Web site that enables subscribers to ‘‘eFiling’’ link at http://www.ferc.gov. sale to MEHI an undivided interest of
receive e-mail notification when a Persons unable to file electronically the following:
document is added to a subscribed should submit an original and 14 copies Twin 30 Pipelines extending from
docket(s). For assistance with any FERC of the protest or intervention to the Southern’s interconnection with Elba Island
Online service, please e-mail Federal Energy Regulatory Commission, to Port Wentworth, Georgia in Chatham
VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1
Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices 60835
County, Georgia and Jasper County, South Commission staff’s issuance of the final required to serve copies of filed
Carolina; 10 miles of Southern’s 20-inch environmental impact statement (FEIS) documents on all other parties. The
Wrens to Savannah Second Loop Line from or EA for this proposal. The filing of the Commission’s rules require that persons
the interconnection with the Twin 30
EA in the Commission’s public record filing comments in opposition to the
Pipelines at Port Wentworth, Georgia, to the
Rincon Gate in Effingham County, Georgia; for this proceeding or the issuance of a project provide copies of their protests
The Cypress Pipeline from the take off point Notice of Schedule for Environmental only to the applicant. However, the non-
on the Wrens Savannah Lines to the Review will serve to notify federal and party commentors will not receive
interconnection with Atlanta Gas Light state agencies of the timing for the copies of all documents filed by other
Company’s (AGLC) Brunswick Pipeline in completion of all necessary reviews, and parties or issued by the Commission
Glynn County, Georgia, including, as the subsequent need to complete all (except for the mailing of environmental
applicable, the compressor facilities to be federal authorizations within 90 days of documents issued by the Commission)
constructed on that portion of the Cypress
the date of issuance of the Commission and will not have the right to seek court
Pipeline; and Southern’s Brunswick Pipeline
from the Jackson Measurement Station at staff’s FEIS or EA. review of the commission’s final order.
Milepost 53.8 to Milepost 0.0. There are two ways to become The Commission strongly encourages
involved in the Commission’s review of electronic filings of comments, protests,
It is stated that upon closing of the this project. First, any person wishing to and interventions via the Internet in lieu
sale of the facilities, MEHI and Southern obtain legal status by becoming a party of paper; see 18 CFR 385.2001(a)(1)(iii)
request authorization for MEHI to lease to the proceeding for this project and the instructions on the
to Southern the facilities, including the should, on or before the comment date Commission’s Web site under the ‘‘e-
compression facilities to be constructed, stated below, file with the Federal Filing’’ link.
and AGLC’s Brunswick Pipeline that it Energy Regulatory Commission, 888 Comment Date: November 9, 2007.
proposes to sell to MEHI so that First Street, NE., Washington, DC 20426,
Southern may operate and maintain the a motion to intervene in accordance Kimberly D. Bose,
facilities as part of its interstate gas with the requirements of the Secretary.
pipeline system under the terms of Commission’s Rules of Practice and [FR Doc. E7–21160 Filed 10–25–07; 8:45 am]
Southern’s tariff. In addition, it is stated Procedure (18 CFR 385.214 or 385.211) BILLING CODE 6717–01–P
that MEHI requests pregranted and the Regulations under the NGA (18
abandonment authority to sell the AGLC CFR 157.10). A person obtaining party
Brunswick Pipeline back to AGLC upon status will be placed on the service list DEPARTMENT OF ENERGY
termination of the lease. maintained by the Secretary of the
This filing is available for review at Commission and will receive copies of Federal Energy Regulatory
the Commission in the Public Reference all documents filed by the applicant and Commission
Room or may be viewed on the by all other parties. A party must submit [Docket No. EF07–4021–000]
Commission’s Web site at http:// 14 copies of filings made with the
www.ferc.gov using the ‘‘eLibrary’’ link. Commission and must mail a copy to Southwestern Power Administration;
Enter the docket number excluding the the applicant and to every other party in Notice of Filing
last three digits in the docket number the proceeding. Only parties to the
field to access the document. For proceeding can ask for court review of October 18, 2007.
assistance, contact FERC Online Commission orders in the proceeding. Take notice that on September 17,
Support at However, a person does not have to 2007, the Deputy Secretary, U.S.
FERCOnlineSupport@ferc.gov or intervene to have comments considered. Department of Energy, pursuant to the
Telephone: 202–502–6652; Toll-free: 1– The second way to participate is by authority vested on the Deputy
866–208–3676; or for TTY, contact (202) filing with the Secretary of the Secretary by the Department of Energy’s
502–8659. Commission, as soon as possible, an Delegation Order Nos. 00–001.00C and
Any initial questions regarding original and two copies of comments in 00–037.00, and by sections 301(b),
Southern’s proposal in this application support of or in opposition to this 302(a), 402(e), 641, 642, 643 and 644 of
should be directed to Patricia S. Francis, project. The Commission will consider the Department of Energy Organization
Senior Counsel, Southern Natural Gas these comments in determining the Act (Pub. L. 95091), submitted for
Company, P.O. Box 2563, Birmingham, appropriate action to be taken, but the confirmation and approval on a final
Alabama 35202–2563, or call (205) 325– filing of a comment alone will not serve basis, the annual power rate increase for
7696. Any initial questions regarding to make the filer a party to the the sale of power and energy by the
EMHI’s proposal in this application proceeding. The Commission’s rules Southwestern Power Administration
should be directed to Shannon Omia require that persons filing comments in from the Sam Rayburn Dam to the Sam
Pierce, Senior Regulatory Counsel, AGL opposition to the project provide copies Rayburn Dam Electric Cooperative, Inc.,
Resources, Inc., Ten Peachtree Place, of their protests only to the party or under Contract No. DE–PM–75–
15th floor, Atlanta, Georgia 30309, or parties directly involved in the protest. 92SW00215, effective October 1, 2007
call (404) 584–3394. Persons who wish to comment only and ending September 30, 2012.
Pursuant to section 157.9 of the on the environmental review of this Any person desiring to intervene or to
Commission’s rules, 18 CFR 157.9, project, should submit an original and protest this filing must file in
within 90 days of this Notice the two copies of their comments to the accordance with Rules 211 and 214 of
Commission staff will either: complete Secretary of the Commission. the Commission’s Rules of Practice and
its environmental assessment (EA) and Environmental commentors will be Procedure (18 CFR 385.211, 385.214).
place it into the Commission’s public placed on the Commission’s Protests will be considered by the
record (eLibrary) for this proceeding; or environmental mailing list, will receive Commission in determining the
rmajette on PROD1PC64 with NOTICES
issue a Notice of Schedule for copies of the environmental documents, appropriate action to be taken, but will
Environmental Review. If a Notice of and will be notified of meetings not serve to make protestants parties to
Schedule for Environmental Review is associated with the Commission’s the proceeding. Any person wishing to
issued, it will indicate, among other environmental review process. become a party must file a notice of
milestones, the anticipated date for the Environmental commentors will not be intervention or motion to intervene, as
VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1