7726 Federal Register / Vol. 73, No.

28 / Monday, February 11, 2008 / Notices

The reporting burden includes the with the Commission and is available average annual generation of 26
total time, effort, or financial resources for public inspection: gigawatt-hours.
expended to generate, maintain, retain, a. Type of Application: Preliminary l. This filing is available for review at
disclose, or provide the information Permit. the Commission in the Public Reference
including: (1) Reviewing instructions; b. Project No.: 12944–000. Room or may be viewed on the
(2) developing, acquiring, installing, c. Date filed: August 8, 2007. Commission’s Web site at http://
using technology and systems for the d. Applicant: Morgantown Hydro, www.ferc.gov using the ‘‘eLibrary’’ link.
purposes of collecting, validating, LLC. Enter the docket number excluding the
verifying, processing, maintaining, e. Name of Project: Morgantown Lock last three digits in the docket number
disclosing and providing information; and Dam Hydroelectric Project. field to access the document. For
(3) adjusting the existing ways to f. Location: Monongahela River in assistance, call toll-free 1–866–208–
comply with any previously applicable Monongalia County, West Virginia. It 3676 or e-mail
filing instructions and requirements; (4) would use the U.S. Army Corps of FERCONLINESUPPORT@FERC.GOV.
training personnel to respond to a Engineers’ Morgantown Lock and Dam. For TTY, call (202) 502–8659. A copy is
collection of information; (5) searching g. Filed Pursuant to: Federal Power also available for inspection and
data sources; (6) completing and Act, 16 U.S.C. 791(a)–825(r). reproduction at the address in item h
reviewing the collection of information; h. Applicant Contact: Mr. Brent L. above.
and (7) transmitting, or otherwise m. Competing Preliminary Permit—
Smith, COO, Symbiotics, LLC, P.O. Box
disclosing the information. Anyone desiring to file a competing
535, Rigby, ID 83442, (208) 745–0834.
The cost estimate for respondents is application for preliminary permit for a
i. FERC Contact: Robert Bell, (202)
based upon salaries for professional and proposed project must submit the
502–4126.
clerical support, as well as direct and competing application itself, or a notice
j. Deadline for filing comments,
indirect overhead costs. Direct costs of intent to file such an application, to
protests, and motions to intervene: 60
include all costs directly attributable to the Commission on or before the
days from the issuance date of this specified comment date for the
providing this information, such as notice.
administrative costs and the cost for particular application (see 18 CFR 4.36).
All documents (original and eight Submission of a timely notice of intent
information technology. Indirect or copies) should be filed with: Kimberly
overhead costs are costs incurred by an allows an interested person to file the
D. Bose, Secretary, Federal Energy competing preliminary permit
organization in support of its mission. Regulatory Commission, 888 First
These costs apply to activities which application no later than 30 days after
Street, NE., Washington, DC 20426. the specified comment date for the
benefit the whole organization rather Comments, protests, and interventions particular application. A competing
than any one particular function or may be filed electronically via the preliminary permit application must
activity. Internet in lieu of paper; see 18 CFR conform with 18 CFR 4.30 and 4.36.
Comments are invited on: (1) The 385.2001(a)(1)(iii) and the instructions n. Competing Development
accuracy of the agency’s burden on the Commission’s Web site under the Application—Any qualified
estimate of the proposed information ‘‘e-Filing’’ link. The Commission development applicant desiring to file a
collection, including the validity of the strongly encourages electronic filings. competing development application
methodology and assumptions used to Please include the project number (P– must submit to the Commission, on or
calculate the reporting burden; (2) ways 12944–000) on any comments or before a specified comment date for the
to enhance the quality, utility and motions filed. particular application, either a
clarity of the information to be The Commission’s Rules of Practice competing development application or a
collected; and (3) the proposal to and Procedure require all intervenors notice of intent to file such an
provide the option to collect FERC Form filing documents with the Commission application. Submission of a timely
561 electronically by late 2007, as to serve a copy of that document on notice of intent to file a development
proposed under RM07–16–000 and any each person in the official service list application allows an interested person
reduction in burden that option might for the project. Further, if an intervenor to file the competing application no
allow filers. files comments or documents with the later than 120 days after the specified
Kimberly D. Bose, Commission relating to the merits of an comment date for the particular
Secretary.
issue that may affect the responsibilities application. A competing license
of a particular resource agency, they application must conform with 18 CFR
[FR Doc. E8–2410 Filed 2–8–08; 8:45 am]
must also serve a copy of the document 4.30 and 4.36.
BILLING CODE 6717–01–P
on that resource agency. o. Notice of Intent—A notice of intent
k. Description of Project: The must specify the exact name, business
proposed project using the U.S. Army address, and telephone number of the
DEPARTMENT OF ENERGY
Corps of Engineers’ Morgantown Lock prospective applicant, and must include
Federal Energy Regulatory and Dam and operated in a run-of-river an unequivocal statement of intent to
Commission mode would consist of: (1) A new submit, if such an application may be
powerhouse and switchyard; (2) two filed, either a preliminary permit
turbine/generator units with a combined application or a development
[Project No. 12944–000]
installed capacity of 9 megawatts; (3) a application (specify which type of
Morgantown Hydro, LLC; Notice of new 13-mile-long above-ground 25- application). A notice of intent must be
Application Accepted for Filing and kilovolt transmission line extending served on the applicant(s) named in this
Soliciting Motions To Intervene, from the switchyard to an public notice.
rwilkins on PROD1PC63 with NOTICES

Protests, and Comments interconnection point with p. Proposed Scope of Studies Under
Monongahela Power Company’s Permit—A preliminary permit, if issued,
February 4, 2008. distribution system; and (4) appurtenant does not authorize construction. The
Take notice that the following facilities. The proposed Morgantown term of the proposed preliminary permit
hydroelectric application has been filed Lock and Dam Project would have an would be 36 months. The work

VerDate Aug<31>2005 16:44 Feb 08, 2008 Jkt 214001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1
Federal Register / Vol. 73, No. 28 / Monday, February 11, 2008 / Notices 7727

proposed under the preliminary permit DEPARTMENT OF ENERGY Irrigation District and the San Joaquin
would include economic analysis, Irrigation District’s Goodwin Dam and
preparation of preliminary engineering Federal Energy Regulatory operated in a run-of-river mode would
plans, and a study of environmental Commission consist of: (1) A new 300-foot-long, 120-
impacts. Based on the results of these [Project No. 12946–000] inch-diameter steel penstock; (2) a new
studies, the Applicant would decide powerhouse and switchyard; (3) two
whether to proceed with the preparation Goodwin Hydro, LLC; Notice of turbine/generator units with a combined
of a development application to Application Accepted for Filing and installed capacity of 5 megawatts; (4) a
construct and operate the project. Soliciting Motions To Intervene, new 3-mile-long above ground 15-
q. Comments, Protests, or Motions to Protests, and Comments kilovolt transmission line extending
Intervene—Anyone may submit from the switchyard to an
comments, a protest, or a motion to February 4, 2008. interconnection point with the
intervene in accordance with the Take notice that the following Tuolumne County Public Power
requirements of Rules of Practice and hydroelectric application has been filed Agency’s distribution system; and (5)
Procedure, 18 CFR 385.210, .211, .214. with the Commission and is available appurtenant facilities. The proposed
In determining the appropriate action to for public inspection: Goodwin Dam Project would have an
take, the Commission will consider all a. Type of Application: Preliminary average annual generation of 22
protests or other comments filed, but Permit. gigawatt-hours.
only those who file a motion to b. Project No.: 12946–000. l. This filing is available for review at
c. Date filed: August 8, 2007. the Commission in the Public Reference
intervene in accordance with the
d. Applicant: Goodwin Hydro, LLC.
Commission’s Rules may become a Room or may be viewed on the
e. Name of Project: Goodwin Dam
party to the proceeding. Any comments, Commission’s Web site at http://
Hydroelectric Project.
protests, or motions to intervene must f. Location: Stanislaus River in www.ferc.gov using the ‘‘eLibrary’’ link.
be received on or before the specified Tuolumne and Calaveras counties, Enter the docket number excluding the
comment date for the particular California. It would use the existing last three digits in the docket number
application. Goodwin Dam owned by Oakdale field to access the document. For
r. Filing and Service of Responsive Irrigation District and San Joaquin assistance, call toll-free 1–866–208–
Documents—Any filings must bear in Irrigation District. 3676 or e-mail
all capital letters the title g. Filed Pursuant to: Federal Power FERCONLINESUPPORT@FERC.GOV.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). For TTY, call (202) 502–8659. A copy is
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Brent L. also available for inspection and
‘‘COMPETING APPLICATION’’, Smith, COO, Symbiotics, LLC, P.O. Box reproduction at the address in item h
‘‘PROTEST’’, and ‘‘MOTION TO 535, Rigby, ID 83442, (208) 745–0834. above.
INTERVENE’’, as applicable, and the i. FERC Contact: Robert Bell, (202) m. Competing Preliminary Permit—
Project Number of the particular 502–4126. Anyone desiring to file a competing
application to which the filing refers. j. Deadline for filing comments, application for preliminary permit for a
Any of the above-named documents protests, and motions to intervene: 60 proposed project must submit the
must be filed by providing the original days from the issuance date of this competing application itself, or a notice
and the number of copies provided by notice. of intent to file such an application, to
the Commission’s regulations to: The All documents (original and eight the Commission on or before the
Secretary, Federal Energy Regulatory copies) should be filed with: Kimberly specified comment date for the
Commission, 888 First Street, NE., D. Bose, Secretary, Federal Energy particular application (see 18 CFR 4.36).
Washington, DC 20426. An additional Regulatory Commission, 888 First Submission of a timely notice of intent
copy must be sent to Director, Division Street, NE., Washington, DC 20426. allows an interested person to file the
of Hydropower Administration and Comments, protests, and interventions competing preliminary permit
Compliance, Federal Energy Regulatory may be filed electronically via the application no later than 30 days after
Commission, at the above-mentioned Internet in lieu of paper; see 18 CFR the specified comment date for the
address. A copy of any notice of intent, 385.2001(a)(1)(iii) and the instructions particular application. A competing
competing application or motion to on the Commission’s Web site under the preliminary permit application must
intervene must also be served upon each ‘‘e-Filing’’ link. The Commission conform with 18 CFR 4.30 and 4.36.
representative of the Applicant strongly encourages electronic filings. n. Competing Development
specified in the particular application. Please include the project number Application—Any qualified
s. Agency Comments—Federal, state, (P–12946–000) on any comments or development applicant desiring to file a
and local agencies are invited to file motions filed. competing development application
comments on the described application. The Commission’s Rules of Practice must submit to the Commission, on or
A copy of the application may be and Procedure require all intervenors before a specified comment date for the
obtained by agencies directly from the filing documents with the Commission particular application, either a
Applicant. If an agency does not file to serve a copy of that document on competing development application or a
comments within the time specified for each person in the official service list notice of intent to file such an
filing comments, it will be presumed to for the project. Further, if an intervenor application. Submission of a timely
have no comments. One copy of an files comments or documents with the notice of intent to file a development
agency’s comments must also be sent to Commission relating to the merits of an application allows an interested person
the Applicant’s representatives. issue that may affect the responsibilities to file the competing application no
rwilkins on PROD1PC63 with NOTICES

of a particular resource agency, they later than 120 days after the specified
Kimberly D. Bose, must also serve a copy of the document comment date for the particular
Secretary. on that resource agency. application. A competing license
[FR Doc. E8–2415 Filed 2–8–08; 8:45 am] k. Description of Project: The application must conform with 18 CFR
BILLING CODE 6717–01–P proposed project using the Oakdale 4.30 and 4.36.

VerDate Aug<31>2005 16:44 Feb 08, 2008 Jkt 214001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1