3692 Federal Register / Vol. 73, No.

14 / Tuesday, January 22, 2008 / Notices

DEPARTMENT OF AGRICULTURE combustion turbines that have a net ACTION:Notice of intent to hold a public
output of 84 MW each. The proposal scoping meeting and prepare an
Rural Utilities Service will require the construction of less than Environmental Assessment.
500 feet of transmission line to
East Texas Electric Cooperative: interconnect with Entergy’s existing 138 SUMMARY: The Rural Utilities Service
Notice of Availability of an kV Jacinto-Poco transmission line that (RUS), an Agency delivering the United
Environmental Assessment crosses the property where the SJCPF States Department of Agriculture
will be located. The output of the SJCPF (USDA) Rural Development Utilities
AGENCY: Rural Utilities Service, USDA.
will be used to meet ETEC’s power and Programs, hereinafter referred to as
ACTION: Notice of availability of an Rural Development, intends to hold a
Environmental Assessment for public energy requirements in east Texas, along
with providing added reliability and public scoping meeting and prepare an
review. Environmental Assessment (EA) related
stability to the region’s power and
SUMMARY: The Rural Utilities Service transmission system. to possible financial assistance to Brazos
(RUS), an agency delivering the United Alternatives considered by USDA Electric Power Cooperative, Inc.
States Department of Agriculture Rural Development and ETEC included: (Brazos) of Waco, Texas, for the
(USDA) Rural Development Utilities (a) No action; (b) alternate generation proposed construction of approximately
Programs, hereinafter referred to as alternatives, and (c) other electrical 600 MW gas-fired unit at the existing
Rural Development, is issuing an alternatives. An Environmental Report Jack County Generating Facility. Brazos
Environmental Assessment (EA) related (ER) that describes the proposal in detail is requesting USDA Rural Development
to possible financial assistance to East and discusses its anticipated to provide financial assistance for the
Texas Electric Cooperative (ETEC) of environmental impacts has been proposal.
Nacogdoches, Texas, for the proposed prepared by ETEC. The USDA Rural DATES: USDA Rural Development will
construction of approximately 168 MW Development has accepted the ER as its hold a scoping meeting in an open
simple cycle combustion turbine EA for the proposal. The EA is available house format in order to provide
generation station in San Jacinto for public review at the addresses information and solicit comments for
County, Texas. ETEC is requesting provided above in this Notice. the preparation of an EA. The meeting
USDA Rural Development to provide Written comments received by the will be held on January 31, 2008, from
financial assistance for the proposed due date will be considered in the 5 to 8 p.m. at the Twin Lakes
project. environmental impact determination. Community Center, 420 Highway 59,
DATES: Written comments on this Notice Should USDA Rural Development Jacksboro, Texas. All written questions
must be received on or before February determine, based on the EA of the and comments must be received by
16, 2008. proposal, that the impacts of the March 3, 2008.
ADDRESSES: To send questions and construction and operation of the ADDRESSES: To send comments or for
comments or for further information, project would not have a significant further information, contact: Dennis
contact: Dennis Rankin, Environmental environmental impact, it will prepare a Rankin, Environmental Protection
Protection Specialist, USDA, Rural Finding of No Significant Impact. Public Specialist, USDA, Rural Development
Development Utilities Programs, notification of a Finding of No Utilities Programs, Engineering and
Engineering and Environmental Staff, Significant Impact will be published in Environmental Staff, 1571, 1400
1400 Independence Avenue, SW., Stop the Federal Register and in newspapers Independence Avenue, SW., Stop 1571,
1571, Washington, DC 20250–1571, with circulation in the project area. Washington, DC 20250–1571, or e-mail:
telephone (202) 720–1953, or e-mail: Any final action by USDA Rural dennis.rankin@wdc.usda.gov. An
dennis.rankin@wdc.usda.gov. The EA Development related to the proposal Alternative Evaluation/Site Selection
will be available for public review at the will be subject to, and contingent upon, Study is available for public review at
USDA Rural Development, Utilities compliance with all relevant federal, USDA Rural Development offices at
Programs, 1400 Independence Avenue, state and local environmental laws and 1400 Independence Avenue, SW.,
SW., Washington, DC 20250–1571: at regulations and completion of the Washington, DC 20250–1571 and at the
the USDA Rural Development’s Web environmental review procedures as following Web site http://
site—http://www.usda.gov/rus/water/ prescribed by USDA Rural Development www.usda.gov/rus/water/ees/ea.htm.
ees/ea.htm; at ETEC’s Web site—http:// Environmental Policies and Procedures
SUPPLEMENTARY INFORMATION: Brazos is
www.etec.coop/projects.html; and the (7 CFR part 1794).
proposing to construct an additional 500
Shepherd Public Library, 30 North Dated: January 14, 2008. MW gas-fired combustion turbine at its
Liberty Street, Shepherd, TX 77371. Mark S. Plank, Jack County Generation Station. The site
SUPPLEMENTARY INFORMATION: The ETEC Director, Engineering and Environmental is located northeast of State Highway
proposes to construct the San Jacinto Staff, USDA/Rural Development/Utilities 199 and FM 1156 in Jack County and
County Peaking Facility (SJCPF), a 168 Programs. southeast of the intersection of Shepard
MW simple cycle combustion turbine [FR Doc. E8–958 Filed 1–18–08; 8:45 am] Road/Henderson Ranch Rd. and FM
generation station, in San Jacinto BILLING CODE 3410–15–P 1156.
County, Texas. The proposal is located Government agencies, private
approximately 5 miles south of organizations, and the public are invited
Shepherd and 2 miles east of U.S. DEPARTMENT OF AGRICULTURE to participate in the planning and
Highway 59. Construction on the analysis of the proposal. Representatives
proposal is expected to commence in Rural Utilities Service from USDA Rural Development and
June 2008 with an expected completion Brazos will be available at the scoping
sroberts on PROD1PC70 with NOTICES

Brazos Electric Power Cooperative


date of May 2009. The generation meeting to discuss USDA Rural
Inc.: Notice of Intent To Hold a Public
facility will be constructed, owned, Development’s environmental review
Scoping Meeting and Prepare an
operated, and maintained by ETEC. process, describe the project, the
Environmental Assessment
The generation units at the SJCPF will purpose and need for the proposal,
consist of two (2) natural gas fired AGENCY: Rural Utilities Service, USDA. discuss the scope of environmental

VerDate Aug<31>2005 20:38 Jan 18, 2008 Jkt 214001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\22JAN1.SGM 22JAN1

Vous aimerez peut-être aussi