Vous êtes sur la page 1sur 7

The SAP Fan Club Forums View topic - plnd delivery cost(in PO), like to pay other ven...

. Page 1 of 7

The SAP Fan Club Forums


The most active SAP community on the net
Skip to content
This website is not affiliated with, sponsored by, or approved by SAP AG.

Search

Search

Advanced search
z
z
z
z
z
z

Board index Technical Logistics MM


Home

ABAP
R/3
Suggestions
Change font size
Web Search

Print view

FAQ
Register
Login

z
z

This website is not affiliated with, sponsored by, or approved by SAP AG.

plnd delivery cost(in PO), like to pay other vendor, how?


Moderators: thx4allthefish, Snowy, Ha Tran, svetja
Topic locked
Search this topic

Search

13 posts Page 1 of 1

plnd delivery cost(in PO), like to pay other vendor, how?


jeffzf Thu Mar 13, 2008 3:04 pm
To someone who knows planned delivery cost very well:
I have 3 points.

http://www.sapfans.com/forums/viewtopic.php?p=932781&sid=9e4b091d1ec101f99a40b8... 8/30/2013

The SAP Fan Club Forums View topic - plnd delivery cost(in PO), like to pay other ven... Page 2 of 7

1. Planned delivery cost(in PO), but like to pay other vendor(in MIRO). How?
2. Condition type for Planned delivery cost, like FRA1, FRB1,ect, have Acc. key& Accrual key like FRE, FR1 in
PO pricing procedure(calculation schema), it controls dlv cost value into Mat. stock value, but we like to post
those value into a expense account, it is possible by cond. type FRA1 or FRB1, how?
3. I did testing, I have impression, for cond.type of planned dlv cost, FRA1 or FRB1, SAP always credits the dlv
cost value into Accrual/provision clearing account(after GR) and debit to clear the account after MIRO. Is it
correct? If yes, why in condition type configuration, it has an indicator Accrual , this indicator seems to have no
difference whether it selected or non-selected.
Thanks,
jeffzhf@gmail.com

jeffzf
Posts: 14
Joined: Sun Dec 03, 2006 11:07 pm
Top
Ha Tran Thu Mar 13, 2008 5:29 pm
Hi,
1. Planned delivery cost(in PO), but like to pay other vendor(in MIRO). How?
By changing the vendor manually in the 'Invoicing Party' field of the invoice header during MIRO process.
2. Condition type for Planned delivery cost, like FRA1, FRB1,ect, have Acc. key& Accrual key like
FRE, FR1 in PO pricing procedure(calculation schema), it controls dlv cost value into Mat. stock
value, but we like to post those value into a expense account, it is possible by cond. type FRA1 or
FRB1, how?
No, once the planned delivery costs are maintained as part of the PO pricing condition, it will be debited to the
stock account (together with the material costs) and credited to either GR/IR clearing account (of the material) or
freight GR/IR clearing account subject to how you are setting in the 'Account Key' field.
3. I did testing, I have impression, for cond.type of planned dlv cost, FRA1 or FRB1, SAP always
credits the dlv cost value into Accrual/provision clearing account(after GR) and debit to clear the
account after MIRO. Is it correct? If yes, why in condition type configuration, it has an indicator
Accrual , this indicator seems to have no difference whether it selected or non-selected.
Please refer to point 2.
Cheers,
HT
Moderator: http://www.sapfans.com
Ha Tran
Posts: 27941
Joined: Sun Mar 30, 2003 8:29 pm
Location: Perth, Western Australia
z Website
Top

http://www.sapfans.com/forums/viewtopic.php?p=932781&sid=9e4b091d1ec101f99a40b8... 8/30/2013

The SAP Fan Club Forums View topic - plnd delivery cost(in PO), like to pay other ven... Page 3 of 7

jeffzf Thu Mar 13, 2008 8:04 pm


Thanks HT.
For point 2 reply, I like to how to configure to credit dlv cost value into GR/IR account with Material value? It
seems to be into Accrual/provision clearing account(after GR). Would pls tell me a little more?
Jeff
jeffzf
Posts: 14
Joined: Sun Dec 03, 2006 11:07 pm
Top
Ha Tran Thu Mar 13, 2008 8:06 pm
jeffzf wrote:Thanks HT.
For point 2 reply, I like to how to configure to credit dlv cost value into GR/IR account with Material
value? It seems to be into Accrual/provision clearing account(after GR). Would pls tell me a little
more?
Jeff
If the account key was not used, then delivery costs will be credited to the same GR/IR Clearing account.
Cheers,
HT
Moderator: http://www.sapfans.com
Ha Tran
Posts: 27941
Joined: Sun Mar 30, 2003 8:29 pm
Location: Perth, Western Australia
z Website
Top
jeffzf Thu Mar 13, 2008 10:20 pm
Hi HT,
I deselected the indictor of Statistics. Then the mat. price + dlv cost all posted into GR/IR account.
Thanks,
Jeff
jeffzf
Posts: 14
Joined: Sun Dec 03, 2006 11:07 pm
Top
Ha Tran Thu Mar 13, 2008 10:24 pm
jeffzf wrote:Hi HT,
I deselected the indictor of Statistics. Then the mat. price + dlv cost all posted into GR/IR account.
Thanks,
Jeff

http://www.sapfans.com/forums/viewtopic.php?p=932781&sid=9e4b091d1ec101f99a40b8... 8/30/2013

The SAP Fan Club Forums View topic - plnd delivery cost(in PO), like to pay other ven... Page 4 of 7

By doing it, have you recognized that your net price was added unexpectedly with the delivery costs?
Cheers,
HT
Moderator: http://www.sapfans.com
Ha Tran
Posts: 27941
Joined: Sun Mar 30, 2003 8:29 pm
Location: Perth, Western Australia
z Website
Top

Thanks HT, one thing about your comment.


jeffzf Fri Mar 14, 2008 10:06 am
I know I included the dlv cost into the net price by removing Statictis indicator.
But I already tested by remove the Account Key and Accrual key from FRB1 in Cal. Schema. It didn't work in
below two situation.
1. I removed the accruals indicator as well in FRB1 cond. type details, it doesn't report error when PO and GR, but
after GR, the account movement didnot show anything related the dlv cost(just like the PO don't have FRB1
condition at all, just credit to GR/IR with mat. price, debit the same to stock account)
2. I keeped the accruals indicator, it reported error when PO, asked to input account/accural key.
So can you help tell me how to "If the account key was not used, then delivery costs will be credited to the same
GR/IR Clearing account."
Thanks for your help!
Jeff
jeffzf
Posts: 14
Joined: Sun Dec 03, 2006 11:07 pm
Top
Ha Tran Fri Mar 14, 2008 9:00 pm
Hi,
1. I removed the accruals indicator as well in FRB1 cond. type details, it doesn't report error when PO
and GR, but after GR, the account movement didnot show anything related the dlv cost(just like the
PO don't have FRB1 condition at all, just credit to GR/IR with mat. price, debit the same to stock
account)
Did you flag the 'Statistics' indicator checkbox for your FRB1 condition type in M/08?. What was the posting lines
did you get in the accounting document upon GR posting?.
Cheers,
HT
Moderator: http://www.sapfans.com
Ha Tran
Posts: 27941
Joined: Sun Mar 30, 2003 8:29 pm
Location: Perth, Western Australia

http://www.sapfans.com/forums/viewtopic.php?p=932781&sid=9e4b091d1ec101f99a40b8... 8/30/2013

The SAP Fan Club Forums View topic - plnd delivery cost(in PO), like to pay other ven... Page 5 of 7

Website

Top

Re: plnd delivery cost(in PO), like to pay other vendor, how
smartandpretty Sun Mar 16, 2008 3:52 pm
jeffzf wrote:To someone who knows planned delivery cost very well:
Planned delivery cost(in PO), but like to pay other vendor(in MIRO). How?

You can directly enter the invoicing party in the detail of the condition type as vendor.
It is also possible to enter the vendor already in the info record.
By doing this you don't have to change the invoicing party in MIRO any more.
Don't say "NO" if you don't know
smartandpretty
Posts: 377
Joined: Wed Aug 15, 2007 2:11 am
Top

To HT
jeffzf Tue Mar 18, 2008 4:36 pm
Hi HT,
I flagged it. if I removed the Accr indicator in setting of FRB1 cond.type, after GR, account movement just like
NO FRB1 cost at all. Credit GR/IR with Net price of Mat. Debit Mat. Stock account.
Jeff
Ha Tran wrote:Hi,
1. I removed the accruals indicator as well in FRB1 cond. type details, it doesn't report
error when PO and GR, but after GR, the account movement didnot show anything related
the dlv cost(just like the PO don't have FRB1 condition at all, just credit to GR/IR with
mat. price, debit the same to stock account)
Did you flag the 'Statistics' indicator checkbox for your FRB1 condition type in M/08?. What was the
posting lines did you get in the accounting document upon GR posting?.
Cheers,
HT
jeffzf
Posts: 14
Joined: Sun Dec 03, 2006 11:07 pm
Top
Ha Tran Tue Mar 18, 2008 5:15 pm
Hi,
You can send me your setting of your FRB1 Condition Type in M/06, your PO pricing schema in M/08, your PO
pricing conditions and the screenshot of your accounting document after GR posting and I will try to get back to

http://www.sapfans.com/forums/viewtopic.php?p=932781&sid=9e4b091d1ec101f99a40b8... 8/30/2013

The SAP Fan Club Forums View topic - plnd delivery cost(in PO), like to pay other ven... Page 6 of 7

you.
Cheers,
HT
Moderator: http://www.sapfans.com
Ha Tran
Posts: 27941
Joined: Sun Mar 30, 2003 8:29 pm
Location: Perth, Western Australia
z Website
Top

Re: plnd delivery cost(in PO), like to pay other vendor, how?
WenDim Mon Jun 16, 2008 1:34 pm
Hi all
I wanna know is there a way to issue the freight cost as a separate PO to the freight vendor (who is different from
the basic goods vendor in the goods supply PO) ?
Or is it done quite differently?
this need appeared because we need some document to bind/order the freight vendor with!
And additionally it would allow to analyse the freight vendor just like any other.
thanks
WenDim
WenDim
Posts: 1
Joined: Mon Jun 16, 2008 1:18 pm
Top

Re: plnd delivery cost(in PO), like to pay other vendor, how?
Ha Tran Mon Jun 16, 2008 7:06 pm
WenDim wrote:Hi all
I wanna know is there a way to issue the freight cost as a separate PO to the freight vendor (who is
different from the basic goods vendor in the goods supply PO) ?
Or is it done quite differently?
this need appeared because we need some document to bind/order the freight vendor with!
And additionally it would allow to analyse the freight vendor just like any other.
thanks
WenDim
I would suggest you to post your inquiry in the new thread so as to avoid any confusion. This posting is locked
now.
Cheers,
HT
Moderator: http://www.sapfans.com
Ha Tran
Posts: 27941
Joined: Sun Mar 30, 2003 8:29 pm
Location: Perth, Western Australia
z Website
Top

Display posts from previous: All posts

Sort by Post time

Ascending  Go

http://www.sapfans.com/forums/viewtopic.php?p=932781&sid=9e4b091d1ec101f99a40b8... 8/30/2013

The SAP Fan Club Forums View topic - plnd delivery cost(in PO), like to pay other ven... Page 7 of 7

Topic locked
13 posts Page 1 of 1
Return to Logistics MM
Jump to:

Logistics MM

Go

Who is online
Users browsing this forum: Google Adsense [Bot], wingyisleeds and 14 guests

z
z

Board index
The team Delete all board cookies All times are UTC - 6 hours [ DST ]

Copyright 2012 SAPFANS All Rights Reserved.


This website is not affiliated with, sponsored by, or approved by SAP AG.

http://www.sapfans.com/forums/viewtopic.php?p=932781&sid=9e4b091d1ec101f99a40b8... 8/30/2013

Vous aimerez peut-être aussi