Federal Register / Vol. 72, No.

244 / Thursday, December 20, 2007 / Notices 72349

Notice is hereby given that the may be filed electronically via Internet 13040–000) on any comments or
requested extension of time for filing the in lieu of paper. The Commission motions filed.
initial comments until December 21, strongly encourages electronic filings. The Commission’s Rules of Practice
2007 is granted. In light of this See 18 CFR 385.2001(a)(1)(iii) and the and Procedure require all intervenors
extension, notice is also given that the instructions on the Commission’s Web filing documents with the Commission
technical conference is rescheduled site under the ‘‘eFiling’’ link. For further to serve a copy of that document on
from January 8, 2008 to January 23, information, contact Tom Dean at (202) each person in the official service list
2008. The deadline for the filing of the 502–6041. for the project. Further, if an intervenor
post-conference comments is extended files comments or documents with the
Kimberly D. Bose, Commission relating to the merits of an
to February 11, 2008.
Secretary. issue that may affect the responsibilities
Kimberly D. Bose, [FR Doc. E7–24660 Filed 12–19–07; 8:45 am] of a particular resource agency, they
Secretary. BILLING CODE 6717–01–P must also serve a copy of the document
[FR Doc. E7–24665 Filed 12–19–07; 8:45 am] on that resource agency.
BILLING CODE 6717–01–P k. Description of Project: The
DEPARTMENT OF ENERGY proposed project using the U.S. Army
Corps of Engineers’ proposed Olmstead
DEPARTMENT OF ENERGY Federal Energy Regulatory Dam and operated in a run-of-river
Commission mode would consist of: (1) A new 250-
Federal Energy Regulatory [Project No. 13040–000] foot long, 200-foot wide, 50-foot high
Commission concrete powerhouse; (2) a new intake
[Project No. 12769–000—MA] BPUS Generation Development, LLC; channel and tailrace channel on the left
Notice of Application Accepted for (Kentucky) bank of the river; (3) three
Ice House Partners, Inc.; Notice of Filing and Soliciting Motions To turbine/generator units with a combined
Availability of Environmental Intervene, Protests, and Comments installed capacity of 63 megawatts; (4) a
Assessment new 52,783-foot long above ground
December 13, 2007. transmission line extending from the
December 13, 2007. Take notice that the following switchyard near the powerhouse
In accordance with the National hydroelectric application has been filed southeast to an existing substation east
Environmental Policy Act of 1969 and with the Commission and is available of the town of Bartlow, Kentucky; and
the Federal Energy Regulatory for public inspection: (5) appurtenant facilities. The proposed
Commission’s regulations, 18 CFR part a. Type of Application: Preliminary Olmstead Locks and Dam Project would
380 (Order No. 486, 52 FR 47879), the Permit. have an average annual generation of
Office of Energy Projects has reviewed b. Project No.: 13040–000. 300 gigawatt-hours.
the application for exemption from c. Date filed: September 28, 2007. l. This filing is available for review at
licensing for the Ice House Power d. Applicant: BPUS Generation the Commission in the Public Reference
Project, to be located on the Nashua Development, LLC. Room or may be viewed on the
River, in the Town of Ayer, Middlesex e. Name of Project: Olmstead Locks Commission’s Web site at http://
County, Massachusetts, and has and Dam Hydroelectric Project. www.ferc.gov using the ‘‘eLibrary’’ link.
prepared an Environmental Assessment f. Location: Ohio River in Ballard Enter the docket number excluding the
(EA). In the EA, Commission staff County, Kentucky. It would use the U.S. last three digits in the docket number
analyze the potential environmental Army Corps of Engineers’ proposed field to access the document. For
effects of the project and conclude that Olmstead Dam. assistance, call toll-free 1–866–208–
issuing an exemption for the project, g. Filed Pursuant to: Federal Power 3676 or e-mail
with appropriate environmental Act, 16 U.S.C. 791(a)–825(r). FERCOnlineSupport@FERC.gov. For
measures, would not constitute a major h. Applicant Contact: Mr. Jeffrey M. TTY, call (202) 502–8659. A copy is also
federal action significantly affecting the Auser, P.E., BPUS Generation available for inspection and
quality of the human environment. Development, LLC, 225 Greenfield reproduction at the address in item h
A copy of the EA is on file with the Parkway, Suite 201, Liverpool, NY above.
Commission and is available for public 13088, (315) 413–2700. m. Competing Preliminary Permit—
inspection. The EA may also be viewed i. FERC Contact: Robert Bell, (202) Anyone desiring to file a competing
on the Commission’s Web site at 502–4126. application for preliminary permit for a
http://www.ferc.gov using the j. Deadline for filing comments, proposed project must submit the
‘‘eLibrary’’ link. Enter the docket protests, and motions to intervene: 60 competing application itself, or a notice
number excluding the last three digits in days from the issuance date of this of intent to file such an application, to
the docket number field to access the notice. the Commission on or before the
document. For assistance, contact FERC All documents (original and eight specified comment date for the
Online Support at copies) should be filed with: Kimberly particular application (see 18 CFR 4.36).
FERCOnlineSupport@ferc.gov or toll- D. Bose, Secretary, Federal Energy Submission of a timely notice of intent
free at 1–866–208–3676, or for TTY, Regulatory Commission, 888 First allows an interested person to file the
(202) 502–8659. Street, NE., Washington, DC 20426. competing preliminary permit
Any comments should be filed within Comments, protests, and interventions application no later than 30 days after
30 days from the issuance date of this may be filed electronically via the the specified comment date for the
notice, and should be addressed to the Internet in lieu of paper; see 18 CFR particular application. A competing
sroberts on PROD1PC70 with NOTICES

Secretary, Federal Energy Regulatory 385.2001(a)(1)(iii) and the instructions preliminary permit application must
Commission, 888 First Street, NE., on the Commission’s Web site under the conform with 18 CFR 4.30 and 4.36.
Room 1–A, Washington, DC 20426. ‘‘e-Filing’’ link. The Commission n. Competing Development
Please affix ‘‘Ice House Power Project strongly encourages electronic filings. Application—Any qualified
No. 12769’’ to all comments. Comments Please include the project number (P– development applicant desiring to file a

VerDate Aug<31>2005 20:08 Dec 19, 2007 Jkt 214001 PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 E:\FR\FM\20DEN1.SGM 20DEN1
72350 Federal Register / Vol. 72, No. 244 / Thursday, December 20, 2007 / Notices

competing development application must be filed by providing the original j. Deadline for filing comments,
must submit to the Commission, on or and the number of copies provided by protests, and motions to intervene: 60
before a specified comment date for the the Commission’s regulations to: The days from the issuance date of this
particular application, either a Secretary, Federal Energy Regulatory notice.
competing development application or a Commission, 888 First Street, NE., All documents (original and eight
notice of intent to file such an Washington, DC 20426. An additional copies) should be filed with: Kimberly
application. Submission of a timely copy must be sent to Director, Division D. Bose, Secretary, Federal Energy
notice of intent to file a development of Hydropower Administration and Regulatory Commission, 888 First
application allows an interested person Compliance, Federal Energy Regulatory Street, NE., Washington, DC 20426.
to file the competing application no Commission, at the above-mentioned Comments, protests, and interventions
later than 120 days after the specified address. A copy of any notice of intent, may be filed electronically via the
comment date for the particular competing application or motion to Internet in lieu of paper; see 18 CFR
application. A competing license intervene must also be served upon each 385.2001(a)(1)(iii) and the instructions
application must conform with 18 CFR representative of the Applicant on the Commission’s Web site under the
4.30 and 4.36. specified in the particular application. ‘‘e-Filing’’ link. The Commission
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state, strongly encourages electronic filings.
must specify the exact name, business and local agencies are invited to file Please include the project number (P–
address, and telephone number of the comments on the described application. 13041–000) on any comments or
prospective applicant, and must include A copy of the application may be motions filed.
an unequivocal statement of intent to obtained by agencies directly from the The Commission’s Rules of Practice
submit, if such an application may be Applicant. If an agency does not file and Procedure require all intervenors
filed, either a preliminary permit comments within the time specified for filing documents with the Commission
application or a development filing comments, it will be presumed to to serve a copy of that document on
application (specify which type of have no comments. One copy of an each person in the official service list
application). A notice of intent must be agency’s comments must also be sent to for the project. Further, if an intervenor
served on the applicant(s) named in this the Applicant’s representatives. files comments or documents with the
public notice. Commission relating to the merits of an
p. Proposed Scope of Studies Under Kimberly D. Bose, issue that may affect the responsibilities
Permit—A preliminary permit, if issued, Secretary. of a particular resource agency, they
does not authorize construction. The [FR Doc. E7–24661 Filed 12–19–07; 8:45 am] must also serve a copy of the document
term of the proposed preliminary permit BILLING CODE 6717–01–P on that resource agency.
would be 36 months. The work k. Description of Project: The
proposed under the preliminary permit proposed project using the Pearl River
would include economic analysis, DEPARTMENT OF ENERGY Valley Water Supply District’s Ross
preparation of preliminary engineering Barnett Dam and operated in a run-of-
plans, and a study of environmental Federal Energy Regulatory river mode would consist of: (1) A new
impacts. Based on the results of these Commission 100-foot long, 125-foot wide, 50-foot
studies, the Applicant would decide [Project No. 13041–000] high concrete powerhouse; (2) three
whether to proceed with the preparation 400-foot-long, 12-foot-diameter steel
of a development application to BPUS Generation Development, LLC; penstocks; (3) a new intake east of the
construct and operate the project. Notice of Application Accepted for spillway and a new tailrace on the east
q. Comments, Protests, or Motions to Filing and Soliciting Motions To bank of the existing stilling basin; (4)
Intervene—Anyone may submit Intervene, Protests, and Comments three turbine/generator units with a
comments, a protest, or a motion to combined installed capacity of 24
December 13, 2007.
intervene in accordance with the megawatts; (5) a new 2.2-mile long
requirements of Rules of Practice and Take notice that the following above ground transmission line
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed extending northwest from the
In determining the appropriate action to with the Commission and is available switchyard near the powerhouse to the
take, the Commission will consider all for public inspection: existing Church Street substation owned
a. Type of Application: Preliminary
protests or other comments filed, but by Mississippi Power & Light; and (6)
Permit.
only those who file a motion to appurtenant facilities. The proposed
b. Project No.: 13041–000.
intervene in accordance with the c. Date filed: September 28, 2007. Ross Barnett Project would have an
Commission’s Rules may become a d. Applicant: BPUS Generation average annual generation of 54
party to the proceeding. Any comments, Development, LLC. gigawatt-hours.
protests, or motions to intervene must e. Name of Project: Ross Barnett l. This filing is available for review at
be received on or before the specified Hydroelectric Project. the Commission in the Public Reference
comment date for the particular f. Location: Pearl River in Rankin Room or may be viewed on the
application. County, Mississippi. It would use the Commission’s Web site at
r. Filing and Service of Responsive Pearl River Valley Water Supply http://www.ferc.gov using the
Documents—Any filings must bear in District’s Ross Barnett Dam. ‘‘eLibrary’’ link. Enter the docket
all capital letters the title g. Filed Pursuant to: Federal Power number excluding the last three digits in
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). the docket number field to access the
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M. document. For assistance, call toll-free
‘‘COMPETING APPLICATION’’, Auser, P.E., BPUS Generation 1–866–208–3676 or e-mail
sroberts on PROD1PC70 with NOTICES

‘‘PROTEST’’, and ‘‘MOTION TO Development, LLC, 225 Greenfield FERCONLINESUPPORT@FERC.GOV.


INTERVENE’’, as applicable, and the Parkway, Suite 201, Liverpool, NY For TTY, call (202) 502–8659. A copy is
Project Number of the particular 13088, (315) 413–2700. also available for inspection and
application to which the filing refers. i. FERC Contact: Robert Bell, (202) reproduction at the address in item h
Any of the above-named documents 502–4126. above.

VerDate Aug<31>2005 20:08 Dec 19, 2007 Jkt 214001 PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:\FR\FM\20DEN1.SGM 20DEN1

Vous aimerez peut-être aussi