Federal Register / Vol. 72, No.

203 / Monday, October 22, 2007 / Notices 59521

DEPARTMENT OF ENERGY requested waivers of various ‘‘e-Filing’’ link. The Commission


Commission regulations. In particular, strongly encourages electronic filings.
Federal Energy Regulatory RBS requested that the Commission
Commission Kimberly D. Bose,
grant blanket approval under 18 CFR
Secretary.
[RT01–99–000, RT01–99–001, RT01–99–002 part 34 of all future issuances of
[FR Doc. E7–20709 Filed 10–19–07; 8:45 am]
and RT01–99–003; RT01–86–000, RT01–86– securities and assumptions of liability
BILLING CODE 6717–01–P
001 and RT01–86–002; RT01–95–000, RT01– by RBS.
95–001 and RT01–95–002; RT01–2–000,
RT01–2–001, RT01–2–002 and RT01–2–003; On October 12, 2007, pursuant to
RT01–98–000; RT02–3–000] delegated authority, the Director, DEPARTMENT OF ENERGY
Division of Tariffs and Market
Regional Transmission Organizations; Development-West, granted the requests Federal Energy Regulatory
Bangor Hydro-Electric Company, et al.; for blanket approval under Part 34 Commission
New York Independent System (Director’s Order). The Director’s Order [Docket No. CP07–451–000]
Operator, Inc., et al.; PJM also stated that the Commission would
Interconnection, L.L.C., et al.; PJM publish a separate notice in the Federal Black Bayou Storage, LLC; Notice of
Interconnection, L.L.C.; ISO New Register establishing a period of time for Intent To Prepare an Environmental
England, Inc.; New York Independent the filing of protests. Accordingly, any Assessment for the Proposed Black
System Operator, Inc.; Notice of Filing person desiring to be heard concerning Bayou Gas Storage Project and
the blanket approvals of issuances of Request for Comments on
October 12, 2007.
securities or assumptions of liability by Environmental Issues
Take notice that PJM Interconnection,
L.L.C., New York Independent System RBS, should file a protest with the October 12, 2007.
Operator, Inc. and ISO New England, Federal Energy Regulatory Commission, The staff of the Federal Energy
Inc. have posted on their internet Web 888 First Street, NE., Washington, DC Regulatory Commission (FERC or
sites information updating their 20426, in accordance with Rules 211 Commission) will prepare an
progress on the resolution of Regional and 214 of the Commission’s Rules of environmental assessment (EA) that will
Transmission Organization seams. Practice and Procedure. 18 CFR 385.211, discuss the environmental impacts of
Any person desiring to file comments 385.214 (2004). the Black Bayou Gas Storage Project
on this information should file with the involving construction and operation of
Notice is hereby given that the
Federal Energy Regulatory Commission, facilities by Black Bayou Storage, LLC
888 First Street, NE., Washington, DC deadline for filing protests is November
13, 2007. (BBS) in Cameron Parrish, Louisiana.
20426, in accordance with Rules 211 This notice announces the opening of
and 214 of the Commission’s Rules of Absent a request to be heard in the scoping process we will use to
Practice and Procedure (18 CFR 385.211 opposition to such blanket approvals by gather input from the public and
and 385.214). All such comments the deadline above, RBS is authorized to interested agencies on the project. Your
should be filed on or before the issue securities and assume obligations input will help the Commission staff
comment date. Comments may be filed or liabilities as a guarantor, indorser, determine which issues need to be
electronically via the Internet in lieu of surety, or otherwise in respect of any evaluated in the EA. Please note that the
paper; see 18 CFR 385.2001(a)(1)(iii) security of another person; provided scoping period will close on November
and the instructions on the that such issuance or assumption is for 30, 2007.
Commission’s Web site under the ‘‘e- some lawful object within the corporate This notice is being sent to affected
Filing’’ link. The Commission strongly purposes of RBS, compatible with the landowners; federal, state, and local
encourages electronic filings. public interest, and is reasonably government representatives and
Comment Date: November 6, 2007. agencies; environmental and public
necessary or appropriate for such
Kimberly D. Bose, purposes. interest groups; Native American tribes;
Secretary. other interested parties in this
The Commission reserves the right to proceeding; and local libraries and
[FR Doc. E7–20708 Filed 10–19–07; 8:45 am] require a further showing that neither newspapers. We encourage government
BILLING CODE 6717–01–P public nor private interests will be representatives to notify their
adversely affected by continued constituents of this planned project and
approvals of RBS’ issuance of securities encourage them to comment on their
DEPARTMENT OF ENERGY or assumptions of liability. areas of concern.
Federal Energy Regulatory Copies of the full text of the Director’s If you are a landowner receiving this
Commission Order are available from the notice, you may be contacted by a
Commission’s Public Reference Room, pipeline company representative about
[Docket Nos. ER07–1215–000 and ER07– the acquisition of an easement to
1215–001] 888 First Street, NE., Washington, DC
20426. The Order may also be viewed construct, operate, and maintain the
The Royal Bank of Scotland, plc; on the Commission’s Web site at proposed facilities. The pipeline
Notice of Issuance of Order http://www.ferc.gov, using the eLibrary company would seek to negotiate a
link. Enter the docket number excluding mutually acceptable agreement.
October 12, 2007. However, if the project is approved by
the last three digits in the docket
The Royal Bank of Scotland, plc (RBS) the Commission, that approval conveys
number filed to access the document.
filed an application for market-based with it the right of eminent domain.
ebenthall on PRODPC61 with NOTICES

rate authority, with an accompanying Comments, protests, and interventions Therefore, if easement negotiations fail
rate schedule. The proposed market- may be filed electronically via the to produce an agreement, the pipeline
based rate schedule provides for the sale internet in lieu of paper. See, 18 CFR company could initiate condemnation
of energy, capacity and ancillary 385.2001(a)(1)(iii) and the instructions proceedings in accordance with state
services at market-based rates. RBS also on the Commission’s Web site under the law.

VerDate Aug<31>2005 15:02 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1
59522 Federal Register / Vol. 72, No. 203 / Monday, October 22, 2007 / Notices

A fact sheet prepared by the FERC would need to be dismantled, relocated are encouraged to notify their
entitled ‘‘An Interstate Natural Gas or removed before BBS constructs its constituents of this proposed action and
Facility on My Land? What Do I Need proposed compressor station and encourage them to comment on their
To Know?’’ was attached to the project leaching facility on the site of Diasu’s areas of concern.
notice BBS provided to landowners. current facilities. In the EA we 2 will discuss impacts
This fact sheet addresses a number of The location of the project facilities is that could occur as a result of the
typically asked questions, including the shown in Appendix 1.1 construction and operation of the
use of eminent domain and how to Nonjurisdictional Facilities proposed project under these general
participate in the Commission’s headings:
proceedings. It is available for viewing Non-jurisdictional facilities that will • Geology and soils
on the FERC Internet Web site be built as a result of the proposed • Land use
(www.ferc.gov). project would include a 2.2 mile-long • Water resources, fisheries, and
230 kV electric powerline to be wetlands
Summary of the Proposed Project constructed by Entergy, Inc. (Entergy). • Cultural resources
BBS proposes to convert a depleted The electric powerline would run • Vegetation and wildlife
natural gas production field in Cameron between Entergy’s existing 230 kV • Air quality and noise
Parish Louisiana located 15 miles west transmission line on the south bank of • Endangered and threatened species
of Hackberry, Louisiana but includes the Gulf Intracoastal Waterway and • Hazardous waste
north into Calcasieu Parish for a short BBS’s proposed electrical substation • Public safety
distance. The storage field design approximately 2,100 feet northwest of We will also evaluate possible
capacity of each cavern would be the Central Facility area. The electric alternatives to the proposed project or
approximately 10.4 billion cubic feet powerline would require several portions of the project, and make
(Bcf) consisting of 7.5 Bcf of working environmental permits and approvals recommendations on how to lessen or
capacity and up to 2.9 Bdf of cushion including state and federal avoid impacts on the various resource
gas. The caverns would have authorization for work in waters of the areas.
approximately 1,200 million cubic feet U.S. (Coastal Use Permit) and clearances Our independent analysis of the
(MMcf) of maximum daily injection under the Endangered Species Act and issues will be in the EA. Depending on
capability and approximately 1,200 the National Historic Preservation Act. the comments received during the
MMcf of maximum daily withdrawal Land Requirements for Construction scoping process, the EA may be
capability. BBS seeks authority to published and mailed to federal, state,
Construction of the proposed facilities
construct and operate the following and local agencies, public interest
would require about 94.4 acres of land.
facilities: groups, interested individuals, affected
Following construction, about 24.2 acres
• Two salt dome storage caverns; landowners, newspapers, libraries, and
would be maintained as permanent
• One 18,940 horsepower compressor the Commission’s official service list for
pipeline right-of-way, new access roads,
station; this proceeding. A comment period will
well sites, or new aboveground facility
• One leaching plant; be allotted for review if the EA is
• Five brine disposal wells on one sites. The remaining 70.2 acres of land
published. We will consider all
common pad; would be restored and allowed to revert
comments on the EA before we make
• Five water supply wells on five to its former use.
our recommendations to the
separate pads; The EA Process Commission.
• One electrical substation; To ensure your comments are
The National Environmental Policy
• One 30-inch-diameter, 2.45-mile- considered, please carefully follow the
Act (NEPA) requires the Commission to
long gas pipeline interconnect with instructions in the public participation
take into account the environmental
Transcontinental Gas Pipeline section below.
impacts that could result from an action
Corporation (Transco) mainline;
whenever it considers the issuance of a Currently Identified Environmental
• One 24-inch-diameter, 4.69-mile-
Certificate of Public Convenience and Issues
long gas pipeline interconnect with
Necessity. NEPA also requires us to
planned Kinder Morgan mainline; We have already identified several
• One 20-inch-diameter, 0.10-mile- discover and address concerns the
public may have about proposals. This issues that we think deserve attention
long cavern gas pipeline for Cavern No. based on a preliminary review of the
1; process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to proposed facilities and the
• One 20-inch-diameter, 0.25-mile- environmental information provided by
long cavern gas pipeline for Cavern No. focus the analysis in the EA on the
important environmental issues. By this BBS. This preliminary list of issues may
2; be changed based on your comments
• One 8-inch-, 12-inch-, and 16-inch- Notice of Intent, the Commission staff
requests public comments on the scope and our analysis.
diameter, 2.20 mile-long water pipeline • Cultural resources may be affected
system; of the issues to address in the EA. All
comments received are considered by the project.
• One 16-inch-diameter, 1.43 mile- • The project would cross two major
long brine pipeline system; during the preparation of the EA. State
and local government representatives waterbodies: Black Bayou and the Gulf
• One meter station and one separate Intracoastal Waterway.
tie-in facility for Transco’s pipeline • About 62.2 acres of wetlands, open
1 The appendices referenced in this notice are not
interconnect; water, and other land uses would be
being printed in the Federal Register. Copies of all
• One meter station with combined appendices, other than Appendix 1 (maps), are impacted during construction by
tie-in facilities for the Kinder Morgan
ebenthall on PRODPC61 with NOTICES

available on the Commission’s Web site at the underground pipeline and cable
pipeline interconnect; and ‘‘eLibrary’’ link or from the Commission’s Public
facilities, and about 6.8 acres of wetland
• One 0.25-mile-long access road for Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
Cavern Nos. 1 and 2. on connecting to eLibrary refer to the last page of 2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
Certain facilities of Diasu Oil and Gas this notice. Copies of the appendices were sent to environmental staff of the Office of Energy Projects
Company (Diasu) including a tank farm all those receiving this notice in the mail. (OEP).

VerDate Aug<31>2005 16:04 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1
Federal Register / Vol. 72, No. 203 / Monday, October 22, 2007 / Notices 59523

open water and other land uses would Environmental Mailing List Commission’s Office of External Affairs,
be impacted by above ground pipeline An effort is being made to send this at 1–866–208–FERC or on the FERC
facilities. notice to all individuals, organizations, Internet Web site (www.ferc.gov) using
• Two cavern well pads, electrical and government entities interested in the eLibrary link. Click on the eLibrary
substation, part of the brine disposal and/or potentially affected by the link, click on ‘‘General Search’’ and
well pad site, the Kinder Morgan meter enter the docket number excluding the
proposed project. This includes all
station site, the Transco meter station, last three digits in the Docket Number
landowners who are potential right-of-
and Water Well Pad No. 1, would be field. Be sure you have selected an
way grantors, whose property may be
constructed in marshland or open water appropriate date range. For assistance,
used temporarily for project purposes,
and could potentially impact fisheries. please contact FERC Online Support at
or who own homes within distances
• Essential fish habitat for the brown FercOnlineSupport@ferc.gov or toll free
defined in the Commission’s regulations
shrimp, white shrimp, and red drum are at 1–866–208–3676, or for TTY, contact
of certain aboveground facilities. By this
likely to be of concern within the (202) 502–8659. The eLibrary link also
notice we are also asking governmental
project area. provides access to the texts of formal
agencies, especially those in Appendix
documents issued by the Commission,
• The proposed project would 2, to express their interest in becoming such as orders, notices, and
encompass areas containing suitable cooperating agencies for the preparation rulemakings.
nesting habitat for colonial wading of the EA. In addition, the Commission now
birds. If you do not want to send comments offers a free service called eSubscription
at this time but still want to remain on which allows you to keep track of all
Public Participation
our mailing list, please return the formal issuances and submittals in
You can make a difference by Information Request (Appendix 3). If specific dockets. This can reduce the
providing us with your specific you do not return the Information amount of time you spend researching
comments or concerns about the project. Request, you will be taken off the proceedings by automatically providing
By becoming a commentor, your mailing list. you with notification of these filings,
concerns will be addressed in the EA/ document summaries and direct links to
Becoming an Intervenor
EIS and considered by the Commission. the documents. Go to www.ferc.gov/
You should focus on the potential In addition to involvement in the EA esubscribenow.htm.
environmental effects of the proposal, scoping process, you may want to Finally, public meetings or site visits
alternatives to the proposal (including become an official party to the will be posted on the Commission’s
alternative locations/routes), and proceeding, an ‘‘intervenor’’. To become calendar located at http://www.ferc.gov/
measures to avoid or lessen an intervenor you must file a motion to EventCalendar/EventsList.aspx along
environmental impact. The more intervene according to Rule 214 of the with other related information.
specific your comments, the more useful Commission’s Rules of Practice and
they will be. Please carefully follow Procedure (18 CFR 385.214). Intervenors Kimberly D. Bose,
these instructions to ensure that your have the right to seek rehearing of the Secretary.
comments are received in time and Commission’s decision. Motions to [FR Doc. E7–20716 Filed 10–19–07; 8:45 am]
properly recorded: Intervene should be electronically BILLING CODE 6717–01–P
• Send an original and two copies of submitted using the Commission’s
your letter to: eFiling system at www.ferc.gov. Persons
without Internet access should send an DEPARTMENT OF ENERGY
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 original and 14 copies of their motion to
the Secretary of the Commission at the Federal Energy Regulatory
First St., NE., Room 1A, Washington, DC Commission
20426. address indicated previously. Persons
filing Motions to Intervene on or before [Project No. 12886–000]
• Label one copy of the comments for
the comment deadline indicated above
the attention of Gas Branch 2. BPUS Generation Development, LLC;
must send a copy of the motion to the
• Reference Docket No. CP07–451– Applicant. All filings, including late Notice of Application Accepted for
000. interventions, submitted after the Filing and Soliciting Motions To
• Mail your comments so that they comment deadline must be served on Intervene, Protests, and Comments
will be received in Washington, DC on the Applicant and all other intervenors
or before November 30, 2007. October 12, 2007.
identified on the Commission’s service
Please note that the Commission Take notice that the following
list for this proceeding. Persons on the
encourages electronic filing of hydroelectric application has been filed
service list with e-mail addresses may
comments. See 18 Code of Federal with the Commission and is available
be served electronically; others must be
Regulations 385.2001(a)(1)(iii) and the for public inspection:
served a hard copy of the filing. a. Type of Application: Preliminary
instructions on the Commission’s Affected landowners and parties with Permit.
Internet Web site at http://www.ferc.gov environmental concerns may be granted b. Project No.: 12886–000.
under the ‘‘eFiling’’ link and the link to intervenor status upon showing good c. Date filed: July 30, 2007.
the User’s Guide. Prepare your cause by stating that they have a clear d. Applicant: BPUS Generation
submission in the same manner as you and direct interest in this proceeding Development, LLC.
would if filing on paper and save it to which would not be adequately e. Name of Project: Fulton Lock &
a file on your hard drive. Before you can represented by any other parties. You do Dam Hydroelectric Project.
file comments you will need to create an not need intervenor status to have your f. Location: Tombigbee River in
ebenthall on PRODPC61 with NOTICES

account by clicking on ‘‘Login to File’’ environmental comments considered. Itawamba County, Mississippi. It would
and then ‘‘New User Account.’’ You will use the U.S. Army Corps of Engineers’
be asked to select the type of filing you Availability of Additional Information
Fulton Lock & Dam.
are making. This filing is considered a Additional information about the g. Filed Pursuant to: Federal Power
‘‘Comment on Filing.’’ project is available from the Act, 16 U.S.C. 791(a)–825(r).