FILED

7-28-15
04:59 PM

ATTACHMEI{T

trl

trcNEULTINc
Consulting Enginees nd Land SuNeyo af California

AGREEMENT BETWEEN CONSULTANT AND SUBCONSULTANT


AGREEMENT ENTERED INTO AT Marina, California, on this date of May 28rh, 2004 by and between RBF Consutting
{"Consultant") and Geoscience Support Services lnc. ("Subconsultant").

Attention:

Dennis E. Williams, Ph..

Project:

CoastalWater Project

Description of Subconsultant's Services: Geohydrologic Consulting per attached May

28th

2004 letter.

Subconsultant Fee: $143,512 which includes the cost of professional services performed by others and all expenses
incurred in the pedormance of ths work.
Payments: Subconsultant shall submit monthly invoces to consultant. Consultant shall bill client monthly on account of
Subconsultant's services and shall pay Subconsultant within fourteen days of the time consultant receives payment from
client on account thereof.
Approved and accepted in accordance with the General Terms of Agreement for Subconsulting Services contained in
paragraphs one (1) through thirteen ('13) herewith.
RBF CONSULTING

Geoscience

Services, lnc.

By:

(sis

l\{r,ttl

Lawrence E. Gallery Jr,, P.E.


ffype/Print Name)

1'3t*"

RBF Job

No:

,*4:.,
ffype/Print Name)

-f,^z:

Senior Vice President, Water Resources


Date

i':" lL) lf

fritle)

t luun I
|rifle)

Date:

10-'103579 - Task No. 3.01

;.?,

^ rrr L *{.} q-

P,O. NO:

1gt4

2Q:J

3180 lmjin Road, Room 104, Marina, CA 93933


931.383.8197
FAX 8g1.883.S967
Offices locatd throughout Californla, Arizona & Nevda r www.RBF.con:

at

EtrNSULTING
GENERAL TERMS OF AGREEMENT FOF SUBCONSULTING SEHVICES
Consultant and Subconsullant agree that the following provisions shall be part of this agreement:

1.

2.
3.
4,
5.
6.
7.

9.

This agreement shall be binding upon the heirs, executors, administralors, successors and assigns of Consultant and

Subconsultant.
This agreement shall not be assigned by either Consultanl or Subconsultant without the prior written consent oT the other.
This agreement contans the entlre agreement between Consultant and Subconsullanl relating lo the project and the provision of
services to the project. Any prior agreements, promses, negotiations or representations not expressly set forth in this agreement
are of no force or effeet. Subsequent modifications to this agreement shall be in writing and signed by both Consultant and
Subconsultant.
This agreemenl shall be governed by and construed in accordance wth the laws of the Stale of California,
onsultant and Subconsultant agree to cooperale with each other in order to fulfill their responsibilities and obligations under this
agreement. Both Consultant and Subconsultant shall endeavor to maintain good working relationships among members of the
project team.
Subconsultant shall perform services as an independent contractor and shall perform lhe services provided for in this agreement in
accordance with generally accepted standards of professional practice in effect at the time of performance.
Unless provided otherwise by the terms of Subconsultant's Services, Subconsultant shall submit monlhly involces to Consultant.
Subconsultant recognizes that his or her invoices will be presented by Consuliant to the project client and that Consullant will pay
Subconsultant the amount due for services rendered and expenses incurred within fourteen (14) calendar days after Consultant is
paid by the project client. Nothing contained in this paragraph shall constitute a waiver or release of Subconsultant's mechanic lien
rights.
Before any services are ptovided under this agreement, Subconsultant shall procure and maintain in eflect insurance coverage in
mounts not less than set Torth below.
(a) Workers' Compensation and Empoyer's Liability: as required by the laws of the State of California.
(b) General Liability; commercial general liability insurance for personal and bodily injury, including death and property damage,
on an occurrence basis, in the amount of $2,000,000 combined single limit each occurrence and in aggregate.
(c) Automobile Liability: automobile liability for personal and bodily injury, including death and property damage, in the amount of
$1 ,000,000 for each accident.
{d) Professional Liability: professional liability insurance for damages incurred by reason of any actual or alleged negligent act,
error or omission by Subconsultant in the amount of $1 ,000,000 combined single limit each occurrence and annual
aggregate.
(e) Certificates: Subconsultant shall provide cerlficates of insurance evidencing coverage required above. Each certifcate shall
provide that the coverage aflorded shall not be canceled or ordered reduced by the Subconsullant, except with at least thiy
(30) days prior written notice to the Consultant. Should this occur, Subconsultani shall procure and furnish to Consultant prior
to such effective date new certificates conforming to the above coverage requrements. Suconsultant shall not have the right
l receive any payment under this agreement until all insurance certificales are received by Consultant.
Subconsultant agree$ to indemnify and hold harmless Consultanl, its oificers, directors and employees from and against all claims,

losses, demands, damages or costs, including attorneys' fees, arising from the negligent acts, errors or omissions of
Subconsultant, its officers, directors and employees, or anyone for whom Subconsultant is legally liable, arising out of the
peformance of this agreement.
'10. Consultant may terminate Subconsultant's performance under this agreement, with or without causet upon written
notice.
Consultant shall compensate Subconsultant for performance of services through the period prior to termination, plus reasonable

termination expenses, provided Subconsultant is not in default.


ln the event of any litigaton arising from or related to the services provided under this agreement, the prevailing par"ty will be entitled
to recovery of all reasonable costs incurred, including staff lime, court costs, attorneys' fees, experts' fees and other related
expenses.
12. lt any provision of this agreement is held by a court of competnt jurisdiction to be invalid, void or unenforceable, the remaining
provisions shall remain in full force and eftect and are binding on Consultant and Subconsultant,
13. ln an effort to resolve any conflicts between Consultant and Subconsultant arising out of or relaling to the performance of this
agreement, Consultant and Subconsultant agree that all disputes between them arising out of or relating to this agreement shall be
submitted to nonbinding mediation unless the parties mutually agree otherwise, This dispute resolution provision shall not preclude
either pady Trom filing a legal action in small claims court if the amount in dispute is within the jurisdiction of the small claims cout,
nor does it preclude or limit the right to pedect or enforce applicable mechanic's lien or stop notice remedies,
'1

1.

General Terms

Subconsultantnitials -

Consultant

tniti"tr,,ffi--

YJI',

Aal aa+

f,.

..L

0lr3lFtl

l6{l{-01

JU J )Uo+OJ

ULUJUILiUL

FfttlUlTER80nCg5

1-130 P-0t/t3

F-s6

tll

.*--*ffH:*orrm,n
ASPEEflETIT gE]ryEE} COil8ULIfT TID qUEO}I{E,&T}I1
AFEEltEllT NTEBEP lNTo AT Mtna, Calrfonc" onpr
('Gorr*ulrrn-) m arcnc. suppan serr*r hc.

cte

sf ly zn, 20ftr Dr 116 Detrn FBF coruanng

asuboonsulflfi,

Amengon:

Proect

ennu

E" Wit$lsns.

pn_

C,arat ttarPnecr

mcnpon of subconslnnf sarpag: eorrdrgr cniunfg pef aEchsct


guoconEr*nm Pm: $l$,$Ie wntcfi
nqlfdet tfie t ol plqlrrsonnt
fisrneQ n tFr pfnnsma trfie xfti,

My f

F Zfu pr.

rvs p.rrrned y oe 5n 4l

ot13s

Faynerf*^ SuDcorsuftrfll tFa{ ssm fongly rtrrics o cans$ant Consuturt


$rall bdl firftt morr]rty on ,"coqllr
subcuosunnre 56rucs and shrll pay Sumcneuilam rtrin torrrrrr
oqs frrns.u-tn
."{rrr

-r ''' F"
"f

clelltonagcufffrof.

pprot/c fltrl scepd in eranct wr, re.]Fcfl TFms


paragraph* ane {1} ro&gh trt (tA} nrewn.

AqreenEr

n ,"o"u"*

er sshtHu*rq squa

REFOT{sI,tNilB

JT

?-L

Vice

t-

+11

F.n

Dens;

Ho; Io.l sflS7g. TsK ilo- s.ol

,*'- $LL. -$fL

F'o- ilo'

Ll-n.

t :c*

GB

1Ocl*rktuqn10r,tr{s,e fEfrl r
ftc pcq{ ner'frtn.

a1

6{tt f Fr(l,tt.gest
r *4mF -m

enn tfrr]rtae

prymsftfurn

onned in

ac],.

rJ]t YJa4 : . J- l.
{04-0,1

0l:[tl

f,rl f, f qg!+J

(:LUf,U

tn|FrTER ffiS0UnCEg

t HgL

!LILL

T-r30 p.03105

t --

F-S60

lla
rHiHLTINC
cEt{ERt rERltS oF rREtlrtr FoR $uot{6ut'Tlilc:
semncEs
CsrurE ar glbcsrlt $ Ano rr ne l,ring prwnnnr
'nrrt
1' Tts qqtltnr sn gs Hnrlirg

a.nfl e Fqft $fta qfrFil:


.reri. 'irnr"rq*. rg1', ro rflgris cf n*,r

olr la

$onryfE|rl

2 this grxnranr glLllof ?e arsgnral sy ffnq cirrunaril or gqnqHnt iiq'l.l t1e pflor rtrItn Gorl3o'r
cf I6 onr.
grere elqrurc srr{u
3" ]T'e glcornrt cotrl'-ms
oocs"i'rrr{ 5.rnit{rirn'ddd;'
prail,,

su rns pr6,.rrfi ef
e
sn'cee ro m' Prsec' ny
prorftsee. ncgaritrm or reprrrdns- r .sd!,
Prior
laf ror fl
rP d nc tofc r dlc{. Suessquml mtlfirhrone ro'tir'r;ffi
,nsen'nt
fEl r rn rrrfig Nll tn"q r a[n Oosltam qr
qqcqtlunflrl

*tsmrn-

c
S
'

h's {qrmrT6n4tflovcrd p31coonrreq n apcofrlailcs'.$FlH


otln sfltorN.
csnH[il no Srmonctff qsrry qp$ uCI rcrr
o i orogl.t hl[ reir rrryrrrplmce srrdr1 ncer rh
agtn'tl 8onl cryrulurr ryro sHcann. 6ll" ;cratr;;firdn
gsorr rot.nq rerniF* rrmng *.rc' f
prqlErflr.
rtp
$t'tri*lFnr r4l Ff,rff ttfi* s rr HFff(E cnFgctfr
fl rhfi prfurm ilrr srvrmr prghridq r rn
fxs qgre
caruanc Fr g*nsra{v flcHFs surffirrfd$ prcilnon* precr.in
dr,icr*pF o,rn.rpi;nfi"

provre{ oemise y

P&g v Fts Proc


ngDa

ir

gnrs q SOmnEnrrf

difi NdnrH

con!r:od

mi-tffiifffin$

.(t
t)
{}
(q)

Sffinq 3.O*r"-r,n n qna[ tldt t fiEty,nroes Corrr,drr


" prrn Xra..rwn p rir,,ii ii rn "' srir-i;;,#
h pr,

d ofor*i',n*mA unhn tonrn fi,r}) adenq$ dflrs 6ff go*hnant

l parryqir irg

or or srrofl

is

s,ro'r{u*r.' rrec'*rc

rn

ee.' ins.rflcp ear,fe

ur

ne amourq c*

St]ttooair;

tt nn,{
emnn
$ry efurnCe c{tEar d rr'*sp tu6r,cin0 rylmq nq,utt o- Esr,t !Ge,flrl
prq4qe $ thc covefrr rlfordrl
slFll ner e cnram{ o. orot reo,c q rr* rrri,r-.,,nr".F
ar {s ,.nf
o) qqra FfFr ffi rrfi le Sra cu1p1 stloutd uri, o*di, _+r-ii*.m;;!i
* h,rr ro rorsErs Fr,or
lo sct cl(Ilu dm ,u* crttrys corqlring ttn erro m;ng reqtrqnft, '
$ncCInsfr* Nr r,a t{hil t ," r,g'
t ri$e ily pryDm qner r
rrl ol nx.nnc
gv n*"rnnn
suocorrlr agrgs b rrrlffl11fo ao hl rnntueo Bonra rrr"f| d"e "l;"d
rR dffi, rraru nd 6rqlq6 Forn sno a8l r[ rir.
.sG. corndrrdr. rnfitrs sr ..osuf, rriclrl{rng Fon
,?r" rdi,ffi *r" Bnors sr rfrsscns c{
!s. ir"e Siqpa
gtcorBuwn rn emers' fol

*r"r*o

Cofla*sm $l cryrperqe Sfguil

ls

lrfirs-tft*flce tq rlryqss rrnrrfld y paon o ny acnI r ngaq


,]sglgq.fl cr,
y svcfitu[srt i0 trt no,nt i
ll,i, o"f, occqrnn,

dtd artpftr.

2'

*ruri

s|,r!{81.s,^!ttffll afiAll prc,rs cnc ri$nn

* rfi;;t"ir E*
subdr*.,ii;'i,i'i"qnly

pcrforrnansc d t qge.nsrt
10' cantlt4rG rrBv ns sucongryrl's perrmerrcn sngff

lt{tv rsr prqornt ndn"r,t;i'ry, ns"dru cfa


""-itn
qn,afuron, anns,
ffirig'ffir
Fhor!elona uDlw' protes'darFl

[] Ceniftc*:

cr;r!r.rr

rttorrr*s' canpcon 8nt-EFoyer.s


!'lb[, e qglgd w [r k.T ot Tr gffp cf , ifofilr!.
qneia u4iti* corrunaro glitorat tr*10-nrnn-pr
Grin*-ms uF r,fy.irx,i,4r1s dilrn d prqprny qarf,sqo,
ori an aG'rnnct re, llt is srmn d-$2,00o.ffi
qtrrleq r'ngr [ftr adir
i ang r aq{fr6

lggragrra.

g'

nt

$corslta r"sggrE lt or ar ntyo' !t


$umons{tlqfrt fre anpr rlp lar servitc
qqglo

'

uu

pernn

rrFr, ororirrg

s grc*art wrr f *llr.,o., car uptn

rer

qr

o.,

ncp-

r
d
n f pi pur ,,!ffrxlarL phs rnbb
llr{nDn
rypenea9. prerCrc 8ocorrsumt c irprno*rdl.
ln fie ?vfi d rnt I04n a$$ns fgtn of refirrd frn rcs pro,q"d
undr tn,s artl'frt, drr prr,relng p.'y sflt eue{
fcgrfy of e r*qnale colla rficrc.!. rdu{,fi

,ur

dn

oaqr, toflr.ln, lei, xFor. fdr {u,g q",


',l,*
lt ny p@rf cf 1i gl'BeFr8 ,3 cc y a
cnps! J'tkon lD- Invr, voirl r rrrltorca{, th r:emarng
'
provtspflE {ndl tqlfln tn full lor tle fficr ilrc31
-or
.rc nrnq1g'o1
Cottltfng ng g,.dns.n*
ln nn offirr rfrotuc gy cortrcre rrtroen atnr1;,r"r,
#
,o,l*rrg r qr. p"lrm''o q
t:lrrma" camtt
oPafne

rr*.

ttns

anq sEqunrashr$ ssprrssr;trn"rnq,tg i*r


.i,plryE b qilffrp,rstr"ll G
$mmd nnrittng Facrqfrcri r{:c rt $nr* n rr.drrr ug* odF{rt".
rti *'rpli ur:lh"n Frrsan 3 nsr prq,.o.t
e{her Ff,ny tptrl thf t fal 0c1fi n tm eiflF rl
,.$ rfpl.nr is rglrn !.s irticdm ol lrs $tt dinE aon.
rr do prd{qorfirrrf

t ngmc} porircror nhrpepFlbls mfrrrtsrr #a.rti,,srrd,".

GEOSCIENCE
May 28,2AA4
Mr. Lawrence E. Gallery Jr., P.E.
Senior Vice President, Water Resources

RBF Consulting
3180Imjin Road, Suite 104
Marina, CA 93933

Subject:

Revised scope of work (Task 4.3)


California American Water

for the coastal water project for

Dear Lany:

As per our recent conversation with Paul Findley, this letter outlines our revised scope of work
aad cost estimate to revise GEOSCIENCE's third task under the Beach Vlell Feed Water Supply
Investigation:

4.1

Beach lVell Feed Water Suppty Investigation

Purpose and Scope

The purpose of Task 4.1 will be to investigate the feasibility of constructing horizontal
directionally drilled wells (HDD) which will serve as the intake supply for the Moss Landing
Seawater Reverse Osmosis (SWRO) plant. It is understood that the supply requirement from the
wells will be approximately 42 mgd.. The work will investigate well design strategies and
technology needed to adapt traditional horizontal well drilling methods, which are currently used
for oil and gas production, to construction of near-shore intake wells for the Moss Landing
SWRO plant. The work will focus on novel well design and completion teehniques that will
optimize well and filter pack design methods. Specific subtasks are described below:

CEOSCIENCE SUPPORT SERVICES INCORPORATFD


rou

d Water Reso u rces Devel op me nt

P.O. Box 220, Claremant, CA 9l71'l


FAX 909-920-0403

949-920-0707

Moss Landing Desalination Plant

Task

Beach well Feed wate

4.1 Background Data collection

Investigation

and Assessment

28-May-04

Moss Landing

Collect and assess all available reports and data pertaining to geohydrologic characteristics in the
vicinity of the Moss Landing SWRO plant. Data review will include, bur not limited to data on
existing wells, borings, pumping tests, geologic maps, cross sections, wate levels, published
reports, informal reports, technical memorandums and any other relevant data.

Task

4.2 Field Site Investigation -

Moss Landing

A field investigation will be made of potential HDD well sites. Potenrial sires will consider both
HDD production potential as well as identify any site issues which may prove problematic in
construction of hoizontal wells or proximity to the SWRO plant. During the field
reconnaissance, a location for the explCIratory/test boring will also be determined.

Task 4.3 [nvestigaton of the Feasibility of HDD Intake at the Armstrong Ranch Site in
Marina
This task will characteze the subsurface materials and hydraulic properties in the aquifer
systems in the vicinity of Armstrong Ranch area. For example, chamctezation will determine
the extent and nature of the 180-ft and 400-ft aquifers beneath the site, their production potential,
and their water quality. To assist in this task, a variable density ground water rnodel will be used
to simulate both project flows, water quality (TDS, chlorides), and impacts on

freshwater/saltwater. aquifers.

Task 4.4 Investigate technology needed to drill and complete HDD wells:

This tsk will involve a collaborative effort between petroleum industry technology, ground
water well driiling technology; well casing aRd screen companies and leading horizontal well
construction firms. The key to developing HDD technology as a viable source for SIVRO supply
is to develop a method which can:

GEOSCIENCE Support Services, Ic.

RBF Consulting

Moss Landing Desalination Plant

* Beach well Feed water Su

Investigation

28-May-04

1) Stabilize boreholes in

unconsolidated materials which are typically found at shallow


depths beneath the sea floor and enable completion of pre-packed (or post-packecl)
screens in a horizontal bore;

2)

Design and construct long-horizontal wells which can provide sufficient flow to meet
SIVRO intake demand.

This task will evaluate and recommend the best drilling and completion technology which may
be subsequently evaluated in a foliow-up investigation where a pilot horizontal well would be
drilled and completed. Potential methods include:
a

Use of petroleum drilling "mud motor" technology followed by enlarging the borehole
prior to placing casing and screen string.

Develop a methodology for placement of filter packed screens to long distances in


horizontally drilling borehole.

Test the effectiveness of pre or post-packed screens in meeting intake requirements

V/ork with well-screen manufactures to develop a cost-effective technology for

producing a filter-packed well screen capable of being placed in a horizontal well beneath
the sea bed.

Task 4.5 Summary Report

The results from all the tasks will be summarized irto a comprehensive report discussing the
feasibility of using HDD wells as the 42 mg souice for the Moss Landing SIVRO plant.
Essential sections of the report will include:
B

ackground data assessment

Geohydrologic characteization of aquifers in the vicinity of the Moss Landing SWRO


plant and the Marina Site
a

HDD consfruction and completion technology

GEOSCIENCE Support Services, Inc.

RBF Consulting

Moss l,andins esalination Plat -- Beach well Feed water Supply Investisation

Feasibility of using HDD wells for supply t Moss tanding ard Marina

Estimated production from each HDD well

Recommendations for further work and verification.

28-May-04

The estimated cost for this scope of work is $143,512 as detailed on the attached table. If you
have any questions, please call me at (909) \Z0-OTA7.
Sincerel

E. Williams, Ph.D.
President
enc1.

cc: Paul Findley

GEOSCIENCE Support Services, Inc.

RBF Consulting

RBF Consulting . Coastal Water Project - California American Water


Estimated lTours and Costs . GEO$CIENCE Support Services, Inc.

HOURS

Principal
Ilydrologist

Senior
GeohydrologisU

Stff

Modeler

Geohydrologist

Graphics

Clerical

ttEt

s149

$7e

$79

$s2

16

40

80

2 - Field Site Investigation - Moss


Landing Site

36

36

3 - Investigation of the Feasibility of


HDD Intake at the Armstrong Ranch Site in
Marina (Includes Field Site Investigation)

32

144

80

12

80

100

80

t6

l6

80

100

40

Description
Task

1-

Hourly Rate

Background Data Collection and

$16,312

$250

$i6,562

$14,436

$o

$14,436

$36,788

$2s0

$37,038

942:t48

$5,000

$47J48

$27,428

$300

s27:728

Total

8137,712

$5,800

$143,512

Assessment - Moss Landing Site

0
q)

r >'

>
H
I

Task

Task

Task 4
Investigate HDD Technology with
Petroleum Industry, Water \rye Industry and
Casing ancl Screen Manufuctuers

Summary Report-Beachwell
Task 5
Feedwater SupplY StudY

?8.May.04

Page

I of

GEOSCIENCE Support Services, Inc,

D
P.O. No. 5494

rlt

Date: August 1,2008

BC]NEULT!NT3

Job No.: 70-100168.001

Vendor:
Geoscience Support Services, Inc.

To
RBF Consulting

P.O. Box22A

14725

Calremont, Ca.,9171.1

Irvine, CA 92618-?027

Cjrder
8/1/08

Date: Contact:

Alton Parkway
For:
Paul Findley

Terms:

Dennis Williams

OUANTITY

PLEASE SUPPLY ITEMS LISTED BELOW

PRICE

Professional services rendered pursuant to the signed

Agreement dated May 16'h 2008 between


Consultant and Sub-Consultant.

Total Contract Amount

$15,000.00

IMPORTANT
P"O. NUMBERS MUST APPEAR ON
INVOICES, PACKAGES, ETC.

ALL

oav'ifByu6s

Corporate Controller

ts an
as part
agreement
provsions of Executive
national orgin; the Vietnam-Era Veierans Readustment
Assistance Act of 974, as amended, ihe Rehabilitation Aci of 1973, as amended; Executive Order 11625 and 15 U.S.C. Sec, 637 as
pertaining to minoriiy business enterprises and smal business concerns and Executve Order 12138 pertaining to women's
business enterprises; and regulatons issued pursuani to each. Pursuant to xecutive Qtder 11246, and particularly 41 C.F.R. Sec.
60-1.2, and by cceptance of this contract, the contractor cerfies that he does not and will not maintain any f;acilities in a
segregated manner, or permit his employees to perform their services at any locaton, under his control, where segregatecj facilities
are maintained. Further, the contractor agrees thai he will obiain smlar certifcate prior to lhe award of any nonexempt
subconlracior.

PL.ANNINEIE5INCff,N5TRUtrTIT]N
14725 .ltan Parkwav. lrvine. CA, 92618-2027

P.O. Box 57057. Irvine, CA 92619-7A57

Oics ociec lhroughout Caliornia, Arizona & |rlevd


p.ted m

rryf frDet

949.472.355

www.FBFcom

tax 949.472.8373

/t

.\ t'

I '
tlt

tr[]NEUUTNC
Consulting Engineers and Land Surveyors of Californa

AG REEMENT BETWEEN CONSULTANT AN D S UBCONSULTANT

AGREEMENT ENTERFD INTO at Monterey, California, on this date of May"l6,2008 by nd between RBF Consulting
( RBF) {"Consultanf') and Geoscience Support Services lnc. (GSSI) {"Subconsultanf').

Attention:

Dennis Williams, Ph.D.

Project:

North Monterey County Seawater lntrusion Barrier Feasibility Study

Descripiion of Subconsultant's Services: Groundwater modeling oi injection of reelaimed waier into the 18-foot aquifer of
the Salinas River groundwater Basin.
Time of Completion:

weeks from the date of this Agreement.

Subconsultant Fee: $15,000, which includes the cost of professional services performed by others and all expenses
incurred in the performance of the work.

Payments: Subconsultant shall submit monthly invoices to consultant. Consultant shall bill clienl monthly on account of
Subconsultant's services and shall pay Subconsultant within fourteen days of the time consultant receives payment from
client on accounl thereof.
Approved and accepted in accordance with the General Terms of Agreement lor Subconsulting Services containd
paragraphs one (1) through thifteen (13) herewith.

Geoscience

RBF CONSU

Services

(Signature)

L.

Dennis Williams
(Type/Print Name)

Vice President

President

(Title)

Date:

{.-

IJ
RBF Job No:

/t^

(Title)

tuo6

Date:

70-100168.001

P.O.

PLANNNCi I

T5IEN I

CA 92618-2027 * P.O. Box 57057, lrvie,

l. -uyt

- -

No: 6

EONSTRUtrTIBN

CA 92619-7057 * 949.47?.3505 * FAX 949.472.8373


Otficas located throughout Calfornia, rizona & Nevada * www.BF.com

14725 Alton Patkway, lrvine,

trrf,NSIJLTINE
GENERAL TERMS OF AGREEMENT FOR SUBCONSULTTNG SERVICES
Consultant and Subconsultant agree that the following provlsions shall be part of this agreement:
1. This agreement shall be binding upon the heirs, executors, administrators, successors and assigns oi Consultant and Subconsultant.
2. This agreement shall not be assigned by either Consultant or Subconsultant without the prior written consent of the other.
3. This agreement contains the entire agreement between Consultant and Subconsultanl relating to the project and the provision of
services to lhe project. Any prior agreements, promises, negoliations or representations not expressly set forth in this agreement are
of no force or effect. Subsequent modfications to this agreemenl shall be in writing and signed by both Consultant and
Subconsultant.
4. This agreement shall be govemed by and construed in accordance with the laws of the State of Califomia"
5. Consultant and Subconsultant agree to cooperate with each other in order to fullill their responsibilities and obligations under this
agrement. Boih Consultant and Subconsultant shail endeavor to maintain good working relationships among members of the
project team.
6. Subconsultant shall perform servces as an independenl contractor and shall perform the services provided lor in this agreemenl in
accordance with generally accepted standards of professonal practice in effecl at the time of performance.
7. Unless provided otherwise by the terms of Subconsultant's Services, Subconsultant shall submit monthly invoices to Consultant.
Subconsultant recognizes that his or her invoices will be presented by Consultant to he project client and that Consultant will pay
Subconsultant lhe amount due for services rendered and expenses incurred within fourteen (14) calendar days after Consultant is
paid y the project client, however, in no event shall payment be later than sixty (60) days from date Consultant receives
Subconsultant's invoice. Nothing contained in this paragraph shall constitute a waiver or release of Subconsultanfs mechanic lien
rights.
L Before any services are provided under this agreement, Subconsultant shall procure and mantain in effect insurance coverage n
amounts not less than set forth below.
(a) Workers' Compensation and Employeds Liability: as required by the laws ot the State of California.
(b) General Liability; commercial general liability insurance lor personal and bodily injury, including death and property damage, on
an occurrence basis, in the amount of $2,000,000 combined single limit each occurrence and in aggregate.
(c) Automobile Liaility: automobile liability for personal and bodily injury, including death and properly damage, in ihe amount of
for each accident.
' (d) $1,000,000
Professional Liability: professional liability insurance for damages incurred by reason of any negligent act, error or omission by
Suconsultant in the amount ol $1,000,000 combined single limit each occurrence and annual aggregate.
(e) Certificates: Subconsultant shall provide certificates of insurance evidencing coverage required above. ach cerlilicate shall
provide that the coverage afforded shall not be canceled or ordered reduced by the Subconsultant, except with at least thirty
(30) days prior written notice to the Consultant. Should this occur, Subconsultant shall procure and lurnish to Consultant prior
to such effective date new certificates conforming to the above coverage requirements. Subconsultant shall not have the right
to receive any payment under this agreement until all insurance certifieates are received by Consultant.
9. Subconsultant agrees to indemnify and hold harmless Consultant, ils officers, directors and employees from and against all claims,
losses, demands, damages or costs, including attorneys'fees, arising from the negligent acts, errors or omissions ol Subconsultant,
its officers, directors and employees, or anyone lor whom Subconsultant is legally liable, arising out ol the performance of this
agreement.
10. Consultant my terminate Subconsullant's performance under this agreement, with or without oause, upon written notice.
Consultant shall compensate Subconsultant for perlormance of seryices through the period prior to termination, plus reasonable
termination expenses, provided Subconsultant is not in default.
'l 'l . ln the event of any litigation arising from or related to the services provided under ths agreement,
the prevailing party wi[ be entitled
to recovery of all reasonable costs incurred, including staff time, court cost$, attorneys' fees, experts' fees and other related
expenses.
12. lf any provision of this agreement is held by a court of competent jurisdiction to be invalid, void or unenTorceable, the remaining
provisions shall remain in full force and effect and are binding on Consultant and Subconsultant.
13. ln an eflsrt to resolve any conilicts between Consultanl and Subconsultant arising out of or relating to the performance of this
agreement, Consultant and Subconsultant agree that all disputes between them arising out of or relating to this agreement shall be
submitted lo nonbinding mediaiion unless the parties mulually agree otherwise. This dispute resolution provision shall not preclude
either party from filing a legal aclion in small claims court if the amount in dispute is within the jurisdiction of the small claims court,
nor does it preclude or limit the right to perfect or enforce applicable mechanic's lien or stop notice remedies.

General Terms
Subconsuliant lnitials
Consultant lnitials:

( Dr'

Irl
trENEULTING
GENERAL TERMS OF AGREEMENT FOR SUBCONSULTING SERVICES
Consultant and Subconsultant agree that the following provisions shall be part of this agreement:
1. This agreement shall be binding upon the heirs, executors, administrators, successors and assigns of Consultant and Subconsultant.
2. This agreement shall not be assigned by either Consultant or Subconsultant without the prior written consent of lhe other.
3. This agreement contains the entire agreement between Consultant and Subconsultant relating to the project and ihe provision of
services to the project. Any prior agreements, promises, negotiations or representations not expressly set forth in this agreement are of
no force or effect. Subsequent modifcations to this agreement shall be in writing and signed by both Consultant and Subconsultant.
4. This agreement shall be governed by and construed in accordance with the laws of the State of California.
5. Consuliant and Subconsultant agree to cooperate with each other in order to fulfll their responsibilites and obligations under this
agreement. Bo{h Consultant and Subconsultant shall endeavor to maintain good working relationships among members of the project
team.
6. Subconsultant shall perform services as an independent contractor and shall perform the services provided for in this agreement in
accordance with generally accepted slandards of professional practice in effect at the time of performance.
7. Unless provided otherwise by the terms of Subconsultant's Services, Subconsultant shal! submit monthly invoices to Consultani.
Subconsultant recognizes that his or her invoices will be presented by Consultant to the project client and that Consultant will pay
Subconsultant the amount due for services rendered and expenses incurred within fourteen (14) calendar days after Consultant is paid
by the project client. Nothing contained in this paragraph shall constitute a waiver or release of Subconsultant's mechanic lien rights.
L Before any services are provided under ths agreement, Subconsultant shall procure and maintain in effect insurance coverage in
amounts not less than set forth below.
(a) Workers' Compensation and mployer's Liability: as required by the laws of the Stale of California.
(b) General Liabilily: commercial general liability insurance for personal and bodily injury, including death and property damage, on an
occurrence basis, in the amount of $2,000,000 combined single limit each occurrence and in aggregate.
(c) Automobile Liability: automobile liabllity for personal and bodily injury, including death and property damage, in the amount of
$1 ,000,000 for each accident.
(d) Professional Liability: professional liabiiity insurance for damages incurred by reason of any aciual or alleged negligent act, error
or omission by Subconsultant in the amount of $1,000,000 each claim and annual aggregate.
(e) ertificates: Subconsultant shall provide certificates of insurance evidencing coverage required above. Each certificate shall
provide that the coverage afforded shall not be cancelled or ordered reduced by the Subconsultant, except with at ieast thitty (30)
days' prior written notice to the Consultant. Should this occur, Subconsullant shall ptocure and furnish io Consultant prior io such
effective date new cerlificates conforming to the above coveage requirements. Subconsultant shall not have the right 1o receive any
payment under this agreement until all insurance certificates are received by Consultant.
Consultanl and Subconsultants agree, to the extent permitted by law, to indemnify and hqld harmless each other, their officers,
9.
directors and employees from and against all claims, losses, demands, damages or costs, including attorneys fees that are ultimalely
determined by a court to be caused by and only the extent of, the actual negligent acts, errors or omissions of either Consultant or
Subconsultant or anyone else for whom Consultant or Subconultant is liable, arising out of the performance of this agreement.
1 Consultant may terminaie Subconsultant's performance under this agreement, with or without cause, upon written notice. Consultant
shall compen"t* Srb"on"ullant for performance of services through the period prior to termination, plus reasonable termination
expenses, provided Subconsultant is not in default.
1' ln the event of any litigation arising from or related to the services provided under this agreement, the prevailing pady will be entitled to
recovery of all reasonable cosis incurred, including staff time, court costs, attorneys' fees, experts' fees and other related expenses.
12 lf any provision of this greement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaning
provisions shall remain in full force and effect and are binding on Consultant and Suconsultant.
t3 ln an effort to resolve any conflicts between Consultant and Subconsuitant arising out of or relating to the pedormance of this
agreement, Consullant and Subconsultant agree that all dsputes between lhem arising out of or relating to this agreement shall be
submitted io nonbinding mediation unless the parties mutually agree otherwise. This dispute resolution provision shall not preclude
either party from filing a legal action in small claims court if the amount in dispute is within the jurisdiction of the small claims court, nor
does it preclude or limit the right io perfect or enforce applicable mechanic's lien or stop notice remedies.

Generar

rerms

z
fr'U
tnitial"'.
F-

Subconsultantlnttials
Consultant

AG REEMENT BETWEEN CONSULTANT AN D SUBCONSU LTANT

AGREEMEN ENTERED INTO AT San Diego, on this date of 11112112 by and between RBF Consulting
i"Consultant") and Geoscience Support Services lnc. ("Subconsultant").

Attention:

Dennis Williams

Project:

Monterey Peninsula Water Supply Project

Description of Subconsultant's Services: Subconsultant shall provide as-needed geotechnical engineering


services prior to the design of the tesi slant well per tasks to be determined by the Consultant.
Payments: Subconsultant shall submit monthly invoices to Consultant using the Subconsultant lnvoice Form,
attached hereto as Exhibit A. Consultant shall bill client monthly on account of Subconsultant's services and
shall pay Subconsultant within fourteen days of the time consultant receives payment from client on account
thereof. The not-io-exceed limit for this contract is $10,000.
Approved and accepted in accordance wiih the General Terms of Agreement for Subconsulting Services
contained in paragraphs one (1) through thifteen (13) herewith.

Geoscie

RBF CONSULING

(Signature)

re)

P**

t l- F;*"J {.y

fype/Frint

Dennis E. Ilillians
(Type/Print Name)

Name)

Vic. - ..s;J.'J

President
(Title)

(Title)

Date:

RBF Job

lnc.

Date:

Z.

No: 13A770

20-Nov-2012

P.O, No:

FLANNINGi T DEIEN T ENETRUtrTItrN


tA 92618-227 r P.O. Box 57057, lrvine, CA 52619"7057 r 949-472.3505 FAX 949.472.8373

14725 Alton Parkway, lrvine,

Offices located throughout Califorra, Arizon & Nevada

www.RBF.com

SUPPLEMENT to STIBCONSULTANT GREEMENT


AMENDMENT NCI. 1
TO
SUBCONSULTANT AGREEMENT
FOR
PROFESSIONAL SERVTCES

TiS AGREEI{ENT, entered into this i 3th day of February,2A13. herei.nafter refen'ed to as
Arnendment No. 1, by and beiween RBF Consulting, located at9755 Clairemont Mesa Blvd. San
Diego, CA,92124, hereinafter referred to as "RBF", and Geoscience Suppofi Services
Incorporated, located at P.O. Bor 220, Claremoff, CA, 91711, hereinafer refered to as
''SUBCONSULTANT".

WHEREAS, RBF and SUBCONSULTAIiT have entereci into an agreement on November 12,
2A12 (heteinaer retrred to as Original Agleement) for as-needed geotechnical engineering
services for the Monterey Peninsula Vy'ater Supply Project {MPWSP) slant test well ancl
WF{EREAS, RBF desires to amend the Original Agreement to have SUBCNSULTANT
perforu aclditional professional and technical services, and SUBCONSULTANT desres to

perform such services,

NOW, TFIEREFORE, in consideration of the mritual covenants and agreements hereinafter


contained, and intending to be legally bound heleby, the partes irereto agree s follows:

{.

SCOPE OF SERVICES

In adclition to techlical services specified in the original Agrcement, SUBCONSULTANT shall


perlbnn in a proper mal1nr, satisfactory 1o RBF and in accordane with recognized codes of
practice, ttrre design services dened in Attachment A, but limted to Task 1.0 Test Slant and
Observ-ation Wells Design. inciuding sub-tasks 1.1 a:n L2.

NI. COMPENSATION AND PAYMENT


F'or satislactoly performance olthe services in accordance with the recognized codes of
practice as described above, the total SUBCONSULTANT not-to-exceed limit is increasecl to
952,92t by this amendment. All other tenls and conditinns for compensation and payment shall
be in accordance with the Original Agreernent.

IV. TERMS AND CONDITIONS


All

other terms and conditions of the Original Agreement shall remain in effect, unless otherwise
specitied herein.

V. ENTIRE AGREEMENT
Amendrnent No, 1 and the Original Agreement constitute the whole agreement between the
partie.s with respect to the subject mtter contained herein and there are no terms other than those
contained therein. No modification or amendment of this Amendment No, 1 shall be valid unless

in writing and signed by the parties hereto,

IN WITNESS I/HEREOF, the parties hereto, by their duiy authorized representatives have
executed this Amendment No. I as of the clate first r't'itten above.
RBF Consulting

Gecscience Support Services, Inc.

,1"^)

BY: 'u-'t"tu

,;

Title:

ir/c'

By:
A

Hl

/' .f

.J

Title:

+l

tk

frL
t

ATTACHMENT A

{uf

di\{

i#f-i

{f

February 6,2A13

Mr. Sarp Sekeroglu,

P.E.

Principal Engineer
RBF Consulting

3180lmjin Road
Marina, CA 93933

Re

Proposal to Provide Geohydrologic Services


Monterey Peninsula Water Supply Project

Test Slant Well and Observation Wells

Dear Sarp

As per your request, GEOSCIENCE is submitting the following scope of work and costs to provide
geohydrologic services related to drilling, construction, development and testing of an 820 ft test slant
well that is to be located adjacent to the beach near Marna, California. The work is understood to be

part of the Monterey Pennsula Water Supply Project {MPWSPi. ln additon, our costs include field
inspection services during drilling, construction, and development of three groups of observation wells
planned to be located near the test slant well. Transducers will be installed in each well for the purpose
of collecting ground water level and water quality information during the short- and long-term testing to
that is to be conducted on the test slant well.
lf you have any questions or comments, please do not hesitate to contact me at your convenience
Sincerely,

Dennis E. Williams, Ph.D.

President
encl.

CFUSC, I ENC 5IJ


{ n

u r

PI]{]ItI

\4/ a te

5t IIVIi-E5 I NCRPORTIL)

r Rex: rc es D -"ve

Iop

f1,). Box 1.10, Clr'enronl, C !i

T,909-451-665{)

1,909-45'l-6638

7l

c:
I

Scope of Work for Slant Test Well and Monitoring Wells

RBF CONSUTTING

MONTEREY PENINSUTA WATER SUPPLV PROJECT


SCOPE OF WORK

1.0

TEST SLANT AND OBSERVATION WELL DESIGN

1.1

Test Slant Well

Revise Existing Detailed Technical Specifications and Drawings

would revise existing technical specifications and construction drawings for drilling,
construction, and testing of one test slant well using the dual rotary drilling method. The technical
specifications and construction drawings would be bundled with RBF's front-end documents to
complete the bid package, GEOSCIENCE would also prepare a detailed bid schedule, to be
included with the bid package, with specific line items showing units and unit quantities for the
construction of the well. ltems included in the technical specifications would include {but are
not necessarily limited to) the following:
GEOSCIENC

.
.
.
.
.
.
.
'
.
.
.
.
.
.
.
.

Well location, angle, dpth and dimensions;


Expectedgeohydrologicconditons;
Permits to be acqured by the contractor;
Compliance with discharge requirements, as necessaryj

Job conditions (e.g., noise suppression, drilling waste, runoff mangement, power, lighting,
water, security, sanitation and work damage);
Mobilzation, demobilization, and cleanup;
Potential drilling problems;
Equipment, materials, and records to be furnished by the contractor;
to be kept by the contractor;

Records

Drilling and constructon procedures;


Developmentprocedures;
Aquifer pumping and recovery tests;
Water quality sampling and analysis;
Downhole video camera and alignrnent surveys;
Eguipping with a designed submersible pump and instrumentation for long-term testing; and
Well cover and final inspection.

The drawings would be prepared as 11"" x 1"7" sheets for attachment to the technical specifications,

GEOSCIENCE Support Services, lnc.

RBF

Consulting

Scope of Work for Slant Test Well and Monitoring Wells

L"?.

Observatiot'l Wells

GEOSCINCE

Prepare Oetailed Technicaf Specifications nd Drawings

would prepare the technical specifications and constructon drawings for drilling,

construction and development of the grouped observation wells that are anticipated to be drilled using
the sonic drilling method, and to a maximum depth of approximately 400 ft below ground surface {bgs)
into the upper prtion of the 400 Ft Aqufer. Other aquifers penetrated would be the Dune Sand, and
the 1"80 Ft Aquifer. The technical specifications and construction drawings would be bundled with RBF's

front-end documents to complete the bid package. Additionally, GEOSCIENCE would prepare a
detailed bid schedule, to be included with the bid package, with specific lne items showing
units and unit quantities for the construction of the well. ltems included in the technical

specifications would include (but are not necessarily limited to)the following:

.
.
.
.
.
.
.
.
'
.
"
.
"

Well location, depth and dmensions;


Expectedgeohydrologicconditions;
Permits to be acquired by the contractor;
Compliance with discharge requirements, as necessary;

Job conditions (e.9., noise suppression, drilling waste, runoff management, power, lighting,
water, security, sa'nitation and work damage);
Mobilization, demobilization, and cleanup;
Potential drlling problems;
Equipment, materials, and records to be furnished by the contractor;
Records to be kept by the contractor;
Drilling and construction procedures;
Developmentprocedures;
lnstallation of pressure transducers to monitor water levels; and
Observation well covers and final inspection.

The drawings would be prepared as 3.1" x 17" sheets for attachment to technical specifications

2.t

s.ANT WEr-- CONSTRUCTIOT\

would provde on-site inspection services during the drilling, construction, and
development of the test slant well, This cost estimate assumes the work would be conducted prmarily
on a full-time basis as the work would take place during daylight hours only, seven days per week.
These costs do not include preliminary design, permitting. reporting, or project management (i.e.,
GEOSCIENCE

meetings), but are for design and inspection only.

GEOSCIENCE Support Services, lnc.

RBF

Cnsulting

Scope of Work for Slant Test Well and Monitoring Wells

2.L

Onsite lnspection during Drilling, Construction and Development of Test Slant Well

Field inspection would be provided on a part-time basis during borehole drilling. Formation samples
would be collected at 1-0 ft intervals {or more frequently depending on the stratigraphy encounteredi.
Samples would be identified as to material type and production potential by visually logging them in the

field using the Unified Soil Classification System

(USCS).

Using visual methods, up to ten (10) samples would be selected from materials collected from the
borehole for mechanical grain size {i.e., sieve) analysis to assess permeability, sand migration potential,
and uniformity coefficients. These analyses would be used as a basis for preparing the design for the

graded filter pack and well screen.

Based on results from the mechanical grading analyses, GEOSCIENct would design the

filter pack with a


pack to aquifer ratio of between 4 and 2A, as well as using Terzaghi's criteria for the movement of fines
through the filter pack, and for the permeability of the aquifer and filter pack. Based on mechanical
grain size analysis, targeted aquifers would be identified. The final well design would include
recommended depth intervals and diameters for the well casing and screen, recommended borehole
diameter(s), and the proper screen opening size to complement the filter pack design. The
recommended design would be submitted to RBF in electronic format for review and comment before
implementation in the field.
Full-time inspection would be provided during installation of the casing, screen, appurtenances, filter
pack, and annular seal to ensure that all materials are furnished and placed in accordance with the
recommended design and technical specifications. Prior to installation, GEOSCIENCE personnel would
inspect the filter pack material and the well casing and screen for compliance with the specified well

design, As the filter pack and cement seal are being installed, GEOSCIENCE personnl would track the
volume placed against the theoretical volume to ensure that there are no voids forming or bridging
occurring within the annular space.

lnitial well development by airlifting and swabbing is an extremely important component of the well
completion and development process, GEOSCIENC would provide full-time inspection during the airlift

development prcess and would closely monitor discharge water turbidity and sand content to track the
development progress of the well.

would monitor final development by pumping and surging on a part-time basis. Tests for
sand content and specific capacity would be performed frequently to rneasure the advancement of the
development process and to ensure that the well is fully developed before beginning the aquifer

GEOSCIENCE

pumping tests.
GEOSCIENCF Supprt 5ervices, lnc.

RBF Consulting

Scope of Work

2"2

for Slant Test Well and Monitoring Wells

Mechanical Grading Analysis to Verfy Fre-Designed Filter Fack Gradation

of a properly designed and installed filter pack will control sand production from the well when
pumping. The pre-desgned filter pack gradation would be verified based on mechanical grading
analysis performed on ten aquifer intervals. The design will be designed based on industry standards
Use

regarding pack-to-aquifer ratios. The size of the screen openings will be designed to allow a minimal but
acceptable amount of filter pack material to move through the screen. This controlled movement of
filter pack mteral would permit the proper development of the filter pack and near-well zone.

2.3

Aquifer Pumping Tests

Once the well development process is considered complete, aquifer pumping tests would be performed

to determine well and aquifer characteristics. The network of nearby observation wells wou{d
monitored during constant rate testing

to provide

be

interference data and enable more accurate

estimation of aquifer parameters. The following aquifer pumping tests would be performed:
a

Step Drawdown Pumng Test: time drawdown measurements would be made to determine
specific capacity and well efficiency relationships that are necessary to calculate the optimal
production rate and pump setting. Typically three to four rates are selected for pumping,
beginning with the lowest rate and progressing to the highest.

Constant Rate Pumplng and Recoverv Test: time drawdown and recovery measurements would
be made to estimate aquifer parameters. lf possible, nearby wells would also be monitored to
obtain interference ground water levels during the test.

would montor final development by pumping and surging on a part-time basis. Sand
content and specific capacity would be montored to track the advancement of the development
process, to ensure that each well is fully developed before installing pressure and conductivity
transducers, At the end of the development process, water quality samples for analysis for general
mineral and physical properties would be collected. For cost estimating purposes, it is assumed that RBF
would be responsible for the water quality laboratory fees and would contract directly with the
GEOSCIENCT

laboratory.

GEOSCIENCE Support Services, lnc.

RBF

Consulting

Scope of Work for Slant Test Well and Monitoring Wells

2"4

Fump Remov|, Vdeo and Alignment Surveys

would provide full-time inspection during removal of the test pump, and accumulated
sediment from the bottom of the well. A final downhole video survey would be performed to document
the post-construction condition of the well. GEOSCIENC would also provide inspection for an
alignment survey of the well, the purpose of which is to measure wll straightness, angle and alignment.
GEOSCIENCE

would provide inspection of the final wellhead completion to ensur that the well casing,
and screen, as well as any required appurtenances are finished as described by the technical
specifications and/or well design. The post-constructon condition of the well site woulcl also be
GEOSCIENCE

inspected to ensure that all equipment, rnaterials, and trash have been removed, and that the site has
been restored as closely as possible to its original condition.

3.0

oBsRVTtof{wEil-cOr\sTRUcTtoN

GEOSCIENCE

would provide on-site inspection services during the drilling, construction,

and

development of three groups of observation wells to be completed in the Dune Sand, 180 Ft, and upper
400 Ft aquifers. This cost estimate assumes that GEOSCIENCE personnei would be onsite on a full-time

basis, as the work would be planned to take place during daylight hours, approximately five days per
week (i.e., Monday through Friday). These costs do not include preliminary design, permitting,
reporting, or project management (i.e., meetings), but are for design and inspection only.

3.L

tnsite lnspection during Drilling, C*nstruction

and Devel*prnent of Observation Wells

Field inspection would be provided on a part-time basis during borehole drilling. Formation samples
would be collected as continuous cores, with samples identified as to material type and production
potential by visually logging them in the field using the Unified Soii Classification System {USCS}. Upon

completion of the borehole drilling, GEOSCIENCE personnelwould provide full-time onste inspection of
the geophysical borehole logging (i.e., dual induction, temperature and fluid resistivty logs). lf
subsurface conditions permit, short- and long-normal resistivity, guard or lateral, self potential, and
gamma-ry logs would be conducted instead of the dual induction logs.
Using the visual and geophysical logs collected frorn the borehole, up to nine (g) samples would be
selected for mechanical grain size {i.e., sieve) analysis to assess permeability, sand migration potential,
and uniformity coefficients. These analyses would be used as a basis for preparing the custom flter
pack and well screen design for the well.

GEOSCIENC

5upport Services, lnc.

RBF

Consulting

Scope of Work

for Slant Test Well and Monitoring Wells

Based on results from the rnechanical grading analyses, GECISCIENCE would design the

filter pack with

pack to aquifer ratio of between 4 and 2A, as well as using Terzaghi's criteria for the rnovement of fines

through the filter pack, and for the permeability of the aquifer and filter pack. Based on lithology,
geophysical borehole logs, and mechanical grain size analysis, aquifers would be identified. The final
well design would include recommended depth intervals for the well casing and screen, recommended
borehole diameter{s), and the proper screen opening size to complement the filter pack design. The
recommended design would be submitted

to

RBF

in electronc format for review and comment before

implementation in the field.


Full-time inspection would be provided during installation of the casing, screen, filter pack, and annular
seal to ensure that all materials are furnished and placed in accordance with the recommended design

and technical specifications. Prior to instailation, GE05CIENCI personnel would inspect the filter pack
material and the well casing and screen for compliance with the specified well design. As the filter pack
and cement seal are being installed, GEOSCIENCE personnel would track the volume placed against the
theoretical volume to ensure that there are no voids lorming or bridging occurring within the annular
space.

would provide full-time inspection during the airlifl development process and would
closely monitor discharge water turbidity and sand content to track the development progress of the
GEOSCIENCE

well.

3.2

Mechanicai Gradng Analysis to Verify Pre-eslgned Filter Pack Gradation

Use of a properly designed and installed filter pack will control sand production from the well when
pumping. The pre-designed filter pack gradation will loe verified based on mechanical grading analysis
performed on nine aquifer intervals. The design will be designed based on industry standards regarding

pack-to-aquifer ratios. The size of the screen openings would be designed to allow a minimal but
acceptable amount of filter pack material to move through the screen. This controiled movement of
filter pack material would permit the proper development of the filter pack and near-well zone.

3.3

Observation Wel Eevelopment and Sampling

would monitor final development of the observation wells by pumping and surgng on a
part-time basis. Sand content and specific capacity would be monitored to track the advancement of
the development process, to ensure that each observation well is fully developed before installing
pressure and conductivity transducers. At the end of the development process, water quality samples
GOSCIENCE

GEOSCIENCE Support Services, lnc.

RBF

Consulting

Scope of Work for Slant Test Well and Monitoring Wells

for analyss of general minerals and physical properties would be collected. tt should be recognized that
analytical fees are not included in GEOSCIENCE's costs.

3.4

Pressure and Conductivity Transducer lnstallation

After development of the newly installed observation wells, each well would be equipped with pressure
and conductivity transducers whch will allow continuous monitoring of ground water levels and
electrical conductivity values during the pumping test and the recovery period. The transducers will
reman in the wells after aquifer testing to continue to collect data to evaluate seasonal variations in
ground water levels, and water quality.

COST ESTIMATE

The estimated cost

for

GECISCIENCE

to

perform Tasks 1 through

4 of the above scope of work

is

$455,305 as detailed in Table 1 {attached), not including the t0% contngency.

GEOSCIENCE Support Services, lnc.

RBF

Consulting

,ir.rJn--*l I'Ji
RBF

Conslting

Phas 1 De5i8n nd
One

l6t

'J-

Costtuction

Slnt well rd Thre Grouped hservation Wells


ONE

PLANNING LEVICOST ESTIMAE. PAs 1 DESIGN AND CO\STRUCIION


GRUPD OBSEVATION WELIS FOR OCEAN WAR ESALINATION

fS SLANT WELLANTHRE
Prncpal

lask

sior sEff

P.olec

Senior

D6qipton

1.0

TES SI,ANT & O3SERVAION

evi*

1.1

2.0

T6T

silr

2.1
2.2

2.3

2.4

wEIr corsrRucroil

{1i'fesSlant Well

- oNE 11)

wtu

up

ro

820

Ltt

wEucoffiucrox

-THRE

(l

GRoups oF oBsrRvftoN

3.2

ire.hnaal Grdi8 Anaysis lAssume!


borehlel

3.4

104

x2

9?

102

36

50

!48

x,28

16

smple inlerls, 3 from ech

subttal .

s
5

71

198

1.,376

lz

24

216

Assums

Tasb 2,3 nd 3.3 do nor ocloe vrr qulty

d!ng

l*k

95
I

I
3

16

24

24

336

26

29,770

2S0

30,020

22,4

500

2?,900

52,x70

750

52,920

241,660

37,500

285,160

2,920

150

2,010

24,s20

2,350 $

26,870

s.8oo

Is

28o,9ao

7so

4a.7so

6,550

32t,6so

40

feg of fed eq! ipt rentals slch s

YSI

t:)

42,600

4,500

47,XOt

?,67A

150

2,a2t

19,920

4,355

20,275

7,720

?,420

x0,540

68,310

12,425

80.735

,t

9,J9J 5

45,$r

tield work, Rermb! 5ble expens6 nclude repol reprodudon, miln8 charges, fie ld eqlipment !5e, per diem d

lfical

16

2"

556 M! tiPa..meter Meter; rental of presr! re

fheseosts do no! i.crude


Irelm,ar design, pedniltis. rcporir& or project,raenl (i.s., m?etEJ-u!

6-Feb-13

196

96

24

IO% (ONTINGLNfY

h! r dys

Onstre nspecrion duriB Developmeilt oi Obscrualiil Wl15 dnd Sampling for


Geoerl Mnerals d PhFicl Propeiles
{k$.r,nes I feld drsl
lnslll Pressure d ConddivityTransduce* n bserviion Wels lAssumes 1

Tobl Cost

lxpenseS

wLts

3.1

3.3

24

24

nse lnspcion dur;g Sonic DdllinS, Geophysical Borehol Logg;ngd


ConslrDclroo ofObsetan Wells lAssufies 18 tield dysl

54

20

Onsre lnlpecion dur'g Pump Re uvl. Vide dnd Gyroscopic SLrvy


fAssuner 2 ied davs'rarr tlnel

oasERvATtoil

Reimbvrsble

bor

smples]

onste nspedon durin Tes Pump islllion daquiferTestng - Stp


Drewdown and 5 DyCont Rre wat| Re@vry, Wter QulitY Sampling
(Generl Minerl and Physicl Propeniesi [Assume5 7 tield dys plus lrvefl

Subtol - fsk 2
3.0

Proed

Snsite lnspedion durnglest Slant well Drillng, Construction and Oevelopment


[A$um-a l5oflld dys, ]2 in. x 20 in. x82Oft well}
lvcchancal GradingAnlys o Veriiy Pre'esigned tlter pck Grdetio

lAss!fies l0

Technil

WLI SIGN AND SO SUPFORT

Existng De(ailed Plans nd Specfctionsfor One

lul Rotry Drillng Method {Assumel 820 linea ftwelll


)rpare etiled Pl and Specificllons for fhree (3 objrvaton wells
lonc Ddllng !ethod iAlsumes Groped/Clustered Wlsl

7.2

Stff

arE for desgild

40.13A

nilee,

nsduce6, or field f lle.

inspe.lon ony

Pge 1 of

GEOSCINCg Supgod snces,

ln."

AGREEMENT BETWEEN CONSULTANT AN SUBCONSULTANT


AGREMENT ENTERE.lNTO_AT San Diego, on this date of 7l2Sl13 by and between RBF Consulting
("Consultanf') and Geoscience Support Services lnc. (,,Subconsultani,').

Attention:

Dennis Williams

Project:

Monterey Peninsula Water Supply project

Descripton of Subconsultant's Services; Subconsultant shall provide as-needed geohydrologic engineering


services for exploratory geotechnical borings and design of the siant test well. Theetaied srp* aC fee ro
ihese services are presented in ExhibitA and B, respectively.
Payments; Subconsultant shall submit monthly invoices to Consultant using the Subconsultant lnvoice Form,
attached hereto as Exhibit C. Consultant shall bill client monthly on account of Subconsultant's services and
shall pay Subconsultant within fourteen days of the tme consuitant receiyes payment from clent on account
thereof. The not-to-exceed limit for ihis contract is $332,770, including stani tesl well design
ISSZ,SZin
geohydrological investigation tasks ($273,850).
Approved and accepted in accordance with the General Terms of Agreement for Subconsulting Services
contained in paragraphs one (1) through thirteen (13)herewith.
RBF CONSULTING

Geos

47 &*.

ignature)

Dennis E. lrlilllams

(Type/Print
_f-

No:

{Type/Print Name)

t{r'-i,4ci{tr

(Tifle)

(/ (t

Date:

RBF Job

'-.--\

02-Aug-20

Date:

136410

14725AtcnParkvy,

lnc.

13

P,O. No

PL.ANNING T DEsIt;N I

CCINETRUtrTIC]N

lwine,cA 92618-2027-P.o.Box57057. hve,cA9?619-7057-943.47?.3505-Fus.172.837s


Offces locaied ihroughout Clifrnia. Arizon & Nvrja

.i ..;,.ilBF.om

FBT
f,gNFUL-f'\t

GENERAL TERMS OF AGREMENT FOR SUBCONSULTING SERVICES


Consuliani and Sui:consrltnt gree tht ih lollowing provisions shall be pait of ihis agreeent:
1.
his agreemeni shall be binding upon ihe leirs, executois, adminish'aiors, successors and assigns of Consultant and Subconsultani.
2. This agreement shali noi be assigned by either Consultani or Subconsr-rltant wthout the pror
w|.en consent f ih other.
J,
Tlris agreemenl contans ih entre agreement between Consultant and Subconsultanl relating io lhe pro,ject and the provision
oi
services to the project. Any prior agreements, proririses, negotiations or reptesentations nol expressly set
forh in ihis agreement re o
no force or erfeci subsequent modificiions io ihis agreemeni shall be in wriiirrg and signed by both consul.tant
and subconsulianl.
,
This agreemeni shall be governed by nd conlrued in accordance with the laws of ih State of Californi.
Consullani and Subccnsulini ag|"ee to cooprte wilh each other in order io fulfill their responsiblities
and obligations under ihis
agrenreni. Boih Consultani and Subconsullant shall endeavo io nrainiain good working relationships tr.,ong
;"n.ruers of the project

[eam.

Subconsultant shall perform services as an independent coriracior and shall perfcrm the servces prcvidecl foin ilris agreemeni in
accordance with generally accepted standards of professional praciice in effect at the tme of performance.
Unless provided otherwise by the ierms of Subcpnsultani' Seruices, Subconsultant shall submit rr-ronihly invoices
io Consuliant.
Subconsultant recognizes ihat hs or her invoices will be presented by Consullani to the project client an that
Consultant v,rill pay
Subconsullant the amounl due for services endered nd expenses incuneii wiihin fourteen-{14) calerrda
days alter Cons;ita;i L pid

D.

7.

bytheprojectclient l'lotlrngccntainedinthispargraplrshall

constiiuteawaiverorreleaseofSubconsultni'srechanicle.,,,igr!--

efore any serices are p|ovided under this agreemenl, subconsullant shall procure nd miniin in effecl
insurance coverage in
amounts noi iess hn set forth below.

la) l4/orkars'Cr:mpensationandmployer'sLiabiliiy: asrequiredbylhelawsothe SiaieofCalifornie.


{b) General Liabiiiy: comnrercial g,enerai liability insr-irance or personal.and bodily injury, incfuding deatlr end oropeit!, cJamage,

an
occurrenr:e basis, in tlre anlouni oT $2,000,000 cmbinerj single limt each occurrec.-a,id in aggre*gale.
Liabililr: automobile liability for pe.sonal ancl hodily injury, including death an property damage.
{c}
n the antotnll
-Automobile
S1,C0.000
lor each accident.
(d) Professional Liability:. professional liabilily insurnce for clamages incurred by ieason of anv actuai or
alleged negligeni act. e*oi
rmission by Subconsuliant in ihe arnouni of g1.00.00 each clim and annr,rl aggregate. '

9.

on

(e) Certificates; Subconsullnl shall provide ceitificates of insurnce evidencing coverage required above. Each cerlificate
slrall
provide thai lhe coverage fforcled shll noi be cance.lled or orcieed reduced tittre SuU"constt.nt,
*tn .rrt ihirty (30|
days' prior writien ntice to tlre tonsultanl.. Shr:uld this occu. Subonsultant sall procure nd ur;ish
"*r"pt
"t
to'Consultant prio,.to such
eiiective daie new cedificales confcrming io ihe above coverge requirements. Su'bconsultant sr-'ari ,roi nave
the dglit to .u.*u unv
paymeni under this agreement until all insurance certificaies are eceived by Consulianl.
onsultani ad Sllbconsullants gree. to the extent permitted by law, to indemniflr and lrold lrarmless each
other, lheir officers,
direciors and employees from and against all claims, losses. r:jemands, damages or osts, incluciirrg aorneys
fees that re ultimtelvt
determined by a courl to be caused by and only the extent of, the ctul negligent acis, enors or omissions
Sulconsultant oI anyone else for whom Consultanl or subconsultant is liabl, rsing out of ihe perforrnance
of .lhis greemeni.
consultat may terminate subconsultnt's performance uncle this gteefienl, with or without cause. upon
wriiten nolice. Consultanl
shall ccmpensaie Subconsultani for performance of serviceg ihi-ough the period prior io terminaion- pls reasonable
termination
expenses. provded Subcnsultant is noi in default.
ln the event of ny litigation arising from or reialed io the seryces provided unde r ihis agreement, the prevailirrg party
wll be entiled io
recoveryof all reasonablecostsincured'includingstafftime,curtcosts,atlomeys'feds.expens'feesandoterreited*rp*niur.'-

;;il";';ili"

10'
1 1

'

'f2'

lanyprovisonof ihisagreementishefdbyacouriofcompetentjurisdictiontobeinvalid,voiclorunenforceable,theremaining

provsions shalf remain in full foroe and effeci and are binding on donsullant and Subconsuliant.

13. lnanefforltoresolveanyconflictsbeiweenConsultntandsubconultantarisingoutoforrelatingtotheperformanceofthis

agreemeni, Consulten{ and Subconsultanl agree ihai all dispu'res between them rising oui of or itang
t tnis agreemeni shall be
submiited lo,nonbinding mediation unless the prties mutully agree otherwise. This d-spute resolution "provision
ha n"t p;;lrJ;
either parly from flling a legal action in small claims court if th amount in dsput is within the jurisdicon f
the small .i"ini, ioul, no,
does ii preclude or limii the right to pedect or enforce applicable mechanc's iien or siop noiica remedies.

General Terms
Subonsulianl lnilials
Consulianl lntias: .

,1

- L,

T\{/t''"

EXHIBIT A

'{

;fi{J\{'

df:dd

February 6, 20L3

Mr. Sarp Sekeroglu,

P.E.

Principal Engineer
RBF

Consulting

3180 lmjin Road

Marina, CA 93933

Re:

Proposal to Provide Geohydrologic Services


Monterey Peninsula Water Supply Project

Test Slant Well and Observation Wells

Dear Sarp

As per your request, GEOSCIENCE is submtting the following scope of work and costs to provide
geohydrologic services related to drilling, construction, development and testing of an g20 ft lest slant
well that is to be located adjacent to the beach near Marina, California. The work is understood to be
part of the Manterey Peninsula Water Supply Project (MPWSP). ln additon, our costs include leld
inspection services during drilling, construction, and development of three groups of observation wells

plannedtobelocatednearthetestslantwell. Transducerswill benstalledineachwell forthepurpose


of collecting ground water level and water quality information during the short- and long-terrn testing to
that is to be conducted on the test slant well,
If you have any questions or comments, please do not hesitate to contact me t
Vour convenience.

Sincerely,

Dennis E. Williams, Ph.D


President
encl.

t;f ()S{ ll!( l. \t.JPP( )Rl tl{\'lr F_\ l\('{ ),{t,( )[^f f l]
(tt,utltl I 1,r/t,r R,,,,rtirr r,, l)r,tt.,lt
li.(). lJor lJ{i. ( lrrjnr'.t. {

I
I

909_J5l _6(150
cll)9-4r I -ri6 S

rystnt,til

(,}-i

Scope of Work fr Slant Test Well and Monitoring Wells

RBF CONSULTIN

MONIEREY PNINSULA WATER SUPPIY PROJCT


SCOPE OF WORK

ANT OBSERVATION WELL DESIN

1.0

TEST SLANT

{{
r.l

rest slant wel[

Revise xisting Detailed Technical specifications and Drawings

GEOSCIENCE would revise existing technical specifications and constructon drawings for drilling,
construction, and testing of one test slnt well using the dual rotary drilling method. The technical

specifications and construction drawings would be bundled with RBF's front-end documents to
complete the bid package. GEOSCTENCE would also prepare a detailed bid schedule, to be

included with the bid package, with specific line items showing units and unit quantities for the
construction of the well. ltems included in the technical specifications would include ibut are

not necessarily limited to) the following:

Well location, angle, depth and dimensions;


a

xpected geohydrologic conditions;

Permits to be acquired by the contractor;


a

Compliance with discharge requirements, as necessary;

Job conditions (e.9., noise suppression, drilling waste, runoff management, power, lighting,
wter, security, sanitation and work damage);
Mobilization, demobilization, and cleanup;
Potential drilling problems;

Equipment, materials, and records to be furnished by the contractor;


Records to be kept by the contractor;
Drilling and construction procedures;

Development procedures;
a

I
a

Aquifer pumping and recovery tests;


Water quality sampling and analysis;
Downhole video camera and alignment surveys;
Equipping with a designed submersible pump and instrumenttion for long-term testing; and
Well cover and final inspectio,n.

The drawings would be prepared as 11" x 17" sheets for attachment to the technical specifications.

GEOSCIENCE Suppon Servces, lnc,

RgF Cnsulting

Scope of Work for Slnt Test Well and Monitoring Wells

1"2

Observation Wells

Prepare Detailed echnical Specifications nd rawing$

would prepare the technical specifications and construction drawings for drilling,
construction and development of the grouped observation wells that are anticipated to be drilled using
the sonic drillng method, and to a maximum depth of approximately 400 ft below ground surface {bgs}
into the upper portion of the 400 Ft Aqufer. Other aquifers penetrated would be the Dune Sand, and
the 180 Ft Aquifer. The technical specficatons and construction drawings would be bundled with RBF's
GEOSCIENCE

front-end documents to cornplete the bid package. Additionally, GEOSCIENCE would prepare a
detailed bd schedule, to be ncluded with the bid package, with specific line items showing

units and unit quantities for the construction of the well. ltems included in the technical
specificatons would include (but are not necessarily limited to) the following:
Well location, depth and dimensions;
Expected geohydro logc cond itions;
Permits to be acquired by the contraclor;
Compliance with discharge requirements, as necessary;

Job conditions {e.g., noise suppression, drilling waste, runoff management} power, lighting,
water, security, sanitation and work damage);
Mobilization, demobilization, and cleanup;
Potential drif ling problems;

Equipment, materlals, and records to be furnished by the contractor;

Records to be kept by the contractor;

Drilling and construction procedures;


Development procedures;
lnstallation of pressure transducers Io montor water levels; and
Observation well covers and final inspection.
The drawings would be prepared as 11" x 17" sheets for attachment to technical specifications

7".8

SLANT WELL CONSTRUCTIN

would provide on-site inspection services during the drilling, construction, and
developmenl of the test slant well. This cost estimate assumes the work would be conducted primarily
GEOSCITNCE

on a full-time basis as the work would take place during daylight hours oniy, seven days per week.
These costs do not include preliminary design, permitting, reporting, or project management
{i.e^,
meetings), but are for design and inspecton only.

GEOSCIENCg Suppart 5ervices, lnc.

RBF Consulting

Scope of Work for Slnt Test Well and Monitoring Wells

2.I

Onsite lnspectisn during rilling, Construction and neveloprnen{ of Test Slant Well

Field inspection would be provided on a part-tme basis during borehole drilling. Formation samples
would be collected at 10 ft intervals (or more frequently depending on the stratigraphy encountered).
Samples would be identified as to material type and production potential byvisually logging them in the
field using the Unified Soil Classificaron Sysrem {USCS).
Using visual methods, up to ten {10} samples would be selected from materials collected frem the
borehole for mechanical grain size (i.e., sieve) analysis to assesi permeability, sand migration potential,
and uniformity coefficients. These analyses would be used as a basls for preparing the design for the
graded filter pack and well screen.
Based on results from the mechanical grading analyses, GECISCIENc would design the filter pack with a
pack to aquifer ratio of between 4 and 20, as well as using Terzaghi's criteria for the movement of fines

through the flter pack, and for the permeability of the aquifer and filter pack. Based on rnechanical
grain size analyss, targeted aquifers would be identified. Ihe final well design would include
recomtrended depth intervals and diameters for the well casing and screen, recommended borehole
diameter{s}, and the proper screen opening size to cornplement the filter pack design. The
recommended design would be submitted to R8F n electronic format for review and comment before
implementaton in the field.

Full-time inspection would be provided during installation of the casing, screen, appurtennces, filter
pack, and annular seal to ensure that all materils are furnished and placed in accorclance with the

recommended design and technical specifications. Prir to installation, GEOSCIENCE personnel would
inspect the filter pack material and the well casing and screen for compliance with the specified well
design. As ihe filter pack and cement seal are being installecl, GEOSCIENCE personnel would track the
volume placed against the theoretical volume to ensure that there are no voids fonning or bridging
occurring within the annular space.

lnitial well development by airlifting and swabbing is an extremely important component of the well
completion ancJ development process. OSCIENCE would provide full-time inspection during the airlift
development process and would closely monitor discharge water turbidity and sand content tc track the
development progress of the well.

GEOSCIENC would monitor final development by pumping and surging on a part,time basis. Tests for
sand content and specific capacity wouid be performed frequently to measure the advancement of the

development process and to ensure that ihe well is fully developed before beginning the aquifer
pumping tests.

GEO5CIENCE Support Servces, lnc.

RBF Consulting

Scope of Work for Slant Test Well and Monitoring Wells

2.2

Mechanical rading Analysis to verify Pre-Designed Filter pack Gradation

Use of a properly designed and installed filter pack will control sand production from the well when

purnping. The pre-designed filter pack gradation would be verified based on mechanical grading
analysis performed on ten aquifer intervals. Ihe design will be designed based on industry standards

regarding pack-to-aquifer ratios. The size of the screen openings will be designed to allow a minimal but
acceptable amount of filter pack material to move through the screen. This controlled movement of

flter pack material would permit the proper development of the filter pack and near-well zone.

2"3

Aq*ifer Pumping

Tests

Once the well development process is considered complete, aquifer pumping tests would be performed

to determine well and aquifer characteristics. Ihe network of nearby


monitored during constant rate testing

to

observation wells would be

provide interference data and enable more accurate

estimation of aquifer parameters. The following aquifer pumping tests would be performedl

Steo Drawdown Pqrmping Test: time drawdown measurements would be made to determine
specific capacity and well efficiency relatonshps that are necessary to calculate the optimal

production rate and pump settng, Typically three to four rates are selected for pumping,
beginning with the lowest rate and progressing to the highest.

Constant Rate Pumpn nd Recoverv Test: time drawdown and recovery measurements would
be made to estmate aquifer parameters. lf possible, nearby wells would also be monitored to

obtain interference ground water levels during the test.

final development by pumping and surging on a part-time basis. Sand


content and specific capacity would be monitored to track the advancement of the development
process, to ensure that each well is fully developed before installing pressure and conductivity
transducers. At the end of the development process, water quality samples for analysis for general
GEOSCINCE wculd monitor

mineral and physical properties would be collected. For cost estimatng purposes, it is assumed that RBF
would be responsible for the water quality laboratory fees and would csntract directly with the
laboratory,

GEOSCIENCE Supprt Services, lnc.

RBF Cnsultng

Scope of Work for Slant Test Well and Monitoring Wells

2,4

Pump emoval, Vdeo and Alignment Surveys

would provide full-time inspection during removal of the test pump, and accumulated
sedment from the bottom of the well. A final downhole video survey would be performed to documenr
the post-constructon condition of the well. GEOSCIENCE would also provide inspection for an
GEOSCIENCE

lgnment survey of the well, the purpose of which is to measure well straightness, angle and alignment"

GEoSclNc would provide inspection of the finai wellhead completion to ensure lhat the well casing,

and screen, as well as ny required appurtenances are finished as described by the technical
specifications andlor well design. The post-construction condition of the well site would also be
inspected to ensure that all equipment, materials, and trash have been removed, and that lhe site has
been restored as closely as possible to its original condition.

3.0

O*SERVATIONWEILCT,NSTRUCTION

GEOSCIENCE

would provde cn-site inspection services during the drilling, construction,

and

development of three groups of observation wells io be completed in the Dune Sand, 180 Ft, and upper
400 Ft aquifers, This cost estimte assumes that GSCINCE personnel would be onsite on a full-time
basis, as the work would be planned to take place during daylight hours, approximately five days per

week (i,e., Monday through Friday)" These costs cio nqt include preliminary design, permtting,
reporting, or project manement (i.e., meetings), but are for design and inspection only.

3"1.

onsite lnspecticn during Drilfng, constructi an and Development of Observation

Vr/ells

Feld inspection would be provided on a part-time basis during borehole drilling. Formation samples
would be collected as continuous cores, with samples identified as to material type and production
potential by visually logglng them in the field using the Unfied Soil Classificaton system (USCS), Uprrn

completion of the borehole drilling, GoSclENCE personnel would provide full-time onsite inspection of

the geophysical borehole logging {i.e., dual induction, temperature and fluid resistivity logs}. lf
subsurfce conditions permit, shorl- and long-normal resistivity, guard or lateral, self potental, and
gamma-ray logs would be conducted instead of the dual induction logs.

Using the visuai and geophysicai logs collected from the borehole, up to nine (9) samples would be
selected for mechanical grain size {i.e., sieve} analysis to assess permeability, sand mgraton potential,

and uniformity coefficients. These analyses would be used as a basis for preparing the custom filter
pack and well screen design for the well.

GEOSCIENCE Support Services. inc"

RBF Consultng

Scope of Work for Slant Test Well and lr4onitoring Wells

Based on results from the mechanical grading analyses, GEOSCIFNCE would design the filter pack with a
pack to aquifer ratio of between 4 and 20, as well as usng Terzaghi's criteria for the movement of fines

through the filter pack, and for the perrneability cf the aquifer and filter pack. Based on lithology,
geophysical borehole logs, and mechanical grain size analysis, aquifers would be identified. The final
well design would include recommended depth intervals fo the well casing and screen, recommended

lorehole diameteris), and the proper screen opening size to complement the filter pack design, The
recommended design would be submitted to RBt in electronc format for review and comment before
implemerrtation in the field.

Full-time nspection would be provided during installation of the casing, screenj filter pack, and annular
seal to ensure that all materials are furnished and placed in accordance with the recommended design

and technical specfcations. Prior to installation, GEosc'NCE personnel would inspect the filter pack
materal and the well casing and screen for corhpliance with the specified well design. As the filter pack
and cement seal are being installed, GOSCENCE personnel would track the volume placed against the
theoretical volurne to ensure that there are no voids forming or bridging occurring within the annular

space.

GEOSCIENCE would provide full-time inspection during the airlift development process ancl would
closely montor discharge water turbidity and sand content to track the clevelopment progress of the
well.

3'2

Meehanicai tSrading llnalysis to Verify Pre-ilesigned Filter acl< Graclation

Use of a properly designed and installed filter pack will control sand production from the well when
pumping, The pre-designed filter pack gradation will be verified based on mechanical gradng analysis
performed on nine aquifer intervals. The design will be desgned based on industry standards regarding

pack-to-aquifer ratos. The size of the screen openings would be designed to allow a minimal but
acceptable mount of filter pack material to move through the screen. This controllecj movement of
filter pack material would permit the proper deveLcpment of the filter pack and near-well zone.

3.3

Obcervation ldlell Development and Sarnpling

would monitor firral developrnent of the observation wells by punrping and surging on a
part-time basis. Sand content and specific capacity would be monitored to track the advancement of
the development process, to ensure that each observation well ls fully developed before installing
GEOSCIFNCE

pressure and conductivity transducers, At the end of the development process, water quality samples

GOSCINCE Support Services, tnc.

RBF Consulting

Scope of Work for Slnt Tst Well and Monitoring Wells

for analysis of general minerals and physical properties would be collected, lt should be recognized that
analyticl fees are not included in GEOSCIENCE's costs.

3.4

Pressure and Conductivity Transducer lnstallation

After development of the newly installed observation wells, each well would be equipped with pressure
and conductivity transducers which will allow continuous mnitoring of ground water levels and

electrical conductivity values during the pumping test and the recovery period. The transducers will
remain in the wells after aquifer testing to contnue to collect data to evaluate seasonal variations in
ground water levels, and water quality,

COST ESTMAT

Ihe estimated cost for

GEOSCIENCE

to perform

Tasks 1 through

4 of the above scope of work

is

5455,305 as detailed in Table 1 {attached), not including the 10% contingency.

GEOSCINCg Support Servces, lnc.

RBF Consultng

EXHIBIT

RBF Consultne

Phas X Dsgn and Contruaton

OnferSlantwell ad

Three Groud Obserutsdon Wetls

PLANNI6 TFVEL COSI ESTIMAT. PHASE , DESIGN AND COiSTRUCTION


GROUPEO O8sRVAT]ON WLLS OR OCEAN WATER DESAIINATION

Torl

1.0

EST

SUN

& OSRVAjON

W[

DS!6N AND 8tD sUppOST

x sli etiled Pln5 nd Sprificdns

1.1

ts20 rneal

for One

ft.relll

{1)

est

Stanr Weil

Detailed pns nd Specifictinsfr Thee (3) Obterutbn

16

y/.lk

nspecilon during

oNE{1}wrLupto

go

?4

102

36

xg

29,17s s

92

22,40C

r96

fs

Llrar n,,

rSlar Well Drillkig, Coilfruc!on

139.:9!:r1 D

54
48

20

.0 Tf suNTwal coNsrUqoN

nd Devetopmet

in. x 20 in. x 820 f werl

G.adgAnalys6 toVrilyP.-esigned FilrePck6.adtioil

10

i.3

urlrglf

Aquifer iesiin8- Sfp


lDrawdown nd 5 DyContti Rar silh Recvery, WaterQutityS!npi!'E
j(Generel Mineri ad Physici Properis)
fA5uffc! 7 flld dayr pius t.vetl
Jnspectin

Purp

hrllrion

71

oBsRvaloN wr! coNTRUcToN

- THR 1:

onours or oesereTton wtLts

.198

o.eoll

3.J

GrdangAna)ysis lsumes

Onr lnsFfton dsrlB Devtopmnt ci Obseryion


General Minerals nri Physical Fropcftiel
ume.s_--f e--deyl
ln:tall Prcssu.e and CnducrjvtyTrsducers

ani

tFeb-13

s
s

30,020

soo

22,901

s2t7a s

754 |

5292A

.""u1

3l,5AC

285,t60

:,920

150

3,070

24,524

2,3S

7S0

s,8c0

2a,9a0

4,600

40.7s0

50q

26,870

321,6s0

47,!AA

2,5t4

1s0

2,820

15,920

4,355

2p,275

10,540

senrpting tor

96

Obserto

Vr'|s {Arsur,c!

7D%

ftcae cosdoni ,.[]e

276

11

t6

Notes:
rAss!esi?hu:rduio8l!t1*ork.

18

sp1 inervts, ? lrom ech

lass
3.4

1.376

Onsite n5&dion durngArlir DrllinE, ccophysrl Brehte Loggtng nc


Corssuct ofObsctutin Wells lAssres 18 fieid dys]

Meclrl

250

nc

:Oisie

3.0

cor

26

336

4A

o:a

CON|INGEN'Y

3.420

7,".20
58,310

J2,425

80,7)s

40,138

5,39J 9

a5,s31

Rb!6sbleexpcsesFcleecro(rprodlctron,malin.nr6ei,iitdequiprts:ure,sa.rrdmiraga.

peLirr lnry desig, oermift8,

repo.tig,. lrlrieer{i.e,, c!gJ*b!:.ir

dais,rrid nLllc.rion nlv.

Page 1

ol I

6EOSCIENC

Supprt Scrvi(er, inr.

EXHIBIT C

RBFConsultirg
MotrEy Peninsula Water Supply prcject
GEOHYDROLO6ICAL INVESTI6AIION
AND IGHT (PHAs I AND II} MOSS IANDING/POTRERo RoAD BoRTHoLES To 2OO FT

PRELIMINARY

sIX CEMEX ARA 8ORHOLESTO

350

FT,

MONTERY, CLIFORNIA
GEOSCIENCT
PrnciFal

esciptio

Piect

Suppolt Sedices, lnc.

Steff
Geohydrologisl Geohydroogst Geohydlogier GeohydrcloBt
Senor

Hydrolo8ist

Senor

Thnkl

lllustEtor

bof

Ceri

Reibu.sable

Expensesl

Tot Cgst

5XgS

12

5,700
24
6

12

12

1.S Progre$/summry meetine at


2.O

FIELO IN5PECI ION -

21

CMT AREA ISIX

3,8t0

Prepamtionl sl

s,700

)28

36

r92

1.80

ft

i8) 5mple

36

ileills

12

Preparesummryrepoft.

32
Subtolal - CEMEX A.eo Borcfobs1

3.0

FII.J IIISPCNON . MO55 LNDING PHSI

Agsumesborehoredepthgol

200 ft.

3-3

loN , Mo55 ltNDtNG pHAs

I {oplloNAt

- IHRTE

Moss Lnding Phse

1
?

24{!n-X3

33,250

4,860

3,800

6 450

57,6s0

rs,:zo I 5

8,500

84,820

12.74A

500

L3,zAC

17,100

250

2,400

12

48

74

32

12

36

80

12

81

106,1.60

108

e,2sa

,t,rro

5,000

31

108

30

17,100

s7

12

60,0s0

x15,4fi

43,675

3,i45

250

a7

350

6r,020

s,?so

66,770

21.950

3,000

24.950

s
9
5

500

3,870

8,sso

BORFHOLS)"

Oosite nspecrjo during sontc drilling, geophysicl borehol loging nd destrrcton. Assumes borehol deths

20

150

s00

fr.

4.2

Meahancigrdjn8nly!s. ssuesiive(5)spleintetulsfromechborhot.

d.3

p.epr 5ummry repon


iassumes work will be combined wirh ph5e I report

SubloLot-Moss Londing

Not6:

zo

Subtoto!

4.1

78

750

sadine aatysis. Assumes five {5} sample inlervals irom ech borehole.

Prepre sumry reFort.

4.o flll lilsptc

(tvE BoREHOTESII

Onse inspedond!ngsoicdrilJing,eophysicrborehorrogginganddesrruatio.

y:1rl"it
_ ,-:r-

4,710 . s

12
52

BOREHOLES)?

anlysis,

2.3

32.500

16

t2

rsite irspecdoo durg sonc dri,ling, geopbyscal borehcle loglng nd ciestruato, Assumes borehole depths of
35

40

I
end of prje(t in taoterey area.
subtotal - Prcject

5,240

cf

,*-:..' *

42

72

415
-_--*T_-.
12

416
Phose U

Apt,ono4:

14

61

72i16

16
31

3,370
33,87

50

3,;'50

8,t00
37,620

Rejbursble expenses include report reproducion, mailng chrues, per diem or iieage and field equipment renral
Assues deylight workng hours only (7aM to 7pM), seven days per week, ren days cn and tour days
ofi ech rotrion

1of1

GEOSIENCE

Suppo seryices, tnc,

Revised: December

FBF

c13KgULl rrG

Su

't::;m

bconsultant lnvoice Transmittal

Please attach this cover sheet to all invoices and transmittal letters.
have any questions.
Send all invoices

Or e-mail

to:

to:

2, 2011

Contact Project Manager if you

Accounts Payable

RBF GonsultinglA Baker Company

14725 Alton Parkway


lrvine, CA 92618-2027

tloehr@rbf.com

Following information to be completed by subconsultant: INOTE:

Please complete all fields.l

lnvoice Date:
lnvoice Number:
lnvoice Amount:

Total ITD lnvoiced:

Less Retention (if applicable):

Total ITD Retainage

Total Payable this invoice:


Dates Work Performed

From

To:

Note: If multple fasks are assocrated with an nvace, ether submt a copy af this seef
for each task and dollar amount, or attach a sheef with a list af task numbrs and
correspondng dallar amou nts.
Following information to be compleied by Project ftlanager:
Project Name:
Subconsullant Name:
Subconsultant Number:
Subconsultant Total Not-to-Exceed:
Project Manager:
Ultimate Client:

INOTE: Pleasecompleteallfields.]

Monterey Peninsula Water Supply Project


Geoscience Support Services, lnc.
29229
$332,770
Sarp Sekeroglu
California American Waier

Project Number:
Organization:

R25,24.SD.FD

Expenditure:

Sub-Professional

Task:

004.800

RBF Entity:

5A

Fayment Terms:

PWP

3641 0

[PWP, N30, N45, N60, Ng0]

tf th is is a minority owned business, check appropriate box:


SDB - Small Disadvantaged Business
VOSB -Veteran-Owned Small Business
I/VOSB - Woman-Owned Small Business
other

I
I

UPPLEMENT

AMENDMENT NO. 4
TO
SUBCONSULTANT AGREEMENT
FOR
PROFESSIONAL SERVICES

THIS AGREEMENT, entered into this 1s day of October, 2014, hereinafter referred to as
Amendment No. 4, by and between RBF Consulting, located at 9755 Clairemont Mesa Blvd. San
Diego, CA,92124, hereinafter rcferred to as "RBF", and Geoscience Support Services Inc.,
located at P.O. Box220, Claremont, CA,9l711, hereinafter referred to as
''SUBCONSULTANT''.
WHEREAS, RBF and SUBCONSULTANT have entered into an agreement on November 12,
2012 (hereinafter refened to as Original Agreemeut) for as-needed geotechnical engineering
services, foi the Monterey Peninsula Water Supply Project {MPV/SP) Test Slant Well.

WHERAS, RBF desires to amend the Original Agreement to have SUBCONSULTANT


perform additional professional and tschnical services, and SUBCONSULTANT desires to
perform such services,
NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter
contained, and intending fo be legally bound hereby, the parties hereto agree s follows:

I.

SCOPE OF'SERVICES

ln addition to technical services specified in the original Agreement, SUBCONSULTANT shall


perform in a proper manner, satisfactory to RBF and in accordance with recognized codes of
practice, the design services defined below.
Task 8081 (CEMEX Site): Provide construction support services for test slant well facilities at
the CEMEX Site, including, but not limited to (refer to Attachments):
Test Slant Well preparation;
r Test Slant Well construction and testing;
r Monitoring Wells preparation;
. Monitoring V/ells construction and testing;
'W'ater quality data analysis;

Project mailagement; and


Additionai Tasks requested by RBF / Cal-Am.

8CI82 (Potrero Site): This task cannot be billed until authorized by RF. Provide
design services fbr the construclion of a test slant well and monitoring wells at the Potrero Road
Parking Lot Site (similar design drawings to CEMEX Site).

Task

TI. COIUPENSATION AND PAYMBNT


For satisfactory performance of the services in accordance with the recognized Codes of
Practice as descrjbed above, the total SUBCONSULTANT nor-to-exceed [NTE) limit is
increased by 8973,917 by this amendment. All other terms and conditons for compensation and
payment shail be in accordance with the Original Agreement,

TII. TERMS AND CONDITIONS


All other terms and condjtions of the Original Agreement shallremain in el'fect, unless otherwise
specifred herein. This Amendment addresses SUBCONSULTANT costs up to February 28,

zfi5.

IV.

ENTIR.E AGREEMENT

Amendment No. 4 and the Original Agreement constitute the whole agreement between the
parties r,vith respect to the subject matter contained herein and there re no terms other than those
contained therein. No modification or amendment of this Amendn:ent No, 4 shall be valid
unless in writing and signed by tlre parties hereto"

IN WITNESS WHEREOF, the parties hereto, by their duly authorized representatives have
executed this Amendment No.4 as of the date first written above.
RBF Consulting:

By:

Date: Z,\
Title:

Ceoscience Support Services, Inc,

By:

Date:

(L- l- )*r,0.-*t1 ritle: ?*

\r\

C* {*

SUPPLEMENT to SUBCONSULTANT AGREEMENT


AMENDMENT NO. 5
TO
SUBCONSULTANT AGREEMNT
FOR

PROFESSIONAL SERVICES
THIS AGREEMENT, entered into this 24rt day of December,2Ql4, hereinafter referred to as
Amendment No. 5, by and between RBF Consulling, located at 9755 Clairemont Mesa Blvd. San
Diego, CA,92l?.4, hereinafter referred to as "RBF", and Geoscience Support Services Inc.,
located at P.O. Box 22t. Claremont, CA, 91711, hereinafter referred to as
,'SUBCONSULTANT".
WHEREAS, RBF and SUBCONSULTANT have entered into an agreement on November 12,
2012 (hereinafter referred to as Original Agreement) for as-needed geotechnical engineering
services, for the Monterey Peninsula Water Supply Project (MPWSP) Test Slant Well.
V/HEREAS, RBF desires to arnend the Original Agreement to have SUBCONSULTANT
perform additional professional and technical services, and SUBCONSULTANT desires to
perform such services,
NOV/, THEREFORE, in consideration of the mutual covenants and agreements hereinafter
contained, and intending to be legally bound hereby, the parties hereto agree as follows:

r. scopE otr'sRvICEs
In addition to technical services specified in the Original Agreement and Amendment No. 4,
SUBCONSULTANT shall perform in a proper mnner, satisfactory to RBF and in accordance
with rectrgnized codes of practice, the design services defined below.
Task 8081 (CBMEX Site): Provide construction support services for offsite monitoring well
facilities in association with the test slant well facilities at the CEMEX Site, including, but nor
limited to (refer to attachments):
r MSHA Training
MIV-5 and MW-6 monitoring wells preparation;
r Monitoring wells construction and testing;
r Water quality data analysis;
e Coordination with quality laboratory and sample delivery;
Purchase and install pressure and conductivity transducers far offsite wells; and
Additional Tasks requested by RBF / Cal-Am.

II.

COMPENSATION AND PAVMENT

For satisfactory performance of the services in accordance with the recognized Codes of
Practice as described above, this Amendment No. 5 increases the SUBCONSULTANT not-toexceed (NTEJ limit for Task 8081 bL$206.838. Therefore the total NTE limit for Task 8081 is

now $1,180,755 (includes$973,9I7 from Amendment No.4)" All other terms and condirions for
compenstion and payment shall be in accordance wth the Original Agreemenr.

III.

TERMS AND CONDITIONS

All

other terms and conditions of the Original Agreement shall remain in ef{ect, unless otherwise
specified herein. This Anendment addresses SUBCONSULTANT costs up to March 31, 215.

IV.

ENTIRE AGREEMENT

Amendment Nr:. 5 and the Original Agreemenl constitute the whole agreement between the
prties with respect to the subject matter contained herein and there are n terms other than those
contained therein. No modification o amendment of rhis Amendment No. 5 shall be valid
unless in writng and signed by the parties hereto.

IN WITNESS WHEREOF, the parties hereto, by their duly authorized representatives have
executed this Amendment No. 5 as of the date first written aboveRBF Consulling:

Geoscience Support Services, Inc

tsy

By

Date:

Title:

lqx

3 \)ws

p-e".ttrrT

fAgLE

.|

f u{mtc qc6r mm. totrl{ ot fqu* HMfi tNG ewE


ailDcof,ssls(r^fatwiltoomilGloflofFstno6!v1owu&mt6oc^Nw TlioHutlfi

l&.

112

!6

l+... Pr.hlyMoq4tod., dWdD#&


l.t .hrv

Motdtu teihr

w.coid

d @'6'

Ils

!r.l
tl. :ddhddvhh

rlk

r!rdo'

d dh

32

d r{!rl

ot <on.1d 3hd1rb

t,

t6

15.6

a,l3s

:
t

426 5

tre ,

f,t0

{.15

I I

t
5

W{S

J?

&

[ -. ---'.]-:r .- .-:-.,-l*.:crii:ili'-rJr-!Tt:jji:-11

l'"'

{rr.r.^

Pt! I ol

,n

,?'..''.ll:TFil

,.1!

ttx

17t0

lr. t

91,99

?J

2,A

a,lt

a.2

.$

,s3

.4t t

,115

100

t
, ,

i
I

fr

5.99

.ry

*rr{r oer dsrd{r.ort,u.rl.n nd d.o!.r *.rl


l rd d.*m.d
rarb, rir b4 r rh.8rsd id..

tt

teF.dwrl DsF t6 t(hMo, w.icdt.t


r.rt dcdrtDw@(rr dob.p.(bn w. ('@nab

t.hr.d ll Pnur.d (ond6Mt tr&dK.,nturyJfr


&!!M lldid i 2 ds t.lr.N.tns l trs(ril

:Hd

:edilnwh wlrr ehv Lern.ry rd tmd.

: rru@

?a

ta

:rerb dud5.ni. rtbi c.ophkl&r*& t.Eh rl


r! )rw(rdob{^
:fr
wd l&!@ tr f!{rr9r..1ar
M*o.tunhB (. Virf,v PrOdrdft a.9*t Grdrbt
9,5

l,

tolt

@.

tt..tt

4t
ttt.7

SUPPLEMENT tO SUBCONSULTANT AGREEMENT


AMENDMENT NO. 6
TO
SUBCONSULTANT AGREEMENT
FOR
PROFESSIONAL SERVICES
THIS AGREEMENT, entered into this 1't day of May, 2015, hereinafter referred to as
Amendment No. 6, by and between RBF Consulting, located at9755 Clairemont Mesa Blvd. San
Diego, CA,92124, hereinafter referred to as "RBF", and Geoscience Support Services Inc.,
located at P.O. Box220, Claremont, CA,9l711, hereinafter referred to as
''SUBCONSULTANT''.
WHEREAS, RBF and SUBCONSULTANT have entered into an agreement on November 12,
2012 (hereinafter referred to as Original Agreement) for as-needed geotechnical engineering
services, for the Monterey Peninsula Water Supply Project (MPWSP) Test Slant Well.
WHEREAS, RBF desires to amend the Original Agreement to have SUBCONSULTANT
perform additional professional and technical services, and SUBCONSULTANT desires to
perform such services,

NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter


contained, and intending to be legally bound hereby, the parties hereto agree as follows:

I. SCOPE OF SERVICES
In addition to technical services specified in the Original Agreement and Amendments No. l-5,
SUBCONSULTANT shall perform in a proper manner, satisfactory to RBF and in accordance
with recognized codes of practice, the design services defined below for the MPWSP Test Slant
Well project, between May l, 2015 and October 3l,Z0l5 (6 months).
Task 8001: Provide construction support services for offsite monitoring well facilities in
association with the test slant well facilities at the CEMEX Site, including, but not limited to
(refer to attachments) :
MW-7, MW-8, and MW-9 monitoring wells preparation, construction, and testing;
o Purchase and install pressure and conductivity transducers for nine (9) MWs;
. Monitoring well data collection, analysis, and reporting;
o Test Slant Well water quality data collection, analysis, and reporting;
. Long Term Pumping Test and Monitoring - Phase II (6 months);
. Coordination with quality laboratory and sample delivery; and
. Additional Tasks requested by RBF / Cal-Am.

TI. CPENSATION AN PAYMET\T


For'atisfactory performance of the services in accordance with the recognizcd Codes of
Practice as described above, the total not-to-exceed INT limit for this Amendment lask 8000)
is $91J9.991. Payment is based on Paid-When-Paid (PTP). All other terms and conditions for
compensation nnd payment shall be in accr:rdance with the OriginalAgreemenl,

ITI, TER}S AND CONDITIONS

All

other terms and conditions of the Original Agreement shall remain in eftbct, unless otherwise
specified herein. This Amendment addresses SIJBCONSULTAN'I costs fronr May 1, ?015 up tc
October 3l , 2015,

IV. NTTRI AGRESMENT


Amendment No. 6 and the CIriginal Agreement cnstitute tlre whole agreement bstween the
parties with respect to the subject nlatter contained herein and there re no terms other than those
containecl therein. No modification or anendmert of this Anrendment No. 6 shall be valid
untess in writing and signcd by thc partics hercto.

tN TtrITNESS V/H.ERO, the parries hereto, by their duly authorized represenlatives havc
exccutcd this Amendment N. 6 as of the date first written above.
RBF Cor:snlting:

Ceoscience Support Services, Inc.

B)':

By:

Dale

Title:

n/Af

5 Vrf Pp*MrlT

1 ..

(-

iv^"-\r' .
DaTe:
Mry 8,zc't5

..*>

Title: $ t- lrr->iO*T-