Vous êtes sur la page 1sur 2

57074 Federal Register / Vol. 72, No.

193 / Friday, October 5, 2007 / Notices

employers must prepare a written • Ways to minimize the burden on significant delay in the receipt of
certification that includes the identity of employers who must comply; for comments. For information about
the employee trained, the signature of example, by using automated or other security procedures concerning the
the employer or the trainer, and the date technological information collection delivery of materials by hand, express
the employee completed the training. In and transmission techniques. delivery, messenger, or courier service,
addition, the employer must maintain please contact the OSHA Docket Office
an employee’s training certificate for the III. Proposed Actions at (202) 693–2350 (TTY (877) 889–
duration of their employment and, on OSHA is requesting that OMB extend 5627). Comments and submissions are
request, make it available to OSHA. its approval of the information posted without change at http://
Emergency action plans allow collection requirements contained in the www.regulations.gov. Therefore, OSHA
employers and employees to anticipate, Standard on Powered Platforms for cautions commenters about submitting
and effectively respond to, emergencies Building Maintenance (29 CFR 1910.66). personal information such as social
that may arise during powered platform The Agency is requesting to retain its security numbers and date of birth.
operations. Affixing load rating plates to current burden hour total of 135,656 Although all submissions are listed in
suspended units, instructions to hours associated with this Standard. the http://www.regulations.gov index,
emergency electric operating devices, The Agency will summarize the some information (e.g., copyrighted
and tags to wire rope fasteners prevent comments submitted in response to this material) is not publicly available to
workplace accidents by providing notice and will include this summary in read or download through this Web site.
information to employers and the request to OMB. All submissions, including copyrighted
employees regarding the conditions Type of Review: Extension of a material, are available for inspection
under which they can safely operate currently approved collection. and copying at the OSHA Docket Office.
these system components. Requiring Title: Standard on Powered Platforms Information on using the http://
building owners to establish and for Building Maintenance (29 CFR www.regulations.gov Web site to submit
maintain written certification of 1910.66). comments and access the docket is
inspections and testing conducted on OMB Number: 1218–0121. available at the Web site’s ‘‘User Tips’’
the supporting structures of buildings, Affected Public: Business or other for- link. Contact the OSHA Docket Office
powered platform systems, and profit. for information about materials not
suspension wire ropes provides Number of Respondents: 900. available through the Web site, and for
employers and employees with Frequency: On occasion; initially, assistance in using the Internet to locate
assurance that they can operate safely monthly, annually. docket submissions.
from the buildings using equipment that Average Time Per Response: Varies
from 2 minutes (.03 hour) to disclose V. Authority and Signature
is in safe operating condition.
The training requirements increase certification records to 10 hours to Edwin G. Foulke, Jr., Assistant
employee safety by allowing them to inspect/test both a powered platform Secretary of Labor for Occupational
develop the skills and knowledge facility and its suspension wire ropes, Safety and Health, directed the
necessary to effectively operate, use, and to prepare the certification record. preparation of this notice. The authority
and inspect powered platforms, Total Burden Hours Requested: for this notice is the Paperwork
recognize and prevent safety hazards 135,656. Reduction Act of 1995 (44 U.S.C. 3506,
associated with platform operation, Estimated Cost (Operation and et seq.) and Secretary of Labor’s Order
respond appropriately under emergency Maintenance): $0. No. 5–2007 (72 FR 31159).
conditions, and maintain and use their IV. Public Participation—Submission of Signed at Washington, DC, on October 2,
fall protection arrest system. Training Comments on This Notice and Internet 2007.
certification permits employers to Access to Comments and Submissions Edwin G. Foulke, Jr.,
review the training provided to their Assistant Secretary of Labor for Occupational
employees, thereby ensuring that the You may submit comments in
Safety and Health.
employees received the necessary response to this document as follows:
(1) Electronically at http:// [FR Doc. E7–19695 Filed 10–4–07; 8:45 am]
training. In addition, the paperwork BILLING CODE 4510–26–P
requirements specified by the Standard www.regulations.gov, which is the
provide the most efficient means for an Federal eRulemaking Portal; (2) by
OSHA compliance officer to determine facsimile (FAX); or (3) by hard copy. All
comments, attachments, and other NATIONAL SCIENCE FOUNDATION
whether or not employers and building
owners are providing the required material must identify the Agency name
and the OSHA docket number for the Committee on Equal Opportunities in
notification, certification, and training. Science and Engineering (CEOSE);
ICR (Docket No. OSHA–2007–0062).
II. Special Issues for Comment You may supplement electronic Notice of Meeting—Correction
OSHA has a particular interest in submissions by uploading document In accordance with the Federal
comments on the following issues: files electronically. If you wish to mail Advisory Committee Act (Pub. L. 92–
• Whether the proposed information additional materials in reference to an 463, as amended), the National Science
collection requirements are necessary electronic or facsimile submission, you Foundation announced the meeting of
for the proper performance of the must submit them to the OSHA Docket the Committee on Equal Opportunities
Agency’s functions, including whether Office (see the section of this notice in Science and Engineering (1173) on
the information is useful; titled ADDRESSES). The additional October 16 and 17, 2007 at the National
• The accuracy of OSHA’s estimate of materials must clearly identify your Science Foundation. This notice was
the burden (time and costs) of the electronic comments by your name,
yshivers on PROD1PC62 with NOTICES

published on September 21, 2007, on


information collection requirements, date, and the docket number so the page 54080, FR Doc. E7–18597.
including the validity of the Agency can attach them to your Below is the corrected agenda. It
methodology and assumptions used; comments. contains the following changes:
• The quality, utility, and clarity of Because of security procedures, the • On October 16 the American
the information collected; and use of regular mail may cause a Community Survey has been removed

VerDate Aug<31>2005 15:33 Oct 04, 2007 Jkt 214001 PO 00000 Frm 00094 Fmt 4703 Sfmt 4703 E:\FR\FM\05OCN1.SGM 05OCN1
Federal Register / Vol. 72, No. 193 / Friday, October 5, 2007 / Notices 57075

and the Planning for the Minority NUCLEAR REGULATORY Register, the licensee may demand a
Technical Organization Summit has COMMISSION hearing with respect to the denial
been added. [Docket No. 50–285]
described above. Any person whose
• The Report on the NSF Broadening interest may be affected by this
Participation Plan has been moved to Omaha Public Power District; Notice of proceeding may file a written petition
October 17. Denial of Amendment to Facility for leave to intervene pursuant to the
Operating License and Opportunity for requirements of 10 CFR 2.309.
Contact Person: Dr. Margaret E.M.
Hearing A request for hearing or petition for
Tolbert, Senior Advisor and Executive
Liaison, CEOSE, Office of Integrative The U.S. Nuclear Regulatory leave to intervene must be filed with the
Activities, National Science Foundation, Commission (NRC or the Commission) Secretary of the Commission, U.S.
4201 Wilson Boulevard Arlington, VA has denied a request by Omaha Public Nuclear Regulatory Commission,
22230, Telephone: (703) 292–8040, Power District (the licensee), for an Washington, DC 20555–0001 Attention:
mtolbert@nsf.gov. amendment to Renewed Facility Rulemakings and Adjudications Staff, or
Operating License No. DPR–40 issued to may be delivered to the Commission’s
Agenda the licensee for operation of the Fort Public Document Room (PDR), located
Calhoun Station, Unit No. 1, located in at One White Flint North, Public File
Tuesday, October 16, 2007
Washington County, Nebraska. Area O1 F21, 11555 Rockville Pike (first
Welcome and Opening Statement by the Notice of Consideration of Issuance of floor), Rockville, Maryland, by the
CEOSE Chair this amendment was published in the above date. A request for hearing or
Federal Register on April 26, 2005 (70 petition for leave to intervene may also
Introductions FR 21459).
By letter dated March 31, 2005, the be transmitted directly to the Secretary
Presentations and Discussions:
licensee requested an amendment to of the Commission by means of
• Experimental Program to Stimulate facsimile transmission to 301–415–1101
revise the Renewed Facility Operating
Competitive Research or by e-mail to hearingdocket@nrc.gov.
License and Technical Specifications
• Broadening Participation Briefings (TSs) to increase the license core power. A copy of any petitions should also be
on NSF Advisory Committee Fort Calhoun Station, Unit No. 1, is sent to the Office of the General
Meetings currently licensed for a rated thermal Counsel, U.S. Nuclear Regulatory
• Planning for the Minority Technical power of 1500 megawatts thermal Commission, Washington, DC 20555–
Organization Summit (MWt). Through the use of more 0001. Copies of petitions may also be
accurate feedwater flow measurement transmitted directly to the Office of the
• Concurrent Planning Meetings of equipment, approval was sought to General Counsel by means of facsimile
CEOSE Ad Hoc Subcommittees increase this core power by 1.5 percent transmission to 301–415–3725 or by e-
• Reports on Strategic Planning by to 1522 MWt. The power uprate would mail to OGCMailCenter@nrc.gov. A copy
CEOSE, Mini-Symposium: be based on the use of the of any petitions should also be sent to
Institutions Serving Persons with CROSSFLOWTM system for James R. Curtiss, Esq., Winston &
Disabilities Who Are in STEM determination of main feedwater flow Strawn, 1700 K Street, NW.,
Fields, and Broadening and the associated determination of Washington, DC 20006–3817, Senior
Participation Efforts of Several reactor power through the performance Counsel for the licensee.
Federal Agencies of the power calorimetric currently
required by the Fort Calhoun Station For further details with respect to this
Wednesday, October 17, 2007 TSs. action, see (1) The application for
The OPPD license amendment request amendment dated March 31, 2005, and
Opening Statement by the New CEOSE to increase core power is based on (2) the Commission’s letter to the
Chair Westinghouse topical report CENPD– licensee dated September 27, 2007.
Presentations/Discussions: 397–P–A, ‘‘Improved Flow Documents may be examined, and/or
• Report on the NSF Broadening Measurement Accuracy Using Crossflow copied for a fee, at the NRC’s PDR,
Participation Plan Ultrasonic Flow Measurement located at One White Flint North, Public
Technology,’’ for new and future uses of File Area O1 F21, 11555 Rockville Pike
• Broadening Participation Initiatives the CROSSFLOW ultrasonic flow meter.
of the NSF Directorate for (first floor), Rockville, Maryland, and
The topical report provided several
Engineering will be accessible electronically through
assessments with respect to that topical
the Agencywide Documents Access and
• Broadening Participation Initiatives report to justify the power increase.
Because the licensee’s license Management System’s (ADAMS) Public
of the Chemistry Division of the
amendment request is based on CENPD– Electronic Reading Room link at the
NSF Directorate for Mathematical
397–P–A and the NRC staff has NRC Web site http://www.nrc.gov/
and Physical Sciences
suspended its approval, as explained in reading-rm/adams.html. Persons who
• Discussion Topics Pertinent to the do not have access to ADAMS or who
the NRC staff’s letter to Westinghouse
CEOSE Mandate with the NSF dated September 26, 2007, of the use of encounter problems in accessing
Director and Deputy Director this topical report in license amendment documents located in ADAMS should
Completion of Unfinished Business requests, the NRC staff has concluded contact the NRC PDR Reference staff by
Dated: October 1, 2007. that the licensee’s request cannot be telephone at 1–800–397–4209, 301–
granted. The licensee was notified of the 415–4737, or by e-mail to pdr@nrc.gov.
yshivers on PROD1PC62 with NOTICES

Susanne Bolton,
Commission’s denial of the proposed Dated at Rockville, Maryland, this 27th day
Committee Management Officer. change by a letter dated September 27, of September 2007.
[FR Doc. E7–19656 Filed 10–4–07; 8:45 am] 2007.
BILLING CODE 7555–01–P By 30 days from the date of
publication of this notice in the Federal

VerDate Aug<31>2005 15:33 Oct 04, 2007 Jkt 214001 PO 00000 Frm 00095 Fmt 4703 Sfmt 4703 E:\FR\FM\05OCN1.SGM 05OCN1

Vous aimerez peut-être aussi