Docket Number: DOT–OST–2007– Renee V. Wright, FOR FURTHER INFORMATION CONTACT: Mr.
0080. Program Manager, Docket Operations, Dennis Walsh, Financial Analysis and
Date Filed: November 21, 2007. Federal Register Liaison. Passenger Facility Charge Branch, 800
Parties: Members of the International [FR Doc. E8–5346 Filed 3–17–08; 8:45 am] Independence Ave., SW., Room 619,
Air Transport Association. BILLING CODE 4910–9X–P Washington, DC 20591. (202) 493–4890.
VerDate Aug<31>2005 17:39 Mar 17, 2008 Jkt 214001 PO 00000 Frm 00123 Fmt 4703 Sfmt 4703 E:\FR\FM\18MRN1.SGM 18MRN1
14552 Federal Register / Vol. 73, No. 53 / Tuesday, March 18, 2008 / Notices
The supplemental information may be projects are adequately justified. In as a dramatic projected increase in flight
reviewed in person at this same reviewing the application submitted by delays at the airport during the summer
location. the District, the FAA discovered that of 2008 if proposed schedules were
SUPPLEMENTARY INFORMATION: The FAA further clarification would be helpful to implemented as requested by carriers.
invites public comment on the make its required determinations. We intend this proposed limitation on
Accordingly, the FAA asked the scheduled operations to relieve the
additional documentation provided by
District to clarify certain information on substantial inconvenience to the
the applicant in response to the FAA’s
costs related to Project # 1—the traveling public caused by excessive
requests for clarification and the
Perimeter Road and Fencing Project and congestion-related flight delays at the
District, to the FAA in support of the
Project #3 Paving/Lighting/NAVAIDS airport, which magnify as they spread
District’s application to impose a PFC at
(specifically the NAVAIDS portion); and through the National Airspace System.
PFN and, once that airport closes, at the
information related to Project # 6— Among other things, this proposal will
New PFN and to use the PFC revenue
Facilities (particularly the design of the ensure that projected delays do not
at the New PFN to construct New PFN.
This document requests public Public Safety Building for Aircraft increase significantly and provide for a
comment on the supplementary material Rescue and Firefighting (ARFF)). The more efficient use of the nation’s
provided by the applicant, the Panama FAA also asked the District to provide airspace. The final Order would take
City-Bay County Airport and Industrial clarification as to the use of AIP and effect at 6 a.m., Eastern Time, on June
District (the District), in response to the PFC funding on the projects. 1, 2008, and would expire at 11:59 p.m.,
In response to the FAA’s requests, the Eastern Time, on October 24, 2009.
FAA’s requests for clarification of its
District provided supplemental material This proposed limitation on
application to impose a PFC at PFN and,
in the form of e-mails, which included scheduled operations is necessary to
once that airport closes, at the New PFN
cost information on perimeter road prevent an increase in scheduled flights
and to use the PFC revenue at the New
improvements and NAVAIDS; a revised during peak hours. Flights in certain
PFN to construct New PFN.
Exhibit 2; a funding summary; and floor hours in summer 2007 were in excess of
The supplemental material includes
plans of the ARFF building. the airport’s capacity, and scheduling is
all documentation provided to the FAA Any person may inspect the PFC
by the District after July 16, 2007, which a factor in the high level of delays
application and supplementary material historically experienced at the airport.
was the date of the Districts’ submission submitted by the District to the FAA at
of its PFC application for collection and The proposed limits would apply to all
the FAA office listed above under FOR U.S. and foreign air carriers’ scheduled
use of PFC revenue to construct certain
FURTHER INFORMATION CONTACT (call operations, excluding helicopters, from
portions of New PFN. The FAA will
(202) 267–3845 to arrange for access). 6 a.m., Eastern Time, through 10:59
issue a decision on the District’s PFC In addition, any person may, upon
application under the provisions of the p.m., Eastern Time. A final Order would
request, inspect the application, notice be enforceable under the FAA’s civil
49 U.S.C. 40117 and 14 CFR Part 158. and supplemental information germane
Background: On July 16, 2007, the penalty authority. In a separate docket,
to the application in person at the the FAA intends to propose limits on
District submitted its application to offices of the District.
impose a PFC at PFN and, once that unscheduled flights at EWR during the
airport closes, at the New PFN. The Issued in Washington, DC, on March 7, same hours, as well as a system to
2008. allocate the reservations for the
District will use the PFC revenue to
construct New PFN. Joe Hebert, available unscheduled operations. The
On August 16, 2007, the FAA sent a Manager, Financial Analysis and Passenger FAA anticipates that the total number of
letter to the District notifying it that the Facility Charge Branch. operations at EWR will be limited to an
PFC application was substantially [FR Doc. E8–5163 Filed 3–17–08; 8:45 am] average of 83 per hour.
complete. BILLING CODE 4910–13–M
DATES: Send your comments on this
The FAA’s decision making process proposed order on or before April 1,
on PFC applications may include 2008.
publishing a notice in the Federal DEPARTMENT OF TRANSPORTATION
Register informing the public of the ADDRESSES: You may submit comments,
Federal Aviation Administration identified by docket number FAA–
FAA’s intention to rule on the pending
application and inviting public [Docket No. FAA–2008–0221] 2008–0221, using any of the following
comment on that application. methods:
Consideration is given to all Operating Limitations at Newark • Federal eRulemaking Portal: Go to
comments submitted pursuant to the Liberty International Airport http://regulations.gov and follow the
Federal Register Notice during FAA’s AGENCY: Federal Aviation online instructions for sending your
deliberations on the application. The Administration (FAA), DOT. comments electronically.
FAA responds to the substantive • Mail: Send comments by mail to
ACTION: Notice of Proposed Order
comments in its Final Agency Decision. Docket Operations, U.S. Department of
Limiting Scheduled Operations at
The FAA published notice and invited Transportation, M–30, Room W12–140,
Newark Liberty International Airport;
comment on the District’s application in 1200 New Jersey Avenue, SE.,
Request for Comments.
the Federal Register on August 24, Washington, DC 20590–0001. Persons
2007. The deadline for the public to SUMMARY: The Federal Aviation wishing to receive confirmation of
comment closed on September 24, 2007. Administration (FAA) has tentatively receipt of their written submission
The FAA did not receive any comments determined that it is necessary to place should include a self-addressed
mstockstill on PROD1PC66 with NOTICES
in response to its August 24, 2007 a temporary limitation on scheduled stamped postcard.
Federal Register notice. flight operations at Newark Liberty • Hand Delivery: Deliver comments to
In conjunction with rendering its International Airport (EWR). The FAA is Docket Operations in Room W12–140
decisions on PFC applications, the FAA issuing this proposal as a result of on the ground floor of the West Building
determines the PFC eligibility for each persistent congestion and delays at EWR at 1200 New Jersey Avenue, SE.,
project, and whether the eligible during the peak operating hours, as well Washington DC, between 9 a.m. and 5
VerDate Aug<31>2005 17:39 Mar 17, 2008 Jkt 214001 PO 00000 Frm 00124 Fmt 4703 Sfmt 4703 E:\FR\FM\18MRN1.SGM 18MRN1