14848 Federal Register / Vol. 73, No.

54 / Wednesday, March 19, 2008 / Notices

SUMMARY: The NRC has recently at the NRC Public Document Room, One 3. How often the collection is
submitted to OMB for review the White Flint North, 11555 Rockville required: NRC Form 241 must be
following proposal for the collection of Pike, Room O–1 F21, Rockville, MD submitted each time an Agreement State
information under the provisions of the 20852. OMB clearance requests are licensee wants to engage in or revise its
Paperwork Reduction Act of 1995 (44 available at the NRC worldwide Web activities involving the use of
U.S.C. Chapter 35). The NRC hereby site: http://www.nrc.gov/public-involve/ radioactive byproduct material in a non-
informs potential respondents that an doc-comment/omb/index.html. The Agreement State, areas of exclusive
agency may not conduct or sponsor, and document will be available on the NRC Federal jurisdiction, or offshore waters.
that a person is not required to respond home page site for 60 days after the The NRC may waive the requirements
to, a collection of information unless it signature date of this notice. for filing additional copies of NRC Form
displays a currently valid OMB control Comments and questions should be 241 during the remainder of the
number. The NRC previously published directed to the OMB reviewer listed calendar year following receipt of the
a Federal Register Notice with a 60-day below by April 18, 2008. Comments initial form.
comment period on this information received after this date will be 4. Who is required or asked to report:
collection on December 18, 2007. considered if it is practical to do so, but Any licensee who holds a specific
1. Type of submission, new, revision, assurance of consideration cannot be license from an Agreement State and
or extension: Extension. given to comments received after this wants to conduct the same activity in
2. The title of the information date. non-Agreement States, areas of
collection: DOE/NRC Form 740M, Nathan J. Frey, Office of Information exclusive Federal jurisdiction, or
‘‘Concise Note’’ and NUREG/BR–0006, and Regulatory Affairs (3150–0057), offshore waters under the general
Revision 6, ‘‘Instructions for Completing NEOB–10202, Office of Management license in 10 CFR 150.20.
Nuclear Material Transaction Reports, and Budget, Washington, DC 20503. 5. The number of annual respondents:
(DOE/NRC Forms 741 and 740M).’’ Comments can also be e-mailed to 140 respondents.
3. Current OMB approval number: Nathan_J._Frey@omb.eop.gov or 6. The number of hours needed
3150–0057. submitted by telephone at (202) 395– annually to complete the requirement or
4. The form number if applicable: request: 582 hours.
7345.
DOE/NRC Form 740M. 7. Abstract: Any Agreement State
5. How often the collection is The NRC Clearance Officer is
licensee who engages in the use of
required: DOE/NRC Form 740M is Margaret A. Janney, (301) 415–7245.
radioactive material in non-Agreement
requested as necessary to inform the Dated at Rockville, Maryland, this 13th day States, areas of exclusive Federal
U.S. or the International Atomic Energy of March, 2008. jurisdiction, or offshore waters, under
Agency (IAEA) of any qualifying For the Nuclear Regulatory Commission. the general license in Section 150.20, is
statement or exception to any of the data Gregory Trussell, required to file, with the NRC regional
contained in other reporting forms Acting NRC Clearance Officer, Office of administrator for the region in which
required under the US/IAEA Safeguards Information Services. the Agreement State that issues the
Agreement. On average, 15 licensees [FR Doc. E8–5500 Filed 3–18–08; 8:45 am] license is located, a copy of NRC Form
submit about 10 forms each per year, for BILLING CODE 7590–01–P 241 (‘‘Report of Proposed Activities in
a total of 150 forms annually. Non-Agreement States, Areas of
6. Who will be required or asked to Exclusive Federal Jurisdiction, or
report: Persons licensed to possess NUCLEAR REGULATORY Offshore Waters’’), a copy of its
specified quantities of special nuclear COMMISSION Agreement State specific license, and
material or source material, and the appropriate fee as prescribed in
licensees of facilities on the U.S. eligible Agency Information Collection Section 170.31 at least 3 days before
list who have been notified in writing Activities: Proposed Collection; engaging in such activity. This
by the NRC that they are subject to Part Comment Request mandatory notification permits NRC to
75. schedule inspections of the activities to
7. An estimate of the number of AGENCY: U.S. Nuclear Regulatory
Commission (NRC). determine whether the activities are
annual responses: 150. being conducted in accordance with
8. The estimated number of annual ACTION: Notice of pending NRC action to requirements for protection of the
respondents: 15. submit an information collection public health and safety.
9. An estimate of the total number of request to the Office of Management and Submit, by May 19, 2008, comments
hours needed annually to complete the Budget (OMB) and solicitation of public that address the following questions:
requirement or request: 113 hours (an comment. 1. Is the proposed collection of
average of .75 hours per response). information necessary for the NRC to
10. Abstract: Licensees affected by SUMMARY: The NRC is preparing a
properly perform its functions? Does the
Part 75 and related sections of Parts 40, submittal to OMB for review of information have practical utility?
50, 70, and 150 are required to submit continued approval of information 2. Is the burden estimate accurate?
DOE/NRC Form 740M to inform the collections under the provisions of the 3. Is there a way to enhance the
U.S. or the IAEA of any qualifying Paperwork Reduction Act of 1995 (44 quality, utility, and clarity of the
statement or exception to any of the data U.S.C. Chapter 35). information to be collected?
contained in any of the other reporting Information pertaining to the 4. How can the burden of the
forms required under the US/IAEA requirement to be submitted: information collection be minimized,
Safeguards Agreement. The use of Form 1. The title of the information including the use of automated
740M enables the NRC to collect, collection: NRC Form 241, ‘‘Report of collection techniques or other forms of
jlentini on PROD1PC65 with NOTICES

retrieve, and analyze, and submit the Proposed Activities in Non-Agreement information technology?
data to IAEA to fulfill its reporting States, Areas of Exclusive Federal A copy of the draft supporting
responsibilities. Jurisdiction, or Offshore Waters.’’ statement may be viewed free of charge
A copy of the final supporting 2. Current OMB approval number: at the NRC Public Document Room, One
statement may be viewed free of charge 3150–0013. White Flint North, 11555 Rockville

VerDate Aug<31>2005 16:50 Mar 18, 2008 Jkt 214001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\19MRN1.SGM 19MRN1
Federal Register / Vol. 73, No. 54 / Wednesday, March 19, 2008 / Notices 14849

Pike, Room O–1 F21, Rockville, MD Required reports are submitted and and Budget, Washington, DC 20503.
20852. OMB clearance requests are evaluated as events occur. Comments can also be e-mailed to
available at the NRC worldwide Web 6. Who will be required or asked to Nathan_J._Frey@omb.eop.gov or
site: http://www.nrc.gov/public-involve/ report: Nuclear power reactor licensees, submitted by telephone at (202) 395–
doc-comment/omb/index.html. The licensed under 10 CFR Part 50 or 52 7345.
document will be available on the NRC who possess, use, import, export, The NRC Clearance Officer is
home page site for 60 days after the transport, or deliver to a carrier for Margaret A. Janney, (301) 415–7245.
signature date of this notice. transport, special nuclear material; Dated at Rockville, Maryland, this 12th day
Comments and questions about the Category I fuel facilities; Category II and of March, 2008.
information collection requirements III facilities; research and test reactors; For the Nuclear Regulatory Commission.
may be directed to the NRC Clearance and 262 other nuclear materials Gregory Trussell,
Officer, Margaret A. Janney (T–5 F52), licensees.
Acting NRC Clearance Officer, Office of
U.S. Nuclear Regulatory Commission, 7. An estimate of the number of Information Services.
Washington, DC 20555–0001, by annual responses: 86,264 (85,880 plus
[FR Doc. E8–5518 Filed 3–18–08; 8:45 am]
telephone at 301–415–7245, or by e-mail 384 recordkeepers).
8. The estimated number of annual BILLING CODE 7590–01–P
to INFOCOLLECTS@NRC.GOV.
respondents: 384.
Dated at Rockville, Maryland, this 12th day 9. An estimate of the total number of
of March 2008. NUCLEAR REGULATORY
hours needed annually to complete the
For the Nuclear Regulatory Commission. requirement or request: 578,863 hours COMMISSION
Gregory Trussell, (85,441 reporting [approximately 1 hour Entergy Operations, Inc.; Notice of
Acting NRC Clearance Officer, Office of per response] and 493,422 Receipt and Availability of Application
Information Services. recordkeeping [1,285 hours per for a Combined License
[FR Doc. E8–5517 Filed 3–18–08; 8:45 am] recordkeeper]).
BILLING CODE 7590–01–P 10. Abstract: NRC regulations in 10 On February 27, 2008, Entergy
CFR Part 73 prescribe requirements to Operations, Inc. (EOI), on behalf of itself
establish and maintain a physical and Entergy Mississippi, Inc., Entergy
NUCLEAR REGULATORY protection system and security Louisiana, LLC, Entergy Gulf States
COMMISSION organization with capabilities for Louisiana, LLC, and System Energy
protection of: (1) Special nuclear Resources, Inc., filed with the U. S.
Agency Information Collection material (SNM) at fixed sites, (2) SNM Nuclear Regulatory Commission (NRC,
Activities: Proposed Collection; in transit, and (3) plants in which SNM the Commission) pursuant to Section
Comment Request is used. The objective is to ensure that 103 of the Atomic Energy Act and Title
AGENCY: U.S. Nuclear Regulatory activities involving special nuclear 10 of the Code of Federal Regulations
Commission (NRC). material are consistent with interests of (10 CFR) Part 52, ‘‘Licenses,
common defense and security and that Certifications, and Approvals for
ACTION: Notice of the OMB review of
these activities do not constitute an Nuclear Power Plants,’’ an application
information collection and solicitation
unreasonable risk to public health and for a combined license (COL) for an
of public comment.
safety. The information in the reports economic simplified boiling water
SUMMARY: The NRC has recently and records submitted by licensees is reactor (ESBWR) nuclear power plant at
submitted to OMB for review the used by the NRC staff to ensure that the the Grand Gulf Nuclear Station (GGNS)
following proposal for the collection of health and safety of the public and the site located in Claiborne County,
information under the provisions of the environment are protected, and licensee Mississippi. The reactor is to be
Paperwork Reduction Act of 1995 (44 possession and use of special nuclear identified as GGNS Unit 3.
U.S.C. Chapter 35). The NRC hereby material is in compliance with license An applicant may seek a COL in
informs potential respondents that an and regulatory requirements. accordance with Subpart C of 10 CFR
agency may not conduct or sponsor, and A copy of the final supporting Part 52. The information submitted by
that a person is not required to respond statement may be viewed free of charge the applicant includes certain
to, a collection of information unless it at the NRC Public Document Room, One administrative information such as
displays a currently valid OMB control White Flint North, 11555 Rockville financial qualifications submitted
number. The NRC published a Federal Pike, Room O–1 F21, Rockville, MD pursuant to 10 CFR 52.77, as well as
Register Notice with a 60-day comment 20852. OMB clearance requests are technical information submitted
period on this information collection on available at the NRC worldwide Web pursuant to 10 CFR 52.79.
January 2, 2008. site: http://www.nrc.gov/public-involve/ Subsequent Federal Register notices
1. Type of submission, new, revision, doc-comment/omb/index.html. The will address the acceptability of the
or extension: Revision. document will be available on the NRC tendered COL application for docketing
2. The title of the information home page site for 60 days after the and provisions for participation of the
collection: 10 CFR Part 73—‘‘Physical signature date of this notice. public in the COL review process.
Protection of Plants and Materials.’’ Comments and questions should be A copy of the application is available
3. Current OMB approval number: directed to the OMB reviewer listed for public inspection at the
3150–0002. below by April 18, 2008. Comments Commission’s Public Document Room
4. The form number if applicable: Not received after this date will be (PDR), located at One White Flint North,
applicable. considered if it is practical to do so, but Public File Area O1 F21, 11555
5. How often the collection is assurance of consideration cannot be Rockville Pike (first floor), Rockville,
jlentini on PROD1PC65 with NOTICES

required: On occasion, with the given to comments received after this Maryland, and via the Agencywide
exception of the initial submittal of date. Documents Access and Management
revised Security Plans, Safeguards Nathan J. Frey, Office of Information System (ADAMS) Public Electronic
Contingency Plans, and Security and Regulatory Affairs (3150–0002), Reading Room on the Internet at the
Training and Qualification Plans. NEOB–10202, Office of Management NRC Web site, http://www.nrc.gov/

VerDate Aug<31>2005 16:50 Mar 18, 2008 Jkt 214001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\19MRN1.SGM 19MRN1