Vous êtes sur la page 1sur 2

500 Federal Register / Vol. 73, No.

2 / Thursday, January 3, 2008 / Notices

Union County House at 73 Grove Street, 73 Grove St., was implemented as a result of the
Murphy, J.T., No 1 Crater, Firetower Rd., 3⁄4 Lynbrook, 07001456 Record of Decision on the Operation of
mi. N. of jct. with Baugh St., Norphlet, Suffolk County Glen Canyon Dam Final Environmental
07001435 Impact Statement to comply with
Davis Field, 2nd St., & 3rd Ave., Bayport,
Washington County 07001456 consultation requirements of the Grand
Evansville—Dutch Mills Road Bridge,
Canyon Protection Act (Pub. L. 102–
WASHINGTON 575) of 1992. The AMP includes a
(Historic Bridges of Arkansas MPS) Co. Rd.
464, Dutch Mills, 07001436 King County federal advisory committee (AMWG), a
White River Bridge at Elkins, (Historic Palmer, A.L., Building, 1000 1st. Ave. S., technical work group (TWG), a
Bridges of Arkansas MPS) Co. Rd. 44, Seattle, 07001457 monitoring and research center, and
Elkins, 07001437 independent review panels. The AMWG
Pierce County
Yell County makes recommendations to the
Auditorium Dance Hall, The, 1308–1310 Secretary of the Interior concerning
Old Arkansas 22—Dardanelle Segment, Fawcett Ave., Tacoma, 07001458
(Arkansas Highway History and Beutel, Conrad F. & Annie K., House, 701 N. Glen Canyon Dam operations and other
Architecture MPS) Co. Rd. 906, 1⁄2 mi. W. 10th St., Tacoma, 07001459 management actions to protect resources
of jct. AR 22 and Co. Rd. 51, Dardanelle, downstream of Glen Canyon Dam
07001438 WISCONSIN consistent with the Grand Canyon
CALIFORNIA Dane County Protection Act. The TWG is a
Orpheum Theatre, 216 State St., Madison, subcommittee of the AMWG and
Los Angeles County provides technical advice and
07001460
Board of Trade Building, 111 W. 7th St., Los recommendations to the AMWG.
Angeles, 07001439 Kewaunee County
DATES AND ADDRESSES: The AMWG will
Perry, Melvin W. and Mary, House, 519 3rd
CONNECTICUT conduct the following public conference
St., Algoma, 07001461
Fairfield County A request to MOVE has been made for the
call:
following resource: Date: Thursday, January 17, 2008—
Greenfield Hill Grange #133, 1873 Hillside
Rd., Fairfield, 07001440
The call will begin at 10 a.m. (MDT) and
NEW YORK 9 a.m. (PDT) and conclude four (4)
Silvermine Center Historic District, Roughly
centered on Silvermine & Perry Aves., New York County hours later in the respective time zones.
Norwalk, 07001441 Hamilton Grange National Memorial, 287 The telephone numbers are: 1–303–445–
MAINE Convent Ave., New York, 66000097 3940 for federal participants and 1–888–
A request for REMOVAL has been made for 808–5102 for non-federal participants
Hancock County the following resources: and members of the public. If needed,
Hancock County Jail, 40 State St., Ellsworth, the pass code for the call is 4773.
07001445 ARKANSAS Agenda: The conference call will
Oxford County Ashley County include the following: (1) An update on
Greenview Café, 3rd Ave. and Arkansas St., plans for a 2008 high flow test from
Deering Memorial United Methodist Church,
39 Main St., Paris, 07001444 Crossett, 04001507 Glen Canyon Dam, including the
proposed hydrograph and timing of the
Penobscot County Hempstead County
test; (2) a report from the Grand Canyon
Corinth Town Hall and Corinthian Lodge Carrigan House 704 W. Ave. B., Hope, Monitoring and Research Center on the
#59, I.O.O.F., 328 Main St., Corinth, 78000591
science plan for the high flow test; (3)
07001446 Independence County a report from the TWG; (4) an update on
Enterprise Grange, No. 173, 446 Dow Rd., the long-term experimental plan; and (5)
Locust Grove School, AR 230 S. of jct. with
Orrington, 07001447
AR 25, Locust Grove, 92001107 an update on compliance activities. To
York County
Jefferson County
view a copy of the draft agenda, please
Goodall, Louis B., Memorial Library, (Maine visit Reclamation’s Web site at: http://
Collier House, 1227 W. 5th St., Pine Bluff,
Public Libraries MPS) 952 Main St., www.usbr.gov/uc/rm/amp/amwg/mtgs/
82000824
Sanford, 07001448 08jan17/index.html.
Rock Rest, 167 Brave Boat Harbor Rd., Lonoke County Time will be allowed for any
Kittery, 07001449 St. Louis Southwestern Railway (Cotton Belt individual or organization wishing to
MARYLAND Route) Depot, Main St., Coy, 03001459 make formal oral comments on the call.
[FR Doc. 07–6277 Filed 1–2–08; 8:45 am] To allow for full consideration of
Frederick County
information by the AMWG members,
L’Hermitage Slave Village Archeological Site, BILLING CODE 4312–51–M
written notice must be provided to
Address Restricted, Frederick, 07001450
Dennis Kubly, Bureau of Reclamation,
NEW YORK DEPARTMENT OF THE INTERIOR Upper Colorado Regional Office, 125
Broome County South State Street, Room 6107, Salt
Bureau of Reclamation Lake City, Utah 84138; telephone 801–
Binghamton Theatre, 236 Washington St.,
Binghamton, 07001451
524–3715; facsimile 801–524–3858; e-
Glen Canyon Dam Adaptive mail at dkubly@uc.usbr.gov at least five
Livingston County Management Work Group (AMWG) (5) days prior to the call. Any written
Barber, Aaron, Memorial Building, 143 AGENCY: Bureau of Reclamation, comments received will be provided to
Genesee St., Avon, 07001452 the AMWG members.
Interior.
pwalker on PROD1PC71 with NOTICES

Nassau County ACTION: Notice of Public Meeting FOR FURTHER INFORMATION CONTACT:
House at 251 Rocklyn Ave., 251 Rocklyn (Conference Call). Dennis Kubly, Bureau of Reclamation,
Ave., Lynbrook, 07001454 telephone (801) 524–3715; facsimile
House at 474 Ocean Avenue, 474 Ocean Ave., SUMMARY: The Glen Canyon Dam (801) 524–3858; e-mail at
Lynbrook, 07001455 Adaptive Management Program (AMP) dkubly@uc.usbr.gov.

VerDate Aug<31>2005 20:29 Jan 02, 2008 Jkt 214001 PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 E:\FR\FM\03JAN1.SGM 03JAN1
Federal Register / Vol. 73, No. 2 / Thursday, January 3, 2008 / Notices 501

Dated: December 19, 2007. the research methodologies used for Signed at Washington, DC, this 27th day of
Randall Peterson, these studies, and to propose an agenda December, 2007.
Manager, Environmental Resources Division, for the next five years (beginning July Emily Stover DeRocco,
Upper Colorado Regional Office, Salt Lake 2007) for pilots, demonstrations, Assistant Secretary, Employment and
City, Utah. research, and evaluation studies in areas Training Administration.
[FR Doc. E7–25566 Filed 1–2–08; 8:45 am] related to workforce development Attachment
BILLING CODE 4310–MN–P programs and policies.
b. What is the purpose of the plan, U.S. Department of Labor, Employment
and how is it structured? and Training Administration’s five-year
DEPARTMENT OF LABOR pilot, demonstration and evaluation
The Strategic Plan provides an strategic plan for 2007–2012. As
overview of prior research, current required under Section 171 of the
Employment and Training
research and proposed direction for Workforce Investment Act.
Administration
future research that builds on prior
efforts. The Strategic Plan is composed Table of Contents
Publication of the Five-Year Research,
Demonstration, and Evaluation of three major sections. Introduction
Section I. Prior Research
Strategic Plan for 2007–2012 The first section describes a sampling
• Workforce Investment Act
of projects conducted during the • Internet Unemployment Insurance
AGENCY: Employment & Training previous five year period (2002–2007)
Administration, Labor. Claims
and provides a web link to the • Personal Reemployment Accounts
ACTION: Notice of publication of U.S. published reports. This section is • Youth Programs
Department of Labor, Employment and organized in four subtopics: Section II. Current Research
Training Administration’s Five-Year • Workforce Investment Act. • Labor Market and the Global Economy
Research, Demonstration, and • Workforce Investment System
Evaluation Strategic Plan for 2007– • Internet Unemployment Insurance Improvements
2012. Claims. • Existing and Emerging Labor Pools
• Personal Reemployment Accounts. • Program Evaluation
SUMMARY: Notice is hereby given of the Section III. Future Research Priority Areas
• Youth Programs. • Integration of Workforce and Regional
publication of the U.S. Department of
Labor, Employment and Training The second section describes a select Economic Development
Administration’s (USDOL/ETA) Five- sampling of current research, • Methods of Expanding U.S. Workforce
demonstration and evaluation projects Skills
Year Research, Demonstration, and
and includes a web link to a list of • Increasing the Labor Market
Evaluation Strategic Plan for 2007–2012, Participation of Underutilized
hereafter referred to as ‘‘Strategic Plan’’. current projects. This section is also
Populations
The Strategic Plan is required under the organized in four subtopics: • Using State-Level Administrative Data to
Workforce Investment Act (WIA) of • Labor Market and the Global Measure Progress and Outcomes
1998, Section 171. The attached Economy. • Post-Secondary Education and Job
Strategic Plan identifies the potential Training
• Workforce Investment System
demonstration and pilot, multi-service, • Unemployment Insurance (UI)
Improvements. Appendix A: Leading Business, Government
multi-state, research and evaluation
efforts that will most assist ETA in • Existing and Emerging Labor Pools. and Academic Economists
carrying out workforce development • Program Evaluation. I. Introduction
programs under WIA. The third section focuses on the six
FOR FURTHER INFORMATION CONTACT: priority areas for research, Section 171 of the Workforce
Heidi M. Casta, USDOL/ETA, Office of demonstration, and evaluation projects Investment Act (WIA) of 1998 requires
Policy Development and Research, N– for the next five-year period (2007– the Secretary of Labor to submit, every
5641, 200 Constitution Avenue, NW., 2012). This section is organizes by the two years, a plan that describes
Washington, DC 20210; phone: (202) following six priority areas: demonstration and pilot, multi-service,
research and multi-state projects that
693–3700; fax: (202) 693–2766; e-mail: • Integration of Workforce and
casta.heidi@dol.gov. focus on priorities for the Department of
Regional Economic Development.
Labor concerning employment and
SUPPLEMENTARY INFORMATION: • Methods of Expanding U.S. training for the five-year period
a. Why has the USDOL/ETA Workforce Skills. following the plan. The Secretary is to
developed a five-year research, • Increasing the Labor Market consult with interested parties in the
demonstration, and evaluation strategic Participation of Underutilized development of the plan and the plan is
plan? Populations. to contain strategies to address national
Under Section 171 of WIA, the • Using State-Level Administrative employment and training problems. On
Secretary of Labor is required to submit, Data to Measure Progress and Outcomes. behalf of the Secretary, Assistant
every two years, a plan that describes Secretary Emily Stover DeRocco
demonstration and pilot, multi-service, • Post-Secondary Education and Job convened a meeting with experts from
research and multi-state projects. The Training. government, business and academia to
Strategic Plan focuses on priorities for • Unemployment Insurance (UI). discuss agency priorities and identify
USDOL/ETA concerning employment To Obtain an Electronic Copy of the key research, demonstration, and
and training for the five-year period evaluation priority areas for the 2007–
pwalker on PROD1PC71 with NOTICES

Attached Report:
following the plan. By requiring such a 2012 five-year period. This Five-Year
plan, WIA has given USDOL/ETA the To download the full report as a PDF, Research, Demonstration and
unique opportunity to conduct a visit the ETA Occasional Paper series Evaluation Strategic Plan for 2007–2012
literature review of previous Web site at: http://wdr.doleta.gov/ has been developed in accordance with
employment and training studies and research/keyword.cfm. the requirements of Section 171.

VerDate Aug<31>2005 20:29 Jan 02, 2008 Jkt 214001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\03JAN1.SGM 03JAN1

Vous aimerez peut-être aussi