Federal Register / Vol. 73, No.

78 / Tuesday, April 22, 2008 / Notices 21625

Enter the docket number excluding the DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY
last three digits in the docket number
field to access the document. For Federal Energy Regulatory Federal Energy Regulatory
assistance, contact FERC Online Commission Commission
Support at [Docket No. CP08–85–000]
FERCOnlineSupport@ferc.gov or call [Docket No. PR07–17–002]
toll-free 1–866–208–3676, or for TTY, Columbia Gas Transmission Company;
call (202) 502–8659. Bridgeline Holdings, L.P.; Notice of Notice of Intent To Prepare an
Compliance Filing Environmental Assessment for the
m. Individuals desiring to be included
Proposed Appalachian Expansion
on the Commission’s mailing list should April 15, 2008. Project—Hamlin Compressor Station
so indicate by writing to the Secretary and Request for Comments on
of the Commission. Take notice that on April 2, 2008,
Bridgeline Holdings, L.P. filed a Report Environmental Issues
n. Comments, Protests, or Motions to of Refunds in compliance with the April 15, 2008.
Intervene—Anyone may submit Commission’s letter order issued on The staff of the Federal Energy
comments, a protest, or a motion to January 28, 2008 in Docket Nos. PR07– Regulatory Commission (FERC or
intervene in accordance with the 17–000 and PR07–17–001. Commission) will prepare an
requirements of Rules of Practice and environmental assessment (EA) that will
Procedure, 18 CFR 385.210, .211, .214. Any person desiring to protest this
filing must file in accordance with Rule discuss the environmental impacts of
In determining the appropriate action to the proposed Appalachian Expansion
take, the Commission will consider all 211 of the Commission’s Rules of
Practice and Procedure (18 CFR Project—Hamlin Compressor Station
protests or other comments filed, but Project involving construction and
only those who file a motion to 385.211). Protests to this filing will be
considered by the Commission in operation of a compressor station and
intervene in accordance with the piping to an existing pipeline by
Commission’s Rules may become a determining the appropriate action to be
taken, but will not serve to make Columbia Gas Transmission Company
party to the proceeding. Any comments, (Columbia) in Lincoln County, West
protests, or motions to intervene must protestants parties to the proceeding.
Virginia. The EA will be used by the
be received on or before the specified Such protests must be filed on or before
Commission in its decision-making
comment date for the particular the date as indicated below. Anyone process to determine whether the
application. filing a protest must serve a copy of that project is in the public convenience and
document on all the parties to the necessity.
o. Filing and Service of Responsive proceeding. This notice announces the opening of
Documents—Any filings must bear in
The Commission encourages the scoping process the Commission
all capital letters the title
electronic submission of protests in lieu will use to gather input from the public
‘‘COMMENTS’’, and interested agencies on the project.
‘‘RECOMMENDATIONS FOR TERMS of paper using the ‘‘eFiling’’ link at
http://www.ferc.gov. Persons unable to Your input will help determine which
AND CONDITIONS’’, ‘‘PROTEST’’, or issues need to be evaluated in the EA.
‘‘MOTION TO INTERVENE’’, as file electronically should submit an
original and 14 copies of the protest to Please note that the scoping period will
applicable, and the Project Number of close on May 19, 2008. Details on how
the particular application to which the the Federal Energy Regulatory
Commission, 888 First Street, NE., to submit comments are provided in the
filing refers. A copy of any motion to Public Participation section of this
intervene must also be served upon each Washington, DC 20426.
notice.
representative of the Applicant This filing is accessible on-line at This notice is being sent to affected
specified in the particular application. http://www.ferc.gov, using the landowners; federal, state, and local
p. Agency Comments—Federal, state, ‘‘eLibrary’’ link and is available for government agencies; elected officials;
and local agencies are invited to file review in the Commission’s Public Native American tribes; other interested
comments on the described application. Reference Room in Washington, DC. parties; and local libraries and
A copy of the application may be There is an ‘‘eSubscription’’ link on the newspapers. State and local government
Web site that enables subscribers to representatives are asked to notify their
obtained by agencies directly from the
receive e-mail notification when a constituents of this proposed project
Applicant. If an agency does not file
document is added to a subscribed and to encourage them to comment on
comments within the time specified for their areas of concern.
filing comments, it will be presumed to docket(s). For assistance with any FERC
Online service, please e-mail A fact sheet prepared by the FERC
have no comments. One copy of an entitled ‘‘An Interstate Natural Gas
agency’s comments must also be sent to FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call Facility On My Land? What Do I Need
the Applicant’s representatives. To Know?’’ addresses a number of
(202) 502–8659.
Kimberly D. Bose, typically asked questions, including the
Comment Date: 5 p.m. Eastern Time use of eminent domain and how to
Secretary. April 22, 2008. participate in the Commission’s
[FR Doc. E8–8636 Filed 4–21–08; 8:45 am] proceedings. It is available for viewing
Kimberly D. Bose,
BILLING CODE 6717–01–P on the FERC Internet Web site (http://
Secretary.
www.ferc.gov).
[FR Doc. E8–8630 Filed 4–21–08; 8:45 am]
sroberts on PROD1PC70 with NOTICES

BILLING CODE 6717–01–P


Summary of the Proposed Project
Columbia proposes to build a
compressor station along its SM116
pipeline, a part of its Appalachian
Pipeline System, to provide additional

VerDate Aug<31>2005 16:25 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 E:\FR\FM\22APN1.SGM 22APN1
21626 Federal Register / Vol. 73, No. 78 / Tuesday, April 22, 2008 / Notices

transportation service of natural gas to Notice of Intent, we are requesting • Reference Docket No. CP08–85–
its customers in the Mid-Atlantic and public comments on the scope of the 000; and
Eastern Markets. Proposed construction issues to address in the EA. All • Mail your comments so that they
would include: comments received will be considered will be received in Washington, DC on
• One compressor building housing during the preparation of the EA. or before May 19, 2008.
two 4,735 horsepower natural gas-fired The EA will discuss impacts that Please note that the Commission
compressors; could occur as a result of the strongly encourages electronic filing of
• One auxiliary building, with office construction and operation of the any comments, interventions, or
space; proposed project under these general
• One truck loading facility with a protests to this proceeding. See Title 18
headings: of the Code of Federal Regulations
used oil storage tank and two sumps • Geology and soils;
• An emergency generator; and (CFR), Part 385.2001(a)(1)(iii) and the
• Water resources; instructions on the Commission’s
• Ancillary foundations, pipe • Land use and visual quality;
supports, and landscaping that include Internet Web site at http://www.ferc.gov
• Cultural resources;
fencing and crushed stone ground cover. • Vegetation and wildlife (including under the ‘‘eFiling’’ link and the link to
The general location of the proposed threatened and endangered species); the User’s Guide. Prepare your
facilities is shown in Appendix 1.1 • Air quality and noise; submission in the same manner as you
• Reliability and safety. would if filing on paper and save it to
Land Requirements for Construction a file on your hard drive. Before you can
We will also evaluate reasonable
The project would be built on a 22- alternatives to the proposed project or file comments you will need to create an
acre parcel owned by Columbia and portions of the project, where necessary, account by clicking on ‘‘Login to File’’
would affect approximately 6.75 acres and make recommendations on how to and then ‘‘New User Account.’’ You will
during construction, with 1.63 acres lessen or avoid impacts on the various be asked to select the type of filing you
permanently converted for project use. resource areas. are making. This filing is considered a
Construction of pipeline facilities would Our independent analysis of the ‘‘Comment on Filing.’’ In addition, there
affect approximately 6.07 acres of open issues will be in the EA. Depending on is a ‘‘Quick Comment’’ option available,
land, 0.58 acres of forested lands, and a the comments received during the which is an easy method for interested
0.10-acre area of County Road 7–2, scoping process, the EA may be persons to submit text-only comments
which would be within the proposed published and mailed to federal, state, on a project. The Quick-Comment User
facility footprint. The remaining 5.08 and local agencies, public interest Guide can be viewed at http://
acres would be revegetated to prevent groups, interested individuals, affected www.ferc.gov/docs-filing/efiling/quick-
erosion. landowners, newspapers, libraries, and comment-guide.pdf. Quick Comment
The EA Process the Commission’s official service list for does not require a FERC eRegistration
this proceeding. A comment period will account; however, you will be asked to
We 2 are preparing this EA to comply provide a valid email address. All
be allotted for review if the EA is
with the National Environmental Policy comments submitted under either
published. We will consider all
Act (NEPA) which requires the eFiling or the Quick Comment option
comments on the EA before we make
Commission to take into account the are placed in the public record for the
our recommendations to the
environmental impact that could result specified docket.
Commission.
if it authorizes Columbia’s proposal. By To ensure your comments are
this notice, we are also asking federal, Becoming an Intervenor
received and considered, please
state, and local agencies with carefully follow the instructions in the In addition to involvement in the EA
jurisdiction and/or special expertise Public Participation section below. scoping process, you may want to
with respect to environmental issues to become an official party to the
formally cooperate with us in the Public Participation proceeding known as an ‘‘intervenor.’’
preparation of the EA. Agencies that You can make a difference by Intervenors play a more formal role in
would like to request cooperating status providing us with your specific the process. Among other things,
should follow the instructions for filing comments or concerns about the project. intervenors have the right to receive
comments provided below. By becoming a commentor, your copies of case-related Commission
NEPA also requires the FERC to concerns will be addressed in the EA documents and filings by other
discover and address concerns the and considered by the Commission. You intervenors. Likewise, each intervenor
public may have about proposals. This should focus on the potential must send one electronic copy (using
process is referred to as ‘‘scoping.’’ The environmental effects of the proposal the Commission’s eFiling system) or 14
main goal of the scoping process is to and alternatives to the proposal, paper copies of its filings to the
focus the analysis in the EA on the including alternative compressor station Secretary of the Commission and must
important environmental issues. By this sites and measures to avoid or lessen send a copy of its filings to all other
1 The appendices referenced in this notice are not
environmental impact. The more parties on the Commission’s service list
being printed in the Federal Register. Copies of all
specific your comments, the more useful for this proceeding.
appendices are available on the Commission’s Web they will be. Please carefully follow If you want to become an intervenor
site at the ‘‘eLibrary’’ link or from the Commission’s these instructions to ensure that your you must file a motion to intervene
Public Reference Room, 888 First Street, NE., comments are received in time and
Washington, DC 20426, or call (202) 502–8371. For
according to Rule 214 of the
instructions on connecting to eLibrary refer to the
properly recorded: Commission’s Rules of Practice and
‘‘Additional Information’’ section of this notice. • Send an original and two copies of Procedure (18 CFR 385.214).3 Only
your letter to: Kimberley D. Bose,
sroberts on PROD1PC70 with NOTICES

Copies of the appendices were sent to all those intervenors have the right to seek
receiving this notice in the mail. Requests for Secretary, Federal Energy Regulatory
detailed maps of the proposed facilities should be
rehearing of the Commission’s decision.
made directly to Columbia.
Commission, 888 First St., NE., Room
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the 1A, Washington, DC 20426; 3 Interventions may also be filed electronically via

environmental staff of the FERC’s Office of Energy • Label one copy of the comments for the Internet in lieu of paper. See the previous
Projects. the attention of Gas Branch 3, PJ–11.3; discussion on filing comments electronically.

VerDate Aug<31>2005 16:25 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\22APN1.SGM 22APN1
Federal Register / Vol. 73, No. 78 / Tuesday, April 22, 2008 / Notices 21627

The Notice of Application for this DEPARTMENT OF ENERGY public nor private interests will be
proposed project issued on March 13, adversely affected by continued
2008 identified the date for the filing of Federal Energy Regulatory approvals of Las Vegas’ issuance of
interventions as April 3, 2008. However, Commission securities or assumptions of liability.
affected landowners and parties with [Docket Nos. ER08–333–000; ER08–333– Copies of the full text of the Director’s
environmental concerns may be granted 001] Order are available from the
late intervenor status upon showing Commission’s Public Reference Room,
good cause by stating that they have a Las Vegas Cogeneration Limited 888 First Street, NE., Washington, DC
clear and direct interest in this Partnership; Notice of Issuance of 20426. The Order may also be viewed
proceeding which would not be Order on the Commission’s Web site at
adequately represented by any other http://www.ferc.gov, using the eLibrary
April 15, 2008.
link. Enter the docket number excluding
parties. You do not need intervenor Las Vegas Cogeneration Limited the last three digits in the docket
status to have your environmental Partnership (Las Vegas) filed an number filed to access the document.
comments considered. application for market-based rate Comments, protests, and interventions
authority, with an accompanying rate may be filed electronically via the
Additional Information schedule. The proposed market-based Internet in lieu of paper. See, 18 CFR
Additional information about the rate schedule provides for the sale of 385.2001(a)(1)(iii) and the instructions
project is available from the energy, capacity and ancillary services on the Commission’s Web site under the
Commission’s Office of External Affairs, at market-based rates. Las Vegas also ‘‘e-Filing’’ link. The Commission
at 1–866–208–FERC or on the FERC requested waivers of various strongly encourages electronic filings.
Commission regulations. In particular,
Internet Web site (http://www.ferc.gov)
Las Vegas requested that the Kimberly D. Bose,
using the ‘‘eLibrary’’ link. Click on the
Commission grant blanket approval Secretary.
eLibrary link, then on ‘‘General Search’’
under 18 CFR Part 34 of all future [FR Doc. E8–8632 Filed 4–21–08; 8:45 am]
and enter the docket number excluding issuances of securities and assumptions BILLING CODE 6717–01–P
the last three digits in the Docket of liability by Las Vegas.
Number field. Be sure you have selected On March 4, 2008, pursuant to
an appropriate date range. For delegated authority, the Director, DEPARTMENT OF ENERGY
assistance, please contact FERC Online Division of Tariffs and Market
Support at FercOnlineSupport@ferc.gov Development—West, granted the Federal Energy Regulatory
or toll free at 1–866–208–3676, or for requests for blanket approval under Part Commission
TTY, contact (202) 502–8659. The 34 (Director’s Order). The Director’s [Docket Nos. ER08–564–000; ER08–564–
eLibrary link also provides access to the Order also stated that the Commission 001]
texts of formal documents issued by the would publish a separate notice in the
Commission, such as orders, notices, Federal Register establishing a period of Vision Power Systems, Inc.; Notice of
and rulemakings. time for the filing of protests. Issuance of Order
In addition, the Commission now Accordingly, any person desiring to be
heard concerning the blanket approvals April 15, 2008.
offers a free service called eSubscription Vision Power Systems, Inc. (Vision
of issuances of securities or assumptions
which allows you to keep track of all Power) filed an application for market-
of liability by Las Vegas, should file a
formal issuances and submittals in based rate authority, with an
protest with the Federal Energy
specific dockets. This can reduce the Regulatory Commission, 888 First accompanying rate schedule. The
amount of time you spend researching Street, NE., Washington, DC 20426, in proposed market-based rate schedule
proceedings by automatically providing accordance with Rules 211 and 214 of provides for the sale of energy, capacity
you with notification of these filings, the Commission’s Rules of Practice and and ancillary services at market-based
document summaries and direct links to Procedure. 18 CFR 385.211, 385.214 rates. Vision Power also requested
the documents. Go to http:// (2004). The Commission encourages the waivers of various Commission
www.ferc.gov/esubscribenow.htm. electronic submission of protests using regulations. In particular, Vision Power
Finally, public meetings or site visits the FERC Online link at http:// requested that the Commission grant
will be posted on the Commission’s www.ferc.gov. blanket approval under 18 CFR part 34
calendar located at http://www.ferc.gov/ Notice is hereby given that the of all future issuances of securities and
deadline for filing protests is May 14, assumptions of liability by Vision
EventCalendar/EventsList.aspx along
2008. Power.
with other related information.
Absent a request to be heard in On April 15, 2008, pursuant to
Kimberly D. Bose, opposition to such blanket approvals by delegated authority, the Director,
Secretary. the deadline above, Las Vegas is Division of Tariffs and Market
[FR Doc. E8–8631 Filed 4–21–08; 8:45 am] authorized to issue securities and Development-West, granted the requests
assume obligations or liabilities as a for blanket approval under part 34
BILLING CODE 6717–01–P
guarantor, indorser, surety, or otherwise (Director’s Order). The Director’s Order
in respect of any security of another also stated that the Commission would
person; provided that such issuance or publish a separate notice in the Federal
assumption is for some lawful object Register establishing a period of time for
within the corporate purposes of Las the filing of protests. Accordingly, any
sroberts on PROD1PC70 with NOTICES

Vegas, compatible with the public person desiring to be heard concerning


interest, and is reasonably necessary or the blanket approvals of issuances of
appropriate for such purposes. securities or assumptions of liability by
The Commission reserves the right to Vision Power, should file a protest with
require a further showing that neither the Federal Energy Regulatory

VerDate Aug<31>2005 16:25 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\22APN1.SGM 22APN1