Notice: Intent to Prepare Environmental Impact Statement:
408 Permission and 404 Permit to Three Rivers Levee Improvement Authority; Feather River Levee Repair Project, California, 11097 [E8-3919] Engineers Corps
Titre original
Notice: Intent to Prepare Environmental Impact Statement: 408 Permission and 404 Permit to Three Rivers Levee Improvement Authority; Feather River Levee Repair Project, California
Notice: Intent to Prepare Environmental Impact Statement:
408 Permission and 404 Permit to Three Rivers Levee Improvement Authority; Feather River Levee Repair Project, California, 11097 [E8-3919] Engineers Corps
Droits d'auteur :
Public Domain
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
Notice: Intent to Prepare Environmental Impact Statement:
408 Permission and 404 Permit to Three Rivers Levee Improvement Authority; Feather River Levee Repair Project, California, 11097 [E8-3919] Engineers Corps
Droits d'auteur :
Public Domain
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
DEPARTMENT OF DEFENSE constructed by TRLIA to improve flood DEPARTMENT OF DEFENSE
protection to portions of Yuba County Department of the Army; Army Corps and Reclamation District (RD) 784. Department of the Army; Army Corps of Engineers of Engineers 2. Alternatives. The EIS will address Notice of Intent To Prepare an an array of flood control improvement Notice of Intent To Prepare an Environmental Impact Statement for alternatives along Segment 2. Environmental Impact Statement for 408 Permission and 404 Permit to Alternatives analyzed during the the American River Common Features Three Rivers Levee Improvement investigation will include a combination General Reevaluation Report, Authority for the Feather River Levee of one or more flood protection Sacramento, CA Repair Project, California, Segment 2 measures. These measures include AGENCY: Department of the Army, U.S. AGENCY: Department of the Army, U.S. seepage berms, stability berms, setback Army Corps of Engineers; DOD. Army Corps of Engineers, DoD. levees, seepage cutoff walls, and ACTION: Notice of intent. relocation of a pump station. ACTION: Notice of intent. 3. Scoping Process. a. The Corps has SUMMARY: The action being taken is the SUMMARY: The action being taken is the initiated a process to involve concerned preparation of an environmental impact preparation of an Environmental Impact individuals, and local, State, and statement (EIS) for the American River Statement (EIS) for the issuance of both Federal agencies. A public scoping Common Features General Reevaluation the 408 permission to the Central Valley meeting will be held on March 10, 2008 Report (GRR). The Common Features Flood Protection Board and 404 Permit Project GRR will re-evaluate the to present information to the public and to Three Rivers Levee Improvement currently authorized plan as well as to receive comments from the public. Authority (TRLIA) for their work on the develop and evaluate other viable Feather River Levee Repair Project b. Significant issues to be analyzed in alternatives, including a locally- (FRLRP). Under 33 U.S.C. 408, the Chief depth in the EIS include effects on preferred plan, with the goal of of Engineers grants permission to alter hydraulic, wetlands and other waters of identifying a comprehensive plan that an existing flood control structure if it the U.S., vegetation and wildlife will lower the risk of flooding in and is not injurious to the public interest resources, special-status species, around the City of Sacramento. The and does not impair the usefulness of cultural resources, land use, fisheries, Common Features Project GRR is such work. Under section 404 of the water quality, air quality, transportation, located in Sacramento, Sutter and Yolo Clean Water Act, the District Engineer and socioeconomics; and cumulative Counties, CA. permits the discharge of dredged or fill effects of related projects in the study DATES: A series of public scoping material into waters of the United States area. meetings will be held as follows: if the discharge meets the requirements 1. March 5, 2008, 5 to 7 p.m. at The c. The Corps is consulting with the of the Environmental Protection Elk’s Lodge. Agency’s 404(b)(1) guidelines and is not State Historic Preservation Officer to comply with the National Historic 2. March 6, 2008, 5 to 7 p.m. at Arden contrary to the public interest. The Park Community Center, Room A. FRLRP is located in Yuba County, CA. Preservation Act, and the National 3. March 10, 2008, 3 to 6 p.m. at The TRLIA is requesting this permission and Marine Fisheries Service and the U.S. Library Galleria East Meeting Room. permit in order to complete Fish and Wildlife Service to comply 4. March 13, 2008, 5 to 7 p.m. at The construction along the east levee of the with the Endangered Species Act. Sierra Health Foundation. Feather River. Coordination with the National Marine Send written comments by April 11, DATES: A public scoping meeting will be Fisheries Service has been completed; 2008 to the address below. held March 10, 2008, 6:30 to 8:30 at the coordination with U.S. Fish and ADDRESSES: Written comments and Yuba County Government Center, 915 Wildlife Service is still ongoing. suggestions concerning this study may 8th Street, Marysville, CA. Send written d. A 45-day public review period will be submitted to Ms. Elizabeth Holland, comments by April 9, 2008 to the be provided for individuals and U.S. Army Corps of Engineers, address below. agencies to review and comment on the Sacramento District, Attn: Planning ADDRESSES: Send written comments and draft EIS. All interested parties are Division (CESPK–PD–R), 1325 J Street, suggestions concerning this study to Mr. encouraged to respond to this notice Sacramento, CA 95814. Requests to be John Suazo, U.S. Army Corps of and provide a current address if they placed on the mailing list should also be Engineers, Sacramento District, Attn: wish to be notified of the draft EIS sent to this address. The location of the Planning Division (CESPK–PD–R), 1325 circulation. public meetings is as follows; The Elks J Street, Sacramento, CA 95814. Lodge, 6446 Riverside Blvd., Requests to be placed on the mailing list 4. Availability. The draft EIS is Sacramento, CA; Arden Park should also be sent to this address. scheduled to be available for public Community Center, 1000 La Sierra FOR FURTHER INFORMATION CONTACT: review and comment in early 2008. Drive, Sacramento, CA; Library Galleria, Questions about the proposed action Dated: February 22, 2008. 828 ‘‘I’’ Street, Sacramento, CA; and and EIS should be addressed to John Thomas C. Chapman, Sierra Health Foundation, 1321 Garden Suazo at (916) 557–6719, e-mail: Highway, Sacramento, CA. COL, EN, Commanding. john.suazo@usace.army.mil or by mail FOR FURTHER INFORMATION CONTACT: [FR Doc. E8–3919 Filed 2–28–08; 8:45 am] to (see ADDRESSES). Questions about the proposed action BILLING CODE 3710–EZ–P SUPPLEMENTARY INFORMATION: and EIS should be addressed to Liz 1. Proposed Action. The U.S. Army Holland at (916) 557–6763, e-mail rwilkins on PROD1PC63 with NOTICES
Corps of Engineers is preparing an EIS Elizabeth.g.holland@usace.army.mil or
to analyze the impacts of the work by mail to (see ADDRESSES). proposed by TRLIA from the SUPPLEMENTARY INFORMATION: implementation of the FRLRP, Segment 1. Proposed Action. The U.S. Army 2. The FRLRP, Segment 2 is being Corps of Engineers is preparing an EIS
VerDate Aug<31>2005 19:22 Feb 28, 2008 Jkt 214001 PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:\FR\FM\29FEN1.SGM 29FEN1