54300 Federal Register / Vol. 72, No.

184 / Monday, September 24, 2007 / Notices

NATIONAL SCIENCE FOUNDATION Title of Collection: Medical Clearance information and understandings of
Process for Deployment to Antarctica. refusal to provide the information or
Agency Information Collection OMB Number: 3145–0177. providing false information. The
Activities: Comment Request Type of Request: Intent to seek agency’s contractors’ reviewing
National Science Foundation.
AGENCY:
approval to renew an information physicians and medical staff complete
collection for three years. the sections of the form that indicated
Submission for OMB Review;
ACTION:
when the documents were received and
Comment Request. Abstract
whether or not the person qualified for
SUMMARY: The National Science A. Proposed Project polar deployment, in which season the
Foundation (NSF) has submitted the All individuals who anticipate person is qualified to deploy and where
following information collection deploying to Antarctica and to certain disqualified the reasons.
requirement to OMB for review and regions of the Arctic under the auspices 2. Forms NSF–1423/1463/1453, Polar
clearance under the Paperwork of the United States Antarctic Program Physical Examination—Antarctica/
Reduction Act of 1995, Public Law 104– are required to take and pass a rigorous Arctic/Official Visitors, will be used by
13. This is the second notice for public physical examination prior to the individual’s physician to document
comment; the first was published in the deploying. The physical examination specific medical examination results
Federal Register at 72 FR 29001, and no includes a medical history, medical and the overall status of the individual’s
substantial comments were received. examination, a dental examination and health. It is a two-page form which also
NSF is forwarding the proposed renewal for those persons planning to winter provides for the signatures of both the
submission to the Office of Management over in Antarctica a psychological patient and the examining physician, as
and Budget (OMB) for clearance examination is also required. The well as contact information about the
simultaneously with the publication of requirement for this determination of examining physician. Finally, it
this second notice. Comments regarding physical status is found in 42 U.S.C. contains the name, address and
(a) whether the collection of information 1870 (Authority) and 62 FR 31522, June telephone number of the agency’s
is necessary for the proper performance 10, 1997 (Source), unless otherwise contractor that collects and retains the
of the functions of the agency, including noted. This part sets forth the information.
whether the information will have procedures for medical screening to 3. Forms NSF–1426/1466/1456,
practical utility; (b) the accuracy of the determine whether candidates for National Science Foundation Polar
agency’s estimate of burden including participation in the United States Physical Examination (Antarctica/
the validity of the methodology and Antarctic [[Page 216]] Program (USAP) Arctic/Official Visitors) Medical History
assumptions used; (c) ways to enhance are physically qualified and Interval Screening, will only be used by
the quality, utility and clarity of the psychologically adapted for assignment individuals who are under the age of 40
information to be collected; (d) ways to or travel to Antarctica. Medical and who successfully took and passed a
minimize the burden of the collection of screening examinations are necessary to polar examination the previous season
information on those who are to determine the presence of any physical or not more than 24 months prior to
respond, including through the use of or psychological conditions that would current deployment date. It allows the
appropriate automated, electronic, threaten the health or safety of the otherwise healthy individual to update
mechanical, or other technological candidate or other USAP participants or his or her medical data without having
collection techniques or other forms of that could not be effectively treated by to take a physical examination every
information technology should be the limited medical care capabilities in year as opposed to those over 40 years
addressed to: Office of Information and Antarctica. of age who must be examined annually.
Regulatory Affairs of OMB, Attention: (b) Presidential Memorandum No. 4. Forms NSF–1465/1425/1455, Polar
Desk Officer for National Science 6646 (February 5, 1982) (available from Dental Examination—Antarctica/Arctic/
Foundation, 725–17th Street, NW., the National Science Foundation, Office Official Visitors, will be used by the
Room 10235, Washington, DC 20503, of Polar Programs, Room 755, 4201 examining dentist to document the
and to Suzanne H. Plimpton, Reports Wilson Blvd., Arlington, VA 22230) sets status of the individual’s teeth and to
Clearance Officer, National Science forth the National Science Foundation’s document when the individual was
Foundation, 4201 Wilson Boulevard, overall management responsibilities for examined. It will also be used by the
Suite 295, Arlington, Virginia 22230 or the entire United States national contractor’s reviewing dentist to
send e-mail to splimpto@nsf.gov. program in Antarctica. document whether or not the individual
Comments regarding these information is dentally cleared to deploy to the polar
collections are best assured of having B. Use of the Information regions.
their full effect if received within 30 1. Forms NSF–1422/1462/1452, 5. Forms NSF–1428/1468 Medical
days of this notification. Copies of the National Science Foundation—Polar Waivers—Antarctic/Arctic: Any
submission(s) may be obtained by Physical Examination (Antarctica/ individual who is determined to be not
calling 703–292–7556. Arctic/Official Visitors) Medical physically qualified for polar
NSF may not conduct or sponsor a History, will be used by the individual deployment may request an
collection of information unless the to record the individual’s family and administrative waiver of the medical
collection of information displays a personal medical histories. It is a five- screening criteria. This information
currently valid OMB control number page form that includes the individual’s includes signing a Request for Waiver
and the agency informs potential and the individual’s emergency point- that is notarized or otherwise legally
persons who are to respond to the of-contact’s name, address, and acceptable in accordance with penalty
collection of information that such
rfrederick on PROD1PC67 with NOTICES

telephone numbers. It contains the of perjury statutes, and obtaining an


persons are not required to respond to individual’s email address, employment Employer Statement of Support.
the collection of information unless it affiliation and dates and locations of Individuals on a case-by-case basis may
displays a currently valid OMB control current and previous polar also be required to submit additional
number. deployments. It also includes a signed medical documentation and a letter
SUPPLEMENTARY INFORMATION: certification of the accuracy of the from the individual’s physician(s)

VerDate Aug<31>2005 14:43 Sep 21, 2007 Jkt 211001 PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 E:\FR\FM\24SEN1.SGM 24SEN1
Federal Register / Vol. 72, No. 184 / Monday, September 24, 2007 / Notices 54301

regarding the individual’s medical request and receive the waiver packet, period specified in the respective
suitability for Antarctic deployment. to obtain employer support and current operating licenses. The current
6. Other information requested: In complete the waiver request, to do any operating license for BVPS, Unit 1
addition to the numbered forms and follow-up testing, to return the waiver (DPR–66), expires on January 29, 2016.
other information mentioned above, the request to the contractor plus any BVPS, Unit 1, is a pressurized-water
USAP medical screening package follow-up information, for the reactor designed by Westinghouse. The
includes the following: contractor to get the completed packet current operating license for BVPS, Unit
—the Medical Risks for NSF-Sponsored to the National Science Foundation, and 2 (NPF–73), expires on May 27, 2027.
Personnel Traveling to Antarctica. for the NSF to make and promulgate a BVPS, Unit 2, is a pressurized-water
—the NSF Privacy Notice. decision. reactor designed by Westinghouse. Both
—the Medical Screening for Blood- Respondents: All individuals units are located near Shippingport,
borne Pathogens/Consent for HIV deploying to the Antarctic under the Pennsylvania. The acceptability of the
Testing. auspices of the United States Antarctic tendered application for docketing, and
—the NSF Authorization for Treatment Program and certain Arctic areas must other matters including an opportunity
of Field-Team Member/Participant complete these forms. There are to request a hearing, will be the subject
Under the Age of 18 Years. This approximately 3,600 submissions per of subsequent Federal Register notices.
should only be sent to the individuals year, with a small percentage (c.3%) Copies of the application are available
who are under 18 years of age. under the age of 40 who provide annual to the public at the Commission’s Public
—the Dear Doctor and Dear Dentist submissions but with less information. Document Room (PDR), located at One
letters, which provide specific Estimated Number of Responses per White Flint North, 11555 Rockville
laboratory and x-ray requirements, as Form: Responses ranges from 2 to Pike, Rockville, MD 20852 or through
well as other instructions. approximately 238 responses. the internet from the NRC’s Agencywide
7. There are two other, non-medical Estimated Total Annual Burden on Documents Access and Management
forms included in the mailing: Respondents: 40,536 hours. System (ADAMS) Public Electronic
Frequency of Responses: Individuals Reading Room under Accession Number
—the Personal Information Form—NSF must complete the forms annually to be ML072430913. The ADAMS Public
Form Number 1458 includes a Privacy current within 12 months of their Electronic Reading Room is accessible
Act Notice. This form is used to anticipated deployment dates. from the NRC Web site at http://
collect information on current address Depending on individual medical status www.nrc.gov/reading-rm/adams.html.
and contact numbers, date and place some persons may require additional In addition, the application is available
of birth, nationality, citizenship, laboratory results to be current within at http://www.nrc.gov/reactors/
emergency point of contact two to six-weeks of anticipated operating/licensing/renewal/
information, travel dates, clothing deployment. applications.html. Persons who do not
sizes so that we may properly outfit have access to the Internet or who
those individuals who deploy, work- Dated: September 19, 2007.
encounter problems in accessing the
site information and prior deployment Suzanne H. Plimpton,
documents located in ADAMS should
history. Reports Clearance Officer, National Science
contact the NRC’s PDR reference staff at
—the Participant Notification— Foundation.
1–800–397–4209, extension 4737, or by
Important Notice for Participants— [FR Doc. 07–4712 Filed 9–21–07; 8:45 am]
e-mail to pdr@nrc.gov.
NSF Form 1457 in the United States BILLING CODE 7555–01–M A copy of the license renewal
Antarctic Program. This form application for the BVPS, Units 1 and 2,
provides information on the laws of is also available to local residents near
the nations through which program NUCLEAR REGULATORY the site at the Beaver Area Memorial
participants must transit in route to COMMISSION Library, 100 College Avenue, Beaver,
Antarctica, regarding the transport, Pennsylvania 15009.
possession and use of illegal [Docket Nos. 50–334 and 50–412]
substances and the possibility of Dated at Rockville, Maryland, this 18th day
FirstEnergy Nuclear Operating of September, 2007.
criminal prosecution if caught, tried Company; Notice of Receipt and
and convicted. For the Nuclear Regulatory Commission.
Availability of Application for Renewal Pao-Tsin Kuo,
Estimate of Burden: Public reporting
of Beaver Valley Power Station, Units Director, Division of License Renewal, Office
burden for this collection of information
1 and 2 Facility Operating License Nos. of Nuclear Reactor Regulation.
varies according to the overall health of
DPR–66 and NPF–73 for an Additional [FR Doc. E7–18742 Filed 9–21–07; 8:45 am]
the individual, the amount of time it
20-Year Period
takes to access the forms online and BILLING CODE 7590–01–P
print them, the amount of research The U.S. Nuclear Regulatory
required to complete the forms, the time Commission (NRC or Commission) has
it takes to make an appointment, take received an application, dated August OCCUPATIONAL SAFETY AND
the examination and schedule and 27, 2007, from FirstEnergy Nuclear HEALTH REVIEW COMMISSION
complete any follow-up medical, dental Operating Company, filed pursuant to
or psychological requirements and the Section 104b for Unit 1 and Section 103 Privacy Act of 1974; New and Revised
completeness of the forms submitted. for Unit 2, of the Atomic Energy Act of Systems of Records
The estimated time is up to six weeks 1954, as amended, and Title 10 of the AGENCY: Occupational Safety and Health
from the time the individual receives Code of Federal Regulations Part 54 (10 Review Commission.
rfrederick on PROD1PC67 with NOTICES

the forms until he or she is notified by CFR Part 54), to renew the operating ACTION: Notice of addition and revision
the contractor of their final clearance licenses for the Beaver Valley Power to Systems of Records.
status. An additional period of up to Station (BVPS), Units 1 and 2. Renewal
eight weeks may be required for the of the licenses would authorize the SUMMARY: In accordance with the
individual who was disqualified to be applicant to operate each facility for an Privacy Act of 1974, 5 U.S.C. 552a, as
notified of the disqualification, to additional 20-year period beyond the amended, the Occupational Safety and

VerDate Aug<31>2005 14:43 Sep 21, 2007 Jkt 211001 PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 E:\FR\FM\24SEN1.SGM 24SEN1

Vous aimerez peut-être aussi