Vous êtes sur la page 1sur 2

Federal Register / Vol. 73, No.

7 / Thursday, January 10, 2008 / Notices 1871

proceedings by automatically providing authority, with an accompanying rate on the Commission’s Web site under the
you with notification of these filings, tariff. The proposed market-based rate ‘‘e-Filing’’ link. The Commission
document summaries and direct links to schedule provides for the sale of energy, strongly encourages electronic filings.
the documents. Go to http:// capacity and ancillary services at
Kimberly D. Bose,
www.ferc.gov/esubscribenow.htm. market-based rates. Ocean State also
Finally, public meetings or site visits requested waivers of various Secretary.
will be posted on the Commission’s Commission regulations. In particular, [FR Doc. E8–237 Filed 1–9–08; 8:45 am]
calendar located at http://www.ferc.gov/ Ocean State requested that the BILLING CODE 6717–01–P
EventCalendar/EventsList.aspx along Commission grant blanket approval
with other related information. under 18 CFR Part 34 of all future
issuances of securities and assumptions DEPARTMENT OF ENERGY
Kimberly D. Bose,
of liability by Ocean State.
Secretary. On December 18, 2007, pursuant to Federal Energy Regulatory
[FR Doc. E8–222 Filed 1–9–08; 8:45 am] delegated authority, the Director, Commission
BILLING CODE 6717–01–P Division of Tariffs and Market [Docket Nos. ER08–200–000; ER08–200–
Development-West, granted the requests 001]
for blanket approval under Part 34
DEPARTMENT OF ENERGY (Director’s Order). The Director’s Order Waterbury Generation, LLC; Notice of
also stated that the Commission would Issuance of Order
Federal Energy Regulatory
publish a separate notice in the Federal December 27, 2007.
Commission
Register establishing a period of time for
Waterbury Generation, LLC
[Docket No. ER05–849–000] the filing of protests. Accordingly, any
(Waterbury) filed an application for
person desiring to be heard concerning
California Independent System market-based rate authority, with an
the blanket approvals of issuances of
Operator Corporation; Notice of securities or assumptions of liability by accompanying market-based rate tariff.
Extension of Time Ocean State, should file a protest with The proposed market-based rate tariff
the Federal Energy Regulatory provides for the sale of energy, capacity
December 27, 2007. and ancillary services at market-based
On December 26, 2007, the Western Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance rates. Waterbury also requested waivers
Power Trading Forum (WPTF) filed a of various Commission regulations. In
request for an extension of time to file with Rules 211 and 214 of the
Commission’s Rules of Practice and particular, Waterbury requested that the
an answer to the Public Utilities of the Commission grant blanket approval
State of California’s (CPUC) Motion to Procedure. 18 CFR 385.211, 385.214
(2004). under 18 CFR Part 34 of all future
Supplement Request for Rehearing or, in issuances of securities and assumptions
Notice is hereby given that the
the Alternative, to Supplement the of liability by Waterbury.
deadline for filing protests is January 18,
CPUC’s Response to the Motion For 2008. On December 26, 2007, pursuant to
Clarification of the California Generators Absent a request to be heard in delegated authority, the Director,
filed December 21, 2007, in the above- opposition to such blanket approvals by Division of Tariffs and Market
docketed proceeding (December 21 the deadline above, Ocean State is Development-West, granted the requests
Motion). WPTF states that because of authorized to issue securities and for blanket approval under Part 34
the intervening holidays and vacation assume obligations or liabilities as a (Director’s Order). The Director’s Order
schedules involving WPTF counsel and guarantor, indorser, surety, or otherwise also stated that the Commission would
personnel, additional time is needed to in respect of any security of another publish a separate notice in the Federal
coordinate and prepare a responsive person; provided that such issuance or Register establishing a period of time for
filing. assumption is for some lawful object the filing of protests. Accordingly, any
Upon consideration, notice is hereby within the corporate purposes of Ocean person desiring to be heard concerning
given that an extension of time for filing State, compatible with the public the blanket approvals of issuances of
answers to the CPUC’s December 21 interest, and is reasonably necessary or securities or assumptions of liability by
Motion is granted and including January appropriate for such purposes. Waterbury, should file a protest with the
14, 2008. The Commission reserves the right to Federal Energy Regulatory Commission,
Kimberly D. Bose, require a further showing that neither 888 First Street, NE., Washington, DC
Secretary. public nor private interests will be 20426, in accordance with Rules 211
[FR Doc. E8–238 Filed 1–9–08; 8:45 am] adversely affected by continued and 214 of the Commission’s Rules of
approvals of Ocean State’s issuance of Practice and Procedure. 18 CFR 385.211,
BILLING CODE 6717–01–P
securities or assumptions of liability. 385.214 (2007).
Copies of the full text of the Director’s Notice is hereby given that the
DEPARTMENT OF ENERGY Order are available from the deadline for filing protests is January 28,
Commission’s Public Reference Room, 2008.
Federal Energy Regulatory 888 First Street, NE., Washington, DC Absent a request to be heard in
Commission 20426. The Order may also be viewed opposition to such blanket approvals by
on the Commission’s Web site at http:// the deadline above, Waterbury is
[ Docket Nos. ER08–25–000, ER08–25–001] www.ferc.gov, using the eLibrary link. authorized to issue securities and
Ocean State Power, Ocean State Power Enter the docket number excluding the assume obligations or liabilities as a
last three digits in the docket number guarantor, indorser, surety, or otherwise
yshivers on PROD1PC62 with NOTICES

II; Notice of Issuance of Order


filed to access the document. in respect of any security of another
December 27, 2007. Comments, protests, and interventions person; provided that such issuance or
Ocean State Power and Ocean State may be filed electronically via the assumption is for some lawful object
Power II (collectively, Ocean State) filed internet in lieu of paper. See, 18 CFR within the corporate purposes of
an application for market-based rate 385.2001(a)(1)(iii) and the instructions Waterbury, compatible with the public

VerDate Aug<31>2005 14:29 Jan 09, 2008 Jkt 214001 PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:\FR\FM\10JAN1.SGM 10JAN1
1872 Federal Register / Vol. 73, No. 7 / Thursday, January 10, 2008 / Notices

interest, and is reasonably necessary or securities or assumptions of liability by based rate authority, with
appropriate for such purposes. Citadel, should file a protest with the accompanying market-based rate tariffs.
The Commission reserves the right to Federal Energy Regulatory Commission, The proposed market-based rate tariffs
require a further showing that neither 888 First Street, NE., Washington, DC provide for the sale of energy, capacity
public nor private interests will be 20426, in accordance with Rules 211 and ancillary services at market-based
adversely affected by continued and 214 of the Commission’s Rules of rates. Lookout and Forward also
approvals of Waterbury’s issuance of Practice and Procedure. 18 CFR 385.211, requested waivers of various
securities or assumptions of liability. 385.214 (2007). Commission regulations. In particular,
Copies of the full text of the Director’s Notice is hereby given that the Lookout and Forward requested that the
Order are available from the deadline for filing protests is January 28, Commission grant blanket approval
Commission’s Public Reference Room, 2008. under 18 CFR part 34 of all future
888 First Street, NE., Washington, DC Absent a request to be heard in issuances of securities and assumptions
20426. The Order may also be viewed opposition to such blanket approvals by of liability by Lookout and Forward.
on the Commission’s Web site at http:// the deadline above, Citadel is On January 2, 2008, pursuant to
www.ferc.gov, using the eLibrary link. authorized to issue securities and delegated authority, the Director,
Enter the docket number excluding the assume obligations or liabilities as a Division of Tariffs and Market
last three digits in the docket number guarantor, indorser, surety, or otherwise Development—West, granted the
filed to access the document. in respect of any security of another requests for blanket approval under part
Comments, protests, and interventions person; provided that such issuance or 34 (Director’s Order). The Director’s
may be filed electronically via the assumption is for some lawful object Order also stated that the Commission
internet in lieu of paper. See, 18 CFR within the corporate purposes of would publish a separate notice in the
385.2001(a)(1)(iii) and the instructions Citadel, compatible with the public Federal Register establishing a period of
on the Commission’s Web site under the interest, and is reasonably necessary or time for the filing of protests.
‘‘e-Filing’’ link. The Commission appropriate for such purposes. Accordingly, any person desiring to be
strongly encourages electronic filings. The Commission reserves the right to heard concerning the blanket approvals
require a further showing that neither of issuances of securities or assumptions
Kimberly D. Bose, of liability by Lookout and Forward,
public nor private interests will be
Secretary. adversely affected by continued should file a protest with the Federal
[FR Doc. E8–239 Filed 1–9–08; 8:45 am] approvals of Citadel’s issuance of Energy Regulatory Commission, 888
BILLING CODE 6717–01–P securities or assumptions of liability. First Street, NE., Washington, DC 20426,
Copies of the full text of the Director’s in accordance with Rules 211 and 214
Order are available from the of the Commission’s Rules of Practice
DEPARTMENT OF ENERGY Commission’s Public Reference Room, and Procedure. 18 CFR 385.211, 385.214
888 First Street, NE., Washington, DC (2007).
Federal Energy Regulatory Notice is hereby given that the
20426. The Order may also be viewed
Commission deadline for filing protests is February
on the Commission’s Web site at
[Docket Nos. ER08–274–000, ER08–274– http://www.ferc.gov, using the eLibrary 1, 2008.
001] Absent a request to be heard in
link. Enter the docket number excluding
opposition to such blanket approvals by
the last three digits in the docket
Citadel Energy Strategies, LLC; Notice the deadline above, Lookout and
number filed to access the document.
of Issuance of Order Forward are authorized to issue
Comments, protests, and interventions securities and assume obligations or
January 3, 2008. may be filed electronically via the liabilities as a guarantor, indorser,
Citadel Energy Strategies, LLC internet in lieu of paper. See, 18 CFR surety, or otherwise in respect of any
(Citadel) filed an application for market- 385.2001(a) (1) (iii) and the instructions security of another person; provided
based rate authority, with an on the Commission’s Web site under the that such issuance or assumption is for
accompanying rate schedule. The ‘‘e-Filing’’ link. The Commission some lawful object within the corporate
proposed market-based rate schedule strongly encourages electronic filings. purposes of Lookout and Forward,
provides for the sale of energy, capacity Kimberly D. Bose, compatible with the public interest, and
and ancillary services at market-based Secretary. is reasonably necessary or appropriate
rates. Citadel also requested waivers of [FR Doc. E8–227 Filed 1–9–08; 8:45 am] for such purposes.
various Commission regulations. In The Commission reserves the right to
BILLING CODE 6717–01–P
particular, Citadel requested that the require a further showing that neither
Commission grant blanket approval public nor private interests will be
under 18 CFR part 34 of all future DEPARTMENT OF ENERGY adversely affected by continued
issuances of securities and assumptions approvals of Lookout and Forward’s
of liability by Citadel. Federal Energy Regulatory issuance of securities or assumptions of
On December 27, 2007, pursuant to Commission liability.
delegated authority, the Director, Copies of the full text of the Director’s
Division of Tariffs and Market [Docket Nos. ER08–293–000; ER08–293– Order are available from the
001; ER08–297–000; ER08–297–001]
Development-West, granted the requests Commission’s Public Reference Room,
for blanket approval under part 34 Lookout Windpower, LLC; Forward 888 First Street, NE., Washington, DC
(Director’s Order). The Director’s Order Windpower, LLC; Notice of Issuance of 20426. The Order may also be viewed
also stated that the Commission would on the Commission’s Web site at
yshivers on PROD1PC62 with NOTICES

Order
publish a separate notice in the Federal http://www.ferc.gov, using the eLibrary
Register establishing a period of time for January 3, 2008. link. Enter the docket number excluding
the filing of protests. Accordingly, any Lookout Windpower, LLC (Lookout) the last three digits in the docket
person desiring to be heard concerning and Forward Windpower, LLC number filed to access the document.
the blanket approvals of issuances of (Forward) filed applications for market- Comments, protests, and interventions

VerDate Aug<31>2005 14:29 Jan 09, 2008 Jkt 214001 PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 E:\FR\FM\10JAN1.SGM 10JAN1

Vous aimerez peut-être aussi