Federal Register / Vol. 73, No.

61 / Friday, March 28, 2008 / Notices 16671

be 1,885 hours per respondent (i.e., an additional repermitting burden and notification for changes in monitoring
annual average of 113,084 hours of costs which were not in the currently plans/strategy.
burden divided among an anticipated approved ICR (EPA ICR Number: Rating EC2.
annual average of 60 facilities). The 1973.03) because more facilities are
EIS No. 20070550, ERP No. D–FHW–
State reporting and record keeping entering the renewal phase of their
F40441–MN
burden for the review, oversight, and permits.
administration of the rule is estimated US–14 Reconstruction Project,
What Is the Next Step in the Process for Improvement to Truck Highway 14 from
to average 111 hours per respondent
(i.e., an annual average of 5,125 hours This ICR? Front Street in New Ulm to Nicollet
of burden divided among an anticipated EPA will consider the comments County Road 6 in North Mankato Brown
46 States on average per year). Burden received and amend the ICR as and Nicollet Counties, MN.
means the total time, effort, or financial appropriate. The final ICR package will Summary: EPA expressed
resources expended by persons to then be submitted to OMB for review environmental concerns about impacts
generate, maintain, retain, or disclose or and approval pursuant to 5 CFR to riparian forested wetlands and
provide information to or for a Federal 1320.12. At that time, EPA will issue surface water quality, and requested
agency. This includes the time needed another Federal Register notice additional information on mitigation
to review instructions; develop, acquire, pursuant to 5 CFR 1320.5(a)(1)(iv) to areas and the corridor preservation plan.
install, and utilize technology and announce the submission of the ICR to Rating EC2.
systems for the purposes of collecting, OMB and the opportunity to submit
EIS No. 20070555, ERP No. D–DHS–
validating, and verifying information, additional comments to OMB. If you
K80050–CA
processing and maintaining have any questions about this ICR or the
information, and disclosing and approval process, please contact the U.S. Border Patrol San Diego Sector,
providing information; adjust the technical person listed under FOR Proposed Construction, Operation, and
existing ways to comply with any FURTHER INFORMATION CONTACT. Maintenance of Tactical Infrastructure,
previously applicable instructions and Dated: March 20, 2008.
San Diego County, CA.
requirements which have subsequently Summary: EPA expressed
James A. Hanlon,
changed; train personnel to be able to environmental objections because of the
Director, Office of Wastewater Management.
respond to a collection of information; proposed filling of two riparian
[FR Doc. E8–6408 Filed 3–27–08; 8:45 am] corridors and has concerns about
search data sources; complete and
BILLING CODE 6560–50–P erosion impacts. EPA recommended
review the collection of information;
and transmit or otherwise disclose the avoiding fill in these canyons, avoiding
information. fence construction on steep slopes, and
ENVIRONMENTAL PROTECTION alternatives to pedestrian fencing across
The ICR provides a detailed AGENCY
explanation of the Agency’s estimate, streams.
which is only briefly summarized here: [ER–FRL–6697–4] Rating EO2.
Estimated total number of potential EIS No. 20080025, ERP No. D–FTA–
respondents: 68 facilities and 46 States Environmental Impact Statements and
Regulations; Availability of EPA G59004–TX
and Territories.
Frequency of response: Annual Comments Northwest Corridor Light Rail Transit
reports and application every 5 years. Line (LRT) to Irving /Dallas/Fort Worth
Availability of EPA comments
Estimated total average number of International Airport, Construction,
prepared pursuant to the Environmental
responses for each respondent: 5.3 for Dallas County, TX.
Review Process (ERP), under section
facilities (317 annual average responses Summary: EPA does not object to the
309 of the Clean Air Act and Section
for an average of 60 facility respondents) proposed action.
102(2)(c) of the National Environmental
and 6.1 for States and Territories (280 Rating LO.
Policy Act as amended. Requests for
annual average responses for an average copies of EPA comments can be directed EIS No. 20080031, ERP No. D–AFS–
of 46 State respondents). to the Office of Federal Activities at F65069–MN
Estimated total annual burden hours:
202–564–7167. An explanation of the Glacier Project, To Maintain and
118,209 (113,084 for facilities and 5,125
ratings assigned to draft environmental Promote Native Vegetation,
for States and Territories).
Estimated total annual costs: $8.5 impact statements (EISs) was published Communities that are Diverse,
million per year. This includes an in the Federal Register dated April 6, Productive, Healthy, Implementation,
estimated burden cost of $6.7 and an 2007 (72 FR 17156). Superior National Forest, Kawishiwi
estimated cost of $1.8 for capital Draft EISs Ranger District, St. Louis and Lake
investment or maintenance and Counties, MN.
operational costs. EIS No. 20070367, ERP No. D–AFS– Summary: EPA does not object to the
A65177–00 action alternatives proposed.
Are There Changes in the Estimates National Forest System Land Rating LO.
From the Last Approval? Management Planning, Implementation,
There is an increase of 41,941 hours EIS No. 20070450, ERP No. DS–WPA–
Proposed Land Management Planning
in the total estimated respondent J08026–00
Rule at 36 CFR Part 219 to Finish
burden compared with that identified in Rulemaking. Big Stone II Power Plant and
the ICR currently approved by OMB. Summary: EPA expressed Transmission Project, Addresses the
This increase is due to the addition of environmental concerns about annual Impacts of Changes to the Proposed
sroberts on PROD1PC70 with NOTICES

the newly built facilities, as well as the monitoring, and how the proposed rule Action relative to Cooling Alternatives
continued performance of annual would ensure that it would be and the Use of Groundwater as Backup
activities by facilities that received their conducted. In addition, the final EIS Water Source, U.S. Army COE Section
permit during the previous ICR approval should clarify under what 10 and 404 Permits, Grant County, SD
periods. In addition, this ICR includes circumstances the public will receive and Big Stone County, MN.

VerDate Aug<31>2005 17:57 Mar 27, 2008 Jkt 214001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\28MRN1.SGM 28MRN1
16672 Federal Register / Vol. 73, No. 61 / Friday, March 28, 2008 / Notices

Summary: EPA expressed Alternative is 2, Increase Roadway Wait Period Ends: 04/28/2008,
environmental concerns about ground and Transportation Safety, Cities of Contact: Catherine Cunningham 720–
water impacts, and requested a detailed Bellevue, Hailey, Ketchum and the 962–7260.
assessment of the wetland and stream- City of Sun Valley, Blaine County, ID, EIS No. 20080109, Final EIS, AFS, OR,
crossing impacts of the transmission Wait Period Ends: 04/28/2008, Mt. Hood National Forest and
line corridors and how mercury Contact: Peter J. Hartman 208–334– Columbia River Gorge National Scenic
emissions will be addressed. 9180. Area, Site-Specific Invasive Plant
Rating EC2. EIS No. 20080102, Final EIS, BLM, 00, Treatments, Forest Plan Amendments
Yuma Field Office (YFO) Resource #16, Mt. Hood National Forest and
EIS No. 20070547, ERP No. DS–COE– Management Plan, Provide Direction Columbia River Gorge National Scenic
G39044–TX Managing Public Lands, Area, Clackamas, Hood River,
Central City Project, Proposed Implementation, Yuma, La Paz and Multnomah and Wasco Counties, OR,
Modification to the Authorized Projects Maricopa Counties, AZ and Imperial Wait Period Ends: 04/28/2008,
which provides Flood Damage and Riverside Counties, CA, Wait Contact: Jennie O’Connor 503–668–
Reduction, Habitat Improvement, Period Ends: 04/28/2008, Contact: 1645.
Recreation and Urban Revitalization, Brenda Hudgens-Williams 202–452– EIS No. 20080110, Final EIS, BIA, CA,
Upper Trinity River Central City, Upper 5112. Scotts Valley Band of Pomo Indians,
Trinity River Basin, Trinity River, TX. EIS No. 20080103, Draft EIS, USN, FL, Proposed 29.87 Acre Fee-to-Trust
Summary: No formal comment letter Mayport Naval Station Project, Transfer and Casino Project, Contra
was sent to the preparing agency. Proposed Homeporting of Additional Costa County, Comment Period Ends:
Rating NC. Surface Ships, Several Permits, 04/28/2008, Contact: John Rydzik
Mayport, FL, Comment Period Ends: 916–978–6042.
Final EISs EIS No. 20080111, Draft EIS, COE, 00,
05/12/2008, Contact: Erica Evans
EIS No. 20080036, ERP No. F–GSA– 703–412–7542. PROGRAMMATIC—Hydropower
J80047–CO EIS No. 20080104, Final EIS, JUS, NV, Rehabilitations, Dissolved Oxygen
Las Vegas Detention Facility, and Minimum Flow Regimes at Wolf
Denver Federal Central Site Plan
Proposed Contractor-Owned/ Creek Dam, Kentucky and Center Hill
Study, Master Site Plan,
Contractor-Operated Detention and Dale Hollow Dams, Tennessee,
Implementation, City of Lakewood,
Facility, Implementation, Nevada Implementation, Comment Period
Jefferson County, CO.
Area, Wait Period Ends: 04/28/2008, Ends: 05/12/2008, Contact: Chip Hall
Summary: EPA’s previous concerns
Contact: Scott P. Stermer 202–353– 615–736–7666.
have been resolved; therefore, EPA does
4601. EIS No. 20080112, Draft Supplement,
not object to the proposed action.
EIS No. 20080105, Draft EIS, AFS, CA, NOA, CA, Channel Islands National
EIS No. 20080056, ERP No. F–AFS– Orleans Community Fuels Reduction Marine Sanctuary Management Plan,
L65530–AK and Forest Health Project, To Manage Supplement/Replace Information,
Tonga’s Land and Resource Forest Stands to Reduce Hazardous Implementation, Santa Barbara and
Management Plan, Plan Amendment, Fuel Conditions, Orleans Ranger Ventura Counties, CA , Comment
Implementation, Tonga’s National District, Six Rivers National Forest, Period Ends: 05/30/2008, Contact:
Forest, AK. Humboldt County, CA, Comment Chris Mobley 805–966–7107 Ext 465.
Summary: The final EIS addressed Period Ends: 05/13/2008, Contact: EIS No. 20080113, Draft EIS, FRC, FL,
EPA’s concerns; therefore, EPA does not William Rice 530–627–3291. Floridian Natural Gas Storage Project,
object to the project. EIS No. 20080106, Draft EIS, AFS, CO, Construction and Operation,
Long Draw Reservoir Project, Re-Issue Liquefied Natural Gas (LNG) Storage
Dated: February 25, 2008. a Special-Use-Authorization to Water and Natural Gas Transmission
Robert W. Hargrove, Supply and Storage to Allow the Facilities, Martin County, FL,
Director, NEPA Compliance Division, Office Continued Use of Long Draw Comment Period Ends: 05/12/2008,
of Federal Activities. Reservoir and Dam, Arapaho and Contact: Andy Black 1–866–208–
[FR Doc. E8–6422 Filed 3–27–08; 8:45 am] Roosevelt National Forests and 3372.
BILLING CODE 6560–50–P Pawnee National Grassland, Grand EIS No. 20080114, Draft EIS, BPA, WA,
and Larimer Counties, CO, Comment Lyle Falls Fish Passage Project, To
Period Ends: 05/12/2008, Contact: Improve Fish Passage to Habitat in the
ENVIRONMENTAL PROTECTION Ken Tu 970–295–6623. Upper Part of the Watershed, Located
AGENCY EIS No. 20080107, Final Supplement, on the Lower Klickitat River, Klickitat
[ER–FRL–6697–3] NOA, 00, Atlantic Mackerel, Squid County, WA, Comment Period Ends:
and Butterfish, Fishery Management 05/12/2008, Contact: Carl Keller 503–
Environmental Impacts Statements; Plan, Amendment #9, 230–7692.
Notice of Availability Implementation, Essential Fish EIS No. 20080115, Draft EIS, UAF, FL,
Habitat (EFH), Exclusive Economic Eglin Air Force Base Program, Base
Responsible Agency: Office of Federal Zone (EEZ), Wait Period Ends: 04/28/ Realignment and Closure (BRAC)
Activities, General Information (202) 2008, Contact: Patricia A. Kurkul 2005 Decisions and Related Action,
564–7167 or http://www.epa.gov/ 978–281–9250. Implementation, FL, Comment Period
compliance/nepa/. EIS No. 20080108, Revised Final EIS, Ends: 05/12/2008, Contact: Mike
Weekly receipt of Environmental Impact WAP, CA, Sacramento Area Voltage Spaits 850–882–2878.
Statements Support Project, Revision to FSEIS EIS No. 20080116, Final EIS, FRC, 00,
sroberts on PROD1PC70 with NOTICES

Filed 03/17/2008 Through 03/21/2008 Filed February 2008, Selected Gulf Crossing Project, Construction
Pursuant to 40 CFR 1506.9. Preferred Alternative B, Proposal to and Operation of Natural Gas Pipeline
EIS No. 20080101, Final EIS, FHW, ID, Build a Double-Circuit 230-kV to Facilitate the Transport of up to
ID–75 Timmerman to Ketchum—US– Transmission Line, Placer, 1.73 Billion Cubic Feet Per Day of
20 to Saddle Road, Preferred Sacramento and Sutter Counties, CA, Natural Gas, Locate in various

VerDate Aug<31>2005 17:57 Mar 27, 2008 Jkt 214001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\28MRN1.SGM 28MRN1