Vous êtes sur la page 1sur 6

TRAINING SESSIONS ATTENDED

N.Suresh Babu

SL.No
Date
1
19 August 2014

Subject
ECBC Requirements

04 November 2014

Process of Project/
Documentation

21 November 2014

LV Switchgear

26 November 2014

Communication
System - Circuit
Breakers

1 of 6

TRAINING SESSIONS ATTENDED


SL.No
Date
5
05 February 2015

Subject
IES-Software

06 February 2015
07 February 2015
14 March 2015

N.Suresh Babu

15 March 2015
23 March 2015

NCS

10 April 2015

ACS, CCTV

10 April 2015

Meters, Load
Mangers

08 May 2015

Hospital Equipment

2 of 6

TRAINING SESSIONS ATTENDED


Technical Notes
Lighting requirements as per code.

Trainer/Presenter Name
Mr. Parasuram(ELE) & Mr. Prasanna
(HVAC)

Timer shall be used for lighting control - external


Occupancy sensor shall be used for control lights in
people presence & obsent
Lumen maintanance shall be done periodically due to
aging of lamps
>500 sqmt building shall be equiped with automatic
control device.
<30 sq mt office area shall be occupancy sensor
exit lights shall not exceed 5W Per qty
office 10.8w /sq mt
energy efficiency transformers shall be used- CRGO,
AMROPHOUS
Energy efficiency motors shall be used
using sub meters for services
using APFCR panels by THD reduction filters.
distribution losses should not be >1%
Providing SLKLIGHTS
15% Solar street lights
using Non conventional energy sources
using Bus bar trunking system
CL: >100KW comes under ECBC
BUDGET AC LOAD IN BANGALORE
OFFICE: 35 SQMT/TON
MALLS: 22 SQMT/TON
HOSPITAL: 30 SQMT/TON
LEED REQUIREMENT:
WWR mam 50%
U FACTOR: <1.9 W/SQ M .K
ELECTRICAL LIMIT FOR HVAC:
WATER COOLED: 1 KW/TR
AIR COOLED: 1.45 KW/TON
using VRV, VRF systems
Explined jurong standards for project such as DBR, BCR, Mr. Ashok (Ele)
Drawing register, tech specs, BOQ, DD Plan, formats etc..
Breifed on mainly documentation, Numbering etc..
Basic of Switchgear like MCB, MCCB, ACB
KA ratings, ICU, ICS, ICW
Relevant codes and standards
LV Switchgear selection
live demo for ACB Operation
Product display and features
Motor Utilization catagory, applications
Arranged live demo for active comminication system for
breakers
System would be interfaced with mobile, PC and all other
modes.
N.Suresh Babu

3 of 6

L&T

M/s.SCHNEIDER ELECTRIC

TRAINING SESSIONS ATTENDED


Technical Notes
Training taken on Module Model IT, Suncast simulation

Trainer/Presenter Name
Mr. Ananth (IES)

Training taken on RadianceIES, MacroFLO,Apache


Analysis and simulation
Training taken on Apache HVAC, PRM Navigator
simulation
Training taken on Importing revit model(GBXML file with
space details)
Apache HVAC advanced details
1. Basic requiremets for NCS
M/S. PROCESS CARE SYSTEM LTD
2. Functional Requirements
3. Micro controller based Nurse Station Unit
4. caters up to 8 patients one NSU
5. Working on 12V
6. 230v interfacting Module is used to interface the Nurse
call system.
Esteem GSM: up to 48 Patients
can be served more than 100m
Main basic scheme for ACS and CCTV explained
Product portfolieo
Applications
Explianed the products overview and application

M/s.SECURE SYSTEM PVT LTD

M/s. Circutor Pvt Ltd.

CVM K2 Power Quality Manager can be used for HT, EHT


System to monitor and control the parameters.
It will read around 500 Parameters
At LV Side (PCC Panel) CVM NRG96 can be used for read
parameters.
It will read around 150 parameters
At Distribution panel side, CVMK2 Load Manger can be
used.
At DB side, M61020 Earth leakage relays shall be used.
All Meters have tested and made as per IEC standards.
Intergrated Operation room management system
OT Light, 24V DC, 5A, 120 W (MAC LED-3 MODEL)
ENDOSCOPE: 500VA, 110-240V, 6.3A (LS7700)
OPEN OR: 400VA, 100-240V
OPEN OR: is a data and image management based on the
needs of surgical dept.
surgical lamp and camera control
general lighting control
OT table control
consultation & audio

N.Suresh Babu

4 of 6

M/s. Mervivaara

TRAINING SESSIONS ATTENDED


Venue, Time
Jurong - 1.30PM-5.30PM

Jurong, 9.30AM-12.45 PM

Jurong, 1.30PM-5.30PM

Jurong, 3.30PM-5.00PM

N.Suresh Babu

5 of 6

TRAINING SESSIONS ATTENDED


Venue, Time
Jurong-5 DAYS

Jurong- 1.30PM-3.30PM

Jurong-2.00PM-3.30PM

Jurong- 11.30-12.30

Jurong- 11.00-12.30

N.Suresh Babu

6 of 6

Vous aimerez peut-être aussi