Vous êtes sur la page 1sur 2

Federal Register / Vol. 72, No.

232 / Tuesday, December 4, 2007 / Notices 68147

representative of the Applicant D. Bose, Secretary, Federal Energy specified comment date for the
specified in the particular application. Regulatory Commission, 888 First particular application (see 18 CFR 4.36).
Comments, protests and interventions Street, NE., Washington, DC 20426. Submission of a timely notice of intent
may be filed electronically via the Comments, protests, and interventions allows an interested person to file the
Internet in lieu of paper; see 18 CFR may be filed electronically via the competing preliminary permit
385.2001(a)(1)(iii) and the instructions Internet in lieu of paper; see 18 CFR application no later than 30 days after
on the Commission’s Web site under the 385.2001(a)(1)(iii) and the instructions the specified comment date for the
‘‘e-Filing’’ link. The Commission on the Commission’s Web site under the particular application. A competing
strongly encourages electronic filings. ‘‘e-Filing’’ link. The Commission preliminary permit application must
u. Agency Comments—Federal, State, strongly encourages electronic filings. conform with 18 CFR 4.30 and 4.36.
and local agencies are invited to file Please include the project number (P– n. Competing Development
comments on the described application. 12902–000) on any comments or Application—Any qualified
A copy of the application may be motions filed. development applicant desiring to file a
obtained by agencies directly from the The Commission’s Rules of Practice competing development application
Applicant. If an agency does not file and Procedure require all intervenors must submit to the Commission, on or
comments within the time specified for filing documents with the Commission before a specified comment date for the
filing comments, it will be presumed to to serve a copy of that document on particular application, either a
have no comments. One copy of an each person in the official service list competing development application or a
agency’s comments must also be sent to for the project. Further, if an intervenor notice of intent to file such an
the Applicant’s representatives. files comments or documents with the application. Submission of a timely
Commission relating to the merits of an notice of intent to file a development
Kimberly D. Bose, issue that may affect the responsibilities application allows an interested person
Secretary. of a particular resource agency, they to file the competing application no
[FR Doc. E7–23433 Filed 12–3–07; 8:45 am] must also serve a copy of the document later than 120 days after the specified
BILLING CODE 6717–01–P on that resource agency. comment date for the particular
k. Description of Project: The application. A competing license
proposed project using the U.S. Army application must conform with 18 CFR
DEPARTMENT OF ENERGY Corps of Engineers’ Allegheny Lock & 4.30 and 4.36.
Dam No. 2 and operated in a run-of- o. Notice of Intent—A notice of intent
Federal Energy Regulatory river mode would consist of: (1) A new must specify the exact name, business
Commission 125-foot-long, 160-foot-wide, 60-foot- address, and telephone number of the
[Project No. 12902–000] high concrete powerhouse; (2) a new prospective applicant, and must include
intake channel and tailrace channel on an unequivocal statement of intent to
BPUS Generation Development, LLC; the north side of the dam, opposite the submit, if such an application may be
Notice of Application Accepted for existing lock structure; (3) three turbine/ filed, either a preliminary permit
Filing and Soliciting Motions To generator units with a combined application or a development
Intervene, Protests, and Comments installed capacity of 12 megawatts; (4) a application (specify which type of
new 10,000-foot-long above ground application). A notice of intent must be
November 26, 2007.
transmission line extending from the served on the applicant(s) named in this
Take notice that the following switchyard near the powerhouse to an public notice.
hydroelectric application has been filed interconnection point with an existing p. Proposed Scope of Studies Under
with the Commission and is available transmission line located east of the Permit—A preliminary permit, if issued,
for public inspection: dam and proposed powerhouse; and (5) does not authorize construction. The
a. Type of Application: Preliminary appurtenant facilities. The proposed term of the proposed preliminary permit
Permit. Allegheny Lock & Dam No. 2 Project would be 36 months. The work
b. Project No.: 12902–000. proposed under the preliminary permit
c. Date filed: July 30, 2007. would have an average annual
d. Applicant: BPUS Generation generation of 66 gigawatt-hours. would include economic analysis,
Development, LLC. l. This filing is available for review at preparation of preliminary engineering
e. Name of Project: Allegheny Lock & the Commission in the Public Reference plans, and a study of environmental
Dam No. 2 Hydroelectric Project. Room or may be viewed on the impacts. Based on the results of these
f. Location: Allegheny River in Commission’s Web site at http:// studies, the Applicant would decide
Allegheny County, Pennsylvania. It www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
would use the U.S. Army Corps of Enter the docket number excluding the of a development application to
Engineers’ Allegheny Lock & Dam No. 2. last three digits in the docket number construct and operate the project.
g. Filed Pursuant to: Federal Power field to access the document. For q. Comments, Protests, or Motions To
Act, 16 U.S.C. 791(a)—825(r). assistance, call toll-free 1–866–208– Intervene—Anyone may submit
h. Applicant Contact: Mr. Jeffrey M. 3676 or e-mail comments, a protest, or a motion to
Auser, P.E., BPUS Generation FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the
Development, LLC, 225 Greenfield For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and
Parkway, Suite 201, Liverpool, NY also available for inspection and Procedure, 18 CFR 385.210, .211, .214.
13088, (315) 413–2700. reproduction at the address in item h In determining the appropriate action to
i. FERC Contact: Robert Bell, (202) above. take, the Commission will consider all
502–4126. m. Competing Preliminary Permit— protests or other comments filed, but
mstockstill on PROD1PC66 with NOTICES

j. Deadline for filing comments, Anyone desiring to file a competing only those who file a motion to
protests, and motions to intervene: 60 application for preliminary permit for a intervene in accordance with the
days from the issuance date of this proposed project must submit the Commission’s Rules may become a
notice. competing application itself, or a notice party to the proceeding. Any comments,
All documents (original and eight of intent to file such an application, to protests, or motions to intervene must
copies) should be filed with: Kimberly the Commission on or before the be received on or before the specified

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1
68148 Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices

comment date for the particular f. Location: Ohio River in Allegheny www.ferc.gov using the ‘‘eLibrary’’ link.
application. County, Pennsylvania. It would use the Enter the docket number excluding the
r. Filing and Service of Responsive U.S. Army Corps of Engineers’ last three digits in the docket number
Documents—Any filings must bear in Dashields Locks & Dam. field to access the document. For
all capital letters the title g. Filed Pursuant to: Federal Power assistance, call toll-free 1–866–208–
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791(a)–825(r). 3676 or e-mail
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M. FERCONLINESUPPORT@FERC.GOV.
‘‘COMPETING APPLICATION’’, Auser, P.E., BPUS Generation For TTY, call (202) 502–8659. A copy is
‘‘PROTEST’’, and ‘‘MOTION TO Development, LLC, 225 Greenfield also available for inspection and
INTERVENE’’, as applicable, and the Parkway, Suite 201, Liverpool, NY reproduction at the address in item h
Project Number of the particular 13088, (315) 413–2700. above.
application to which the filing refers. i. FERC Contact: Robert Bell, (202) m. Competing Preliminary Permit—
Any of the above-named documents 502–4126. Anyone desiring to file a competing
must be filed by providing the original j. Deadline for filing comments, application for preliminary permit for a
and the number of copies provided by protests, and motions to intervene: 60 proposed project must submit the
the Commission’s regulations to: The days from the issuance date of this competing application itself, or a notice
Secretary, Federal Energy Regulatory notice. of intent to file such an application, to
Commission, 888 First Street, NE., All documents (original and eight the Commission on or before the
Washington, DC 20426. An additional copies) should be filed with: Secretary, specified comment date for the
copy must be sent to Director, Division Federal Energy Regulatory Commission, particular application (see 18 CFR 4.36).
of Hydropower Administration and 888 First Street, NE., Washington, DC Submission of a timely notice of intent
Compliance, Federal Energy Regulatory 20426. Comments, protests, and allows an interested person to file the
Commission, at the above-mentioned interventions may be filed electronically competing preliminary permit
address. A copy of any notice of intent, via the Internet in lieu of paper; see 18 application no later than 30 days after
competing application or motion to CFR 385.2001(a)(1)(iii) and the the specified comment date for the
intervene must also be served upon each instructions on the Commission’s Web particular application. A competing
representative of the Applicant site under the ‘‘e-Filing’’ link. The preliminary permit application must
specified in the particular application. Commission strongly encourages conform with 18 CFR 4.30 and 4.36.
s. Agency Comments—Federal, state, electronic filings. Please include the n. Competing Development
and local agencies are invited to file project number (P–12904–000) on any Application—Any qualified
comments on the described application. comments or motions filed. development applicant desiring to file a
A copy of the application may be The Commission’s Rules of Practice competing development application
obtained by agencies directly from the and Procedure require all intervenors must submit to the Commission, on or
Applicant. If an agency does not file filing documents with the Commission before a specified comment date for the
comments within the time specified for to serve a copy of that document on particular application, either a
filing comments, it will be presumed to each person in the official service list competing development application or a
have no comments. One copy of an for the project. Further, if an intervenor notice of intent to file such an
agency’s comments must also be sent to files comments or documents with the application. Submission of a timely
the Applicant’s representatives. Commission relating to the merits of an notice of intent to file a development
issue that may affect the responsibilities application allows an interested person
Kimberly D. Bose, of a particular resource agency, they to file the competing application no
Secretary. must also serve a copy of the document later than 120 days after the specified
[FR Doc. E7–23434 Filed 12–3–07; 8:45 am] on that resource agency. comment date for the particular
BILLING CODE 6717–01–P k. Description of Project: The application. A competing license
proposed project using the U.S. Army application must conform with 18 CFR
Corps of Engineers’ Dashields Locks & 4.30 and 4.36.
DEPARTMENT OF ENERGY Dam and operated in a run-of-river o. Notice of Intent—A notice of intent
mode would consist of: (1) A new 200- must specify the exact name, business
Federal Energy Regulatory
foot long, 200-foot wide, 50-foot high address, and telephone number of the
Commission
concrete powerhouse; (2) a new intake prospective applicant, and must include
[Project No. 12904–000] channel and tailrace channel on the an unequivocal statement of intent to
northeastern side of the river opposite submit, if such an application may be
BPUS Generation Development, LLC; the existing locks structure; (3) five filed, either a preliminary permit
Notice of Application Accepted for turbine/generator units with a combined application or a development
Filing and Soliciting Motions To installed capacity of 25 megawatts; (4) a application (specify which type of
Intervene, Protests, and Comments new 11,500-foot long above ground application). A notice of intent must be
November 26, 2007. transmission line extending from the served on the applicant(s) named in this
Take notice that the following switchyard near the powerhouse to an public notice.
hydroelectric application has been filed interconnection point with an existing p. Proposed Scope of Studies Under
with the Commission and is available transmission line located northwest of Permit—A preliminary permit, if issued,
for public inspection: the powerhouse; and (5) appurtenant does not authorize construction. The
a. Type of Application: Preliminary facilities. The proposed Dashields Locks term of the proposed preliminary permit
Permit. & Dam Project would have an average would be 36 months. The work
mstockstill on PROD1PC66 with NOTICES

b. Project No.: 12904–000. annual generation of 120 gigawatt- proposed under the preliminary permit
c. Date filed: July 30, 2007. hours. would include economic analysis,
d. Applicant: BPUS Generation l. This filing is available for review at preparation of preliminary engineering
Development, LLC. the Commission in the Public Reference plans, and a study of environmental
e. Name of Project: Dashields Locks & Room or may be viewed on the impacts. Based on the results of these
Dam Hydroelectric Project. Commission’s Web site at http:// studies, the Applicant would decide

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1

Vous aimerez peut-être aussi