Introduction
Plan-Do-Check-Act Approach to 5S
The PDCA (plan, do, check, act), or Deming cycle, of implementing 5S is
effective. This is a never-ending process and has to follow a process approach.
The 5S
Seiri, or Sort
Seiri is sorting through the contents of the workplace and removing unnecessary
items. This is an action to identify and eliminate all unnecessary items from the
workplace.
Actions items:
1. Look around the workplace along with colleagues to discover and identify
items, which are not needed and not necessary to complete work.
2. Develop criteria for disposal for not-needed items.
3. Take before photographs wherever it is required.
4. An effective method for recording progress is to tag the items not needed. This
visual control of the not-needed items is often called red tagging.
5. While red tagging, ask these
10. Items or equipment used once a
questions:
week or once a month should be
Is this item needed?
kept within the work area.
If it is needed, is it needed in this
11. Items or equipment used less
quantity?
frequently should be stored in a more
If it is needed, how frequently is it
distant location.
used?
12. Unneeded or unnecessary items
If it is needed, should it be located
should be stored in the holding area.
here?
13. Individual departments should
Who is ultimately responsible for the
each have a holding area.
item? (Verify from that person.)
14. A holding area should be clearly
Are there any other not-needed items
visible and clearly marked to assure
cluttering the workplace?
visual control of items.
Are there tools or material left on the
15. Display pictures of items and
floor?
place it on a public board visible to
6. Find a holding area to put red
all.
tagged items.
16. Responsibility for the holding
7. If it is difficult to decide whether an
area should be assigned to some at
item is necessary or not, put a
the beginning of sorting activity.
different tag and segregate it in the
17. The items in holding area should
holding area.
be kept for three or four months. If
8. Classify the items by frequency of
the items are not needed for work,
use.
then the items can be disposed. It is
9. Items or equipment used hour by
always necessary to verify plans to
hour or day by day should be kept
dispose of items with anyone who
within arms reach of the point of use.
had been using these items in the
item belongs.
9. Locate needed items so they can
be retrieved in 30 to 60 seconds with
minimum steps.
10. Make sure to inform everybody at
the workplace about positioning of
the items.
11. Make a clear list of items with
their locations and put it on lockers
or cabinets.
12.
Label
each
locker/drawer/cupboard to show what
is kept inside.
13. Outline locations of equipment,
supplies, common areas and safety
zones with lines:
Divider lines define aisle ways and
work stations.
Marker lines show position of
equipment.
Range lines indicate range of
operation of doors or equipment.
Limit lines show height limits related
to items stored in the workplace.
Tiger marks draw attention to safety
hazards.
Arrows show direction.
14. Identify all needed items with
labels.
15. Take after photographs.
16. Complete evaluation using 5S
levels of implementation with the
facility manager or the authorized
person in the organization.
of actions, condition and culture. To get the greatest success, the nature and
implication of each S need to be understood by each employee and should be
regularly practiced.
Recommended Implementation of 5s to TDD
a. Take pictures of cubicles of each TDD personnel at the start of each
month. Preferably during break time (12:00nn)
b. Make a log sheet in which each member of TDDs name is indicated and
identify from the photos what items should be minimized during working
hours.
c. Submit a report to the section head/supervisor the details of which
cubicles must organize their working area.