400KV PROTECTION

PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
gk_aptransco@yahoo.co.in,
Mobile:9440336984

BASICS
OF
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

ONE & HALF BREAKER DESCRIPTION


BUS-1

1. IN THIS TWO BUSES ARE PRIOVIDED.

BUS-1

BUS-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1

2. THESE TWO BUSES ARE INTER-CONNECTED BY THREE CIRCUIT BREAKERS.

BUS-1

BUS-2

BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1

3. THEY ARE DESIGNATED AS 1-52 CB, 2-52 CB, 3-52 CB.

1-52 CB

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

2-52 CB

3-52 CB
BUS-2

ONE & HALF BREAKER DESCRIPTION


BUS-1

4. LINE - 1 IS CONNECTED IN BETWEEN 1-52 CB & 2-52 CB.


5. LINE - 2 IS CONNECTED IN BETWEEN 3-52 CB & 2-52 CB.

1-52 CB

LINE-1

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-2
2-52 CB

3-52 CB
LINE-1
BUS-2

LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB

LINE-1

6. LINE-1 HAVING TWO FEEDING PATHS i.e


A. VIA BUS-1 & 1-52 CB
B. VIA BUS-2, 3-52 CB & 2-52 CB
7. LINE-2 HAVING TWO FEEDING PATHS i.e
A. VIA BUS-2 & 3-52 CB
B. VIA BUS-1, 1-52 CB & 2-52 CB

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-2

2-52 CB

3-52 CB
LINE-1
BUS-2

LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1

8. FOR INTURUPTING LINE-1 THE 1-52CB AND 2-52CB IS TO BE TRIPPED.


9. FOR INTURUPTING LINE-2 THE 3-52CB AND 2-52CB IS TO BE TRIPPED.

1-52 CB

LINE-1

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-2
2-52 CB

3-52 CB
LINE-1
BUS-2

LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1

10. FOR ANY PROBLEM IN LINE-1 OR LINE-2 ALONG WITH MAIN BREAKER
THE MIDDLE BREAKER OR SAY TIE BREAKER (2-52 CB) MUST TRIP.

1-52 CB

LINE-1

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-2
2-52 CB

3-52 CB
LINE-1
BUS-2

LINE-2

ONE & HALF BREAKER DESCRIPTION


BUS-1
1-52 CB

LINE-1

11. NORMALLY IN ALL TYPES OF BUSBAR CONFIGUARATIONS ONE BREAKER


IS SUFFICIENT FOR ONE FEEDER.
12. HERE TWO FEEDERS ARE CONTROLED BY THREE BREAKERS.
13. SO THESE TWO FEEDERS CONTROLLED BY THREE CIRCUIT BREAKERS
IT IS CALLED ONE & HALF BREAKER SYSTEM.

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-2
2-52 CB

3-52 CB
LINE-1
BUS-2

LINE-2

1-52 CB

LINE-1

2-52 CB

LINE-2

14. THE BAY BETWEEN BUS-1 & LINE-1 IS CALLED MAIN BAY FOR FEEDER-1.

BUS-1

MAIN BAY(1ST BAY) FOR FEEDER-1

BUS-1

MAIN BAY(1ST BAY) FOR FEEDER-1

ONE & HALF BREAKER DESCRIPTION

BUS-2

1-52 CB

3-52 CB

2-52 CB

3-52 CB
LINE-1
BUS-2

LINE-2

LINE-1

2-52 CB

LINE-2

15. THE BAY BETWEEN LINE-1 & LINE-2 IS CALLED TIE BAY FOR FEEDER-1 & 2.

BUS-1

MAIN BAY(1ST BAY) FOR FEEDER-1

1-52 CB

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

BUS-1

MAIN BAY(1ST BAY) FOR FEEDER-1

ONE & HALF BREAKER DESCRIPTION

BUS-2

1-52 CB

3-52 CB

2-52 CB

3-52 CB
LINE-1
BUS-2

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

LINE-2

3-52 CB
BUS-2

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

2-52 CB

16. THE BAY BETWEEN BUS-2 & LINE-2 IS CALLED MAIN BAY FOR FEEDER-2.

MAIN BAY(1ST BAY) FOR FEEDER-1

LINE-1

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

1-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

BUS-1

MAIN BAY(1ST BAY) FOR FEEDER-1

ONE & HALF BREAKER DESCRIPTION

LINE-2

3-52 CB
BUS-2

BUS-1

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

2-52 CB

17. IN THIS SYSTEM FULL DIA MEANS 2 FEEDERS CONTROLLED BY 3 CBs.


18. HALF DIA MEANS 1 FEEDER CONTROLLED BY 2 CBs.
(Nothing but Double CB System)

MAIN BAY(1ST BAY) FOR FEEDER-1

LINE-1

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

1-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

BUS-1

MAIN BAY(1ST BAY) FOR FEEDER-1

ONE & HALF BREAKER DESCRIPTION

ONE & HALF BREAKER DESCRIPTION

3-52 CB
BUS-2

BUS-2

1-52 CB

3-52 CB

2-52 CB

LINE-1

LINE-2

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.

MAIN BAY(3RD BAY) FOR FEEDER-2

LINE-2

BUS-1

MAIN BAY(1ST BAY) FOR FEEDER-1

2-52 CB

GOPALA KRISHNA PALEPU


ADE/MRT/ T&C/400KV SS/
O/O CE/400KV / L&SS/ VS
APTRANSCO, HYDERABAD
gk_aptransco@yahoo.co.in
Mobile: 9440336984

MAIN BAY(1ST BAY) FOR FEEDER-1

LINE-1

TIE BAY (2ND BAY ) FOR FEEDER-1 & 2

1-52 CB

MAIN BAY(3RD BAY) FOR FEEDER-2

BUS-1

SUBSTATION DESIGN/LAYOUT

DIA5

BAY17
BAY18

BAY15

BAY16

DIA6

BAY14

BAY11

BAY8
BAY9

BAY5

FEEDER11

BAY13

DIA4
BAY10

DIA3

BAY6

BAY2
BAY3

FEEDER9

FEEDER7

BAY12

DIA2

BAY1

BUS-1 DIA1

FEEDER5

BAY7

FEEDER3

BAY4

FEEDER1

(I-CONFIGUARATION)

BUS-2

FEEDER2

FEEDER4

FEEDER6

FEEDER8

FEEDER10

FEEDER12

SUBSTATION DESIGN/LAYOUT
(D-CONFIGUARATION)
FEEDER5

FEEDER10
BAY14

BAY13

BAY7

DIA1

FEEDER9

BAY8

BAY3

BAY1

BAY2

FEEDER6

DIA3

BAY15

FEEDER2

BAY9

FEEDER1

DIA5

BUS-1

BAY5

FEEDER3

BAY11

FEEDER4

FEEDER7

FEEDER8

DIA6

BAY18

BAY16

DIA4

BAY12

BAY10

DIA2

BAY6

BAY4

BUS-2

BAY17

FEEDER11

FEEDER12

SUBSTATION DESIGN/LAYOUT
(DOUBLE BUS & DOUBLE BREAKER SYSTEM)
FEEDER1

FEEDER3

FEEDER1

FEEDER3

BAY6

BAY5

BAY2

BAY1

BAY7

BAY5

BAY3

BAY1

BUS-1

BUS-1

BAY8

BAY7

BAY4

BAY3

BAY8

BAY6

BAY4

BAY2

BUS-2

BUS-2

FEEDER2

FEEDER4

FEEDER2

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 800KV SYSTEM

FEEDER 8

FEEDER 1
1-52 CB

FEEDER 2
2-52 CB

3-52 CB

8-52 CB

FEEDER 7

MESH / RING
LAYOUT
4-52 CB

7-52 CB

5-52 CB

6-52 CB
FEEDER 6

FEEDER 3

FEEDER 5

FEEDER 4

SUBSTATION DESIGN/LAYOUT
(DOUBLE MAIN BUS & TRANSFER BUS SYSTEM)
T/F-1

T/F-2

BUS-2

BAY3
BAY1

BAY2

FEEDER1 FEEDER2

BAY4

TRANSFER BUS

BAY5

TRANSFER BUS
COUPLER

BUS COUPLER

BUS-1

BAY6

BAY7

BAY8

FEEDER3 FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 400 & 220 KV SYSTEM

SUBSTATION DESIGN/LAYOUT
(DOUBLE MAIN BUS & CB BYPASS ISO SYSTEM)
T/F-1

BAY1

BAY2

T/F-2

BAY6

BAY4
BUS COUPLER

BUS-1

BAY7

BUS-2

BAY3

FEEDER1

FEEDER2

BAY5

WHEN ANY CB PROBLEM OR FOR


PREVENTIVE MAINTANENCE THEN ALL
OTHER
FEEDERS
SHIFTED
TO
ANOTHER BUS OF FAULTED CB BUS
AND CLOSE THE BYPASS ISOLATOR,
THEN PROTECTION IS SHIFTED TO BUS
COUPLER AND OPEN THE FAULTY CB.

FEEDER3

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 220KV SYSTEM

SUBSTATION DESIGN/LAYOUT
(SINGLE BUS & TRANSFER BUS SYSTEM)
T/F-2

T/F-1

TRANSFER BUS COUPLER

TRANSFER BUS

BUS-1
BAY1

FEEDER1

BAY2

FEEDER2

BAY3

BAY4

BAY5

BAY6

FEEDER3

BAY7

FEEDER4

FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 220 & 132 KV SYSTEM

CT METHODS
IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

DIFFERENT CT METHODS OF ONE & HALF BREAKER SYSTEM

CB
LINE
CB
LINE
CB
LINE

CB

CB
4 CT METHOD

CB

CB

CB

AT/F
AT/F

CB

CB

6 CT METHOD
CB

LINE

CB

5 CT METHOD

LINE
LINE

CB
3 CT METHOD

CB

CB

6 CT METHOD
CB

CB
6 CT METHOD

CB

AT/F
AT/F
AT/F
AT/F

ONE & HALF BREAKER SYSTEM


(3CT METHOD)
BUS-1

BUS-2

1-89

3-89

1-52CB
1-CT

3-52CB
P2

P2

3P1

3-CT
3
P1

1-89A

3-89A

3
3

2-CT

2-89A 2-52CB
1-89L

P1

P2

2-89B
3-89T

LINE 1
T/F-1

ONE & HALF BREAKER SYSTEM


(4CT METHOD)
BUS-1

BUS-2

1-89

3-89

1-52CB
1-CT

3-52CB
P2

P2

3P1

3-CT
3
P1

1-89A

3-89A

P2

2-89A
1-89L

P1

2-BCT

2-ACT

P1

2-52CB

P2

2-89B
3-89T

LINE 1
T/F-1

ONE & HALF BREAKER SYSTEM


(5CT METHOD)
BUS-1

BUS-2

1-89

3-89

1-52CB
1-CT

3-52CB
P2

P2

3P1

3 3-CT

P1

1-89A

3-89A

2-CT
2-89A

P1

2-52CB

P2

2-89B

1-89L
1L-CT

3-89T
P2

3P1

P2

3T-CT
3
P1

LINE 1
T/F-1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)

BUS-1

BUS-2

1-89
P2
P1

3-89

3 1A-CT

3A-CT

1-52CB

3 P1

3-52CB

P2

1B-CT
3
P1

3B-CT

1-89A

P2
P1

3-89A

2-89A

P2

P1

2B-CT

2A-CT

1-89L

P2

P1

2-52CB

P2

2-89B
3-89T

T/F-1
LINE 1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)
BUS-1

BUS-2

1-89

3-89

1-52CB

3-52CB

P2

1-CT
3
P1

3-CT

1-89A

P2

P1

2B-CT

2-89A

P1

2-52CB

P2

2-89B

1-89L
1L-CT
3
P1

LINE 1

P1

3-89A
2A-CT

P2

P2

3-89T

3T-CT

P2

3 P1

T/F-1

ONE & HALF BREAKER SYSTEM


(6CT METHOD)

BUS-1

BUS-2

1-89

P2

P2

3 1-CT

1-52CB

3-52CB

1-89A

3-89A

2-89A

P2

P1

2B-CT

2A-CT

P1

2-52CB

P2

2-89B

1-89L
1L-CT
3
P1

LINE 1

3 3-CT

P1

P1

P2

3-89

3-89T

3T-CT

P2

3 P1

T/F-1

TYPICAL ONE & HALF BREAKER


SYSTEM ADOPTED IN GIS

DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER

TYPICAL ONE & HALF BREAKER


SYSTEM ADOPTED IN GIS
DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER

1-1/2 CB SYSTEM
(SIEMENS VATECH)

VD

VD

CT
DS

CT
CB

CT
DS

DS

CT
CB

GS

GS

GS

GS

VD
GS

GS

GS

GS

VD

CT
DS

DS

CT
CB

DS

CORE WISE
APLICATION OF
CTs IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

CURRENT TRANSFORMER
CONNECTIONS IN 3CT METHOD
1 CT
2 CT
3 CT
BUSBAR-1
2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND
CORE 1
( PS)

CORE 2
( PS)

CORE 3
( 0.5 / 0.2)

CORE 4
(0.5 / 0.2)

CORE 5
( PS)

CORE 6
( PS)

PROTECTION

CONNECTED TO MAIN PROTECTION FOR TRANSFORMER

BUSBAR-1 CHECKUP
PROTECTION (SPARE)

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND


CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR
FOR TRANSFORMER

SPARE

METERING & ENERGY METER FOR AT/F

METERING & ENERGY METER FOR FEEDER

SPARE

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND


CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR FOR
FEEDER

BUSBAR-2 CHECKUP
PROTECTION (SPARE)

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND


CONNECTED TO MAIN-1 PROTECTION FOR FEEDER

BUSBAR-2
PROTECTION

CURRENT TRANSFORMER
CONNECTIONS IN 3CT METHOD
1 CT
2 CT
3 CT
BUSBAR-1
2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND
CORE 1
( PS)

CORE 2
( PS)

CORE 3
(0.5 / 0.2)

CORE 4
( PS)

CORE 5
( PS)

BUSHING CT
METERING
CORE (0.5 / 0.2)

PROTECTION

CONNECTED TO MAIN PROTECTION FOR TRANSFORMER

BUSBAR-1 CHECKUP
PROTECTION (SPARE)

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND


CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR
FOR TRANSFORMER

METERING & ENERGY METER FOR FEEDER

SPARE

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND


CONNECTED TO MAIN-2 PROTECTION AFTER LBB/BFR FOR
FEEDER

BUSBAR-2 CHECKUP
PROTECTION (SPARE)

2CTs SECONDARIES ARE CONNECTED IN PARALLEL AND


CONNECTED TO MAIN-1 PROTECTION FOR FEEDER

BUSBAR-2
PROTECTION

NORMALLY THIS SYTEM ADOPTS, WHEN ONE SIDE LINE, OTHER SIDE AUTO
TRANSFORMER / BUS REACTOR IS PROVIDED IN A DIA OF ONE AND HALF BREAKER
SYSTEM, IF BUSHING CT METERING CORE IS AVAILABLE, THEN IT IS USED FOR
METERING & ENERGY METER FOR AT/F OR BUS REACTOR.

CURRENT TRANSFORMER
CONNECTIONS IN 4CT METHOD
CORE-1
(PS)

CORE-2
(PS)

CORE-3
(0.5/0.2)

CORE-4
(PS)

CORE-5
(PS)

1- CT

2-BCT

2-ACT

3-CT

CT SECONDARY
CORE IS
CONNECTED TO
BUSBAR-1
PROTECTION

SPARE

SPARE

CT SECONDARY
CORE IS
CONNECTED TO
BUSBAR-2
PROTECTION

BUSBAR-1
CHECKUP
PROTECTION
(SPARE)

SPARE

SPARE

BUSBAR-2
CHECKUP
PROTECTION
(SPARE)

2CTs SECONDARIES ARE


CONNECTED IN PARALLEL AND
CONNECTED TO
PANEL METERS & ENERGY METER

2CTs SECONDARIES ARE


CONNECTED IN PARALLEL AND
CONNECTED TO
PANEL METERS & ENERGY METER

2CTs SECONDARIES ARE


CONNECTED IN PARALLEL AND
CONNECTED TO
MAIN-2 PROTECTION
AFTER LBB/BFR

2CTs SECONDARIES ARE


CONNECTED IN PARALLEL AND
CONNECTED TO
BACKUP PROTECTION
AFTER LBB/BFR

2CTs SECONDARIES ARE


CONNECTED
IN PARALLEL AND CONNECTED TO
MAIN-1 PROTECTION

2CTs SECONDARIES ARE


CONNECTED
IN PARALLEL AND CONNECTED TO
MAIN PROTECTION

CURRENT TRANSFORMER
CONNECTIONS IN 5CT METHOD
1-CT

1-LCT

2-CT

3-TCT

3-CT

BUSBAR-1
PROTECTION

TEED PROT-1
(BAY 1&2)

TEED PROT-1
(BAY 2&3)

TEED PROT-1
(BAY 2&3)

BUSBAR-2
PROTECTION

BUSBAR-1
CHECKUP
PROTECTION
(SPARE)

TEED PROT-2
(BAY 1&2)

TEED PROT-2
(BAY 2&3)

TEED PROT-2
(BAY 2&3)

BUSBAR-2
CHECKUP
PROTECTION
(SPARE)

CORE-3
(0.5/0.2)

SPARE

METERING &
ENERGY
METER

SPARE

METERING &
ENERGY
METER

SPARE

CORE-4
(PS)

TEED PROT-2
(BAY 1&2)
AFTER
LBB/BFR
(1-52)

MAIN-2
PROTECTION

TEED PROT-2
(BAY 1&2)
AFTER
LBB/BFR
(2-52)

BACKUP
PROTECTION

TEED PROT-2
(BAY 2&3)
AFTER
LBB/BFR
(3-52)

CORE-5
(PS)

TEED PROT-1
(BAY 1&2)

MAIN-1
PROTECTION

TEED PROT-1
(BAY 1&2)

MAIN
PROTECTION

TEED PROT-1
(BAY 2&3)

CORE-1
(PS)
CORE-2
(PS)

Paralleling of 2Nos CTs to the Main-1/Main-2/Backup line protection is not required. This gives better
transient response. Separate STUB protection can be connected (Nothing BUT TEED Protection).

CURRENT TRANSFORMER
CONNECTIONS IN 6CT METHOD
(GIS or AIS with DEAD TANK CBs)
1B-CT
CORE-1
(PS)
CORE-2
(PS)

CORE-3
(0.5/0.2)

BUSBAR-1
PROTECTION

BUSBAR-1
CHECKUP
PROTECTION

(SPARE)

SPARE

1A-CT

2B-CT

2A-CT

3A-CT

2CTs SECONDARIES
ARE CONNECTED
IN PARALLEL AND
CONNECTED TO
MAIN-1 PROTECTION

2CTs SECONDARIES
ARE CONNECTED
IN PARALLEL AND
CONNECTED TO
MAIN-1 PROTECTION

2CTs SECONDARIES
ARE CONNECTED IN
PARALLEL AND
CONNECTED TO
MAIN-2 PROTECTION
AFTER LBB/BFR

2CTs SECONDARIES
ARE CONNECTED IN
PARALLEL AND
CONNECTED TO
BACKUP PROTECTION
AFTER LBB/BFR

2CTs SECONDARIES
ARE CONNECTED IN
PARALLEL AND
CONNECTED TO
PANEL METERS &
ENERGY METER

2CTs SECONDARIES
ARE CONNECTED IN
PARALLEL AND
CONNECTED TO
PANEL METERS &
ENERGY METER

3B-CT
BUSBAR-2
PROTECTION

BUSBAR-2
CHECKUP
PROTECTION

(SPARE)

SPARE

CURRENT TRANSFORMER
CONNECTIONS IN 6CT METHOD
1-CT

1L-CT

2A-CT

2B-CT

3T-CT

3-CT

CORE-1
(PS)
CORE-2
(PS)

BUSBAR-1
PROTECTION

TEED PROT-1
(BAY 1&2)

SPARE

SPARE

TEED PROT-1
(BAY 2&3)

BUSBAR-2
PROTECTION

BUSBAR-1
CHECKUP

TEED PROT-2
(BAY 1&2)

SPARE

SPARE

TEED PROT-2
(BAY 2&3)

BUSBAR-2
CHECKUP

CORE-3
(0.5/0.2)

SPARE

METERING &
ENERGY
METER

SPARE

SPARE

METERING &
ENERGY
METER

SPARE

CORE-4
(PS)

TEED PROT-2
(BAY 1&2)

MAIN-2
PROTECTION

TEED PROT-2
(BAY 2&3)

TEED PROT-2
(BAY 1&2)

BACKUP
PROTECTION

TEED PROT-2
(BAY 2&3)

CORE-5
(PS)

TEED PROT-1
(BAY 1&2)

PROTECTION
(SPARE)

PROTECTION
(SPARE)

AFTER LBB/BFR
(1-52)

AFTER LBB/BFR
(2-52)

MAIN-1
PROTECTION

TEED PROT-1
(BAY 2&3)

TEED PROT-1
(BAY 1&2)

AFTER LBB/BFR
(3-52)

MAIN
PROTECTION

TEED PROT-1
(BAY 2&3)

CT CORES
CONEECTION
DIAGRAMS IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

3
3
3
2

BB-EVT
/ CVT
1-52CB

P1

3
3
3

CORES
3
4

MAIN-1 PROTECTION

MAIN-2/BACKUP PROTECTION

BUS

METERING

BUS BAR CHECKUP PROT

1-89
P2

BUS BAR PROTECTION

SINGLE BUS SYSTEM


1-CT
5
1-89L

1-CVT

ONE & HALF BREAKER ( 3 CT METHOD) WITH PROTECTION SCHEME


87BB1
BUSBAR-1
79

CVT
VBB1

21M1
VBB1

VL1

25

VL1 / VL2
OR VBB2

BF
87L

21M2

VL1

CVT

VL1
FEEDER1 / LINE1

79
VL1 / VBB1
VL2 / VBB2

25

BF

FEEDER2 / LINE2
CVT VL2

MAIN-1
BF
VL2 / VL1
OR VBB1
CVT
VBB2

VBB2

79

MAIN-2

PROTECTION OF LINE2
(OR TRANSFORMER, IF APPLICABLE)

25
BUSBAR-2
87BB2

FOR TRANSFORMER PROTECTION &


METERING VOLTAGE SELECTION RELAYS
FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 4 CT METHOD) WITH PROTECTION SCHEME


87BB1
BUSBAR-1
79

CVT
VBB1

21M1
VBB1

VL1

25

VL1 / VL2
OR VBB2

BF
87L

21M2

VL1

CVT

VL1
FEEDER1 / LINE1

79
VL1 / VBB1
VL2 / VBB2

25

BF

FEEDER2 / LINE2
CVT VL2

MAIN-1
BF
VL2 / VL1
OR VBB1
CVT
VBB2

VBB2

79

MAIN-2

PROTECTION OF LINE2
(OR TRANSFORMER, IF APPLICABLE)

25
BUSBAR-2
87BB2

FOR TRANSFORMER PROTECTION &


METERING VOLTAGE SELECTION RELAYS
FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1
BUSBAR-1
CVT

21M1

VBB1

BF

79
VBB1

VL1

25

87L

VL1 / VL2
OR VBB2

21M2

VL1

CVT

VL1
FEEDER1 / LINE1

79
VL1 / VBB1
VL2 / VBB2

25

BF

FEEDER2 / LINE2
CVT VL2

MAIN-1
VL2 / VL1
OR VBB1
CVT
VBB2

VBB2

BF

79

MAIN-2

PROTECTION OF LINE2
(OR TRANSFORMER, IF APPLICABLE)

25
BUSBAR-2
87BB2

FOR TRANSFORMER PROTECTION &


METERING VOLTAGE SELECTION RELAYS
FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 5 CT METHOD) WITH PROTECTION SCHEME


87BB1
BUSBAR-1
79

CVT
VBB1

21M1

VBB1

VL1

87 TD1 HZ

25

VL1 / VL2
OR VBB2

BF

87L

87 TD2 LZ

21M2

VL1

CVT

VL1
FEEDER1 / LINE1

79
VL1 / VBB1
VL2 / VBB2

25

BF

FEEDER2 / LINE2

.
BF
VL2 / VL1
OR VBB1
CVT
VBB2

VBB2

CVT VL2
MAIN-1

87 TD2 LZ

PROTECTION OF LINE2
(OR TRANSFORMER, IF APPLICABLE)
MAIN-2

79
87 TD1 HZ

25

BUSBAR-2
87BB2

FOR TRANSFORMER PROTECTION &


METERING VOLTAGE SELECTION RELAYS
FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1
BUSBAR-1
79

CVT
VBB1

21M1

VBB1

VL1

87 TD1 HZ

25

VL1 / VL2
OR VBB2

BF

87L

87 TD2 LZ

21M2

VL1

CVT

VL1
FEEDER1 / LINE1

79
VL1 / VBB1
VL2 / VBB2

25

BF

FEEDER2 / LINE2

.
BF
VL2 / VL1
OR VBB1
CVT
VBB2

VBB2

CVT VL2
MAIN-1

87 TD2 LZ

PROTECTION OF LINE2
(OR TRANSFORMER, IF APPLICABLE)
MAIN-2

79
87 TD1 HZ

25

BUSBAR-2
87BB2

FOR TRANSFORMER PROTECTION &


METERING VOLTAGE SELECTION RELAYS
FOR BUS-1, BUS-2& LINE ARE PROVIDED .

ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME


87BB1
BUSBAR-1
21M1

VL1

87 TD1 HZ

CVT
VBB1

BF
87 TD2 LZ

79
VBB1

87L

21M2

VL1

CVT

VL1

25

VL1 / VL2
OR VBB2

FEEDER1 / LINE1

79
VL1 / VBB1
VL2 / VBB2

VL2 / VL1
OR VBB1
VBB2

25

BF

FEEDER2 / LINE2

79

CVT VL2
25

MAIN-1

87 TD2 LZ

PROTECTION OF LINE2
(OR TRANSFORMER, IF APPLICABLE)
MAIN-2

BF

VBB2
CVT

87 TD1 HZ
BUSBAR-2
87BB2

FOR TRANSFORMER PROTECTION &


METERING VOLTAGE SELECTION RELAYS
FOR BUS-1, BUS-2& LINE ARE PROVIDED .

COMPARISION BETWEEN DIFFERENT CT METHODS


CT
PURPOSE

3 CT
METHOD

4 CT
METHOD

6 CT (S)
METHOD

5 CT
METHOD

6 CT (T1)
METHOD

6 CT (T2)
METHOD

BUSBAR &
BUSBAR
CHECKUP
PROTECTION

1 CT

1 CT

1B CT

1 CT

1 CT

1 CT

MAIN-1
MAIN-2
PROTECTION
&
METERING

ADDITIONAL
PROTECTION
AVAILABLE

BLIND
ZONE

ADVANTAGES

ABOVE FOR BUS-1

&

BELOW FOR BUS-2

3 CT

3 CT

3B CT

3 CT

3 CT

3 CT

1 - CT & 2 - CT

1 CT & 2 B - CT

1 A CT & 2 B CT

1 L - CT

1 L - CT

1 L - CT

ABOVE CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-1


BELOW CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-2
3 - CT & 2 CT

3 - CT & 2 A - CT

3 A - CT & 2 A - CT

ABOVE FOR FEEDER-1


BELOW FOR FEEDER-2
3 L - CT

3 L - CT

3 L CT

STUB-1 & STUB-2 PROTECTION


FOR LINE & AT/F

TEED-1 & TEED-2 PROTECTION


FOR LINE & AT/F

STUB-1 & STUB-2 PROTECTION IS A NORMALLY INBUILT


PROTECTION FOR MAIN-1 & MAIN-2 RELAYS, IN CASE OF LATEST
NUMERICAL RELAYS. STUB PROTECTION WORKS WHEN LINE
ISOLATOR OPEN CONDITION ONLY.

TEED1 IS NORMALLY HIGH IMPEDENCE DIFFERENTIAL RELAY &


TEED-2 IS NORMALLY LOW IMPEDENCE DIFFERENTIAL RELAY.
THESE ARE NOT INBUILT FUNCTIONS OF MAIN-1 & MAIN-2
RELAYS.

A FAULT BETWEEN CIRCUIT BREAKERS AND CT (END FAULT) MAY THEN STILL BE FED FROM ONE SIDE
EVEN WHEN THE BREAKER HAS BEEN OPENED. CONSEQUENTLY, FINAL FAULT CLEARING BY CASCADED
TRIPPING HAS TO BE ACCEPTED IN THIS CASE. THIS SITUATION LBB/BFR OPERATES AND TIME TAKEN TO
CLEAR FAULT IS ABOUT 300 mSECs. THIS IS BLIND ZONE AREA.
MINIMUM CT
METHOD. REDUCING
THE COST OF CTs

TIE CB BLIND ZONE


AREA IS TAKEN
CARE.

MAIN CB & TIE CB


BLIND ZONE AREA IS
TAKEN CARE

WHEN THE FAULT IS TAKEN PLACE BETWEEN THE


MAIN CB, TIE CB & LINE ISOLATOR, DURING SERVICE
ONLY, DISTANCE SCHEME SHOULD TAKE CARE.

BLIND ZONE FOR


MAIN CB & TIE CB

TIE CB BLIND ZONE


AREA IS TAKEN CARE

TIE CB BLIND ZONE


AREA IS TAKEN CARE

WHEN THE FAULT IS TAKEN PLACE BETWEEN THE MAIN CB, TIE CB &
LINE ISOLATOR DURING SERVICE ONLY, TEED PROTECTION IN
ADDITION TO DISTANCE SCHEME SHOULD TAKE CARE.

400KV C.T. INFORMATION


P1

PRIMARY CONNECTIONS : P1 P2
CURRENT RATING : 2000 AMPS

500/ 1A

1S1 1S3

1S1 1S2
1S2 1S3

__

PS

BUSBAR
CHECKUP 2S1 2S3
PROTECTION

2S1 2S2
2S2 2S3

__

CORE-3 0.5 / 0.2

METERING

3S1 3S3
3S4 3S2

3S1 3S2
3S4 3S3

CORE-4

MAIN-2
4S1 4S3 4S1 4S2
4S1 4S4
PROTECTION
4S4 4S2 4S4 4S3
5S1 5S2
5S4 5S3

5S1 5S3
5S4 5S2

2S12
2S 3
2S

4S1
4S2
4S3
4S4

MAIN-1
5S1 5S4
PROTECTION

PS

1
5S S2
5 S3
5 S4
5

1
1S S1
1S 2
3

3S1
3S2
3S3
3S4

CORE-5

PS

3S1 3S4

3
3

2S1
2S2
2S3

CORE-2

1S1
1S2
1S3

5S1
5S2
5S3
5S4
4S1
4S2
4S3
4S4

BUSBAR
PROTECTION

3S1
3S2
3S3
3S4

PS

CORE-1

1000/ 1A

2000/ 1A

PURPOSE

CLASS

P1 P2

3
3

CORES

SECONDARY CONNECTIONS
CURRENT RATING : 1A

P2

HAIR
PIN /
U SHAPE
DESIGN

EYE BOLT
DESIGN

DEAD TANK DESIGN

MAIN-1, MAIN-2
PROTECTION &
METERING
FOR LINE
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME

PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

NORMS OF PROTECTION FOLLOWED IN APTRANSCO


FOR TRANSMISIION LINES & DISTRIBUTION LINES ( FEEDER / LINE PROTECTION )

Sr.No
1.
2.
3.
4.

VOLTAGE
11 KV LINES
33 KV LINES
66 KV LINES
132 KV LINES

MAIN- 1 PROTECTION

MAIN-2 PROTECTION/ BACKUP PROTECTION

2 O/L + E/F ( 51 + 51N )

3 O/L + E/F ( 51 + 51N )

SWITCHED DISTANCE SCHEME OR


NUMERICAL DISTANCE SCHEME (21P+ 21N)

DIRECTIONAL O/L & E/F RELAYS WITH HIGH


SET ( 67 + 67N )

NON SWITCHED DISTANCE SCHEME OR

SWITCHED DISTANCE SCHEME OR

5.

220 KV LINES NUMERICAL DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21P+ 21N)

6.

DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE


400 KV LINES NUMERICAL
+ in BUILT DEF RELAY(67N)
DIFFERENTIAL SCHEME (87L) WITH 67N

7.

DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE


765 KV LINES NUMERICAL
+ in BUILT DEF RELAY(67N)
DIFFERENTIAL SCHEME (87L) WITH 67N

IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS, BOTH SHOULD BE SEPARATE MEASURING PRINCIPLES (CHARECTERESTICS), MODELS
AND ALGORITHAMS (SHOULD NOT BE DUPLICATED) AND ALL FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH RELAYS
SHOULD BE 100% REDENDENCY IN ALL ASPECTS ( COMPLEMENTARY TO EACH OTHER ) . DISSIMILAR CARRIER SCHEMES ARE TO BE
SELECTED ( POTT & PUTT or BLOCK & UNBLOCK). OTHER WISE MAIN-2 MAY BE DIFFERENT MAKE OR PHASE COMPARISION
PROTECTION/LINE DIFFERENTIAL PROTECTION WITH BACKUP DISTANCE PROTECTION IS TO BE ADOPTED. BOTH M1 & M2 SHOULD
CONTAIN DIRECTIONAL EARTH FAULT PROTECTION (67N) WITH DIRECTIONAL COMPARISION PICKUP SCHEME AS INBUILT FUNCTION.
ZONE-1: 80% OF MAIN LINE
ZONE-2: 100% OF MAIN LINE + 50% OF SHORTEST LINE AT OTHER END
ZONE-3: 100% OF MAIN LINE + 100% OF SHORTEST LINE AT OTHER END
ZONE-4: 100% OF MAIN LINE + (100% OF SHORTEST LINE + 20% OF LONGEST LINE) AT

OTHER END.

MAIN-1 PROTECTION FOR LINE


P2 P2 P2

CT MB

IR5 / A511
IY5 / A531
IB5 / A551

1-CT
CTR: 2000-1000-500/1A

3 3 3

CORE-5

(4CT METHOD)

5S4

5S4

5S4

5S2

5S2

5S2

IN5 / A571

REL 521
ACTIVE START

TRIP

1-CVT

CLASS: PS
3 CT METHOD : 1-CT & 2-CT
4 CT METHOD : 1-CT & 2-BCT
6 CT METHOD : 1-ACT & 2-BCT

DISPLAY
C

CT MB

2-BCT
CTR: 2000-1000-500/1A

5S2

5S2

5S2

5S4

5S4

5S4

3 3 3

CORE-5
CLASS: PS

P2 P2 P2

VR11 / E111
VY11 / E131
VB11 / E151
VN11 / E171

CORE 1
200VA
CLASS: 3P

MAIN-1 PROTECTION FOR LINE


(4CT METHOD) (NEW DEVELOPMENT)
P2 P2 P2

CT MB
IR5 / A511
IY5 / A531
IB5 / A551

1-CT
CTR: 2000-1000-500/1A

3 3 3

CORE-5

5S4

5S4

5S4

5S2

5S2

5S2

IN5 / A571

3 CT METHOD : 1-CT & 2-CT


4 CT METHOD : 1-CT & 2-BCT
6 CT METHOD : 1-ACT & 2-BCT

CLASS: PS

ESC

CT MB

2-BCT
CTR: 2000-1000-500/1A

ENABLED
TRIP

IN5 / A571
5S2

5S2

5S2

5S4

5S4

5S4

3 3 3

CORE-5

IA =250.10 A
IB =250.10 A
IC =250.10 A
VAB =400.0 KV
VBC =400.0 KV
VCA =400.0 KV

CLASS: PS

IB5 / A551
IY5 / A531
IR5 / A511

P2 P2 P2

INST
TIME
COMM
SOTF
ZONE1
ZONE2
ZONE3
ZONE4

SEL

ENT

TARGET
RESET

PH-A
PH-B
PH-C
GND
50
51
79 RESET
79 LOCKOUT

SEL- 421
PROTECTION
AUTOMATION
CONTROL

VR11 / E111
VY11 / E131
VB11 / E151
VN11 / E171

1-CVT
CORE 1
200VA
CLASS: 3P

MAIN-1 PROTECTION FOR LINE


(5CT METHOD)

P2 P2 P2

IR5 / A511
IY5 / A531
IB5 / A551

1-LCT
CTR: 2000-1000-500/1A

3 3 3

CORE-5

CT MB

5S4

5S4

5S4

5S2

5S2

5S2

IN5 / A571

REL 521
ACTIVE START

TRIP

VR11 / E111
VY11 / E131
VB11 / E151
VN11 / E171
1-CVT

CLASS: PS

DISPLAY
C
E

CORE 1
200VA
CLASS: 3P

MAIN-2 PROTECTION FOR LINE


(4CT METHOD)
P2 P2 P2

50Z

CT MB

1-CT

RAICA

CORE-4

LBB / BFR

3 3 3

CTR: 2000-1000-500/1A

4S4

4S4

4S4

4S2

4S2

4S2

IR4 / C411
IY4 / C431
IB4 / C451
IN4 / C471

REL 316
ACTIVE START

TRIP

1-CVT

CLASS: PS
3 CT METHOD : 1-CT & 2-CT
4 CT METHOD : 1-CT & 2-BCT
6 CT METHOD : 1-ACT & 2-BCT

DISPLAY
C
E

CT MB

2-BCT
CTR: 2000-1000-500/1A

4S2

4S2

4S2

4S4

4S4

4S4

3 3 3

CORE-4

RAICA

CLASS: PS

LBB / BFR
P2 P2 P2

50ZT

VR21 / E211
VY21 / E231
VB21 / E251
VN21 / E271

CORE 2
200VA
CLASS: 3P

MAIN-2 PROTECTION FOR LINE


(4CT METHOD) ( NEW DEVELOPMENT)
P2 P2 P2

CT MB
IR4 / C411
IY4 / C431
IB4 / C451

1-CT
CTR: 2000-1000-500/1A

3 3 3

CORE-4

4S4

4S4

4S4

4S2

4S2

4S2

IN4 / C471

3 CT METHOD : 1-CT & 2-CT


4 CT METHOD : 1-CT & 2-BCT
6 CT METHOD : 1-ACT & 2-BCT

CLASS: PS

CT MB

2-BCT
CTR: 2000-1000-500/1A

4S2

4S2

4S2

4S4

4S4

4S4

3 3 3

CORE-4

IN4 / C471

CLASS: PS

P2 P2 P2

IB4 / C451
IY4 / C431
IR4 / C411

VR21 / E211
VY21 / E231
VB21 / E251
VN21 / E271

1-CVT
CORE 2
200VA
CLASS: 3P

MULTI FUNCTION NUMERICAL RELAY FOR


MULTI BREAKER, MULTI CT & CVT/PT APPLICATION
3-52 CB

BUS-1 PT

BUS-2 PT
59

50 BF-1 50 BF-2

79-1 79-2 25-1

25-2

21P 50P 51P 67P


21N 50N 51N 67N

3
LINE CVT
3

2-52 CB

1-52 CB

(NEW APPLICATION) (ONE & HALF BREAKER SYSTEM or RING BUS SYSTEM)

LINE

27

1-52,2-52: MAIN & TIE CIRCUIT BREAKER


21P: PHASE DISTANCE PROTECTION
21N: GROUND DISTANCE PROTECTION
27: UNDER VOLTAGE RELAY
67: DIRECTIONAL RELAY
50: INST OVER CURRENT RELAY
51: TIME OVER CURRENT RELAY
59: OVER VOLTAGE RELAY
64: EARTH FAULT RELAY
50BF-1: LBB/BFR OF MAIN CB
50BF-2: LBB/BFR OF TIE CB
79-1,2: AUTO RECLOSURE RELAY OF
MAIN & TIE CB
25-1,2: CHECK SYNCHRONISAM RELAY
FOR MAIN & TIE CB

MAIN-2 PROTECTION FOR LINE


(5CT METHOD)

P2 P2 P2

IR4 / C411
IY4 / C431
IB4 / C451

1-LCT
CTR: 2000-1000-500/1A

3 3 3

CORE-4

CT MB

4S4

4S4

4S4

4S2

4S2

4S2

IN4 / C471

REL 316
ACTIVE START

TRIP

VR21 / E211
VY21 / E231
VB21 / E251
VN21 / E271
1-CVT

CLASS: PS

DISPLAY
C
E

CORE 2
200VA
CLASS: 3P

MULTI FUNCTION PANEL METERING & ENERGY METER


(4CT METHOD)
P2 P2 P2

CT MB
IR3 / D311
IY3 / D331
IB3 / D351

1-CT
CTR: 2000-1000-500/1A

3 3 3

CORE-3

3S4

3S4

3S4

3S2

3S2

3S2

IN3 / D371

3 CT METHOD : 1-CT & 2-CT


4 CT METHOD : 1-CT & 2-BCT
6 CT METHOD : 1-ACT & 2-BCT

CLASS: 0.5

CT MB

2-BCT
CTR: 2000-1000-500/1A

3S2

3S2

3S2

3S4

3S4

3S4

3 3 3

CORE-3
CLASS: 0.5

VR31 / E311
VY31 / E331
VB31 / E351
VN31 / E371
1-CVT
CORE 3
100VA

P2 P2 P2

CLASS: 0.5/0.2

MULTI FUNCTION PANEL METERING & ENERGY METER


(5CT METHOD)
P2 P2 P2

IR3 / D311
IY3 / D331
IB3 / D351

1-LCT
CTR: 2000-1000-500/1A

3 3 3

CORE-3

CT MB

3S4

3S4

3S4

3S2

3S2

3S2

CLASS: 0.5/0.2
IN3 / D371

VR31 / E311
VY31 / E331
VB31 / E351
VN31 / E371
1-CVT
CORE 3
100VA
CLASS: 0.5/0.2

LBB & BUSBAR


PROTECTION
SCHEMES
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

BASICS OF LBB/BFR PROTECTION

LOCAL BREAKER BACKUP PROTECTION

A PROTECTION WHICH IS DESIGNED TO CLEAR A SYSTEM


FAULTY BY INITIATING TRIPPING OTHER CIRCUIT BREAKER(S) IN
THE CASE OF FAILURE TO TRIP OF THE APPROPRIATE CIRCUIT
BREAKER.
IN MODERN NETWORKS THE CRITICAL FAULT CLEARING
TIME MAY BE LESS THAN 200ms. HENCE, IF THE FAULT IS NOT
CLEARED DUE TO FAILURE OF THE PRIMARY PROTECTIVE RELAYS
OR THEIR ASSOCIATED CIRCUIT BREAKER, A FAST ACTING BACKUP PROTECTIVE RELAY MUST CLEAR THE FAULT.
THERE ARE TWO BASIC FORMS.
REMOTE BACK-UP.
LOCAL BACK-UP.

REMOTE BACK-UP

PROVIDES BACK-UP PROTECTION FOR THE BOTH THE


RELAYS (MAIN-1 & MAIN-2) AND BREAKERS AT REMOTE
SUBSTATION.

LOCAL BACK-UP
LOCAL BACK-UP PROTECTION CAN BE DEVIDED INTO TWO
CATAGORIES.
RELAY BACK-UP
BREAKER BACK-UP

RELAY BACK-UP
z

DUPLICATE PRIMARY PROTECTION. i.e ONE IS NON SWITCHED


DISTANCE
PROTECTION AND ANOTHER IS SWITCHED DISTANCE
SCHEME OR OTHER WISE BOTH SCHEMES CHARECTERSTICS ARE
DIFFERENT (QUADRALATERAL, MHO CIRCULAR, TAMOTO & OPTICAL )
OR DIFFERENT MANUFACTURERS(ABB, ALSTOM, SIEMENS, EASUN
REYROLL, SEL, GE, NXT PHASE OR BASLER) OR DIFFERENT METHODS (i.e
ELECTROMECHANICAL, STATIC, NUMERICAL{MICROPROCESSOR &DSP}).
IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS BOTH SHOULD BE
SEPARATE CHARECTERESTICS AND SEPARATE MODELS AND ALL
FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH
RELAYS SHOULD BE 100% REDENDENCY IN ALL ASPECTS.
TO INCREASE THE SECURITY, THE CIRCUIT BREAKER HAS TWO
TRIP COILS, ONE IS CONNECTED TO MAIN-1 PROTECTION AND ANOTHER
IS CONNECTED TO MAIN-2 PROTECTION.

BREAKER BACK-UP
BECAUSE OF THE HIGH COST OF HIGH VOLTAGE CIRCUIT
BREAKERS, IT IS NOT FEASIBLE TO DUPLICATE THEM.
IN CASE OF A BREAKER FAILURE THE OTHER CIRCUIT BREAKERS
CONNECTED TO THE SAME BUS AS THE FAULTED BREAKER MUST THERE
FORE BE TRIPPED.

LBB/BFR FLOW CHART


MAIN
PROTECTION
OPERATED

YES

TRIP
MAIN
BREAKER

FAULT
CLEARED

NO

RETRIP

YES

INITIATE
BFR

YES

RESET
BREAKER
FAILURE
SCHEME

WAIT FOR
FAULT
CLEARENCE

AND

TRIP
BACK-UP/
Adjacent
BREAKERS

The Breaker Failure Protection (LBB/BFR) can operate single-stage/two-stage.


When used as single-stage protection, the Bus trip command is given to the
adjacent Circuit Breakers if the protected feeder Breaker fails.
When used as two-stage protection, the first stage can be used to repeat the
trip command to the relevant feeder Breaker, normally on a different trip coil, if
the initial trip command from the feeder protection is not successful. The
second stage will result in a Bus trip to the adjacent Breakers, if the command
of the first stage is not successful.

LBB/BFR TIME CO-ORDINATION CHART


FAULT OCCURS

NORMAL CLEARING TIME

NORMAL
CLEARING

PROTECTIVE RELAY
FOR EX: DISTANCE RELAY

RESETTING TIME OF THE


CURRENT MEASURING UNITS

BREAKER
INTURUPTING TIME

~30ms

~60ms

MARGIN

<12ms

SET TIME OF THE TIME MEASURING UNIT

INOPERATIVE
BREAKER

TRIPPING
RELAY
TIME

BACK-UP BREAKER
INTERUPTING TIME

BREAKER FAILURE RELAY START


TOTAL CLEARING TIME OF THE BREAKER FAILURE RELAY
MAXIMUM FAULT CLEARING TIME BEFORE SYSTEM INSTABILITY

MARGIN

LBB/BFR LOGIC
CURRENT INPUTS
PHASE L1

A/D
CONVERTER PHASE CURRENT SET POINT

I > ISET

PHASE L2/E
PHASE L3

I > ISET
|||

&

LED
(PHASE START)
ALARM RELAY
(PHASE START)

>1

&

ALARM RELAY
(EARTH START)

EARTH CURRENT SET POINT

OUT PUT OF DISTANCE RELAY OR


SHORT CIRCUIT CURRENT RELAY

LED
(EARTH START)

BINARY INPUT
CIRCUIT BREAKER FAILURE INITIATE

TIMING/OUTPUT
STAGE

TRIP T1
RELAY

TIME STAGE T1

&

ALARM T1
RELAY

&

TIME STAGE T2
SWITCHED OFF

>1

TIME STAGE T2

O&
0

LED

TRIP T2
RELAY

LED
LED
CB FAILURE
INITIATE

LBB/BFR PROTECTION
LINE1
BUS-1

AT/F-1
1-52CB

50Z

2-52CB

50ZT

3-52CB

50Z

BUS-2

LBB/BFR IS LOCAL BREAKER BACKUP PROTECTION/ BREAKER FAILURE RELAY.


1No RELAY IS PROVIDED FOR EACH BREAKER.
THIS IS CURRENT OPERATED RELAY.
THIS RELAY IS ENERGISED WHEN MASTER TRIP RELAY(86-A OR/AND 86-B)
OPERATES OR SINGLE PHASE TRIP RELAYS OPERATES AND GIVEN SIGNAL TO BREAKER FOR TRIP.
IN THIS RELAY TIME DELAY IS PROVIDED.
THIS RELAY OPERATES WHEN THE BREAKER IS UNDER TROUBLE/ FAILS TO OPERATE.
AFTER ENERGISED THE RELAY AND TIME DELAY COMPLETES, EVEN CURRENT IS THERE THIS THINKS
BREAKER FAIL TO OPERATE AND GIVEN SIGNAL AS PER SCHEME DESCRIBED NEXT PRESENTATION.
NEW CONCEPT: Normally the CT connections for LBB/BFR relay is in series with Main-2 Protection.
In case of Numerical Distributed LBB/BFR and Centralized Bus-Bar System, the CT connections for
Bus-Bar are terminated at LBB/BFR and Centralized Bus-Bar is interconnected by Fiber-Optic
cable.

1-52 CB LBB/BFR OPERATION


86-A

50Z

DIRECT TRIP 1&2


VIA CARRIER TO
OTHER END
BUSBAR-1
PROTECTION OPTD
AND BUSBAR-1
ISOLATED

TO 86-B TRIP RELAY


OF TIE CB(2-52CB)

1-52CB
TC-1
BUS-1

ABB
REL316
MAIN-2

86-B

86-B

86-A

ABB
REL521
MAIN-1

TC-2

2-52CB
TC-2
TC-1

3-52CB
BUS-2

2-52 CB LBB/BFR OPERATION


ABB
RET521
MAIN-1

86-A

ABB
REL521
MAIN-1

86-B

ABB
REL316
MAIN-2

ABB
RET316
MAIN-2

50ZT
DIRECT TRIP 1&2
VIA CARRIER
TO OTHER END

INTER TRIP TO
LVCB & TBCCB

TO 86-B TRIP RELAY


OF AT/F(ICT) CB (3-52CB)

TO 86-B TRIP RELAY


OF LINE CB(1-52CB)

2-52CB

1-52CB
TC-1
BUS-1

3-52CB
TC-2
BUS-2

3-52 CB LBB/BFR OPERATION

ABB
RET316
MAIN-2

86-A
86-B

86-B

86-A

ABB
RET521
MAIN-1

50Z
INTER TRIP TO
LV CB & TBC CB
BUSBAR-2
PROTECTION OPTD
AND BUSBAR-2
ISOLATED

TO 86-B TRIP RELAY


OF TIE CB(2-52CB)

2-52CB

1-52CB
TC-1
BUS-1

3-52CB
TC-2

TC-2

TC-1
BUS-2

BASICS OF BUSBAR PROTECTION


NEED FOR BUSBAR PROTECTION
IN ITS ABSENCE FAULT CLEARING TAKES PLACE IN ZONE-2 OF DISTANCE RELAY BY
REMOTE END TRIPPING.
THIS MEANS SLOW AND UNSELECTIVE TRIPPING AND WIDE SPREAD BLACKOUT.

EFFECT OF DELAYED CLEARENCE


GREATER DAMAGE AT FAULT POINT.
INDIRECT SHOCK TO CONNECTED EQUIPMENT LIKE SHAFTS OF GENERATOR AND
WINDINGS OF TRANSFORMER.

BASIC THEORY
KIRCHOFFs CURRENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A
GIVEN NODE MUST BE EQUAL TO THE CURRENTS LEAVING AT THAT NODE.

BUS BAR PROTECTION SYSTEMS


1.
2.
3.
4.

HIGH IMPEDENCE DIFFERENTIAL PROTECTION


MODERATE-IMPEDENCE DIFFERENTIAL PROTECTION
LOW-IMPEDENCE DIFFERENTIAL PROTECTION
NUMERICAL BUS DIFFERENTIAL PROTECTION

HIGH IMPEDENCE DIFFERENCIAL PROTECTION


THE HIGH IMPEDENCE PROTECTION SCHEME, ON THE OTHER HAND, IS A GOOD SOLUTION FOR
SINGLE BUSBAR ARRANGEMENTS , ONE & HALF BREAKER SYSTEMS OR RING BUSBARS, PROVIDING
THAT APPROPRIATE DEDICATED CT CORES ARE AVAILABLE FOR THIS USE ALONE. IT IS SENSTIVE,
STABLE & FAST PROTECTION.
HOWEVER, SPECIAL CT REQUIREMENTS, ADDITIONAL HIGH VOLTAGE DEVICE PROTECTION,
DEMANDING MAINTANENCE etc PUT RESTRICTIONS IN ITS APPLICATIONS.
A MEASURING CIRCUIT COMPRISES A HIGH-IMPEDENCE STABILIZING RESISTOR CONNECTED
ACROSS THE CIRCULATING CURRENT ARRANGEMENT OF ALL THE CTs IN PARALLEL. THE VALUE
OF THE STABILIZING RESISTOR IS CHOOSEN SUCH THAT THE VOLTAGE DROP ACROSS THE RELAY
CIRCUIT IS INSUFFICIENT TO OPERATE THE FAULTS OUTSIDE THE PROTECTED ZONE.

LIMITATIONS OF CONVENTIONAL HIGH IMPEDENCE DIFFERENTIAL RELAY

PUTS STRINGENT REQUIREMENTS ON CTs. Class X for all CT Cores.


NEED FOR DEDICATED CT CORES. Separate CT Cores for BUSBAR and CHECK ZONE Protection.
IDENTICAL CT RATIO, MAGNETISING IMPEDENCE.
AUX CTs RATIO CORRECTIONS UNACCEPTABLE.
IN ABILITY TO COPE WITH INCREASING FAULT CURRENT.
SLOW RESPONSE.
Advantage of Numerical Protection Technology (e.g. Fault recording, Communication etc) not available.
BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 20ms.
THIS RELAY REQUIRES CHECK ZONE FEATURE. THE TRIP COMMAND IS ONLY GIVEN WHEN
BOTH A DISCRIMINATING & CHECK ZONE SYSTEM OPERATES.

MEDIUM IMPEDENCE DIFFERENTIAL PROTECTION


MANY OF THE LIMITATIONS OF HIGH IMPEDENCE PROTECTION CAN BE
OVERCOME USING MODERATE MEDIUM IMPEDENCE PROTECTION (OR STABILIZED
HIGH-IMP SCHEME), WHICH IS A COMBINATION OF THE NORMAL HIGH-IMP AND
STABILIZED DIFFERENTIAL SCHEMES.

LOW IMPEDENCE DIFFERENTIAL PROTECTION


LOW IMPEDENCE PROTECTION(PERCENTAGE BIASED BUS DIFFERENTIAL RELAY) IS
MOST SUITABLE PROTECTION SCHEME FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS
(WITH OR WITHOUT TRANSFER BUS) WITH FEEDERS BEING SWITCHED BETWEEN
SECTIONS OF BUSBAR, WHICH OPERATES WITH FULL SELECTIVITY FOR ALL POSSIBLE
BUSBAR CONFIGUARATIONS.

ADVANTAGES

FREE OF ANY NEED FOR MATCHED CT CHARACTERESTICS OR RATIOs, LOW


LEAKAGE REACTANCE OR RESISTANCE.
OTHER PROTECTIVE RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT.
STABLE FOR INFINITE FAULT LEVELS. INSENSITIVE TO CT SATURATION.
DETECTS FAULTS WITHIN 1 2ms & INITIATES TRIPPING WITHIN 5 7ms.

BASICS OF BUS BAR PROTECTION


BASIC THEORY
KIRCHOFFs CURENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A GIVEN NODE MUST BE EQUAL
TO THE CURRENTS LEAVING THAT NODE

EXTERNAL FAULT

INTERNAL FAULT
IF

I1

I1
I2

I3

I2
I3

I4
I5

I4
I5

I6

I6

IF

IF= I6= I1+I2+I3+I4+I5

IF= I1+I2+I3+I4+I5+I6

HIGH IMPEDENCE BUSBAR PROTECTION


87BBC

UU

UU

UU

UU

UU

UU

UU

UU

UU

UU

UU

UU

87BBM

96 BBC : BUSBAR
CHECK TRIPPING RELAY

52 CIRCUIT
BREAKER
TRIP COIL
- VE
A varistor is normally applied across the
relay input terminals to limit the voltage
to a value safely below the insulation
voltage of the secondary circuits

+ VE

96 BBM : BUSBAR
MAIN TRIPPING RELAY

UU

UU
OVER CURRENT
COIL

UU

.
Is

Id

OVER CURRENT
STARTER RELAYS

RESTRAINT
COIL

UU

UU
52 CIRCUIT
BREAKER
TRIP COIL

UU

OPERATING
COIL

LOW IMPEDENCE BUSBAR PROTECTION


+VE

96 BUS BAR
TRIPPING
RELAY

-VE

DIFFERENCE BETWEEN BUSBAR SCHEMES


HIGH IMPEDENCE BUSBAR PROTECTION

PERCENTAGE BIASED LOW IMPEDENCE


BUS BAR PROTECTION

PRINCIPLE

THE CURRENTS ENTERING AND LEAVING THE BUSBAR ARE COMPARED


CONTINUOSLY. IT INVOLVES CHOOSING OF IMPEDENCE HIGH ENOUGH
STABLISE THE RELAY FOR HEAVY EXTERNAL FAULTS. THIS IS
CIRCULATING CURRENT PRINCIPLE.

IT HAS DIFFERENTIAL AND BIAS SETTING. THE RESULTANT BIAS


IS PROPOTIONAL TO ARITHMATIC SUM OF ALL CURRENTS,
WHEREAS THE OPERATING CURRENT IS VECTOR SUM OF ALL
CIRCUIT CURRENTS.

CTs

IT REQUIRES ALL IDENTICAL CT RATIOs & TURNS RATIO. LOW IT CAN WORK WITH CTs OF UNEQUAL RATIOS ALSO. FREE OF
RESISTANCE OF SECONDARY WINDING. Class X for all CT Cores.
ANY NEED OF MATCHED CT CHARACTERESTIC OR RATIOs LOW
MINIMUM KNEE POINT VOLTAGE OF 300-500V.
LEAKAGE REACTANCE OR RESISTANCE. OTHER PROTECTIVE
LOW MAGNETISING CURRENT(FEW MILLIAMPS).
RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT.

BURDEN

IMPOSES COMPARATIVELY HIGH BURDEN ON CTs. AUXILIARY CTs IMPOSES LESS BURDEN ON CTs. AUXILIARY CTs HAVE NO
REDUCE THE PERFORMANCE OF THE SCHEME
EFFECT ON PERFORMANCE OF SCHEME.

CT SATURATION

OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED DURING OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED
INTERNAL FAULTS.
DURING INTERNAL FAULTS. INSENSITIVE TO CT SATURATION.

UTILISATION

IT IS GOOD SOLUTION FOR SINGLE BUSBAR ARRANGEMENTS, ONE & MOST SUITABLE FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS
HALF BREAKER SYSTEMS OR RING BUSBAR SYSTEMS.
( WITH OR WITHOUT TRANSFER BUS).

OPERATING TIME

BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 20 mS.

DETECTS FAULTS WITH IN 1 2 mS AND INITIATES TRIPPING


WITH IN 5-7 mS.

STABILITY

INABILITY TO COPE WITH INCREASING FAULT CURRENT.

STABLE FOR INFINITE FAULT LEVEL.

PERFORMANCE

HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY STABLE HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY
FOR EXTERNAL FAULTS.
STABLE FOR EXTERNAL FAULTS.

ADDITIONAL
PROTECTION

THIS RELAY REQUIRES CHECK ZONE FEATURE. THE TRIP COMMAND IS THIS RELAY HAS IN BUILT CHECK ZONE FEATURE (NO SEPARATE
ONLY GIVEN WHEN BOTH A DISCRIMINATING & CHECK ZONE SYSTEM CHECKZONE FEATURE) i.e OVER CURRENT STARTING RELAY
OPERATES.
PROVIDED.

DETAILS

BUS BAR MAIN & CHECHUP PROTECTION


(ANY CT METHOD)
P2 P2 P2

CT MB

1-CT
CTR: 2000-1000/1A

3 3 3

CORE-1

REB 521

IN1 / B171
1S3

1S3

1S3

1S1

1S1

1S1

ACTIVE START

TRIP

IB1 / B151

CLASS: PS

IY1 / B131
IR1 / B111

BUS BAR
PROTECTION
FOR
BUS-1

DISPLAY
C
E

CT MB
IR1 / B111
IY1 / B131

3-CT
CTR: 2000-1000/1A

ACTIVE START

TRIP

IB1 / B151
1S1

1S1

1S1

1S3

1S3

1S3

3 3 3

CORE-1

RED 521

IN1 / B171

CLASS: PS

P2 P2 P2

BUS BAR
PROTECTION
FOR
BUS-2

DISPLAY
C
E

BUS-2

87 BB2
BUS BAR-2 PROTECTION

UU

10-CT

UU

13-CT

UU

16-CT

UU

UU

12-CT

UU

15-CT

UU

18-CT

UU

12-52

15-52

18-52

21-52

20-52

17-52

14-52

11-52

19-CT

7-CT

9-CT

19-52

16-52

13-52

10-52

7-52

4-52

1-52

87 BB1

21-CT

UU

UU

9-52
8-52

4-CT

UU

1-CT

UU

6-CT

5-52

2-52

UU

3-CT

UU

6-52

3-52

BUS BAR PROTECTION


BUS BAR-1 PROTECTION

BUS-1

BUSBAR-1 PROTECTION TRIPPING SCHEME


HIGH SPEED
TRIP RELAY
FOR
1-52 CB

1-52 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB

4-52 CB PANEL

REB 521

HIGH SPEED
TRIP RELAY
FOR
4-52 CB

TRIP FROM 50 LBB


TO START 50 LBB

ACTIVE

START

TRIP

7-52 CB PANEL

HIGH SPEED
TRIP RELAY
FOR
7-52 CB

TRIP FROM 50 LBB


TO START 50 LBB

DISPLAY

HIGH SPEED
TRIP RELAY
FOR
10-52 CB

10-52 CB PANEL
TRIP FROM 50 LBB

TO START 50 LBB

HIGH SPEED
TRIP RELAY
FOR
13-52 CB

13-52 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB

16-52 CB PANEL

HIGH SPEED
TRIP RELAY
FOR
16-52 CB

TRIP FROM 50 LBB


TO START 50 LBB

+VE

BUSBAR PANEL

1-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

4-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

7-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

10-52CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

13-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

16-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

BUSBAR-2 PROTECTION TRIPPING SCHEME


HIGH SPEED
TRIP RELAY
FOR
3-52 CB

3-52 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB

6-52 CB PANEL

REB 670

HIGH SPEED
TRIP RELAY
FOR
6-52 CB

TRIP FROM 50 LBB


TO START 50 LBB

ACTIVE

START

TRIP

9-52 CB PANEL

HIGH SPEED
TRIP RELAY
FOR
9-52 CB

TRIP FROM 50 LBB


TO START 50 LBB

DISPLAY

HIGH SPEED
TRIP RELAY
FOR
12-52 CB

12-52 CB PANEL
TRIP FROM 50 LBB

TO START 50 LBB

HIGH SPEED
TRIP RELAY
FOR
15-52 CB

15-52 CB PANEL
TRIP FROM 50 LBB
TO START 50 LBB

18-52 CB PANEL

HIGH SPEED
TRIP RELAY
FOR
18-52 CB

TRIP FROM 50 LBB


TO START 50 LBB

+VE

BUSBAR PANEL

3-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

6-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

9-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

12-52CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

15-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

18-52 CB PANEL
TO CLOSE CKT INTERLOCK
TO BLOCK A/R
TO TRIP COIL-1
TO TRIP COIL-2
DIRECT TRIP SEND CH-1
DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER

DISTRIBUTED LBB & NUMERICAL CENTRALISED BUS BAR PROTECTION


(REB 500) ABB

(7 SS 52) SIEMENS

(MICOM P740) AREVA

OR

OR

OR

OR

14-52
15-52

13-52

11-52

10-52

BUS-2

12-52

7-52
8-52
9-52

5-52
6-52

4-52

2-52
3-52

1-52

BUS-1

LATEST DEVELOPMENT IN NUMERICAL CENTRALISED BUS BAR PROTECTION

ABB

SIEMENS

AREVA

BUSBAR
PROTECTION
CENTRAL UNIT
BAY UNIT
ABB Network Partner AG

REL531

ABB Network Partner AG

1
2
3
4
5
6
7
8

LINE
PROTECTION

MAIN -1
ABB Network Partner AG

MAIN -2
REL531

ABB Network Partner AG

1
2
3
4
5
6
7
8

TRANSFORMER
PROTECTION
MAIN
1.
2.

DESCRIPTION

REC 316*4

9
10
11
12
13
14
15
16

3.
4.

MAIN -1

MAIN -2

MAIN -1

MAIN -2

MAIN

B/U

MAIN

B/U

REC 316*4

9
10
11
12
13
14
15
16

B/U

IN THIS NO SEPARATE CORE IS REQUIRED FOR EITHER BUSBAR PROTECTION OR LBB / BFR.
CENTRALISED BUSBAR IS CONNECTED FROM BAY UNIT OR LBB OR BFR THROUGH FIBRE OPTIC.
BAY UNIT / BFR / LBB IS CONNECTED FROM MAIN-1 & MAIN-2 OF LINE PROTECTION OR MAIN & BACKUP
PROTECTION OF TRANSFORMER THROUGH FIBRE OPTIC FOR REDUNDANCY TO BAY UNIT.
THE CURRENT DATA IS TRANSFERED TO BAY UNIT TO BUSBAR CENTRAL UNIT FROM LINE / TRANSFORMER
PROTECTIONS FOR NUMIRICAL ALGORITHAM OF LBB & BUSBAR CENTRAL UNIT AND IT WILL OPERATE FOR
INTERNAL FAULTS AND DOES NOT OPERATE FOR THROUGH / EXTERNAL FAULTS.

MISCELENEOUS
RELAYS & PROTECTIONS
ADOPTED FOR LINE IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
(STUB, TEED AND AUTO RECLOSURE
FUNCTIONS)
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

LINE-1

STUB-1&2
(BAY 1&2)
1-89L
REL 521
REL 316

DISTANCE / ATF
RELAYS
CONVERTED
TO STUB/BUS
OVER LOAD
RELAYS WHEN
LINE ISOLATOR
OPENS

2-52CB

1-52CB

BUS-1

STUB-1/ STUB-2 PROTECTION


3-52CB

STUB-3&2
(BAY 3&2)
3-89T

BUS-2

AT/F-1

RET 521
RET 316

WHEN A LINE IS SUPPLIED VIA TWO CIRCUIT BREAKERS IN A ONE & HALF CIRCUIT
BREAKER ARRANGEMENT, THE LINE PROTECTION INCLUDES THE AREA BETWEEN THE TWO
CTs. HOWEVER, WHEN THE LINE ISOLATOR IS OPEN THE LINE CVTs FOR THE DISTANCE
PROTECTION ARE CONNECTED TO THE LINE AND CANNOT PROVIDE THE CORRECT
VOLTAGE FOR THE STUB END.(i.e THE AREA BETWEEN THE LINE ISOLATOR AND CTs)
(STUB = DEAD END)
TO PROVIDE PROTECTION FOR A FAULT IN THIS AREA, REL 521/ REL 316 IS
PROVIDED WITH A STUB PROTECTION WHICH GIVES AN BUS OVER CURRENT TRIP IF THE
LINE ISOLATOR IS OPEN AND THE CURRENT EXCEEDS THE SET VALUE IN ANY PHASE.

STUB-1 (BAY 1&2 OR BAY 3&2)


OPERATES

STUB-2 (BAY 1&2 OR BAY 3&2)


OPERATES

IT OPERATES THE 3-PH TRIP GR-A MAIN CB (1-52CB OR 3-52CB)


AND 3-PH TRIP GR-A TIE CB (2-52CB)
IT OPERATES THE 3-PH TRIP GR-B MAIN CB (1-52CB OR 3-52CB)
AND 3-PH TRIP GR-B TIE CB (2-52CB)

2-52CB

TEED-1&2
(BAY 1&2)

1-52CB

BUS-1

TEED-1/ TEED-2 PROTECTION


3

3-52CB

BUS-2

TEED-1&2
(BAY 2&3)

LINE-1
AT/F-1
TEED PROTECTION IS BASED ON KIRCHOFFS CURRENT LAW. THREE SETS OF CTS
ARE CONNECTED IN STAR FASHION. SOME OF THE CURRENTS MUST BE ZERO. IF ANY
UNBALANCE CURRENTS ARE NOTICED THEN IMMEDIATELY TEED PROTECTION
OPERATES. IF TEED PROTECTION BAY 1&2 OPERATED THEN IT TRIPS 1-52CB & 2-52CB.
SIMILARLY IF TEED PROTECTION BAY 2&3 OPERATED THEN IT TRIPS 2-52CB & 3-52CB.

TEED-1
PROTECTION

SUMMATION OF INDIVIDUAL PHASES OF T-SHAPED 3


CTs BEFORE REACHING TO RELAY. THIS IS
CIRCULATING CURRENT PRINCIPLE. THE CURRENT
FLOWING THROUGH IS ZERO DURING BALANCED
CONDITION.
HIGH IMPENDENCE THREE PHASE DIFFERENTIAL
RELAY IS USED AS TEED-1 PROTECTION.

TEED-2
PROTECTION

T- SHAPED 3 CTs ARE CONNECTED TO RELAY. THE


RELAY HAVING OPERATING COIL & RESTAIRING COIL.
BASED ON THE DIFFERENTIAL CURRENT FLOWING
THROUGH THE OPERATING COIL THE RELAY
OPERATES.
LOW IMPEDENCE PERCENTAGE BIASED THREE
TERMINAL THREE PHASE DIFFERENTIAL RELAY IS
USED AS TEED-2 PROTECTION.

TEED-1 PROTECTION
P2 P2 P2
1-CT
CTR: 2000-1000-500/1A

IR5
IY5
IB5

3 3 3

CORE-5

{BAY1&2}(5CT METHOD)

5S4

5S4

5S4

5S2

5S2

5S2

CLASS: PS

IN5

RADHA

P1 P1 P1
P2 P2 P2

IR5
IY5
IB5

2-CT
CTR: 2000-1000-500/1A

3 3 3

CORE-5

5S4

5S4

5S4

5S2

5S2

5S2

CLASS: PS

IN5

ACTIVE START

TRIP

DISPLAY
C

P1 P1 P1

P2 P2 P2
1-LCT
CTR: 2000-1000/1A

CLASS: PS

IN1
1S3

1S3

1S3

1S2

1S2

1S2

3 3 3

CORE-1

IB1
IY1
IR1
P1 P1 P1

IT WORKS ON CIRCULATING
CURRENT PRINCIPLE AND
IT IS HIGH IMPEDENCE
DIFFERENTIAL RELAY.
TEED-1 PROTECTION FOR
BAY 2&3 IS ALSO SAME AS
ABOVE AND THE
FOLLOWING CTs & CORES
ARE USED
3-CT(CORE-5), 2-CT(CORE-1)
& 3-TCT(CORE-1) ARE
STARRED AND CONNECTED
TO TEED-1 PROTECTION

TEED-2 PROTECTION
1-CT
CTR: 2000-1000-500/1A

3 3 3

CORE-4

4S4

4S4

4S4

4S2

4S2

4S2

CLASS: PS

{BAY1&2}(5CT METHOD)
CT MB

RAICA
LBB/BFR

CT MB

RAICA
LBB/BFR

P2 P2 P2

RADSB
ACTIVE

START

P2 P2 P2

4S4

4S4

4S4

4S2

4S2

4S2

3 3 3

TRIP

2-CT
CORE-4

DISPLAY

CTR: 2000-1000-500/1A

CLASS: PS

P2 P2 P2 CT MB
1-LCT
CTR: 2000-1000/1A

CLASS: PS

C
2S3

2S3

2S3

2S2

2S2

2S2

3 3 3

CORE-2

TEED-2 PROTECTION FOR


BAY 2&3 IS ALSO SAME AS
ABOVE AND THE
FOLLOWING CTs & CORES
ARE USED. 3-CT(CORE-4),
2-CT(CORE-2) & 3-TCT
(CORE-2) ARE CONNECTED
TO TEED-2 PROTECTION.
IT WORKS ON KIRCHOFFS
CURRENT PRINCIPLE & IT IS
PERCENTAGE BIASED LOW
IMPEDENCE DIFFERENTIAL
RELAY

TEED PROTECTION TRIP SCHEME


ABB
RADHA
TEED-1
86-A
MTR/
HSTR

TRIP COIL-1
1-52CB
TRIP COIL-2
BUS-1
86-B
ABB
REL521
MTR/
MAIN-1
HSTR

OR
ABB
(BAY
1&2)
REL521
STUB-1
(BAY 1&2)
(BAY 1&2)

ABB
RADSB
TEED-2
OR
ABB
REL316
STUB-2

ABB
RADHA
TEED-1
86-A
MTR/
HSTR
TRIP COIL-1
2-52CB
TRIP COIL-2

86-B
MTR/
HSTR

OR
ABB
RET521
STUB-1
(BAY 2&3)
(BAY 2&3)

ABB
RADSB
TEED-2
OR
ABB
RET316
STUB-2

86-A
MTR/
HSTR

TRIP COIL-1
3-52CB
TRIP COIL-2
BUS-2
86-B
MTR/
HSTR

86-A : GROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY


86-B : GROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY
LINE/TRANSFORMER ISOLATOR OPENS THIS INTERLOCK WILL INITIATE
MAIN-1 REL 521/ RET 521 & MAIN-2 REL 316/ RET 316 CONVERTED STUB-1 & 2 PROTECTION

AUTO RECLOSURE BASICS


FAULTS ARE THREE TYPES
1. TRANSIENT FAULT: These are cleared by the immediate tripping of
Circuit Breakers and do not reoccur when the line is re-energized.
2. SEMI-PERMANENT FAULTS: These require a time interval to disappear
before a line is charged again.
3. PERMANENT FAULTS: These are to be located and repaired before the
line is re-energized.
About 80-90% of the faults occurring are transient in nature. Hence the Automatic
Reclosure of breaker (after tripping on Fault) will result in the line being
successfully re-energized.
ADVANTAGES:
A. Decreasing outage time.
B. Improving Reliability.
C. Improving system stability.
D. Reduce fault damage and Maintenance Time.
DEAD TIME: The time between the Auto-reclosing Scheme being energized and
the operation of the contacts which energize the Circuit Breaker closing
circuit.
RECLAIM TIME: The Time Following a successful closing operation measured
from the instant the Auto-Reclosing relay closing contacts make which
must elapse before the Auto-Reclosing relay initiates another reclosing
attempt. In other words, it may be said to be the time between 1st and 2nd
Auto-Reclosure.

TYPES OF AUTO-RECLOSING SCHEMES:


1. BASED ON PHASE
A. THREE PHASE AUTO-RECLOSING: This type of Auto-Reclosing causes an
immediate drift part of the two systems and hence no interchange of synchronizing
power can take place during the dead time.
B. SINGLE PHASE AUTO-RECLOSING: In this, only the faulty phase(only SLG Faults) is
reclosed without causing interruption in interchange synchronizing power between two
systems through other two healthy phases.
2. BASED ON ATTEMPTS OF RECLOSURE
A. SINGLE SHOT AUTO-RECLOSING: In this scheme, Breaker is reclosed only once on
a given fault before lockout of Circuit Breaker Occurs. High-Speed Auto-Reclosing for
EHT System is invariably Single Shot.
B. MULTI-SHOT AUTO-RECLOSING: In this scheme, more than one reclosing attempts
made for a given fault before lockout of Circuit Breaker occurs.
B.I. DISADVANTAGES: Repeated closure attempts has with high fault level would
seriously affect the Circuit Breaker, Equipment and System Stability.
B.ii. CIRCUIT BREAKER LIMITATIONS: Ability of Circuit Breaker to Perform several Trip
Close operations in quick succession.
B. iii. SYSTEM CONDITIONS: In the percentage of the semi-Permanent faults (which
could be burnt out) is moderate, For example on the lines through the forest, multi
shot Auto-Reclosing is followed.
3. DEPENDING ON SPEED:
A. HIGH-SPEED AUTO-RECLOSING: This aids in fast restoration of supply but should
be done by taking into account the following factors.
I. System disturbance time can be tolerated without loss of system stability.
ii. Characteristics of Protection Schemes and Circuit Breaker.
B. LOW SPEED OR DELAYED AUTO RECLOSING: This is suitable for highly interconnected systems where the loss of a single line is unlikely to cause two sections
of the system to drift apart and loose synchronism.

METHOD OF ADOPTION IN ONE AND HALF BREAKER SYSTEM:


The Auto-Reclosure Functions used for the Bus Breakers 1-52CB & 3-52CB are set
as Masters and one for the Center Breaker 2-52CB(TIE) as Follower. Co-ordination
is required between the Auto-Reclosure Functions. A Synchrocheck function is
also loaded in each Relay to permit 3 pole Auto-Reclosing.
Each Line Protection relays starts both MAIN & TIE Circuit Breakers to trip for the
Concerned line. After a Successful reclosure of the Main Breaker, The Tie Breaker
will be reclosed after a supplementary time delay. Should the Main CB AutoReclosure relay not be successful in its reclosing attempts, the Tie CB AutoReclosure is blocked. If the Main CB is Open or its Auto-Reclosure Relay is not
ready or Out of service, The TIE CB Auto-Reclosure will reclose The TIE Breaker
after its own dead time without any supplementary time delay.
CHOICES OF EHV SYSTEM:
1. CHOICE OF DEAD TIME:
A. Lower limit is decided by deionising of Circuit Breaker.
B. Upper Limit is decided by Transient Stability and Synchronism.
C. Longer Transmission Lines Require Longer dead Time.
D. The dead time for High Speed Auto-Reclosing scheme with EHV System is 0.3 to
1.2 sec.
2. CHOICE OF RECLAIM TIME:
This should not be set to such a low value that the operating cycle of Breaker is
exceeded when two faults incident occurs close together. The reclaim time will be
in the range of 10 to 30 sec., depending the breaker opening and closing
mechanisms.
3. CHOICE OF ZONE:
This should normally kept in Zone-1. It is a Zone-1 fault and SLG fault only autoreclosure is comes in to picture. In other zones the auto reclosure is blocked.

AUTO-RECLOSURE FOR
ONE & HALF BREAKER SCHEME
TRIP COMMANDS
AUTO RECLOSURE
COMMANDS

79 (A/R)+
25(SYNC)
RAAAM
RASC

79 (A/R)+
25(SYNC)
RAAAM
RASC

79 (A/R)+
25(SYNC)
RAAAM
RASC

1-52CB

2-52CB

3-52CB

ABB Network Partner AG


ABB Network Partner AG

ABB Network Partner AG

LINE-1

1
2
3
4
5
6
7
8

C
E

21 MAIN-1
REL 521

REL531

REL531

21 MAIN-2
REL 316

ABB Network Partner AG

REC 316*4

1
2
3
4
5
6
7
8

9
10
11
12
13
14
15
16

LINE-2
C

21 MAIN-1
REL 521

REC 316*4

9
10
11
12
13
14
15
16

C
E

21 MAIN-2
REL 316

AUTO RECLOSING TIMING CHART


INSTANT OF FAULT
OPERATES

RESETS

TRANSIENT FAULT

PROTECTION
OPERATING
TIME

TRIP COIL CONTACTS


ARC
CONTACTS
ENERGISED SEPARATE EXTINGUISHED FULLY OPEN

CIRCUIT
BREAKER
OPENING
TIME

CLOSING
TIME

ARCING
TIME

OPERATING TIME
OPERATES

RESETS

PROTECTION

PERMANENT FAULT

CLOSING COIL CONTACTS CONTACTS


MAKE FULLY CLOSED
ENERGISED

OPERATES

RESETS

RECLOSE
ON TO FAULT

OPERATING
TIME

TRIP COIL CONTACTS


ARC
CONTACTS
ENERGISED SEPARATE EXTINGUISHED FULLY OPEN

CIRCUIT
BREAKER

DEAD TIME

OPENING
TIME

CLOSING COIL CONTACTS CONTACTS


ENERGISED
MAKE FULLY CLOSED

CLOSING
TIME

ARCING
TIME

OPERATING TIME

DEAD TIME

ARC
CONTACTS
CONTACTS
SEPARATE EXTINGUISHED FULLY OPEN

TRIP COIL
ENERGISED

SYSTEM DISTURBANCE TIME


RECLOSE INITIATED
BY PROTECTION

RELAY READY TO RESPOND


TO FURTHER FAULT INCIDENTS
(AFTER SUCEESFUL RECLOSRE)

AUTO RECLOSE
RELAY
DEAD TIME

CLOSING PULSE TIME


RECLAIM TIME

TIME

CARRIER
INTERTRIPPING
SCHEMES
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

TYPES OF CARRIER TRIPPING SCHEMES


PERMISSIVE TRIPPING
Permissive trip commands are always monitored by a protection
relay. The circuit breaker is tripped when receipt of the command
coincides with operation of the protection relay at the receiving end
responding to a system fault. The receipt of an incorrect signal
must coincide with operation of the receiving end protection for a
trip operation to take place. Normally, the risk of a spurious trip is
lesser. The intention of these schemes is to speed up tripping for
faults occurring within the protected zone.

BLOCKING SCHEME
Blocking commands are initiated by a protection element that
detects faults external to the protected zone. Detection of an
external fault at the local end of a protected circuit results in a
blocking signal being transmitted to the remote end. At the remote
end, receipt of the blocking signal prevents the remote end
protection operating if it had detected the external fault. Loss of the
communications channel is less serious for this scheme than in
others as loss of the channel does not result in a failure to trip when
required. However, the risk of a spurious trip is higher.

TYPES OF CARRIER TRIPPING SCHEMES


Conventional time-stepped distance protection has One of the main disadvantages is that the
instantaneous Zone 1 protection at each end of the protected line cannot be set to cover the whole
of the feeder length and is usually set to about 80%. This leaves two 'end zones', each being about
20% of the protected feeder length. Faults in these zones are cleared in Zone 1 time by the
protection at one end of the feeder and in Zone 2 time (typically 0.25 to 0.5 seconds) by the
protection at the other end of the feeder. This situation cannot be tolerated in some applications,
for two main reasons:
I). Faults remaining on the feeder for Zone 2 time may cause the system to become unstable.
II). Where high-speed auto-reclosing is used, the non-simultaneous opening of the circuit.
Breakers at both ends of the faulted section results in no 'dead time' during the auto- reclose cycle
for the fault to be extinguished and for ionized gases to clear. This results in the possibility that a
transient fault will cause permanent lockout of the circuit breakers at each end of the line section.
Even where instability does not occur, the increased duration of the disturbance may give rise to
power quality problems, and may result in increased plant damage.
Unit schemes of protection that compare the conditions at the two ends of the feeder
simultaneously positively identify whether the fault is internal or external to the protected section
and provide high-speed protection for the whole feeder length. This advantage is balanced by the
fact that the unit scheme does not provide the back up protection for adjacent feeders given by a
distance scheme.
The most desirable scheme is obviously a combination of the best features of both arrangements,
that is, instantaneous tripping over the whole feeder length plus back-up protection to adjacent
feeders. This can be achieved by interconnecting the distance protection relays at each end of the
protected feeder by a communications channel.
The purpose of the communications channel is to transmit information about the system
conditions from one end of the protected line to the other, including requests to initiate or prevent
tripping of the remote circuit breaker. The former arrangement is generally known as a 'transfer
tripping scheme' while the latter is generally known as a 'blocking scheme'. However, the
terminology of the various schemes varies widely, according to local custom and practice.

TYPES OF CARRIER TRIPPING SCHEMES


1. ZONE 1 EXTENSION SCHEME (Z1X SCHEME)
2. TRANSFER TRIPPING SCHEMES
I. DIRECT UNDER REACH TRANSFER TRIP SCHEME (DUTT)
II. PERMISSIVE UNDER REACH TRANSFER TRIP SCHEME (PUTT)
III. PUTT FWD SCHEME
IV. PERMISSIVE UNDER REACH ACCELERATED SCHEME
V. PERMISSIVE OVER REACH TRANSFER TRIP SCHEME (POTT)
VI. WEEK IN FEED CONDITIONS.
3. BLOCKING OVER REACHING SCHEMES
I. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 2.
OR DIRECTIONAL COMPARISION BLOCKING SCHEME

II. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 1.


III. WEEK IN FEED CONDITIONS.
4. DIRECTIONAL COMPARISON UNBLOCKING SCHEME

PROPERTIES OF COMMAND PROTECTION SYSTEMS


OPERATING
MODE

UNDER
REACHING
SENDING

OVER
REACHING
SENDING

PERMISSIVE
CRITERIA
RECEIVING

GENERAL
REQUIREMENTS

UNDER IMPEDENCE
UNDER VOLTAGE
OVER CURRENT
DISTANE &
DIRECTION

SECURE &
FAST

PERMISSIVE
UNDER
REACH
(PUTT)

ZONE-1

- - -

PERMISSIVE
OVER
REACH
(POTT)

- - -

ZONE-2

DIRECT
TRIP

ZONE-1

- - -

DISTANCE &
DIRECTION

DEPENDABLE

ACCELERA
TED UNDER
REACH

ZONE-1

- - -

ZONE-2

SECURE &
FAST

BLOCKING
OVER
REACH

- - -

REVERSE
LOCKING

DISTANCE &
DIRECTION

SECURE &
FAST
SECURE &

FAST &

DEPENDABLE

PREFFERED APPLICATIONS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

Signal
Transmission
System

PUTT

POTT

Dependable and secure communication


channel
1. Power line carrier with frequency shift
modulation. HF signal coupled to 2 phases
of the protected line, or even better, to a
parallel circuit to avoid transmission of
the HF signal through the fault location.
2. Microwave radio, especially
digital(PCM)
3. Fibre -optic cables

Characteristic Best suited for


longer lines - where
Of line
the Under-reach
zone provides
sufficient
resistance
coverage.

1. Excellent
coverage On short
lines in the
Presence of fault
resistance.
2. Suitable for the
Protection of multiterminal lines with
intermediate infeed.

BLOCKING

UNBLOCKING

Reliable
communication
channel
(only
required during
external faults)
1. Power line carrier
With
amplitude
Modulation (ON/OFF).
The same frequency
may be used on all
terminals)
All line types
Preferred practice
in the USA.

Dedicated channel
With
continuous
signal Transfer
1. Power line carrier
With frequency shift
keying. Continuous
Signal transmission
must be permitted.

Same as POTT

COMPARISION OF TELE/ CARRIER TRIPPING SCHEMES


On normal two-terminal lines the main deciding factors in the choice of the type
of scheme, apart from the reliability of the signalling channel, operating speed
and the method of operation of the system. Table compares the important
characteristics of the various types of scheme.

Criterion
Speed of operation

Transfer Tripping Scheme


Fast

Blocking scheme
Not as Fast

Speed with in-service testing Slower

As fast

Suitable for auto Re Close

Yes

Yes

Security against mal-operation due to:


Current reversal

Special features required

Special features required

Loss of communications

Poor

good

Weak In feed/Open CB

Special features required

Special features required

Modern digital or numerical distance relays are provided with a choice of


several schemes in the same relay. Thus scheme selection is now largely
independent of relay selection, and the user is assured that a relay is available
with all the required features to cope with changing system conditions.

ADVANTAGES & DRAWBACKS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

PUTT

POTT

ADVANTAGES

1. Simple technique
2. No coordination
Of zones and times
With the opposite
End required.
3.The combination
Of different relay
Types therefore
presents no
Problems.

1. Can be applied without Under


reaching zone1 stage (e.g.
overcompensated Series
compensated lines).
2. Can be applied on Extremely short
lines (impedance less than minimum
relay setting)
3. Better for parallel lines as mutual
coupling is not critical for the
overreach zone
4. Weak in feed terminals are no
problem. (Echo and Weak In feed
logic is included)

Same as POTT

DRAWBACKS

1. Overlapping of the
zone 1 reaches must be
ensured. On parallel
lines, teed feeders and
tapped lines, the
influence of zero
sequence coupling and
intermediate In feeds
must be carefully
considered to make sure
a minimum overlapping
of the zone 1 reach is
always present.
2. Not suitable for weak
In feed terminals

1. Zone reach and signal


timing coordination with the
Remote end is necessary
(current reversal).

Same as POTT
Same as
1. Slow tripping all POTT
Tele-protection trips
must be delayed to
wait for the eventual
blocking signal.
2. Continuous
channel
Monitoring is not
Possible.

BLOCKING

UNBLOCKING
Same as POTT
but:
1. If no signal is
Received (no
block and no
unblock) then
tripping by the
overreach zone
is released
after 20 ms

ADVANTAGES & DRAWBACKS OF TELE/ CARRIER TRIPPING SCHEMES


PARAMETERS

Short Line

Weak Infeed
Amplitude
Modulated
Power Line
Carrier
Frequency or
Phase
Modulated
Power Line
Carrier
Communication

independent
of Power Line

PUTT
Not Suitable as the
Zone1 Operation is
essential and Zone1
setting in X and R
direction must be
small on Short Lines.

POTT

BLOCKING

UNBLOCKING
Suitable Same as
POTT.

Suitable as the Z1B


setting may be
substantially larger than
the Line impedance so
that signal Transmission
is secure for all faults on
the Line.
Suitable as the Strong
end detects all the Line
Faults with the OverReaching Z1B. The
Weak In-feed end then
echos the received
Signal.

Suitable as
Reverse Reach
Setting is
independent of
Line Length.

Not Suitable as the


Signal must be Transmitted through the
Fault Location which
Attenuates the Signal.

Not Suitable same


as PUTT.

Suitable as the
Signal is only sent
when the Line is
not Faulted.

Not Suitable Same


as PUTT.

Suitable as the
Signal can be
Transmitted through
the Fault Location.

Suitable same as
PUTT.

Suitable as the
Signal can be
Transmitted under
all Conditions.

Suitable Same as
PUTT.

Suitable.

Suitable.

Suitable.

Suitable.

Not Suitable as the


Zone1 Operation is
essential at Both
Ends for 100%
Coverage.

Partially Suitable
Suitable Same as
as the Reverse Fault POTT.
is also Detected at
the Weak In-feed
end but no trip at
Weak In-feed end.

NSD 50/
NSD 70
ACTIVE

START

TRIP

ALARM-1
250V DC

PROTECTION COUPLER PANEL


C
S

2+
5C
R

6+

ALARM-2
250V DC

DISPLAY
C

1-

C
S

910+

C
R

1314+

G4AA TB: V9LB

TX
TRIP
A(C)

RX
TRIP
A(C)

C
S

2+

G4AC TB: V9LC

5-

C
R

TX
TRIP
B(D)

RX
TRIP
B(D)

1-

6+

C
S

910+

C
R

1314+

TX
TRIP
C(A)

RX
TRIP
C(A)

TX
TRIP
D(B)

RX
TRIP
D(B)

GA4D TB:V9LC

PROTECTION COUPLERS FOR 400KV LINE

FOR EACH LINE 2Nos PROTECTION COUPLER PANELS PROVIDED.


FOR EACH LINE 1NO CARRIER SPEECH PANEL PROVIDED.
SO, ONE LINE REQUIRES TOTAL 3 PANELS.
CARRIER SPEECH PANEL PURELY FOR VOICE COMMUNICATION BETWEEN
TWO SUBSTATIONS, i.e THE LINE CONNECTED SUBSTATIONS.
THE VOICE COMMUNICATION ARE TWO METHODS PROVIDED.
ONE IS HOTLINE COMMUNICATION/DEDICATED/ LIFT&TALK METHOD.
ANOTHER IS DIAL METHOD.
IN PROTECTION COUPLER PANEL-1 TOTAL 3 CARDS ARE IMPORTANT FOR
SENDING & RECEIVING TRIP SIGNALS.
ONE CARD FOR ALARM i.e G4AA. ONE CARD FOR PERMISSIVE/PROTECTION
TRIP i.e G4AC & ANOTHER CARD FOR DIRECT TRIPS i.e G4AD.
IN PROTECTION COUPLER-2 PANEL ALSO 3 CARDS ARE PROVIDED SIMILAR TO
PROTECTION COUPLER-1 PANEL.
THE PROTECTION COUPLER PANEL DRAWING IS SHOWN IN PREVIOUS MENU.
1SET TX & RX FOR PERMISSIVE/ PROTECTION TRIP(G4AC)
1SET TX & RX FOR BACKUP FOR PERMISSIVE/ PROTECTION IN ANOTHER
PANEL(G4AC).
1SET TX & RX FOR DIRECT TRIP CHANNEL-1( G4AD).
1SET TX & RX FOR SPARE UNDER EMERGENCY(G4AD).
THE ABOVE ARRANGEMENT SIMILAR FOR PROTECTION COUPLER PANEL-2.
G4AA CARD FOR ALARM.

NSD 50

MAIN-1 PROTECTION CARRIER INTER TRIPPING


G4AC V9LC 1
G4AC V9LC 6

CARRIER RECEIVE

G4AC V9LC 5

ABB

REL521
CR
-VE
CS

G4AC V9LC 2

CARRIER SEND

G4AA V9LB 5
G4AA V9LB 6
PANEL-1

NSD 50

ABB

IN OUT

ALARM

+VE

-VE

G4AC V9LC 10
G4AC V9LC 13
G4AC V9LC 14

ABB

G4AC V9LC 9

PANEL-2

THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP


AND CONNECTED IN ANOTHER PANEL

NSD 50

MAIN-2 PROTECTION CARRIER INTER TRIPPING


G4AC V9LC 1
G4AC V9LC 6

CARRIER RECEIVE

G4AC V9LC 5

ABB

REL316
CR
-VE
CS

G4AC V9LC 2

CARRIER SEND

G4AA V9LB 5
G4AA V9LB 6
PANEL-2

NSD 50

ABB

IN OUT

ALARM

+VE

-VE

G4AC V9LC 10
G4AC V9LC 13
G4AC V9LC 14

ABB

G4AC V9LC 9

PANEL-1

THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP


AND CONNECTED IN ANOTHER PANEL

DIRECT TRIP SEND CARRIER CHANNEL-1


96 BUSBAR PROT-2 PANEL

PANEL-1

87 BUSBAR TRIP (ZONE-2)

ABB
NSD 50

96 BUSBAR PROT-1 PANEL


87 BUSBAR TRIP (ZONE-1)

DC +VE
FROM PANEL

CONTROL PANEL
T NC

MAIN CB(1-52CB)

TIE CB (2-52 CB)

T NC

TIE CB(2-52CB)

MAIN CB (1-52 CB)

G4AD V9LC 2
G4AD V9LC 1

50 LBB/BFR FOR MAIN CB / RAICA


59L1 / OVER VOLTAGE STAGE-1
59L2 / OVER VOLTAGE STAGE-2
87 HZ / TEED-1 PROTECTION
87 LZ / TEED-2 PROTECTION
50 LBB/BFR FOR TIE CB / RAICA

DC VE FROM PANEL
CONDITIONS FOR DIRECT TRIP
1.
TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN.
2.
MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN.
3.
TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED.
4.
MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY).
5.
MAIN CB 50 LBB/BFR OPERATED.
6.
TIE CB 50 LBB/BFR OPERATED.
7.
59L1 OVER VOLTAGE STAGE-1 OPERATED.
8.
59L2 OVER VOLTAGE STAGE-2 OPERATED.
9.
87 HZ TEED-1 PROTECTION OPERATED
10. 87 LZ TEED-2 PROTECTION OPERATED.

DIRECT TRIP SEND CARRIER CHANNEL- 2


96 BUSBAR PROT-2 PANEL

PANEL-2

87 BUSBAR TRIP (ZONE-2)

ABB
NSD 50

96 BUSBAR PROT-1 PANEL


87 BUSBAR TRIP (ZONE-1)

DC +VE
FROM PANEL

CONTROL PANEL
T NC

MAIN CB(1-52CB)

TIE CB (2-52 CB)

T NC

TIE CB(2-52CB)

MAIN CB (1-52 CB)

G4AD V9LC 2
G4AD V9LC 1

50 LBB/BFR FOR MAIN CB / RAICA


59L1 / OVER VOLTAGE STAGE-1
59L2 / OVER VOLTAGE STAGE-2
87 HZ / TEED-1 PROTECTION
87 LZ / TEED-2 PROTECTION
50 LBB/BFR FOR TIE CB / RAICA

DC VE FROM PANEL
CONDITIONS FOR DIRECT TRIP
1.
TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN.
2.
MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN.
3.
TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED.
4.
MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY).
5.
MAIN CB 50 LBB/BFR OPERATED.
6.
TIE CB 50 LBB/BFR OPERATED.
7.
59L1 OVER VOLTAGE STAGE-1 OPERATED.
8.
59L2 OVER VOLTAGE STAGE-2 OPERATED.
9.
87 HZ TEED-1 PROTECTION OPERATED
10. 87 LZ TEED-2 PROTECTION OPERATED.

DIRECT TRIP RECEIVE CHANNEL-1&2


PANEL-1

ABB
NSD 50

TO 86-A MASTER TRIP RELAY


(HIGH SPEED TRIP RELAY) FOR
MAIN CB(152CB)

DC +VE

TO 86-A MASTER TRIP RELAY


(HIGH SPEED TRIP RELAY) FOR
TIE CB(252CB)

G4AD V9LC 6
G4AD V9LC 5
PANEL-2

DIRECT TRIP-1
CARRIER RECEIVE
RELAY

+VE

-VE

ABB
NSD 50

TO 86-B MASTER TRIP RELAY


(HIGH SPEED TRIP RELAY) FOR
MAIN CB(152CB)

DC +VE

TO 86-B MASTER TRIP RELAY


(HIGH SPEED TRIP RELAY) FOR
TIE CB(252CB)

G4AD V9LC 6
G4AD V9LC 5

DIRECT TRIP-2
CARRIER RECEIVE
RELAY

PLCC CARRIER PROTECTION SYSTEM


(TELEPROTECTION)
ABB Network Partner AG

REL531

ABB Network Partner AG

REL531

REL 521
MAIN-1
PROTECTION
C

ELECTRICAL CONNECTION
NSD 50
PANEL

NSD 50
PANEL
PLCC
PANEL

ELECTRICAL POWER LINE

PLCC
PANEL
NSD 50
PANEL

NSD 50
PANEL
ELECTRICAL CONNECTION
ABB Network Partner AG

2
3
4
5
6

10
11
12
13
14

7
8

15
16

REC 316*4

ABB Network Partner AG

REL 316
MAIN-2
PROTECTION

2
3
4
5
6

10
11
12
13
14

7
8

15
16

REC 316*4

FIBRE OPTIC PROTECTION SYSTEM


(TELEPROTECTION)
ABB Network Partner AG

REL531

ABB Network Partner AG

REL531

REL 521
MAIN-1
PROTECTION
C

ELECTRICAL CONNECTION

TUNOS

TUNOS

FOX-U
FOX-515

FOX-U
FOX-515

GECOD/ SIFOX

NSD 70
PANEL

NSD 70
PANEL
GECOD/ SIFOX

NSD 70
PANEL

NSD 70
PANEL

ELECTRICAL CONNECTION
ABB Network Partner AG

2
3
4
5
6

10
11
12
13
14

7
8

15
16

REC 316*4

ABB Network Partner AG

REL 316
MAIN-2
PROTECTION

2
3
4
5
6

10
11
12
13
14

7
8

15
16

REC 316*4

FIBRE OPTIC CARRIER PROTECTION SYSTEM


(TELEPROTECTION)
DIGITAL RELAY CONNECTION VIA FIBRE OPTIC
ABB Network Partner AG

REL531

ABB Network Partner AG

REL531

REL 521
MAIN-1
PROTECTION

ABB Network Partner AG

2
3
4
5
6

10
11
12
13
14

7
8

15
16

FOX-U
FOX-515

REC 316*4

ABB Network Partner AG

REL 316
MAIN-2
PROTECTION

2
3
4
5
6

10
11
12
13
14

7
8

15
16

OTERM

TUNOS

TUNOS

OTERM

FOX-U
FOX-515

REC 316*4

MAIN-1 & MAIN-2


PROTECTION FOR
AUTO TRANSFORMER
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME

PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

BASICS OF TRANSFORMER PROTECTION


1.

2.

3.

PURPOSE OF POWER TRANSFORMER PROTECTION


POWER T/F PROTECTION IS USUALLY INSTALLED TO DISCONNECT THE T/F AT:
A. INTERNAL SHORT CIRCUITS AND EARTH FAULTS IN THE T/F AND ITS CONNECTED
CIRCUITS.
B. EXTERNAL FAULTS ON OTHER CIRCUITS. (BACK-UP PROTECTION)
C. ABNORMAL SERVICE CONDITIONS SUCH AS OVERLOAD & OVER VOLTAGE.
PROTECTION DEVICES INBUILT OR MOUNTED ON POWER T/F
A. OIL IMMERSED POWER T/F USUALLY HAVE A GAS DETECTOR AND OIL SURGE.
DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR
DETECTING INTERNAL FAULTS.
B. LOAD TAPCHANGER COMPARTMENTS MAY HAVE A SIMILAR OVER PRESSURE
DEVICE.
C. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD
PROTECTION.
D. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE T/F FROM HIGH
PRESURES.
TRANSFORMER DIFFERENTIAL PROTECTION
IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH
IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR T/F.
THE MOST COMMON TYPE OF PROTECTION IS THE CURRENT RESTRAINT TYPE.
SOME TYPE OF DIFFERENTIAL RELAYS REQUIRE INTERPOSING CTs FOR CT RATIO
MATCHING AND/OR PHASE SHIFT.
HIGH IMPEDENCE DIFFERENTIAL PROTECTION CAN BE USED ON AUTO T/F & REACTORS.
IT COVERS ONE GALVANICALLY INTERCONNECTED WINDING (WDG DIFF). BUT NOT A
SEPARATE TERTIARY WINDING.
IT REQUIRES A THREE PHASE SET OF CTs AT THE NEUTRAL SIDE OF WINDING.

4.RESTRICTED EARTH FAULT PROTECTION


AT/Fs are used to couple EHV Power Networks, If the Ratio of their Voltages is Moderate. An Alternative
to Differential Protection that can be applied to AT/Fs. A Circulating Current System is arranged between
Equal Ratio Current Transformers in the Two Groups of Line Connections and the Neutral End
Connections. The Line Current Transformers can be connected in Parallel to A Single Element Relay, Thus
providing a Scheme Responsive to Earth Faults Only. If Current Transformers are fitted in Each Phase at
the Neutral End of the Windings and a Three-Element Relay is used, A Differential System can be provided,
giving Full Protection against Phase and Earth Faults. This Provides High-speed Sensitive Protection. It is
Unaffected by Ratio Changes on the Transformer due to Tap-changing and is immune to the Effects of
Magnetizing In Rush Current. It does not respond to Interturn Faults. In Addition, This Scheme does not
respond to any Fault in a Tertiary Winding. Unloaded Delta-connected Tertiary Windings are often not
Protected.

5. BACK UP PROTECTION
A VARIETY OF RELAYS ARE AVAILABLE.
A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE)
B. UNDER IMPEDENCE / DISTANCE ( Z<)(21T).
C. NEUTRAL DISPLACEMENT PROTECTION (Un>).

6.OTHER TYPES OF RELAYS


A. OVER VOLTAGE RELAY (U >).
B. OVER FLUX/ EXCITATION (V/F >)( INVERSE TIME & DIFENITE TIME).
FOR 400KV/220KV & 765/400KV TRANSFORMERS BOTH SIDES( i.e HV & LV) OVER FLUX RELAYS ARE
PROVIDED BECAUSE BOTH SIDES HAVING GRID.
C. AT/F NEUTRAL CURRENT RELAY (51N).

NORMALLY ADOPTED POWER TRANSFORMERS CAPACITIES IN 400KV / 220KV


CAPACITY OF
TRANSFORMER

HV
VOLTAGE

HV CURRENT

LV VOLTAGE

LV
CURRENT

315 MVA
500 MVA
630 MVA

400 KV
400 KV
400 KV

454.68 A
721.71 A
909.35 A

220 KV
220 KV
220 KV

0826.68 A
1312.20 A
1653.37 A

NORMS OF PROTECTION FOLLOWED IN APTRANSCO


FOR POWER TRANSFORMERS & AUTO TRANSFORMERS
S.No

CAPACITY

132KV/11KV

16 MVA
31.5 MVA
50 MVA
80 MVA
31.5 MVA
50 MVA

220KV/33KV

100 MVA
160 MVA

220KV/132KV

315 MVA
500 MVA
630 MVA

400KV/220KV

630 MVA
750 MVA
1000MVA
1500MVA

MAIN
PROTECTION

132KV/33KV

765KV/400KV

87T DIFFERENTIAL RELAY

7.5 MVA
16 MVA
25 MVA
31.5 MVA

VOLTAGE
RATIO

BACK UP
PROTECTION
HV

LV

3 OL +
1 DIR EL

3 OL +
1 EL

3 OL +
1 DIR EL

3 OL +
1 EL

3 OL +
1 DIR EL
3 OL +
1 DIR EL

3 OL +
1 EL
3 OL +
1 DIR EL

3 DIR OL
(HIGHSET) +
1 DIR EL
(HIGHSET)

3 DIR OL
(HIGHSET) +
1 DIR EL
(HIGHSET)

ADDITIONAL
PROTECTION

SPECIAL
PROTECTION

BUCHHOLZ,
OLTC OSR
OIL TEMP
WDNG TEMP

NIL

BUCHHOLZ
OVER FLUX
OLTC OSR
PRV/PRD
REF RELAY,
OIL TEMP
OVER LOAD
WDNG TEMP ALARM RELAY
T/F NEUTRAL
CURRENT RELAY
+ HIGH
IMPEDENCE
DIIFERENTIAL
RELAY

MAIN / DIFFERENTIAL PROTECTION FOR AT/F


(4 CT METHOD)
CT MB

3-CT
5S4

5S4

5S4

5S3

5S3

5S3

3 CT METHOD : 3-CT & 2-CT


4 CT METHOD : 3-CT & 2-ACT
6 CT METHOD : 3-ACT & 2-ACT

CLASS: PS

TRIP

5S1

5S1

5S3

5S3

5S3

CORE-5

DISPLAY

CTR: 1200-800/1A

CLASS: PS

CT MB

5S3

5S3

5S3

5S4

5S4

5S4

3 3 3

CTR: 2000-1000-500/1A

START

3 3 3

5S1

P2 P2 P2
LV-CT

2-ACT
CORE-5

RET 521/
RET 316
RADSB
ACTIVE

CLASS: PS

P2 P2 P2

AUX.CT Y/
0.91 / 0.577A

CTR: 2000-1000-500/1A

3 3 3

CORE-5

CT MB

AUX.CT Y/
0.689 / 0.577A

AUX.CT Y/
0.91 / 0.577A

P2 P2 P2

IN CASE OF 1&1/2 CB
SYSTEM, THE DIFFERENTIAL
PROTECTION CTs
ASSOCIATED WITH MAIN &
TIE CBs SHOULD BE
CONNECTED TO SEPARATE
BIAS WINDINGS AND THESE
SHOULD NOT BE PARALLED
IN ORDER TO AVOID FALSE
OPERATION DUE TO
DISSIMILAR CT TRANSIENT
RESPONSE.

MAIN / DIFFERENTIAL PROTECTION FOR AT/F


(5 CT METHOD)

3-TCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-5

5S4

5S4

5S4

5S3

5S3

5S3

CT MB

AUX.CT Y/
0.91 / 0.577A

P2 P2 P2

RET 521/
RET 316
RADSB
ACTIVE

START

TRIP

AUX.CT Y/
0.689 / 0.577A

CT MB

3 3 3

5S1

5S1

5S1

5S3

5S3

5S3

P2 P2 P2
LV-CT
CORE-5

DISPLAY

CTR: 1200-800/1A

CLASS: PS

NORMALLY LOW
IMPEDENCE BIASED
DIFFERENTIAL RELAY
IS USED FOR
TRANSFORMER
DIFFERENTIAL
PROTECTION

SELECTION OF AUX.CTs FOR DIFFERENTIAL PROTECTION

NORMALLY 400KV/220KV AUTO TRANSFORMERS ARE OF CAPACITY 315MVA.


FOR MERZ PRICE PROTECTION IF TRANSFORMER IS CONNECTED IN STAR/STAR
THEN CT SECONDARIES ARE TO BE CONNECTED IN DELTA/DELTA.
CORRECT RATIO CTs ARE NOT AVAILABLE, THEN AUX.CTs ARE TO BE PROVIDED
FOR ACHEVING SUITABLE CURRENTS.
IF AUX CTs ARE USING THEN MAIN CT SECONDARIES ARE CONNECTED IN STAR.
THIS IS BROUGHT TO AUX CTs. AUX CTs PRIMARY IS CONNECTED IN STAR &
SECONDARIES ARE CONNECTED IN DELTA.
NORMALLY THE RELAY RATED CURRRENT IS 1A.
AUX.CT s SECONDARIES ARE CONNECTED IN DELTA. FOR ACHIEVING 1A TO
RELAY, AUX.CT SECONDARY CURRENT IS TO BE 0.577A.
THE FULL LOAD PRIMARY CURRENT OF 315MVA AT/F IS 454.7A.
BUT THE 400KV CTs RATIOs ARE AVAILABLE : 2000-1000-500/1A
NEAREST VALUE TO FULL LOAD CURRENT IS 500/1A. HENCE IT IS ADOPTED.
HENCE AT FULL LOAD HV CURRENT i.e 454.7A, THEN SECONDARY OF CT
CURRENT WILL BE 0.91A.
SO HV SIDE AUX.CT RATIO IS 0.91/0.577A.
THE FULL LOAD SECONDARY CURRENT OF 315MVA AT/F IS 826.7A.
BUT THE 220KV CTs RATIOs ARE AVAILABLE: 1200-800/1A.
NEAREST VALUE TO FULL LOAD CURRENT IS 1200/1A. HENCE IT IS ADOPTED.
HENCE AT FULL LOAD LV CURRENT i.e 826.7A,THEN SECONDARY OF CT CURRENT
WILL BE 0.689A.
SO LV SIDE AUX CT RATIO IS 0.689/0.577A.
SPECIAL INFORMATION: LATEST NUMERICAL RELAYS NEED NOT REQUIRE AUX
CTs. IN THESE RELAYS, CT RATIOS MATCHING CAN BE PROGRAMMED.

BACKUP PROTECTION FOR AT/F HV


(4 CT METHOD)
P2 P2 P2

CT MB

IR4 / C411
IY4 / C431
RAICA IB4 / C451
LBB / BFR
IN4 / C471
50Z

3-CT
CTR: 2000-1000-500/1A

3 3 3

CORE-4

4S4

4S4

4S4

4S3

4S3

4S3

3 CT METHOD : 3-CT & 2-CT


4 CT METHOD : 3-CT & 2-ACT
6 CT METHOD : 3-ACT & 2-ACT

CLASS: PS

START

C
4S3

4S3

4S4

4S4

4S4

CLASS: PS

P2 P2 P2

IB4 / C451
IY4 / C431
IR4 / C411

VB11 / E151
VN11 / E171

3 3 3
E172
E174

CT MB

4S3

VY11 / E131

TRIP

DISPLAY

3 3 3

CTR: 2000-1000-500/1A

RAPDK
DIR O/L & E/F
REL 505
ACTIVE

2-ACT
CORE-4

VR11 / E111

3 3

CVT
SELECTION
BUS-1 CVT /
BUS-2 CVT /
LINE CVT
CORE-1
VA : 200

CLASS: 3P

BACKUP PROTECTION FOR AT/F HV


(5 CT METHOD)
VR11 / E111

P2 P2 P2

IR4 / C411
IY4 / C431
IB4 / C451

3-TCT
CTR: 2000-1000-500/1A

CLASS: PS

3 3 3

CORE-4

CT MB

4S4

4S3

4S4

4S4

4S3

4S3

RAPDK
DIR O/L & E/F
REL 505
ACTIVE

START

VY11 / E131
VB11 / E151
VN11 / E171

TRIP

3 3 3
E172
E174

IN4 / C471

DISPLAY
C

3 3

CVT
SELECTION
BUS-1 CVT /
BUS-2 CVT /
LINE CVT
CORE-1
VA : 200

CLASS: 3P

BACKUP PROTECTION FOR AT/F LV


P1 P1 P1
LV-CT
CTR: 1200 800 /1A

3 3 3

CORE-4

4S2

4S2

4S2

4S1

4S1

4S1

CLASS: PS
P2 P2 P2

CT MB

IR4 / C411
IY4 / C431
RAICA IB4 / C451
LBB / BFR
IN4 / C471
50Z

VR11 / E111

RAPDK
DIR O/L & E/F
REL 505
ACTIVE

START

VY11 / E131
VB11 / E151
VN11 / E171

TRIP

3 3 3
E172
E174

DISPLAY

3 3
VOLTAGE

SELECTION
BUS-1 PT /

BUS-2 PT
CORE-1
VA : 200

CLASS: 3P

MISCELLENEOUS
RELAYS & PROTECTIONS
ADOPTED FOR
AUTO TRANSFORMER IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
(OVER FLUX & REF FUNCTIONS)
PREPARED BY

GOPALA KRISHNA PALEPU


ADE/MRT(PROTECTION)

OVER EXCITATION/FLUX RELAY


{FOR AUTO TRANSFORMER HV & LV}
VOLTAGE
SELECTION

CVT SELECTION
BUS-1 CVT /
BUS-2 CVT /
LINE CVT
CORE-1
VA : 200

CLASS: 3P

RATUB

BUS-1 PT /

V/F RELAY
HV

CORE-1

RATUB
V/F RELAY
LV

BUS-2 PT
VA : 200

CLASS: 3P

315MVA, 400KV/220KV/33KV AT/F


RESTRICTED EARTH FAULT RELAY
P2 P2 P2
400KV HV
CORE-1

S2

S2

S1

S1

S1

3 3 3

BUSHING CT

S2

RADHD
ACTIVE START

TRIP

CTR: 1000/1A

CLASS: PS
P1 P1 P1
P1 P1 P1

NEUTRAL
CORE-1

S1

S1

S1

S2

S2

S2

3 3 3

BUSHING CT
CTR: 1000/ 1A

CLASS: PS
P2 P2 P2
P1 P1 P1
220KV LV
CORE-1
CTR: 1000/1A

S1

S1

S1

S2

S2

S2

3 3 3

BUSHING CT

DISPLAY

CLASS: PS

P2 P2 P2

315MVA, 400KV/220KV/33KV AT/F


3-PH HIGH IMPEDENCE DIFFERENTIAL RELAY
P2 P2 P2

400KV HV
CORE-1

S2

S2

S1

S1

S1

3 3 3

BUSHING CT

S2

RADHA
ACTIVE START

TRIP

CTR: 1000/1A

CLASS: PS
P1 P1 P1
P1 P1 P1

NEUTRAL
CORE-1

S1

S1

S1

S2

S2

S2

3 3 3

BUSHING CT
CTR: 1000/ 1A

CLASS: PS
P2 P2 P2
P1 P1 P1
220KV LV
CORE-1
CTR: 1000/1A

S1

S1

S1

S2

S2

S2

3 3 3

BUSHING CT

DISPLAY

CLASS: PS

P2 P2 P2

315MVA, 400KV/220KV AT/F VOLAGE SELECTION


BUS-1

LINE1

1-52CB

2-52CB

3-52CB

BUS-2

AT/F-1

FEEDER HAVING LINE CVTs &BUSES ARE HAVING BUS CVTs BUT AT/Fs ARE
NOT HAVING CVTs. FOR TRANSFORMER PANEL, PT SUPPLY IS SELECTED AS
PER SELECTION DESCRIBED BELOW FOR METERING AND PROTECTION,
WHICH IS FIRST SELECTED .

BUS-1
CVT
BUS-2
CVT
LINE
CVT

If AT/F is feeding from Bus-1 and 1-52CB & 2-52CB is closed. Then
Bus-1 CVT is selected and this supply is extended to Control &
Relay Panels for Auto Transformer.
If AT/F is feeding from Bus-2 and 3-52 CB is closed & 2-52CB is
open. Then Bus-2 CVT is selected and this supply is extended to
Control & Relay Panels for Auto Transformer.
If AT/F is feeding from Direct Line and 2-52CB is closed & 1-52 CB
& 3-52 CB is open and 389T ISO is Closed . Then line CVT is
selected and this supply is extended to Control & Relay Panels for
Auto Transformer.

MAIN-1 & MAIN-2


PROTECTION FOR
SHUNT REACTOR
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME

PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

BASICS OF SHUNT REACTOR

1. TYPES OF REACTORS :
A. BASED ON REACTOR CONNECTION
i. SHUNT REACTOR.
ii. SERIES REACTOR.
B. BASED ON REACTOR LOCATION
i. BUS REACTOR
ii. LINE REACTOR
C. BASED ON CONTROL
i. 3-PH OIL IMMERSED REACTOR WITH GAPPED IRON CORE.
ii. THYRISTOR CONTROLLED REACTOR (STATIC VAR COMPENSATOR)
(APTRANSCO UTILISING SHUNT REACTORS FOR BUS & LINE IN 400KV NETWORK)
2. NEED OF SHUNT REACTOR:
A. LINE REACTOR
SHUNT REACTORS ARE USED IN ORDER TO COMPENSATE FOR THE CAPACITIVE SHUNT
REACTANCE OF TRANSMISSION LINES. THE REACTOR IS CONNECTED PARALLEL TO THE LINE. THE
LOCATION OF REACTOR IS OUT GOING SIDE OF LINE i.e AFTER CIRCUIT BREAKER. LENGTH OF LINE
IS MORE THERE MAY BE VOLTAGE IS RAISING DUE TO FARANTI EFFECT(CAPACITANCE) DURING
CHARGING. IN CASE OF ZONE-2 (OPEN JUMPER) FAULT, THE FAULT CLEARED BY REMOTE END IS
FAST, BUT THIS END IT WILL TAKE TIME DELAY DUE TO ZONE-2. DURING THIS TIME, VOLTAGE MAY
RAISING. SO, LINE REACTOR IS USED FOR CONTROLLING THE SWITCHING OVER VOLTAGES AND
SAFEGUARD THE OPERATING EQUIPMENT. NORMALLY IT IS ALWAYS IN SERVICE. NORMALLY BOTH
ENDS LINE REACTORS ARE PROVIDED. THE ELECTRICAL INTERLOCK IS PROVIDED THAT IF
REACTOR ISOLATOR CLOSSED POSITION ONLY WILL GIVE PERMIT TO CLOSE THE LINE ISOLATOR.
SIMILARLY FOR OPENING REACTOR ISOLATOR THE LINE ISOLATOR SHOULD BE IN OPEN POSITION.
NEUTRAL REACTOR CONNECTED BETWEEN THE STAR POINT OF EHV SHUNT REACTOR AND THE
GROUND, LIMITS THE SECONDARY ARC CURRENT TO A LOW VALUE OF AROUND 10 AMPS
TYPICALLY FOR 400KV SYSTEM TO ENSURE COMPLETE DE-IONISATION OF ARC PATH WHEN EHV
SYSTEM DEVELOPS A SINGLE LINE TO GROUND FAULT. ARC EXTINCTION DURING LINE SINGLEPHASE AUTORECLOSE DEAD TIME IS ASSISTED BY THIS NEUTRAL REACTOR.

3.

4.

B. BUS REACTOR
THE REACTOR IS CONNECTED PARALLEL TO THE BUS i.e LIKE A FEEDER/LINE.
DURING LIGHTLY LOADED CONDITIONS THERE MAY BE POSSIBULITY OF RAISING
BUS VOLTAGES. FOR SAFEGUARD THE OPERATING EQUIPMENT BUS REACTORS
ARE UTILISING. NORMALLY IT IS NOT IN SERVICE. WHENEVER THE VOLTAGE
RAISES TO 4%TO 5% MORE THAN THE RATED VOLTAGE THIS MAY BE KEPT IN
SERVICE AND 2% TO 3% LESS THAN THE RATED VOLTAGE THIS MAY BE KEPT OUT
OF SERVICE.
SELECTION OF REACTOR
A. LINE REACTOR
NORMALLY LINE REACTORS ARE PROVIDED IF THE LINE IS MORE OR EQUAL TO
250KM. IN APTRANSCO NETWORK MAXIMUM LENTH OF LINE IS 350KM. AS PER
SYSTEM STUDIES RECOMANDATIONS IF LINE LENGTH IS 250KM TO 300KM 50MVAR
REACTOR IS TO BE USED. IF MORE THAN 300KM 63MVAR REACTOR IS TO BE
USED.
B. BUS REACTOR
NORMALLY BUS REACTORS ARE PROVIDED IF THE SUBSTATION BUS VOLTAGE IS
RAISING 5% MORE THAN THE RATED VOLTAGE DURING LIGHTLY LOADED
CONDITION. BASED ON THE SYSTEM STUDIES RECOMANDATIONS BUS REACTORS
ARE TO BE PROVIDED. CALCULATIONS ARE REQUIRED FOR PROVIDING BUS
REACTOR. IN THIS THERE IS NO STANDARDISATION.
LOCATION OF REACTORS WITH CAPACITY IN APTRANSCO
A. LINE REACTOR
1. 400KV KALAPAKA-KHAMMAM 1 AT BOTH ENDS 63MVAR
2. 400KV KALAPAKA-KHAMMAM 2 AT BOTH ENDS 63MVAR
B. BUS REACTOR
1. 400KV KALAPAKA SS 2 X 50 MVAR
2. 400KV NUNNA SS(PGCIL BAYS) 1 x 63 MVAR

5.

6.

7.

8.

9.

PURPOSE OF SHUNT REACTOR PROTECTION


THE PURPOSE OF THE PROTECTION RELAYING IS TO DISCONNECT THE REACTOR AND
LIMIT DAMAGE IN CASE OF INTERNAL SHORT CIRCUITS, EARTH FAULTS, INTERTURN
FAULTS AND OVER VOLTAGE OR OVER LOAD.THE REACTOR FORMS CERTAIN
IMPEDENCE FOR RATED FREQUENCY, AND AS IT IS SHUNT CONNECTED, AS OVER LOAD
MAY BE CAUSED BY OVER VOLTAGE OR HARMONICS IN VOLTAGE AND CURRENT.
PROTECTION DEVICES INBUILT OR MOUNTED ON REACTOR
A. OIL IMMERSED REACTOR USUALLY HAVE A GAS DETECTOR AND OIL SURGE.
DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR
DETECTING INTERNAL FAULTS.
B. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD
PROTECTION.
C. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE REACTOR FROM HIGH
PRESURES.
REACTOR DIFFERENTIAL PROTECTION
IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH
IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR REACTOR.
IT CAN BE OF HIGH IMPEDENCE TYPE OR OF A SENSITIVE CURRENT STABILISED TYPE.
HIGH IMPEDENCE DIFFERENTIAL PROTECTION RELAYS REQUIRE AN EQUAL CT TURNS
RATIO ON THE PHASE AND NEUTRAL SIDE. SENSITIVITY IS 5% OF NOMINAL REACTOR CT
CURRENT.
BACK-UP PROTECTION
A VARIETY OF RELAYS ARE AVAILABLE.
A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY
COMBINATION OF THESE)
B. UNDER IMPEDENCE / DISTANCE ( Z<)(21R).
C. NEUTRAL DISPLACEMENT PROTECTION (Un>).
RESTRICTED EARTH FAULT PROTECTION
IF, FOR SOME REASON, A SENSITIVE DIFFERENTIAL PROTECTION NOT CHOOSEN A
RESTRICTED EARTH FAULT PROTECTION CAN BE UTILISED.

SHUNT REACTOR (BUS & LINE)


(4CT METHOD)
BUS-1

BUS-2

1-89

IL
INTER LOCK FACILITY:
WHEN 1-89R CLOSES ONLY
PERMIT TO CLOSE 1-89L AND
1-89L OPENS ONLY
PERMIT TO OPEN 1-89R.

3-89

1-52CB
1-CT

3-52CB
P2

P2

3P1

3-CT
3
P1

1-89A

UUU

1-89L

2-89A

P1

P2

2-BCT
P1

2-52CB

P2

2-89B
3-89R

UUUU

1-PH NEUTRAL
GROUNDING REACTOR

IL

UUU

LINE
SHUNT
REACTOR

P1 3

1-RCT

2-ACT

1-89R
P2

3-89A

LINE 1

BUS
SHUNT
REACTOR

SHUNT REACTOR (BUS & LINE)


(5CT METHOD)
BUS-1

BUS-2

1-89

IL
INTER LOCK FACILITY:
WHEN 1-89R CLOSES ONLY
PERMIT TO CLOSE 1-89L AND
1-89L OPENS ONLY
PERMIT TO OPEN 1-89R.

3-89

1-52CB
1-CT

3-52CB
P2

P2

3P1

3 3-CT

P1

1-89A

2-89A

IL

2-52CB

P2

2-89B

3-89R
P2

1-89L
1-LCT

P1

P2

3P1

LINE 1

P1

3 3-RCT

UUUU

UUU
UUU

1-PH NEUTRAL
GROUNDING
REACTOR

P2

LINE
SHUNT
REACTOR

2-CT

1-89R
1-RCT
P1 3

3-89A

BUS
SHUNT
REACTOR

SHUNT REACTOR PROTECTION


PROTECTIONS

3,4,6S - CT METHOD

5,6T1,6T2 - CT METHOD

LINE PROTECTION
IN THIS REACTOR CT CURRENT IS OPPOSES THE
MAIN&TIE CT CURRENT. VECTOR SUM OF CTs i.e.
MAIN, TIE & REACTOR IS LINE CURRENT.

MAIN-1 PROTECTION,
MAIN-2 PROTECTION,
METERING,
BUSBAR & BUSBAR
CHECKUP PROTECTION

3CT METHOD, 4CT METHOD,


6CT(S) METHOD

AS USUAL IN
5CT METHOD,
6CT(T1) METHOD,
6CT(T2) METHOD

LINE SHUNT REACTOR PROTECTION


MAIN PROTECTION ( 87 R )
(DIFFERENTIAL
PROTECTION)

HV BUSHING CT CORE-1 & NEUTRAL


BUSHING CT CORE-3 OF LINE SHUNT
REACTOR IS CONNECTED TO 3-PH
HIGH IMPEDENCE DIFFERENTIAL
RELAY.

HV BUSHING CT CORE-1 & NEUTRAL


BUSHING CT CORE-3 OF LINE SHUNT
REACTOR IS CONNECTED TO 3-PH
HIGH IMPEDENCE DIFFERENTIAL
RELAY.

BACK UP PROTECTION(21R)
( SINGLE STEP REACTOR
IMPEDENCE PROTECTION )

1-RCT CORE-1 & SELECTED CVT IS


CONNECTED TO SINGLE STEP
REACTOR IMPEDENCE RELAY.

1-RCT CORE-5 & SELECTED CVT IS


CONNECTED TO SINGLE STEP
REACTOR IMPEDENCE RELAY.

RESTRICTED EARTH FAULT


PROTECTION (64 R )

HV BUSHING CT CORE-2 & 1-PH


NEUTRAL GROUNDING REACTOR
EARTH BUSHING CT CORE-1.2 OF
LINE SHUNT REACTOR IS
CONNECTED TO 1-PH HIGH
IMPEDENCE DIFFERENTIAL
RELAY(REF).

HV BUSHING CT CORE-2 & I-PH


NEUTRAL GROUNDING REACTOR
EARTH BUSHING CT CORE-1.2 OF
LINE SHUNT REACTOR IS
CONNECTED TO 1-PH HIGH
IMPEDENCE DIFFERENTIAL
RELAY(REF).

METERING

REACTOR STAR SIDE BUSHING CT


CORE-1 IS CONNECTED TO REACTOR
METERING

REACTOR STAR SIDE BUSHING CT


CORE-1 IS CONNECTED TO
REACTOR METERING

SHUNT REACTOR PROTECTION


PROTECTIONS

4 CT METHOD

5 CT METHOD

BUS SHUNT REACTOR PROTECTION


MAIN PROTECTION (87 R)
(DIFFERENTIALPROTECTION)

HV BUSHING CT CORE-1 & NEUTRAL


BUSHING CT CORE-3 OF BUS SHUNT
REACTOR IS CONNECTED TO 3-PH
HIGH IMPEDENCE DIFFERENTIAL
RELAY.

HV BUSHING CT CORE-1&
NEUTRAL BUSHING CT CORE-3 OF
BUS SHUNT REACTOR IS
CONNECTED TO 3-PH HIGH
IMPEDENCE DIFFERENTIAL RLY.

BACK UP PROTECTION (21R )


( SINGLE STEP REACTOR
IMPEDENCE PROTECTION )

3-CT CORE-5 & 2-ACT CORE-5


SECONDARIES ARE CONNECTED
PARALLEL & SELECTED CVT IS
CONNECTED TO SINGLE STEP
REACTOR IMPEDENCE RELAY.

3-RCT CORE-5 & SELECTED CVT IS


CONNECTED TO SINGLE STEP
REACTOR IMPEDENCE RELAY.

RESTRICTED EARTH FAULT


PROTECTION ( 64 R )

HV BUSHING CT CORE-2 & EARTH


BUSHING CT CORE-2 OF BUS SHUNT
REACTOR IS CONNECTED TO 1-PH
HIGH IMPEDENCE DIFFERENTIAL
RELAY(REF).

HV BUSHING CT CORE-2 & EARTH


BUSHING CT CORE-2 OF BUS
SHUNT REACTOR IS CONNECTED
TO 1-PH HIGH IMPEDENCE
DIFFERENTIAL RELAY(REF).

SPECIAL PROTECTION
LINE SHUNT REACTOR

STUB PROTECTION

TEED-1: 1-CT, 2-CT, 1-LCT & 1-RCT


TEED-2: 1-CT, 2-CT, 1-LCT & 1-RCT

BUS SHUNT REACTOR

TEE DIFFERENTIAL PROTECTION :


3-CT, 2A-CT & REACTOR HV CT

TEED-1: 3-CT, 2-CT & 3-RCT


TEED-2: 3-CT, 2-CT & 3-RCT

CVT SELECTION

LINE SHUNT REACTOR: ACCORDING


TO ISOLATORS & BREAKERS
POSITION BUS-1/ BUS-2/ LINE CVT
WILL BE SELECTED.

BUS SHUNT REACTOR:


ACCORDING TO ISOLATORS &
BREAKERS POSITION BUS-1/
BUS-2 CVT WILL BE SELECTED.

REACTOR BUSHING CT CONNECTIONS


CORES

LINE SHUNT REACTOR


4 CT METHOD

5 CT METHOD

BUS SHUNT REACTOR


4 CT METHOD

5 CT METHOD

REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY

REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY

HV (400KV SIDE) BUSHING CTs


CORE-1(PS)

REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY

CORE-2(PS)

RESTRICTED EARTH
FAULT PROTECTION

CORE-3*(PS)

SPARE

REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY
RESTRICTED EARTH
FAULT PROTECTION

SPARE

RESTRICTED EARTH
FAULT PROTECTION

RESTRICTED EARTH
FAULT PROTECTION

TEED PROTECTION

SPARE

METERING

METERING

NEUTRAL (STAR POINT SIDE) BUSHING CTs


CORE-1

METERING

METERING

CORE-2(PS)

SPARE

SPARE

CORE-3(PS)

REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY

REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY

(0.2/0.5)

NEUTRAL REACTOR (MAIN REACTOR STAR POINT SIDE) BUSHING CTs


CORE-1.1(PS)

SPARE

SPARE

NEUTRAL REACTOR (EARTH POINT SIDE) BUSHING CTs


CORE-1.2 (PS)

RESTRICTED EARTH
FAULT PROTECTION

RESTRICTED EARTH
FAULT PROTECTION

RESTRICTED EARTH
FAULT PROTECTION
REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY

RESTRICTED EARTH
FAULT PROTECTION
REACTOR HIGH
IMPEDENCE
DIFFERENTIAL RELAY

*NOTE: NORMALLY CORE-3 OF HV


BUSHING CT IS USED FOR REACTOR
IMPEDENCE PROTECTION. FOR REACTOR
IMPEDENCE PROTECTION EITHER CORE-3
OF HV BUSHING CT OR ONE OF THE
PROTECTION CORE OF EXTERNAL CT
MAY BE UTILISED.

LINE SHUNT REACTOR PROTECTION


.

(4CT METHOD)
1-RCT

NEUTRAL BUSHING
(STAR PONT SIDE)
CTs

CORES
3 2 1

200/ 1A

P1

3
3
3

LINESHUNT
REACTOR

UUU

P2

.
.
CORE 1.1
.
P2

CORES
4 3 2

.
.

.
.

LINE

METERING

MAIN-2 PROTECTION

MAIN-1 PROTECTION
1-CT

1-PH NEUTRAL
GROUNDING REACTOR

UUU

P2

.
CORE 1.2
.
P1

200/ 1A

P2

1-CT
2B-CT
LINE

1-CT
2B-CT
LINE
2B-CT

REACTOR DIFFERENTIAL PROTECTION


RESTRICTED EARTHFAULT PROTECTION

REACTOR IMPEDENCE PROTECTION

P1

200/ 1A

2000-1000-500/1
2000-1000-500/1
2000-1000-500/1
2000-1000-500/1
2000-1000-500/1

1-89R

3
3
3
3
3

3
3
3

HV BUSHING
(400KV SIDE) CTs

CORES
3 2 1

P1

200/ 1A

CORE-1:
CORE-2:
CORE-3:
CORE-4:
CORE-5:

SELECTED
BUS-1/ BUS-2/ LINE
CVT VOLTAGE

REACTOR METERING

LINE SHUNT REACTOR PROTECTION


.

(5CT METHOD)
1-RCT

NEUTRAL BUSHING
(STAR PONT SIDE)
CTs

2000-1000-500/1
2000-1000-500/1
2000-1000-500/1
2000-1000-500/1
2000-1000-500/1

1-89R

P2
1-LCT CORE-1

TEE DIFFERENTIAL PROTECTION-1


1-CT CORE-5

P1

CORES
3 2 1

200/ 1A

3
3
3

LINESHUNT
REACTOR

P1

UUU

P2

CORES
4 3 2

3
3
3
3
3

3
3
3

HV BUSHING
(400KV SIDE) CTs

CORES
3 2 1

P1

200/ 1A

CORE-1:
CORE-2:
CORE-3:
CORE-4:
CORE-5:

2-CT CORE-5

.
.
CORE 1.1
.
P2

TEE DIFFERENTIAL PROTECTION-2

SELECTED
BUS-1/ BUS-2/ LINE
CVT VOLTAGE

UUU

P2

1-PH NEUTRAL
GROUNDING REACTOR

.
CORE 1.2
.
P1

200/ 1A

P2

2-CT
CORE-4
1-LCT
CORE-2

REACTOR IMPEDENCE PROTECTION

P1

200/ 1A

1-CT
CORE-4

REACTOR DIFFERENTIAL PROTECTION


RESTRICTED EARTHFAULT PROTECTION

REACTOR METERING

TEE DIFFERENTIAL PROTECTION

2-52CB
4 3 2
CORES

2A-CT

.
3 2 1
CORES

NEUTRAL BUSHING CTs


200/ 1A
(STAR PONT SIDE)

. UUU

P1

3
3
3

3
3
3

P2

3-89R

2-89B

P1

P1

3-89A

P2

3-CT

5 4 3
CORES

3
3
3

3
3
3
3
3

REACTOR METERING

REACTOR IMPEDENCE PROTECTION

P2

3
3

SELECTED
BUS-1/ BUS-2
CVT VOLTAGE

3-52CB

P2 3

2 1
CORES

BUS SHUNT REACTOR

200/ 1A

P1

HV BUSHING CTs
(400KV SIDE)

RESTRICTED EARTHFAULT PROTECTION

3-89

REACTOR DIFFERENTIAL PROTECTION

BUS-2

BUSBAR CHECKUP PROT

(4CT METHOD)

BUS BAR PROTECTION

BUS SHUNT REACTOR PROTECTION

1
2

3
3
3

.
2-52CB P1

2-CT

P2

3-89A

P2 3

2 1
CORES

BUS SHUNT REACTOR 200/ 1A

P1

HV BUSHING CTs
(400KV SIDE)

2-89B

3
3
3
3
3

P2

3R-CT

NEUTRAL BUSHING CTs


200/ 1A
(STAR PONT SIDE)

P1

P1

3-89R

CORES
2 3 4

3 2 1
CORES

. UUU

3
3
3

P2

3
3
3

3-CT

4 3 2
CORES

P2

P1

BUSBAR CHECKUP PROT

TEED-2 PROT (BAY 2&3)


TEED-1 PROT (BAY 2&3)

TEED-2 PROT (BAY 1&2)


TEED-1 PROT (BAY 1&2)

REACTOR IMPEDENCE PROTECTION

REACTOR DIFFERENTIAL PROTECTION

3-52CB

CORES
3 4 5

RESTRICTED EARTHFAULT PROTECTION

3-89

3
3
3
3
3

REACTOR METERING

(5CT METHOD)

3
3

SELECTED
BUS-1/ BUS-2
CVT VOLTAGE

BUS BAR PROTECTION

BUS SHUNT REACTOR PROTECTION


BUS-2

CARRIER INTERTRIPPING OF LINE SHUNT REACTOR


LINE SHUNT REACTOR PROTECTION TRIPPINGS WILL BE USED AS DIRECT TRIPPINGS OF LINE IN
ADDITION TO OTHER TRIPPINGS. BUS SHUNT REACTOR NEED NOT REQUIRE CARRIER INTER
TRIPPING FACILITY.
87R REACTOR DIFFERENTIAL RELAY
RADHA
21R REACTOR IMPEDENCE RELAY
RAKZB

ABB
NSD 50

LINE PROTECTION
COUPLER PANEL-1

DC +VE
FROM PANEL

64R RESTRICTED EARTH FAULT RELAY

RADHD
REACTORS INTERNAL FAULTS

G4AD V9LC 2

GROUP-1/A TRIPPINGS

G4AD V9LC 1
87R REACTOR DIFFERENTIAL RELAY
RADHA
21R REACTOR IMPEDENCE RELAY
RAKZB

ABB
NSD 50

DC VE FROM PANEL

LINE PROTECTION
COUPLER PANEL-2

DC +VE
FROM PANEL

64R RESTRICTED EARTH FAULT RELAY

RADHD
REACTORS INTERNAL FAULTS

G4AD V9LC 2

GROUP-2/B TRIPPINGS

G4AD V9LC 1

DC VE FROM PANEL

ADDITIONAL AND
SPECIAL FUNCTIONS
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
(EVENT LOGGER & DISTURBANCE
RECORDER)
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

400KV SUBSTATION: MAMIDIPALLY


19 MAR 2004 13:00:00
A 13:09:37.090 # 195
A 13:09:37.096 # 188
A 13:09:37.097 # 187
A 13:09:37.100 # 181
A 13:09:37.104 # 162
A 13:09:37.110 # 196
A 13:09:37.110 # 170
A 13:09:37.111 # 161
A 13:09:37.111 # 163
A 13:09:37.111 # 169
A 13:09:37.112 # 168
A 13:09:37.113 # 182
A 13:09:37.126 # 199
A 13:09:37.140 # 185
N 13:09:37.147 # 195
N 13:09:37.148 # 196
N 13:09:37.175 # 187
N 13:09:37.176 # 181
N 13:09:37.176 # 188
N 13:09:37.185 # 182
N 13:09:37.257 # 199
N 13:09:37.279 # 185
19 MAR 2004 14:00:00
N 14:09:48.702 # 163
N 14:09:48.704 # 161
N 14:09:48.720 # 162
N 14:10:00.903 # 169
N 14:10:00.907 # 168
N 14:10:00.907 # 170
19 MAR 2004 15:00:00

EVENT LOGGER EVENTS INFORMATION

400KV SRISAILAM-2 MAIN-2 RAZFE PROT TRIP


400KV SRISAILAM-2 MAIN-1 REL100 PROT STARTY
400KV SRISAILAM-2 MAIN-1 REL100 PROT STARTR
400KV SRISAILAM-2 MAIN-1 REL100 PROT TRIP
400KV SRISAILAM-2 MAIN CB 752 Y-PH OPEN
400KV SRISAILAM-2 MAIN-2 RAZFE CARRIER SEND
400KV SRISAILAM-2 AT/F-2 TIE CB 852 B-PH OPEN
400KV SRISAILAM-2 MAIN CB 752 R-PH OPEN
400KV SRISAILAM-2 MAIN CB 752 B-PH OPEN
400KV SRISAILAM-2 AT/F-2 TIE CB 852 Y-PH OPEN
400KV SRISAILAM-2 AT/F-2 TIE CB 852 R-PH OPEN
400KV SRISAILAM-2 MAIN-1 REL100 CARRIER SEND
400KV SRISAILAM-2 CARRIER PROT CH-2 RECEIVED
400KV SRISAILAM-2 CARRIER PROT CH-1 RECEIVED
400KV SRISAILAM-2 MAIN-2 RAZFE PROT TRIP RESET
400KV SRISAILAM-2 MAIN-2 RAZFE CARRIER SEND RESET
400KV SRISAILAM-2 MAIN-1 REL100 START R RESET
400KV SRISAILAM-2 MAIN-1 REL100 PROT TRIP RESET
400KV SRISAILAM-2 MAIN-1 REL100 START Y RESET
400KV SRISAILAM-2 MAIN-1 REL100 CARRIER SEND RESET
400KV SRISAILAM-2 CARRIER PROT CH-2 RECEIVED RESET
400KV SRISAILAM-2 CARRIER PROT CH-1 RECEIVED RESET
400KV SRISAILAM-2 MAIN CB 752 B-PH CLOSE
400KV SRISAILAM-2 MAIN CB 752 R-PH CLOSE
400KV SRISAILAM-2 MAIN CB 752 Y-PH CLOSE
400KV SRISAILAM-2 AT/F-2 TIE CB 852 Y-PH CLOSE
400KV SRISAILAM-2 AT/F-2 TIE CB 852 R-PH CLOSE
400KV SRISAILAM-2 AT/F-2 TIE CB 852 B-PH CLOSE

DISTURBANCE RECORDER

R PH VOLTAGE
Y PH VOLTAGE
B PH VOLTAGE
OPEN DELTA VOLTAGE
R PH CURRENT
Y PH CURRENT
B PH CURRENT
STAR/NEUTRAL CURRENT
MAIN CB R PH OPEN
MAIN CB Y PH OPEN
MAIN CB B PH OPEN
TIE CB R PH OPEN
TIE CB Y PH OPEN
TIE CB B PH OPEN
MAIN/TIE CB LBB OPTD
DIRECT TRIP CH-1/2 OPTD
BUSBAR PROT OPTD
MAIN-1 PROT OPTD
MAIN-2 PROT OPTD
OVER VOLTAGE STAGE-1/2 OPTD
STUB PROT-1/2 OPTD
MAIN-1 PROT CARRIER RECEIVE
MAIN-2 PROT CARRIER RECEIVE
DF/DT OPTD
EVENT NO
NAME OF FEEDER
DATE & TIME

PREFERRED DISTURBANCE RECORDER


400 KV LINES

400 KV TRANSFORMER

ANALOG CHANNELS

ANALOG CHANNELS

DIGITAL CHANNELS

1.
2.
3.
4.
5.
6.
7.
8.

1. HV
2. HV
3. HV
4. HV
5. LV
6. LV
7. LV
8. LV
9. HV
10. HV
11. HV
12. HV
13. LV
14. LV
15. LV
16. LV

1. HV MAIN CB R-PH OPEN


2. HV MAIN CB Y-PH OPEN
3. HV MAIN CB B-PH OPEN
4. HV TIE CB R-PH OPEN
5. HV TIE CB Y-PH OPEN
6. HV TIE CB B-PH OPEN
7. LV 220 CB R-PH OPEN
8. LV 220 CB Y-PH OPEN
9. LV 220 CB B-PH OPEN
10 87 LZ DIFF RLY OPERATED
11. HV 67 ABCN OPERATED
12. LV 67 ABCN OPERATED
13. 51 O/L RLY OPERATED
14. 64 REF / 87 HZ RLY OPERATED
15. NDR RLY OPERATED
16. HV 99T OVER FLUX OPTD
17. LV 99T OVER FLUX OPTD
18. HV 400 BUSBAR OPERATED
19. LV 220 BUSBAR OPERATED
20. HV MAIN CB LBB OPERATED
21. HV TIE CB LBB OPERATED
22. LV 220 CB LBB OPERATED
23. HV 86 GR-A/B RELAY OPTD
24. LV 86 GR-A/B RELAY OPTD
25. AT/F 21T UZ RELAY OPERATED
26. OIL TEMP HIGH TRIP
27. WNDG TEMP HV/IV/LV TRIP
28. BUCHHOLZ MAIN/OLTC TRIP
29. PRD 1/ 2 TRIP
30. AT/F NEUTRAL CURRENT TRIP

R-PH VOLTAGE
Y-PH VOLTAGE
B-PH VOLTAGE
OPEN DELTA VOLTAGE
R-PH CURRENT
Y-PH CURRENT
B-PH CURRENT
NEUTRAL/STAR CURRENT

DIGITAL CHANNELS
1. HV MAIN CB R-PH OPEN
2. HV MAIN CB Y-PH OPEN
3. HV MAIN CB B-PH OPEN
4. HV TIE CB R-PH OPEN
5. HV TIE CB Y-PH OPEN
6. HV TIE CB B-PH OPEN
7. 21 MAIN1 REL 521 OPERATED
8. 21 MAIN2 REL 316 OPERATED
9. 87 BUSBAR RELAY OPERATED
10. MAIN CB A/R OPERATED
11. TIE CB A/R OPERATED
12. PSB OPERATED
13. SOTF OPERATED
14. 27 O/V STG-1/2 OPERATED
15. 51 STUB-1/2 OPERATED
16. 87HZ / LZ TEED-1/2 OPERATED
17. MAIN CB LBB OPERATED
18. TIE CB LBB OPERATED
19. DIRECT TRIP CH-1/2 TRIP
20. 21M1 / 21M2 CARRIER RECEIVE
21. 86 GR-A/B RELAY OPERATED
22. 67N DEF/TEF RLY OPERATED
23. DF/DT RELAY OPERATED

R-PH VOLTAGE
Y-PH VOLTAGE
B-PH VOLTAGE
OPEN DELTA VOLTAGE
R-PH VOLTAGE
Y-PH VOLTAGE
B-PH VOLTAGE
OPEN DELTA VOLTAGE
R-PH CURRENT
Y-PH CURRENT
B-PH CURRENT
NEUTRAL/STAR CURRENT
R-PH CURRENT
Y-PH CURRENT
B-PH CURRENT
NEUTRAL/STAR CURRENT

CONFIGUARATION
OF CONTROL &
RELAY PANELS IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME

PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

CONFIGUARATION OF C & R PANEL


CONTROL PANEL

CB RELAY PANEL

LINE PROTECTION PANEL

1. AMMETERS IN 3Phs
2. VOLTMETER WITH SEL. SWITCH
3. WATTMETER
4. VAR METER
5. 20W ANNUCIATION FACIA
6. CB CONTROL (TNC) SWITCH
7. ISO CONTROL (TNC) SWITCH
8. SEMAPHORE FOR EARTH SWITCH
9. INDICATING LAMPS FOR CB G&R
10. INDICATING LAMPS FOR ISO
11. INDICATING LAMPS FOR DC
12. INDICATING LAMPS FOR ISO I/L
13. PUSH BUTTON FOR ANNUNCIATION
14. SYNCHRONISING SOCKET FOR CB
15. SYNCHRONISING SEL.SWITCH
16. PROTECTION TRANSFER
17. MIMIC TO REPRESENT SLD
18. CUTOUT FOR RWTI WITH SEL .SWI.
19. PANEL INDICATING LABEL

1. BREAKER FAILURE RELAY


2. AUTO RECLOSURE RELAY
3. CHECK SYNCHRONISING RELAY
4. CB ALARM RELAYS
5. CB TRIP CKT SUPERVISION RELAYS
6. 3-PH TRIP UNITS 86-GA & 86-GB
7. 1-PH TRIP RELAYS M1, M2 - 1 2 Nos
8. DIRECT TRIP RECEIVE RELAYS
9. DC SUPERVISION RELAYS
10. U/V RELAY E/S I/L
11. CB MULTIPLICATION RELAY
12. TEST TERMINAL BLOCK
13. ENERGY METER
14. AUX RELAYS
15. PANEL INDICATING LABEL

1. MAIN-1 NUM. DIST. PROT


2. MAIN-2 NUM. DIST. PROT.
3. O/V STAGE-1 (EXT/IN BUILT)
4. O/V STAGE-2 (EXT/IN BUILT)
5. DISTURBANCE RECORDER(EXT/INBUILT)
6. DISTANCE TO FAULT (EXT/ INBUILT)
7. DC SUPERVISION RELAYS
8. TEED-1 PROTECTION
9. TEED-2 PROTECTION
10. STUB-1/2 PROTECTION (EXT/ INBUILT)
11. AUXILIARY RELAYS
12. MAIN-1 CARRIER SEL.SWITCH
13. MAIN-2 CARRIER SEL.SWITCH
14. CARRIER RECEIVE RELAYS
15. FLAG RELAYS
16. TIMERS
17. PANEL INDICATING LABEL

* IN CASE OF ONE AND HALF CB


SYSTEM CONTROL PANEL FOR FULL
DIA IS TO BE AVAILABLE

CONFIGUARATION OF C & R PANEL


TRANSFORMER PROTECTION PANEL
HV PROTECTION PANEL

1. T/F DIFFERENTIAL PROTECTION


2. REF PROTECTION RELAY
3. DIRECTIONAL O/L E/F RELAYS
4. OVER FLUX PROTECTION
5. OVER LOAD PROTECTION
6. VOLTAGE SELECTION RELAYS
7. FUSE FAILURE RELAY
8. AUX RELAYS FOR T/F TROBLES
9. FLAG RELAYS
10. TIMERS
11. CIRCUIT LABEL

MV PROTECTION PANEL

1. DIRECTIONAL O/L E/F RELAYS


2. OVER FLUX PROTECTION
3. NEUTRAL DISPALCEMENT RELAY
4. VOLTAGE SELECTION RELAYS
5. FUSE FAILURE RELAY
6. AUX RELAYS FOR T/F TROBLES
7. FLAG RELAYS
8. TIMERS
9. CIRCUIT LABEL

REACTOR PROTECTION PANEL


1. REACTOR DIFFERENTIAL PROTECTION
2. REF PROTECTION RELAY
3. REACTOR IMPEDENCE PROTECTION
4. CVT SELECTION RELAYS
5. FLAG RELAYS
6. AUX RELAYS
7. TIMERS
8. CIRCUIT LABEL

IN ADDITION TO THE ABOVE THE FOLLOWING PANELS WILL BE AVAILABLE


1. CONTROL PANELS FOR LINE, T/F, B/C, TBC, BUS REACTOR (AS & WHEN REQ)
2. COMMON CONTROL PANEL
3. BUS BAR PROTECTION PANELS
4. TRANSFER BUS COUPLER PROTECTION PANEL(IN CASE OF DMT/SMT SCHEME)
5. BUS COUPLER PROTECTION PANEL (IN CASE OF DMT/DB SCHEME)
I. NOMINCLATURE FOR PANELS ARE NORMALLY
MAIN CB PANEL RLA, TIE CB PANEL RTB, HV CB PANEL RTRA, LV CB PANEL RTRD
LINE PROTECTION PANEL RLB, HV PROTECTION PANEL RTRB, LV PROTECTION PANEL
RTRC, LINE REACTOR PROTECTION PANEL RLRC, BUS REACTOR PROTECTION PANEL
RBRA, BUS BAR PANEL RBBA, CONTROL PANEL CP, KP, KT, KBC, KTBC,KL,CCP

MV CB RELAY PANEL

MV PROTECTION PANEL

HV PROTECTION PANEL

HV CB RELAY PANEL

TIE CB RELAY PANEL

LINE REACTOR PROT PANEL

LINE PROTECTION PANEL

DIA WITH LINE & REACTORS


MV CB RELAY PANEL

MV PROTECTION PANEL

HV PROTECTION PANEL

HV CB RELAY PANEL

TIE CB RELAY PANEL

LINE PROTECTION PANEL

MAIN CB RELAY PANEL

MAIN CB RELAY PANEL

LINE-2 PROTECTION PANEL

TIE CB RELAY PANEL

LINE-1 PROTECTION PANEL

MAIN CB RELAY PANEL

DIA WITH TWO LINES

MAIN CB RELAY PANEL

MAIN CB RELAY PANEL

BUS REACTOR PROT PANEL

TIE CB RELAY PANEL

LINE REACTOR PROT PANEL

LINE PROTECTION PANEL

MAIN CB RELAY PANEL

ARRANGEMENT OF C & R PANELS


DIA WITH LINE & TRANSFORMER

DIA WITH LINE, REACTOR & T/F

TRIP LOGICS
OF
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

GROUP-A & GROUP-B TRIPPINGS


FOR 400KV STATIONS THERE SHALL BE TWO SEPARATE BATTERY SYSTEMS AVAILABLE FOR
PROTECTION, CONTROL & TRIPPING/CLOSING OPERATIONS. TO OBTAIN REDUNDENCY AND TO BE
ABLE TO TAKE PROTECTION OUT FOR MAINTANENCE, WHILE EQUIPMENT IS IN SERVICE, THE
RELAYS ARE ELECTRICALLY AND PHYSICALLY SEGREGATED IN TO TWO GROUPS. GROUPING IS
DONE TO THE EXTENT POSSIBLE IN SUCH A WAY THAT EACH GROUP CAN INDEPENDENTLY
CARRYOUT PROTECTIVE FUNCTIONS WITH NEAR EQUAL REDUNDENCY. INTER CONNECTION OF
THESE TWO GROUPS SHALL NOT BE GENERALLY BE ATTEMPTED.
DISTRIBUTION OF DC SUPPLY SHALL BE DONE BAY WISE TO FEED THE FOLLOWING
1. PROTECTION
2. CB CONTROL
3. ISOLATOR / EARTH SWITCH CONTROL
4. ANNUNCIATION / INDICATION

LINE PROTECTION

TRANSFORMER PROTECTION

REACTOR PROTECTION

GROUP-A

GROUP-A

GROUP-A

MAIN-1 PROTECTION
M1 BUILT IN FUNCTIONS
TEED-1 PROTECTION
OVER VOLTAGE STAGE-1 PROT
DIRECT TRIP CHANNEL-1 RECEIVED

T/F DIFFERENTIAL RELAY


T/F HV BACKUP RELAY
T/F IMP / 21T RELAY
T/F HV OVERFLUX RELAY
OIL TEMP HIGH TRIP
PRESURE RELIEF TRIP
TERITIARY DELTA WNDG NDR PROT

REACTOR DIFFERENTIAL RELAY


REACTOR BACKUP / 21R RELAY
OIL TEMP HIGH TRIP
PRESURE RELIEF TRIP

GROUP-B
MAIN-2 PROTCTION
M2 BUILT IN FUNCTIONS
TEED-2 PROTECTION
OVER VOLTAGE STAGE-2 PROT
LBB/BFR RELAY
DIRECT TRIP CHANNEL-2 RECEIVED

GROUP-B
T/F REF / HIGH Z DIFF RELAY
BUCHHOLZ TRIP
T/F LV BACKUP RELAY
T/F NEUTRAL CURRENT / 51 O/C RLY
T/F LV OVERFLUX RELAY
OVER LOAD PROT (ALARM ONLY)
OLTC BUCHHOLZ TRIP
WINDING TEMP HIGH TRIP
LOW/ HIGH OIL LEVEL TRIP

GROUP-B
REACTOR REF RELAY
BUCHHOLZ TRIP
WINDING TEMP HIGH TRIP
LOW/ HIGH OIL LEVEL TRIP
FIRE PROTECTION TRIP

SOTF, PSB

MAIN-1/MAIN-2 CARRIER SEND

INITIATE 400KV B/B PROT

DIRECT TRIP CARRIER SEND

INITIATE SCADA (DR & SOE)

INITIATE ALARM

BLOCK T_CB A/R RELAY

1-PH

BLOCK M_CB A/R RELAY

START T_CB A/R RELAY

21 M2

START M_CB A/R RELAY

MAIN-2 PROTECTION

INITIATE T_CB 1PH TRIP UNIT GR-B


INITIATE T_CB 3PH TRIP UNIT GR-B

INITIATE T_CB 3PH TRIP UNIT GR-A

1-PH

INITIATE T_CB 1PH TRIP UNIT GR-A

OUTPUT

INITIATE M_CB 3PH TRIP UNIT GR-B

GROUP

21 M1

INITIATE M_CB 1PH TRIP UNIT GR-B

SYMBOL

MAIN-1 PROTECTION

INITIATE M_CB 3PH TRIP UNIT GR-A

PROTECTION
RELAY

INITIATE M_CB 1PH TRIP UNIT GR-A

MAIN CB FOR LINE (1-52CB)TRIPPING LOGICS

IN BUILT FUNCTIONS OF DISTANCE SCHEME

OVER VOLTAGE
STAGE-1 & STAGE-2
(BUILT IN 21 M1)

59 L1 & L2

3-PH

OVER VOLTAGE
STAGE-1 & STAGE-2
(BUILT IN 21 M2)

59 L1 & L2

3-PH

STUB, TOC, BOC,


TEF, DEF,
(BUILT- IN 21M1)

3-PH

STUB, TOC, BOC,


TEF, DEF,
(BUILT- IN 21M2)

3-PH

TEED PROT-1

87T HZ

3-PH

TEED PROT-2

87T LZ

3-PH

DIRECT TRIP CH-1 RECD

3-PH

DIRECT TRIP CH-2 RECD

3-PH

M_CB BFR / LBB PROT

3-PH

T_CB BFR / LBB PROT

3-PH

X
X

X
X

X
X

X
X

X
X

X
X

INITIATE T_CB A/R PRIORITY

INITIATE ALARM

TO SCADA (DR & SOE)

1-PH & 3PH

SYNC CHECK RELAY


(BUILT IN 21M1 & 21M2)

25 SYNC

A&B

3-PH

1-PH TRIP UNIT GR-A

186

1-PH

3-PH TRIP UNIT GR-A

86 GR A

3-PH

1-PH TRIP UNIT GR-B

286

1-PH

3-PH TRIP UNIT GR-B

86 GR B

3-PH

TRIP SIGNAL FROM 400KV


BUSBAR PROTECTION

96 BB

3-PH

LINE UNDER VOLTAGE RELAY

27 UV

89LE C LOSE PERMISSION

OUTPUT

A&B

START LBB/BFR M_C B

GROUP

79 A/R

INITIATE M_C B TRIP COIL-2

SYMBOL

AUTO RECLOSURE RELAY


(BUILT IN 21M1 & 21M2)

INITIATE M_C B TRIP COIL-1

PROTECTION
RELAY

CLOSE MAIN CB

MAIN CB FOR LINE (1-52 CB) TRIPPING LOGICS

PROTECTION
RELAY
SYMBOL
GROUP
OUTPUT

T_CB BFR / LBB PROT


50 ZT
B
3-PH

M_CB BFR / LBB PROT


(152 CB & 352 CB)
50 Z
B
3-PH

AUTO RECLOSURE RELAY


79
A/R
A
&
B
1-PH
&
3-PH

SYNC CHECK RELAY


25
3-PH

1-PH TRIP UNIT GR-A


186
A
1-PH
X
X

3-PH TRIP UNIT GR-A


86A
A
3-PH
X
X

1-PH TRIP UNIT GR-B


286
B
1-PH
X
X

3-PH TRIP UNIT GR-B


86B
B
3-PH
X
X

DIRECT TRIP CH-1 RECD


A
3-PH

DIRECT TRIP CH-2 RECD


B
3-PH
X

X
X

INITIATE SCADA (DR & SOE)

INITIATE ALARM

DIRECT TRIP CARRIER SEND

252 START LBB/BFR OF T_CB


252 CLOSE T_CB

252 INITIATE T_CB TRIPCOIL-1 & COIL-2

352 INITIATE M_CB 1PH TRIP UNIT GR-B


352 INITIATE M_CB 3PH TRIP UNIT GR-B

352 INITIATE M_CB 1PH TRIP UNIT GR-A


352 INITIATE M_CB 3PH TRIP UNIT GR-A

252 INITIATE T_CB 1PH TRIP UNIT GR-B


252 INITIATE T_CB 3PH TRIP UNIT GR-B

252 INITIATE T_CB 3PH TRIP UNIT GR-A

252 INITIATE T_CB 1PH TRIP UNIT GR-A

152 INITIATE M_CB 1PH TRIP UNIT GR-B


152 INITIATE M_CB 3PH TRIP UNIT GR-B

152 INITIATE M_CB 1PH TRIP UNIT GR-A


152 INITIATE M_CB 3PH TRIP UNIT GR-A

TIE CB TRIPPING LOGICS

X
X
X

X
X
X

X
X
X

X
X
X

X
X

X
X

INITIATE SCADA ( SOE)

HV BACKUP PROTECTION

67 ABCN

3-PH

HV OVER FLUX PROT

99T HV

3-PH

OVER LOAD RELAY

51 O/L

3-PH

HV PROT TRIP UNIT GR-A & B

86 GR-A/B

A/B

3-PH

REF PROTECTION

64T(HZ)

3-PH

TEED PROT-1 / 2

87T HZ/LZ

A/B

3-PH

STUB PROT

50 STUB

3-PH

AT/F TROUBLE TRIP HV & LV

86 GR-A/B

A/B

3-PH

X
X

X
X

X
X

X
X

INITIATE LV_CBTRIP COIL-2

INITIATE LV_CB TRIP COIL-1

START LV_CB LBB/BFR RELAY

START M_CB LBB/BFR RELAY

INITIATE 220KV B/B PROT

INITIATE 400KV B/B PROT

INTER TRIP CIRCUIT HV & LV

3-PH

INITIATE M_CBTRIP COIL-2

INITIATE M_CB TRIP COIL-1

INITIATE ALARM

INITIATE LV_CB 3PH TRIP UNIT GR-B

INITIATE M_CB 3PH TRIP UNIT GR-A

INITIATE LV_CB 3PH TRIP UNIT GR-A

OUTPUT

87T(LZ)

INITIATE T_CB 3PH TRIP UNIT GR-B

GROUP

DIFFERENTIAL RELAY

INITIATE T_CB 3PH TRIP UNIT GR-A

PROTECTION
RELAY

SYMBOL

INITIATE M_CB 3PH TRIP UNIT GR-B

MAIN CB FOR AT/F (3-52CB)TRIPPING LOGICS

AT/F TROUBLE ALRM


M_CB BFR / LBB PROT

50Z

3-PH

T_CB BFR / LBB PROT

50ZT

3-PH

LV_CB BFR / LBB PROT

50Z

3-PH

400KV B/B PROT

87 BB

96

3-PH

220KV B/B PROT

87 BB

96

3-PH

LV BACKUP PROTECTION

67 ABCN

3-PH

LV OVER FLUX PROT

99T LV

3-PH

TERI NEUTRAL DISP PROT

151N

3-PH

LV PROT TRIP UNIT GR-A & B

86 GR-A/B

A/B

3-PH

X
X

PROTECTION TRIP SCHEME


86-A
MTR/
HSTR

ABB
REL521
MAIN-1

TRIP COIL-1
1-52CB
TRIP COIL-2

86-A
MTR/
HSTR

ABB
RET521
MAIN-1

TRIP COIL-1
2-52CB

TRIP COIL-1
3-52CB

TRIP COIL-2

TRIP COIL-2
BUS-2

BUS-1
86-B
ABB
REL521
MTR/
MAIN-1
HSTR

ABB
REL316
MAIN-2

86-A
MTR/
HSTR

86-B
MTR/
HSTR

ABB
RET316
MAIN-2

86-B
MTR/
HSTR

86-A : GROUP-A MASTER TRIP RELAY / HIGH SPEED TRIP RELAY


86-B : GROUP-B MASTER TRIP RELAY / HIGH SPEED TRIP RELAY

MAIN-1/ MAIN-2
ZONE-1 & SINGLE PHASE FAULT
REL 521
ACTIVE

START

TRIP

INITIATE MAIN CB GR-A 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )
INITIATE TIE CB GR-A 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )
START MAIN CB AUTO RECLOSURE
START TIE CB AUTO RECLOSURE

DISPLAY

REL 316
ACTIVE

START

TRIP

CARRIER SEND
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )
TO LBB/BFR INITIATION

INITIATE MAIN CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )
INITIATE TIE CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )
START MAIN CB AUTO RECLOSURE
START TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TO DISTURBANCE RECORDER
TO LBB/BFR INITIATION

AUTO RECLOSURE

CONDITIONS REQUIRED FOR A/R OPERATION

1.
2.
3.

7.
8.
9.

CB CLOSE CONDITION.
TIME LAPSED MORE THAN RECLAIM TIME.
OPERATING PRESSURE OF CB SUITABLE FOR AUTORECLOSURE
OPERATION.
DC SUPPLY TO AUTORECLOSURE SHOULD BE AVAILABLE.
PREPARE 3-PH TRIP RELAY SHOULD BE RELEASED CONDITION.
NO BLOCKING SIGNAL TO AUTORECLOSURE RELAY.
POLE DISTURBANCE RELAY TIME SHOULD BE MORE THAN
TWICE OF DEAD TIME OF AUTO RECLOSURE.
CARRIER FAIL SIGNAL SHOULD NOT COME AT BOTH ENDS.
CARRIER SWITCH SHOULD BE IN SERVICE CONDITION.
SINGLE PHASE & ZONE-1 FAULT ONLY.

AUTO RECLOSURE OPERATION

1.
2.
3.
4.

TRIP MAIN CB SINGLE POLE.


TRIP TIE CB SINGLE POLE.
CLOSE MAIN CB AFTER DEAD TIME.
IF A/R SUCCESS FOR MAIN CB THEN AFTER SUPPLEMENTARY TIME
DELAY CLOSE TIE CB.(NORMALLY SUPPLEMENTARY TIME DELAY IS
DEAD TIME)
IF A/R UNSUCCESS THEN TRIP MAIN & TIE CBs.
IF MAIN CB OPEN CONDITION, THEN NO SUPPLEMENTARY DELAY TIME
FOR TIE A/R. IT WILL OPERATE ITs OWN DEAD TIME.

4.
5.
6.
7.

5.
6.

MAIN-1/ MAIN-2
ZONE-1 & TWO / THREE PHASE FAULT
REL 521
ACTIVE

START

TRIP

INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

REL 316
ACTIVE

START

TRIP

CARRIER SEND
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )
TO LBB/BFR INITIATION

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TO DISTURBANCE RECORDER
TO LBB/BFR INITIATION

MAIN-1/ MAIN-2
ZONE-2 & 1 / 2 / 3 PHASE FAULT
REL 521

CARRIER SIGNAL
ACTIVE START
RECEIVED
& ZONE-2 STARTER
IS PICKUP CONDITION

TRIP

REL 316
ACTIVE

START

INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SIGNAL
RECEIVED
& ZONE-2 STARTER
IS PICKUP CONDITION

INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )

TRIP

TO LBB/BFR INITIATION
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION CAME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CARRIER SEND ( IF PUTT OR2 SCHEME SELECTED )


INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TO DISTURBANCE RECORDER
TO LBB/BFR INITIATION

MAIN-1/ MAIN-2
ZONE- 3/4/5 & 1 / 2 / 3 PHASE FAULT
REL 521
ACTIVE

START

TRIP

INITIATE MAIN CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

REL 316
ACTIVE

START

TRIP

TO LBB/BFR INITIATION
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION CAME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )

INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

TO LBB/BFR INITIATION
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TO DISTURBANCE RECORDER

DISTANCE SCHEME TRIPPING OUTPUTS


TIE CB

MAIN CB
186 R

CO

CO

REL 521

TO TRIP COIL-1
TO TRIP COIL-2

ACTIVE

START

TO TRIP COIL-1
TO TRIP COIL-2

TRIP

186 Y

186 Y

DISPLAY

TO TRIP COIL-1
TO TRIP COIL-2

TO TRIP COIL-1
TO TRIP COIL-2

186 B

186 B

TO TRIP COIL-1
TO TRIP COIL-2
286 R

CO

TO TRIP COIL-1
TO TRIP COIL-2
CO

286 R

REL 316

TO TRIP COIL-1
TO TRIP COIL-2

ACTIVE

START

TO TRIP COIL-1
TO TRIP COIL-2

TRIP

286 Y

286 Y

DISPLAY

TO TRIP COIL-1
TO TRIP COIL-2
286 B
TO TRIP COIL-1
TO TRIP COIL-2

186 R

TO TRIP COIL-1
TO TRIP COIL-2
286 B
TO TRIP COIL-1
TO TRIP COIL-2

MAIN LBB

INITIATION
1-PH TRIP RELAYS OF
MAIN-1 PROTECTION

INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)

RAICA
ACTIVE

1-PH TRIP RELAYS OF


MAIN-2 PROTECTION

START

TRIP

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END

DISPLAY

96 BB
BUSBAR RELAY

86-GR-B
MASTER TRIP RELAY

INITIATE ALARM (ANNUNCIATION COME)


TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )

TIE LBB

INITIATION

86-GR-A
MASTER TRIP RELAY

CLOSE INTERLOCK OF MAIN CB & TIE CB


INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

86-GR-B
MASTER TRIP RELAY

1-PH TRIP RELAYS OF


MAIN-2 PROTECTION
OF LINE-1 (BAY1) &
LINE-2 (BAY 3)

BLOCK MAIN CB & TIE CB AUTO RECLOSURE


DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

86-GR-A
MASTER TRIP RELAY

1-PH TRIP RELAYS OF


MAIN-1 PROTECTION
OF LINE-1(BAY1) &
LINE-2 (BAY3)

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )

RAICA
ACTIVE

START

TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES )


BLOCK MAIN CB OF BAY1 & BAY3 AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE
CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3
CLOSE INTERLOCK OF TIE CB

DISPLAY

DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES


DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER (BAY1 & BAY3)
TO EVENT RECORDER ( SOE/ SCADA )

BUS BAR PROTECTION


INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE.

REB 521
ACTIVE

START

TRIP

TO TRIP COIL-1 CONCERNED BAY CB


TO TRIP COIL-2 CONCERNED BAY CB
TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB
DIRECT TRIP SEND CHANNEL-1 TO OTHER END
DIRECT TRIP SEND CHANNEL-2 TO OTHER END

DISPLAY

TO LBB/BFR INITIATION
FROM LBB/BFR TO BUS BAR TRIPPING

TO DISTURBANCE RECORDER OF MAIN-1


TO DISTURBANCE RECORDER OF MAIN-2

TO EVENT RECORDER ( SOE/ SCADA )


INITIATE ALARM (ANNUNCIATION COME)

INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE.

RED 521
ACTIVE

START

TRIP

TO TRIP COIL-1 CONCERNED BAY CB


TO TRIP COIL-2 CONCERNED BAY CB
TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB
DIRECT TRIP SEND CHANNEL-1 TO OTHER END
DIRECT TRIP SEND CHANNEL-2 TO OTHER END

DISPLAY

TO LBB/BFR INITIATION
FROM LBB/BFR TO BUS BAR TRIPPING

TO DISTURBANCE RECORDER OF MAIN-1


TO DISTURBANCE RECORDER OF MAIN-2

TO EVENT RECORDER ( SOE/ SCADA )


INITIATE ALARM (ANNUNCIATION COME)

STUB PROTECTION
REL 521
ACTIVE

LINE /AT/F
ISOLATOR
OPENS

START

TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

REL 316
ACTIVE

LINE /AT/F
ISOLATOR
OPENS

INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

START

TRIP

CLOSE INTERLOCK OF MAIN CB


CLOSE INTERLOCK OF TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CLOSE INTERLOCK OF MAIN CB


CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

TO DISTURBANCE RECORDER

INITIATE ALARM (ANNUNCIATION COME)


TO EVENT RECORDER ( SOE/ SCADA )

TEED PROTECTION
RADHA
ACTIVE

START

TRIP

INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

RADSB
ACTIVE

START

TRIP

CLOSE INTERLOCK OF MAIN CB


CLOSE INTERLOCK OF TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CLOSE INTERLOCK OF MAIN CB


CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

TO DISTURBANCE RECORDER

INITIATE ALARM (ANNUNCIATION COME)


TO EVENT RECORDER ( SOE/ SCADA )

MAIN-1/ MAIN-2
OVER VOLTAGE STAGE-1
110% OF V
4 SECS FOR
FEEDER-1
5 SECS FOR
FEEDER-2

REL 521
ACTIVE

START

TRIP

INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB & TIE CB AUTO RECLOSURE
DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

DISPLAY

REL 316

110% OF V
ACTIVE START
4 SECS FOR
FEEDER-1
5 SECS FOR
FEEDER-2

TRIP

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END


CLOSE INTERLOCK OF MAIN CB & TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB 86-GR-a 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB & TIE CB AUTO RECLOSURE
DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

DISPLAY

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END


CLOSE INTERLOCK OF MAIN CB & TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

TO DISTURBANCE RECORDER

INITIATE ALARM (ANNUNCIATION COME)


TO EVENT RECORDER ( SOE/ SCADA )

OVER VOLTAGE STAGE-2


RXEG 21
ACTIVE

START

TRIP

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB & TIE CB AUTO RECLOSURE
DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END

120% OF V
20m SECS

DISPLAY

DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END


CLOSE INTERLOCK OF MAIN CB & TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2)
TO EVENT RECORDER ( SOE/ SCADA )

UNDER VOLTAGE RELAY


RXEG 21
ACTIVE

1O% OF V

START

TRIP

DISPLAY

LINE EARTH SWITCH CLOSE PERMISSION ONLY.

CARRIER TRIPPING SCHEMES(TELEPROTECTION)


DETAILS

PERMISSIVE TRIPPING

CHANNEL-1
SEND

MAIN-1 PROTECTION :
IT SENDS SIGNAL PARALLEL VIA
PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL &
PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE
CHANNEL..

CHANNEL-2
SEND

DIRECT TRIPPING

HERE CHANNEL-1 & CHANNEL-2 SIGNALS ARE MAIN & ALTERNATE CHANNEL
1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN.
2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN.
3. TIE CB OPEN CONDITION + 87 BUSBAR-1 OPERATED.
4. MAIN CB OPEN CONDITION + 87 BUSBAR-2 OPERATED
(FOR HALF DIA ONLY).
MAIN-2 PROTECTION :
5. MAIN CB 50 LBB/BFR OPERATED.
6. TIE CB 50 LBB/BFR OPERATED.
IT SENDS SIGNAL PARALLEL VIA
PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL &
7. 59L1 OVER VOLTAGE STAGE-1 OPERATED.
PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED.
9. 87 TEED-1 PROTECTION OPERATED
CHANNEL.
10. 87 TEED-2 PROTECTION OPERATED

CHANNEL-1
RECEIVE

MAIN-1 PROTECTION :
1. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB.
IT RECEIVES SIGNAL PARALLEL VIA
2. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB.
PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL &
PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE
CHANNEL.

CHANNEL-2
RECEIVE

MAIN-2 PROTECTION :
1. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB.
IT RECEIVES SIGNAL PARALLEL VIA
PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL &
2. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB.
PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE
CHANNEL.

CARRIER TRIPPING SCHEMES(TELEPROTECTION)

21 M1 REL 521
ABB Network Partner AG

REL531

DIRECT TRIP
SEND CH-1
MAIN CB 86-A
TIE CB 86-A

21 M2
REL 316
ABB Network Partner AG

2
3
4
5
6

10
11
12
13
14

7
8

15
16

CARRIER
PROTECTION
PANEL-1

CARRIER
PROTECTION
PANEL-1

PT SEND

PT SEND

PT RECEIVE

PT RECEIVE

PT SEND

PT SEND

PT RECEIVE

PT RECEIVE

DT SEND

DT SEND

DT RECEIVE

DT RECEIVE

ONE END
CARRIER
PROTECTION
PANEL-2

REC 316*4

OTHER END
CARRIER
PROTECTION
PANEL-2

PT SEND

PT SEND

PT RECEIVE

PT RECEIVE

ABB Network Partner AG

REL531

DIRECT TRIP
SEND CH-1
MAIN CB 86-A
TIE CB 86-A

21 M2
REL 316
ABB Network Partner AG

2
3
4
5
6

10
11
12
13
14

7
8

15
16

REC 316*4

PT SEND

PT SEND

DIRECT TRIP
SEND CH-2

PT RECEIVE

PT RECEIVE

DT SEND

DT SEND

MAIN CB 86-B

DT RECEIVE

DT RECEIVE

TIE CB 86-B

21 M1 REL 521

PT : PERMISSIVE PROTECTION TRANSFER TRIP


DT : DIRECT TRANSFER TRIP

DIRECT TRIP
SEND CH-2
MAIN CB 86-B
TIE CB 86-B

DIRECT TRANSFER TRIP


CHANNEL 1 / 2 RECEIVED
85 LO X1
ACTIVE

DIRECT TRIP
CHANNEL-1
RECEIVED

START

TRIP

INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

85 LO X2
ACTIVE

DIRECT TRIP
CHANNEL-2
RECEIVED.

INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

START

TRIP

CLOSE INTERLOCK OF MAIN CB


CLOSE INTERLOCK OF TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE

DISPLAY

CLOSE INTERLOCK OF MAIN CB


CLOSE INTERLOCK OF TIE CB

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)

TO DISTURBANCE RECORDER

INITIATE ALARM (ANNUNCIATION COME)


TO EVENT RECORDER ( SOE/ SCADA )

DIRECT TRIP CHANNEL-1


RECEIVED
SOTF PROTECTION
(INBUILT MAIN-1)
DEF,TOC, BOC, STUB
(INBUILT MAIN-1)
TEED-1 PROTECTION

86-GA
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

OVER VOLTAGE STAGE-1


( IN BUILT MAIN-2 )

86-GB
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

DIRECT TRIP CHANNEL-2


RECEIVED
SOTF PROTECTION
( IN BUILT MAIN-2 )
OVER VOLTAGE STAGE-2
DEF, TOC, BOC, STUB
( IN BUILT MAIN-2 )
MAIN LBB OPERATED
TIE LBB OPERATED
TEED-2 PROTECTION

86-GB
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

TRIP COIL -2

MAIN CB

OVER VOLTAGE STAGE-1


(INBUILT MAIN-1)

TIE CB

TRIP COIL-2

86-GA
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

TRIP COIL-1

TRIP COIL -1

86-GA & 86 GB MASTER TRIP / HIGH SPEED


TRIP LOCKOUT RELAY OPERATION

MASTER TRIP RELAYS


HIGH SPEED TRIP RELAYS
LOCKOUT RELAYS
PUSH BUTTON FOR RESETTING.

PUSH BUTTON FOR RESETTING.

TO CLOSING INTERLOCK OF CONCERNED BAY CB

86-GA
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

86-GB
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

TO INITIATE LBB/BFR OF CONCERNED BAY


BLOCK AUTO RECLOSURE OF CONCERNED BAY
TO TRIP COIL-1 CONCERNED BAY CB
TO TRIP COIL-2 CONCERNED BAY CB
INITIATE FLAG RELAY (FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2)
TO EVENT RECORDER ( SOE/ SCADA )

TO CLOSING INTERLOCK OF CONCERNED BAY CB


TO INITIATE LBB/BFR OF CONCERNED BAY
BLOCK AUTO RECLOSURE OF CONCERNED BAY
TO TRIP COIL-1 CONCERNED BAY CB
TO TRIP COIL-2 CONCERNED BAY CB
INITIATE FLAG RELAY (FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2)
TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
(DIFFERENCIAL & REF / 3-PH HZ DIFF PROTECTION)

RADSB

87 T
(LZ)

ACTIVE

START

TRIP

INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)
TO EVENT RECORDER ( SOE/ SCADA )

64 REF
OR

87 T
(HZ)

RADHD
ACTIVE

START

TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
( BACKUP DIRECTIONAL O/L & E/F PROTECTION FOR HV & LV)

RAPDK

67 HV
ABCN

ACTIVE

START

TRIP

INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)
TO EVENT RECORDER ( SOE/ SCADA )

RAPDK

67 LV
ABCN

ACTIVE

START

TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TRANSFORMER PROTECTION
( OVER FLUX PROTECTION FOR HV & LV)
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

RALK

99T HV

ACTIVE

START

INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

TRIP

INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)
TO EVENT RECORDER ( SOE/ SCADA )

RATUB

99T LV

ACTIVE

START

TRIP

INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

OVER VOLTAGE (LINE) AND OVER FLUX(TRANSFORMER )


PROTECTION TRIP SCHEME
86-A
MTR/
HSTR

ABB
O/V 1
O/V 2

86-A
MTR/
HSTR

ABB
RALK
O/F- HV
(BAY 2&3 / HV)

(BAY 1&2)

TRIP COIL-1
1-52CB
TRIP COIL-2
BUS-1
86-B
ABB
REL521
MTR/
MAIN-1
HSTR

TRIP COIL-1
2-52CB

TRIP COIL-1

TRIP COIL-2

TRIP COIL-2
BUS-2

3-52CB

(BAY 1&2)

ABB
O/V 1
O/V 2

OVER VOLTAGE STAGE-1 & STAGE-2


ARE IN BUILT FUNCTIONS OF MAIN-1
& MAIN-2 NUMERICAL RELAYS. IF
EXTERNAL RELAYS ARE UTILISED
THEN STAGE-1 IS GR-A & STAGE-2 IS
GR-B TRIPPING IS TO UTILISED.

86-A
MTR/
HSTR

86-B
MTR/
HSTR

86-B
MTR/
HSTR

TRIP COIL-2

86-B
MTR/
HSTR

LV - CB
(BAY LV)

ABB
RATUB
O/F- LV

TRIP COIL-1

86-A
MTR/
HSTR

TRANSFORMER PROTECTION
RXIG 21

51 O/L

ACTIVE

START

TRIP

INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)
TO EVENT RECORDER ( SOE/ SCADA )

RAEDK1

NDR

ACTIVE

START

TRIP

INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

MAIN LBB

INITIATION

INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)

86-GR-A
MASTER TRIP RELAY
86-GR-B
MASTER TRIP RELAY
96 BB
BUSBAR RELAY

RAICA
ACTIVE

START

TRIP

INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INTER TRIP TO 220KV LV MAIN CB
INTER TRIP TO 220KV LV TBC CB
CLOSE INTERLOCK OF MAIN CB & TIE CB

DISPLAY

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)

TO EVENT RECORDER ( SOE/ SCADA )

TIE LBB

INITIATION
1-PH TRIP RELAYS OF
MAIN-1 PROTECTION
OF LINE-1(BAY1)

1-PH TRIP RELAYS OF


MAIN-2 PROTECTION
OF LINE-1 (BAY1)

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )

RAICA
ACTIVE

START

TRIP

86-GR-B
MASTER TRIP RELAY

BLOCK MAIN CB OF BAY1 AUTO RECLOSURE


BLOCK TIE CB AUTO RECLOSURE
CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3
CLOSE INTERLOCK OF TIE CB

DISPLAY
86-GR-A
MASTER TRIP RELAY

INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES )

DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES


DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES

INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)


INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER (BAY1)
TO EVENT RECORDER ( SOE/ SCADA )

B/U O/C & E/F PROTN RLY


67 ABCN
INTER TRIP FROM LV SIDE
ICT TROUBLES GR-A
PROTECTION TRIP
ICT HV OVER FLUX RELAY

86-GA
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

RESTRICTED EARTH FAULT


RELAY 64 REF/T

86-GB
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

INTER TRIP FROM LV SIDE


ICT TROUBLES GR-B
PROTECTION TRIP
STUB RELAY 50ST
MAIN LBB OPERATED
TIE LBB OPERATED
ICT LV OVER FLUX RELAY
INTER TRIP FROM TBC LBB
& MANUAL TRIP OF 220KV

86-GB
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

TRIP COIL -2

MAIN CB

T/F DIFFERENTIAL RELAY


87 T

TIE CB

TRIP COIL-2

86-GA
MASTER
TRIP /
HIGH
SPEED
TRIP
RELAY

TRIP COIL-1

TRIP COIL -1

86-GA & 86 GB MASTER TRIP / HIGH SPEED


TRIP LOCKOUT RELAY OPERATION

AUTO TRANSFORMER INTER TRIP CIRCUITS


HV INTER TRIP CIRCUITS(TO LV)
FOR LV MASTER TRIP RELAY 86 GR-A
1.
TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP
GIVEN.
2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP
GIVEN.
3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED.
4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED
(FOR HALF DIA ONLY).
5. MAIN CB 50 LBB/BFR OPERATED.
6. TIE CB 50 LBB/BFR OPERATED.
7. 87 TEED-1 PROTECTION OPERATED
8. 87 TEED-2 PROTECTION OPERATED.
FOR LV MASTER TRIP RELAY 86 GR-B
1.
TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP
GIVEN.
2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP
GIVEN.
3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED.
4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED
(FOR HALF DIA ONLY).
5. MAIN CB 50 LBB/BFR OPERATED.
6. TIE CB 50 LBB/BFR OPERATED.
7. 87 TEED-1 PROTECTION OPERATED
8. 87 TEED-2 PROTECTION OPERATED.

LV INTER TRIP CIRCUIT(TO HV)

FOR HV M-CB MASTER TRIP RELAY 86 GR-A


1. LV CB REMOTE HAND TRIP GIVEN.
2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
OPERATED.
3. LV CB 50 LBB/BFR OPERATED.
FOR HV M-CB MASTER TRIP RELAY 86 GR-B
1. LV CB REMOTE HAND TRIP GIVEN.
2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
OPERATED.
3. LV CB 50 LBB/BFR OPERATED.
FOR HV T-CB MASTER TRIP RELAY 86 GR-A
1. LV CB REMOTE HAND TRIP GIVEN.
2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
OPERATED.
3. LV CB 50 LBB/BFR OPERATED.
FOR HV T-CB MASTER TRIP RELAY 86 GR-B
1. LV CB REMOTE HAND TRIP GIVEN.
2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
OPERATED.
3. LV CB 50 LBB/BFR OPERATED.

TRANSFORMER TROUBLES TRIPPING


GR-A
86 AX

OIL TEMP TRIP

TO 3PH GR-A 400KV MAIN CB


TO 3PH GR-A 400KV TIE CB

DIFF RELAY 87T

TO 3PH GR-A 220KV MAIN CB

BUCHHOLZ TRIP

TO 3PH GR-A 220KV TBC CB

OL RELAY 51OL
PRD-1 TRIP

HV O/L+E/F PROT 67
PRD-2 TRIP

NDR RELAY 151N

HV O/F RELAY 99T

86 AY

TRANSFORMER TROUBLES TRIPPING


GR-B
86 BX

OLTC BUCHHOLZ-R TRIP

TO 3PH GR-B 400KV MAIN CB


TO 3PH GR-B 400KV TIE CB

OLTC BUCHHOLZ-Y TRIP

REF RELAY 64REF

TO 3PH GR-B 220KV MAIN CB


TO 3PH GR-B 220KV TBC CB

OLTC BUCHHOLZ B TRIP

WNDG TEMP-HV TRIP

WNDG TEMP-LV TRIP

WNDG TEMP-IV TRIP

STUB RELAY 50ST

LV O/L+E/F PROT 67

LV O/F RELAY 99T

86 BY

TRIP COIL-1 CIRCUITS


TRIP COIL-1
186R1

186Y1

186B1

186R2

186Y2

186B2

286R1

286Y1

286B1

286R2

286Y2

286B2

186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2


ARE CB 1-PH TRIP UNIT OF GR-A. THESE
ARE SELF RESETING.
286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2
ARE CB 1-PH TRIP UNIT OF GR-B. THESE
ARE SELF RESETING.
THE BELOW ARE HAND RESETING.
86GR-A, 86GR-B ARE 3-PH TRIP UNITS.
96 BB IS BUSBAR TRIPPING RELAY

86GR-A

86GR-B

96BB

TRIP COIL 2 CIRCUITS


TRIP COIL-2
186R1

186Y1

186B1

186R2

186Y2

186B2

286R1

286Y1

286B1

286R2

286Y2

286B2

186R1, 186R2, 186Y1, 186Y2, 186B1, 186B2


ARE CB 1-PH TRIP UNIT OF GR-A. THESE
ARE SELF RESETING.
286R1, 286R2, 286Y1, 286Y2, 286B1, 286B2
ARE CB 1-PH TRIP UNIT OF GR-B. THESE
ARE SELF RESETING.
THE BELOW ARE HAND RESETING.
86GR-A, 86GR-B ARE 3-PH TRIP UNITS.
96 BB IS BUSBAR TRIPPING RELAY

86GR-A

86GR-B

96BB

ISOLATOR
INTERLOCKS

NOTE: All Earth Switches


in the Bay are towards
Circuit Breaker side only.
The Line and Transformer
Earth Switches are towards
Line & Transformer.
O: OPEN
C: CLOSE
A: ACTED

BB189E : BUSBAR-1 EARTH SWITCH .


BB289E : BUSBAR-2EARTH SWITCH .
UV RELAY: UNDER VOLTAGE RELAY.

S.NO

ISOLATOR
OPEN/CLOSE

EQUIPMENT-1

EQUIPMENT-2

EQUIPMENT-3

EQUIPMENT-4

INTERLOCKS REQUIRED FOR CONCERNED ISOLATOR / EARTH SWITCH OPEN OR CLOSE

BAY - 1
1

1 - 89

ISO

BB189 E

189 AE

189 E

152 CB

1 89 E

ES

189 A

189

--

--

1 89 A

ISO

189 AE

189 E

152 CB

--

1 89 AE

ES

189 A

189

--

--

1 89 L

ISO

189 LE

152 CB

252 CB

--

1 89 LE

ES

189 L

UV RELAY

--

--

2 89 A

ISO

289 BE

289 AE

252 CB

--

2 89 AE

ES

289 B

289 A

--

--

2 89 B

ISO

289 BE

289 AE

252 CB

--

10

2 89 BE

ES

289 B

289 A

--

--

11

3 89

ISO

BB289 E

389 AE

389 E

352 CB

12

3 89 E

ES

389 A

389

--

--

13

3 89 A

ISO

389 AE

389 E

352 CB

--

14

3 89 AE

ES

389 A

389

--

--

15

3 89 T

ISO

LV89 E2

389 TE

252 CB

352 CB

16

3 89 TE

ES

389 T

LV89 T

--

--

BAY - 2

BAY - 3

BB189E
1-89AE
1-89E
1-52CB
1-52CB
1-89AE
1-89E
1-52CB
1-89LE
2-52CB
1-89
1-89A
1-89
1-89A
1-89L
U/V RLY

ISOLATOR & CB INTERLOCKS

OPEN
OPEN
OPEN

& OPERATION

1-89

1-89E

OPEN

1-89AE

OPEN

2-89AE

OPEN
OPEN

& OPERATION

1-89A

3-89E
3-89AE

OPEN
OPEN
OPEN

2-89BE

& OPERATION

86GR-A

1-89L

86GR-B
96BB

OPEN
OPEN

&
&

86GR-A

OPERATION

1-89AE

86GR-A
86GR-B

OPEN
ACTED

1-89E

86GR-B

OPEN
OPEN

OPERATION

&

OPERATION

1-89LE

96BB

2-89A
2-52CB
2-89AE
2-89BE

OPEN
OPEN
OPEN

2-89B

& OPERATION
2-89A

2-89A
2-89B

CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE

OPEN
LOCAL
CLOSE

& 1-52CB

RESET

& 2-52CB

REMOTE
CLOSE

& 1-52CB
REMOTE
CLOSE

& 2-52CB

RESET

OPEN
OPEN
OPEN
OPEN

&

REMOTE
CLOSE

OPEN
3-89A

OPERATION

&

& OPERATION
2-89BE

OPEN
OPEN
OPEN

3-89T

OPERATION

OPEN

&

OPEN
OPEN

3-89E

3-89AE

3-52CB

& OPERATION
2-89AE

OPEN
OPEN

& 3-52CB

RESET
RESET

&

LOCAL
CLOSE

RESET
RESET

3-89

OPERATION

LOCAL
CLOSE

RESET
RESET

OPEN

3-89TE

OPERATION

OPERATION

OPERATION

2-52CB
2-89AE
2-89BE

&
&
&

BB289E
3-89AE
3-89E
3-52CB
3-52CB
3-89AE
3-89E
3-52CB
3-89TE
2-52CB
LV89E2

OPEN
OPEN

3-89
3-89A

OPEN
OPEN
OPEN
OPEN

3-89
3-89A
3-89T
LV89T

OPEN
OPEN
OPEN

& OPERATION
2-89B

CLOSING INTERLOCK OF MAIN & TIE CB


96 BB

86 GR-A

86 GR-B
+ VE
T N C
CB REMOTE CLOSE
MAIN CB

21M1 AR

21M2 AR

86 GR-A

86 GR-B
+ VE
T N C

TIE

AR

TIE CB

CB REMOTE CLOSE

ADVANTAGES & DISADVANTAGES OF ONE & HALF BREAKER SYSTEM


A.
1.
2.
3.
4.
5.
6.
7.
8.

B.
1.
2.
3.
4.

ADVANTAGES:

THREE CIRCUIT BREAKERS IN A FULL DIA ARE ALWAYS IN CLOSED POSITION.


IF MAIN CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD
THE FEEDER IS FEEDING FROM TIE CB & OTHER BUS . NEED NOT REQUIRE
TRANSFER THE FEEDER.
IF TIE CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD
THE FEEDER IS FEEDING FROM MAIN CB & CONNECTED BUS.
EVEN IF BOTH MAIN BREAKERS UNDER TROUBLE, DURING THAT PERIOD ONE
FEEDER WORKS AS INCOMING AND OTHER FEEDER WORKS AS OUTGOING VIA
TIE CB. (WITHOUT INTERUPTION TO FEEDERS)
IF BUSBAR-1 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN
BREAKERS CONNECTED TO BUSBAR-1 WILL TRIP. DURING THAT PERIOD THE
FEEDERS CONNECTED TO BUS-1 ARE FEEDING VIA TIE CB FROM BUS-2.
IF BUSBAR-2 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN
BREAKERS CONNECTED TO BUSBAR-2 WILL TRIP. DURING THAT PERIOD THE
FEEDERS CONNECTED TO BUS-2 ARE FEEDING VIA TIE CB FROM BUS-1.
IN THIS BUSBAR PROTECTION IS SIMPLE AND NEED NOT REQUIRE SELECTION
OF ISOLATOR.
IT IS MORE RELIABLE SYSTEM FOR OPERATION & MAINTANENCE POINT OF
VIEW.

DISADVANTAGES

CT CONNECTIONS & PROTECTION


TRIP LOGICS ARE SOME WHAT
COMPLICATED. COMPLEX CONTROL & PROTECTION PHILOSOPHY
COST TOWARDS CTs, CIRCUIT BREAKERS & PANELS ARE TO BE INCREASED DUE
TO EXTRA BAY. THE COST COMPARISION TABLE SHOWN IN NEXT
PRESENTATION.
THE OPERATIONS FOR OPERATOR POINT OF VIEW IS LITTLE BIT COMPLICATED
WHEN COMPARED TO CONVENTIONAL SYSTEM.
SPACE OCUPATION FOR BAY IS MORE i.e COST OF LAND IS INCREASE.

COST COMPARISION BETWEEN CONVENTIONAL SYSTEM


& ONE AND HALF BREAKER SYSTEM FOR FEEDER
S.No

EQUIPMENT

CONVENTIONAL
SYSTEM

1.

CIRCUIT
BREAKERS

1 No

CURRENT
TRANSFORMERS
2.

3 CT METHOD

ONE & HALF BREAKER SYSTEM


FULL DIA
(FOR 2 FEEDERS)

% INCREASE
IN COST

3 Nos

50%

HALF DIA
% INCREASE
(FOR 1 FEEDER)
IN COST
2 Nos

100%

INCLUDES THE COST OF CT MARSHELLING BOXES.


3 Sets

50%

2 Sets

100%

4 Sets

100%

2 Sets

100%

5 CT METHOD

5 Sets

125%

3 Sets

200%

6 CT METHOD

6 Sets

200%

3 Sets

200%

3 SETS

30%

2 SETS

30%

4 CT METHOD

1 Set

I SET

3.

CONTROL &
RELAY PANELS

4.

BAY
MARSHALLING
BOXES

1 No

3 Nos

50%

2 Nos

30%

5.

CONTROL
CABLES

8 KM

30 KM

100%

20 KM

150%

NORMALLY EXTRA PANEL IS TIE BAY PANEL. IT IS ARROUND 30% COST OF MAIN
PANEL. BECAUSE IT IS NOT HAVING PROTECTION RELAYS( M-1 & M-2 AND OTHER
RELAYS) . ONLY TIE CB TRIPPING RELAYS & ASSOCIATED RELAYS(A/R +LBB).

OTHER
INFORMATION
REGARDING
RELAYS AND
TESTING
EQUIPMENT
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)

ABB RELAYS
ABB Network Partner AG

REL 521

ABB Network Partner AG

REL 316*4

ABB Network Partner AG

10

11

12

13

14

15

16

C
E

EE

ABB Relays
ABB Network Partner AG

REL 512

c
E

ALSTOM RELAYS

P445

P443

P437

E-PAC

P442

GE MULTILIN
RELAYS

SIEMENS
RELAYS

SEL RELAYS
ENABLED
TARGET
RESET

TRIP

IA =250.10 A
IB =250.10 A
IC =250.10 A
VAB =400.0 KV
VBC =400.0 KV
VCA =400.0 KV
ESC

ENT

INST TIME COMM SOTF

INST
TIME
COMM
SOTF
ZONE 1
ZONE 2
ZONE 3
ZONE 4

PH - A
PH - B
PH - C
GND
50
51
79 RESET
79 LOCKOUT

2ENABLED
3

ZONE

TRIP
EN

FAULT TYPE

TARGET TARGET FAULT SET


RESET NO /
YES /
CANCEL SELECT

51

MC
ENABLED

COMM
ENABLED

RECLOSE
ENABLED

ALT
SETTINGS

CB
CLOSED

RELAY
TEST

CB
OPEN

SEL- 321- 5 - 2

TARGET
RESET

TRIP

SPT
ENABLED

PROTECTION
AUTOMATION
CONTROL

50
O/C

METER STATUS OTHER GROUP


EXIT

SEL

SEL- 421
PROTECTION
AUTOMATION
CONTROL

SEL

VA TECH REYROLLE RELAYS

NXT PHASE RELAYS

RELAY HARDWARE
16 / 32 BIT

PC
MODEM

IRIG-B
RE/CC

NORMALLY
400KV
RELAYS
SUPPLIED
WITH
CONFIGUARATION/HARDWARE
1. MIN 4Nos MAX 8Nos COMMAND/TRIP OUTPUTS
2. MIN 24Nos SIGNAL OUTPUTS
3. MIN 14 LED INDICATIONS
4. MIN 24 BINARY INPUTS

FOLLOWING

RELAY SIGNAL DATA FLOW

FUNCTIONS AVAILABLE NUMERICAL DISTANCE RELAYS


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

4 TO 6 SETTING IMPEDENCE ZONES WITH 4 TO 6 SETTING GROUPS (21 + 21N).


DIR / INST / TIME OVERCURRENT & EARTH FAULT FUNCTION( 50 / 51 / 67 P+G).
EIGHT COMMUNICATION SCHEMES.
SWITCH ON TO FAULT PROTECTION(21 SOTF).
PHASE SELECTION(R,Y,B).
POWER SWING BLOCKING(PSB)(68 + 68T).
FUSE FAILURE SUPERVISION(PT FFR).
AUTO RECLOSER WITH CHECK SYNCHRNISATION & VOLTAGE CHECK(79 + 25 +86).
WEEK END INFEED LOGIC(27 WI).
SYSTEM SUPERVISION.
STUB PROTECTION(STUB).
OVER VOLTAGE/ UNDER VOLTAGE FUNCTION(27+ 59).
LBB/BFR FUNCTION(50 BF).
DISTANCE TO FAULT LOCATOR(21 FL).(SHOWS IN 1. %, 2. KM 3. MILES & 4. R+JX )
16 PROGRAMABLE SIGNALLING RELAYS WITH LEDs.
RECORDABLE 10Nos LATEST DISTRUBANCES WITH BASIC EVALUATION
DISTURBANCE RECORDER.
EVENT RECORDER RELATED TO RELAY EVENTS.
PRE-FAULT, FAULT & POST-FAULT VALUES OF ANALOG POINTS WITH IMPEDENCE
DETAILS.
USER CAN BE CONFIGUARED PROGRAMABLE LOGIC FUNCTIONS.
TELE / CARRIER INTER TRIPPING SCHEMES(85 +21)(PUTT, POTT).
TRIP CIRCUIT MONITORING(74 TC).
METERING FUNCTION (INSTANTANEOUS VALUES DISPLAY FUNCTION).
4 QUADRANT ENERGY METER FUNCTION (KWH,KVAH,KVARH)(KYZ PULSE OUTPUT).
MINIMUM 8 COMMOND/ TRIP RELAYS, 24 SIGNAL RELAYS
MINIMUM 20 BINARY INPUTS, 14 LEDs

DISTANCE RELAYS CHARACTERESTICS


( MHO CIRCULAR )

DISTANCE RELAYS CHARACTERESTICS


( QUADRILATERAL-1 )

DISTANCE RELAYS CHARACTERESTICS


( QUADRILATERAL-2 )

DISTANCE RELAYS CHARACTERESTICS


( BULLET )

DISTANCE RELAYS CHARACTERESTICS


( TRIANGLER )

DISTANCE RELAYS CHARACTERESTICS


( LENS / OPTICAL )

DISTANCE RELAYS CHARACTERESTICS


( TOMATO )

RELAY MODELS OF LINE (DISTANCE) & TRANSFORMER( M & B ) OF DIFFERENT MANUFACTURERS


MANUFACTURERS

TRANSMISSION LINE PROTECTION


CURVES

MAIN-2
REL 316
REL 512
MICOM P437
E-PAC 3000,
OPTIMHO

CURVES

T/F PROTECTION

ET

DIFFERENTIAL
RET 521 / 670
RET 316

DIR O/L,E/F
REL 505
REX 521

QUAD
/
MHO

MICOM P633
KBCH/ MBCH

MICOM P141
MICOM P127

AREVA
(ALSTOM)

MAIN-1
REL 521
REL 670
MICOM
P443/P444/
P442/P445

SIEMENS
( SIPROTEC )

SIPROTEC
7SA62/3

QUAD/
MHO

SIPROTEC
7SA522

QUAD
/
MHO

7UT 613/ 2
7UT 513/ 2

7SJ 62/3/4/5
7SJ 52/3/4/5

SEL

SEL 421

QUAD/
MHO

SEL 321
SEL 311C

QUAD
/
MHO

SEL 387

SEL 351

GE
MULTILIN

D-60,
ALPS

QUAD/
MHO

L-60/L-90
D-30

QUAD
/
MHO

T-35 / T-60
SR 7465

F-60
SR 750/60

EASUN
REYROLL

THR 4 PE 24

MHO

THR 4 PE 16
THR 3 PE 18

MHO

---

MIT

NXT
PHASE

L-PRO

QUAD/
MHO

L-PRO

LENS/
TOMAT0

T-PRO

F-PRO

VA TECH
REYROLL

OHMEGA 402

QUAD/
MHO

OHMEGA 311/308

QUAD/
MHO

DUOBIAS M

ARGUS

ABB

QUAD

QUAD/
MHO

QUAD
/BULL

RELAY TESTING EQUIPMENTS


1. PROGRAMA_GE (MODEL: FREEJA-300)
3. OMICRON (MODEL: CMC 256-6)

2. MANTA TEST SYSTEMS (MODEL: MTS 4000)


4. DOBLE ( MODEL: F 6150)

RELAY TESTING EQUIPMENTS


1. MEEGER_AVO (MODEL: MPRT 8430)
3. KOCOS (MODEL: ARTES 440 II)

2. RES (MODEL: APTS 3)


4. EURO SMC ( MODEL: TRES)

400KV SUBSTATIONS IN APTRANSCO


S.No
1.

400KV SUBSTATION
MAMIDIPALLY (HYDERABAD)

2.

NURNOOR (KURNOOL)

3.

KALAPAKA (VISHAKHAPATNAM)

4.

VEMAGIRI (RAJHAMUNDRY)

5.

VELTUR (MB NAGAR)

CAPACITY

FEEDERS

(2 + 1**) X
315 MVA
(2 + 1**) X
315 MVA
2 X 315 MVA

1. SRISAILAM 1&2
2. GHANAPUR (PGCIL)

3. KHAMMAM 1&2(PGCIL)
4. YEDDUMAILARAM 1&2**

1. SRISAILAM
2. GHANAPUR (PGCIL)

3. GOOTY (PGCIL)
4. NARASARAOPETA**

1. SIMHADRI 1,2,3&4 (NTPC)


2. GAJUWAKA 1&2 (PGCIL)

3. KHAMMAM 1&2 (PGCIL)


4. VEMAGIRI 1&2

2 X 315 MVA

1. KALAPAKA 1&2
2. GAJUWAKA 1&2 (PGCIL)*
3. NUNNA 1&2 (PGCIL)*
4. GUNTUR 1&2*

5. GVK EXTN 1&2 (IPP)


6. GOWTHAMI 1&2 (IPP)
7. KONASEEMA 1&2 (IPP)
8. GMR VASAVI 1&2 (IPP)

1. TALLAPALLY

2. RAICHUR

1. CHENNAI RED HILLS

2. KADAPA

6.

CHITTOR(VEPANJIR)

7.

NELLORE(MANUBOLU)

(1 + 2**) X
315 MVA
(1 + 1**) X
315 MVA
2 X 315 MVA

8.

DICHPALLY* (NIZAMABAD)

2 X 315 MVA

1. RAMAGUNDAM

9.

GAJWEL* (MEDAK)

2 X 315 MVA

1. RAMAGUNDAM
3. BTPS 1&2**

2. GHANAPUR
4. YEDDUMAILARAM 1&2**

10.

NARASARAOPETA* (GUNTUR)

2 X 315 MVA

1. SRISAILAM 1&2
2. NUNNA 1&2

3. VEMAGIRI 1&2
4. KURNOOL**

11.

MALKARAM** (SECUNDRABAD)

2 X 315 MVA

1. RAMAGUNDAM
2. NAKEREKALLU 1&2**

2. GHANAPUR

12.

YEDDUMAILARAM** (RR, SHANKARPALLY)

3 X 315 MVA

1. GAJWEL 1&2

2. MAMIDIPALLY 1&2

13.

NAKEREKALLU** (NALGONDA)

2 X 315 MVA

1. VTPS 1&2

2. MALKARAM 1&2

400KV SUBSTATIONS OF PGCIL IN AP


S.No

400KV SUBSTATION

1.

RAMAGUNDAM(NTPC)

2.

GHANAPUR (HYDERABAD)

3.

GAJUWAKA (VISHAKHAPATNAM)

4.

NUNNA (VIJAYAWADA)

5.

TALLAPALLY
(NAGARJUNA SAGAR)

6.

BUDIDAMPADU (KHAMMAM)

7.

GOOTY

8.

CHINAKAMPALLY

9.

NELLORE(MANUBOLU)

10.

MULUGU* (WARANGAL)

CAPACITY
2 X 200 MVA
2 X 250 MVA
1 X 315 MVA
3 X 315 MVA
(1 + 1*) X
315 MVA
(1 + 1*) X
315 MVA
3 X 315 MVA
(1 + 1*) X
315 MVA
(1 + 1**) X
315 MVA
(1 + 1**) X
315 MVA
2 X 315 MVA

FEEDERS
1. GHANAPUR 1&2
2. GAJWEL(GHNP3)
3. MALKARAM(GHNP4)

4. TALLAPALLY 1&2
5. DICHPALLY*
6. KHAMMAM (WRNGL)
7. CHANDRAPUR 1&2

1. RAMAGUNDAM 1&2
2. MAMIDIPALLY
3. GAJWEL(RMGNDM3)

4. NAGARJUNA SAGAR
5. KURNOOL
6. MALKARAM(RMGNDM4)

1. NUNNA
2. KALAPAKA1&2

3. VEMAGIRI 1&2
4. JAIPUR(HVDC)

1. GAJUWAKA
2. SRISAILAM 1&2(NRSPT)
3. VEMAGIRI 1&2

4. VEMAGIRI 3&4(VTPS)
5. KHAMMAM
6. NELLORE 1&2

1. RAMAGUNDAM 1&2
2. GHANAPUR
3. MAHABOOBNAGAR

4. GOOTY
5. CHINAKAMPALLY 1&2

1. RAMAGUNDAM (WRGL)
2. NUNNA

4. MAMIDIPALLY 1&2
5. KALAPAKA 1&2

1. TALLAPALLY
2. SOMANAHALLY
3. KURNOOL

4. NEELAMANGALA
5. RAICHUR 1&2*

1. TALLAPALLY 1&2
2. SOMANAHALLY

3. KOLAR
4. CHITTOR

1. NUNNA 1&2

2. CHENNAI(ALAMATHI)
1&2

1. RAMAGUNDAM
2. KHAMMAM

3. BTPS(KTPS) 1&2

1. AT RAMAGUNDAM 1NO 315 MVA TRANSFORMER IS TO BE REMOVED AND DICHPALLY FEEDER IS PLANNED TO CONNECT.
2. RAMAGUNDAM TO GHANAPUR CKT-1 IS PROPOSED TO TAKE LILO AT GAJWEL (APTRANSCO) SS.
3. RAMAGUNDAM TO GHANAPUR CKT-2 IS PROPOSED TO TAKE LILO AT MALKARAM (APTRANSCO) SS.
4. GAJUWAKA TO NUNNA CKT-2&3 IS PROPOSED TO TAKE LILO AT VEMAGIRI (APTRANSCO) SS.
5. RAMAGUNDAM TO KHAMMAM CKT IS PROPOSED TO TAKE LILO AT WARANGAL SS.

400KV NETWORK IN AP

GUNTUR
NELLORE

ALAMETHI
/ CHENNAI

NKRKL

SRISAILAM

KURNOOL

CHITTOR

GOOTY

RAICHUR
MAMIDIPALLY

CHINAKAMPALLY

CHENNAI

KHAMMAM

CHANDRAPUR
(MAHARASTRA)

KOLAR

VTPS

YEDDUMAILARAM

NUNNA

GHANAPUR

BANGALORE

IPP2

VEMAGIRI

MBNGR

IPP1

TALLAPALLY

BANGALORE

IPP4

DICHPALLY

MALKARAM

IPP3

BTPS

GAJWEL

KALAPAKA

WARANGAL

HVDC

JAIPUR

RAMAGUNDAM

SIMHADRI

GAJUWAKA

VEMAGIRI SUBSTATION DISPLAY


NUNNA I
(PGCIL)

315MVA,
400/220KV
AUTO
TRANSFORMER-I

NUNNA II GAJUWAKA I GAJUWAKA II


(PGCIL)
(PGCIL)
(PGCIL)

315MVA,
400/220KV
AUTO
TRANSFORMER-II

GUNTUR I

GUNTUR II

KALAPAKA I KALAPAKA II GOWTHAMI I GOWTHAMI II FUTURE I


PHES

KOPCL II
VPGCL I
VPGCL II KOPCL I
GMR VASAVI GMR VASAVI KONASEEMA KONASEEMA