Académique Documents
Professionnel Documents
Culture Documents
MODALIDADES DE INTERVENCI
CONCURSO REGULAR
DESCRIPCION
% MAXIMO
MONC
COSTO DE
PARTICIPANTE
CUANDRO DE
INSUMOS
65.00%
APORTE MAXIMO
SOLICITADO
S/.
RUBRO OTROS
150,000.00
DESCRIPCION
COFINANCIAMIENTO /ORG. E
COFINANCIANTE
NO
COSTO
SI
S/.
A. COSTOS DIRECTOS
S/.
36,350.00
S/.
26,250.00
S/.
5,000.00
X
X
EQUIPOS
S/.
2,600.00
KIT HERRAMIENTAS
S/.
2,500.00
S/.
4,025.00
S/.
1,650.00
S/.
1,875.00
B. COSTOS INDIRECTOS
SEGUIMIENTO Y CONTROL DEL PROYECTO
(CTE)
MAESTRO DE OBRA
S/.
S/.
X
X
500.00
DIFERENCIA
ASISTENTE DE OBRA
COMISIONES BANCARIAS 1% CD
GUARDIAN
OTROS GASTOS POR FORMULACION DE
PROYECTO
Sub-TOTAL
X
A+B
X
S/.
40,375.00
IDADES DE INTERVENCION
ACCION DE CONTINGENCIA
%MONC
APORTE
SOLICITADO AL
PROGRAMA
APORTE MAXIMO
SOLICITADO
RUBRO OTROS
%MONC
26250
COSTO
S/.
5,050.00
S/.
5,000.00
S/.
41,350.00
S/.
4,075.00
S/.
45,425.00
0
0.00
5,000.00
S/.
50.00
50.00
S/.
5,050.00
APORTE MAXIMO
SOLICITADO
RUBRO OTROS
S/.
4025
9025
5,110.00
DESCRIPCION
NO
TOTAL DE COFINANCIAMIEN
SUB TOTAL
SI
A. COSTOS DIRECTOS
X
X
X
X
X
X
X
X
X
X
X
B. COSTOS INDIRECTOS
SEGUIMIENTO Y CONTROL DEL PROYECTO (CTE)
X
X
X
X
DIFERENCIA
X
X
A+B
X
X
X
X
X
X
X
S/.
EL PROGRAMA Y COFINANCIAMIENTO
COSTO TOTAL
DEL
PROYECTO
OTAL DE COFINANCIAMIENTO
NO
SUB TOTAL
S/.
S/.
S/.
S/.
EJEMPLO APLICATIVO
ACTIVIDAD
Plazo de ejecucion
Err:509
Err:509
63 dias/habiles
CRITERIOS BASICOS A TENER ENCUENTA DURANTE LA FORMULACION DEL PROYECTO REFERENTE AL APORT
APORTE DEL PROGRAMA
MODALIDADES DE INTERVENC
CONCURSO REGULAR
DESCRIPCION
% MAXIMO
MONC
65.00%
Err:509
DESCRIPCION
COSTO DE
PARTICIPANTE
CUANDRO DE
INSUMOS
APORTE MAXIMO
SOLICITADO
S/.
S/.
150,000.00
111,417.00 Err:509
NO
COSTO
Err:509
Err:509
X
Err:509
X
EQUIPOS
0
S/.
KIT HERRAMIENTAS
B. COSTOS INDIRECTOS
SEGUIMIENTO Y CONTROL DEL PROYECTO
(CTE)
11,673.27
0
Err:509
0
S/.
24,770.27
S/.
6,000.00
MAESTRO DE OBRA
S/.
7,500.00
S/.
11,270.27
ASISTENTE DE OBRA
COMISIONES BANCARIAS 1% CD
GUARDIAN
OTROS GASTOS POR FORMULACION DE
PROYECTO
Sub-TOTAL
X
A+B
0
Err:509
Err:509
PLICATIVO
GULAR
ACCION DE CONTINGENCIA
RUBRO OTROS
%MONC
APORTE
SOLICITADO AL
PROGRAMA
APORTE MAXIMO
SOLICITADO
NO
COSTO
Err:509
S/.
10,241.47
Err:509
X
X
10,241.47
0.00
0.00
0.00
Err:509
Err:509
X
RUBRO OTROS
0.00
0.00
DIFERENCIA
0.00
0.00
240.27
2,280.00
Err:509
Err:509
Err:509
FORMATO N02
FICHA GENERAL DEL PROYECTO DEFINITIVO
MODALIDAD DE INTERVENCIN: PROYECTOS DE CONTINGENCIA -2014
I
Ubicacin
Distrito
: PUOS
Provincia
: HUAMALIES
Departamento
: HUANUCO
CREACION DE ESCALINATAS
Infraestructura Urbana
Econmica
S/.
S/.
S/.
S/.
278,243.74
5.1
S/.
79,837.19
5.2
S/.
198,406.55
Cofinanciamiento
S/.
a)
Organismo Proponente
S/.
Documento que presenta como sustento del aporte del Organismo Proponente:
0.00
0.00
63 das hbiles
N promedio de participantes
(MONC/(25*Plazo de Ejecucin)) trabajando en el
Proyecto (30 minimo). En todos los casos redondear al
inmediato inferior
50
278,243.74
240,273.47
37,970.27
b)
participantes
S/.
0.00
FORMATO N02
FICHA GENERAL DEL PROYECTO DEFINITIVO
13
14 RUC
Codigo SIAF de la Unidad Ejecutora (Del Gobierno
Regional o Local)
Nombre de la Unidad Ejecutora (Del Gobierno Regional
16
o Local)
: PUOS
: HUAMALIES
: HUANUCO
15
17 Telfono: celular/fijo
511832
04007429
PLAZA DE ARMAS S/N PUOS
FORMATO N02
FICHA GENERAL DEL PROYECTO DEFINITIVO
III. MEMORIA DESCRIPTIVA SUSCINTA DEL PROYECTO
El Proyecto "CREACIN DE ESCALINATAS DEL JR.SHINGUA Y JR. MARIANO QUISPE, DISTRITO DE PUOS
HUAMALIES - HUNUCO" se encuentra ubicado en el distrito de Puos, provincia de Huamalies y departamento
Hunuco.
El proyecto contempla la construccin de escalinatas de Concreto F'c=140kg/cm2
Jr. Shingua 189.77m
Jr. Mariano Quispe 35.64m
19 Sustento para la presentacin del Perfil del Proyecto
19.1 Descripcin de la situacin actual
En la actualidad la inadecuada infraestructura peatonal, se producen accidentes sobre todo en las epocas
lluvia;por lo cual los pobladores se ven en la necesidad de buscar vias alternas, que en la mayoria de los ca
son mas peligrosas. todo esto genera perdida de dinero y tiempo.
19.2 Descripcin de la situacin deseada
El anhelo de la poblacin es contar con la construccin de Escalinatas en el Jr. Mariano Quispe y Jr. Shing
que permitir tener Escalinastas por donde caminaran toda la poblacion.
19.3 Contribucin del proyecto al desarrollo de la localidad o zona de intervencin
Se pretende con el proyecto, lograr Mejorar la calidad de vida de la poblacion de los Jirones Shingua y
Mariano Quispe, dotando de infraestructura peatonal adecuada.
19.4 Actualmente el Proyecto cuenta con Perfil por la Quese est elaborando el Expediente Tcnico
20
Relevancia econmica
20.1
Qu tipo de actividades economicas se podra implementar una vez finalizada la ejecucin del proyecto?
- Facilitar el acceso a las viviendas.
- Disminuir constantes accidentes de nios y ancianos en epocas de lluvi
- Brindar un empleo temporal a los pobldores de la localidad , tanto
mujeres , varones y
personas
incluyendo
a los
la terceraeconmica
edad.
20.2 discapcitadas,
El proyecto tendr
impacto
en de
la actividad
de la zona? Explique.
Se generar actividades econmicas durante la ejecucion del proyecto brindando trabajo a los vecinos
escasos recursos y indirectamente al contar con un mejor servicios podran desarrollar actividades domestic
comerciales , incrementanto el ingreso diario. Ademas que las viviendas incrementaran el costo propio
como de alquiler por brindar un eficiente servicio basico.
21
21.1 El proyecto que se presenta al programa TRABAJA PERU, es poder brindar de infrestructura Escalinatas e
Jr. Mariano Quispe y Jr. Shingua , mediante la construccin de Escalinatas de con Concreto f'c=140 Kg/
con Materiales de la zona.
1.- Construccin de Escalinatas Jr. Mariano Quispe 35.64m
2.-Construccin de Escalinatas Jr. Shingua 189.77m
IV. COMPARACIONES DE LOS COMPONENTES DEL PERFIL Y EXPEDIENTE TCNICO
FORMATO N02
1.-EXPEDIENTE TCNICO
2.-CONSTRUCCIN DE ESCALINATAS
3.-SUPERVISIN
4.-GASTOS GENERALES (Costo Indirecto)
TOTAL
VI. INFORMACIN COMPLEMENTARIA
1.- N DE FOLIOS
2.- Coordenadas UTM del Proyecto:
DECLARATORIA DE
VIABILIDAD
8,000.00
240,273.47
6,000.00
23,970.27
278,243.74
E=
282920.17
N= 8953703.39
Z= 3,722.00
8,00
243,00
7,84
23,59
282,44
FORMATO N02
FICHA GENERAL DEL PROYECTO DEFINITIVO
3.-
Vista N 01: Jr. Shingua Inicio del Tramo, al Fondo el Jr. Mariano Quispe
FORMATO N02
FICHA GENERAL DEL PROYECTO DEFINITIVO
FORMATO N02
FICHA GENERAL DEL PROYECTO DEFINITIVO
FORMATO N02
OS DE CONTINGENCIA -2014
: PUOS
: HUAMALIES
: HUANUCO
CREACION DE ESCALINATAS
Infraestructura Urbana
Econmica
28.69%
71.31%
33.23%
63 das hbiles
ipal N003-2014-MDP/H
hotmail.com
FORMATO N02
TE
MUNICIPALIDAD DISTRITAL DE PUOS
Municipalidad Distrital
Gobierno Local
Institucin Pblica
: PUOS
: HUAMALIES
: HUANUCO
Ley Transitoria de Municipalidades - 29/12/1856
FORMATO N02
L PROYECTO
AS DEL JR.SHINGUA Y JR. MARIANO QUISPE, DISTRITO DE PUOS ubicado en el distrito de Puos, provincia de Huamalies y departamento de
escalinatas de Concreto F'c=140kg/cm2
l del Proyecto
al
neral)
FORMATO N02
8953703.39
3,722.00
FORMATO N02
royecto
FORMATO N02
FORMATO N02
FORMATO N 04
PRESUPUESTO DEL PROYECTO DEFINITIVO
"CREACION DE ESCALINATAS DEL JR. SHINGUA Y JR.MARIANO QUISPE, DISTRITO DE PUOS - HUAMALIES - HUANUCO"
ORGANISMO EJECUTOR: MUNICIPALIDAD DISTRITAL DE PUOS
UBICACIN: DISTRITO DE PUOS
ITEM
PARTIDAS
UNIDAD
01
01.01
01.02
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04
04.01
04.02
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
06
06.01
06.02
06.03
06.04
07
07.01
07.02
07.03
OBRAS PROVISIONALES
Cartel de obra impresion de banner de 3.60m x 2.40m
Alquiler de local para la obra
Und
mes
OBRAS PRELIMINARES
Limpieza Manual de Terreno Normal
Trazo y replanteo en terreno accidentado con pendiente pronunciada sin equipo
m2
m2
MOVIMIENTO DE TIERRAS
Corte en Terreno Semirocoso manual
Excavacin de zanjas y/o zapatas Hmx <= 1.00m en terreno rocoso
Excavacin de Zanjas para Sardineles en terreno Semirocoso
Excavacin de Zanjas para Cunetas Terreno Semirocoso secc. prom. 0.50x0.20m
Nivelacin y compactacin Manual de subrasante
Relleno con material propio Compactacin con Equipo Liviano
Acarreo y acopio manual de material exedente D>100m
Eliminacin de material excedente carguio manual d<= 5Km
m3
m3
m
m
m2
m3
m3
m3
m3
m3
OBRAS DE CONCRETO
Gradas y/o Escalinatas - Concreto F'c=140kg/cm2
Gradas o graderias - Encofrado y desencofrado
Junta de Dilatacin/ Const. con tecnoport e=1" Amax=25cm
Junta con asfalto E= 1"
Sardineles - Concreto F'c= 140 kg/cm2
Sardineles - Encofrado y desencofrado (H=0.50m) uso canal
Cuneta - Concreto F'c= 140 kg/cm2
Cuneta - Encofrado y desencofrado
m3
m2
m
m
m3
m
m3
m
PRUEBAS Y ENSAYOS
Ensayo densidad de campo
Prueba de diseo de mezclas de concreto
Prueba de resistencia a la compresin del concreto
Ensayo prctor (Compactacin del suelo)
Und
Und
Und
Und
VARIOS
Acarreo de cemento Dmx <= 100m
Acarreo de agua para la obra Dmx<=50m
Sealizacion en obra durante ejecucin
Und
m3
m
"CREACION DE ESCALINATAS DEL JR. SHINGUA Y JR.MARIANO QUISPE, DISTRITO DE PUOS - HUAMALIES - HUANUCO"
ORGANISMO EJECUTOR: MUNICIPALIDAD DISTRITAL DE PUOS
UBICACIN: DISTRITO DE PUOS
ITEM
07.04
07.05
07.06
07.07
07.08
07.09
07.10
PARTIDAS
Subproyecto
UNIDAD
m
m2
m
m2
Und
Und
kg
ORMATO N 04
METRADO
PU
SUB-TOTAL
490.99
1.00
3.00
340.99
50.00
1,014.35
1,014.35
0.50
0.83
340.99
150.00
1,349.09
507.18
841.91
48,914.45
959.81
19.14
525.28
525.28
1,237.89
314.58
1,189.65
1,189.65
16.69
41.73
1.67
0.63
0.83
12.86
7.15
14.55
314.58
428.00
16.69
25.04
250.46
545.96
849.15
849.15
56.67
377.82
64.23
503.76
328.06
18.29
2.50
3.13
313.69
13.49
308.62
15.26
10.00
1.00
10.00
2.00
55.21
300.00
26.04
353.13
16,019.23
798.71
877.22
330.93
1,027.45
4,045.50
8,506.00
17,309.41
15,967.46
5,250.34
10,717.12
147,315.88
82,165.91
9,985.61
2,122.88
2,657.84
17,776.81
5,096.79
19,822.66
7,687.38
1,818.76
552.10
300.00
260.40
706.26
24,416.84
2,603.00
298.46
251.88
0.63
7.15
0.63
1,639.89
2,133.99
158.68
METRADO
251.88
403.71
503.76
1,259.40
1.00
1.00
8,000.00
PU
SUB-TOTAL
0.10
8.73
5.81
0.25
5,693.00
5,200.00
0.35
25.19
3,524.39
2,926.85
314.85
5,693.00
5,200.00
2,800.00
S/.
Subtotales
240,273.47
S/.
240,273.47
S/.
240,273.47
S/.
37,970.27
S/.
278,243.74
FORMATO N 010
DISTRITO:
CODIGO SNIP:
253722
FECHA:
PUOS
5/30/2014
Desagregado segn Fuentes
Concepto
N de meses (Nm)
Aporte del
Organismo Ejecutor
26,700.00
0.00
2,000.00
3.0
6000.00
6,000.00
0.00
Residente de Obra
3,400.00
3.0
10200.00
10,200.00
0.00
1,000.00
3.0
3,000.00
3,000.00
0.00
Maestro de Obra
2,500.00
3.0
7,500.00
7,500.00
0.00
11,270.27
0.00
240.27
240.27
0.00
Otros
Comisiones Bancarias 0.1% CD
240,273.47
15.00
50.0
750.00
750.00
0.00
Guardiana
760.00
3.0
2,280.00
2,280.00
0.00
8,000.00
8,000.00
0.00
37,970.27
0.00
FORMATO N 05
USOS Y FUENTES
DISTRITO:
FECHA:
PUOS
5/30/2014
COFINANCIAMIENTO
Organismo
Proponente
( b)
S/.
%
Otros
Cofinanciantes
(c)
S/.
%
Total
Cofinanciante
( d ) =(b+c)
S/.
1. COSTOS DIRECTOS
240,273.47 86.35%
0.00
0.00%
0.00
0.00%
0.00
0.00%
12,747.710
4.58%
0.00
0.00%
0.00
0.00%
0.00
0.00%
79,837.19 28.69%
0.00
0.00%
0.00
0.00%
0.00
0.00%
123,899.890 44.53%
0.00
0.00%
0.00
0.00%
0.00
0.00%
12,895.68
4.63%
0.00
0.00%
0.00
0.00%
0.00
0.00%
- kit Herramientas
5,693.00
2.05%
0.00
0.00%
0.00
0.00%
0.00
0.00%
5,200.00
1.87%
0.00
0.00%
0.00
0.00%
0.00
0.00%
2. COSTOS INDIRECTOS
37,970.27 13.65%
0.00
0.00%
0.00
0.00%
0.00
0.00%
29,970.27 10.77%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
8,000.00
2.88%
278,243.74 100.00%
FORMATO N 05
86.35%
12,747.71
4.58%
79,837.19
28.69%
123,899.89
44.53%
12,895.68
4.63%
5,693.00
2.05%
5,200.00
1.87%
37,970.27
13.65%
29,970.27
10.77%
8,000.00
2.88%
278,243.74
100.00%
FORMATO N 16
Planilla de sustentacin de metrados por partida.
PROYECTO:
"CREACION DE ESCALINATAS DEL JR.SHINGUA Y JR. MARIANO QUISPE, DISTRITO DE PUOS - HUAMALI
ORGANISMO PROPONENTE : MUNICIPALIDAD DE PUOS
Partida N: 01.01
Grfico
Partida N: 01.02
Grfico
Grfico
JIRON : SHINGUA
JIRON : MARIANO
QUISPE
Partida N: 2.02
Grfico
1.00
Partida N: 2.01
1era CUADRA
2da CUADRA
3ra CUADRA
4ta CUADRA
5ta CUADRA
1.00
1.00
1.00
1.00
1.00
34.98
42.79
48.19
41.13
11.09
1.00
1.00
1.00
1.00
1.00
40.03
40.22
40.20
40.52
39.33
JIRON : SHINGUA
1era CUADRA
2da CUADRA
3ra CUADRA
4ta CUADRA
5ta CUADRA
1.00
1.00
1.00
1.00
1.00
34.98
42.79
48.19
41.13
11.09
JIRON : MARIANO
QUISPE
1era CUADRA
2da CUADRA
3ra CUADRA
4ta CUADRA
5ta CUADRA
1.00
1.00
1.00
1.00
1.00
40.03
40.22
40.20
40.52
39.33
Partida N: 03.01
Grfico
Descripcin
Grfico
1ERA CUADRA
1er TRAMO
2do TRAMO
3er TRAMO
4to TRAMO
5to TRAMO
6to TRAMO
1.00
1.00
1.00
1.00
1.00
1.00
3.40
3.02
2.53
2.44
2.90
3.45
11mo TRAMO
12mo TRAMO
13ro TRAMO
14to TRAMO
15to TRAMO
16to TRAMO
1.00
1.00
1.00
1.00
1.00
1.00
3.15
3.10
2.99
2.90
2.80
2.70
17mo TRAMO
18mo TRAMO
19ro TRAMO
20to TRAMO
21to TRAMO
22to TRAMO
1.00
1.00
1.00
1.00
1.00
1.00
4.02
3.27
2.72
2.76
2.86
2.92
23mo TRAMO
24mo TRAMO
25ro TRAMO
26to TRAMO
1.00
1.00
1.00
1.00
4.91
5.59
5.30
5.04
27mo TRAMO
28mo TRAMO
29ro TRAMO
30to TRAMO
31to TRAMO
32to TRAMO
1.00
1.00
1.00
1.00
1.00
1.00
4.02
3.27
3.22
3.26
2.86
2.92
1er TRAMO
2do TRAMO
3er TRAMO
4to TRAMO
5to TRAMO
6to TRAMO
7mo TRAMO
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.15
3.14
3.37
4.84
4.18
4.08
3.97
2DA CUADRA
3RA CUADRA
JIRON : SHINGUA
4TA CUADRA
5TA CUADRA
5TA CUADRA
JIRON : MARIANO
QUISPE
Partida N: 03.02
Grfico
Grfico
Descripcin
1.00
1.00
1.00
1.00
1.00
1.00
2.00
3.40
3.02
2.53
2.44
2.90
3.45
42.52
7mo TRAMO
8vo TRAMO
9no TRAMO
10mo TRAMO
11mo TRAMO
12mo TRAMO
SARDINEL
1.00
1.00
1.00
1.00
1.00
1.00
2.00
3.15
3.10
2.99
2.90
2.80
2.70
42.95
13ro TRAMO
14to TRAMO
15to TRAMO
16to TRAMO
17mo TRAMO
18vo TRAMO
SARDINEL
1.00
1.00
1.00
1.00
1.00
1.00
2.00
4.02
3.27
2.72
2.76
2.86
2.92
49.94
19no TRAMO
20mo TRAMO
21ro TRAMO
22do TRAMO
23ro TRAMO
SARDINEL
1.00
1.00
1.00
1.00
1.00
2.00
4.91
5.59
5.30
5.04
5.79
33.87
24to TRAMO
25to TRAMO
26to TRAMO
27mo TRAMO
28vo TRAMO
29no TRAMO
SARDINEL
1.00
1.00
1.00
1.00
1.00
1.00
2.00
4.34
4.30
4.22
3.82
4.10
4.25
40.04
2DA CUADRA
3RA CUADRA
JR : SHINGUA
4TA CUADRA
5TA CUADRA
1ERA CUADRA
JR : MARIANO
QUISPE
1er TRAMO
2do TRAMO
3er TRAMO
4to TRAMO
5to TRAMO
6to TRAMO
SARDINEL
1.00
1.00
1.00
1.00
1.00
1.00
2.00
3.31
2.43
3.49
3.54
3.59
3.65
42.95
7mo TRAMO
8vo TRAMO
9no TRAMO
10mo TRAMO
SARDINEL
1.00
1.00
1.00
1.00
2.00
2.46
4.18
4.08
3.97
20.70
2DA CUADRA
Partida N: 03.03
Grfico
JIRON : SHINGUA
JR: MARIANO
QUISPE
1.00
1.00
1.00
1.00
1.00
3.45
3.15
4.02
5.59
4.34
1RA CUADRA
2DA CUADRA
3ra CUADRA
4ta CUADRA
5ta CUADRA
1.00
1.00
1.00
1.00
1.00
3.59
4.18
2.74
3.48
4.44
Partida N: 03.04
Grfico
Grfico
JIRON : SHINGUA
JIRON : MARIANO
QUISPE
Partida N: 03.05
1.00
1.00
1.00
1.00
1.00
34.98
42.79
48.19
41.13
11.09
1er CUADRA
2do CUADRA
3er CUADRA
4to CUADRA
5to CUADRA
1.00
1.00
1.00
1.00
1.00
40.03
40.22
40.20
40.52
39.33
Grfico
Descripcin
Grfico
JIRON : SHINGUA
400.34
1.00
JIRON : MARIANO
QUISPE
152.78
1.00
Partida N: 03.06
Grfico
Grfico
JIRON : SHINGUA
371.38
1.00
JIRON : MARIANO
QUISPE
371.38
1.00
Partida N: 04.01
Grfico
Partida N: 04.02
Grfico
1.00
321.07
1.00
Partida N: 05.01
Grfico
Descripcin
JIRON : SHINGUA
Descanso 2 - Losa.
Descanso 2- Uas.
Tramo 2 - Pasos y contrapasos. (T-2)
Descanso 3 - Losa.
Descanso 3- Uas.
Tramo 3 - Pasos y contrapasos. (T-3)
1ERA CUADRA
Descanso 4 - Losa.
Descanso 4- Uas.
Tramo 4 - Pasos y contrapasos. (T-4)
Descanso 5 - Losa.
Descanso 5- Uas.
1.00
1.00
2.12
2.48
16.00
2.48
1.00
1.00
1.56
1.53
19.00
1.53
1.00
1.00
1.35
1.53
17.00
1.53
1.00
1.00
1.81
1.44
16.00
1.44
1.00
1.00
1.25
1.90
Descanso 6 - Losa.
Descanso 6- Uas.
Tramo 6 - Pasos y contrapasos. (T-6)
Descanso 7 - Losa.
Descanso 7- Uas.
Tramo 7 - Pasos y contrapasos. (T-7)
Descanso 8 - Losa.
Descanso 8- Uas.
Tramo 8 - Pasos y contrapasos. (T-8)
Descanso 9 - Losa.
Descanso 9- Uas.
Tramo 9 - Pasos y contrapasos. (T-9)
2DA CUADRA
Descanso 10 - Losa.
10.00
1.90
1.00
1.00
2.75
2.45
12.00
2.45
1.00
1.00
1.43
2.31
20.00
2.31
1.00
1.00
2.49
1.43
18.00
1.43
1.00
1.00
2.54
2.49
18.00
2.49
1.00
2.59
2DA CUADRA
Descanso 10- Uas.
Tramo 10 - Pasos y contrapasos. (T-20
Descanso - Losa.
Descanso - Uas.
Tramo 11 - Pasos y contrapasos. (T-11)
Descanso 12 - Losa.
Descanso 12 - Uas.
Tramo 12 - Pasos y contrapasos. (T-12)
Descanso 13 - Losa.
Descanso 13 - Uas.
Tramo 13 - Pasos y contrapasos. (T-13)
Descanso 14 - Losa.
Descanso 14 - Uas.
Tramo 14 - Pasos y contrapasos. (T-14)
1.00
2.54
17.00
2.54
1.00
1.00
2.65
2.59
17.00
2.59
1.00
1.00
2.68
2.65
12.00
2.65
1.00
1.00
2.10
2.15
17.00
2.15
1.00
1.00
1.99
2.10
16.00
2.10
Descanso 15 - Losa.
Descanso 15 - Uas.
Tramo 15 - Pasos y contrapasos. (T-15)
3RA CUADRA
Descanso 16 - Losa.
Descanso 16 - Uas.
Tramo 16 - Pasos y contrapasos. (T-16)
Descanso 17 - Losa.
Descanso 17 - Uas.
Tramo 17 - Pasos y contrapasos. (T-17)
Descanso 18 - Losa.
Descanso 18 - Uas.
Tramo 18 - Pasos y contrapasos. (T-18)
Descanso 19 - Losa.
Descanso 19 - Uas.
Tramo 19 - Pasos y contrapasos. (T-19)
16.00
2.10
1.00
1.00
1.90
1.99
17.00
1.99
1.00
1.00
1.80
1.90
13.00
1.90
1.00
1.00
1.70
1.80
13.00
1.80
1.00
1.00
1.65
1.70
17.00
1.70
1.00
1.00
2.67
3.02
20.00
3.02
Descanso 20 - Losa.
Descanso 20 - Uas.
Tramo 20 - Pasos y contrapasos. (T-20)
Descanso 21 - Losa.
Descanso 21 - Uas.
Tramo 21 - Pasos y contrapasos.
20.00
3.02
1.00
1.00
1.92
1.61
6.00
1.61
1.00
1.00
1.69
1.72
16.00
1.72
1.00
1.00
1.92
1.76
15.00
1.76
1.00
1.00
2.02
1.86
12.00
1.86
1.00
1.00
1.64
1.92
7.00
1.92
4TA CUADRA
Descanso 22 - Losa.
Descanso 22 - Uas.
Tramo 22 - Pasos y contrapasos.
Descanso 23 - Losa.
Descanso 23 - Uas.
Tramo 23 - Pasos y contrapasos.
Descanso 24 - Losa.
Descanso 24 - Uas.
Tramo 24 - Pasos y contrapasos.
0.40
0.16
0.36
0.40
0.16
0.36
Descanso 25 - Losa.
Descanso 25 - Uas.
Tramo 25 - Pasos y contrapasos. (T-19)
7.00
1.92
1.00
1.00
4.59
3.91
13.00
3.91
1.00
1.00
4.30
4.59
11.00
4.59
1.00
1.00
4.04
4.30
11.00
4.30
1.00
1.00
3.79
4.04
11.00
4.04
0.40
0.16
0.36
Descanso 26 - Losa.
Descanso 26 - Uas.
Tramo 26 - Pasos y contrapasos.
0.40
0.16
0.36
5TA CUADRA
Descanso 27 - Losa.
Descanso 27 - Uas.
Tramo 27 - Pasos y contrapasos. (T-19)
0.40
0.16
0.36
Descanso 28 - Losa.
Descanso 28 - Uas.
Tramo 28 - Pasos y contrapasos.
0.40
0.16
0.36
Descanso 29 - Losa.
Descanso 29 - Uas.
Tramo 29 - Pasos y contrapasos.
1.00
1.00
3.79
3.79
8.00
3.79
1.00
1.00
3.30
3.34
17.00
3.34
1.00
1.00
3.25
3.30
17.00
3.30
1.00
1.00
2.64
3.22
17.00
3.22
1.00
1.00
3.10
2.82
17.00
2.82
0.40
0.16
0.36
JIRON : MARIANO
QUISPE
Descanso 1 - Losa.
Descanso 1- Uas.
Tramo 1 - Pasos y contrapasos. (T-1)
Descanso 2 - Losa.
Descanso 2- Uas.
Tramo 2 - Pasos y contrapasos. (T-2)
Descanso 3 - Losa.
Descanso 3- Uas.
Tramo 3 - Pasos y contrapasos. (T-3)
1ERA CUADRA
Descanso 4 - Losa.
Descanso 4- Uas.
Tramo 4 - Pasos y contrapasos. (T-4)
Descanso 5 - Losa.
Descanso 5- Uas.
Tramo 5 - Pasos y contrapasos. (T-5)
Descanso 6 - Losa.
Descanso 6- Uas.
Tramo 6 - Pasos y contrapasos. (T-6)
17.00
2.82
1.00
1.00
3.30
3.10
13.00
3.10
1.00
1.00
3.60
3.60
2.00
3.60
Descanso 7 - Losa.
Tramo 7 - Pasos y contrapasos. (T-7)
Descanso 8 - Losa.
Tramo 8 - Pasos y contrapasos. (T-8)
1.00
2.15
7.00
1.89
1.00
3.18
7.00
3.18
1.00
1.00
3.01
2.97
5.00
2.97
1.00
1.00
1.50
4.26
11.00
4.26
2DA CUADRA
Descanso 9 - Losa.
Descanso 9- Uas.
Tramo 9 - Pasos y contrapasos. (T-9)
Descanso 10 - Losa.
Descanso 10- Uas.
Tramo 10 - Pasos y contrapasos. (T-10)
Partida N: 05.02
Grfico
Descripcin
Grfico
JIRON : SHINGUA
tramo 1
tramo 2
tramo 3
1ERA CUADRA
tramo 4
tramo 5
tramo 6
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
16.00
2.00
2.00
19.00
2.00
2.00
17.00
2.00
2.00
17.00
2.00
2.00
16.00
2.00
2.00
10.00
2.00
2.00
2.48
5.87
0.86
2.11
6.89
0.86
1.58
6.38
0.85
1.44
6.38
0.85
1.90
5.82
2.16
2.45
4.58
1.06
tramo 7
tramo 8
tramo 9
2DA CUADRA
tramo 10
tramo 11
tramo 12
tramo 13
tramo 14
tramo 15
3RA CUADRA
tramo 16
tramo 17
tramo 18
tramo 19
tramo 20
tramo 20
4TA CUADRA
tramo 20
tramo 20
contrapasos
costados
descanso
contrapasos
laterales
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
12.00
2.00
2.00
20.00
2.00
2.00
18.00
2.00
2.00
18.00
2.00
2.00
17.00
2.00
2.00
17.00
2.00
2.00
12.00
2.00
2.00
17.00
2.00
2.00
16.00
2.00
2.00
13.00
2.00
2.00
13.00
2.00
1.00
17.00
2.00
1.00
20.00
2.00
2.00
18.00
2.00
2.00
6.00
2.00
2.00
16.00
2.00
2.00
15.00
3.30
4.27
0.86
2.10
7.25
0.86
1.99
6.75
0.85
1.90
6.75
0.85
1.80
6.38
0.85
1.70
6.43
0.81
3.02
6.19
2.07
1.67
6.17
1.66
1.72
5.82
2.66
1.76
5.84
2.08
1.86
5.84
2.58
1.92
6.17
2.16
3.91
7.50
0.85
4.59
6.75
0.85
4.30
5.81
0.85
4.04
5.46
1.46
3.34
tramo 20
tramo 20
tramo 20
5TA CUADRA
tramo 20
tramo 20
tramo 20
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
tapa final
2.00
1.00
12.00
2.00
2.00
7.00
2.00
13.00
2.00
2.00
11.00
2.00
2.00
11.00
2.00
1.00
8.00
2.00
2.97
1.33
3.30
5.39
1.58
3.22
1.96
2.82
6.96
1.96
3.10
4.83
1.59
3.25
4.94
108.00
3.60
3.64
JIRON : MARIANO
QUISPE
tramo 1
tramo 2
tramo 3
1ERA CUADRA
tramo 4
tramo 5
tramo 6
tramo 7
tramo 8
2DA CUADRA
tramo 9
tramo 10
Partida N:
5.03
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
costados
descanso
contrapasos
contrapasos
costados
descanso
contrapasos
costados
contrapasos
17.00
2.00
2.00
17.00
2.00
2.00
17.00
2.00
2.00
17.00
2.00
2.00
16.00
2.00
2.00
13.00
2.00
2.00
2.00
7.00
2.00
1.00
7.00
1.00
5.00
2.31
6.38
0.85
2.43
6.38
0.85
2.49
6.38
0.85
2.54
6.38
0.85
2.59
5.81
0.85
2.65
5.27
0.85
1.46
3.18
6.48
1.78
3.04
1.78
4.93
Grfico
Descripcin
2.00
2.00
42.52
42.52
BASE
PARAPETO
2.00
2.00
42.95
42.95
BASE
PARAPETO
2.00
2.00
49.94
49.94
BASE
PARAPETO
2.00
2.00
33.87
33.87
2DA CUADRA
3RA CUADRA
JIRON : SHINGUA
4TA CUADRA
5TA CUADRA
BASE
PARAPETO
2.00
2.00
40.04
40.04
BASE
PARAPETO
2.00
2.00
42.95
42.95
BASE
PARAPETO
2.00
2.00
20.70
20.70
1ERA CUADRA
JIRON : MARIANO
QUISPE
2DA CUADRA
Partida N: 05.04
Grfico
Descripcin
JIRON : SHINGUA
JIRON : MARIANO
QUISPE
Partida N: 05.05
1ERA CUADRA
4.00
42.52
2DA CUADRA
3RA CUADRA
4TA CUADRA
5TA CUADRA
4.00
4.00
4.00
4.00
42.95
49.94
33.87
40.04
1ERA CUADRA
2DA CUADRA
4.00
4.00
42.95
20.70
Grfico
Descripcin
JIRON : SHINGUA
JIRON : MARIANO
QUISPE
Partida N: 05.06
Grfico
JIRON : SHINGUA
1ERA CUADRA
2DA CUADRA
3RA CUADRA
4TA CUADRA
5ta CUADRA
2.00
2.00
2.00
2.00
2.00
42.52
42.95
49.24
33.87
40.04
1ERA CUADRA
2DA CUADRA
2.00
2.00
42.95
20.70
2.00
2.00
2.00
2.00
2.00
42.52
42.95
49.24
33.87
40.04
JIRON : MARIANO
QUISPE
Partida N: 05.07
1ERA CUADRA
2DA CUADRA
JIRON : SHINGUA
42.95
20.70
Grfico
Grfico
2.00
2.00
Descripcin
1.00
1.00
1.00
1.00
1.00
85.04
101.65
118.58
87.38
109.54
JIRON : MARIANO
QUISPE
Partida N: 05.08
1ERA CUADRA
2DA CUADRA
JIRON : SHINGUA
JIRON : MARIANO
QUISPE
Partida N: 06.01
Grfico
Grfico
101.65
49.18
Grfico
Grfico
1.00
1.00
Descripcin
1.00
1.00
1.00
1.00
1.00
85.04
101.65
118.58
87.38
109.54
1ERA CUADRA
2DA CUADRA
1.00
1.00
101.65
49.18
Partida N: 06.02
Grfico
Descripcin
Grfico
20.00
Partida N: 06.03
Grfico
Grfico
Partida N: 07.01
Grfico
Grfico
Partida N: 07.02
Grfico
Descripcin
Se establece a los trabajos para verificar la
compactacin del suelo despus de ser relleno
con material propio.
10.00
1,882.61
1.00
41.76
1.00
Partida N: 07.03
Grfico
JIRON : SHINGUA
JIRON : MARIANO
QUISPE
Partida N: 07.04
Descripcin
1.00
1.00
1.00
1.00
1.00
85.04
101.65
118.58
87.38
109.54
1ERA CUADRA
2DA CUADRA
1.00
1.00
101.65
49.18
Grfico
Descripcin
tramo 7
tramo 8
tramo 9
tramo 10
tramo 11
1era cuadra
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
2da cuadra
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
16.00
2.00
19.00
2.00
17.00
2.00
17.00
2.00
16.00
2.00
10.00
2.00
2.48
17.00
2.00
17.00
2.00
17.00
2.00
17.00
2.00
16.00
2.00
2.31
2.11
1.58
1.44
1.90
2.45
2.43
2.49
2.54
2.59
tramo 12
tramo 13
JIRON : SHINGUA
tramo 14
tramo 15
tramo 16
tramo 17
tramo 18
tramo 19
tramo 20
tramo 21
tramo 22
tramo 23
tramo 24
tramo 25
tramo 26
tramo 27
tramo 28
tramo 1
tramo 2
tramo 3
tramo 4
JIRON : MARIANO
QUISPE
tramo 5
contrapasos
costados
3ra cuadra
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
4ta cuadra
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
5ta cuadra
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
1era cuadra
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
costados
contrapasos
13.00
2.00
2.65
12.00
2.00
20.00
2.00
18.00
2.00
18.00
2.00
17.00
2.00
17.00
2.00
3.30
20.00
2.00
18.00
2.00
16.00
2.00
15.00
2.00
8.00
2.00
3.02
12.00
2.00
7.00
2.00
6.00
2.00
16.00
2.00
15.00
2.00
3.91
12.00
2.00
7.00
2.00
13.00
2.00
11.00
2.00
11.00
3.30
2.10
1.99
1.90
1.80
1.70
1.67
1.72
1.76
1.86
4.59
4.30
4.04
3.34
3.22
2.82
3.10
3.25
JIRON : MARIANO
QUISPE
tramo 6
tramo 7
tramo 8
tramo 9
Partida N: 07.05
Partida N: 07.06
2.00
8.00
2.00
7.00
2.00
7.00
2.00
5.00
2.00
3.60
3.18
3.04
4.93
FLETE TERRESTRE
Grfico
Grfico
costados
contrapasos
costados
2da cuadra
contrapasos
costados
contrapasos
costados
contrapasos
costados
Descripcin
(*) El metrado de esta partida corresponde al
metrado del expediente tcnico original.
1.00
Grfico
Descripcin
JIRON : SHINGUA
1ERA CUADRA
2DA CUADRA
3RA CUADRA
4TA CUADRA
5TA CUADRA
1.00
1.00
1.00
1.00
1.00
42.52
42.95
49.94
33.87
40.04
JIRON : MARIANO
QUISPE
1ERA CUADRA
2DA CUADRA
3ra CUADRA
4ta CUADRA
5ta CUADRA
1.00
1.00
1.00
1.00
1.00
42.95
20.70
49.24
26.90
20.71
artida.
Unidad:
Ancho (m) Alto (m)
UND
Metrado
Parcial
1.00
Metrado Total
1.00
Unidad:
Ancho
(m)
Alto
(m)
MES
Metrado
Parcial
3.00
Metrado Total
3.00
Unidad:
Ancho
(m)
Alto
(m)
M2
Metrado
Parcial
3.75
3.15
4.02
4.92
4.92
Metrado Parcial
(Und)
131.18
134.79
193.72
202.36
54.56
716.61
3.15
3.15
3.88
4.84
3.68
Metrado Parcial
(Und)
Metrado Total
126.09
126.69
155.98
196.12
144.73
749.61
1,466.22
Pronunciada con
Ancho
(m)
Unidad:
Alto
(m)
M2
Metrado
Parcial
3.75
3.15
4.02
4.92
4.92
Metrado Parcial
(Und)
3.15
3.15
3.88
4.84
3.68
Metrado Parcial
(Und)
Metrado Total
131.18
134.79
193.72
202.36
54.56
716.61
126.09
126.69
155.98
196.12
144.73
749.61
1,466.22
Unidad:
AREA (M2)
M3
Metrado
Parcial
3.14
5.35
3.93
3.99
4.08
3.91
10.68
16.16
9.94
9.74
11.83
13.49
1.73
4.25
5.64
5.74
5.58
6.01
5.45
13.18
16.86
16.65
15.62
16.23
2.19
4.20
4.31
4.62
3.66
3.27
8.80
13.73
11.72
12.75
10.47
9.55
8.15
6.83
4.69
4.07
40.02
38.18
24.86
20.51
2.19
3.20
3.31
3.62
3.66
4.27
Metrado Parcial
(Und)
8.80
10.46
10.66
11.80
10.47
12.47
411.08
5.59
3.22
2.05
17.50
3.56
3.43
4.11
Metrado Parcial
(Und)
17.61
10.11
6.91
84.70
14.88
13.99
16.32
164.52
Metrado Total
TERRENO NORMAL
Unidad:
ANCHO ALTO
575.60
M3
Metrado
Parcial
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.32
0.12
0.12
0.12
0.12
0.12
0.47
0.44
0.14
0.12
0.12
0.14
0.17
23.98
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.32
0.12
0.12
0.12
0.12
0.12
0.47
0.40
0.15
0.14
0.14
0.13
0.13
24.22
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.25
0.12
0.12
0.12
0.12
0.12
0.47
0.40
0.16
0.13
0.13
0.14
0.14
28.17
0.40
0.40
0.40
0.40
0.40
0.60
0.33
0.12
0.12
0.12
0.12
0.47
0.65
0.27
0.25
0.24
0.28
19.10
0.40
0.29
0.40
0.12
0.40
0.12
0.40
0.12
0.40
0.12
0.40
0.12
0.60
0.47
Metrado Parcial
(Und)
0.50
0.21
0.20
0.18
0.20
0.20
22.58
124.57
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.32
0.12
0.12
0.12
0.12
0.12
0.47
0.42
0.12
0.17
0.17
0.17
0.18
24.22
0.40
0.33
0.40
0.12
0.40
0.12
0.40
0.21
0.60
0.47
Metrado Parcial
(Und)
Metrado Total
0.32
0.20
0.20
0.33
11.67
38.18
Unidad:
AREA(M2)
162.74
M3
Metrado
Parcial
6.37
8.30
5.40
6.20
7.10
Metrado Parcial
(Und)
21.98
26.15
21.71
34.66
30.81
135.30
4.60
3.55
55.64
71.54
3.94
Metrado Parcial
(Und)
Metrado Total
16.51
14.84
152.45
248.96
17.49
450.26
585.56
TE CON EQUIPO
Ancho
(m)
Unidad:
Alto
(m)
M2
Metrado
Parcial
3.00
2.15
3.31
4.51
4.51
Metrado Parcial
(Und)
104.94
92.00
159.51
185.50
50.02
591.96
3.28
2.75
2.75
3.48
4.44
Metrado Parcial
(Und)
Metrado Total
131.30
110.61
110.55
141.01
174.63
668.09
1,260.05
E D>100 m. (*)
Ancho
(m)
Unidad:
Alto
(m)
M3
Metrado
Parcial
1.00
1.00
Metrado Parcial
(Und)
500.42
500.42
1.00
1.00
Metrado Parcial
(Und)
Metrado Total
190.97
190.97
691.40
Unidad:
Alto
(m)
1.00
1.00
Metrado Parcial
(Und)
1.00
1.00
M3
Metrado
Parcial
371.38
371.38
371.38
Metrado Parcial
(Und)
Metrado Total
371.38
742.75
Unidad:
Ancho
(m)
Alto
1.00
(m)
1.00
Metrado Total
(Und)
Unidad:
Ancho
(m)
Alto
(m)
1.00
1.00
Metrado Total (Und)
M3
Metrado
Parcial
129.70
129.70
M3
Metrado
Parcial
321.07
321.07
SOS
Unidad:
Ancho
(m)
Alto
(m)
M3
Metrado
Parcial
1.20
AREA=
0.15
0.17
0.38
0.42
AREA=
0.1200
4.76
1.20
AREA=
0.15
0.17
0.28
0.26
AREA=
0.1200
3.49
1.20
AREA=
0.15
0.17
0.24
0.26
AREA=
0.1200
3.12
1.20
AREA=
0.15
0.17
0.33
0.25
AREA=
0.1200
2.76
2.50
AREA=
0.15
0.17
0.47
0.32
AREA=
0.1200
2.28
1.56
AREA=
0.15
0.17
0.64
0.42
AREA=
0.1200
3.53
1.20
AREA=
0.15
0.17
0.26
0.40
AREA=
0.1200
5.54
1.20
AREA=
0.15
0.17
0.45
0.24
AREA=
0.1200
3.09
1.20
AREA=
0.15
0.17
0.46
0.43
AREA=
0.1200
5.38
1.20
0.15
0.47
AREA=
0.17
0.43
AREA=
0.1200
5.18
1.20
AREA=
0.15
0.17
0.48
0.44
AREA=
0.12
5.28
1.77
AREA=
0.15
0.17
0.71
0.45
AREA=
0.1200
3.82
1.20
AREA=
0.15
0.17
0.38
0.37
AREA=
0.1200
4.39
1.20
AREA=
0.15
0.17
0.36
0.36
AREA=
0.1200
4.03
AREA=
0.1200
4.03
1.20
AREA=
0.15
0.17
0.34
0.34
AREA=
0.1200
4.06
1.20
AREA=
0.15
0.17
0.32
0.31
AREA=
0.1200
2.96
1.20
AREA=
0.15
0.17
0.31
0.30
AREA=
0.1200
2.81
1.20
AREA=
0.15
0.17
0.30
0.28
AREA=
0.1200
3.47
2.40
AREA=
0.15
0.17
0.96
0.50
AREA=
0.1200
7.25
AREA=
0.1200
7.25
2.00
AREA=
0.15
0.17
0.00
0.27
AREA=
0.1200
1.16
1.65
AREA=
0.15
0.17
0.42
0.28
AREA=
0.1200
3.30
2.50
AREA=
0.15
0.17
0.72
0.29
AREA=
0.1200
3.17
3.00
AREA=
0.15
0.17
0.91
0.31
AREA=
0.1200
2.68
2.50
AREA=
0.15
0.17
0.62
0.32
AREA=
0.1200
1.61
AREA=
0.1200
1.61
1.20
AREA=
0.15
0.17
0.83
0.65
AREA=
0.1200
6.10
1.20
AREA=
0.15
0.17
0.77
0.76
AREA=
0.1200
6.06
1.20
AREA=
0.15
0.17
0.73
0.71
AREA=
0.1200
5.68
1.80
AREA=
0.15
0.17
1.02
0.67
AREA=
0.1200
5.33
1.70
AREA=
0.15
0.17
0.97
0.63
AREA=
0.1200
3.64
142.69
2.00
AREA=
0.15
0.17
0.99
0.57
AREA=
0.1300
7.38
1.95
AREA=
0.15
0.17
0.95
0.54
AREA=
0.1300
7.29
3.86
AREA=
0.15
0.17
1.53
0.53
AREA=
0.1300
7.12
2.00
AREA=
0.15
0.17
0.93
0.48
AREA=
0.1200
5.75
AREA=
0.1200
5.75
1.50
AREA=
0.15
0.16
0.74
0.48
AREA=
0.1310
5.28
2.59
AREA=
0.15
0.15
1.40
0.54
AREA=
0.1800
1.30
0.40
0.68
0.58
AREA=
0.1200
1.59
0.40
0.65
0.83
AREA=
0.1200
2.67
2.50
AREA=
0.15
0.17
1.13
0.50
AREA=
0.1200
1.78
4.09
AREA=
0.15
0.15
0.92
0.64
AREA=
0.1800
8.43
SCANSOS
Unidad:
Ancho
(m)
Alto
(m)
62.88
205.57
M2
Metrado
Parcial
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
7.94
4.23
0.26
8.02
4.96
0.26
5.37
4.59
0.26
4.90
4.59
0.26
6.08
4.19
0.65
4.90
3.30
0.32
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
7.92
3.07
0.26
8.40
5.22
0.26
7.16
4.86
0.26
6.84
4.86
0.26
6.12
4.59
0.26
5.78
4.63
0.24
7.25
4.46
0.62
5.68
4.44
0.50
5.50
4.19
0.80
4.58
4.20
0.62
4.84
4.20
0.39
6.53
4.44
0.32
15.64
5.40
0.26
16.52
4.86
0.26
5.16
4.18
0.26
12.93
3.93
0.44
10.02
0.36
0.15
0.20
0.36
0.15
0.20
0.15
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.36
0.15
Metrado Parcial (Und)
2.14
0.20
7.92
3.88
0.47
4.51
0.59
5.01
0.59
6.82
3.48
0.48
7.15
3.56
16.20
5.76
2.62
0.00
350.83
0.20
0.37
0.15
0.20
0.37
0.15
0.20
0.37
0.15
0.20
0.36
0.15
0.20
0.36
0.15
0.20
0.37
0.15
0.20
0.20
0.37
0.15
0.20
0.37
0.20
Metrado Parcial (Und)
Metrado Total
Unidad:
Ancho
(m)
Alto
(m)
7.85
4.72
0.26
8.26
4.72
0.26
8.47
4.72
0.26
8.64
4.59
0.26
8.29
4.18
0.26
6.89
3.90
0.26
0.58
4.45
4.80
0.27
4.26
0.66
4.93
96.71
447.53
M3
Metrado
Parcial
0.40
0.20
0.47
0.50
15.99
8.50
0.40
0.20
0.47
0.50
16.15
8.59
0.40
0.20
0.47
0.50
18.78
9.99
0.40
0.20
0.47
0.50
12.74
6.77
0.40
0.47
0.20
0.50
Metrado Parcial
(Und)
0.40
0.20
15.06
8.01
120.57
0.47
0.50
16.15
8.59
0.40
0.47
0.20
0.50
Metrado Parcial
(Und)
Metrado Total
7.78
4.14
36.66
157.23
A VISTA
Unidad:
Ancho
(m)
Alto
(m)
M2
Metrado
Parcial
0.50
85.04
0.50
0.50
0.50
0.50
Metrado Parcial
(Und)
85.90
99.88
67.74
80.08
418.64
0.50
0.50
Metrado Parcial
(Und)
Metrado Total
85.90
41.40
127.30
545.94
Unidad:
AREA (m2)
M3
Metrado
Parcial
0.03
0.03
0.03
0.03
0.03
Metrado Parcial
(Und)
2.55
2.58
2.95
2.03
2.40
12.52
0.03
0.03
Metrado Parcial
(Und)
Metrado Total
2.58
1.24
3.82
16.34
Unidad:
Ancho
(m)
Alto
(m)
M
Metrado
Parcial
85.04
85.90
98.48
67.74
80.08
Metrado Parcial
(Und)
417.24
85.90
41.40
127.30
544.54
Metrado Parcial
(Und)
Metrado Total
Unidad:
Ancho
(m)
Alto
Metrado Parcial
(Und)
(m)
M
Metrado
Parcial
85.04
101.65
118.58
87.38
109.54
502.19
101.65
49.18
150.83
653.02
Metrado Parcial
(Und)
Metrado Total
Unidad:
Ancho
(m)
Alto
(m)
85.04
101.65
118.58
87.38
109.54
502.19
Metrado Parcial
(Und)
101.65
49.18
150.83
653.02
Metrado Parcial
(Und)
Metrado Total
Unidad:
Ancho
(m)
Alto
(m)
Unidad:
Ancho
(m)
Alto
M
Metrado
Parcial
5.00
5.00
Metrado Total
NCRETO
M
Metrado
Parcial
(m)
Metrado Total
Unidad:
UND
Metrado
Parcial
20.00
20.00
UND
Ancho
(m)
Alto
(m)
Metrado
Parcial
10.00
Metrado Total
10.00
Unidad:
Ancho
(m)
Alto
(m)
1.00
1.00
Metrado Total
Unidad:
Ancho
(m)
Alto
(m)
1.00
1.00
Metrado Total
UND
Metrado
Parcial
1,882.61
1,882.61
M3
Metrado
Parcial
41.76
41.76
Unidad:
Ancho
(m)
Alto
(m)
85.04
101.65
118.58
87.38
109.54
502.19
Metrado Parcial
(Und)
101.65
49.18
150.83
653.02
Metrado Parcial
(Und)
Metrado Total
APASOS Y COSTADOS)
Area
Unidad:
Alto
(m)
0.20
1.46
0.20
1.71
0.20
1.55
0.20
1.63
0.20
1.66
0.20
1.22
0.20
1.63
0.20
1.83
0.20
1.63
0.20
1.43
0.20
1.12
M
Metrado
Parcial
M2
Metrado
Parcial
7.94
2.92
8.02
3.42
5.37
3.10
4.90
3.26
6.08
3.32
4.90
2.44
7.85
3.26
8.26
3.66
8.47
3.26
8.64
2.86
8.29
2.24
0.20
6.89
2.08
0.20
7.92
2.76
8.40
2.82
7.16
2.40
6.84
2.60
6.12
2.60
5.78
2.56
1.04
1.38
0.20
1.41
0.20
1.20
0.20
1.30
0.20
1.30
0.20
1.28
0.20
1.76
0.20
1.59
0.20
1.40
0.20
1.27
0.20
0.66
0.20
1.24
0.20
0.68
0.20
1.83
0.20
1.90
0.20
1.86
Metrado Parcial
(Und)
0.20
1.63
0.20
1.83
0.20
1.63
0.20
1.43
0.20
12.08
3.52
6.01
3.18
27.52
2.80
26.40
2.54
14.88
1.32
9.38
2.48
6.43
1.36
5.16
3.66
12.93
3.80
10.02
3.72
338.57
7.92
3.26
4.51
3.66
7.33
3.26
6.82
2.86
7.15
1.12
0.20
1.04
0.20
1.41
0.20
1.22
0.20
1.05
Metrado Parcial
(Und)
Metrado Total
Unidad:
Ancho
(m)
1.00
Alto
(m)
1.00
Metrado Total
Unidad:
Ancho
Alto (m)
(m)
3.75
3.15
4.02
4.92
4.92
Metrado Parcial
(Und)
3.15
3.15
3.88
4.84
3.89
Metrado Parcial
(Und)
Metrado Total
2.24
5.76
2.08
4.45
2.82
4.26
2.44
4.93
2.10
77.85
416.42
GLB
Metrado
Parcial
1.00
1.00
M2
Metrado
Parcial
159.45
135.29
200.76
166.64
197.00
859.14
135.29
65.21
191.05
130.20
80.56
602.31
1,461.45
RESUMEN
OBRA
UBICACIN
FECHA
TEM
01
01.01
01.02
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
04
04.01
04.02
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
07.05
07.06
:
:
RESUMEN DE METRADOS
"CREACION DE ESCALINATAS DEL JR. SHINGUA Y JR.MARIANO QUISPE, DISTRITO DE PUOS - HUAMA
HUANUCO"
PUOS - HUAMALIES - HUNUCO
MARZO DEL 2013
DESCRIPCIN
OBRAS PROVISIONALES
CARTEL DE OBRA IMPRESIN DE BANNER DE 3.60m X 2.40m
ALQUILER DE LOCAL PARA LA OBRA
OBRAS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO NORMAL
TRAZO Y REPLANTEO EN TERRENO ACCIDENTADO CON EQUIPO
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO SEMIROCOSO MANUAL
EXCAVACION DE ZANJAS PARA UAS Y/O ZAPATAS EN TERRENO NORMAL
RELLENO CON MATERIAL PROPIO SIN COMPACTAR
NIVELACION Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO
ACARREO Y ACOPIO MANUAL DE MATERIAL EXCEDENTE D > 100m
ELIMINACION DE MATERIAL EXCEDENTE. CARGUIO MANUAL D<= 0.5 Km
HABILITACION DE AGREGADOS Y PIEDRAS
ACARREO MANUAL DE P.G.(PROM. 6") 50m<D<100m
ACARREO DE AGREGADOS 50m<D<100m
OBRAS DE CONCRETO
CONCRETO f 'c=140 kg/cm2 EN GRADERIAS Y DESCANSOS
ENCOFRADO Y DESENCOFRADO EN GRADERIAS Y DESCANSOS
CONCRETO F`c=140Kg/cm2 EN SARDINELES
ENCOFRADO Y DESENCOFRADO EN SARDINELES
CONCRETO f 'c=140 kg/cm2 EN CUNETAS
ENCOFRADO Y DESENCOFRADO EN CUNETAS
JUNTA DE CONSTRUCCION DE TECNOPOR E=1"
JUNTA CON ASFALTO E=1"
PRUEBAS Y ENSAYOS
ENSAYO DENSIDAD DE CAMPO
PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO
ENSAYO PROCTOR (COMPACTACION DEL SUELO)
VARIOS
ACARREO DE CEMENTO Dmax <= 100m
ACARREO DE AGUA PARA LA OBRA Dmax <= 50m
SEALIZACION EN OBRA DURANTE EJECUCION
PINTURA EN ESCALERAS CON ESMALTE (SOLO CONTRAPASOS Y COSTADOS)
FLETE TERRESTRE
LIMPIEZA GENERAL DE OBRA
MEN DE METRADOS
Und
TOTAL
u
mes
1.00
3.00
m2
1,466.22
m2
1,466.22
m3
m3
m3
m2
m3
m3
576
162.74
585.56
1,260.05
691.40
742.75
m3
129.70
m3
321.07
m3
m2
m3
m2
m3
m
m
205.57
447.53
157.23
545.94
16.34
544.54
653.02
653.02
u
u
u
5.00
20.00
10.00
u
m3
m
m2
glb
m2
1,882.61
41.76
653.02
416.42
1.00
1,461.45
S10
Pgina :
FORMATO N14
RELACIN DE INSUMOS DEL COSTO DIRECTO
PROYECTO
"CREACION DE ESCALINATAS DEL JR. SHINGUA Y JR. MARIANO QUISPE, IDSTRITO DE PUOS - HUAMALIES HUNUCO"
ORGANISMO PROPONENTE
Fecha
Lugar
01/05/2014
100509
Recurso
MANO DE OBRA
0147110001
JEFE DE CUADRILLA
0147110002
ASISTENTE DE CUADRILLA
0147110003
PARTICIPANTE
Unidad
hh
hh
hh
Cantidad
1,668.60
346.55
25,345.14
Precio S/.
6.25
9.00
3.15
Presupuestado S/.
9,183.26
3,564.45
79,837.19
92,584.90
MATERIALES
0202000007
0202000015
0202010005
0202080035
0204000000
0213000006
0221000001
0229040010
0229060001
0229200010
0232000032
0238000000
0239010101
0239050000
0239060025
0239130019
0239150007
239160011
239300004
0239900004
0239900006
0239900101
243110020
0243520002
0254190002
0254450070
0255000002
kg
kg
kg
Und
m3
gl
bol
m
kg
gl
kg
m3
mes
m3
kg
m2
Und
m
m2
Und
Und
Und
p2
Und
gl
gl
gl
43.68
97.39
231.11
6.00
1.70
112.75
2,604.06
251.88
26.37
10.09
8,000.00
427.83
3.00
298.46
20.19
8.65
1.00
20.28
220.78
2.00
10.00
10.00
2,817.22
2.00
16.15
24.18
6.05
4.50
4.50
4.50
4.50
90.00
18.00
24.50
0.50
5.00
18.00
0.35
90.00
50.00
0.00
8.00
10.50
300.00
0.50
8.00
350.00
25.00
50.00
2.80
2.20
35.00
80.00
25.00
196.55
438.27
1,039.99
27.00
152.85
2,029.47
63,799.46
125.94
131.87
181.67
2,800.00
38,504.77
150.00
0.00
161.48
90.83
300.00
10.14
1,766.23
700.00
250.00
500.00
7,888.21
4.40
565.19
1,934.44
151.13
123,899.89
EQUIPOS
0337010102
0337010103
0348110002
0349030001
HERRAMIENTAS MANUALES
IMPLEMENTOS DE SEGURIDAD
CAMION VOLQUETE DE 6 m3
COMPACTADOR VIBRATORIO TIPO PLANCHA 4
HP
est
est
hm
hm
1.0000
1.0000
158.5633
179.6250
5,693.00
5,200.00
70.00
10.00
5,693.00
5,200.00
11,099.43
1,796.25
23,788.68
Total
S/.
240,273.47
S/.
240,273.47
FORMATO N 14
O.P.
UBICACIN
Cdigo
Recurso
COSTO AL:
Unidad
Cantidad
Precio S/.
MANO DE OBRA
0147000032
TOPOGRAFO
hh
33.5764
10.0000
0147000037
ASISTENTE DE CUADRILLA
hh
1,584.9143
6.2500
0147020003
JEFE DE CUADRILLA
hh
2,167.1279
9.0000
MATERIALES
0202000010
ALAMBRE NEGRO # 16
kg
92.2806
5.0000
0202000015
ALAMBRE NEGRO # 8
kg
38.4503
5.0000
0202010002
kg
154.7910
5.0000
0202010005
kg
54.6290
5.0000
0205000040
m3
129.7030
90.0000
0213000006
ASFALTO RC-250
gal
86.8517
20.0000
0221000001
bls
1,882.6113
23.0000
0229040010
653.0200
1.0000
0229060003
YESO EN BOLSAS DE 18 kg
bls
1.4662
3.7000
0229200010
THINNER CORRIENTE
gal
10.4105
18.0000
0230760074
BANNER
m2
8.6400
15.0000
0238000000
m3
321.0688
90.0000
0239050000
AGUA
m3
41.7604
4.3000
0239060025
TRAPO
kg
20.8210
2.5000
0239150005
10.0000
50.0000
0239300004
TECNOPORT
pln
228.5570
17.0000
0239900006
20.0000
30.0000
0239900101
5.0000
100.0000
0243040000
MADERA TORNILLO
p2
46.0000
5.0000
0244010001
p2
21.9933
4.5000
0254190003
PINTURA ESMALTE
gal
20.8210
36.0000
0337010101
ALQUILER DE LOCAL
mes
3.0000
100.0000
EQUIPOS
0348010007
hm
169.0130
25.0000
0349030001
hm
36.0374
20.0000
0349070006
hm
169.0130
8.0000
0349190003
he
33.5764
6.5000
0349880003
TEODOLITO
hm
33.5764
10.0000
FORMATO N 14
4/3/2014
Parcial
Total
29,745.62
335.7640
335.76
9905.7144
9,905.70
19504.1511
19,504.15
95,378.36
461.4030
461.40
192.2515
192.25
773.9550
773.96
273.1450
273.14
11673.2700
11,673.27
1737.0340
1,737.03
43300.0599
43,300.06
653.0200
653.02
5.4249
5.43
187.3890
187.39
129.6000
129.60
28896.1920
28,896.20
179.5697
179.57
52.0525
52.05
500.0000
500.00
3885.4690
3,885.47
600.0000
600.00
500.0000
500.00
230.0000
230.00
98.9699
98.97
749.5560
749.56
300.0000
300.00
6,852.26
4225.3250
4,225.33
720.7480
720.75
1352.1040
1,352.10
218.2466
218.32
335.7640
335.76
131,976.24
#REF!
FORMATO N 15
DESAGREGADO DE HERRAMIENTAS
"CREACION DE ESCALINATAS DEL JR. SHINGUA Y JR.MARIANO QUISPE, DISTRITO DE PUOS HUAMALIES - HUANUCO"
Unidad
Cantidad
ML
UND
UND
UND
UND
UND
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
100.00
4.00
25.00
25.00
1.00
2.00
10.00
2.00
2.00
100.00
10.00
20.00
8.00
10.00
10.00
4.00
2.00
5.00
5.00
50.00
Total S/.
Precio S/.
0.40
8.00
25.00
25.00
35.00
12.00
0.70
8.50
4.00
5.00
70.00
5.00
180.00
50.00
70.00
25.00
25.00
10.00
8.00
2.00
FORMATO N 15
AGREGADO DE HERRAMIENTAS
FORMATO N 11
DESAGREGADO DE KIT DE IMPLEMENTOS DE SEGURIDAD
"CREACION DE ESCALINATAS DEL JR. SHINGUA Y JR.MARIANO QUISPE, DISTRITO DE PUOS - HUAMALIES - HUANUCO"
Cantidad (Und)
1.00
2.00
1.00
0.50
2.00
1.00
1.00
N
Precio Unitario
participantes
(S/.) (*)
promedio
50
10.00
50
10.00
50
5.00
50
8.00
50
10.00
50
25.00
50
20.00
FORMATO N 11
KIT DE IMPLEMENTOS DE SEGURIDAD
FORMATO
PROGRAMACION DE VAL
Partidas
Und
Metrado
Metrado
OTROS
CREACION DE ESCALINATAS
01
01.01
01.02
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04
04.01
04.02
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
06
OBRAS PROVISIONALES
CARTEL DE OBRA IMPRESIN DE BANNER DE 3.60m X 2.40m
ALQUILER DE LOCAL PARA LA OBRA
OBRAS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO NORMAL
TRAZO Y REPLANTEO EN TERRENO ACCIDENTADO SIN EQUIPO
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO SEMIROCOSO MANUAL
EXCAVACION DE ZANJAS y/O ZAPATAS Hmx<=1.00m EN TERRENO ROCOSO
EXCAVACIN DE ZANJAS PARA SARDINELES EN TERRENO SEMIROCOSO
EXCAVACIN DE ZANJAS PARA CUNETAS TERRENO SEMIROCOSO
NIVELACIN Y COMPACTACIN MANUAL DE LA SUBRASANTE
RELLENO CON MATERIAL PROPIO COMPACTACIN CON EQUIPO LIVIANO
ACARREO Y ACOPIO MANUAL DE MATERIAL EXCEDENTE D > 100m
ELIMINACION DE MATERIAL EXCEDENTE. CARGUIO MANUAL D<= Km 5
HABILITACION DE AGREGADOS Y PIEDRAS
ACARREO DE MATERIAL EXCEDENTE PARA SER UTILIZADO EN RELLENOS D>150m
ACARREO DE AGREGADOS EN PENDIENTE PRONUNCIADA D>100m
OBRAS DE CONCRETO
GRADAS O ESCALINATAS - CONCRETO F'C=140KG/CM2
GRADAS O GRADERIAS - ENCOFRADO Y DESENCOFRADO
JUNTA DE DILATACIN/CONST CON TECKNOPORT E=1"
JUNTA CON ASFALTO E=1"
SARDINELES - CONCRETO F'C=140KG/CM2
SARDINELES ENCOFRADO Y DESENCOFRADO
CUNETA - CONCRETO F'C=140KG/CM2
CUNETA - ENCOFRADO Y DESENCOFRTADO
PRUEBAS Y ENSAYOS
u
mes
1.00
3.00
m2
m2
1,014.35
1,014.35
50.0800
0.50
0.3800
m3
m3
m
m
m2
m3
m3
m3
959.81
19.14
525.28
525.28
1,237.89
314.58
1,189.65
1,189.65
16.6900
41.73
1.670
0.630
0.830
7.1500
7.1500
5.22
m3
m3
314.58
428.00
16.6900
25.0400
m3
m2
m
m
m3
m
m3
m
250.46
545.96
849.15
849.15
56.67
377.82
64.23
503.76
37.56
3.34
0.42
0.56
29.21
3.4100
25.0400
6.26
290.91
50.00
340.99
50.00
0.50
0.83
0.4500
16.69
41.73
1.67
0.63
0.83
12.8600
7.15
14.55
5.7100
9.33
290.50
14.95
2.08
2.57
284.48
10.0800
283.5800
9.0000
16.69
25.0400
0.0000
328.0600
18.2900
2.5000
3.1300
313.6900
13.4900
308.6200
15.2600
490.99
340.99
150.00
1,349.09
507.18
841.91
48,914.45
16,019.23
798.71
877.22
330.93
1,027.45
4,045.50
8,506.00
17,309.41
15,967.46
5,250.34
10,717.12
147,315.88
82,165.91
9,985.61
2,122.88
2,657.84
17,776.81
5,096.79
19,822.66
7,687.38
1,818.76
1.00
1.00
1,014.35
1,014.35
959.81
500.00
100.00
800.00
600.00
FORMATO
PROGRAMACION DE VAL
Partidas
Und
Metrado
06.01
06.02
06.03
06.04
07
07.01
07.02
07.03
07.04
07.05
07.06
07.07
07.08
07.09
07.10
Und
Und
Und
Und
10.00
1.00
10.00
2.00
4.17
Und
m3
m
m
m2
m
m2
Est.
Est.
KG
2,603.00
298.46
251.88
251.88
403.71
503.76
1,259.40
1.00
1.00
8,000.00
0.63
7.15
0.13
0.10
5.89
1.11
0.25
1.04
3.13
OTROS
51.04
300.00
25.00
350.00
55.2100
300.0000
26.0400
353.1300
0.00
0.00
0.50
2.84
4.70
5,693.00
5,200.00
0.35
0.6300
7.1500
0.6300
0.1000
8.7300
5.8100
0.2500
5,693.0000
5,200.0000
0.3500
552.10
300.00
260.40
706.26
24,416.84
1,639.89
2,133.99
158.68
25.19
3,524.39
2,926.85
314.85
5,693.00
5,200.00
2,800.00
Metrado
1.00
2.00
50.00
1.00
1.00
8,000.00
-
240,273.47
37,970.27
278,243.74
ORMATO N 17
TAS DEL JR.SHINGUA Y JR. MARIANO QUISPE, DISTRITO DE PUOS - HUAMALIES - HUNUCO"
mes 1
mes 2
Valorizacin desagregada
Aporte del programa
MONC
OTROS
mes 3
Valorizacin desagregada
Cofinancia
miento
47.77
507.18
385.45
16,019.23
-
293.22
50.00
456.46
-
415.00
715.00
5,720.00
3,132.00
-
571.00
5,598.00
-
Valorizacin
mensual
Metrado
340.99
50.00
507.18
841.91
16,019.23
415.00
1,286.00
5,720.00
8,730.00
-
1.00
19.14
525.28
525.28
737.89
214.58
389.65
400.00
314.58
428.00
-
798.71
877.22
330.93
612.45
1,534.25
2,786.00
2,088.00
5,250.34
10,717.12
-
OTROS
50.00
1,225.25
3,732.00
-
Valorizacin desagregada
Cofinanciamient
o
Valorizacin
mensual
Metrado
50.00
798.71
877.22
330.93
612.45
2,759.50
2,786.00
5,820.00
5,250.34
10,717.12
-
1.00
189.65
250.46
545.96
849.15
849.15
56.67
377.82
64.23
503.76
-
989.97
9,407.28
1,823.51
356.64
475.52
1,655.33
1,288.37
1,608.32
3,153.54
-
OTROS
50.00
1,769.43
72,758.63
8,162.10
1,766.23
2,182.32
16,121.48
3,808.43
18,214.34
4,533.84
-
Cofinanciami
ento
Valorizacin
mensual
50.00
2,759.41
82,165.91
9,985.61
2,122.88
2,657.84
17,776.81
5,096.79
19,822.66
7,687.38
-
ORMATO N 17
TAS DEL JR.SHINGUA Y JR. MARIANO QUISPE, DISTRITO DE PUOS - HUAMALIES - HUNUCO"
mes 1
mes 2
Valorizacin desagregada
Aporte del programa
MONC
OTROS
6.26
6.50
26,954.39
300.00
700.00
25.00
-
Valorizacin desagregada
Valorizacin
Cofinancia
mensual
miento
-
5,693.00
5,200.00
2,800.00
-
21,686.68
300.00
706.26
31.50
5,693.00
5,200.00
2,800.00
48,641.07
7,686.72
Metrado
OTROS
Valorizacin desagregada
Valorizacin
Cofinanciamient
mensual
o
10.00
41.70
510.40
10.00
-
10.40
819.00
715.00
13.00
250.00
50.00
1,300.00
100.00
100.00
-
26,594.11
5,817.65
56,327.79
20.24%
20.24%
mes 3
552.10
260.40
819.00
715.00
63.00
32,411.77
5,122.01
Metrado
1,303.00
198.46
101.88
251.88
403.71
503.76
1,259.40
-
Cofinanciami
ento
OTROS
820.89
1,418.99
13.24
25.19
2,377.85
559.17
314.85
26,288.66
50.94
1,146.54
2,367.67
-
132,931.95
37,533.78
13.49%
33.73%
Valorizacin
mensual
820.89
1,418.99
64.18
25.19
3,524.39
2,926.85
314.85
159,220.63
25,161.54
184,382.17
66.27%
100.00%
FORMATO N 18
CRONOGRAMA DE VALORIZACIN MENSUAL
OBRA :
ITEM
01.00.00
01.01.00
01.02.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
03.06.00
03.07.00
04.00.00
04.01.00
Err:509
DESCRIPCION
OBRAS PROVISIONALES
CARTEL DE OBRA IMPRESION BANNER DE 3.60x2.40m. (SOPORTE DE
MADERA)
ALQUILER DE LOCAL PARA LA OBRA
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO EN ROCA SUELTA
TRAZO Y REPLANTEO EN TERRENO ACCIDENTADO CON PENDIENTE
PRONUNCIADA CON EQUIPO
POSTE P/SEALIZACION EN OBRAS VIALES 3",H=1.00m. PINTADOS ROJO
Y BLANCO ALTERNADOS
SEALIZACIN EN OBRA DURANTE LA EJECUCIN
DEMOLICION Y/O DESMONTAJE DE MURO EMPIRCADO DE PIEDRA
h.prom.=1.00m.
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO SEMIROCOSO MANUAL
CORTE EN TERRENO ROCOSO (Manual, inc. insumos para rotura de roca por
calentamiento)
RELLENO CON MATERIAL PROPIO COMPACTACIN CON EQUIPO LIVIANO
RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=4" INC.
COMPACTACION EQUIPO LIVIANO
ACARREO DE MATERIAL EXCEDENTE PARA SER UTILIZADO EN RELLENOS
D<50m.
ACARREO Y ACOPIO MANUAL DE MATERIAL EXCEDENTE A ELIMINAR D >
100m.
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6.0 M3
CARGUIO MNUAL D<=5KM
EXTRACCIN DE MATERIAL Y ACARREO
EXTRACCIN DE PIEDRA EN CANTERA
Un
PRESUPUESTO
PRECIO
METRADO
UNITARIO
IMPORTE
PARCIAL
MES 3
2 3
MESES
MES 2
2 3
un
1.00
412.28
un
3.00
200.00
412.28 100%
600.00
35%
412.28
210.00
0%
35%
0.00
210.00
0%
30%
m2
618.00
0.56
346.08 100%
346.08
0%
0.00
0%
mes
515.00
0.71
365.65 100%
365.65
0%
0.00
0%
un
35.00
7.91
214.00
0.47
35%
35%
96.90
35.20
35%
35%
96.90
35.20
30%
30%
m2
103.00
5.99
616.97 100%
616.97
0%
0.00
0%
m3
503.73
14.99
m3
215.89
37.07
m3
524.28
20.14
m3
473.80
9.77
m3
629.14
5.00
m3
297.20
6.42
m3
297.20
15.68
m3
896.63
29.97
276.85
100.58
7,550.91
35%
2,642.82
40%
3,020.36
25%
8,003.04
25%
2,000.76
35%
2,801.06
40%
10,559.00
0%
0.00
40%
4,223.60
60%
4,629.03
0%
0.00
0%
3,145.70
35%
1,101.00
35%
1,101.00
30%
1,908.02
35%
667.81
35%
667.81
30%
4,660.10
35%
1,631.04
35%
1,631.04
30%
26,872.00
40%
10,748.80
30%
8,061.60
30%
0.00 100%
MES 3
3
FORMATO N 18
CRONOGRAMA DE VALORIZACIN MENSUAL
OBRA :
Err:509
ITEM
04.02.00
DESCRIPCION
Un
m3
05.02.00
05.03.00
05.04.00
05.05.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
04.03.00
04.04.00
04.05.00
04.06.00
05.00.00
05.01.00
PRESUPUESTO
PRECIO
METRADO
UNITARIO
245.81
32.98
m3
896.63
14.99
m3
m3
un
334.00
1,249.00
98.00
22.48
0.56
6.42
m3
148.57
164.64
m3
506.56
114.12
m2
m2
m
479.36
128.84
58.80
9.53
8.20
13.07
un
un
un
un
m2
1.00
8.00
1.00
1.00
515.00
350.00
33.80
Err:509
Err:509
0.22
IMPORTE
PARCIAL
8,106.81
1
40%
13,440.48
7,508.32
699.44
629.16
MES 3
2 3
4
3,242.72
1
30%
40%
40%
30%
30%
5,376.19
3,003.33
209.83
188.75
24,460.56
35%
57,808.63
4,568.30
1,056.49
768.52
25%
20%
25%
25%
350.00
270.40
0%
0%
100%
100%
113.30
0%
212,109.86
MESES
MES 2
2 3
4
2,432.04
1
2
30%
30%
30%
40%
40%
4,032.14
2,252.50
279.78
251.66
30%
30%
30%
30%
8,561.20
35%
8,561.20
30%
14,452.16
913.66
264.12
192.13
40%
40%
40%
40%
23,123.45
1,827.32
422.60
307.41
35%
40%
35%
35%
0.00 100%
0.00
50%
0%
0%
0.00
0%
350.00
135.20
0%
50%
0%
0%
0.00 100%
69,442.28
70,849.69
32.74%
32.74%
33.40%
66.14%
MES 3
3
MENSUAL
MESES
MES 3
4
0.00
180.00
1.00
1.00
412.28
600.00
0.00
0.00
0.00
1.00
346.08
0.00
0.00
1.00
365.65
0.00
83.06
30.17
1.00
1.00
276.85
100.58
0.00
0.00
0.00
1.00
616.97
0.00
1,887.73
1.00
7,550.91
0.00
3,201.22
1.00
8,003.04
0.00
6,335.40
1.00
10,559.00
0.00
4,629.03
1.00
4,629.03
0.00
943.71
1.00
3,145.70
0.00
572.41
1.00
1,908.02
0.00
1,398.03
1.00
4,660.10
0.00
8,061.60
1.00
26,872.00
0.00
MENSUAL
MESES
MES 3
4
2,432.04
1.00
8,106.81
0.00
4,032.14
2,252.50
209.83
188.75
1.00
1.00
1.00
1.00
13,440.48
7,508.32
699.44
629.16
0.00
0.00
0.00
0.00
7,338.17
1.00
24,460.56
0.00
20,233.02
1,827.32
369.77
268.98
1.00
1.00
1.00
1.00
57,808.63
4,568.30
1,056.49
768.52
0.00
0.00
0.00
0.00
0.00
135.20
350.00
270.40
0.00
0.00
113.30
1.00
1.00
1.00
1.00
1.00
113.30
0.00
71,817.89
212,109.86
240,273.47
33.86%
100.00%
-28,163.61
FORMATO N 18
CRONOGRAMA DE MANO DE OBRA NO CALIFICADA (RECURSO PARTICIPANTE)
PROYECTO:
"CREACIN DE ESCALINATAS DEL JR.SHINGUA Y JR. MARIANO QUISPE, DISTRITO DE PUOS - HUAMALIES - HUNUCO"
Periodo
Numero minimo de participantes
por mes:
mes 1
mes 2
mes 3
Promedio
General
50
50
50
50
Semana
1
Semana
2
Semana
3
Semana
4
Semana
Da
Da
Da
11-15
Da
16-20
Da
21
1-5
6-10
5
Da
22-25
Semana
6
Semana
7
Semana
8
Semana
Da
26-30
Da
31-35
Da
36-40
Da
41-42
9
Da
43-45
Semana
Semana
Semana
Semana
10
Da
46-50
11
Da
51-55
12
Da
56-60
13
Da
61-63
Total
a) N de das tiles
63
b) N de participantes
50
53
53
52
53
50
50
50
50
50
50
50
50
50
50
50
125.00
125.00
125.00
125.00
25.00
100.00
125.00
125.00
125.00
50.00
75.00
125.00
125.00
125.00
75.00
6,250.00
6,625.00
6,625.00
6,500.00
1,325.00
5,000.00
6,250.00
6,250.00
6,250.00
2,500.00
3,750.00
6,250.00
6,250.00
6,250.00
3,750.00
27,325.00
26,250.00
26,250.00
50
Nota: El organismo proponente deber sealar la estimacin del nmero de participantes a los cuales el Programa har efectivo el pago de incentivo econmico. La elaboracin de este
cronograma debe ser a escala semanal. Para efectos de elaboracin del expediente, este cronograma deber ser trabajado en funcin de semanas ideales (todas las semanas de 5 das tiles), no
se deber trabajar en funcin de una fecha proyectada de inicio de obra.
79,825.00