PURPOSE:
Upgrade & Improve Existing Local Sewer System Capacity
Reduce Discharge Into Boston Harbor & Chelsea Creek
By 40 Million Gallons Annually (90% Reduction)
GOAL: Comply with Federal Clean Water Act of 1972
SCOPE: 11,800 LF of 36 to 66 Micro-tunnel
CSO Relief Piping
DESIGN SERVICES:
Structural & Geotechnical Engineering
20 Deep Structure Shafts
8-ft Wide x 96-ft Long Trench Support Design
MBTM Jacking Thrust Blocks