Training Manual

Client Name
Project Name

Al Turki Enterprises LLC


SAP Solution Enhancement in New Landscape

Document Name
Prepared By (Author)
Prepared On

MM_TM_23-Payment Certificate

Type of Document
Module

Training Manual
MM

Manual Payment Certificate


Page 1 of 72

Training Manual

Index
1.0

Payment Certificate ................................................................................................................................ 3

2.0

Create Payment Certificate ................................................................................................................. 10

3.0

Change payment certificate ................................................................................................................ 14

4.0

Print payment certificate ..................................................................................................................... 16

5.0

Delete payment certificate .................................................................................................................. 20

6.0

Scenario-1 Advance Payment to Contractor on Work Order .......................................................... 23

7.0

Scenario-2 Payment certificate for material on site ....................................................................... 35

8.0

Scenario 3: Creation of Payment Certificate for work executed .................................................. 43

9.0

Scenario 4: Certified Quantities and Material on site consumed .................................................. 55

10.0

Scenario 5: Creation of Payment Certificate with contra charges ............................................... 59

11.0

Release of Retention & Contra charges ............................................................................................. 71

12.0

Checks and Validation: ......................................................................................................................... 72

Manual Payment Certificate


Page 2 of 72

Training Manual

1.0

Payment Certificate

This document contains information about the process for Subcontract for all type of Civil and O&G
subcontracts which is given to nominated subcontractors or for third party services.
The main objective of this document is to describe the process of creation of payment certificate for
payment processing of subcontractor under different heads like booking the work executed, addition
work executed, retention on work executed and any advance payment requirement and recovery,
deduction of contra charges and release of retention and contra charges, wherever required.
For creation of payment certificate, a customized screen will be developed in which all the heads
which are required to generate the payment certificate will be available. In this screen, some fields
values will be derived automatically based on the various transactions during the period which will
not be allowed to change and some fields will be allowed to enter manually. This will show the
Cumulative Values till this Bill, Cumulative Values till Last Bill and Net Value this bill. The QS has to
enter the period for which payment certificate is required to generate. All the values posted for this
period will be automatically available in the payment certificate.

Manual Payment Certificate


Page 3 of 72

Training Manual

S.No.

Basis for Calculation

Particulars

4
5
6

D=A+BC
E
F=D+E

Estimated Value of Work Done


During the Month
Estimated Value of Additional Work
Executed
Extra Work Deduction (will be used
for deduction of extra work)
Total Value of Work Executed
Material on Site
Total Value

G=E*% Retention

Retention on Material on Site

H=D*% Retention

Retention on Work Executed

H1=F*% Retention

10

I = G + H + H1

Additional Retention in Lieu of


Performance Bond
Total Retention

11

Advance Payment on PO value

12

K = %of E

Recovery of Advance Payment on


Material on Site

13

L = % of D

Recovery of Advance Payment on


PO

14

M=K+L

Total Recovery

15

Contra Charges on Materials

16

Contra Charges Other than


Materials

17
18
19
20

Mark Up on Contra Charges (Value)


Total Contra Charges
Retention Release
Release of Contra Charges

22

O1
P = N + O + O1
P1
P2
Q=F-I+J-M-P+
P1 + P2
R

23

S = Q-R

21

%
tage

Calculation for Payment Certificate

Available from Posting of SES


Available from Posting of SES
Manual Entry in Certificate
Auto Calculation
Manual Entry in Certificate
Auto Calculation
Auto Calculated in Certificate,
10%
however changes allowed
Auto Calculated in Certificate,
10%
however changes allowed
Manual Entry in Certificate
Auto Calculation
Available from Posting of Advance
Payment Request
% Tage available from the PO, Auto
10% Calculated in Certificate, however
changes allowed
% Tage available from the PO, Auto
10% Calculated in Certificate, however
changes allowed
Auto Calculation
Auto available from different
material issue transaction on
Internal Order wrt Work Order
Auto available from Parking of
contra charges booking on Internal
Order wrt Work Order
Manual Entry in Certificate
Auto Calculation
Manual Entry in Certificate
Manual Entry in Certificate

Total

Auto Calculation

Less Previous Certificate

Auto from previous certificate

Net Total Payable

Auto Calculation

Manual Payment Certificate


Page 4 of 72

Training Manual

Following are the heads which are considered for payment certificate:
1. Estimated Value of Work Done During the Month - To get the total value of work executed during a
particular period. This value will be available after posting of service entry sheet. This field will be in
display mode and hence no manual entry will be allowed.
2. Estimated Value of Additional Work Executed - To get the total value of additional work executed during
a particular period. This will be identified by mentioning the supplement work in the work order for each
service line number. This value will be available after posting of service entry sheet. This field will also be
in display mode and hence no manual entry will be allowed.
3. Extra Work Deduction - To deduct the value of work executed, if paid in the earlier payment certificates.
This field value will be allowed to enter manually at the time of creation of payment certificate. This field
will be used when there is no work balance (No service entry sheet) and only deduction of work is required.
However if any work in terms of quantity is to be deducted in the current certificate which is related to the
previous certificate, the QS has to mention those line items in terms of quantity in the service entry sheet
itself. System will allow entering the negative quantities keeping the total value of service entry sheet as
positive.
4. Total Value of Work Executed - This will be the sum total of all the work executed after deduction of
extra work and will be available automatically. This field will be in display mode.
5. Material on Site - This is a manual entry field. QS Department has to enter the value of material on site
after calculating the value on 80% manually.
6. Total Value - Since material on site is also considered as work executed and later on, this value is shifted
/ transferred to the work executed, hence this total will be the sum total of work executed and material on
site. This field will be in display mode.
7. Retention on Material on Site - Based on the retention mentioned in the work order, retention percent
will be available at the time of creation of payment certificate. The value of retention will be calculated on
Manual Payment Certificate
Page 5 of 72

Training Manual

Material on site value automatically and will be in display mode. However percentage is allowed to change
as per the certificate requirement. If percentage is changed at the time of creation of certificate,
accordingly, value of retention will get changed.
8. Retention on Work Executed - Similarly, value of retention on total work executed will be calculated
automatically based on the percentage and will be in display mode. However percentage is allowed to
change as per the certificate requirement. If percentage is changed at the time of creation of certificate,
accordingly, value of retention will get changed. This field will be in display mode and no manual entry is
allowed.
Above two types of retention is shown separately for calculation purpose. However at the time of printing
of payment certificate, the value of retention will be shown on total (work executed and material on site).
09. Total Retention - This will be calculated automatically which will be the total sum of all types of
retention. This field will be in display mode.
When total cumulative value of total retention is reaching the max retention percent, system will
automatically proposed the max retention amount.
10. Additional Retention in Lieu of Performance Bond - As per the contract terms and conditions, some
contracts also have retention clause which are applicable in lieu of performance bond.
For such type of retention, QS department has to enter the retention percent manually. Accordingly value
of retention will get calculated on Total Contract Value. Retention value will be in display mode, only
percentage can be entered manually.
11. Advance Payment on PO Value - For any advance payment on PO like mobilization advance, QS
department has to create the advance payment request with T.Code ME2DP. After creating request, this
value of advance will be automatically available during creation of payment certificate. This value will be
available in display mode and no changes will be allowed.
12. Recovery of Advance Payment on Material on Site - Advance payment % will be available from the
advance percent mentioned in the PO. Value will get automatically calculated based on the value of
Manual Payment Certificate
Page 6 of 72

Training Manual

Material on Site. This value will be in display mode and will not be allowed to change. However percentage
field will be allowed to change. If percentage is changed at the time of creation of certificate, accordingly
value of recovery of advance payment will be calculated as per the changed percentage.
13. Recovery of Advance Payment on PO - Similarly, advance payment % will be available from the advance
percent mentioned in the PO. Value will get automatically calculated based on the value of work executed.
This value will be in display mode and will not be allowed to change. However percentage field will be
allowed to change. Accordingly value of recovery of advance payment will be calculated as per the changed
percentage.
14. Total Recovery - This value will be the total sum of recovery on advance payment on material on site
and advance payment on PO. This value will be in display mode.
15. Contra Charges on Materials - For execution of work, sometimes contractors requires material from our
store. This value of material is debited to the contractor as per the terms and conditions mentioned in the
WO. Additional mark up is also debited from the contractor.
For issuing materials, each contractor will have an internal order number on which the cost of materials will
be booked. During the period, store person will issue the material on contractor internal order with
reference to contractor's work order number. For this, QS person shall communicate the store for internal
order number and corresponding work order number for which material is being issued and value to be
debited.
This value of issued materials during the period will be available automatically at the time of creation of
payment certificate. This value will be in display mode and will not be allowed to change.
At the time of creation of payment certificate, if value is not coming, it means no material has been
booked.
16. Contra Charges Other than Materials - There are other charges like TAC charges, food charges,
penalties, repairs which need to be debited to contractor. These different charges are communicated to the
QS team by site admin or site QS.

Manual Payment Certificate


Page 7 of 72

Training Manual

These charges will be booked by site admin or site QS at the internal order by parking the value in different
heads through T.Code FV50. In this transaction, internal order alongwith work order number shall be
mentioned.
This value of issued materials during the period will be available automatically at the time of creation of
payment certificate. This value will be in display mode and will not be allowed to change.
At the time of creation of payment certificate, if value is not coming, it means no material has been
booked.
17. Mark up on Contra Charges - Since system will not automatically calculate any mark up on contra
charges, hence QS department has to mention the mark up value manually at the time of creation of
payment certificate. This value will be allowed to enter manually.
18. Total Contra Charges - This will be the total sum of all the contra charges and mark up value and will be
in display mode.
19. Retention Release - During the creation of payment certificate, if any retention is required to be
released, then QS has to mention the value of retention release manually in the certificate. Based on the
value, account has to pass the accounting entry for retention release.
20. Release of Contra Charges - During creation of payment certificate, if any contra charges is required to
be released, then QS has to mention the value of contra charges to be released manually in the certificate.
Based on the value, account has to pass the accounting entry for contra charges release.
21. Total Value - This value will be calculated based on the total cumulative values of all the heads. This
value will be in display mode.
22. Less Previous Certificate - This value will be derived from the last certificate saved and will be in the
cumulative value till this bill.

Manual Payment Certificate


Page 8 of 72

Training Manual

23. Net Total Payable - This value will be the total net value of the current certificate which will be
required to pay to the subcontractor. This value will be calculated from all above heads and will be in
display mode.

Manual Payment Certificate


Page 9 of 72

Training Manual

2.0

Create Payment Certificate

T-Code: ZMM_PC

Step 1.

Enter the necessary details on initial screen

Sr.
no

Field Name

Purchase
Document

Description

R/O/
C

User
Action
and
Values

Comments

Purchase order
Number

ZP03/ZP0
4

Posting
Period

Posting Period

Enter appropriate posting period

Fiscal year

Fiscal year

Enter fiscal year for entry of


payment certificate

Select Purchase Order Number


while creating new payment
certificate. Starting from 43* or
44* number series of purchase
order

Manual Payment Certificate


Page 10 of 72

Training Manual

Select
option:
create

Creation of
payment
certificate

Select, option to create payment


certificate.

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


Step 2.

Sr.
no

Enter the header details for the payment certificate.

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Manual Payment Certificate


Page 11 of 72

Training Manual

Remarks

Remarks for the


payment
certificate

Specific remarks or instructions


for the payment certificate

Invoice
Number

Vendor Invoice
number

Enter the vendor invoice number


for the reference

PDO PO Ref

PDO PO reference
number

PDO purchase order reference


number for the reference in
payment certificate

Work done
up to

Work completed
till month

Enter the month till work


completed for the payment
certificate.

PDO SES Ref

PDO SES
reference number

PDO service entry sheet reference


number for the reference in
payment certificate

ATE client
valuation/
P.C.

ATE client
valuation/ P.C.

Reference text for ATE client


valuation/ P.C.

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

Manual Payment Certificate


Page 12 of 72

Training Manual

The column wise details in the payment certificate are as follows,


1. Particulars: description & details for the amount
2. Percentage: values calculated from the Percentage details for the specific particulars
3. Cumulative till this bill: total cumulative value including the payment certificate
4. Cumulative till last bill: total cumulative value till last payment certificate (excluding the current)
5. Net value: difference between total cumulative & cumulative till last bill
All the values in gray are not editable.

Manual Payment Certificate


Page 13 of 72

Training Manual

3.0

Change payment certificate

In order to correct or add entries of the payment certificate, user change option. But user can
change entries before submission of the certificate to accounts.
T-Code: ZMM_PC

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Purchase
Document
no

Purchase/ work
order number

Specific purchase order number

Certificate
No

Payment
certificate
Number

Payment certificate Number

Change

Select change

Select option, change

Execute

Execute the entry

Execute the process

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


Payment certificate screen will opened in editable format, after making necessary changes user can submit
it to accounts & save it
Manual Payment Certificate
Page 14 of 72

Training Manual

Payment Certificate for only advance payment shall be printed and forwarded to accounts.

Based on the payment certificate, accounts shall process the advance payment request as per
payment process

Manual Payment Certificate


Page 15 of 72

Training Manual

4.0

Print payment certificate

T-Code: ZMM_PC

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Purchase
Document
no

Purchase/ work
order number

Specific purchase order number

Certificate
No

Payment
certificate
Number

Payment certificate Number

Change

Select change

Select option, change

Execute

Execute the entry

Execute the process

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

Manual Payment Certificate


Page 16 of 72

Training Manual

Manual Payment Certificate


Page 17 of 72

Training Manual

Select, save or print option

Manual Payment Certificate


Page 18 of 72

Training Manual

Manual Payment Certificate


Page 19 of 72

Training Manual

5.0

Delete payment certificate

User can make any changes in payment certificate, till its submitted to accounts, if he/she has to
change payment certificate after submission to accounts, it should be deleted first & new payment
certificate needed to be created again, which will be next serial number for the payment
certificate. User cannot delete the payment certificate if any subsequent payment certificate is
created. Means if payment certificate -1 is needed to delete while payment certificate-2 already
created & submitted, then system will not allow user to delete the payment certificate.
T-Code: ZMM_PC

Sr.
no

Field Name

Purchase
Document
no

Description

Purchase/ work
order number

R/O/
C

User
Action
and
Values

Comments

Specific purchase order number

Manual Payment Certificate


Page 20 of 72

Training Manual

Certificate
No

Payment
certificate
Number

Payment certificate Number

Delet

Select, Delet

Select option, delet

Execute

Execute the entry

Execute the process

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


Tick cancelation indicator, & Specify the reason to delete

In the print preview of payment certificate, the CANCELLED watermark gets printed.

Manual Payment Certificate


Page 21 of 72

Training Manual

Manual Payment Certificate


Page 22 of 72

Training Manual

6.0

Scenario-1 Advance Payment to Contractor on Work Order

Advance Payment to Contractor on Work Order Recoverable in equal instalments)


Prerequisite: Advance Payment clause in terms of percentage must be mentioned in the work order

QS Department has to create the advance payment request through T.Code ME2DP.

Transaction Code

ME2DP

SAP Menu

SAP Menu >> Logistics >> Materials Management >>


Purchasing >> Purchase order >> Reporting>> ME2DP >>
Down payment monitoring for PO

Manual Payment Certificate


Page 23 of 72

Training Manual

Manual Payment Certificate


Page 24 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Purchase
Document

Purchase order
Number

Enter Purchase Order Number

Execute

Execute the entry

Execute the process

Select header, create document as shown in snapshot

Manual Payment Certificate


Page 25 of 72

Training Manual

Enter Purchase document number, Press Enter for Down payment request

Enter the down payment amount, it should be less than or equalt to down payment amount specified in PO.
Execute

the entry

Manual Payment Certificate


Page 26 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Document
date

Document date

Enter Document date

Reference

Text reference

Any reference for down payment

Document
Header Text

Header reference

Any reference for down payment

Manual Payment Certificate


Page 27 of 72

Training Manual

Vendor

Vendor code

Vendor code as per PO

Trg sp G/L
ind

Target Special
G/L indicator

Target Special G/L indicator: A


Adv to Subcontractor

Enter

Press, Enter to proceed

Sr.
no

Field Name

Amount

Description

Amount

R/O/
C

User
Action
and
Values

Comments

Enter amount for the down

Manual Payment Certificate


Page 28 of 72

Training Manual

payment
2

Tax Code

Tax code

Enter, valid tax code, AA

Save

Header reference

Save the entry

Create Payment Certificate by mentioning the period of certificate.

Advance payment value will automatically be available in the payment certificate. This value is
fetched from the advance payment request created through ME2DP - system will consider all ME2DP
requests for this PO.
T-Code: ZMM_PC

Step 1.

Sr.
no

Enter the necessary details on initial screen

Field Name

Description

R/O/
C

User
Action
and

Comments

Manual Payment Certificate


Page 29 of 72

Training Manual

Values
1

Purchase
Document

Purchase order
Number

ZP03/ZP0
4

Posting
Period

Posting Period

Enter appropriate posting period

Fiscal year

Fiscal year

Enter fiscal year for entry of


payment certificate

Select
option:
create

Creation of
payment
certificate

Select Purchase Order Number


while creating new payment
certificate. Starting from 43* or
44* number series of purchase
order

Select, option to create payment


certificate.

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


Step 2.

Enter the header details for the payment certificate.

Manual Payment Certificate


Page 30 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Remarks

Remarks for the


payment
certificate

Specific remarks or instructions


for the payment certificate

Invoice
Number

Vendor Invoice
number

Enter the vendor invoice number


for the reference

PDO PO Ref

PDO PO reference
number

PDO purchase order reference


number for the reference in
payment certificate

Manual Payment Certificate


Page 31 of 72

Training Manual

Work done
up to

Work completed
till month

Enter the month till work


completed for the payment
certificate.

PDO SES Ref

PDO SES
reference number

PDO service entry sheet reference


number for the reference in
payment certificate

ATE client
valuation/
P.C.

ATE client
valuation/ P.C.

Reference text for ATE client


valuation/ P.C.

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

The column wise details in the payment certificate are as follows,


6. Particulars: description & details for the amount
7. Percentage: values calculated from the Percentage details for the specific particulars
8. Cumulative till this bill: total cumulative value including the payment certificate
Manual Payment Certificate
Page 32 of 72

Training Manual

9. Cumulative till last bill: total cumulative value till last payment certificate (excluding the current)
10. Net value: difference between total cumulative & cumulative till last bill
All the values in gray are not editable.

Step 3. Advance payment details


Enter the necessary details on initial screen for the advance payment, amount auto picked from
PO,

Check the net payable amount & save the certificate.

Manual Payment Certificate


Page 33 of 72

Training Manual

Manual Payment Certificate


Page 34 of 72

Training Manual

7.0

Scenario-2 Payment certificate for material on site

Material on site will be treated as an advance and will be posted to a separate special g/l account. For
this, a special g/l indicator "G- Material at Site-SC Vendor" has been created to track the material on site
advances separately.
QS Department has to create a new Payment Certificate for initiation of Material on Site payment. In
this certificate, he shall manually enter the amount to be paid in the certificate screen.
Prerequisite:

After that, an Advance Payment Request needs to be created through T.Code F-47 by QS Department.

This payment certificate only for material on site needs to be printed and to be submitted to the
accounts for payment processing.

Based on the payment certificate, Account shall consider the payment request created (F-47) for
further payment processing

If any additional Material on Site is to be paid, request through F-47 shall be created to get the "Net
Value this bill" in the certificate.
F-47 transaction:
Menu Path:

Transaction Code

F-47

IMG Menu

SAP menu >> Logistics >> Accounting

>> Financial

Accounting >> Account Payable >> Document entry >>


Down payment >> F-47 Request

Manual Payment Certificate


Page 35 of 72

Training Manual

Manual Payment Certificate


Page 36 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Document
date

Document date

Enter Document date

Posting date

Posting date

Enter Posting date

Reference

Text reference

Any reference for down payment

Document
Header Text

Header reference

Any reference for down payment

Manual Payment Certificate


Page 37 of 72

Training Manual

Account

Vendor code

Vendor code as per PO

Trg sp G/L
ind

Target Special
G/L indicator

Target Special G/L indicator: G


Material onsite SC vendor

Company
code

Company code
for the
transaction

Press, Enter Company code for the


document entry

Currency

Currency

Currency for payment

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

Manual Payment Certificate


Page 38 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Amount

Amount for
material onsite

Amount for the material onsite

Tax Code

Valid tax code

Enter Valid Tax code

Due on

Date of payment

Date of payment due for material


onsite

PO Number

PO number

Purchase Order Number with Item


No.

Account

Vendor code

Vendor code as per PO

Save

Save the entries

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


Document number gets generated.

Manual Payment Certificate


Page 39 of 72

Training Manual

Creation of new payment certificate


T-Code: ZMM_PC

Enter the certificate header details,

Specify the amount for material on site excluding the percentage,( for example OMR 27,489 is 80%
34361.828)

Manual Payment Certificate


Page 40 of 72

Training Manual

Sr.
no

Field Name

Material on
site

Description

Amount of
material onsite

R/O/
C

User
Action
and
Values

Comments

Enter the Amount of the material


onsite excluding the percentage
(E.g. for example OMR 27,489 is 80%
34361.828)

Retention of
material
onsite

Percent of
retention onsite

Change Percent of retention


onsite, if necessary

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


System automatically calculates the amount as per the chart specified on page no.12.

Manual Payment Certificate


Page 41 of 72

Training Manual

Manual Payment Certificate


Page 42 of 72

Training Manual

8.0

Scenario 3: Creation of Payment Certificate for work executed

Certified Quantities and extra work executed:

QS Department has to create the Service Entry Sheet based on the certified quantities and also for
extra quantities.

This service entry will get released as per the approval hierarchy.

QS Department shall initiate for the creation of payment certificate.

All the service entry sheets values for the month posted till that date will be available in the
certificate

All the billing will be on the cumulative values

Previous certificate values will be available in the current certificate

Percentage calculation for retention and advance recovery will be available from the PO and will be
auto calculated accordingly in the certificate. However it is allowed to change as per the
requirement.

Check the status "submit to accounts" in payment certificate before sending the physical paper to
accounts.

This payment certificate shall be printed and submit to accounts for further processing

At the time of invoice booking, accounts have to recover the advance payment mention in the
payment certificate in MIRO (amount should be adjusted only on value of work executed and not on
material on site. Advance recovery on material on site will be done manually).

Entry for Retention on vendor bill will be done auto through invoice booking in MIRO. (either on 10%
as per PO or up to Maximum mentioned in the PO)

System will calculate all the retention amount deducted and will post only the amount which is equal
to or less than the amount of maximum retention % maintained in the WO.

Manual Payment Certificate


Page 43 of 72

Training Manual

All entries which are to be made by accounts shall be on "Net Value this Bill" only.

Step- Creation of Service Entry Sheet:


Transaction Code

ML81N

SAP Menu

SAP Menu >> Logistics >> Materials Management >>


Purchasing >> Purchase order >> Follow on function>>
Service Entry Sheet >> ML81N

Manual Payment Certificate


Page 44 of 72

Training Manual

Select the Other Purchase Order,


Enter Purchase Order Number:
Enter.

Click on, Create new Service Entry Sheet

Manual Payment Certificate


Page 45 of 72

Training Manual

Service Entry for Unplanned Services:


If in Work order services specifically not mentioned service limit is mentioned, services can be
entered in service entry sheet manually.

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Service
Number

Service Number

select service number as per


required service description

Quantity

Amount of work
completed

Amount of work completed,


needed to be confirmed

Gross Price

Gross Price

Gross Price for service per unit

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

Manual Payment Certificate


Page 46 of 72

Training Manual

Save the document.

Manual Payment Certificate


Page 47 of 72

Training Manual

Service Entry for Planned Services:


For Planned Services: if in Work order services specifically mentioned follow the process, user can
adopt the services with reference to work order.

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Manual Payment Certificate


Page 48 of 72

Training Manual

Short text

Short text for ref

Reference short text

Reference

Reference detail

Reference details for services

Service Sel.

Service Selection

Service Selection for adoption in


Service entry sheet

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

Select the Purchase order,


Enter.

Manual Payment Certificate


Page 49 of 72

Training Manual

Select the services which are executed.


Adopt the Services in to service entry sheet, as highlighted in snapshot.

Update the Quantity of service executed.

Manual Payment Certificate


Page 50 of 72

Training Manual

Save the document.

Manual Payment Certificate


Page 51 of 72

Training Manual

Create Payment Certificate:


T-code: ZMM_PC

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values
ZP03/ZP0
4

Comments

Purchase
Document

Purchase order
Number

Posting
Period

Posting Period

Enter appropriate posting period

Fiscal year

Fiscal year

Enter fiscal year for entry of


payment certificate

Select
option:
create

Creation of
payment
certificate

Select Purchase Order Number


while creating new payment
certificate. Starting from 43* or
44* number series of purchase
order

Select, option to create payment


certificate.

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


Manual Payment Certificate
Page 52 of 72

Training Manual

Value of the work executed will automatically come from payment certificate,
Extra work deduction value can be entered manually if required.
After confirming all the details payment certificate can be submitted to accounts & saved.

Manual Payment Certificate


Page 53 of 72

Training Manual

Print for the payment certificate for work executed

Manual Payment Certificate


Page 54 of 72

Training Manual

9.0

Scenario 4: Certified Quantities and Material on site consumed

This is applicable if the Material on Site is consumed and the valuation is done as per the BOQ line item.
In such case, the value of material advance will be reduced and billing is to be done for BOQ service line
item.

QS Department has to create the Service Entry Sheet based on the certified quantities.

This service entry will get released as per the approval hierarchy.

QS Department shall initiate for the creation of payment certificate.

All the service entry sheets values for the month posted till that date will be available in the
certificate.

For Material on site, QS has to manual remove the value in the new certificate. The net impact of
removing the material on site will be as -ve value in the column "Net value this bill".

% tage calculation for retention and advance recovery will be available from the PO and will be auto
calculated accordingly in the certificate. However it is allowed to change as per the requirement.

This payment certificate shall be printed and submit to accounts for further processing.

Check the status "submit to accounts" in payment certificate before sending the physical paper to
accounts.

At the time of invoice booking, accounts have to recover the advance payment mention in the
payment certificate in MIRO (amount should be adjusted only on value of work executed and not on
material on site. Advance recovery on material on site will be done manually).

Entry for Retention on vendor bill will be done auto through invoice booking in MIRO. (either on 10%
as per PO or up to Maximum mentioned in the PO)

Manual Payment Certificate


Page 55 of 72

Training Manual

System will calculate all the retention amount deducted and will post only the amount which is equal
to or less than the amount of maximum retention % maintained in the WO.

All entries which are to be made by accounts shall be on "Net Value this Bill" only.

Service entry sheet can be posted as per the process mentioned above,
Payment certificate created for the work executed along with reduction in material on site, as highlighted
below,
However the planned & additional value of the work done executed will directly come from Service entry
sheet.

Manual Payment Certificate


Page 56 of 72

Training Manual

Manual Payment Certificate


Page 57 of 72

Training Manual

Manual Payment Certificate


Page 58 of 72

Training Manual

10.0

Scenario 5: Creation of Payment Certificate with contra charges

This is a scenario wherein materials and services are given to the subcontractor and those needs to be
recovered from the bill.

Contra charges for materials shall be booked on Internal Order of the vendor with respect to the work
order. These entries will happen as and when materials are issued on internal order.

Contra charges other than materials - like repairs, TAC charges, penalties, medical charges, food
charges etc

Repair charges - P&M department shall provide the value of recoverable amount to QS
Department.

Other Charges - Admin at site shall inform all the recoverable charges to QS Department.

QS Department shall park an FI document through T.Code FV50 by crediting the cost center and
debiting the internal order along with PO number. These entries shall be parked in the respective g/l
heads.
Expense A/c

Expense A/C

Dr (with internal order and PO number)


Cr (with cost center with PO number)

QS Department shall initiate for the creation of payment certificate.

All the service entry sheets values for the month posted till that date will be available in the
certificate.

All the cumulative entries of contra charges will be available in the payment certificate based on the
parked entries. If no values are coming in the contra charges, then QS has to check with all other
departments.

% tage calculation for retention and advance recovery will be available from the PO and will be auto
calculated accordingly in the certificate. However it is allowed to change as per the requirement.

This payment certificate shall be printed and submit to accounts for further processing

Manual Payment Certificate


Page 59 of 72

Training Manual

Parking of document FV-50 for debiting the Services rendered to the subcontractor:

Transaction Code

FV-50

IMG Menu

SAP menu >> Accounting

>> Financial Accounting >>

General Ledger >> Document entry >> FV-50 >> Edit or


Park G/L Document

Manual Payment Certificate


Page 60 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action
and
Values

Comments

Document
Date

Document Date

Enter the Document Date

Posting Date

Posting date

Enter the Posting Date

Reference

Reference

Reference text

Doc. Header
Text

Document Header
text

G/L Acct.

General Ledger A

Enter Document Header text


Specific G/L for entries, E.g.
4040820 for accommodation
expenses

Manual Payment Certificate


Page 61 of 72

Training Manual

D/C

Debit/Credit

Debit/ Credit entries

Amount

Amount

Amount in doc

Order

Internal order
number

Internal order: Vendor & plant


specific,

Plant

Plant code

Enter Plant code

10

Purchase
Doc

Purchase order

Enter, Purchase Order Number

No

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)


Create payment Certificate,

Payment certificate will reflect the entries made in FV-50 document as contra charges other than materials,
As shown below,
If any markup is to be taken on Contra Charges, then QS has to mention the amount at the time of
preparation of payment certificate.

Check the status "submit to accounts" in payment certificate before sending the physical paper to
accounts.

Rest of entries for advance recovery and retention etc will be posted as mentioned in the details of
the previous certificates.

Manual Payment Certificate


Page 62 of 72

Training Manual

All entries which are to be made by accounts shall be on "Net Value this Bill" only.

Mark up on Contra Charges

If any mark up is to be taken on Contra Charges, then QS has to mention the amount at the time of
preparation of payment certificate.

Contra charges on the materials:

Contra charges for materials shall be booked on Internal Order of the vendor with respect to the work
order. These entries will happen as and when materials are issued on internal order.

Goods Issue to the sub-contractor on Debitable basis:


Reservation made for Goods Issue to the sub-contractor on Debitable basis Z-61 MvT & Vendor internal
order with reference to the work order, followed by Goods Issue to the vendor,
Creation of the reservation,

Transaction Code

MB21

Manual Payment Certificate


Page 63 of 72

Training Manual

IMG Menu

SAP menu >> Logistics

>>Materials Management >>

Inventory Management >> Reservation >> MB21 -Create

Manual Payment Certificate


Page 64 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action and
Values

Comments

Base date

Base date

Base Date for reservation

Movement
Type

Movement Type

Enter the Movement Type for the


reservation Z-61: GI to sub con
Debitable basis

Plant

Plant Code

Plant Number

(Note: On above table, in column R/O/C; R = Required, O = Optional, C = Conditional)

Manual Payment Certificate


Page 65 of 72

Training Manual

Sr.
no

Field Name

Description

R/O/
C

User
Action and
Values

Comments

Goods
Recipient

Goods Recipient

Goods Recipient: Text

Order

Internal Order
No.

Internal Order Number: vendor


& plant combination

Material
code

Material code

Material code for the reservation

Qty

Quantity

Quantity for the reservation

Batch

Valuation Type

Select, proper Valuation Type

Manual Payment Certificate


Page 66 of 72

Training Manual

Enter the Purchase Order number for the contract for the vendor & plant.
Save.
Reservation is created.

Manual Payment Certificate


Page 67 of 72

Training Manual

Goods Issue to Sub Contractor (by site personnel)

As per the Goods Issue, all the entries will be reflected in the payment certificate, refer the below
screenshot

Manual Payment Certificate


Page 68 of 72

Training Manual

Manual Payment Certificate


Page 69 of 72

Training Manual

Manual Payment Certificate


Page 70 of 72

Training Manual

11.0

Release of Retention & Contra charges

Release of Contra Charges


At the time of preparation of certificate, if any contra charges needs to be released, QS has to manually
enter the amount of contra charges to be allowed. This information will also be passed on to the account
through payment certificate.
Retention Release
Any retention release required by QS needs to be mentioned at the time of creation of payment certificate.
This needs to be mentioned manually in the payment certificate.

Manual Payment Certificate


Page 71 of 72

Training Manual

12.0

Checks and Validation:

1. Payment Certificate will be prepared based on the period of work. All the values posted other than the
previous certificate will be available in the payment certificate.
2. Option of Create, Change and Display will be available for payment certificate. If any entry is missed, it
can be rectified in the change mode. For manual entries, QS Department has to change the entry manual,
however all other entries which are posted through different transactions will appear automatically.
3. There will be an indicator "Submit to account". This indicator needs to be set for submission of payment
certificate to account. If this indicator is not set, user will not be able to create the new certificate.
Also, once this indicator is set, no change will be allowed in the same certificate. For any correction, QS
has to create the new certificate.
4. If Advance payment request on PO through ME2DP is not created, the amount will not be available in the
payment certificate.
5. Material issued to contractor will be issued to the internal Order alongwith work order, corresponding to
the plant and vendor code.
6. At the time of park and post of contra charges, the user has to mention the PO number against which
contra charges are being booked. If it is not mentioned, amount will not be available in the payment
certificate.
7. At the time of booking of retention amount for Material at site amount, the account has to mention the
PO number against which retention amount is being retained. This will also be applicable when any
retention amount is being released.
8. Payment certificate will not be available for work execution amount until SES is not passed and material
document is not posted.

Manual Payment Certificate


Page 72 of 72