.6
1408 FIXED BUT MX MY MZ KFX 30621.8 KFY 36314.7 KFZ 30621.8
1409 FIXED BUT MX MY MZ KFX 29332.4 KFY 34785.7 KFZ 29332.4
1410 FIXED BUT MX MY MZ KFX 28204.3 KFY 33447.7 KFZ 28204.3
1411 FIXED BUT MX MY MZ KFX 27237.2 KFY 32301 KFZ 27237.2
1412 FIXED BUT MX MY MZ KFX 30782.9 KFY 36505.8 KFZ 30782.9
1413 FIXED BUT MX MY MZ KFX 39324.8 KFY 46635.7 KFZ 39324.8
1414 FIXED BUT MX MY MZ KFX 36101.4 KFY 42813.1 KFZ 36101.4
1415 FIXED BUT MX MY MZ KFX 31427.6 KFY 37270.3 KFZ 31427.6
1416 FIXED BUT MX MY MZ KFX 29977.1 KFY 35550.2 KFZ 29977.1
1417 FIXED BUT MX MY MZ KFX 26914.9 KFY 31918.7 KFZ 26914.9
1418 FIXED BUT MX MY MZ KFX 26914.9 KFY 31918.7 KFZ 26914.9
1419 FIXED BUT MX MY MZ KFX 26914.9 KFY 31918.7 KFZ 26914.9
1420 FIXED BUT MX MY MZ KFX 30460.6 KFY 36123.6 KFZ 30460.6
1421 FIXED BUT MX MY MZ KFX 28526.6 KFY 33830 KFZ 28526.6
1422 FIXED BUT MX MY MZ KFX 20790.6 KFY 24655.8 KFZ 20790.6
1423 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1424 FIXED BUT MX MY MZ KFX 36262.6 KFY 43004.2 KFZ 36262.6
1425 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1426 FIXED BUT MX MY MZ KFX 30299.4 KFY 35932.4 KFZ 30299.4
1427 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1428 FIXED BUT MX MY MZ KFX 7091.4 KFY 8409.7 KFZ 7091.4
1429 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1430 FIXED BUT MX MY MZ KFX 17083.7 KFY 20259.8 KFZ 17083.7
1431 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1432 FIXED BUT MX MY MZ KFX 9831.2 KFY 11658.9 KFZ 9831.2
1433 FIXED BUT MX MY MZ KFX 13860.4 KFY 16437.2 KFZ 13860.4
1434 FIXED BUT MX MY MZ KFX 14666.2 KFY 17392.8 KFZ 14666.2
1435 FIXED BUT MX MY MZ KFX 12571 KFY 14908.1 KFZ 12571
1436 FIXED BUT MX MY MZ KFX 12571 KFY 14908.1 KFZ 12571
1437 FIXED BUT MX MY MZ KFX 12571 KFY 14908.1 KFZ 12571
1438 FIXED BUT MX MY MZ KFX 14988.5 KFY 17775.1 KFZ 14988.5
1439 FIXED BUT MX MY MZ KFX 14827.4 KFY 17584 KFZ 14827.4
1440 FIXED BUT MX MY MZ KFX 16277.9 KFY 19304.1 KFZ 16277.9
1441 FIXED BUT MX MY MZ KFX 18695.4 KFY 22171.1 KFZ 18695.4

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

224 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

1442 FIXED BUT MX MY MZ KFX 14021.5 KFY 16628.3 KFZ 14021.5


1443 FIXED BUT MX MY MZ KFX 12248.7 KFY 14525.9 KFZ 12248.7
1444 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1445 FIXED BUT MX MY MZ KFX 13538 KFY 16054.9 KFZ 13538
1446 FIXED BUT MX MY MZ KFX 14182.7 KFY 16819.4 KFZ 14182.7
1447 FIXED BUT MX MY MZ KFX 15633.2 KFY 18539.6 KFZ 15633.2
1448 FIXED BUT MX MY MZ KFX 12087.5 KFY 14334.7 KFZ 12087.5
1449 FIXED BUT MX MY MZ KFX 11604 KFY 13761.4 KFZ 11604
1450 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1451 FIXED BUT MX MY MZ KFX 19017.7 KFY 22553.3 KFZ 19017.7
1452 FIXED BUT MX MY MZ KFX 18534.2 KFY 21979.9 KFZ 18534.2
1453 FIXED BUT MX MY MZ KFX 14505 KFY 17201.7 KFZ 14505
1454 FIXED BUT MX MY MZ KFX 13860.4 KFY 16437.2 KFZ 13860.4
1455 FIXED BUT MX MY MZ KFX 13376.9 KFY 15863.8 KFZ 13376.9
1456 FIXED BUT MX MY MZ KFX 12893.4 KFY 15290.4 KFZ 12893.4
1457 FIXED BUT MX MY MZ KFX 14505 KFY 17201.7 KFZ 14505
1458 FIXED BUT MX MY MZ KFX 18695.4 KFY 22171.1 KFZ 18695.4
1459 FIXED BUT MX MY MZ KFX 17083.7 KFY 20259.8 KFZ 17083.7
1460 FIXED BUT MX MY MZ KFX 14827.4 KFY 17584 KFZ 14827.4
1461 FIXED BUT MX MY MZ KFX 14182.7 KFY 16819.4 KFZ 14182.7
1462 FIXED BUT MX MY MZ KFX 12732.2 KFY 15099.3 KFZ 12732.2
1463 FIXED BUT MX MY MZ KFX 12732.2 KFY 15099.3 KFZ 12732.2
1464 FIXED BUT MX MY MZ KFX 12732.2 KFY 15099.3 KFZ 12732.2
1465 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1466 FIXED BUT MX MY MZ KFX 13538 KFY 16054.9 KFZ 13538
1467 FIXED BUT MX MY MZ KFX 9831.2 KFY 11658.9 KFZ 9831.2
1468 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1469 FIXED BUT MX MY MZ KFX 17083.7 KFY 20259.8 KFZ 17083.7
1470 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1471 FIXED BUT MX MY MZ KFX 14343.9 KFY 17010.6 KFZ 14343.9
1472 FIXED BUT MX MZ KFX 7091.4 KFY 8409.7 KFZ 7091.4
*************************************************************
LOAD 1 DEAD LOAD
**************************************************************
SELFWEIGHT Y -1
*SELFWEIGHT OF WALL W3 & W4
ELEMENT LOAD
95 96 130 131 140 141 175 176 185 186 220 221 230 231 265 266 275 276 310 311 320 321 355 356 365 366 400 401 410 411 445 446 455 456 490 491 500 501 535 536 545 546 580 581 590 591 625 626 635 636 670 671 680 681 715 716 725 726 760 761 770 771 805 806 815 816 850 851 860 861 895 896 905 906 940 941 950 951 985 986 995 996 1030 1031 1040 1041 1075 1076 1085 1086 1120 1121 1130 TO 1141 1155 TO 1166 PR -427
*SELFWEIGHT OF WALL W5
97 TO 129 PR -151.25
*SELFWEIGHT OF COUNTERFORT CF8
JOINT LOAD
1302 1325 FY -327
*SELFWEIGHT OF COUNTERFORT CF9 +
*TUNNEL SUPPORTING BEAM REACTIONS
1306 1321 FY -2668.22
* DEAD LOAD DUE TO FLOOR BEAM REACTION ASSUMED AS 100 KN
*SELFWEIGHT OF CF13 + DEAD LOAD
106 129 FY -185.45
*SELFWEIGHT OF CF12 + DEAD LOAD
109 126 FY -177
*LOAD DUE TO APRON FEEDER
109 126 FY -112.5
*SELFWEIGHT OF CF11 + DEAD LOAD
115 120 FY -194.37
*LOAD DUE TO APRON FEEDER
115 120 FY -112.5

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

225 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

*********************
* DEAD LOAD FROM FRAME -3 AT CF3 LOCATION
**************************
*AT CF3 LOCATION
190 FY -3676.75 MX 46.24 MZ 2054.06
229 FY -3649.61 MX -77.87 MZ 2051.04
* AT CENTRAL COLUMN LOCATION
256 FY -1746.25 MX -3.25 MZ 82.55
*********************
* DEAD LOAD FROM FRAME -4 AT CF4 LOCATION
**************************
*AT CF4 LOCATION
551 FY -2179.11 MX -259.68 MY 19.77 MZ -124.12
512 FY -2179.11 MX 259.68 MY -19.77 MZ -124.12
* AT COLUMN C4 LOCATIONS
541 FY -1523.5 MX 156.84 MY -4.58 MZ 14.57
522 FY -1523.5 MX -156.84 MY 4.58 MZ 14.57
*********************
* DEAD LOAD FROM FRAME -5 AT CF5 LOCATION
**************************
* AT CF5 LOCATIONS
873 FY -3316.15 MX -121.82 MY 3.55 MZ -23.16
834 FY -3316.15 MX 121.82 MY -3.55 MZ -23.16
* AT COLUMN C5 LOCATIONS
863 FY -1009.02 MX 36.56 MZ -0.88
844 FY -1009.02 MX -36.56 MZ -0.88
*****************************************
*DEAD LOAD DUE TO OVERBURDEN PCC FILLING
* ON 1.3 M SIDE 24 * 4=96 KN/M2
ELEMENT LOAD
5 TO 41 50 TO 86 PR -96
* SURCHARGE PRESSURE DUE TO TOP RAFT
1 TO 90 PR -300
* ON 2.930 & 2.75 M SIDE
91 TO 94 132 TO 139 177 TO 184 222 TO 229 267 TO 274 312 TO 319 357 TO 364 402 TO 409 447 TO 454 492 TO 499 537 TO 544 582 TO 589 627 TO 634 672 TO 679 717 TO 724 762 TO 769 807 TO 814 852 TO 859 897 TO 904 942 TO 949 987 TO 994 1032 TO 1039 1077 TO 1084 1122 TO 1129 1167 TO 1185 1200 TO 1230 1245 TO 1275 1290 TO 1320 1335 TO 1365 1380 TO 1394 1395 PR -307.36
************************************************
* DEAD LOAD DUE TO PEDESTALS B1 B2 B3 & B4
*********************************************
JOINT LOAD
297 301 303 306 FY -12
390 393 395 397 FY -12
*B5 TO B12
665 668 671 673 895 898 901 903 1125 1128 1131 1133 1355 1358 1361 1363 FY -3
*DEAD LOAD DUE TO SCREED CONCRETE & FLOOR FINISH OF AVG 75 MM THK
ELEMENT LOAD
142 TO 174 187 TO 219 232 TO 244 246 TO 264 277 TO 309 322 TO 354 367 TO 399 412 TO 430 432 TO 444 457 TO 489 502 TO 534 547 TO 579 592 TO 624 637 TO 669 682 TO 714 727 TO 754 756 TO 759 772 TO 804 817 TO 849 862 TO 894 907 TO 939 952 TO 976 978 TO 984 997 TO 1029 1042 TO 1064 1066 1067 TO 1074 1087 TO 1119 PR -1.875
*************************************************
LOAD 2 LIVE LOAD
**************************************************
*********************
* LIVE LOAD FROM FRAME -3 AT CF3 LOCATION
**************************
JOINT LOAD

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

226 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

*AT CF3 LOCATION


190 FY -93.19 MX -8.39 MZ -1.92
229 FY -93.19 MX 8.27 MZ -1.92
* AT CENTRAL COLUMN LOCATION
256 FY -84.47 MX 0.02 MZ 3.84
***********************************
* LIVE LOAD FROM FRAME -4 AT CF4 LOCATION
**************************
JOINT LOAD
*AT CF4 LOCATION
551 FY -85.31 MX -24.44 MY 2.42 MZ -15.36
512 FY -85.31 MX 24.44 MY -2.42 MZ -15.36
* AT COLUMN C4 LOCATIONS
541 FY -165.49 MX 19.37 MY -0.59 MZ 1.83
522 FY -165.49 MX -19.37 MY 0.59 MZ 1.83
*********************
* LIVE LOAD FROM FRAME -5 AT CF5 LOCATION
**************************
* AT CF5 LOCATIONS
873 FY -132.69 MX -29.99 MY 1.51 MZ -12.96
834 FY -132.69 MX 29.99 MY -1.51 MZ -12.96
* AT COLUMN C5 LOCATIONS
863 FY -183.61 MX 19.37 MY -0.4 MZ -0.57
844 FY -183.61 MX -19.37 MY 0.4 MZ -0.57
*********************************************
* LIVE LOAD DUE TO PEDESTALS B1 B2 B3 & B4
*********************************************
JOINT LOAD
297 301 303 306 FY -7.5
390 393 395 397 FY -7.5
*B5 TO B12
665 668 671 673 895 898 901 903 1125 1128 1131 1133 1355 1358 1361 1363 FY -1.5
********************************
*LIVE LOAD ON RAFT @ 5 KN/M2
********************************
ELEMENT LOAD
142 TO 174 187 TO 219 232 TO 244 246 TO 264 277 TO 309 322 TO 354 367 TO 399 412 TO 430 432 TO 444 457 TO 489 502 TO 534 547 TO 579 592 TO 624 637 TO 669 682 TO 714 727 TO 754 756 TO 759 772 TO 804 817 TO 849 862 TO 894 907 TO 939 952 TO 976 978 TO 984 997 TO 1029 1042 TO 1064 1066 1067 TO 1074 1087 TO 1119 PR -5
*LIVE LOAD DUE TO FLOOR BEAM REACTION ASSUMED AS 100 KN
JOINT LOAD
*CF13
106 129 FY -100
*CF12
109 126 FY -100
*CF11
115 120 FY -100
********************************************************************
LOAD 3 COAL HOPPER FULL LOAD
********************************************************************
* COAL HOOPER FULL LOAD FROM FRAME -3
**************************
JOINT LOAD
*AT CF3 LOCATION
190 FY -282.68 MX -212.06 MY 471.25 MZ -1543.34
229 FY -282.62 MX -213.45 MY -471.25 MZ -1543.34
* AT CENTRAL COLUMN LOCATION
256 FY -1073.06 MX 0.26 MY 0 MZ -47.49
********************************************************************
LOAD 4 WAGON TIPPLER LOAD CASE-1

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

227 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

****************************************************************
* WAGON TIPPLER AT REST WITH WAGON IE WAGON JUST KEEP ON TIPPLER TABLE
****************************************
*WAGON TIPPLER LOAD FROM FRAME -3 AT CF3 LOCATION
***********************************
JOINT LOAD
*AT CF3 LOCATION
190 FY -1219.4 MX 141.16 MY -0.92 MZ -151.82
229 FY -1228.65 MX -141.53 MY 0.92 MZ -151.82
* AT CENTRAL COLUMN LOCATION
256 FY -261.23 MX 0.06 MZ -1.37
***********************************
* WAGON TIPPLER LOAD FROM FRAME -4 AT CF4 LOCATION
***********************************
JOINT LOAD
*AT CF4 LOCATION
551 FY 0.11 MX 2.38 MY -2.91 MZ -284.52
512 FY 0.11 MX -2.38 MY 2.91 MZ -284.52
* AT COLUMN C4 LOCATIONS
541 FY -0.11 MX 0.17 MY -0.92 MZ -35.48
522 FY -0.11 MX -0.17 MY 0.92 MZ -35.48
********************************************************************
LOAD 5 WAGON TIPPLER LOAD CASE-2
****************************************************************
* WAGON JUST LIFTED FROM REST POSITION BUT IT IS STILL CONNECTD TO LOAD CELL
****************************************
*WAGON TIPPLER LOAD FROM FRAME -3 AT CF3 LOCATION
***********************************
JOINT LOAD
*AT CF3 LOCATION
190 FY -39.48 MX -2148.95 MY -952.92 MZ 8458.06
229 FY -335.63 MX -3355.42 MY 1003.73 MZ 8547.8
* AT CENTRAL COLUMN LOCATION
256 FY 465.11 MX -239.03 MY 5.02 MZ 105.24
***********************************
* WAGON TIPPLER LOAD FROM FRAME -4 AT CF4 LOCATION
***********************************
JOINT LOAD
*AT CF4 LOCATION
551 FY -596.02 MX 208.04 MY -358.64 MZ 3154.23
512 FY -596.02 MX -208.04 MY 358.64 MZ 3154.23
* AT COLUMN C4 LOCATIONS
541 FY -473.98 MX 4.77 MY -22.22 MZ 486.02
522 FY -473.98 MX -4.77 MY 22.22 MZ 486.02
********************************************************************
LOAD 6 WAGON TIPPLER LOAD CASE-3
****************************************************************
* WAGON TIPPLER IN OPERATION
****************************************
*WAGON TIPPLER LOAD FROM FRAME -3 AT CF3 LOCATION
***********************************
JOINT LOAD
*AT CF3 LOCATION
190 FY -73.26 MX 387.27 MY -793.38 MZ 3897.24
229 FY -73.29 MX -386.94 MY 793.38 MZ 3897.24
* AT CENTRAL COLUMN LOCATION
256 FY 236.55 MX -0.06 MY 0 MZ 61.03
***********************************
* WAGON TIPPLER LOAD FROM FRAME -4 AT CF4 LOCATION
***********************************
JOINT LOAD
*AT CF4 LOCATION

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

228 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

551 FY -786.62 MX -1283.93 MY -360.1 MZ 3152.39


512 FY -1341.17 MX -1947.39 MY 360.02 MZ 3150.5
* AT COLUMN C4 LOCATIONS
541 FY -958.18 MX -62.52 MY -24.08 MZ 488.44
522 FY -734.03 MX -73.76 MY 24.05 MZ 489.17
***************************************************************
LOAD 7 EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE
***************************************************************
* EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE AT FRAME 3 LOCATION
************************************************************
JOINT LOAD
*AT CF3 LOCATION
190 FY -81.26 MX 10700 MY 4612.35 MZ 18.16
229 FY -82.76 MX -10657.7 MY -4608.18 MZ 18.33
* AT CENTRAL COLUMN LOCATION
256 FY 164.02 MX -1.49 MY 0.02 MZ -36.48
***********************************
*EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE AT FRAME 4 LOCATION
***********************************
JOINT LOAD
*AT CF4 LOCATION
551 FY -253.17 MX -8259.31 MY 47.42 MZ 93.11
512 FY -253.17 MX 8259.31 MY -47.42 MZ 93.11
* AT COLUMN C4 LOCATIONS
541 FY 253.17 MX 5.13 MY 61.74 MZ -93.11
522 FY 253.17 MX -5.13 MY -61.74 MZ -93.11
***********************************
*EARTH PRESSURE WITH SURCHARGE & SUB SOIL WATER PRESSURE AT FRAME 5 LOCATION
***********************************
* AT CF5 LOCATIONS
873 FY -256.09 MX -7808.18 MY 43.25 MZ 106.14
834 FY -256.09 MX 7808.18 MY -43.25 MZ 106.14
* AT COLUMN C5 LOCATIONS
863 FY 256.09 MX 6.44 MY 76.36 MZ -106.14
844 FY 256.09 MX -6.44 MY -76.36 MZ -106.14
************************************************
*EARTH PRESSURE WITH SURCHARGE & SUB SOIL PRESSURE AT COUNTERFORT CF8
JOINT LOAD
1302 1325 MZ -748.56
*****************************
*DUE TO COUNTERFORT CF9 +
*TUNNEL SUPPORTING BEAM REACTIONS
1306 1321 MZ -5155.62
************************
*DUE TO CF13
106 129 MZ -5446.81
101 TO 104 MZ -664.4
131 TO 134 MZ -664.4
*****************
*DUE TO CF12
109 126 MZ -6266.77
*********************
*DUE TO CF11
115 120 MZ -7480.32
**********************
*EARTH PRESSURE WITH SUR & SUB SOIL BETWEN CF5 & WALL
JOINT LOAD
1018 1064 1110 1156 MX 2661.48
1057 1103 1149 1195 MX -2661.48
*EARTH PRESSURE WITH SUR & SUB SOIL BETWEN CF8 & WALL
1297 TO 1299 MZ 3369
1328 TO 1330 MZ 3369

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

229 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

ELEMENT LOAD
1 TO 1395 PR 130.76
***************************************************************
LOAD 8 EARTH PRESSURE WITHOUT SURCHARGE & SUB SOIL WATER PRESSURE
***************************************************************
* EARTH PRESSURE WITHOUT SURCHARGE & SUB SOIL WATER PRESSURE AT FRAME 3 LOCATION
************************************************************
JOINT LOAD
*AT CF3 LOCATION
190 FY -62.12 MX 7862.44 MY 3371.4 MZ 13.78
229 FY -62.14 MX -7862.61 MY -3371.4 MZ 13.78
* AT CENTRAL COLUMN LOCATION
256 FY 124.26 MX -0.03 MY 0 MZ -27.56
***********************************
*EARTH PRESSURE WITHOUT SURCHARGE & SUB SOIL WATER PRESSURE AT FRAME 4 LOCATION
***********************************
JOINT LOAD
*AT CF4 LOCATION
551 FY -197.44 MX -6022.97 MY 35.27 MZ 69.25
512 FY -197.46 MX 6022.77 MY -35.27 MZ 69.25
* AT COLUMN C4 LOCATIONS
541 FY 197.45 MX 3.73 MY 45.92 MZ -69.25
522 FY 197.45 MX -3.73 MY -45.92 MZ -69.25
***********************************
*EARTH PRESSURE WITHOUT SURCHARGE & SUB SOIL WATER PRESSURE AT FRAME 5 LOCATION
***********************************
* AT CF5 LOCATIONS
873 FY -200.48 MX -5681.26 MY 32.16 MZ 78.92
834 FY -200.48 MX 5681.26 MY -32.16 MZ 78.92
* AT COLUMN C5 LOCATIONS
863 FY 200.48 MX 4.69 MY 56.78 MZ -78.92
844 FY 200.48 MX -4.69 MY -56.78 MZ -78.92
************************************************
*EARTH PRESSURE WITHOUT SURCHARGE & SUB SOIL PRESSURE AT COUNTERFORT CF8
JOINT LOAD
1302 1325 MZ -598.49
*****************************
*DUE TO COUNTERFORT CF9 +
*TUNNEL SUPPORTING BEAM REACTIONS
1306 1321 MZ -3855.56
************************
*DUE TO CF13
106 129 MZ -2163.12
101 TO 104 MZ -263.87
131 TO 134 MZ -263.87
*****************
*DUE TO CF12
109 126 MZ -2488
*********************
*DUE TO CF11
115 120 MZ -2970
**********************
*EARTH PRESSURE WITHOUT SUR & SUB SOIL BETWEN CF5 & WALL
JOINT LOAD
1018 1064 1110 1156 MX 1867.14
1057 1103 1149 1195 MX -1867.14
*EARTH PRESSURE WITHOUT SUR & SUB SOIL BETWEN CF8 & WALL
1297 TO 1299 MZ -100
1328 TO 1330 MZ -100
****************************************
LOAD 9 APRON FEEDER LOAD
****************************************

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

230 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

JOINT LOAD
*AT CF3 LOCATION
190 FY -8.63 MX 10.99 MY 1.36 MZ -3.18
229 FY -8.63 MX -10.97 MY -1.36 MZ -3.18
* AT CENTRAL COLUMN LOCATION
256 FY -132.73 MX 0 MY 0 MZ 6.36
***************************************
JOINT LOAD
*AT CF4 LOCATION
551 FY -0.2 MX -4.26 MY 14.02 MZ -61.72
512 FY -0.2 MX 4.26 MY -14.02 MZ -61.72
* AT COLUMN C4 LOCATIONS
541 FY 0.2 MX -0.3 MY 1.64 MZ 1.72
522 FY 0.2 MX 0.3 MY -1.64 MZ 1.72
************************************************
* BELT LOAD DUE TO PEDESTALS B1 B2 B3 & B4
*********************************************
JOINT LOAD
297 301 303 306 FX 27 FY 63.2
390 393 395 397 FX 27 FY -63.2
***********************************
LOAD 10 MAXIMUM LOAD FROM SHED
****************************************
JOINT LOAD
*AT CF3 LOCATION
190 FY 258.57 MX -986.83 MY 11.09 MZ -20.46
229 FY 56.28 MX -1246.89 MY 13.16 MZ 24.79
* AT CENTRAL COLUMN LOCATION
256 FY 99.15 MX -96.06 MY 2.54 MZ -4.33
***********************************
* AT CF5 LOCATIONS
873 FY 340.38 MX -854.87 MY -0.13 MZ 0.14
834 FY -1.84 MX -883.54 MY 0.19 MZ -0.94
* AT COLUMN C5 LOCATIONS
863 FY -27.65 MX -48.42 MY -0.28 MZ 0.2
844 FY 103.11 MX -48.55 MY 0.29 MZ 0.6
********************************************************************
LOAD 11 WAGON TIPPLER LOAD CASE-4
****************************************************************
* LOCOMOTIVE MOVING OVER RAIL TABLE FROM OUTHAUL TO INHAUL
JOINT LOAD
*AT CF4 LOCATION
551 FY -407.07 MX -21.76 MY 13.99 MZ 1096.65
512 FY -407.07 MX 21.76 MY -13.99 MZ 1096.65
* AT COLUMN C4 LOCATIONS
541 FY -42.93 MX -0.3 MY 0.97 MZ 139.41
522 FY -42.93 MX 0.3 MY -0.97 MZ 139.41
* LOAD DUE TO WAGON AXLE LOAD
* AT CF5 LOCATIONS
873 FY -202.16 MX -9.26 MY 0.11 MZ 0.28
834 FY -202.16 MX 9.26 MY -0.11 MZ 0.28
* AT COLUMN C5 LOCATIONS
863 FY -26.84 MX -0.12 MY 0.2 MZ -0.28
844 FY -26.84 MX 0.12 MY -0.29 MZ -0.28
*********************************************
*LOAD COMBINATIONS
*********************************************
*FACTORED
LOAD COMB 12 DL + LL + HFL+ WGT-CASE-1 + EPWITHSUR&SUBSOIL + SHED + APF LOAD
1 1.5 2 1.5 3 1.5 4 1.5 7 1.5 9 1.5 10 1.5
LOAD COMB 13 DL + LL + HFL+ WGT-CASE-2 + EPWITHSUR&SUBSOIL + SHED + APF LOAD
1 1.5 2 1.5 3 1.5 5 1.5 7 1.5 9 1.5 10 1.5

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

231 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

LOAD COMB 14 DL + LL + HFL+ WGT-CASE-3 + EPWITHSUR&SUBSOIL + SHED + APF LOAD


1 1.5 2 1.5 3 1.5 6 1.5 7 1.5 9 1.5 10 1.5
LOAD COMB 15 DL + LL + HFL+ WGT-CASE-4 + EPWITHSUR&SUBSOIL + SHED + APF LOAD
1 1.5 2 1.5 3 1.5 7 1.5 9 1.5 10 1.5 11 1.5
LOAD COMB 16 DL + LL + HFL+ WGT-CASE-1 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.5 2 1.5 3 1.5 4 1.5 8 1.5 9 1.5 10 1.5
LOAD COMB 17 DL + LL + HFL+ WGT-CASE-2 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.5 2 1.5 3 1.5 5 1.5 8 1.5 9 1.5 10 1.5
LOAD COMB 18 DL + LL + HFL+ WGT-CASE-3 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.5 2 1.5 3 1.5 6 1.5 8 1.5 9 1.5 10 1.5
LOAD COMB 19 DL + LL + HFL+ WGT-CASE-4 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.5 2 1.5 3 1.5 8 1.5 9 1.5 10 1.5 11 1.5
LOAD COMB 20 DL + LL + HFL + EPWITHSUR & SUB SOIL
1 1.5 2 1.5 3 1.5 7 1.5
*UNFACTORED
LOAD COMB 21 DL + LL + HFL+ WGT-CASE-1 + EPWITHSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 22 DL + LL + HFL+ WGT-CASE-2 + EPWITHSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 5 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 23 DL + LL + HFL+ WGT-CASE-3 + EPWITHSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 6 1.0 7 1.0 9 1.0 10 1.0
LOAD COMB 24 DL + LL + HFL+ WGT-CASE-4 + EPWITHSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 7 1.0 9 1.0 10 1.0 11 1.0
LOAD COMB 25 DL + LL + HFL+ WGT-CASE-1 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 26 DL + LL + HFL+ WGT-CASE-2 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 5 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 27 DL + LL + HFL+ WGT-CASE-3 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 6 1.0 8 1.0 9 1.0 10 1.0
LOAD COMB 28 DL + LL + HFL+ WGT-CASE-4 + EPWITHOUTSUR&SUBSOIL + SHED + APF LOAD
1 1.0 2 1.0 3 1.0 8 1.0 9 1.0 10 1.0 11 1.0
LOAD COMB 29 DL + LL + HFL + EPWITHSUR & SUB SOIL
1 1.0 2 1.0 3 1.0 7 1.0
PERFORM ANALYSIS
LOAD LIST 12 TO 29
PRINT ELEMENT STRESSES
FINISH

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

232 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

ANALYSIS RESULTS PRESSURE ON SOIL:


Base pressure summary for all loadings:
From the analysis the spring support reactions are obtained and corresponding base pressure is obtained
by diving with node effective area. The governing base pressures are listed as below for all load
combinations.

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz

Node
228
189
11
48
275
236

L/C
29
24
26
24
21
21

Horizontal
Fx kN
5.553
-2.015
1.021
-0.057
0.464
0.463

Vertical
Fy kN
69.614
70.704
235.84
0.017
94.384
98.527

Horizontal
Fz kN
0.968
-1.167
-1.113
-0.138
3.733
-3.751

Moment
Mx kNm
0
0
0
0
0
0

My kNm
0
0
0
0
0
0

Mz kNm
0
0
0
0
0
0

The base pressures thus arrived from the above table will be compared with allowable gross safe bearing
capacity.

Allowable Bearing capacity of soil as per report

400 KN/m2

Gross allowable pressure

743.36KN/m2

=400 + 19.076 x 18

Max. Support reaction on the soil is at node no. 11 for load comb. No. 26 = 235.84 KN
(Ref staad file for Support reactions)
Pressure on soil

= 235.84 / (0.61x0.65)

= 594.8 KN/ m2 < 743.3 KN/m2

Min. Support reaction on the soil is at node no. 48 for load comb. No. 24 = 0.017 KN
Pressure on soil = 0.017 / (0.5x0.35)

= 0.1KN/ m2

> 0.0

Hence no loss of contact with soil.

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

233 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Node: 11
Max. Pressure

Node: 48
Min. Pressure

View Showing Max and Min base pressure locations

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

234 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

10 DESIGN OF BASE RAFT


Design of Base Raft:
The Base Raft supporting the WGT columns &
counterforts
is provided with thickness of =

2000

mm

From STAAD model the Raft Plate elements in the zone of columns &
counterforts
cross section are listed below
91 92 93 94 95 96 136 137 138 139 140 141 181 182 183 184 185 186 226 227 228 229 230 231 130 131 132 133 175 176 177 178 179 180 220 221 222 223 451 452 453 454 455 456 496 497 498 499 535 536 537 538 539 540 766 767 768 769 770 771 811 816 805 806 807 808 809 810 850 851 852 853 854 855 203 204 248 249 463 464 508 509 482 483 527 528 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 The bending moment in the plates (listed above) below the WGT columns & Counterforts are
excluded for flexure design.
The moments in the plate Mx, Mxy and My, Mxy are combined as below.
Top Face Reinforcement
Modified moment, Mx* = Mx + Absolute value of (Mxy)
Modified moment, My* = My + Absolute value of (Mxy)
Bottom Face Reinforcement
Modified moment, Mx* = Mx - Absolute value of (Mxy)
Modified moment, My* = My - Absolute value of (Mxy)

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

235 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Governing Loads:
X - Direction

Top Face
Bottom Face

Y - Direction

Top Face
Bottom Face

(Longitudinal)
Element
Number
71

Units = KN, m
Load
Combination
13

Mx

Mxy

Mx*

1243

2758

4001

1032

15

5045

571

5616

Units = KN, m
Load
Combination
13

My

Mxy

My*

2632

2758

5390

20

5560

922

6482

(Transverse)
Element
Number
71
1253

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.

B
D
Tcov
Bcov
Fck
Fy

=
=
=
=
=
=

1000
2000
50
50
25
500

Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

236 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

mm
mm
mm
mm
N/mm2
N/mm2

MX
El no
Top
71
Bottom 1032

L/C
13
15

Mu
kN.m/m
4001
5616

Dia of
bar
32
32

Effectiv
ed
1902
1902

Mu/b
d2
Pt req Ast reqd
1.11 0.27
5135.4
1.55 0.4
7608

Spacing Spacing Ast


req
prov
prov
Pt pro Remarks
314
200
8042
0.42 2-LAYERS
212
150
10723 0.56 2-LAYERS

L/C
13
20

Mu
5390
6482

Dia of
bar
32
32

Effectiv
e depth
1870
1870

Mu/b
d2
Pt req Ast reqd
1.54 0.39
7293
1.85 0.485
9070

Spacing Spacing Ast


req
prov
prov
Pt pro
221.00 200.00
8042
0.43 2-LAYERS
178.00 150.00 10723 0.57 2-LAYERS

L/C
15
13

(TvTc)Xbd
Tv
Tc
0.64 0.46 329120
0.6 0.52 153340

Dia of
links
16
16

MY

El no
Top
71
Bottom 1253

CHECK FOR SHEAR

El no
848
1170

IN X DIRECTION
IN Y DIRECTION

Spacing
/m
PROVIDE 16Y
Length
Remarks
LINKS @ 600
provide SHEAR
839
C/C
2133.22 provide SHEAR BOTHWAYS

Design moments calculated above are based on Wood's criteria


Mxu
Myu

=
=

Mx
My

+
+

Mxy
Mxy

For element No 71 and for loadcase 13


Mx from Staad
Mxy from Staad
Mxu

=
=
1243

1243 KN.m/m
2758 KN.m/m
2758

4001 KN.m/m

similarly remaining design moments are calculated

The Following elements are neglected for one way shear calculation in the analysis of Base raft
233 To 244 252 To 263 278 To 289 297 To 308 323 To 334 342 To 353 368 To 370 376 To 389 397 398 413
To 415 421 To 434 442 443 458 To 460 466 To 479 487 488 503 To 505 511 To 524 532 533 548 To 550 556
To 569 577 578 593 To 595 601 To 614 622 623 638 To 668 683 To 685 691 To 704 712 713 728 To 730 736
To 749 757 758 773 To 775 781 To 785 787 To 794 802 803 818 To 820 826 To 839 847 848 863 To 865 871
To 884 892 893 908 To 910 916 To 929 937 938 953 To 983 998 To 1028 1055 To 1061 1100 To 1103 1105
1106 1145 To 1151 1190 To 1196 1235 To 1241 1280 To 1286 1325 1326 1328 1329 1331 1370 To 1376

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

237 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

10.1 CHECK FOR PUNCHING SHEAR


PUNCHING SHEAR: AT Column C3
Breadth of column (b)
Depth (width) of column (D)
Concrete Grade
Characteristic Strength Of Reinforcement

600
1600
25
500

mm
mm
2
N/mm
2
N/mm

Long term condition


unFactored Loads from the STAAD output
Node
101

Fx kN My kNm
2309.23 5.782

Mz kNm
340

L/C
15
935

Y
1600

3470

935

935
600

935

2470
effective depth of footing
punching width for columns

punching area for columns

6940

d
4940

11880

1870

=
=
=

1870 mm
11880 mm
22215600 mm2

punching load due to moment MY

5.782

2.445

2.365 kN

punching load due to moment MZ

340

3.47

97.983 kN

22215600

0.104 N/mm2

punching stress due to axial load

2309230

punching stress due to moment My =

2364.8

(3445X1845)

0.0004 N/mm2

punching stress due to moment Mz =

97982.7

(2445X1845)

0.021 N/mm2

0.126 N/mm2

0.80 N/mm2

Total punching shear stress


permissible punching shear stress =

0.16 Fck

SAFE

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

238 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

PUNCHING SHEAR: AT Column C4 & C5


Breadth of column (b)
Depth (width) of column (D)
Concrete Grade
Characteristic Strength Of Reinforcement

900
900
25
500

mm
mm
2
N/mm
2
N/mm

Long term condition


unFactored Loads from the STAAD output
Node
108

Fx kN
2170

My kNm
414

Mz kNm
255

L/C
17

935

Y
900

2770

935

935

Y
900
935

2770
effective depth of footing
punching width for columns
punching area for columns

5540

d
5540

11080

1870

=
=

1870 mm
11080 mm

20719600 mm

punching load due to moment MY

414

2.77

149.458 kN

punching load due to moment MZ

255

2.77

92.058 kN

punching stress due to axial load

2170000

20719600

0.105 N/mm2

punching stress due to moment My =

149458.5

(2745X1845)

0.029 N/mm2

punching stress due to moment Mz =

92057.8

(2745X1845)

0.018 N/mm2

0.151 N/mm2

0.80 N/mm2

Total punching shear stress


permissible punching shear stress =

0.16 Fck

SAFE

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

239 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

11 DESIGN OF COUNTERFORTS
11.1 DESIGN OF CF8
Design parameters

Spacing of counterfort (infuence width)

2.375

Unit weight of soil

18

kN/m3

Unit weight of water

10

kN/m3

Height of counterfort below FGL

17.076

Earth pressure coefficient at rest condition

0.5

Thickness of counterfort

Grade of concrete

Grade of steel

Depth of counterfort at base

Depth of counterfort at top

Thickness of wall at base

700

Fe 500 & 415


2750

Height of water from base

0.7

0.5

11.076

water table is at 6 m beow FGL

0.7

Thickness of wall at top

mm

25

surcharge +soil + water

700

500
7.65

17.35
17.076
700
9.7

74.00

2750

10

50

98.30 110.80

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

240 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Counterfort for T- beam action


Thichness of Flange
Width of counterfort

=
=

700
0.7

mm
m

2.375

219.10

kN/m2

Thus each counterfort receives earth pressure from a


width of

4.75/2

At Base

The intensity of earth pressure at the base of the stem is


due to surcharge + soil + water =

10+98.3+110.8

Applying a load factor of 1.5,

Mu

Vu

D base

785.5

(Refer Staad file for Moments)

1178

kN.m

1035

(Refer Staad file for Moments)

1552.50

kN

2750

mm

Assuming a clear cover of 50 mm & 32 dia bars

2750 - 40-12-20/2

2688

mm

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

241 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Effective flange width (cl 23.1.2 code):

bf

bf

Thus bf

lo/6+bw+6Df

17.35x1000/6+700+6x600

7192

bw+clear span of slab

700 +1675

2375

Df is taken as average thickness

mm

mm

2375 mm (least of the above two values)

Assuming the neutral axis is located at Xu = Df

MuR

0.362 X Fck X bX Df (d - 0.416XDf)

10628609600

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange

Mu/bd

0.23

(Pt)reqd/100

Ast reqd.

25/(2X500)[1-sqrt(1-4.598X0.23X/25)]

0.0005

0.0005X700X2688

940.80

MinimumAST

3198.72

mm

mm

Provide 7no's of 25 dia bars in 1layers on inner side of Counterfort


DIRECT TENSION REINFORCEMENT DUE TO BASE PRESSURE
Applied pressure on raft projection =
Direct tension below the counterfort at bottom =

307

say310

kN/m2

310*(2.375*2.05)=

1509

kN

Ast

1509/(0.87*500) =

3470

Ast per face

3470/2

1735

mm2
mm2

provide 6nos-20 dia on each face

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

242 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Above 6.076m height from the base

The intensity of earth pressure at h =11.00m from GROUND LEVEL

11

Height of water table

Applying a load factor of 1.5,


M

Mu

9640.5

1704

Vu

2556

Dh=11.384

6427 (Refer Staad file for Moments)

kN.m
(Refer Staad file for Moments)

kN

2050X(11.384+0.274)/17.35+700

2032

mm

Assuming a clear cover of 50 mm and 32 dia bars


d

2032-50-12-32-32-16

1890.10

mm

Assuming the neutral axis is located at Xu = Df


Df
MuR

700 mm

0.362 X Fck X bf X Df (d - 0.416XDf)

24056449813

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange
R

(Pt)reqd/100

Ast reqd.

Mu/bd

1.14

25/(2X500)[1-sqrt(1-4.598X1.14/25)]

0.0028

0.0028x2375x1890.1

12569.17

mm

Provide 16 no's of 32 dia bars in 3 layers with a 32 mm separation on outer side of counterfort

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

243 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Below 6.274 m height from the Top


Intensity of earth pressure from ground level

Dh=6.274

2050X6.274/17.35+700

1441

mm

Assuming a clear cover of 50 mm and 32 dia bars


d

1441-50-12-32-16

1331

mm

Applying a load factor of 1.5,


M

Mu

Vu

1198

(Refer Staad file for Moments)

528

(Refer Staad file for Moments)

1797.00

kN.m

792.00

kN

Assuming the neutral axis is located at Xu = Df


Df=300 mm
MuR

0.362 X Fck X bf X Df (d - 0.416XDf)

7779662813

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange
R

Mu/bd

=
(Pt)reqd/100

Ast reqd.

0.43
=

25/(2X500)[1-sqrt(1-4.598X0.43/25)]

0.0010

0.001x2375x1331.3

3161.84

mm

Provide 7 no's of 32 dia bars in 1 layer


In the rear face of the counterfort provide 7 bars of 25 dia

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

244 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Horizontal Ties

Horizontal tie reinforcement in the counterfort serves as shear reinforcement against flexural
shear in the counterfort and also as ties resisting the separation of the stem from the counterfort
due to lateral pressure

At 6.076 m from base

Vu

2556.00

Nominal shear stress Tv

Pt provided

kN

Vu/bd

1.93

0.97%

Tc

N/mm2

100XAst/bd

for Pt

< Tc max

0.97 %

0.634

N/mm2

hence shear reinforcement is to be provided for a shear force of

Vus

(Tv - Tc)bd

1717173.62

Assuming 12 dia 6-legged stirrups


Asv
Required spacing

=
=

6X113.1

Sv

678.6

mm2
0.87X415X678.6X1890.1
1717173.6

383.53

provide 12dia 6-legged stirrups at 250c/c

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

245 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

11.2 DESIGN OF CF9

Design parameters
m

Spacing of counterfort (infuence width)

part-1

1.1875

Spacing of counterfort (infuence width)

part-2

2.5375

Unit weight of soil

18

kN/m3

Unit weight of water

10

kN/m3

Height of counterfort below FGL

17.076

Earth pressure coefficient at rest condition

0.5

Thickness of counterfort

Grade of concrete

Grade of steel

Thickness of wall at base

Thickness of wall at top

700

Height of water from base


pressure due to surcharge at base=

0.5x20

mm

25
Fe 500 & 415
0.7

0.5

water table is at 6 m beow FGL

11.076

10

kN/m2

Pressure due to soil at base=

0.5x(18-10)x11.076+0.5x18x6

98.3

kN/m2

Pressure due to water at base =

11.076x10

110.76

kN/m2

surcharge +soil + water


500
11.274

part-2
17.35

11

2000
17.076

6.076

part1 2750

10

98.30 110.76

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

246 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

DESIGN OF COUNTERFORT PART-1 FOR L BEAM ACTION


Thichness of Flange

Thickness of counterfort

INFLUENCE WIDTH FOR COUNTERFORT

700
0.7
1.1875

mm
m
m

Thus each counterfort receives earth pressure from a


width of

2.375/2

1.1875

219.06

kN/m2

At Base

The intensity of earth pressure at the base of the stem is


due to surcharge + soil + water =

10+98.3+110.76

Applying a load factor of 1.5,

Mu

V Max

Vu

D base

5155.62

(Refer Staad file for Moments)

7733.43

kN.m

2827

(Refer Staad file for Moments)

4240.50

kN

2750

mm

Assuming a clear cover of 50 mm & 32 dia bars

2750 - 50-12 - 32-32-16

2608

mm

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

247 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Effective flange width (cl 23.1.2 code):

bf

lo/12+bw+3Df

6076/12+700+3X700

5406

mm

Thus bf is taken as the influnce width of counterfort

I,e
Thus bf

1425

mm

1425

Assuming the neutral axis is located at Xu = Df

MuR

0.362 X Fck X b X Df (d - 0.416XDf)

10273849600

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange

Mu/bd

1.62

(Pt)reqd/100

Ast reqd.

25/(2X500)[1-sqrt(1-4.598X1.62/25)]

0.0041

0.0041X700X2608

7484.96

mm

Provide 10 no's of 32 dia bars in 2 layers on inner face of counterfort UPTO 3m height

DIRECT TENSION REINFORCEMENT DUE TO BASE PRESSURE


Applied pressure on raft projection =
Direct tension below the counterfort at bottom =

307

say310

kN/m2

310*(1.1875*2.05)=

755

kN

Ast

755/(0.87*500) =

1735

Ast per face

1735/2

867

mm2
mm2

provide 6nos-20 dia on each fa

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

248 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

At 6.076m from Base

Mu

V Max

Vu

(Pt)reqd/100

Ast reqd.

11098.2

(Refer Staad file for Moments)

16647.30

kN.m

3711

(Refer Staad file for Moments)

5566.50

kN

Mu/bd

1.72

25/(2X500)[1-sqrt(1-4.598X1.72/25)]

0.0043

0.0043X1425X2608

15980.52

mm

Provide 21 no's of 32 dia bars in 3 layers on outer face of counterfort Throughout

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

249 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

DESIGN OF COUNTERFORT PART-2 FOR T BEAM ACTION

The intensity of earth pressure at h =11.0m from GROUND LEVEL


Thus each counterfort receives earth pressure from a
width of

2.475/2 + 2.375/2

Height of water table from base

2.5375

5.00

Applying a load factor of 1.5,


M

Mu

Vu

Dh@BASE

10859

(Refer Staad file for Moments)

2130

(Refer Staad file for Moments)

16288.50

kN.m

3195.00

kN

2000
mm

Assuming a clear cover of 50 mm and 32 dia bars


d

2000-50-12-32-32-32-16

1826.00

mm

Assuming the neutral axis is located at Xu = Df


Df
MuR

=
=

300

mm

0.362 X Fck X bf X Df (d - 0.416XDf)

15357370350

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange
R

(Pt)reqd/100

Ast reqd.

Mu/bd

1.925
=

25/(2X500)[1-sqrt(1-4.598X1.925/25)]

0.0049

0.00491x1826x2.5375x1000

22750.36

mm

Provide 30no's of 32 dia bars in 4 layer


In the rear face of the counterfort provide 7 bars of 25 dia

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

250 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Below 6.0 m Height from FGL


The intensity of earth pressure at h =6m from GROUND LEVEL
Thus each counterfort receives earth pressure from a
width of

2.7/2 + 2.375/2

Height of water table from base

2.5375

0.00

Applying a load factor of 1.5,


M

Mu

Vu

Dh@6M FROM FGL

3566.5

5349.75

kN.m
930

1395.00

kN

1300*6.274/11.274 + 700

1423.00

mm

Assuming a clear cover of 50 mm and 32 dia bars


d

1423-50-12-32-16

1313.00

mm

Assuming the neutral axis is located at Xu = Df


Df
MuR

=
=

500

mm

0.362 X Fck X bf X Df (d - 0.416XDf)

12687817188

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange
R

(Pt)reqd/100

Ast reqd.

Mu/bd

1.22
=

25/(2X500)[1-sqrt(1-4.598X1.22/25)]

0.0030

0.003x1313x2.5375x1000

9995.21

mm

Provide 14 no's of 32 dia bars in 2 layer


In the rear face of the counterfort provide 7 bars of 25 dia

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

251 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Horizontal Ties (part-1)


Horizontal tie reinforcement in the counterfort serves as shear reinforcement against flexural
shear in the counterfort and also as ties resisting the separation of the stem from the counterfort
due to lateral pressure
=

Vu

3711.00

Nominal shear stress Tv

Pt provided

kN
=

Vu/bd

2.0

1.30%

Tc

N/mm2

100XAst/bd

for Pt

< Tc max

1.30 %

0.706

N/mm2

hence shear reinforcement is to be provided for a shear force of

Vus

(Tv - Tc)bd

2422126.40

Assuming 10 dia 6-legged stirrups


Asv
Required spacing

6X78.5

Sv

471

mm2
0.87X415X471X2608
2422126.4

183.10 mm

provide 10 dia 6-legged stirrups at 175c/c

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

252 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Horizontal Ties (part-II)

Horizontal tie reinforcement in the counterfort serves as shear reinforcement against flexural
shear in the counterfort and also as ties resisting the separation of the stem from the counterfort
due to lateral pressure
=

Vu

3195.00

Nominal shear stress Tv

Pt provided

kN
=

Vu/bd

2.5

1.89%

Tc

N/mm2

100XAst/bd

for Pt

< Tc max

1.89 %

0.803

N/mm2

hence shear reinforcement is to be provided for a shear force of

Vus

(Tv - Tc)bd

1549003.86

Assuming 10 dia 6-legged stirrups


Asv
Required spacing

6X78.5

Sv

471

mm2
0.87X415X471X1826
1549003.9

200.46

provide 10 dia 6-legged stirrups at 175c/c

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

253 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

11.3 DESIGN OF CF11

Design parameters

Spacing of counterfort (infuence width)

2.85

Unit weight of soil

18

kN/m3

Unit weight of water

10

kN/m3

Height of counterfort below FGL

17.076

Earth pressure coefficient at rest condition

0.5

Thickness of counterfort

850

Grade of concrete

Grade of steel Fe

Depth of counterfort at base

=
=

Depth of counterfort at top


Thickness of wall at base

Thickness of wall at top

water table is at 6 m beow FGL


Average Surcharge pressure from Hopper portion

mm

25
500

415 for shear

1500
0.7
0.7

m
m
m

0.5

250

kN/m2

FILLING
6.05
5.9
700

1500

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

254 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Counterfort for T- beam action


Thichness of Flange
Thickness of counterfort

=
=

700
0.85

mm
m

2.85

Thus each counterfort receives earth pressure from a


width of

3.0/2 + 2.7/2

Mu

Vu

At Base

Applying a load factor of 1.5,

D base

7480.32

11220

kN.m

2256.03

3384.05

kN

2000

mm

Assuming a clear cover of 50 mm & 32 dia bars

2000 - 50-12-32-32-16

1858

mm

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

255 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Effective flange width (cl 23.1.2 code):

bf

bf

Thus bf

lo/6+bw+6Df

6.05x1000/6+850+6x600

5458

bw+clear span of slab

800 +2050

2850

Df is taken as average thickness

mm

mm

2850 mm (least of the above two values)

Assuming the neutral axis is located at Xu = Df

MuR

0.362 X Fck X bf X Df (d - 0.416XDf)

28288182300

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange

Mu/bd

1.14

(Pt)reqd/100

Ast reqd.

25/(2X500)[1-sqrt(1-4.598X1.14X/25)]

0.0028

0.0028X2850X1858

14826.84

mm

Provide20no's of 32 dia bars in 3layers with a 32 mm separation on outerside of counterfort upto 2m height
Provide 8no's of 32 dia bars in 1layer on outerside of counterfort for Remaining height
DIRECT TENSION REINFORCEMENT DUE TO BASE PRESSURE
Applied pressure on raft projection =300 + 96
Direct tension below the counterfort at bottom =

396

say 400

kN/m2

400*(2.85*1.3)=

1482

kN

Ast

1482/(0.87*500) =

3407

Ast per face

3407/2

1703

mm2
mm2

provide 6nos-20 dia on each face

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

256 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Inner Reinforcement

Applying a load factor of 1.5,


M

Mu

1170

(or )

1755.00

kN.m
(or )

kN

Dh=2m from Top of CFT


=

700

mm

Assuming a clear cover of 50 mm and 32 dia bars


d

700-50-12-32-16

590.00

mm

Assuming the neutral axis is located at Xu = Df


Df
MuR

=
=

700 mm
0.362 X Fck X b X Df (d - 0.416XDf)

1608963300

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange
R

(Pt)reqd/100

Ast reqd.

Mu/bd

5.93

=
=

0.0186

0.0186x850x590

9327.90

mm

Provide 12 no's of 32 dia bars in 2 layers with a 32 mm separation

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

257 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Horizontal Ties

Horizontal tie reinforcement in the counterfort serves as shear reinforcement against flexural
shear in the counterfort and also as ties resisting the separation of the stem from the counterfort
due to lateral pressure

At base

Vu

3384.05
kN

Nominal shear stress Tv

Pt provided

Vu/bd

2.143

1.02%

Tc

N/mm2

100XAst/bd

for Pt

<= Tc max

1.02 %

0.66

N/mm2

hence shear reinforcement is to be provided for a shear force of

Vus

(Tv - Tc)bd

2341707.00

Assuming 12 dia 8-legged stirrups


Asv
Required spacing

=
=

8X113.1

Sv

904.8

mm2
0.87X415X904.8X1858
2341707.0

259.20

provide 12dia 8-legged stirrups at 250c/c

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

258 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

11.4 DESIGN OF CF12

Design parameters

Spacing of counterfort (infuence width)

2.3875

Unit weight of soil

18

kN/m3

Unit weight of water

10

kN/m3

Height of counterfort below FGL

17.076

Earth pressure coefficient at rest condition

0.5

Thickness of counterfort

Grade of concrete

Grade of steel Fe

=
=

Depth of counterfort at base


Depth of counterfort at top

Thickness of wall at base

water table is at 6 m beow FGL


Average Surcharge pressure from Hopper portion

mm

500

415 for shear

1500
0.7
0.7

m
m
m

0.5

250

kN/m2

Thickness of wall at top

700
25

FILLING
6.05
5.9
700

1500

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

259 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Counterfort for T- beam action


Thichness of Flange
Thickness of counterfort

700

mm

0.7

2.3875

Thus each counterfort receives earth pressure from a


width of

3.0/2 + 1.775/2

Mu

Vu

At Base

Applying a load factor of 1.5,

D base

6266.71

9400

kN.m

1890

2835.00

kN

2000

mm

Assuming a clear cover of 50 mm & 32 dia bars

2000 - 50-12-32-32-16

1858

mm

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

260 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Effective flange width (cl 23.1.2 code):

bf

bf

Thus bf

lo/6+bw+6Df

6.05x1000/6+700+6x600

5308

bw+clear span of slab

700 +1687.5

2387.5

Df is taken as average thickness

mm

mm

2387.5 mm (least of the above two values)

Assuming the neutral axis is located at Xu = Df

MuR

0.362 X Fck X bf X Df (d - 0.416XDf)

23697556225

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange

Mu/bd

1.14

(Pt)reqd/100

Ast reqd.

25/(2X500)[1-sqrt(1-4.598X1.14X/25)]

0.0028

0.0028X2387.5X1858

12420.73

mm

Provide16no's of 32 dia bars in 3layers with a 32 mm separation on outerside of counterfort upto 2m height
Provide 6no's of 32 dia bars in 1layer on outerside of counterfort for Remaining height
DIRECT TENSION REINFORCEMENT DUE TO BASE PRESSURE
Applied pressure on raft projection =300 + 96
Direct tension below the counterfort at bottom =

396

say 400

kN/m2

400*(2.3875*1.3)=

1241.5

kN

Ast

1241.5/(0.87*500) =

2854

Ast per face

2854/2

1427

mm2
mm2

provide 6nos-20 dia on each face

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

261 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Inner Reinforcement

Applying a load factor of 1.5,


M

Mu

980.3

1470.45

kN.m

kN

Dh=2m from Top of CFT


=

700

mm

Assuming a clear cover of 50 mm and 32 dia bars


d

700-50-12-32-16

590.00

mm

Assuming the neutral axis is located at Xu = Df


Df
MuR

=
=

700 mm
0.362 X Fck X b X Df (d - 0.416XDf)

1325028600

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange
R

(Pt)reqd/100

Ast reqd.

Mu/bd

6.03

=
=

0.0162

0.0162x700x590

6690.60

mm

Provide 9 no's of 32 dia bars in 2 layers with a 32 mm separation

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

262 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Horizontal Ties

Horizontal tie reinforcement in the counterfort serves as shear reinforcement against flexural
shear in the counterfort and also as ties resisting the separation of the stem from the counterfort
due to lateral pressure

At base

Vu

2835.00
kN

Nominal shear stress Tv

Pt provided

Vu/bd

2.2

0.99%

Tc

N/mm2

100XAst/bd

for Pt

<= Tc max

0.99 %

0.64

N/mm2

hence shear reinforcement is to be provided for a shear force of

Vus

(Tv - Tc)bd

2002616.00

Assuming 12 dia 6-legged stirrups


Asv
Required spacing

=
=

6X113.1

Sv

678.6

mm2
0.87X415X678.6X1858
2002616.0

227.32

provide 12dia 6-legged stirrups at 200c/c

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

263 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

11.5 DESIGN OF CF13


Design parameters

Spacing of counterfort (infuence width)

2.075

Unit weight of soil

18

kN/m3

Unit weight of water

10

kN/m3

Height of counterfort below FGL

17.076

Earth pressure coefficient at rest condition

0.5

Thickness of counterfort

700

Grade of concrete

Grade of steel Fe

Depth of counterfort at base

Depth of counterfort at top

Thickness of wall at base

Thickness of wall at top

water table is at 6 m beow FGL


Average Surcharge pressure from Hopper portion

mm

25
500

415 for shear

1500
0.7
0.7

m
m
m

0.5

250

kN/m2

FILLING
6.05
5.9
700

1500

7/1/08 7:13 PM

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

264 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Counterfort for T- beam action


Thichness of Flange
Thickness of counterfort

700

mm

0.7
1 375

2.075

Thus each counterfort receives earth pressure from a


width of

2.375/2 + 1.775/2

Mu

Vu

At Base

Applying a load factor of 1.5,

D base

5446.8

8170

kN.m

1643

2464.50

kN

2000

mm

Assuming a clear cover of 50 mm & 32 dia bars

2000 - 50-12-32-32-16

1858

mm

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

265 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Effective flange width (cl 23.1.2 code):

bf

bf

Thus bf

lo/6+bw+6Df

6.05x1000/6+700+6x600

5308

bw+clear span of slab

600 +1475

2075

Df is taken as average thickness

mm

mm

2075 mm (least of the above two values)

Assuming the neutral axis is located at Xu = Df

MuR

0.362 X Fck X bf X Df (d - 0.416XDf)

20595781850

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange

Mu/bd

1.14

(Pt)reqd/100

Ast reqd.

25/(2X500)[1-sqrt(1-4.598X1.14X/25)]

0.0028

0.0028X2075X1858

10794.98

mm

Provide14no's of 32 dia bars in 3layers with a 32 mm separation on outerside of counterfort upto 2m height
Provide 6no's of 32 dia bars in 1layer on outerside of counterfort for Remaining height

DIRECT TENSION REINFORCEMENT DUE TO BASE PRESSURE


Applied pressure on raft projection =300 + 96
Direct tension below the counterfort at bottom =

396

say 400

kN/m2

400*(2.075*1.3)=

1079

kN

Ast

1079/(0.87*500) =

2480

Ast per face

2480/2

1240

mm2
mm2

provide 6nos-20 dia on each face

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

266 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Inner Reinforcement
Applying a load factor of 1.5,
M

Mu

852.05

1278.08

kN.m

kN

Dh=2m from Top of CFT


=

700

mm

Assuming a clear cover of 50 mm and 32 dia bars


d

700-50-12-32-16

590.00

mm

Assuming the neutral axis is located at Xu = Df


Df
MuR

=
=

700 mm
0.362 X Fck X b X Df (d - 0.416XDf)

1325028600

>

Mu

N.mm

This clearly indicates that the neutral axis lies with in the flange
R

(Pt)reqd/100

Ast reqd.

Mu/bd

5.25

25/(2X500)[1-sqrt(1-4.598X5.25/25)]

0.0203

0.0203x700x590

8383.90

mm

Provide 12 no's of 32 dia bars in 2 layers with a 32 mm separation

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

267 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

Design of Horizontal Ties

Horizontal tie reinforcement in the counterfort serves as shear reinforcement against flexural
shear in the counterfort and also as ties resisting the separation of the stem from the counterfort
due to lateral pressure

At base

Vu

2464.50
kN

Nominal shear stress Tv

Pt provided

Vu/bd

1.89

100XAst/bd

for Pt

0.87%

Tc

N/mm2

< Tc max

0.87 %

0.61

N/mm2

hence shear reinforcement is to be provided for a shear force of

Vus

(Tv - Tc)bd

1671134.00

Assuming 12 dia 6-legged stirrups


Asv
Required spacing

=
=

6X113.1

Sv

678.6

mm2
0.87X415X678.6X1858
1671134.0

272.41

provide 12dia 6-legged stirrups at 250c/c

7/1/08 7:13 PM

292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

268 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

12 DESIGN OF WALLS

Design of side wall W3

0
1
1.975
3.325
4.325
5.325
6
7.376
7.8
8.325
9.325
10.325
11.325
12.375
14
15
16
17.076

m
Mpa
Mpa
mm
m
40 mm
25 mm
Longitudinal Steel

MOMENT CHECK
Ph kN/m

DEPTH BELOW FGL

L
=
3.675
fck
=
25
fy
=
500
b
=
1000
width of c =
0.9
Clear cover on soil face =
Clear cover on inner face=

46.00
55.00
43.78
45.93
51.93
57.93
64.00
83.26
89.20
96.55
110.55
124.55
138.55
153.25
176.00
190.00
204.00
219.06

D mm

500
500
500
500
500
500
500
500
700
700
700
700
700
700
700
700
700
700

Effective Depth
(d) mm
Moment kN-m
outer
face
454
454
454
454
454
454
454
452
652
652
652
652
652
652
650
650
650
650

inner
face
469
469
469
469
469
469
469
467
667
667
667
667
667
667
665
665
665
665

Mu/bd

span

supp

69.03
82.53
65.69
68.92
77.92
86.92
96.04
125
133.9
144.9
165.9
186.9
207.9
230
264.1
285.1
306.1
328.7

0.424
0.507
0.403
0.423
0.478
0.533
0.589
0.773
0.406
0.44
0.503
0.567
0.631
0.698
0.806
0.87
0.935
1.004

0.12
0.142
0.11
0.118
0.134
0.150
0.166
0.221
0.111
0.12044
0.1384
0.15652
0.17477
0.19409
0.22576
0.24469
0.26378
0.2845

62.13
74.28
59.12
62.02
70.13
78.23
86.44
112.5
120.5
130.4
149.3
168.2
187.1
207
237.7
256.6
275.5
295.9

0.502
0.601
0.478
0.502
0.567
0.633
0.699
0.917
0.472
0.511
0.585
0.659
0.734
0.811
0.938
1.012
1.087
1.167

STEEL REQD.

Pt

Msup Mspan supp

Lateral Reinforcement

SHEAR CHECK

Ast (mm /M)

Vsupp
Vu/bd
at d

span Outer Inner


0.1
0.12
0.09
0.1
0.11
0.13
0.14
0.18
0.1
0.1
0.12
0.13
0.15
0.17
0.19
0.21
0.22
0.24

537
645.2
510.4
536.2
608.2
680.6
754.6
997.3
724.1
785.3
902.4
1020
1139
1265
1467
1591
1715
1849

466
560
443
465
528
590
654
862
635
688
791
894
997
1107
1282
1389
1496
1612

42.9
51.3
40.9
42.9
48.5
54.1
59.7
77.9
65.6
71.0
81.3
91.6
101.9
112.7
129.8
140.1
150.5
161.6

Pt

REBAR.REQD.

STEEL REQD

Outer
Inner
Inner
Outer
Rebar
Rebar
Ast
Ast(m
(mm2/
m2/M)
M)
dia spa dia spa

0.142 0.12 544.8


0.17 0.12 544.8
0.135 0.12 544.8
0.142 0.12 544.8
0.16 0.12 544.8
0.179 0.12 544.8
0.197 0.12 544.8
0.258 0.12 542.4
0.151 0.12 782.4
0.163 0.12 782.4
0.187 0.12 782.4
0.211 0.12 782.4
0.234 0.12 782.4
0.259 0.12 782.4
0.300 0.155 1008
0.323 0.19 1235
0.347 0.225 1463
0.373 0.265 1723

562.8
562.8
562.8
562.8
562.8
562.8
562.8
560.4
800.4
800.4
800.4
800.4
800.4
800.4
1031
1264
1496
1762

12
12
12
12
12
12
12
16
16
16
16
16
16
16
20
20
20
20

208
175
208
208
186
166
150
202
257
256
223
197
176
159
214
198
183
170

12
12
12
12
12
12
12
16
16
16
16
16
16
16
20
20
20
20

201
201
201
201
201
192
173
233
251
251
251
225
202
182
245
226
210
178

Rebar Reqd.

Outer
Outer Inner
Rebar
Ast
Ast
(mm2/ (mm2/
M) dia sp
M)
300
300
300
300
300
300
300
300
420
420
420
420
420
420
420
420
420
420

300
300
300
300
300
300
300
300
420
420
420
420
420
420
420
420
420
420

12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12

7/1/08 7:13 PM

377
377
377
377
377
377
377
377
269
269
269
269
269
269
269
269
269
269

Inner Rebar

dia

sp

12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12

377
377
377
377
377
377
377
377
269
269
269
269
269
269
269
269
269
269

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

269 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Design of side wall W4

0
1
1.975
3.325
4.325
5.325
6
7.376
7.8
8.325
9.325
10.325
11.026
12.375
14
15
16
17.076

m
Mpa
mm
m
40 mm
25 mm
Longitudinal Steel

10.00
19.00
27.78
39.93
48.93
57.93
64.00
83.26
89.20
96.55
110.55
124.55
134.36
153.25
176.00
190.00
204.00
219.06

D mm

500
500
500
500
500
500
500
500
700
700
700
700
700
700
700
700
700
700

Effective Depth
(d) mm

outer
face
454
454
454
454
454
454
454
452
652
652
652
652
652
652
652
652
652
652

inner
face
469
469
469
469
469
469
469
467
667
667
667
667
667
667
667
667
667
667

Haunch

MOMENT CHECK
Ph kN/m

DEPTH BELOW FGL

L
=
2.55
fy
=
500
b
=
1000
width of cf =
0.5
Clear cover on soil face =
Clear cover on inner face=

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Moment kN-m

Mu/bd

span

supp

7.23
13.73
20.07
28.85
35.35
41.85
46.24
60.16
64.45
69.76
79.87
89.99
97.08
110.7
127.2
137.3
147.4
158.3

0.044
0.084
0.123
0.177
0.217
0.257
0.284
0.372
0.196
0.212
0.242
0.273
0.295
0.336
0.386
0.417
0.447
0.48

0.01
0.023
0.03
0.049
0.060
0.071
0.079
0.104
0.053
0.05725
0.06565
0.0741
0.08003
0.09149
0.10537
0.11396
0.12257
0.13187

6.5
12.35
18.06
25.96
31.81
37.67
41.62
54.14
58
62.78
71.89
80.99
87.37
99.65
114.4
123.6
132.7
142.5

0.053
0.1
0.146
0.21
0.257
0.305
0.337
0.442
0.227
0.246
0.282
0.318
0.343
0.391
0.449
0.484
0.52
0.558

STEEL REQD.

Pt

Msup Mspan supp

Lateral Reinforcement

SHEAR CHECK

Ast (mm /M)

Vsupp
at d

Vu/bd

Pt

5.7
10.8
15.9
22.8
27.9
33.1
36.5
47.7
33.3
36.0
41.2
46.5
50.1
57.2
65.6
70.9
76.1
81.7

0.019
0.036
0.052
0.075
0.092
0.109
0.121
0.158
0.077
0.083
0.095
0.107
0.115
0.132
0.151
0.163
0.175
0.188

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12

span Outer Inner


0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.09
0.05
0.05
0.06
0.06
0.07
0.08
0.09
0.1
0.11
0.11

55.05
104.8
153.5
221.3
271.8
322.5
356.8
468.7
344.5
373.2
428.1
483.1
521.8
596.5
687
743
799.2
859.8

47.9
91.2
134
192
236
280
310
407
303
328
376
424
458
523
603
652
701
754

REBAR.REQD.

STEEL REQD

Outer
Inner
Inner
Outer
Rebar
Rebar
Ast
Ast(m
(mm2/
m2/M)
M)
dia spa dia spa
544.8
544.8
544.8
544.8
544.8
544.8
544.8
542.4
782.4
782.4
782.4
782.4
782.4
782.4
782.4
782.4
782.4
782.4

562.8
562.8
562.8
562.8
562.8
562.8
562.8
560.4
800.4
800.4
800.4
800.4
800.4
800.4
800.4
800.4
800.4
800.4

12
12
12
12
12
12
12
16
16
16
16
16
16
16
16
16
16
16

208
208
208
208
208
208
208
371
257
257
257
257
257
257
257
257
252
234

12
12
12
12
12
12
12
16
16
16
16
16
16
16
16
16
16
16

201
201
201
201
201
201
201
359
251
251
251
251
251
251
251
251
251
251

Rebar Reqd.

Outer
Outer Inner
Rebar
Ast
Ast
(mm2/ (mm2/
M)
M) dia sp
300
300
300
300
300
300
300
300
420
420
420
420
420
420
420
420
420
420

300
300
300
300
300
300
300
300
420
420
420
420
420
420
420
420
420
420

7/1/08 7:13 PM

12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12

377
377
377
377
377
377
377
377
269
269
269
269
269
269
269
269
269
269

Inner

dia
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
12

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

270 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Design of side wall W5

11.026
12.375
14
15
16
17.076

m
Mpa
Mpa
mm
m
40 mm
25 mm
Longitudinal Steel

274.36
293.25
316.00
330.00
344.00
359.06

D mm

700
700
700
700
700
700

Effective Depth
(d) mm

outer
face
650
650
650
650
650
650

inner
face
665
665
665
665
665
665

Haunch

MOMENT CHECK
Ph kN/m

DEPTH BELOW FGL

L
=
3
fck
=
25
fy
=
500
b
=
1000
width of cf =
0.85
Clear cover on soil face =
Clear cover on inner face=

0
0
0
0
0
0

Moment kN-m

Mu/bd

span

supp

274.4
293.3
316
330
344
359.1

0.838
0.895
0.965
1.007
1.05
1.096

0.23498
0.25206
0.27281
0.28567
0.29861
0.31262

246.9
263.9
284.4
297
309.6
323.2

0.974
1.041
1.122
1.172
1.221
1.275

STEEL REQD.

Pt

Msup Mspan supp

Lateral Reinforcement

SHEAR CHECK

Ast (mm /M)

Vsupp
at d

span Outer Inner


0.2
0.22
0.23
0.24
0.25
0.27

1527
1638
1773
1857
1941
2032

1334
1430
1547
1619
1692
1770

116.6
124.6
134.3
140.3
146.2
152.6

Vu/bd

Pt

REBAR.REQD.

STEEL REQD

Outer
Inner
Inner
Outer
Rebar
Rebar
Ast
Ast(m
(mm2/
m2/M)
M)
dia spa dia spa

0.269 0.18 1170


0.288 0.215 1398
0.310 0.255 1658
0.324 0.29 1885
0.337 0.32 2080
0.352 0.355 2308

1197
1430
1696
1929
2128
2361

20
20
20
20
20
20

206
192
177
167
151
136

20
20
20
20
20
20

235
220
185
163
148
133

Rebar Reqd.

Outer
Outer Inner
Rebar
Ast
Ast
(mm2/ (mm2/
M)
M) dia sp
420
420
420
420
420
420

420
420
420
420
420
420

7/1/08 7:13 PM

12
12
12
12
12
12

269
269
269
269
269
269

Inner

dia
12
12
12
12
12
12

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

271 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

13 CHECK FOR BUOYANCY IN BUILDING PORTION

Buoyancy Check for Under Ground Building


At Bottom of PCC = EL ( - ) 19.676 m. Lvl.
Data
FGL
Ground Water Table at

EL(-)0.5 M. lvl.

Lvl.

below FGL

Saturated density of soil

1.8

T/M

Density of RCC

2.5

T/M

Density of PCC

2.4

T/M

Density of Sand

1.6

T/M

Side Wall
2 Nos. (left and right hand side)
Thk. At Base

0.7

Thk. At top

0.5

Height

17.576

Base Raft
Projection of Base Raft beyond wall edge(LH)

2.23

Projection of Base Raft beyond wall edge(RH)

2.23

Width

Thickness of Raft

clear width + Thk. Of wall+projection


17.0

2.0

1.4

4.5

22.86 M

1) Buoyance force from Wagon Tippler complex in Hopper portion


Total Height Of ground water table @ base of Raft

13.176

Total intensity of ground water at base of Raft

13.176 T/Sq. Mt

Buoyancy Force

=
=

13.176

x
22.86
4654 MT

M
= 4654

15.45

7/1/08 7:13 PM

MT

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

272 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Downward Stabilizing Load (Only 90 % DL of structure is considered)


Structural Components
WAGON TIPPLER COMPLEX IN BUILDING PORTION

Size in M

Nos.

Density

90%

Weight in MT

Side Wall W3

0.60

x 17.58

10.70

2.00

2.50

0.90

= 507.77

MT

Side Wall W4

0.60

x 17.58

5.10

2.00

2.50

0.90

= 242.02

MT

Side Wall W4

0.60

x 11.00

7.00

1.00

2.50

0.90

= 103.95

MT

Side Wall W5

0.50

6.00

22.86

1.00

2.50

0.90

= 154.31

MT

Base Raft

22.86 x

2.00

15.45

1.00

2.50

0.90

= 1589.34

MT

Counterforts CF3

2.15

2.33

17.58

2.00

2.50

0.90

= 395.29

MT

Counterforts CF4 & CF5

0.90

1.57

17.58

4.00

2.50

0.90

= 222.80

MT

Counterforts CF9

0.50

2.05

4.40

2.00

2.50

0.90

= 20.30

MT

1.05

11.58

4.00

2.50

0.90

= 54.70

MT

1.35

17.58

2.00

2.50

0.90

= 53.39

MT
MT

Counterforts CF9a & CF10

0.50

10

Counterforts CF8

0.50

11

Counterforts CF11 CF12 CF13

0.60

0.75

6.00

6.00

2.50

0.90

= 36.45

12

Vertical Column at centre

0.90

0.90

17.58

4.00

2.50

0.90

= 128.13

MT

13

Hopper Closure Beam RB2

0.50

2.70

17.00

1.00

2.50

0.90

= 51.64

MT

14

Cross Beam Between Columns RB3

0.50

3.15

15.30

1.00

2.50

0.90

= 54.22

MT

15

Roof Beam Suppt. steel columnRB4

0.85

1.00

15.30

1.00

2.50

0.90

= 29.26

MT

16

Tunnel Supporting Beam

2.00

1.50

7.00

1.00

2.50

0.90

= 47.25

MT

17

Floor slab at @ 0.00 m lvl incl Beams

17.00 x

0.30

7.43

1.00

2.50

0.90

= 85.20

MT

18

Floor Finish @ 0.00 m lvl

17.00 x

0.05

7.43

1.00

2.40

0.90

= 13.63

MT

19

Floor slab at @ 11.076 m lvl inc beams 17.00 x

0.30

10.70

1.00

2.50

0.90

= 122.78

MT

20

Floor Finish @ 11.076 m lvl

17.00 x

0.05

10.70

1.00

2.40

0.90

= 19.65

MT

23

PCC below Raft

23.06 x

0.10

14.90

1.00

2.40

0.90

= 74.22

MT

24

Wt of Downward water on Raft Projectio 2.23

x 11.18

52.26

1.00

1.00

1.00

= 1302.45

MT

25

Wt of Downward water on Raft Projectio 1.30

4.00

22.86

1.00

1.00

1.00

= 118.87

MT

26

Bracket for suppt. Steel column

0.85

2.03

5.00

4.00

2.50

0.90

= 77.46

MT

27

staicase

= 30.00

MT

28
29

Rail Track Supporting beams


Base Raft in Tunnel portion

0.50
7.00

x
x

0.60
0.60

x
x

7.00
2.50

x
x

2.00
1.00

x
x

2.50
2.50

x
x

0.90
0.90

= 9.45
= 23.63

MT
MT

30

Cantilever slab in Tunnel Portion

7.80

0.50

0.50

1.00

2.50

0.90

= 4.39

MT

31

Drive Base Beams @ 1.975m lvl

1.60

0.80

1.40

2.00

2.50

0.90

= 8.06

MT

32

Bearing Pedestals @ 0.00 m lvl

1.30

1.83

0.73

2.00

2.50

0.90

= 7.74

MT

= 5588.33

MT

Downward Force Due to Wagon Tipplex Complex in Building Portion


Factor of Safety for WG Complex

5588.33 /
1.201

7/1/08 7:13 PM

4654
SAFE

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

273 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Buoyancy Check for Under Ground Wagon Tippler Complex in Hopper portion
At Bottom of PCC = EL ( - ) 13.676 m. Lvl.
Data
FGL
Ground Water Table at

Saturated density of soil

1.8

m
3
T/M

Density of RCC

2.5

T/M

Density of PCC

2.4

T/M

Density of Sand

1.6

T/M

EL(-)0.500 M. lvl.

Lvl.

below FGL

Side Wall
2 Nos. (left and right hand side)
Thk. At Base

0.7

Thk. At top

0.5

M
M

Height

10.400

Projection of Base Raft beyond wall edge(LH)

2.23

Projection of Base Raft beyond wall edge(RH)

2.23

Width

Thickness of Raft

Base Raft

clear width + Thk. Of wall+projection


17.0

0.7

1.4

4.5

22.86

Other Data:
Width
in M

Depth

Length/Height

in M

in M

Nos.

Side counterfort (LH) CF

0.50

2.23

10.40

Cross beam forHOPPER at top(HB1)

0.50

0.80

5.48

Vertical Rib beam for Hopper(HB2)

0.50

0.80

6.5

cross beam (HB3)

0.50

2.70

2.618

Cross Beam between Hoppers (HB4)

0.50

0.80

3.5

Long beam for for Hopper (HB5)

0.50

0.80

3.5

Long beam for for Hopper at TOP(HB6)

0.80

0.80

3.5

2
1

Vertical Column at centre

0.50

1.40

11.5

Hopper vertical Wall

3.00

0.35

5.06

Hopper Inclined Wall

3.00

0.35

2.914

Bottom Cross Beam RB1

0.50

0.80

17

Bottom Longitudinal Beams RB2

0.60

0.70

Depth

Length/Height

Nos.

in M

in M

Width
in M
Dead Weight super Structure

100.0

Kg/Sq.mt

Pit slab at @ -1.975 m lvl

4.48

0.15

3.5

Pit Wall

0.3

1.83

3.5

Sand Fill from Top of Raft

17

1.03

PCC below Grade slab

17

0.08

3.5

Floor Finish

17.00

0.05

3.50

gradeSlab at raft Lvl

17.00

0.15

3.50

0.1

3.5

PCC below Raft

23.06

1) Buoyance force from Wagon Tippler complex in Hopper portion


Total Height Of ground water table @ base of Raft

7.176

Total intensity of ground water at base of Raft

7.176

Buoyancy Force

=
=

7.176

x
22.86
574.2 MT

M
T/Sq. Mt

3.50

= 574

7/1/08 7:13 PM

MT

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

274 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

Downward Stabilizing Load (Only 90 % DL of structure is considered)


Structural Components
WAGON TIPPLER COMPLEX IN BUILDING PORTION

Size in M

Nos.

Density

90%

Weight in MT

Side Wall W3

0.60

x 17.58

10.70

2.00

2.50

0.90

= 507.77

MT

Side Wall W4

0.60

x 17.58

5.10

2.00

2.50

0.90

= 242.02

MT

Side Wall W4

0.60

x 11.00

7.00

1.00

2.50

0.90

= 103.95

MT

Side Wall W5

0.50

6.00

22.86

1.00

2.50

0.90

= 154.31

MT

Base Raft

22.86

2.00

15.45

1.00

2.50

0.90

= 1589.34

MT

Counterforts CF3

2.15

2.33

17.58

2.00

2.50

0.90

= 395.29

MT

Counterforts CF4 & CF5

1.05

2.23

17.58

4.00

2.50

0.90

= 370.39

MT

Counterforts CF9

0.50

2.05

4.40

2.00

2.50

0.90

= 20.30

MT

Counterforts CF9a & CF10

0.50

1.05

11.58

4.00

2.50

0.90

= 54.70

MT

Counterforts CF8

0.50

1.35

17.58

2.00

2.50

0.90

= 53.39

MT

11

Counterforts CF11 CF12 CF13

0.60

0.75

6.00

6.00

2.50

0.90

= 36.45

MT

12

Vertical Column at centre

0.90

0.90

17.58

4.00

2.50

0.90

= 128.13

MT

13

Hopper Closure Beam RB2

0.50

2.70

17.00

1.00

2.50

0.90

= 51.64

MT

14

Cross Beam Between Columns RB3

0.50

3.15

15.30

1.00

2.50

0.90

= 54.22

MT

15

Roof Beam Suppt. steel columnRB4

0.85

1.00

15.30

1.00

2.50

0.90

= 29.26

MT

16

Tunnel Supporting Beam

2.00

1.50

7.00

1.00

2.50

0.90

= 47.25

MT

17

Floor slab at @ 0.00 m lvl incl Beams

17.00

0.30

7.43

1.00

2.50

0.90

= 85.20

MT

18

Floor Finish @ 0.00 m lvl

17.00

0.05

7.43

1.00

2.40

0.90

= 13.63

MT

19

Floor slab at @ 11.076 m lvl inc beams

17.00

0.30

10.70

1.00

2.50

0.90

= 122.78

MT

20

Floor Finish @ 11.076 m lvl

17.00

0.05

10.70

1.00

2.40

0.90

= 19.65

MT

23

PCC below Raft

23.06

0.10

14.90

1.00

2.40

0.90

= 74.22

MT

24

Wt of Downward water on Raft Projectio 2.23

x 11.18

52.26

1.00

1.00

1.00

= 1302.45

MT

25

Wt of Downward water on Raft Projectio 1.30

4.00

22.86

1.00

1.00

1.00

= 118.87

MT

26

Bracket for suppt. Steel column

0.85

2.03

5.00

4.00

2.50

0.90

= 77.46

MT

= 30.00

MT

0.50
7.00

x
x

0.60
0.60

x
x

7.00
2.50

x
x

2.00
1.00

x
x

2.50
2.50

x
x

0.90
0.90

= 9.45
= 23.63

MT
MT

10

27

staicase

28
29

Rail Track Supporting beams


Base Raft in Tunnel portion

30

Cantilever slab in Tunnel Portion

7.80

0.50

0.50

1.00

2.50

0.90

= 4.39

MT

31

Drive Base Beams @ 1.975m lvl

1.60

0.80

1.40

2.00

2.50

0.90

= 8.06

MT

32

Bearing Pedestals @ 0.00 m lvl

1.30

1.83

0.73

2.00

2.50

0.90

= 7.74

MT

= 5735.91

MT

Downward Force Due to Wagon Tipplex Complex in Building Portion


Factor of Safety for WG Complex

5735.91 /
1.233

7/1/08 7:13 PM

4654
SAFE

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1X500MW Expansion Project

Page

Title

WAGON TIPPLER Design of Foundation

275 of

Doc. No.

GID-091-CV-CAL-3481C

Rev

292

14 CHECK FOR CRACKWIDTH IN RAFT


CHECK FOR CRACK WIDTH : as per IS 456 : 2000 ANNEX F
25 N/mm2

fck

432 tm

DEPTH OF THE SECTION

2000 mm

Spacing of rebar

150 mm

EFFECTIVE DEPTH

1934 mm

CLEARCOVER TO THE TENSION STEEL

Cmin

50 mm

DISTANCE FROM THE POINT CONSIDERED TO THE


SURFACE OF THE NEAREST LONGITUDINAL BAR

acr

90.1 mm

THE WIDTH OF THE SECTION AT THE CENTROID OF


THE TENSION STEEL

bt

1000 mm

MODULAR RATIO

10.98

GRADE OF CONCRETE
MOMENT AT THE SECTION CONSIDERED

AREA OF TENSION STEEL

5361.65 mm2

AREA OF COMPRESSION STEEL

5361.65 mm2

NEUTRAL AXIS

421.94 mm

CRACKED MOMENT OF INERTIA

Icr

1.60E+11 mm4

SERVICE STRESS IN TENSION REINFORCEMENT

fs

= M /(As * ( d-x))

MODULUS OF ELASTICITY OF STEEL

Es

DISTANCE FROM THE COMPRESSION FACE TO THE


POINT AT WHICH THE CRACK WIDTH IS BEING
CALCULATED

a'

STRAIN AT THE LEVEL CONSIDERED,

224.64 N/mm2
2.00E+05 N/mm2
2000 mm

= ((D-x)/(d-x)) x fs/Es

1-

0.001172

(bt(d-x)(a'-x) )

0.000660

3EsAst(D-x)
DESIGN SURFACE CRACK WIDTH

W cr

3 x acr x

0.170 mm

1 + 2(acr-Cmin)/(D-x)
PERMISSIBLE CRACK WIDTH

0.2 mm

7/1/08 7:13 PM

Page 276 of 292

BGR Energy Systems Ltd.


Project KHAPARKHEDA TPS 1x500MW Expansion Project
WAGON TIPPLER - Design of Foundation

Title

Page

Doc. No GID-091-CV-CAL-3481C

Rev

15 DESIGN OF COLUMNS( CALCULATION OF DESIGN RESPONSES):


B
D
H

Width of the column


Depth of the column
Max. Horizontal Load at the top of the column in kN

Z
CF3 Bottom columns UPTO 2.75 M :
Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

117
105
116
117
104
110
110
104
116
117
116
117

Load Combination

24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSUR)+ A.F


22 DL + LL + HOP.FULL + TRKCASE-2 + E.P(W.OSUR)+ A.F
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSUR)+ A.F
27 DL + LL + HOP.FULL + E.P(WTHSUR)
21 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR)+ A.F
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSUR)+ A.F
24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSUR)+ A.F
27 DL + LL + HOP.FULL + E.P(WTHSUR)
22 DL + LL + HOP.FULL + TRKCASE-2 + E.P(W.OSUR)+ A.F
24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSUR)+ A.F
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSUR)+ A.F
27 DL + LL + HOP.FULL + E.P(WTHSUR)

Node

103
93
102
103
97
98
98
97
102
103
102
103

Fx kN

8007.747
4742.405
5380.08
5640.481
7542.19
6075.064
7842.55
5510.831
5347.542
8007.747
5380.08
5640.481

Fy kN

Fz kN

Mx kNm

My kNm

Mz kNm

-5457.08 153.249 3139.644 -6301.5 -9536.69


2646.231 -929.25 -200.749 9396.032 4057.98
6135.873 -929.973 -718.958 11932.36 16907.89
-5722.6 155.041 2940.79 -4081.41
-11441
3614.316 157.813 -2407.74 -6002.76 6722.606
-4036.7 -945.019 1662.765 10743.52 -430.642
-4679.55 153.249 3139.644 -6186.41 -5732.79
4952.774 154.848 -2939.71 -3990.62 7542.696
4529.534 -929.25 -200.749 11952.4 13852.63
-5457.08 153.249 3139.644 -6301.5 -9536.69
6135.873 -929.973 -718.958 11932.36 16907.89
-5722.6 155.041 2940.79 -4081.41
-11441

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145

12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40

12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ex
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30

ey
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47

May kNm Maz kNm


771.1
456.7
518.1
543.2
726.3
585.0
755.2
530.7
515.0
771.1
518.1
543.2

980.7
580.8
658.9
690.8
923.7
744.0
960.5
674.9
654.9
980.7
658.9
690.8

Additional Moments Due To Slenderness

eax

eay

100
100
100
100
100
100
100
100
100
100
100
100

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

800.8
474.2
538.0
564.0
754.2
607.5
784.3
551.1
534.8
800.8
538.0
564.0

Maz
kNm

H kN

800.8
474.2
538.0
564.0
754.2
607.5
784.3
551.1
534.8
800.8
538.0
564.0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
about
about
1.5*H*e Cl. 41.3.1
Major
Minor Axis
(kN-m) of IS: 456
Axis kNm
kNm

1.5*H*e
(kN-m)

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

3139.64
200.749
718.958
2940.79
2407.741
1662.765
3139.644
2939.712
200.749
3139.644
718.958
2940.79

7171.557
2755.855
6528.478
7328.492
4929.123
4944.69
6394.032
6558.077
4639.158
7171.557
6528.478
7328.492

7102.27
9870.27
12470.37
4645.46
6756.98
11351.02
6970.66
4541.70
12487.15
7102.27
12470.37
4645.46

10337.47
4532.22
17445.90
12005.06
7476.83
1351.51
6517.04
8093.78
14387.38
10337.47
17445.90
12005.06

CF3 FROM 2.75 M TO 15.1 :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

112
56
106
112
65
73
73
65
106
112
80
73

Load Combination

24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSU


22 DL + LL + HOP.FULL + TRKCASE-2 + E.P(W.OSUR
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU
27 DL + LL + HOP.FULL + E.P(WTHSUR)
21 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU
24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSU
27 DL + LL + HOP.FULL + E.P(WTHSUR)
22 DL + LL + HOP.FULL + TRKCASE-2 + E.P(W.OSUR
24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSU
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU

Node

94
5
93
94
54
62
62
54
93
94
69
48

Fx kN

Fy kN

Fz kN

Mx kNm

My kNm

Mz kNm

7402.61
60.48
4774.942
5035.345
4902.554
3435.427
5202.913
2871.194
4742.405
7402.61
4975.216
3215.457

-2794.25
540
3473.048
-3059.78
-1788.29
3237.861
2595.005
-2330.28
2646.231
-2794.25
168.681
3462.771

153.249
-300
-929.973
155.041
157.813
-945.019
153.249
154.848
-929.25
153.249
-945.019
-945.019

3139.644
574.15
-718.958
2940.79
-2407.74
1662.765
3139.644
-2939.71
-200.749
3139.644
1662.765
1662.765

-5879.91
-49.745
9374.005
-3654.9
-4109
-596.711
-4347.42
-2132.44
9396.032
-5879.91
6018.421
-1541.73

1696.246
0
3807.582
522.383
2045.541
-5224.54
-2812.41
1360.636
4057.98
1696.246
8533.481
-8578.08

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145

12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40

12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ex
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30
96.30

ey
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47
122.47

May kNm Maz kNm


712.9
5.8
459.8
484.9
472.1
330.8
501.0
276.5
456.7
712.9
479.1
309.6

906.6
7.4
584.8
616.7
600.4
420.7
637.2
351.6
580.8
906.6
609.3
393.8

Additional Moments Due To Slenderness


eax
100
100
100
100
100
100
100
100
100
100
100
100

eay

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

740.3
6.0
477.5
503.5
490.3
343.5
520.3
287.1
474.2
740.3
497.5
321.5

Maz
kNm
740.3
6.0
477.5
503.5
490.3
343.5
520.3
287.1
474.2
740.3
497.5
321.5

1.5*H*e
(kN-m)

H kN

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
3139.64 4508.731
6620.17
2436.51
574.15
853.529
55.79
13.45
718.958 3865.653
9851.50
4285.08
2940.79 4665.667
4158.43
1120.23
2407.741 3103.092
4599.26
2535.80
1662.765 4145.856
940.25
5568.08
3139.644 4309.486
4867.71
3332.70
2939.712 3935.585
2419.56
1647.76
200.749 2755.855
9870.27
4532.22
3139.644 4508.731
6620.17
2436.51
1662.765 1853.014
6515.94
9031.00
1662.765 4370.766
1863.28
8899.63

Page 277 of 292

BGR Energy Systems Ltd.


Project KHAPARKHEDA TPS 1x500MW Expansion Project
WAGON TIPPLER - Design of Foundation

Title

Page

Doc. No GID-091-CV-CAL-3481C

Rev

15 DESIGN OF COLUMNS( CALCULATION OF DESIGN RESPONSES):


B
D
H

Width of the column


Depth of the column
Max. Horizontal Load at the top of the column in kN

C3 column :
Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

115
62
3
102
3
91
62
3
102
115
115
102

Load Combination

21 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR


21 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU
27 DL + LL + HOP.FULL + E.P(WTHSUR)
27 DL + LL + HOP.FULL + E.P(WTHSUR)
27 DL + LL + HOP.FULL + E.P(WTHSUR)
21 DL + LL + HOP.FULL + TRKCASE-1 + E.P(W.OSUR
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU
24 DL + LL + HOP.FULL + TRKCASE-1 + E.P(WTHSU
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU
25 DL + LL + HOP.FULL + TRKCASE-2 + E.P(WTHSU

Node

101
6
3
81
3
80
53
3
80
101
101
80

Fx kN

4586.876
249
2438.375
1841.894
3543.23
849.925
296.04
2438.375
665.675
4519.268
3066.599
665.675

Fy kN

20.817
66
90.581
-2.011
1.722
0.869
66
90.581
88.931
21.173
89.947
88.931

Fz kN

17.121
0
3.911
19.031
19.031
-32.435
0
3.911
3.911
18.581
3.911
3.911

Mx kNm

My kNm

Mz kNm

-2.561 -223.872 148.138


3.3
-12.45
0
-9.199
94.415
111.6
0.458 131.114
-9.611
0.243
-87.4
2.046
0.142
59.984
2.433
3.3
-12.45
92.4
-9.199
94.415
111.6
-8.867 201.785 -699.899
-2.575 -235.667 150.612
-9.175
50.177 628.794
-8.867 201.785 -699.899

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
1600
1600
1600
1600
1600
1600
1600
1600
1600
1600
1600
1600

600
600
600
600
600
600
600
600
600
600
600
600

11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23

6.48
6.48
6.48
6.48
6.48
6.48
6.48
6.48
6.48
6.48
6.48
6.48

11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23
11.23

ex

ey

42.46
42.46
42.46
42.46
42.46
42.46
42.46
42.46
42.46
42.46
42.46
42.46

75.79
75.79
75.79
75.79
75.79
75.79
75.79
75.79
75.79
75.79
75.79
75.79

May kNm Maz kNm


194.8
10.6
103.5
78.2
150.4
36.1
12.6
103.5
28.3
191.9
130.2
28.3

347.7
18.9
184.8
139.6
268.6
64.4
22.4
184.8
50.5
342.5
232.4
50.5

Additional Moments Due To Slenderness


eax
105
105
105
105
105
105
105
105
105
105
105
105

eay

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

482.1
26.2
256.3
193.6
372.4
89.3
31.1
256.3
70.0
474.9
322.3
70.0

Maz
kNm
458.7
24.9
243.8
184.2
354.3
85.0
29.6
243.8
66.6
451.9
306.7
66.6

H kN

118
118
118
118
118
118
118
118
118
118
118
118

1.5*H*e
(kN-m)

13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4

Design
Design
Tu = Mx + Ve (kN), Moments Moments
about
about
1.5*H*e Cl. 41.3.1
Major
Minor Axis
(kN-m) of IS: 456
Axis kNm
kNm
15.96
16.7
22.599
13.858
13.643
13.542
16.7
22.599
22.267
15.975
22.575
22.267

36.778
82.7
113.18
32.889
32.674
45.977
82.7
113.18
111.198
37.148
112.522
111.198

705.93
38.62
359.76
324.69
522.77
149.31
43.71
359.76
271.74
710.62
452.48
271.74

806.39
43.80
428.64
323.79
622.92
149.39
122.00
428.64
766.47
794.43
935.45
766.47

Page 278 of 292

BGR Energy Systems Ltd.


Project KHAPARKHEDA TPS 1x500MW Expansion Project
WAGON TIPPLER - Design of Foundation

Title

Page

Doc. No GID-091-CV-CAL-3481C

Rev

15 DESIGN OF COLUMNS( CALCULATION OF DESIGN RESPONSES):


B
D
H

Width of the column


Depth of the column
Max. Horizontal Load at the top of the column in kN

CF4 Bottom columns UPTO 5.75 M :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

130
108
129
130
110
106
104
110
129
114
129
130

Load Combination

26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD


20 DL + LL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
27 DL + LL + TRKCASE-4 + E.P(WTHSUR)+ A.FLOAD
20 DL + LL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
24 DL + LL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
27 DL + LL + TRKCASE-4 + E.P(WTHSUR)+ A.FLOAD

Node

112
61
111
112
98
93
97
98
111
69
111
112

Fx kN

Fy kN

Fz kN

6211.351
2726.331
5102.243
4343.143
3341.658
4382.515
4915.092
6024.227
4721.054
2821.063
5102.243
4343.143

-4818.88
-506.954
5507.428
-5274.69
-3161.26
1957.85
3401.878
-2713.28
5197.907
804.891
5507.428
-5274.69

-431.622
-2.5
-432.087
-120.214
-2.5
-433.296
-421.609
-421.144
-433.296
-12.978
-432.087
-120.214

Mx kNm

My kNm

Mz kNm

-585.871
-107.694
586.03
162.152
107.694
583.108
606.687
-606.529
583.108
128.351
586.03
162.152

5730.604
-765.241
5733.917
1934.321
-752.742
4544.402
5387.203
5384.24
5736.4
-795.415
5733.917
1934.321

-5088.1
-2345.93
10862.2
-8570.6
-3745.87
-1514.03
5897.512
-640.26
8187.77
3011.532
10862.2
-8570.6

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ex
51.50
51.50
51.50
51.50
51.50
51.50
51.50
51.50
51.50
51.50
51.50
51.50

ey
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17

May kNm Maz kNm


319.9
140.4
262.8
223.7
172.1
225.7
253.1
310.2
243.1
145.3
262.8
223.7

678.1
297.6
557.0
474.1
364.8
478.4
536.6
657.6
515.4
308.0
557.0
474.1

Additional Moments Due To Slenderness


eax

eay

100
100
100
100
100
100
100
100
100
100
100
100

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

621.1
272.6
510.2
434.3
334.2
438.3
491.5
602.4
472.1
282.1
510.2
434.3

Maz
kNm

1.5*H*e
(kN-m)

H kN

621.1
272.6
510.2
434.3
334.2
438.3
491.5
602.4
472.1
282.1
510.2
434.3

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

585.87
107.694
586.03
162.152
107.694
583.108
606.687
606.529
583.108
128.351
586.03
162.152

5138.807
565.763
5827.444
5363.234
3220.068
2276.271
3733.175
3044.49
5516.328
874.98
5827.444
5363.234

6351.74
1037.87
6244.14
2368.64
1086.91
4982.65
5878.71
5986.66
6208.51
1077.52
6244.14
2368.64

5709.23
2618.56
11372.42
9004.91
4080.03
1952.28
6389.02
1260.02
8659.88
3293.64
11372.42
9004.91

CF4 MIDDLE & TOP COLUMN :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

80
116
118
116
66
66
66
74
72
116
116
118

Load Combination

26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD


20 DL + LL + TRKCASE-1 + E.P(W.OSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
24 DL + LL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD

Node

69
102
104
102
55
55
55
63
61
102
102
104

Fx kN

Fy kN

Fz kN

5534.766 -1339.11 -400.35


1132.942 -2088.48
17.52
3651.236 3429.581 -387.159
2373.899 -2949.43 -386.803
2236.676 -1494.69
35.659
3684.896 -1182.15 -405.415
3684.896 -1182.15 -405.415
4657.511 1859.237 -405.189
4423.257 1496.66 -405.415
2760.152 -2064.34 -389.234
2373.899 -2949.43 -386.803
3651.236 3429.581 -387.159

Mx kNm

My kNm

Mz kNm

-659.23
-22.631
-674.963
673.845
-117.414
680.222
680.222
-680.826
680.222
674.878
673.845
-674.963

3245.976
-458.035
-1362.21
-1360.83
-554.794
841.226
841.226
842.466
3273.718
-1375.45
-1360.83
-1362.21

3776.741
7478.438
-14972.9
11012
-2555.71
-996.205
-996.205
-826.238
-992.714
8254.078
11012
-14972.9

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ex
54.00
54.00
54.00
54.00
54.00
54.00
54.00
54.00
54.00
54.00
54.00
54.00

ey
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67

May kNm Maz kNm


298.9
61.2
197.2
128.2
120.8
199.0
199.0
251.5
238.9
149.0
128.2
197.2

618.0
126.5
407.7
265.1
249.8
411.5
411.5
520.1
493.9
308.2
265.1
407.7

Additional Moments Due To Slenderness


eax
100
100
100
100
100
100
100
100
100
100
100
100

eay

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

553.5
113.3
365.1
237.4
223.7
368.5
368.5
465.8
442.3
276.0
237.4
365.1

Maz
kNm
553.5
113.3
365.1
237.4
223.7
368.5
368.5
465.8
442.3
276.0
237.4
365.1

1.5*H*e
(kN-m)

H kN

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
659.23 1699.094
3799.45
4330.22
22.631 2100.842
571.33
7591.73
674.963 3798.161
1727.33 15338.05
673.845 3317.397
1598.22 11249.39
117.414 1558.807
778.46
2779.38
680.222 1553.601
1209.72
1364.69
680.222 1553.601
1209.72
1364.69
680.826 2231.019
1308.22
1291.99
680.222 1868.112
3716.04
1435.04
674.878 2432.872
1651.46
8530.09
673.845 3317.397
1598.22 11249.39
674.963 3798.161
1727.33 15338.05

Page 279 of 292

BGR Energy Systems Ltd.


Project KHAPARKHEDA TPS 1x500MW Expansion Project
WAGON TIPPLER - Design of Foundation

Title

Page

Doc. No GID-091-CV-CAL-3481C

Rev

15 DESIGN OF COLUMNS( CALCULATION OF DESIGN RESPONSES):


B
D
H

Width of the column


Depth of the column
Max. Horizontal Load at the top of the column in kN

C4 Bottom columns UPTO 5.75 M :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

119
119
120
119
119
120
120
119
120
120
119
120

Load Combination

22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD


24 DL + LL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
28 DL + LL + E.P(WTHSUR) + WAGON AXEL LOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
27 DL + LL + TRKCASE-4 + E.P(WTHSUR)+ A.FLOAD
27 DL + LL + TRKCASE-4 + E.P(WTHSUR)+ A.FLOAD
22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD
24 DL + LL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD

Node

106
109
108
106
106
108
108
106
108
108
109
110

Fx kN

Fy kN

4044.267
1842.02
3501.251
2981.139
2077.269
3595.964
2119.05
2119.05
3595.964
2033.411
2789.748
3309.861

-116.104
-159.949
197.287
-161.902
-160
187.557
159.772
-159.772
187.557
159.949
-161.902
197.287

Fz kN

Mx kNm

My kNm

Mz kNm

-78.187
12.978
-68.582
-66.704
20.837
-79.06
0.214
0.214
-79.06
12.978
-66.704
-68.582

-24.786 885.801 -139.169


-97.995 -115.006 812.886
51.725 846.692 414.118
-55.402 840.384 -276.12
-97.674 -134.693 -266.869
24.83 887.256 411.743
101.766 147.165 265.995
-101.766 147.165 -265.995
24.83 887.256 411.743
97.995 -202.62 266.929
-55.402 390.066 816.881
51.725 383.697 -917.766

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00

ex

ey

41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50

41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50

May kNm Maz kNm


167.8
76.4
145.3
123.7
86.2
149.2
87.9
87.9
149.2
84.4
115.8
137.4

167.8
76.4
145.3
123.7
86.2
149.2
87.9
87.9
149.2
84.4
115.8
137.4

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
24.79
160.168
1326.18
572.23
97.995
334.162
315.58
997.09
51.725
289.243
1227.94
764.24
55.402
260.394
1165.00
574.23
97.674
333.643
360.88
474.60
24.83
231.699
1278.82
771.34
101.766
340.689
377.91
477.90
101.766
340.689
377.91
477.90
24.83
231.699
1278.82
771.34
97.995
334.162
424.04
470.27
55.402
260.394
693.84
1095.86
51.725
289.243
744.10
1248.75

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
95.88
283.282
892.91
888.51
38.544
168.08
202.25
367.83
112.685
406.919
868.86
1241.16
115.003
361.872
807.25
1005.03
41.428
172.141
38.62
114.91
33.574
172.884
184.81
222.05
115.003
361.872
807.25
1005.03
115.003
361.872
807.25
1005.03
115.003
361.872
807.25
1005.03
33.574
172.884
626.73
480.50
112.685
406.919
868.86
1241.16
115.003
361.872
807.25
1005.03

Additional Moments Due To Slenderness


eax

eay

109
109
109
109
109
109
109
109
109
109
109
109

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

440.4
200.6
381.2
324.6
226.2
391.6
230.7
230.7
391.6
221.4
303.8
360.4

Maz
kNm

1.5*H*e
(kN-m)

H kN

404.4
184.2
350.1
298.1
207.7
359.6
211.9
211.9
359.6
203.3
279.0
331.0

0
0
0
0
0
0
0
0
0
0
0
0

C4 MIDDLE & TOP COLUMN :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

121
137
123
121
135
135
121
123
123
135
123
121

Load Combination

22 DL + LL + TRKCASE-3 + E.P(W.OSUR)+ A.FLOAD


24 DL + LL + TRKCASE-1 + E.P(WTHSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
28 DL + LL + E.P(WTHSUR) + WAGON AXEL LOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD
26 DL + LL + TRKCASE-3 + E.P(WTHSUR)+ A.FLOAD
25 DL + LL + TRKCASE-2 + E.P(WTHSUR)+ A.FLOAD

Node

109
107
110
109
117
117
109
110
110
105
110
109

Fx kN

Fy kN

Fz kN

2419.036
71.088
1910.69
1326.88
239.045
1208.642
1326.88
1326.879
1326.879
1079.649
1910.69
1326.88

-112.823
99.557
206.59
-157.422
-98.491
-104.114
-157.422
157.422
157.422
-104.114
206.59
-157.422

-94.417
-19.705
-99.817
-100.203
-9.611
-113.197
-100.203
-100.203
-100.203
-113.197
-99.817
-100.203

Mx kNm

My kNm

Mz kNm

95.883 629.499 -646.602


-38.544 -194.512 -360.72
-112.685 660.808 1050.088
115.003 662.767 -872.341
41.428 -12.589 -91.005
33.574
5.874 -101.188
115.003 662.767 -872.341
-115.003 662.767 872.341
-115.003 662.767 872.341
33.574 -509.172 372.531
-112.685 660.808 1050.088
115.003 662.767 -872.341

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00

ex

ey

44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00

44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00

May kNm Maz kNm


106.4
3.1
84.1
58.4
10.5
53.2
58.4
58.4
58.4
47.5
84.1
58.4

106.4
3.1
84.1
58.4
10.5
53.2
58.4
58.4
58.4
47.5
84.1
58.4

Additional Moments Due To Slenderness


eax
109
109
109
109
109
109
109
109
109
109
109
109

eay

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

263.4
7.7
208.1
144.5
26.0
131.6
144.5
144.5
144.5
117.6
208.1
144.5

Maz
kNm
241.9
7.1
191.1
132.7
23.9
120.9
132.7
132.7
132.7
108.0
191.1
132.7

1.5*H*e
(kN-m)

H kN

0
0
0
0
0
0
0
0
0
0
0
0

Page 280 of 292

BGR Energy Systems Ltd.


Project KHAPARKHEDA TPS 1x500MW Expansion Project
WAGON TIPPLER - Design of Foundation

Title

Page

Doc. No GID-091-CV-CAL-3481C

Rev

15 DESIGN OF COLUMNS( CALCULATION OF DESIGN RESPONSES):


B
D
H

Width of the column


Depth of the column
Max. Horizontal Load at the top of the column in kN

CF5 Bottom columns UPTO 5.75 M :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

130
108
129
130
110
106
110
104
129
114
129
130

Load Combination

18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F


17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
19 DL + LL + E.P(WTHSUR)

Node

112
61
111
112
98
93
98
97
111
69
111
112

Fx kN

Fy kN

5582.799
4010.981
5069.471
5582.799
5362.385
4608.362
5456.92
4943.592
5069.471
4618.845
5069.471
5377.798

-4937.74
-755.136
5222.783
-4937.74
-2815.85
1818.57
-3944.47
4229.51
5222.783
1443.599
5222.783
-4487.66

Fz kN

-41.006
-29.345
-41.214
-41.006
-29.137
-41.214
-41.006
-41.214
-41.214
-41.006
-41.214
-36.095

Mx kNm

My kNm

Mz kNm

81.454
80.231 -6568.29
-62.695 -121.516 -974.306
-81.548
81.645 8890.855
81.454
80.231 -6568.29
62.601
23.95 -2209.6
-81.548 -31.734 -646.857
81.454
49.436 -3236.06
-81.548
50.693 5344.556
-81.548
81.645 8890.855
81.454 -155.593 2127.878
-81.548
81.645 8890.855
72.465
68.927 -6842.07

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

900
900
900
900
900
900
900
900
900
900
900
900

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ex
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50

ey
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17
109.17

May kNm Maz kNm


231.7
166.5
210.4
231.7
222.5
191.2
226.5
205.2
210.4
191.7
210.4
223.2

609.5
437.9
553.4
609.5
585.4
503.1
595.7
539.7
553.4
504.2
553.4
587.1

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
81.45 4982.219
789.98
7126.57
62.695
789.372
567.60
1375.40
81.548 5267.314
717.35
9397.80
81.454 4982.219
789.98
7126.57
62.601 2850.031
758.74
2745.84
81.548 1863.101
652.04
1107.69
81.454 3988.947
772.19
3781.75
81.548 4274.041
699.56
5838.92
81.548 5267.314
717.35
9397.80
81.454 1488.079
653.58
2589.76
81.548 5267.314
717.35
9397.80
72.465 4527.233
760.98
7379.85

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
68.45
2308.65
680.67
2236.13
12.068 1645.887
290.38
4318.02
16.063
2622.41
354.82
8100.24
15.258 2344.202
306.10
6068.78
68.453 1421.111
535.81
3279.68
12.873 1578.247
424.80
624.40
68.453 1421.111
535.81
3279.68
68.865 1142.507
472.51
3996.89
16.063
2622.41
354.82
8100.24
68.865 2587.703
617.28
1280.36
14.008 2185.142
306.71
6120.03
16.063
2622.41
354.82
8100.24

Additional Moments Due To Slenderness


eax

eay

100
100
100
100
100
100
100
100
100
100
100
100

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

558.3
401.1
506.9
558.3
536.2
460.8
545.7
494.4
506.9
461.9
506.9
537.8

Maz
kNm

1.5*H*e
(kN-m)

H kN

558.3
401.1
506.9
558.3
536.2
460.8
545.7
494.4
506.9
461.9
506.9
537.8

0
0
0
0
0
0
0
0
0
0
0
0

CF5 MIDDLE & TOP COLUMN :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

80
116
118
116
74
56
74
66
118
72
116
118

Load Combination

18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F


17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
19 DL + LL + E.P(WTHSUR)
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F

Node

69
102
104
102
63
48
63
55
104
61
102
104

Fx kN

Fy kN

4726.744
2016.816
2464.168
2125.991
3721.054
2950.025
3721.054
3281.066
2464.168
4286.756
2130.141
2464.168

-2271.27
-1639.3
2613.638
-2335.87
1383.731
1571.217
1383.731
-1104.9
2613.638
2550.098
-2177.49
2613.638

Fz kN

23.41
8.927
11.762
11.788
23.41
8.901
23.41
23.313
11.762
23.313
10.443
11.762

Mx kNm

My kNm

Mz kNm

68.453 -137.492 1763.454


12.068
45.933 4116.335
-16.063
61.087 -7853.83
15.258
60.658 5856.177
68.453
2.968 2907.574
-12.873
14.763 282.316
68.453
2.968 2907.574
-68.865
2.354 -3668.78
-16.063
61.087 -7853.83
-68.865 -137.524 -851.687
14.008
53.999 5907.018
-16.063
61.087 -7853.83

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

900
900
900
900
900
900
900
900
900
900
900
900

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ex
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00

ey
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67
111.67

May kNm Maz kNm


208.0
88.7
108.4
93.5
163.7
129.8
163.7
144.4
108.4
188.6
93.7
108.4

527.8
225.2
275.2
237.4
415.5
329.4
415.5
366.4
275.2
478.7
237.9
275.2

Additional Moments Due To Slenderness


eax
100
100
100
100
100
100
100
100
100
100
100
100

eay

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

472.7
201.7
246.4
212.6
372.1
295.0
372.1
328.1
246.4
428.7
213.0
246.4

Maz
kNm
472.7
201.7
246.4
212.6
372.1
295.0
372.1
328.1
246.4
428.7
213.0
246.4

1.5*H*e
(kN-m)

H kN

0
0
0
0
0
0
0
0
0
0
0
0

Page 281 of 292

BGR Energy Systems Ltd.


Project KHAPARKHEDA TPS 1x500MW Expansion Project
WAGON TIPPLER - Design of Foundation

Title

Page

Doc. No GID-091-CV-CAL-3481C

Rev

15 DESIGN OF COLUMNS( CALCULATION OF DESIGN RESPONSES):


B
D
H

Width of the column


Depth of the column
Max. Horizontal Load at the top of the column in kN

C5 Bottom columns UPTO 5.75 M :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

119
120
120
119
119
120
120
119
119
119
119
120

Load Combination

17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F


18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
19 DL + LL + E.P(WTHSUR)
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
19 DL + LL + E.P(WTHSUR)
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F

Node

106
110
108
106
106
108
108
106
109
106
109
110

Fx kN

1622.707
1140.647
1332.038
1499.659
1528.172
1426.573
1332.038
1528.172
1336.781
1528.172
1294.597
1140.647

Fy kN

-60.281
110.032
110.032
-83.086
-71.976
98.338
110.032
-71.976
-71.976
-71.976
-83.086
110.032

Fz kN

29.456
40.894
40.894
36.095
41.326
29.025
40.894
41.326
41.326
41.326
36.095
40.894

Mx kNm

My kNm

Mz kNm

-96.24
129.508
129.508
-114.514
-129.529
96.219
129.508
-129.529
-129.529
-129.529
-114.514
129.508

-139.337 -30.032
91.071 -564.382
-185.007 178.447
-164.102
-98.9
-185.606
-33
-138.738 175.479
-185.007 178.447
-185.606
-33
93.383 452.909
-185.606
-33
79.574 462.015
91.071 -564.382

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75
5.75

14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00

ex

ey

41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50

41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50
41.50

May kNm Maz kNm


67.3
47.3
55.3
62.2
63.4
59.2
55.3
63.4
55.5
63.4
53.7
47.3

67.3
47.3
55.3
62.2
63.4
59.2
55.3
63.4
55.5
63.4
53.7
47.3

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
96.24
231.374
316.03
229.57
129.508
340.268
215.27
678.45
129.508
340.268
330.05
311.65
114.514
286.666
327.40
248.87
129.529
302.25
352.01
216.22
96.219
269.394
294.08
318.14
129.508
340.268
330.05
311.65
129.529
302.25
352.01
216.22
129.529
302.25
238.94
586.59
129.529
302.25
352.01
216.22
114.514
286.666
220.54
591.47
129.508
340.268
215.27
678.45

0
0
0
0
0
0
0
0
0
0
0
0

Design
Design
Tu = Mx + Ve (kN), Moments Moments
1.5*H*e Cl. 41.3.1
about
about
(kN-m) of IS: 456
Major
Minor Axis
Axis kNm
kNm
55.89
138.804
182.27
422.71
48.514
251.627
76.09
529.81
48.514
251.627
40.67
262.98
42.867
201.865
56.26
208.66
36.267
145.143
65.24
151.19
76.072
231.889
181.97
659.40
76.026
187.536
196.70
502.50
76.072
231.889
181.97
659.40
76.072
231.889
181.97
659.40
48.514
251.627
76.09
529.81
76.072
231.889
181.97
659.40
48.514
251.627
76.09
529.81

Additional Moments Due To Slenderness


eax

eay

109
109
109
109
109
109
109
109
109
109
109
109

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

176.7
124.2
145.0
163.3
166.4
155.3
145.0
166.4
145.6
166.4
141.0
124.2

Maz
kNm

1.5*H*e
(kN-m)

H kN

162.3
114.1
133.2
150.0
152.8
142.7
133.2
152.8
133.7
152.8
129.5
114.1

0
0
0
0
0
0
0
0
0
0
0
0

C5 MIDDLE & TOP COLUMN :


Moments Due To Min.Eccentricity
Load
STAAD
Conditio Member
n
Number
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

121
137
137
135
135
123
121
123
123
137
123
137

Load Combination

17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F


18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
19 DL + LL + E.P(WTHSUR)
17 DL + LL + TRACK LOAD + E.P(W.OSUR)+ LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F
18 DL + LL + TRACK LOAD + E.P(WTHSUR)+LOAD F

Node

109
107
118
117
117
110
109
110
110
107
110
107

Fx kN

698.603
137.054
266.046
367.94
426.456
399.415
552.461
399.415
399.415
137.054
399.415
137.054

Fy kN

-39.44
165.38
165.38
-125.657
-80.668
96.65
-52.379
96.65
96.65
165.38
96.65
165.38

Fz kN

-17.998
-11.854
-11.854
-10.443
-8.836
-23.502
-23.221
-23.502
-23.502
-11.854
-23.502
-11.854

Mx kNm

55.892
-48.514
-48.514
42.867
36.267
-76.072
76.026
-76.072
-76.072
-48.514
-76.072
-48.514

My kNm

106.2
-61.164
-7.228
-6.483
-5.654
138.476
136.539
138.476
138.476
-61.164
138.476
-61.164

Mz kNm

-352.853
-516.103
236.377
-171.861
-108.548
619.456
-447.251
619.456
619.456
-516.103
619.456
-516.103

Unsup Effct.le Effct.le


B mm D mm ported ngth, ngth,
length
Lez
Ley
900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00

ex

ey

44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00

44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00

May kNm Maz kNm


30.7
6.0
11.7
16.2
18.8
17.6
24.3
17.6
17.6
6.0
17.6
6.0

30.7
6.0
11.7
16.2
18.8
17.6
24.3
17.6
17.6
6.0
17.6
6.0

Additional Moments Due To Slenderness


eax
109
109
109
109
109
109
109
109
109
109
109
109

eay

May kNm
100
100
100
100
100
100
100
100
100
100
100
100

76.1
14.9
29.0
40.1
46.4
43.5
60.2
43.5
43.5
14.9
43.5
14.9

Maz
kNm
69.9
13.7
26.6
36.8
42.6
39.9
55.2
39.9
39.9
13.7
39.9
13.7

1.5*H*e
(kN-m)

H kN

0
0
0
0
0
0
0
0
0
0
0
0

Page 282 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

CF3 Bottom column UPTO 3 M HEIGHT :

Column Load
ID
Conditn

CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

8007.7
4742.4
5380.1
5640.5
7542.2
6075.1
7842.6
5510.8
5347.5
8007.7
5380.1
5640.5

Muy
(kNm)

7102.3
9870.3
12470.4
4645.5
6757.0
11351.0
6970.7
4541.7
12487.2
7102.3
12470.4
4645.5

Muz
(kNm)

10337.5
4532.2
17445.9
12005.1
7476.8
1351.5
6517.0
8093.8
14387.4
10337.5
17445.9
12005.1

Tu
(kNm)

3139.6
200.7
719.0
2940.8
2407.7
1662.8
3139.6
2939.7
200.7
3139.6
719.0
2940.8

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)
2975.1
651.0
1240.1
2750.0
2232.2
1745.2
2902.9
2975.1
721.9
2975.1
1240.1
2750.0

8007.7
4742.4
5380.1
5640.5
7542.2
6075.1
7842.6
5510.8
5347.5
8007.7
5380.1
5640.5

8589.8
10195.8
13090.4
6020.5
7873.1
12223.6
8422.1
6029.3
12848.1
8589.8
13090.4
6020.5

11825.0
4857.7
18066.0
13380.1
8592.9
2224.1
7968.5
9581.3
14748.3
11825.0
18066.0
13380.1

2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

0.044
0.044
0.044
0.044
0.044
0.044
0.044
0.044
0.044
0.044
0.044
0.044

P U/
d1
fckBD

0.051
0.03
0.034
0.036
0.048
0.039
0.05
0.035
0.034
0.051
0.034
0.036

(m)
d1/D
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074

0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034

MUY1/
2

fckBD

0.084
0.078
0.079
0.080
0.083
0.081
0.084
0.079
0.079
0.084
0.079
0.080

Check for Interaction Value


Column Load
ID
Conditn

CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.080
0.050
0.060
0.060
0.080
0.060
0.080
0.060
0.060
0.080
0.060
0.060

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.303
0.388
0.492
0.223
0.281
0.448
0.297
0.226
0.483
0.303
0.492
0.223

MUZ/
MUZ1
0.306
0.135
0.497
0.363
0.225
0.060
0.206
0.263
0.406
0.306
0.497
0.363

28310.1
26288.0
26625.0
26962.0
27973.1
27299.0
28310.1
26625.0
26625.0
28310.1
26625.0
26962.0

d1/B
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025

MUZ1/
fckDB2
0.084
0.078
0.079
0.080
0.083
0.081
0.084
0.079
0.079
0.084
0.079
0.080

MUZ1
38670.7
35908.5
36368.9
36829.2
38210.3
37289.6
38670.7
36368.9
36368.9
38670.7
36368.9
36829.2

95852
95852
95852
95852
95852
95852
95852
95852
95852
95852
95852
95852

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.610
0.523
0.988
0.586
0.506
0.508
0.503
0.489
0.889
0.609
0.988
0.586

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

69133.4
69133.4
69133.4
69133.4
69133.4
69133.4
69133.4
69133.4
69133.4
69133.4
69133.4
69133.4

Dia. Of
the Bar

32
32
32
32
32
32
32
32
32
32
32
32

No's
Req.

86
86
86
86
86
86
86
86
86
86
86
86

No's
Prov.

88
88
88
88
88
88
88
88
88
88
88
88

Ast.
Prov

70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774

pt %
Prov.

1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13
1.13

Ve
(kN)
7171.6
2755.9
6528.5
7328.5
4929.1
4944.7
6394.0
6558.1
4639.2
7171.6
6528.5
7328.5

Tu
(kNm)

Vu
(kN)

3139.6
200.7
719.0
2940.8
2407.7
1662.8
3139.6
2939.7
200.7
3139.6
719.0
2940.8

5457.1
2646.2
6135.9
5722.6
3614.3
4036.7
4679.6
4952.8
4529.5
5457.1
6135.9
5722.6

v,
N/mm2
1.184
0.455
1.078
1.210
0.814
0.816
1.056
1.083
0.766
1.184
1.078
1.210

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.283
0.283
0.283
0.283
0.283
0.283
0.283
0.283
0.283
0.283
0.283
0.283

0.385
0.385
0.385
0.385
0.385
0.385
0.385
0.385
0.385
0.385
0.385
0.385

DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
538.9
538.9
565.1
538.9
538.9
538.9
538.9
538.9
538.9
538.9
565.1
538.9

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2
8
6 603.2

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 283 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

CF3 FROM 3 M TO TOP :

Column Load
ID
Conditn

CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

7402.6
60.5
4774.9
5035.3
4902.6
3435.4
5202.9
2871.2
4742.4
7402.6
4975.2
3215.5

Muy
(kNm)

6620.2
55.8
9851.5
4158.4
4599.3
940.3
4867.7
2419.6
9870.3
6620.2
6515.9
1863.3

Muz
(kNm)

2436.5
13.4
4285.1
1120.2
2535.8
5568.1
3332.7
1647.8
4532.2
2436.5
9031.0
8899.6

Tu
(kNm)

3139.6
574.2
719.0
2940.8
2407.7
1662.8
3139.6
2939.7
200.7
3139.6
1662.8
1662.8

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)
3198.9
0.0
732.5
2996.3
2453.2
1694.1
3198.9
2995.2
204.5
3198.9
0.0
1694.1

7402.6
60.5
4774.9
5035.3
4902.6
3435.4
5202.9
2871.2
4742.4
7402.6
4975.2
3215.5

8219.6
55.8
10217.8
5656.6
5825.8
1787.3
6467.2
3917.2
9972.5
8219.6
6515.9
2710.3

4036.0
13.4
4651.3
2618.4
3762.4
6415.2
4932.1
3145.4
4634.5
4036.0
9031.0
9746.7

2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032

P U/
d1
fckBD

0.071
0.001
0.046
0.048
0.047
0.033
0.05
0.027
0.045
0.071
0.047
0.031

(m)
d1/D
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076

0.035
0.035
0.035
0.035
0.035
0.035
0.035
0.035
0.035
0.035
0.035
0.035

MUY1/
2

fckBD

0.073
0.05
0.066
0.067
0.066
0.062
0.067
0.06
0.066
0.073
0.066
0.061

Check for Interaction Value


Column Load
ID
Conditn

CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3
CF3

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.080
0.000
0.050
0.060
0.060
0.040
0.060
0.030
0.050
0.080
0.060
0.040

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.334
0.003
0.459
0.251
0.262
0.086
0.286
0.194
0.448
0.334
0.293
0.132

MUZ/
MUZ1
0.120
0.001
0.153
0.085
0.124
0.225
0.160
0.114
0.153
0.120
0.297
0.347

24602.8
16851.3
22243.7
22580.7
22243.7
20895.6
22580.7
20221.5
22243.7
24602.8
22243.7
20558.5

d1/B
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026

MUZ1/
fckDB2
0.073
0.050
0.066
0.067
0.066
0.062
0.067
0.060
0.066
0.073
0.066
0.061

MUZ1
33606.7
23018.3
30384.1
30844.5
30384.1
28542.6
30844.5
27621.9
30384.1
33606.7
30384.1
28082.3

88993
88993
88993
88993
88993
88993
88993
88993
88993
88993
88993
88993

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.454
0.004
0.612
0.336
0.386
0.311
0.446
0.308
0.601
0.454
0.590
0.479

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

50278.8
50278.8
50278.8
50278.8
50278.8
50278.8
50278.8
50278.8
50278.8
50278.8
50278.8
50278.8

Dia. Of
the Bar

32
32
32
32
32
32
32
32
32
32
32
32

No's
Req.

62.5
62.5
62.5
62.5
62.5
62.5
62.5
62.5
62.5
62.5
62.5
62.5

No's
Prov.

88
88
88
88
88
88
88
88
88
88
88
88

Ast.
Prov

70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774

pt %
Prov.

1.1261
1.1261
1.1261
1.1261
1.1261
1.1261
1.1261
1.1261
1.1261
1.1261
1.1261
1.1261

Ve
(kN)
4508.7
853.5
3865.7
4665.7
3103.1
4145.9
4309.5
3935.6
2755.9
4508.7
1853.0
4370.8

Tu
(kN)

Vu
(kN)

3139.6
574.2
719.0
2940.8
2407.7
1662.8
3139.6
2939.7
200.7
3139.6
1662.8
1662.8

2794.3
540.0
3473.0
3059.8
1788.3
3237.9
2595.0
2330.3
2646.2
2794.3
945.0
3462.8

v,
N/mm2
0.744
0.141
0.638
0.770
0.512
0.685
0.712
0.650
0.455
0.744
0.306
0.722

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.282
0.282
0.282
0.282
0.282
0.282
0.282
0.282
0.282
0.282
0.282
0.282

0.384
0.384
0.384
0.384
0.384
0.384
0.384
0.384
0.384
0.384
0.384
0.384

DTMR
PMST
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
PMST
DTMR

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
538.9
538.9
538.9
538.9
538.9
538.9
538.9
538.9
538.9
538.9
538.9
538.9

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 284 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

C3 Column :

Column Load
ID
Conditn

C3
C3
C3
C3
C3
C3
C3
C3
C3
C3
C3
C3

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

4586.9
249.0
2438.4
1841.9
3543.2
849.9
296.0
2438.4
665.7
4519.3
3066.6
665.7

Muy
(kNm)

705.9
38.6
359.8
324.7
522.8
149.3
43.7
359.8
271.7
710.6
452.5
271.7

Muz
(kNm)

806.4
43.8
428.6
323.8
622.9
149.4
122.0
428.6
766.5
794.4
935.5
766.5

Tu
(kNm)

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)

16.0
16.7
22.6
13.9
13.6
13.5
16.7
22.6
22.3
16.0
22.6
22.3

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

4586.9
249.0
2438.4
1841.9
3543.2
849.9
296.0
2438.4
665.7
4519.3
3066.6
665.7

705.9
38.6
359.8
324.7
522.8
149.3
43.7
359.8
271.7
710.6
452.5
271.7

806.4
43.8
428.6
323.8
622.9
149.4
122.0
428.6
766.5
794.4
935.5
766.5

1600
1600
1600
1600
1600
1600
1600
1600
1600
1600
1600
1600

600
600
600
600
600
600
600
600
600
600
600
600

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032

P U/
d1
fckBD

0.287
0.016
0.152
0.115
0.221
0.053
0.019
0.152
0.042
0.282
0.192
0.042

(m)
d1/D

0.0725
0.0725
0.0725
0.0725
0.0725
0.0725
0.0725
0.0725
0.0725
0.0725
0.0725
0.0725

0.121
0.121
0.121
0.121
0.121
0.121
0.121
0.121
0.121
0.121
0.121
0.121

MUY1/
2

fckBD

0.071
0.047
0.076
0.072
0.077
0.058
0.048
0.076
0.055
0.071
0.077
0.055

Check for Interaction Value


Column Load
ID
Conditn

C3
C3
C3
C3
C3
C3
C3
C3
C3
C3
C3
C3

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.340
0.020
0.180
0.140
0.260
0.060
0.020
0.180
0.050
0.330
0.230
0.050

MUY/
MUY1

1.2
1.0
1.0
1.0
1.1
1.0
1.0
1.0
1.0
1.2
1.1
1.0

0.690
0.057
0.329
0.313
0.471
0.179
0.063
0.329
0.343
0.695
0.408
0.343

MUZ/
MUZ1
0.256
0.024
0.147
0.117
0.211
0.067
0.066
0.147
0.363
0.291
0.316
0.363

d1/B

1022.4
676.8
1094.4
1036.8
1108.8
835.2
691.2
1094.4
792.0
1022.4
1108.8
792.0

0.045
0.045
0.045
0.045
0.045
0.045
0.045
0.045
0.045
0.045
0.045
0.045

MUZ1/
fckDB2
0.082
0.047
0.076
0.072
0.077
0.058
0.048
0.076
0.055
0.071
0.077
0.055

MUZ1
3148.8
1804.8
2918.4
2764.8
2956.8
2227.2
1843.2
2918.4
2112.0
2726.4
2956.8
2112.0

13594
13594
13594
13594
13594
13594
13594
13594
13594
13594
13594
13594

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.821
0.081
0.476
0.430
0.617
0.246
0.129
0.476
0.706
0.863
0.688
0.706

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

7680
7680
7680
7680
7680
7680
7680
7680
7680
7680
7680
7680

Dia. Of
the Bar

25
25
25
25
25
25
25
25
25
25
25
25

No's
Req.

15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.6

No's
Prov.

20
20
20
20
20
20
20
20
20
20
20
20

Ast.
Prov

9817.5
9817.5
9817.5
9817.5
9817.5
9817.5
9817.5
9817.5
9817.5
9817.5
9817.5
9817.5

pt %
Prov.

1.0227
1.0227
1.0227
1.0227
1.0227
1.0227
1.0227
1.0227
1.0227
1.0227
1.0227
1.0227

Ve
(kN)
36.8
82.7
113.2
32.9
32.7
46.0
82.7
113.2
111.2
37.1
112.5
111.2

Tu
(kN)
16.0
16.7
22.6
13.9
13.6
13.5
16.7
22.6
22.3
16.0
22.6
22.3

Vu
(kN)
20.8
66.0
90.6
19.0
19.0
32.4
66.0
90.6
88.9
21.2
89.9
88.9

v,
N/mm2
0.044
0.099
0.136
0.039
0.039
0.055
0.099
0.136
0.133
0.044
0.135
0.133

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.256
0.256
0.256
0.256
0.256
0.256
0.256
0.256
0.256
0.256
0.256
0.256

0.369
0.369
0.369
0.369
0.369
0.369
0.369
0.369
0.369
0.369
0.369
0.369

PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
294.3
294.3
294.3
294.3
294.3
294.3
294.3
294.3
294.3
294.3
294.3
294.3

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 285 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

CF4 Bottom column UPTO 6 M HEIGHT :

Column Load
ID
Conditn

CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

6211.4
2726.3
5102.2
4343.1
3341.7
4382.5
4915.1
6024.2
4721.1
2821.1
5102.2
4343.1

Muy
(kNm)

Muz
(kNm)

6351.7 5709.2
1037.9 2618.6
6244.1 11372.4
2368.6 9004.9
1086.9 4080.0
4982.7 1952.3
5878.7 6389.0
5986.7 1260.0
6208.5 8659.9
1077.5 3293.6
6244.1 11372.4
2368.6 9004.9

Tu
(kNm)

585.9
107.7
586.0
162.2
107.7
583.1
606.7
606.5
583.1
128.4
586.0
162.2

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)
485.8
0.0
485.9
134.4
89.3
483.5
503.0
502.9
483.5
0.0
485.9
134.4

6211.4
2726.3
5102.2
4343.1
3341.7
4382.5
4915.1
6024.2
4721.1
2821.1
5102.2
4343.1

6594.6 5952.1
1037.9 2618.6
6487.1 11615.4
2435.9 9072.1
1131.6 4124.7
5224.4 2194.0
6130.2 6640.5
6238.1 1511.5
6450.2 8901.6
1077.5 3293.6
6487.1 11615.4
2435.9 9072.1

2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08

P U/
d1
fckBD

0.106
0.047
0.087
0.074
0.057
0.075
0.084
0.103
0.081
0.048
0.087
0.074

(m)
d1/D
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078

0.065
0.065
0.065
0.065
0.065
0.065
0.065
0.065
0.065
0.065
0.065
0.065

MUY1/
2

fckBD

0.129
0.121
0.127
0.125
0.123
0.125
0.126
0.128
0.126
0.121
0.127
0.125

Check for Interaction Value


Column Load
ID
Conditn

CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.100
0.040
0.080
0.070
0.050
0.070
0.080
0.090
0.070
0.040
0.080
0.070

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.485
0.081
0.484
0.185
0.087
0.396
0.461
0.462
0.485
0.084
0.484
0.185

MUZ/
MUZ1
0.164
0.084
0.355
0.282
0.130
0.068
0.205
0.046
0.274
0.106
0.355
0.282

13606.9
12763.1
13396.0
13185.0
12974.0
13185.0
13290.5
13501.4
13290.5
12763.1
13396.0
13185.0

d1/B
0.027
0.027
0.027
0.027
0.027
0.027
0.027
0.027
0.027
0.027
0.027
0.027

MUZ1/
fckDB2
0.141
0.121
0.127
0.125
0.123
0.125
0.126
0.128
0.126
0.121
0.127
0.125

MUZ1
36314.1
31163.2
32708.5
32193.4
31678.3
32193.4
32450.9
32966.0
32450.9
31163.2
32708.5
32193.4

65134
65134
65134
65134
65134
65134
65134
65134
65134
65134
65134
65134

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.649
0.165
0.839
0.467
0.217
0.464
0.666
0.508
0.759
0.190
0.839
0.467

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

70320
70320
70320
70320
70320
70320
70320
70320
70320
70320
70320
70320

Dia. Of
the Bar

32
32
32
32
32
32
32
32
32
32
32
32

No's
Req.

87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4

No's
Prov.

88
88
88
88
88
88
88
88
88
88
88
88

Ast.
Prov

70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774

pt %
Prov.

2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129

Ve
(kN)
5138.8
565.8
5827.4
5363.2
3220.1
2276.3
3733.2
3044.5
5516.3
875.0
5827.4
5363.2

Tu
(kN)
585.9
107.7
586.0
162.2
107.7
583.1
606.7
606.5
583.1
128.4
586.0
162.2

Vu
(kN)
4818.9
507.0
5507.4
5274.7
3161.3
1957.9
3401.9
2713.3
5197.9
804.9
5507.4
5274.7

v,
N/mm2
1.563
0.172
1.773
1.631
0.980
0.692
1.136
0.926
1.678
0.266
1.773
1.631

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503

0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49

DTMR
PMST
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
PMST
DTMR
DTMR

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
849
538.9
970.3
929.2
556.9
538.9
599.4
538.9
915.7
538.9
970.3
929.2

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810
12
8 1810

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 286 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

CF4 MIDDLE & TOP COLUMN :

Column Load
ID
Conditn

CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

5534.8
1132.9
3651.2
2373.9
2236.7
3684.9
3684.9
4657.5
4423.3
2760.2
2373.9
3651.2

Muy
(kNm)

3799.5
571.3
1727.3
1598.2
778.5
1209.7
1209.7
1308.2
3716.0
1651.5
1598.2
1727.3

Muz
(kNm)

4330.2
7591.7
15338.0
11249.4
2779.4
1364.7
1364.7
1292.0
1435.0
8530.1
11249.4
15338.0

Tu
(kNm)

659.2
22.6
675.0
673.8
117.4
680.2
680.2
680.8
680.2
674.9
673.8
675.0

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)
546.6
18.8
559.6
558.7
0.0
0.0
0.0
564.5
564.0
559.6
558.7
559.6

5534.8
1132.9
3651.2
2373.9
2236.7
3684.9
3684.9
4657.5
4423.3
2760.2
2373.9
3651.2

4072.8
580.7
2007.2
1877.6
778.5
1209.7
1209.7
1590.5
3998.0
1931.3
1877.6
2007.2

4603.5
7601.1
15617.9
11528.7
2779.4
1364.7
1364.7
1574.2
1717.0
8809.9
11528.7
15617.9

2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08

P U/
d1
fckBD

0.094
0.019
0.062
0.041
0.038
0.063
0.063
0.079
0.075
0.047
0.041
0.062

(m)
d1/D
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076

0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063
0.063

MUY1/
2

fckBD

0.127
0.116
0.123
0.12
0.12
0.124
0.124
0.126
0.125
0.121
0.12
0.123

Check for Interaction Value


Column Load
ID
Conditn

CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4
CF4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.080
0.020
0.060
0.040
0.030
0.060
0.060
0.070
0.070
0.040
0.040
0.060

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.304
0.047
0.155
0.148
0.062
0.092
0.092
0.120
0.303
0.151
0.148
0.155

MUZ/
MUZ1
0.129
0.254
0.493
0.373
0.090
0.043
0.043
0.049
0.053
0.283
0.373
0.493

13396.0
12235.7
12974.0
12657.6
12657.6
13079.5
13079.5
13290.5
13185.0
12763.1
12657.6
12974.0

d1/B
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026

MUZ1/
fckDB2
0.139
0.116
0.123
0.120
0.120
0.124
0.124
0.126
0.125
0.121
0.120
0.123

MUZ1
35799.0
29875.5
31678.3
30905.6
30905.6
31935.8
31935.8
32450.9
32193.4
31163.2
30905.6
31678.3

65134
65134
65134
65134
65134
65134
65134
65134
65134
65134
65134
65134

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.433
0.301
0.648
0.521
0.152
0.135
0.135
0.169
0.356
0.434
0.521
0.648

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

70320
70320
70320
70320
70320
70320
70320
70320
70320
70320
70320
70320

Dia. Of
the Bar

32
32
32
32
32
32
32
32
32
32
32
32

No's
Req.

87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4
87.4

No's
Prov.

88
88
88
88
88
88
88
88
88
88
88
88

Ast.
Prov

70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774
70774

pt %
Prov.

2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129
2.0129

Ve
(kN)
1699.1
2100.8
3798.2
3317.4
1558.8
1553.6
1553.6
2231.0
1868.1
2432.9
3317.4
3798.2

Tu
(kN)
659.2
22.6
675.0
673.8
117.4
680.2
680.2
680.8
680.2
674.9
673.8
675.0

Vu
(kN)
1339.1
2088.5
3429.6
2949.4
1494.7
1182.1
1182.1
1859.2
1496.7
2064.3
2949.4
3429.6

v,
N/mm2
0.517
0.639
1.155
1.009
0.474
0.473
0.473
0.679
0.568
0.740
1.009
1.155

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503
0.503

0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49

DTMR
DTMR
DTMR
DTMR
PMST
PMST
PMST
DTMR
DTMR
DTMR
DTMR
DTMR

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
538.9
538.9
601.9
538.9
538.9
538.9
538.9
538.9
538.9
538.9
538.9
601.9

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 287 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

C4 Bottom column UPTO 6 M HEIGHT :

Column Load
ID
Conditn

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

4044.3
1842.0
3501.3
2981.1
2077.3
3596.0
2119.1
2119.1
3596.0
2033.4
2789.7
3309.9

Muy
(kNm)

1326.2
315.6
1227.9
1165.0
360.9
1278.8
377.9
377.9
1278.8
424.0
693.8
744.1

Muz
(kNm)

572.2
997.1
764.2
574.2
474.6
771.3
477.9
477.9
771.3
470.3
1095.9
1248.8

Tu
(kNm)

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)

24.8
98.0
51.7
55.4
97.7
24.8
101.8
101.8
24.8
98.0
55.4
51.7

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

4044.3
1842.0
3501.3
2981.1
2077.3
3596.0
2119.1
2119.1
3596.0
2033.4
2789.7
3309.9

1326.2
315.6
1227.9
1165.0
360.9
1278.8
377.9
377.9
1278.8
424.0
693.8
744.1

572.2
997.1
764.2
574.2
474.6
771.3
477.9
477.9
771.3
470.3
1095.9
1248.8

900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12

P U/
d1
fckBD

0.3
0.136
0.259
0.221
0.154
0.266
0.157
0.157
0.266
0.151
0.207
0.245

(m)
d1/D
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074

0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082

MUY1/
2

fckBD

0.159
0.172
0.164
0.167
0.171
0.163
0.171
0.171
0.163
0.171
0.169
0.165

Check for Interaction Value


Column Load
ID
Conditn

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.230
0.100
0.200
0.170
0.120
0.200
0.120
0.120
0.200
0.110
0.160
0.180

MUY/
MUY1

1.1
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.458
0.101
0.411
0.383
0.116
0.430
0.121
0.121
0.430
0.136
0.225
0.247

MUZ/
MUZ1
0.197
0.318
0.256
0.189
0.152
0.260
0.153
0.153
0.260
0.151
0.356
0.415

d1/B

2897.8
3134.7
2988.9
3043.6
3116.5
2970.7
3116.5
3116.5
2970.7
3116.5
3080.0
3007.1

0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082

MUZ1/
fckDB2
0.159
0.172
0.164
0.167
0.171
0.163
0.171
0.171
0.163
0.171
0.169
0.165

MUZ1
2897.8
3134.7
2988.9
3043.6
3116.5
2970.7
3116.5
3116.5
2970.7
3116.5
3080.0
3007.1

17952
17952
17952
17952
17952
17952
17952
17952
17952
17952
17952
17952

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.622
0.419
0.667
0.572
0.268
0.69
0.274
0.274
0.69
0.287
0.581
0.662

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

24300
24300
24300
24300
24300
24300
24300
24300
24300
24300
24300
24300

Dia. Of
the Bar

28
28
28
28
28
28
28
28
28
28
28
28

No's
Req.

39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5

No's
Prov.

40
40
40
40
40
40
40
40
40
40
40
40

Ast.
Prov

24630
24630
24630
24630
24630
24630
24630
24630
24630
24630
24630
24630

pt %
Prov.

3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408

Ve
(kN)
160.2
334.2
289.2
260.4
333.6
231.7
340.7
340.7
231.7
334.2
260.4
289.2

Tu
(kN)
24.8
98.0
51.7
55.4
97.7
24.8
101.8
101.8
24.8
98.0
55.4
51.7

Vu
(kN)
116.1
159.9
197.3
161.9
160.0
187.6
159.8
159.8
187.6
159.9
161.9
197.3

v,
N/mm2
0.217
0.452
0.391
0.352
0.451
0.313
0.461
0.461
0.313
0.452
0.352
0.391

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76

0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578

PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 288 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

C4 MIDDLE & TOP COLUMN :

Column Load
ID
Conditn

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

2419.0
71.1
1910.7
1326.9
239.0
1208.6
1326.9
1326.9
1326.9
1079.6
1910.7
1326.9

Muy
(kNm)

892.9
202.3
868.9
807.2
38.6
184.8
807.2
807.2
807.2
626.7
868.9
807.2

Muz
(kNm)

888.5
367.8
1241.2
1005.0
114.9
222.1
1005.0
1005.0
1005.0
480.5
1241.2
1005.0

Tu
(kNm)

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)

95.9
38.5
112.7
115.0
41.4
33.6
115.0
115.0
115.0
33.6
112.7
115.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

2419.0
71.1
1910.7
1326.9
239.0
1208.6
1326.9
1326.9
1326.9
1079.6
1910.7
1326.9

892.9
202.3
868.9
807.2
38.6
184.8
807.2
807.2
807.2
626.7
868.9
807.2

888.5
367.8
1241.2
1005.0
114.9
222.1
1005.0
1005.0
1005.0
480.5
1241.2
1005.0

900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12

P U/
d1
fckBD

0.179
0.005
0.142
0.098
0.018
0.09
0.098
0.098
0.098
0.08
0.142
0.098

(m)
d1/D
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074

0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082

MUY1/
2

fckBD

0.17
0.165
0.172
0.171
0.167
0.171
0.171
0.171
0.171
0.171
0.172
0.171

Check for Interaction Value


Column Load
ID
Conditn

C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4
C4

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.130
0.000
0.110
0.070
0.010
0.070
0.070
0.070
0.070
0.060
0.110
0.070

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.288
0.067
0.277
0.259
0.013
0.059
0.259
0.259
0.259
0.201
0.277
0.259

MUZ/
MUZ1
0.287
0.122
0.396
0.322
0.038
0.071
0.322
0.322
0.322
0.154
0.396
0.322

d1/B

3098.3
3007.1
3134.7
3116.5
3043.6
3116.5
3116.5
3116.5
3116.5
3116.5
3134.7
3116.5

0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082

MUZ1/
fckDB2
0.170
0.165
0.172
0.171
0.167
0.171
0.171
0.171
0.171
0.171
0.172
0.171

MUZ1
3098.3
3007.1
3134.7
3116.5
3043.6
3116.5
3116.5
3116.5
3116.5
3116.5
3134.7
3116.5

17952
17952
17952
17952
17952
17952
17952
17952
17952
17952
17952
17952

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.575
0.189
0.673
0.581
0.051
0.130
0.581
0.581
0.581
0.355
0.673
0.581

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

24300
24300
24300
24300
24300
24300
24300
24300
24300
24300
24300
24300

Dia. Of
the Bar

28
28
28
28
28
28
28
28
28
28
28
28

No's
Req.

39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5
39.5

No's
Prov.

40
40
40
40
40
40
40
40
40
40
40
40

Ast.
Prov

24630
24630
24630
24630
24630
24630
24630
24630
24630
24630
24630
24630

pt %
Prov.

3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408
3.0408

Ve
(kN)
283.3
168.1
406.9
361.9
172.1
172.9
361.9
361.9
361.9
172.9
406.9
361.9

Tu
(kN)
95.9
38.5
112.7
115.0
41.4
33.6
115.0
115.0
115.0
33.6
112.7
115.0

Vu
(kN)
112.8
99.6
206.6
157.4
98.5
113.2
157.4
157.4
157.4
113.2
206.6
157.4

v,
N/mm2
0.383
0.227
0.550
0.489
0.233
0.234
0.489
0.489
0.489
0.234
0.550
0.489

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76
0.76

0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578
0.578

PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 289 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

CF5 Bottom column UPTO 6 M HEIGHT :

Column Load
ID
Conditn

CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

5582.8
4011.0
5069.5
5582.8
5362.4
4608.4
5456.9
4943.6
5069.5
4618.8
5069.5
5377.8

Muy
(kNm)

790.0
567.6
717.3
790.0
758.7
652.0
772.2
699.6
717.3
653.6
717.3
761.0

Muz
(kNm)

7126.6
1375.4
9397.8
7126.6
2745.8
1107.7
3781.7
5838.9
9397.8
2589.8
9397.8
7379.9

Tu
(kNm)

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)

81.5
62.7
81.5
81.5
62.6
81.5
81.5
81.5
81.5
81.5
81.5
72.5

62.6
0.0
62.7
62.6
48.1
62.7
62.6
62.7
62.7
62.6
62.7
55.7

5582.8
4011.0
5069.5
5582.8
5362.4
4608.4
5456.9
4943.6
5069.5
4618.8
5069.5
5377.8

821.3
567.6
748.7
821.3
782.8
683.4
803.5
730.9
748.7
684.9
748.7
788.8

7157.9
1375.4
9429.2
7157.9
2769.9
1139.0
3813.1
5870.3
9429.2
2621.1
9429.2
7407.7

2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

900
900
900
900
900
900
900
900
900
900
900
900

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032

P U/
d1
fckBD

0.127
0.091
0.115
0.127
0.122
0.105
0.124
0.112
0.115
0.105
0.115
0.122

(m)
d1/D
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076
0.076

0.084
0.084
0.084
0.084
0.084
0.084
0.084
0.084
0.084
0.084
0.084
0.084

MUY1/
2

fckBD

0.08
0.074
0.078
0.08
0.079
0.077
0.08
0.078
0.078
0.077
0.078
0.079

Check for Interaction Value


Column Load
ID
Conditn

CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.150
0.110
0.140
0.150
0.140
0.120
0.150
0.130
0.140
0.120
0.140
0.140

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.173
0.129
0.162
0.173
0.167
0.150
0.169
0.158
0.162
0.150
0.162
0.168

MUZ/
MUZ1
0.441
0.096
0.626
0.463
0.182
0.077
0.247
0.390
0.626
0.176
0.626
0.485

d1/B

4746.6
4390.6
4627.9
4746.6
4687.3
4568.6
4746.6
4627.9
4627.9
4568.6
4627.9
4687.3

0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026
0.026

MUZ1/
fckDB2
0.084
0.074
0.078
0.080
0.079
0.077
0.080
0.078
0.078
0.077
0.078
0.079

MUZ1
16225.5
14293.9
15066.5
15452.8
15259.7
14873.3
15452.8
15066.5
15066.5
14873.3
15066.5
15259.7

37340
37340
37340
37340
37340
37340
37340
37340
37340
37340
37340
37340

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.614
0.225
0.788
0.636
0.349
0.227
0.416
0.548
0.788
0.326
0.788
0.653

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

21096
21096
21096
21096
21096
21096
21096
21096
21096
21096
21096
21096

Dia. Of
the Bar

28
28
28
28
28
28
28
28
28
28
28
28

No's
Req.

34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3

No's
Prov.

36
36
36
36
36
36
36
36
36
36
36
36

Ast.
Prov

22167
22167
22167
22167
22167
22167
22167
22167
22167
22167
22167
22167

pt %
Prov.

0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406

Ve
(kN)
4982.2
789.4
5267.3
4982.2
2850.0
1863.1
3988.9
4274.0
5267.3
1488.1
5267.3
4527.2

Tu
(kN)
81.5
62.7
81.5
81.5
62.6
81.5
81.5
81.5
81.5
81.5
81.5
72.5

Vu
(kN)
4937.7
755.1
5222.8
4937.7
2815.8
1818.6
3944.5
4229.5
5222.8
1443.6
5222.8
4487.7

v,
N/mm2
2.069
0.328
2.187
2.069
1.183
0.774
1.656
1.775
2.187
0.618
2.187
1.880

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21

0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338

DTMR
PMST
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
1214
538.9
1284.1
1214
692.3
538.9
969.8
1039.9
1284.1
538.9
1284.1
1103.4

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357
12
6 1357

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 290 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

CF5 MIDDLE & TOP COLUMN :

Column Load
ID
Conditn

CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

4726.7
2016.8
2464.2
2126.0
3721.1
2950.0
3721.1
3281.1
2464.2
4286.8
2130.1
2464.2

Muy
(kNm)

680.7
290.4
354.8
306.1
535.8
424.8
535.8
472.5
354.8
617.3
306.7
354.8

Muz
(kNm)

2236.1
4318.0
8100.2
6068.8
3279.7
624.4
3279.7
3996.9
8100.2
1280.4
6120.0
8100.2

Tu
(kNm)

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)

68.5
12.1
16.1
15.3
68.5
12.9
68.5
68.9
16.1
68.9
14.0
16.1

52.6
9.3
12.4
11.7
52.6
9.9
52.6
53.0
12.4
53.0
10.8
12.4

4726.7
2016.8
2464.2
2126.0
3721.1
2950.0
3721.1
3281.1
2464.2
4286.8
2130.1
2464.2

707.0
295.0
361.0
312.0
562.1
429.8
562.1
499.0
361.0
643.8
312.1
361.0

2262.4
4322.7
8106.4
6074.6
3306.0
629.4
3306.0
4023.4
8106.4
1306.8
6125.4
8106.4

2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930
2930

900
900
900
900
900
900
900
900
900
900
900
900

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032

P U/
d1
fckBD

0.108
0.046
0.056
0.048
0.085
0.067
0.085
0.075
0.056
0.098
0.048
0.056

(m)
d1/D
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074
0.074

0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082
0.082

MUY1/
2

fckBD

0.077
0.063
0.066
0.064
0.073
0.069
0.073
0.071
0.066
0.076
0.064
0.066

Check for Interaction Value


Column Load
ID
Conditn

CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5
CF5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.130
0.050
0.070
0.060
0.100
0.080
0.100
0.090
0.070
0.110
0.060
0.070

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.155
0.079
0.092
0.082
0.130
0.105
0.130
0.118
0.092
0.143
0.082
0.092

MUZ/
MUZ1
0.145
0.355
0.636
0.491
0.234
0.047
0.234
0.293
0.636
0.089
0.495
0.636

d1/B

4568.6
3737.9
3915.9
3797.3
4331.3
4093.9
4331.3
4212.6
3915.9
4509.3
3797.3
3915.9

0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025

MUZ1/
fckDB2
0.081
0.063
0.066
0.064
0.073
0.069
0.073
0.071
0.066
0.076
0.064
0.066

MUZ1
15646.0
12169.1
12748.6
12362.3
14100.7
13328.1
14100.7
13714.4
12748.6
14680.2
12362.3
12748.6

37340
37340
37340
37340
37340
37340
37340
37340
37340
37340
37340
37340

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.300
0.434
0.728
0.573
0.364
0.152
0.364
0.411
0.728
0.232
0.577
0.728

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

21096
21096
21096
21096
21096
21096
21096
21096
21096
21096
21096
21096

Dia. Of
the Bar

28
28
28
28
28
28
28
28
28
28
28
28

No's
Req.

34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3
34.3

No's
Prov.

36
36
36
36
36
36
36
36
36
36
36
36

Ast.
Prov

22167
22167
22167
22167
22167
22167
22167
22167
22167
22167
22167
22167

pt %
Prov.

0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406
0.8406

Ve
(kN)
2308.7
1645.9
2622.4
2344.2
1421.1
1578.2
1421.1
1142.5
2622.4
2587.7
2185.1
2622.4

Tu
(kN)
68.5
12.1
16.1
15.3
68.5
12.9
68.5
68.9
16.1
68.9
14.0
16.1

Vu
(kN)
2271.3
1639.3
2613.6
2335.9
1383.7
1571.2
1383.7
1104.9
2613.6
2550.1
2177.5
2613.6

v,
N/mm2
0.959
0.683
1.089
0.973
0.590
0.655
0.590
0.474
1.089
1.074
0.907
1.089

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21

0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338
0.338

DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
555.5
538.9
639.2
571.3
538.9
538.9
538.9
538.9
639.2
623.7
538.9
639.2

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 291 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

C5 Bottom column UPTO 6 M HEIGHT :

Column Load
ID
Conditn

C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

1622.7
1140.6
1332.0
1499.7
1528.2
1426.6
1332.0
1528.2
1336.8
1528.2
1294.6
1140.6

Muy
(kNm)

316.0
215.3
330.1
327.4
352.0
294.1
330.1
352.0
238.9
352.0
220.5
215.3

Muz
(kNm)

229.6
678.4
311.7
248.9
216.2
318.1
311.7
216.2
586.6
216.2
591.5
678.4

Tu
(kNm)

96.2
129.5
129.5
114.5
129.5
96.2
129.5
129.5
129.5
129.5
114.5
129.5

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)
0.0
152.4
152.4
134.7
152.4
0.0
152.4
152.4
152.4
152.4
134.7
152.4

1622.7
1140.6
1332.0
1499.7
1528.2
1426.6
1332.0
1528.2
1336.8
1528.2
1294.6
1140.6

316.0
291.5
406.2
394.8
428.2
294.1
406.2
428.2
315.1
428.2
287.9
291.5

229.6
754.6
387.8
316.2
292.4
318.1
387.8
292.4
662.8
292.4
658.8
754.6

900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032

P U/
d1
fckBD

0.12
0.084
0.099
0.111
0.113
0.106
0.099
0.113
0.099
0.113
0.096
0.084

(m)
d1/D
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07

0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078

MUY1/
2

fckBD

0.079
0.073
0.076
0.078
0.078
0.077
0.076
0.078
0.076
0.078
0.075
0.073

Check for Interaction Value


Column Load
ID
Conditn

C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.140
0.100
0.120
0.130
0.130
0.120
0.120
0.130
0.120
0.130
0.110
0.100

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.220
0.219
0.293
0.278
0.301
0.210
0.293
0.301
0.228
0.301
0.211
0.219

MUZ/
MUZ1
0.159
0.567
0.280
0.222
0.206
0.227
0.280
0.206
0.479
0.206
0.482
0.567

d1/B

1439.8
1330.4
1385.1
1421.6
1421.6
1403.3
1385.1
1421.6
1385.1
1421.6
1366.9
1330.4

0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078

MUZ1/
fckDB2
0.079
0.073
0.076
0.078
0.078
0.077
0.076
0.078
0.076
0.078
0.075
0.073

MUZ1
1439.8
1330.4
1385.1
1421.6
1421.6
1403.3
1385.1
1421.6
1385.1
1421.6
1366.9
1330.4

11470
11470
11470
11470
11470
11470
11470
11470
11470
11470
11470
11470

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.379
0.786
0.573
0.500
0.507
0.437
0.573
0.507
0.707
0.507
0.693
0.786

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

6480
6480
6480
6480
6480
6480
6480
6480
6480
6480
6480
6480

Dia. Of
the Bar

20
20
20
20
20
20
20
20
20
20
20
20

No's
Req.

20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6

No's
Prov.

28
28
28
28
28
28
28
28
28
28
28
28

Ast.
Prov

8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5

pt %
Prov.

1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086

Ve
(kN)
231.4
340.3
340.3
286.7
302.3
269.4
340.3
302.3
302.3
302.3
286.7
340.3

Tu
(kN)
96.2
129.5
129.5
114.5
129.5
96.2
129.5
129.5
129.5
129.5
114.5
129.5

Vu
(kN)
60.3
110.0
110.0
83.1
72.0
98.3
110.0
72.0
72.0
72.0
83.1
110.0

v,
N/mm2
0.313
0.460
0.460
0.387
0.409
0.364
0.460
0.409
0.409
0.409
0.387
0.460

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271

0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378

PMST
DTMR
DTMR
DTMR
DTMR
PMST
DTMR
DTMR
DTMR
DTMR
DTMR
DTMR

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Page 292 of 292

BGR Energy Systems Ltd.


Project

KHAPARKHEDA TPS 1x500MW Expansion Project

Title

Page

WAGON TIPPLER - Design of Foundation

Doc. No

GID-091-CV-CAL-3481C

Rev

DESIGN OF COLUMNS (CHECK FOR AREA OF STEEL):


Characteristic Strength of the concrete
Characteristic Strength of the Steel
Assuming clear cover
Notation:
PMST
DTMR

25 N/mm2
500 N/mm2
50 mm

Provide Min Shear Ties


Design Ties and Main Rebar
Z

C5 MIDDLE & TOP COLUMN :

Column Load
ID
Conditn

C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Pu

698.6
137.1
266.0
367.9
426.5
399.4
552.5
399.4
399.4
137.1
399.4
137.1

Muy
(kNm)

182.3
76.1
40.7
56.3
65.2
182.0
196.7
182.0
182.0
76.1
182.0
76.1

Muz
(kNm)

422.7
529.8
263.0
208.7
151.2
659.4
502.5
659.4
659.4
529.8
659.4
529.8

Tu
(kNm)

Additnl
Size of Column
Design Forces
Momnt
Due To
D
Torsn PU (kN) MUy (kN- MUz (kN- B (mm)
(mm)
m)
m)
(kNm)

55.9
48.5
48.5
42.9
36.3
76.1
76.0
76.1
76.1
48.5
76.1
48.5

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

698.6
137.1
266.0
367.9
426.5
399.4
552.5
399.4
399.4
137.1
399.4
137.1

182.3
76.1
40.7
56.3
65.2
182.0
196.7
182.0
182.0
76.1
182.0
76.1

422.7
529.8
263.0
208.7
151.2
659.4
502.5
659.4
659.4
529.8
659.4
529.8

900
900
900
900
900
900
900
900
900
900
900
900

900
900
900
900
900
900
900
900
900
900
900
900

Assum
ed

Uniaxial Moment Capacity

p/fck
p t%
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80

0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032
0.032

P U/
d1
fckBD

0.052
0.01
0.02
0.027
0.032
0.03
0.041
0.03
0.03
0.01
0.03
0.01

(m)
d1/D
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07

0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078

MUY1/
2

fckBD

0.065
0.052
0.055
0.057
0.059
0.058
0.062
0.058
0.058
0.052
0.058
0.052

Check for Interaction Value


Column Load
ID
Conditn

C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5
C5

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

PU/
PUZ
0.060
0.010
0.020
0.030
0.040
0.030
0.050
0.030
0.030
0.010
0.030
0.010

MUY/
MUY1

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.154
0.080
0.041
0.054
0.061
0.172
0.174
0.172
0.172
0.080
0.172
0.080

MUZ/
MUZ1
0.357
0.559
0.262
0.201
0.141
0.624
0.445
0.624
0.624
0.559
0.624
0.559

d1/B

1184.6
947.7
1002.4
1038.8
1075.3
1057.1
1130.0
1057.1
1057.1
947.7
1057.1
947.7

0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078
0.078

MUZ1/
fckDB2
0.065
0.052
0.055
0.057
0.059
0.058
0.062
0.058
0.058
0.052
0.058
0.052

MUZ1
1184.6
947.7
1002.4
1038.8
1075.3
1057.1
1130.0
1057.1
1057.1
947.7
1057.1
947.7

11470
11470
11470
11470
11470
11470
11470
11470
11470
11470
11470
11470

Design for Shear and Torsion

(MUY/MUY1)n+
(MUZ+MUZ1)n
0.511
0.639
0.303
0.255
0.202
0.796
0.619
0.796
0.796
0.639
0.796
0.639

MUY1

Section
Capacit
y Under
Pure
Axial
Load,
PUZ

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

Ast.
Req

6480
6480
6480
6480
6480
6480
6480
6480
6480
6480
6480
6480

Dia. Of
the Bar

20
20
20
20
20
20
20
20
20
20
20
20

No's
Req.

20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6
20.6

No's
Prov.

28
28
28
28
28
28
28
28
28
28
28
28

Ast.
Prov

8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5
8796.5

pt %
Prov.

1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086
1.086

Ve
(kN)
138.8
251.6
251.6
201.9
145.1
231.9
187.5
231.9
231.9
251.6
231.9
251.6

Tu
(kN)
55.9
48.5
48.5
42.9
36.3
76.1
76.0
76.1
76.1
48.5
76.1
48.5

Vu
(kN)
39.4
165.4
165.4
125.7
80.7
96.7
52.4
96.7
96.7
165.4
96.7
165.4

v,
N/mm2
0.188
0.340
0.340
0.273
0.196
0.313
0.253
0.313
0.313
0.340
0.313
0.340

pt% Prov.
cperm.
Check
On One
N/mm2
Face
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271
0.271

0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378
0.378

PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST
PMST

SvProv.
200
200
200
200
200
200
200
200
200
200
200
200

Asvreq.
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5
165.5

No.of
Dia.of Closed
AsvProv
Stirrup Links
Prov.
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5
10
6 942.5

Check
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok

Vous aimerez peut-être aussi