Vous êtes sur la page 1sur 6

Federal Register / Vol. 72, No.

180 / Tuesday, September 18, 2007 / Notices 53237

Part 431, unless it has submitted a ACTION: Notice of petition for waiver, document. DOE does not accept
Compliance Certification to DOE granting of application for interim telefacsimiles (faxes).
according to the provisions under 10 waiver, and request for comments. Any person submitting written
CFR 431.36, that the basic model meets comments must also send a copy of
the requirements of the applicable SUMMARY: This notice announces receipt such comments to the petitioner,
standard. This collection of information of and publishes a Petition for Waiver pursuant to 10 CFR 430.27(d). The
ensures compliance with the energy from Daikin U.S. Corporation (Daikin). contact information for the petitioner is:
efficiency for certain commercial and The Petition for Waiver (hereafter Mr. Russell Tavolacci, Director of
industrial electric motors. (5) Estimated ‘‘Daikin Petition’’) requests a waiver of Product Marketing, Daikin U.S.
Number of Respondents: 84. (6) the Department of Energy (DOE) test Corporation, 1645 Wallace Drive, Suite
Estimated Total Burden Hours: 25,200 procedures applicable to residential 110, Carrollton, TX 75006. Telephone:
total hours requested (approximately central air conditioners and heat pumps. (972) 245–1510. E-mail:
300 hours per manufacturer or private The waiver request is specific to the Russell.Tavolacci@daikinac.com.1
labeler). (7) Number of Collections: The Daikin Variable Refrigerant Volume According to 10 CFR 1004.11, any
package contains one information and VRV–II–S (residential) multi-split heat person submitting information that he
recordkeeping requirement. pumps and heat recovery systems. or she believes to be confidential and
Comments are invited on: (a) Whether Through this document, DOE is: (1) exempt by law from public disclosure
the information collections are Soliciting comments, data, and should submit two copies: one copy of
necessary for the proper performance of information with respect to the Daikin the document including all the
the functions of the DOE, including Petition; and (2) granting an Interim information believed to be confidential,
whether the information has practical Waiver to Daikin from the DOE test and one copy of the document with the
utility; (b) the accuracy of the DOE’s procedure for residential central air information believed to be confidential
estimate of the burden of the conditioners and heat pumps. deleted. DOE will make its own
information collections, including the DATES: DOE will accept comments, data, determination about the confidential
validity of the methodology and and information with respect to the status of the information and treat it
assumptions used; (c) ways to enhance Daikin Petition until, but no later than according to its determination.
the quality, utility, and clarity of the October 18, 2007. Docket: For access to the docket to
information to be collected; and (d) ADDRESSES: You may submit comments, review the documents relevant to this
ways to minimize the burden of the identified by case number [CAC–016], matter, you may visit the U.S.
information collections on respondents, by any of the following methods: Department of Energy, Forrestal
including through the use of automated • Federal eRulemaking Portal: http:// Building, Room 1J–018 (Resource Room
collection techniques or other forms of www.regulations.gov. Follow the of the Building Technologies Program),
information technology. instructions for submitting comments. 1000 Independence Avenue, SW.,
Comments submitted in response to • E-mail: Washington, DC, (202) 586–2945,
this notice will be summarized and Michael.Raymond@ee.doe.gov Include between 9 a.m. and 4 p.m., Monday
included in the request for OMB review either the case number [CAC–016], and/ through Friday, except Federal holidays.
and approval of these information or ‘‘Daikin Petition’’ in the subject line Available documents include the
collections. The comments will also of the message. following items: (1) This notice; (2)
become a matter of public record. • Mail: Ms. Brenda Edwards-Jones, public comments received; (3) the
Statutory Authority: Section 3507(h)(1) of
U.S. Department of Energy, Building Petition for Waiver and Application for
the Paperwork Reduction Act of 1995 (Pub. Technologies Program, Mailstop EE–2J, Interim Waiver; and (4) prior DOE
L. 104–13, 44 U.S.C. Chapter 35). Forrestal Building, 1000 Independence rulemakings regarding central air
Issued in Washington, DC on September 4,
Avenue, SW., Washington, DC 20585– conditioners and heat pumps. Please
2007. 0121. Telephone: (202) 586–2945. call Ms. Brenda Edwards-Jones at the
Alexander A. Karsner,
Please submit one signed original paper above telephone number for additional
copy. information regarding visiting the
Assistant Secretary, Energy Efficiency and
• Hand Delivery/Courier: Ms. Brenda Resource Room. Please note that DOE’s
Renewable Energy.
Edwards-Jones, U.S. Department of Freedom of Information Reading Room
[FR Doc. E7–18275 Filed 9–17–07; 8:45 am]
Energy, Building Technologies Program, (Room 1E–190 at the Forrestal Building)
BILLING CODE 6450–01–P
Room 1J–018, Forrestal Building, 1000 is no longer housing rulemaking
Independence Avenue, SW., materials.
Washington, DC 20585–0121. Please
DEPARTMENT OF ENERGY FOR FURTHER INFORMATION CONTACT: Dr.
submit one signed original paper copy.
Michael G. Raymond, U.S. Department
Office of Energy Efficiency and Instructions: All submissions received
of Energy, Building Technologies
Renewable Energy must include the agency name and case
Program, Mail Stop EE–2J, Forrestal
number for this proceeding. Submit
[Docket No. EERE–2007–BT–WAV–0006] Building, 1000 Independence Avenue,
electronic comments in WordPerfect,
SW., Washington, DC 20585–0121.
Microsoft Word, Portable Document
Energy Conservation Program for Telephone: (202) 586–9611. E-mail:
Format (PDF), or text (American
Consumer Products: Publication of the Michael.Raymond@ee.doe.gov.
Standard Code for Information
Petition for Waiver From Daikin U.S. Francine Pinto or Eric Stas, U.S.
Interchange (ASCII)) file format, and
Corporation and Granting of the Department of Energy, Office of the
avoid the use of special characters or
Application for Interim Waiver From
any form of encryption. Wherever
the Department of Energy Residential 1 DOE notes that Daikin has updated the contact
possible, include the electronic
pwalker on PROD1PC71 with NOTICES

Central Air Conditioner and Heat Pump information provided in its initial petition.
signature of the author. Absent an Accordingly, the information provided in the
Test Procedure [Case No. CAC–016] ADDRESSES section above should be used in lieu of
electronic signature, comments
the Daikin contact information cited in the
AGENCY: Office of Energy Efficiency and submitted electronically must be company’s original Petition for Waiver and
Renewable Energy, Department of followed and authenticated by Application for Interim Waiver (published
Energy. submitting the signed original paper following this notice).

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1
53238 Federal Register / Vol. 72, No. 180 / Tuesday, September 18, 2007 / Notices

General Counsel, Mail Stop GC–72, known to evaluate the basic model in a • Testing laboratories cannot test
Forrestal Building, 1000 Independence manner representative of its energy products with so many indoor units.
Avenue, SW., Washington, DC 20585– consumption. 10 CFR 430.27(b)(1)(iii). • There are too many possible
0103. Telephone: (202) 586–9507. E- The Assistant Secretary for Energy combinations of indoor and outdoor
mail: Francine.Pinto@hq.doe.gov or Efficiency and Renewable Energy (the units to test. 69 FR 52660, 52661
Eric.Stas@hq.doe.gov. Assistant Secretary) may grant the (August 27, 2004).
waiver subject to conditions, including Further, Daikin states that although
SUPPLEMENTARY INFORMATION:
adherence to alternate test procedures. the VRV–II–S product line fits within
Table of Contents 10 CFR 430.27(l). Waivers generally the scope of the applicable DOE
I. Background and Authority remain in effect until final test residential test procedure, the basic
II. Petition for Waiver procedure amendments become design is not commensurate with the
III. Application for Interim Waiver effective, thereby resolving the problem intent of the test procedures for the
IV. Alternate Test Procedure that instigated the Petition for Waiver. reasons that follow. In particular, the
V. Summary and Request for Comments 10 CFR 430.27(m). test procedure does not provide for:
I. Background and Authority The waiver process also permits • The test procedure for a split
parties petitioning DOE for a waiver to system requires testing a combination of
Title III of the Energy Policy and apply for an Interim Waiver from the paired indoor and outdoor unit
Conservation Act (EPCA) sets forth a prescribed test procedure requirements. assemblies, but it does not include
variety of provisions concerning energy 10 CFR 430.27(a)(2). The Assistant provisions for how the Daikin VRV–II–
efficiency. Part B of Title III establishes Secretary will grant an Interim Waiver S product, with its thousands of indoor
the ‘‘Energy Conservation Program for request if it is determined that the unit combinations, should be evaluated
Consumer Products Other Than applicant will experience economic with just one outdoor unit test.
Automobiles.’’ (42 U.S.C. 6291–6309) hardship if the Interim Waiver is • The test procedure requires testing
This notice involves residential denied, if it appears likely that the matched assemblies, but the Daikin
products under Part B, and the statute Petition for Waiver will be granted, and/ VRV–II–S product is designed to be
specifically includes definitions, test or the Assistant Secretary determines used in zoned systems where the
procedures, labeling provisions, energy that it would be desirable for public capacity of the indoor units installed
conservation standards, and the policy reasons to grant immediate relief does not necessarily match the capacity
authority to require information and pending a determination on the Petition of the outdoor unit.
reports from manufacturers. for Waiver. 10 CFR 430.27(g). An • The Daikin VRV–II–S products are
With respect to test procedures, Part Interim Waiver remains in effect for a intended to be used in zoned systems
B generally authorizes the Secretary of period of 180 days or until DOE issues where an outdoor unit can be connected
Energy (the Secretary) to prescribe test its determination on the Petition for with up to nine separated indoor units.
procedures that are reasonably designed Waiver, whichever is sooner, and may Moreover, Daikin offers 83 indoor unit
to produce results which reflect energy be extended for an additional 180 days, models. Each indoor unit is designed to
efficiency, energy use, and estimated if necessary. 10 CFR 430.27(h). be used with up to eight other indoor
annual operating costs, and that are not units, which may not be the same
unduly burdensome to conduct. (42 II. Petition for Waiver models, in combination with a single
U.S.C. 6293(b)(3)) On December 9, 2005, Daikin filed a outdoor unit. Consequently, for each
Relevant to the current Petition for Petition for Waiver from the test VRV–II–S outdoor unit, there could be
Waiver, the test procedures for procedures applicable to residential and thousands of possible combinations of
residential central air conditioners and commercial package air conditioning indoor units that could be matched in
central air conditioning heat pumps are and heating equipment and an a system configuration.
set forth in 10 CFR Part 430, Subpart B, Application for Interim Waiver. The Accordingly, Daikin requests that
Appendix M. Section 323 of EPCA applicable test procedure for Daikin’s DOE grant a test procedure waiver for its
provides that the Secretary of Energy residential VRV–II–S products is the VRV–II–S product designs, until a
may amend test procedures for DOE residential test procedure found in suitable test method can be prescribed.
consumer products if the Secretary 10 CFR Part 430, Subpart B, Appendix Furthermore, Daikin states that failure
determines that amended test M. For Daikin’s commercial VRV–II–S to grant the waiver would result in
procedures would more accurately products, the applicable test procedure economic hardship because it would
reflect energy efficiency, energy use or is also the residential test procedure prevent the company from marketing its
estimated annual operating costs, and found in Appendix M, because the same VRV–II–S products. Also, Daikin states
are not unduly burdensome to conduct. test is used for single-phase products that it is willing to work closely with
(42 U.S.C. 6293(b)(1)(A) and (b)(3)) with capacities less than 65,000 Btu/h. DOE, the Air-Conditioning and
DOE’s regulations contain provisions Daikin seeks a waiver from the DOE Refrigeration Institute (ARI), and other
allowing a person to seek a waiver from test procedures on the grounds that the agencies to develop appropriate test
the test procedure requirements for VRV–II–S Series multi-split heat pump procedures, as necessary.
covered products, for which the and heat recovery systems contain
petitioner’s basic model contains one or design characteristics that prevent III. Application for Interim Waiver
more design characteristics that prevent testing according to the current DOE test On December 9, 2005, in addition to
testing according to the prescribed test procedures. Specifically, Daikin asserts its Petition for Waiver, Daikin submitted
procedures, or when the prescribed test that the two primary factors that prevent to DOE an Application for Interim
procedures may evaluate the basic testing of multi-split variable speed Waiver. Daikin’s Application for Interim
model in a manner so unrepresentative products, regardless of manufacturer, Waiver does not provide sufficient
pwalker on PROD1PC71 with NOTICES

of its true energy consumption as to are the same factors stated in the waiver information to evaluate the level of
provide materially inaccurate that DOE granted to Mitsubishi Electric economic hardship Daikin will likely
comparative data. 10 CFR 430.27(a)(1). & Electronics USA, Inc. (Mitsubishi) for experience if its Application for Interim
Petitioners must include in their a similar line of commercial multi- Waiver is denied. However, in those
petition any alternate test procedures splits: instances where the likely success of the

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1
Federal Register / Vol. 72, No. 180 / Tuesday, September 18, 2007 / Notices 53239

Petition for Waiver has been • FXF series, ceiling mounted have been adopted by the committee or
demonstrated, based upon DOE having cassette (multi flow) type, FXF 25/32/ submitted to DOE.
granted a waiver for a similar product 40/50/63/80/100/125 Therefore, as discussed below, DOE is
design, it is in the public interest to • FXK series, ceiling mounted including an alternate test procedure as
have similar products tested and rated cassette (corner) type, FXK 25/32/40/63 a condition in granting the Interim
for energy consumption on a • FXD series, slim above ceiling Waiver for Daikin’s products, and plans
comparable basis. DOE has previously mounted ducted type, FXD 20/25/32/ to consider the same alternate test
granted Interim Waivers to Fujitsu and 40/50/63 procedure in the context of the
Samsung for comparable residential and • FXYD series, low silhouette above subsequent Decision and Order
commercial multi-split air conditioners ceiling mounted ducted type, FXYD 20/ pertaining to Daikin’s Petition for
and heat pumps. 70 FR 5980 (Feb. 4, 25/32/40/50 /63 Waiver. Utilization of this alternative
2005); 70 FR 9629 (Feb. 28, 2005), • FXS series, built-in above ceiling test procedure will allow Daikin to test
respectively. In addition, as noted mounted ducted type, FXS 20/25/32/40/ and make energy efficiency
above, DOE approved the Petition for 50/63/80/100 /125 representations for its VRV–II–S
Waiver from Mitsubishi for its • FXM series, above ceiling mounted products. More broadly, DOE is also
comparable line of commercial multi- ducted type, FXM 40/50/63/80/100/125 considering applying a similar alternate
split air conditioners and heat pumps. • FXH series, ceiling suspended type, test procedure to other existing waivers
69 FR 52660 (August 27, 2004). The two FXH 32/63/100 for similar residential and commercial
prevailing reasons for granting these central air conditioners and heat pumps.
• FXA series, wall mounted type,
waivers also apply to Daikin’s VRV–II– Such cases include Samsung’s Petition
FXA 20/25/32/40/50/63
S products: (1) Test laboratories cannot for Waiver for its multi-split products at
• FXL series, floor standing console
test products with so many indoor 70 FR 9629 (Feb. 28, 2005), and
type, FXL 20/25/32/40/50/63
units 2; and (2) it is impractical to test Fujitsu’s Petition for Waiver for its
• FXN series, floor standing
so many combinations of indoor units multi-split products at 70 FR 5980 (Feb.
concealed type, FXN 20/25/32/40/50/63 4, 2005). Similarly, DOE is considering
with each outdoor unit. Thus, DOE has This Interim Waiver is conditioned
determined that it is likely that Daikin’s use of this alternate test procedure for
upon the presumed validity of other products of this type for which
Petition for Waiver will be granted for statements, representations, and
its new VRV–II–S multi-split models. manufacturers seek waivers, until such
documentary materials provided by the time as the DOE test procedure has been
Hence, It is ordered that: petitioner. This Interim Waiver may be
The Application for Interim Waiver updated appropriately.
revoked or modified at any time upon In the present case, DOE is modifying
filed by Daikin is hereby granted for
a determination that the factual basis the alternate test procedure in the
Daikin’s VRV–II–S multi-split central air
underlying the Petition for Waiver is above-referenced waiver granted to
conditioners and central air
incorrect, or DOE determines that the Mitsubishi for the R410A CITY MULTI
conditioning heat pumps, subject to the
results from the alternate test procedure products, and plans to consider
specifications and conditions below.
are unrepresentative of the basic inclusion of the following similar
The Interim Waiver applies to the
models’ true energy consumption waiver language in the Decision and
following models:
1. Daikin shall not be required to test characteristics. Order for Daikin’s VRV–II–S multi-split
or rate its VRV–II–S residential products IV. Alternate Test Procedure air conditioner and heat pump models:
on the basis of the currently applicable (1) The ‘‘Petition for Waiver’’ filed by
In response to two recent Petitions for Daikin U.S. Corporation (Daikin) is
test procedure, which is set forth in 10
Waiver from Mitsubishi, DOE specified hereby granted as set forth in the
CFR Part 430, Subpart B, Appendix M;
an alternate test procedure to provide a paragraphs below.
and
2. Daikin shall be required to test and basis from which Mitsubishi could test (2) Daikin shall not be required to test
rate its VRV–II–S products according to and make valid energy efficiency or rate its variable refrigerant volume
the alternate test procedure as set forth representations for its R410A CITY multi-split air conditioner and heat
in section IV(3), ‘‘Alternate test MULTI products, as well as for its R22 pump products listed in section III,
procedure.’’ multi-split products. The Mitsubishi above, on the basis of the currently
petitions, including the alternate test applicable test procedure, but shall be
Outdoor Units, Heat Pump-type procedure, were published in the required to test and rate such products
• RXYM4MVMT: 38,200 Btu/h Federal Register on April 9, 2007. 72 FR according to the alternate test procedure
cooling/ 42,600 Btu/h heating, single 17528, 17532. For similar reasons, DOE as set forth in paragraph (3).
phase, 220 volts, 60 Hz believes that alternate test procedures (3) Alternate test procedure.
• RXYM5MVMT: 47,700 Btu/h are necessary here. (A) Daikin shall be required to test the
cooling/ 54,600 Btu/h heating, single In general, DOE understands that products listed above according to the
phase, 220 volts, 60 Hz existing testing facilities have a limited test procedures for central air
• RXYM6MVMT: 52,900 Btu/h ability to test multiple indoor units at conditioners and heat pumps prescribed
cooling/ 61,400 Btu/h heating, single one time, and the number of possible by DOE at 10 CFR part 430, except that:
phase, 220 volts, 60 Hz combinations of indoor and outdoor (i) Daikin shall not be required to
units for some variable refrigerant flow comply with: The first sentence in 10
Indoor units
zoned systems is impractical to test. We CFR 430.24(m)(2), which refers to ‘‘that
• FXC series, ceiling mounted further note that subsequent to the combination manufactured by the
cassette (double flow) type, FXC 20/25/ waiver that DOE granted for condensing unit manufacturer likely to
32/40/50/63/80/125 Mitsubishi’s R22 multi-split products, have the largest volume of retail sales;’’
pwalker on PROD1PC71 with NOTICES

ARI formed a committee to discuss this and the third sentence in 10 CFR
2 According to the Daikin petition, up to 17
issue and to work on developing an 430(m)(2), including the provisions of
indoor units are possible candidates for testing of
its commercial multi-split air conditioners and heat
appropriate testing protocol for variable 10 CFR 430(m)(2)(i) and (ii). Instead of
pumps. However, DOE believes that the practical refrigerant flow systems. However, to testing the combinations likely to have
limits for testing would be about five units. date, no additional test methodologies the highest volume of retail sales,

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1
53240 Federal Register / Vol. 72, No. 180 / Tuesday, September 18, 2007 / Notices

Daikin may test a ‘‘tested combination’’ methods, except that only method (a) Issued in Washington, DC, on September 4,
selected in accordance with the may be used, if available: 2007.
provisions of subparagraph (B) of this Alexander A. Karsner,
(a) Representation of non-tested
paragraph. Additionally, instead of combinations according to an Assistant Secretary, Energy Efficiency and
following the provisions of 10 CFR Renewable Energy.
alternative rating method approved by
430(m)(2)(i) and (ii) for every other December 13, 2005
DOE; or
system combination using the same Hon. Douglas Faulkner, Acting Assistant
outdoor unit as the tested combination, (b) Representation of non-tested Secretary for Energy Efficiency and
Daikin shall make representations combinations at the same energy Renewable Energy, Department of Energy
concerning the VRV–II–S products efficiency level as the tested 1000 Independence Ave., SW.,
covered in this waiver according to the combination with the same outdoor Washington, DC.
provisions of subparagraph (C) below. unit. Re: Petition for Waiver of Test Procedures
and Application for Interim Waiver for
(ii) Daikin shall be required to comply
V. Summary and Request for Comments Daikin’s ‘‘VRV–II–S’’ variable refrigerant
with 10 CFR 430 Appendix M as volume multi-split heat pumps
amended in accordance with designated Through today’s notice, DOE Dear Assistant Secretary Faulkner: Daikin
changes that are listed in the July 20, announces receipt of Daikin’s Petition U.S. Corporation (DUS) respectfully submits
2006 Federal Register notice. 71 FR for Waiver from the test procedures this document as our Petition for Waiver of
41320. These designated changes are applicable to Daikin’s VRV–II–S multi- Test Procedure and Application for Interim
with respect to the following test Waiver of Test Procedure applicable to our
split air conditioner and heat pump
procedure sections: 2.1, 2.2.3, 2.4.1, VRV–II–S product offering to the Department
products, and for the reasons articulated of Energy (DOE) for review and approval.
3.2.4 (including Table 6), 3.6.4
(including Table 12), 4.1.4.2, and above, DOE is granting Daikin an This petition is submitted pursuant to the
4.2.4.2. Interim Waiver from those procedures. provisions of 10 CFR 431.29 on the grounds
(B) Tested combination. The term As part of this notice, DOE is publishing that the basic models addressed herein
Daikin’s Petition for Waiver in its contain design characteristics which prevent
‘‘tested combination’’ means a sample testing according to prescribed procedures.
basic model comprised of units that are entirety. The Petition contains no
This petition is being requested specifically
production units, or are representative confidential information. Furthermore, for Daikin’s VRV–II–S multi-split heat pump
of production units, of the basic model today’s notice includes an alternate test system incorporating variable speed
being tested. For the purposes of this procedure that Daikin is required to compressor technology, variable refrigerant
waiver, the tested combination shall follow as a condition of the Interim flow and multiple zoning capabilities.
have the following features: Waiver and which DOE is considering There are two primary factors that prevent
(i) The basic model of a variable including in its subsequent Decision the testing of multi-split variable speed
refrigerant volume system used as a product regardless of manufacturer which
and Order. In this alternate test
tested combination shall consist of an are:
procedure, DOE is defining a ‘‘tested • Testing laboratories cannot test products
outdoor unit that is matched with combination’’ which Daikin could use with so many indoor units.
between two and five indoor units. in lieu of testing all retail combinations • There are too many possible
(ii) The indoor units shall: of its VRV–II–S multi-split air combinations of indoor and outdoor units to
(a) Represent the highest sales volume test.
conditioner and heat pump products.
type models; The existing test standard that most closely
(b) Together, have a capacity between Furthermore, should a subsequent relates to such product is ARI 210/240
95 percent and 105 percent of the manufacturer be unable to test all retail (2003).
capacity of the outdoor unit; combinations, DOE is considering I. Background
(c) Not, individually, have a capacity allowing such manufacturers to rate Daikin Industries Limited is a leading
greater than 50 percent of the capacity waived products according to an manufacturer of variable speed and Variable
of the outdoor unit; alternate rating method approved by Refrigerant Volume (VRV) zoning systems
(d) Have a fan speed that is consistent DOE, or to rate waived products the which are offered for sale by DUS in the
with the manufacturer’s specifications; same as that for the specified tested North American market. These products
and combination. DOE is also considering combine advanced technologies such as high
(e) All have the same external static applying a similar alternate test efficiency variable speed compressors and
pressure. fan motors along with electronic expansion
procedure to other comparable Petitions valves and other devices to insure peak
(C) Representations. Daikin may make
representations about the energy for Waiver for residential and operating performance of the overall system.
efficiency of its variable refrigerant commercial central air conditioners and The systems are applied in both commercial
heat pumps. Such cases include and residential applications whereas zoning
volume multi-split air conditioner and
Samsung’s Petition for Waiver for its is applied to provide users with peak utility
heat pump products, for compliance, of the system and energy savings. The
marketing, or other purposes, only to DVM products at 70 FR 9629 (Feb. 28,
capacity of this DUS product offering ranges
the extent that such representations are 2005), and Fujitsu’s Petition for Waiver from 38,200 BTU/Hr to 52,900 BTU/Hr.
made consistent with the provisions for its Airstage variable refrigerant flow Our product offering (VRV–II–S) shares
outlined below: products at 70 FR 5980 (Feb. 4, 2005). many of the same design and characteristic
(i) For multi-split combinations tested DOE is interested in receiving features as that of the City Multi product
in accordance with this paragraph, manufactured and distributed by Mitsubishi
comments on the issues addressed in
Daikin may make representations based Electric and Electronics USA, Inc. (MEUS), of
this notice. Pursuant to 10 CFR which DOE has granted a waiver as described
on these test results. 430.27(d), any person submitting
(ii) For multi-split combinations that in the Federal Register/Vol. 69, No. 166/
pwalker on PROD1PC71 with NOTICES

written comments must also send a Friday, August 27, 2004/Notices, page
are not tested, Daikin may make 52,660. DOE granted MEUS’ petition for
copy of such comments to the
representations which are based on the waiver on the basis that (1) testing
petitioner, whose contact information is
testing results for the tested laboratories cannot test products with so
combination and which are consistent included in the ADDRESSES section
many indoor units, and (2) there are too
with either of the two following above. many possible combinations of indoor and

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1
Federal Register / Vol. 72, No. 180 / Tuesday, September 18, 2007 / Notices 53241

outdoor units to test, therefore preventing of slowing down to an operating capacity as tested for a variable refrigerant volume
testing of the basic models according to little as 30% of its rated capacity and system. While a test procedure using a given
prescribed test procedures. The VRV–II–S accelerating to up to 150% of its rated number of indoor units (4, 5, 6 or more)
also shares many of the same design capacity allowing ti to install up to 130% whose total capacity matches that of the
characteristics as that of the DVM product indoor unit capacity to the outdoor unit outdoor unit may be considered, the results
offered by Samsung Air Conditioning, of capacity. will not entirely represent the system’s true
which DOE granted an interim waiver on Grounds for the Petition energy consumption characteristics. Because
February 28, 2005. such a test procedure sets a condition to the
An additional problem that prevents Daikin seeks a waiver from the test ratings based on one test combination among
testing is the wide variety of indoor unit procedures applicable to central air thousands of possible combinations, they do
static pressure ratings available with these conditioners and heat pumps under Title III not represent all system combinations and
and other multi-split products. Testing of the Energy Policy and Conservation Act consumers may misread true energy
facilities cannot effectively control multiple (EPCA), Part B of Title III (42 U.S.C. 6291– consumption if their system configuration
indoor static pressures that would be 6309) Energy Conservation Program for differs from the tested configuration.
required with many of the indoor unit Consumer Products other than Automobiles At the same time, it will be unduly
combinations available. To accomplish such and 10 CFR 430 Energy Conservation burdensome for us to conduct tests of each
testing a large number of test rooms would Program for Consumer Products and Part C possible combination and extremely
need to be utilized simultaneously, of Title III (42 U.S.C. 6311–6317) Energy impracticable. Therefore, the test procedure
networked with data recording Efficiency of Industrial Equipment and 10 does not contemplate, and cannot practically
instrumentation and extensive piping CFR 431 Energy Efficiency Program for be applied to Daikin’s ‘‘VRV–II–S’’ consisting
configurations would need to be routed Certain Commercial and Industrial of multiple assemblies that are intended to be
throughout the various test rooms. Obviously Equipment. used in a very large number of different
this process would be cost and time In particular, Daikin seeks a waiver from combinations.
prohibitive. the currently applicable test procedure (2) The test procedure calls for testing
Daikin’s VRV–II–S product offering provided in 10 CFR 430.23(m) central air ‘matched assemblies,’ but ‘‘VRV–II–S’’ is
consists of multiple indoor units being conditioners and heat pumps and 10 CFR designed to be used in zoning systems where
connected to an outdoor unit. Indoor units 430, Appendix M to Subpart B Uniform Test the capacity of the indoor units installed
for these products are available in Ducted Method for Measuring the Energy does not necessarily match the capacity of
(with many different indoor static pressure Consumption of Central Air Conditioners and the outdoor unit. In a typical split system the
ratings as standard), 4-Way Cassette, Wall Heat Pumps. indoor and outdoor units are balanced and
Mounted, Ceiling Suspended, Floor Standing III. Specific Requirements Sought to be the capacity of the outdoor unit is equivalent
and other models. There are thousands of Waived and the Need for the Waiver to the capacity of the indoor unit. However,
possible combinations with this current Daikin seeks a waiver from the applicable with ‘‘VRV–II–S’’ the sum of the capacity of
product offering. test procedures for ‘‘VRV–II–S,’’ because the the indoor units can be from 50% to 130%
II. Design Characteristics current test procedures would evaluate of the capacity of the outdoor unit. Such
Daikin developed the ‘‘VRV–II–S’’ to ‘‘VRV–II–S’’ in a manner completely imbalanced combination of indoor units and
respond to the needs of a truly energy unrepresentative of its true energy outdoor units are possible because of the
efficient, easy to design and install air consumption as to provide materially zoning and electronic controls characteristics
conditioning system that is also flexible, inaccurate competitive data. Below are the of the system. For example, the use of
reliable and user friendly and capable to details of the two main reasons: electronic controls, electronic expansion
provide real zoning to residences, small (1) Specified test procedures for a split valves and inverter driven scroll compressors
offices and shops. Daikin has incorporated system call for testing a combination of allow the system to precisely control the
comprehensive cutting-edge technologies paired indoor and outdoor unit assemblies volume of refrigerant needed in each of the
into the ‘‘VRV–II–S,’’ and the results are for typical split systems to be tested together, indoor units in accordance with the
quieter operation, smaller units, and simpler but it does not include provisions on how the particular load and set points of that indoor
maintenance with higher efficiencies. ‘‘VRV–II–S’’ with thousands of indoor unit unit. This is possible because of the
These compact 38,200 (4 HP); 47,700 (5 combinations is to be evaluated with just one advanced control system utilizing digital
HP) and 52,900 (6 HP) BTU/h Variable outdoor unit test. communication between all the components
Refrigerant Volume (VRV) multi-split Test procedures for typical multi-split of the system for overall system control. The
systems consist of one outdoor unit, using a central air conditioning and heat pump test procedure specified in 10 CFR 430.23(m)
Reluctance DC scroll compressor with a sine systems (a combination of one outdoor unit is for matched assemblies and does not
wave DC inverter with truly variable and up to five indoor units) calls for all the address testing for substantially unbalanced
refrigerant volume capacity serving multiple indoor units operating at full capacity. This systems.
indoor units through a single piping set of type of test, even though limited, can be For these reasons, the existing test
gas and liquid lines and using headers or impractical for these types of products since procedures would evaluate ‘‘VRV–II–S’’ in a
’Refnets’ for refrigerant distribution and it is possible to match a defined standard manner so unrepresentative of its true energy
electronic expansion valves. combination of indoor units to one outdoor consumption as to result in materially
The ‘‘VRV–II–S’’ system enables a single unit. ‘‘VRV-II-S’’ does not have a standard inaccurate competitive data.
outdoor unit to connects with up to 6 indoor representative combination of outdoor and It was only recently that variable
units for the 4HP model; with up to 8 indoor indoor units for testing. refrigerant volume systems were introduced
units for the 5 HP model and with up to 9 ‘‘VRV–II–S’’ products are intended to be into the United States market. Previous and
indoor units for the 6 HP model. used in zoning systems where an outdoor current test procedures have not been
The indoor units can be selected from 13 unit can be connected from up to 9 separated developed for these products that would
types with 83 models (included in item IV of indoor units in a zoned system. Moreover, we reflect their real energy consumption and
this application), giving these systems offer 83 indoor unit models. Each of these their extraordinary efficiency as of this date.
thousands of possible installation indoor unit models is designed to be used But, without a waiver of the test procedures
combinations. The operation control system together with up to 8 other indoor units, for variable refrigerant volume systems like
allows each indoor unit to have different set which may not be the same models, in ‘‘VRV–II–S,’’ we will be at a competitive
temperatures and different modes of combination with a single outdoor unit. In disadvantage in the market and consumers
operation. other words, for each ‘‘VRV–II–S’’ outdoor will be deprived of using this remarkably
pwalker on PROD1PC71 with NOTICES

The Reluctance DC scroll compressor and unit there are thousands of possible efficient technology.
the sine wave inverter maintain compressor combinations of indoor units that can be In accordance with 42 U.S.C. 6293(c) and
operation at optimum performance allowing matched in a system configuration. 42 U.S.C. 6314(d) of EPCA if there is an
it to precisely match the cooling or heating The current test procedure provides no acceptable test procedure for a covered
load demand of the conditioned areas. The direction for determining what combinations product, the manufacturer is prohibited from
Reluctance DC scroll compressor is capable of outdoor unit and indoor units shall be making representations about the energy

VerDate Aug<31>2005 20:44 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1
53242 Federal Register / Vol. 72, No. 180 / Tuesday, September 18, 2007 / Notices

consumption of its equipment unless the Engineering Committee of ARI’s Ductless Measuring the Energy Consumption of
equipment has been tested in accordance Section is actively working to evaluate and Central Air Conditioners and Heat Pumps for
with such test procedures and the develop possible methods to provide testing Residential Uses and ARI 210/240 (1989),
representation fairly discloses the result of and rating of such systems. Daikin is ARI 210/240 (1994) and ARI 210/240 (2003)
the testing. Therefore Daikin is at a involved in this project in an effort to speed for commercial uses.
disadvantage in our ability to provide the process.
This is necessary because the test
information on energy consumption of the VI. Manufacturers of Similar Models procedures in use and approved evaluate the
‘‘VRV–II–S’’ to our customers. Incorporating the Same Design basic models in a manner that is not
IV. Identification of the Basic Models Characteristics
representative of the true energy
Daikin seeks a waiver from the test Manufacturers of similar product within consumption characteristics of the ‘‘VRV–II–
procedures for ‘‘VRV-II-S,’’ variable the United States market are: S.’’ Using such test methods as those
refrigerant volume multi-split heat pump • Samsung Electronics Co., Ltd. outlined in ARI 210/240 will result in
systems, listed below: • Sanyo Fisher (USA) Corp.
materially inaccurate competitive data.
• Mitsubishi Electric & Electronics USA,
Outdoor unit, Heat Pump type Inc. As ruled in the Federal Register (page
• RXYM4MVMT; 38,200 BTU/h cooling/ • Fujitsu General America 52,660, Vol. 69, no. 166/Friday, August 27,
42,600 BTU/h heating, single phase, 220 • LG Electronics USA, Inc. 2004/Notices) DOE has previously concluded
Volts, 60 Hz VII. Application for Interim Waiver that the testing of product with the same
• RXYM5MVMT; 47,700 BTU/h cooling/ design characteristics of Daikin’s VRV–II–S
54,600 BTU/h heating, single phase, 220 Under the direction of 10 CFR 431.29,
product is not feasible under currently
Volts, 60 Hz Daikin U.S. Corporation also submits this
document as an Application for Interim established test methods as a result of:
• RXYM6MVMT; 52,900 BTU/h cooling/ • ‘‘Test laboratories cannot test products
61,400 BTU/h heating, single phase, 220 Waiver of Test Procedures applicable to the
VRV–II–S models as listed previously. Such with so many indoor units’’
Volts, 60 Hz • ‘‘And there are too many possible
approval of Interim Waiver will provide
Indoor units Daikin with an opportunity to compete in the combinations of indoor and outdoor units to
• FXC series, Ceiling mounted cassette market during which time DOE reviews our test.’’
(double flow) type, FXC 20/25/32/40/50/63/ Petition for Waiver of Test Procedure for the Daikin U.S. Corporation respectfully asks
80/125 VRV–II–S product. the Department of Energy to recognize the
• FXF series, Ceiling mounted cassette Daikin U.S. believes that there is a high technologies incorporated into this advanced
(multi flow) type, FXF 25/32/40/50/63/80/ likelihood of success that our Petition for heating and cooling product and allow us to
100/125 Waiver will be approved based on the
market such product by granting our request
• FXK series, Ceiling mounted cassette grounds that DOE has issued a Waiver from
Test Standards for product that is very for waiver. Daikin will work with
(corner) type, FXK 25/32/40/63 stakeholders, U.S. Department of Energy, Air
• FXD series, Slim above ceiling mounted similar in design and operation to that of the
VRV–II–S product. Such approvals are Conditioning and Refrigeration Institute, the
ducted type, FXD 20/25/32/40/50/63
evidenced as follows: American Society of Heating, Refrigeration
• FXYD series, Low silhouette above
ceiling mounted ducted type, FXYD 20/25/ • DOE has issued a Waiver from Test and Air-Conditioning Engineers, Inc. and
32/40/50/63 Standards for product of very similar others, through the process of developing test
• FXS series, Built-in above ceiling characteristics: procedures suitable for products using
mounted ducted type, FXS 20/25/32/40/50/ Æ City Multi product marketed by variable refrigerant volume (flow) systems.
63/80/100/125 Mitsubishi Electric & Electronics USA, Inc., Failure to receive such waiver or
• FXM series, Above ceiling mounted as approved in the Federal Register/Vol. 69, exemption from test standards would prevent
ducted type, FXM 40/50/63/80/100/125 No. 166/Friday, August 27, 2004/Notices,
Daikin U.S. from marketing our products
• FXH series, Ceiling suspended type, FXH page 52,660.
even though DOE has previously granted
32/63/100 • DOE has issued an Interim Waiver from
Test procedures to Samsung on February 28, waiver for other products currently in the
• FXA series, Wall mounted type, FXA 20/ market with similar design characteristics.
25/32/40/50/63 2005.
• Testing laboratories cannot test products We would be pleased to respond to any
• FXL series, Floor standing console type,
FXL 20/25/32/40/50/63 with so many indoor units. questions you may have regarding this
• FXN series, Floor standing concealed • There are too many possible Petition for Waiver of Test Procedure. Please
type, FXN 20/25/32/40/50/63 combinations of indoor and outdoor units to direct such questions or comments to Raul
Note: All the above series have engineering test. Esparza, Vice President of Latin American
differences among the series. Failure to approve such Interim Waiver Operations at 305–596–4344 or by email at
from Test Procedure will inhibit Daikin’s raul.esparza@daikinac.com.
IV. Identification of the Manufacturers of All ability to compete in the marketplace even
Other Basic Models Sincerely,
though our VRV–II–S product has the same
Yoshinobu Inoue,
At the present time Variable refrigerant basic design characteristics as that of other
volume (flow) multi-split air conditioning manufacturers currently under waiver. The President, Daikin U.S. Corporation, 475 Fifth
and heat pumps are proposed in the United VRV–II–S models, for which this Interim Avenue, 18th Floor, New York, NY
States by Mitsubishi Electric and Electronics Waiver is requested, comprise a significant 10017.
USA Inc., Samsung Electronic Company, Ltd. portion of our total product offering. An
[FR Doc. E7–18340 Filed 9–17–07; 8:45 am]
and Fujitsu General Limited, the first two inability to market such products would
companies apply most of their products to result in an economic hardship due to lost BILLING CODE 6450–01–P
commercial and industrial use; Fujitsu’s revenue and breadth of product offering
‘‘Airstage’’ system is applied in residential available to attract customers.
and commercial use. (Fujitsu filed FR Doc. VIII. Conclusion
05–2184 on 2–3–05 for a waiver for a similar
product) Daikin seeks a waiver of current test
procedures established in 10 CFR 430.23(m)
pwalker on PROD1PC71 with NOTICES

V. Alternate Test Procedures Central Air Conditioners and Heat Pumps


There are no alternative test procedures (including the new version published in the
available within the United States that Federal Register dated October 11, 2005
provide a means to test and to rate the [Docket No. EE–RM/TP–97–440] RIN 1904–
performance of such variable speed, multi- AA46) and 10 CFR 430.27 Appendix M to
split, multi-zone product types. The Subpart B Uniform Test Method for

VerDate Aug<31>2005 19:28 Sep 17, 2007 Jkt 211001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\18SEN1.SGM 18SEN1

Vous aimerez peut-être aussi