Description: California Independent the New England Power Pool (NEPOOL) link to log on and submit the
System Operator Corp submits an errata Participants Committee submit revised intervention or protests.
to their 7/20/07 filing of a petition to tariff sheets and supporting testimony of Persons unable to file electronically
waive sanctions for violation of Section Marc Montalvo reflecting proposed should submit an original and 14 copies
31.1.4.1 of its Tariff through 10/18/06. revisions to Market Rule 1. of the intervention or protest to the
VerDate Aug<31>2005 16:26 Aug 21, 2007 Jkt 211001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\22AUN1.SGM 22AUN1
Federal Register / Vol. 72, No. 162 / Wednesday, August 22, 2007 / Notices 46989
Federal Energy Regulatory Commission, construction of any facilities at this constituents of this proposed action and
888 First St., NE., Washington, DC time. Any future proposal to construct encourage them to comment on their
20426. jurisdictional facilities at the areas of concern.
The filings in the above proceedings Cunningham Storage Field would be In the EA we 3 will discuss impacts
are accessible in the Commission’s subject to an appropriate environmental that could occur as a result of the
eLibrary system by clicking on the review by the Commission. storage field extension. We will also
appropriate link in the above list. They A fact sheet prepared by the FERC evaluate possible alternatives to the
are also available for review in the entitled ‘‘An Interstate Natural Gas proposed project or portions of the
Commission’s Public Reference Room in Facility on My Land? What Do I Need project, and make recommendations on
Washington, DC. There is an To Know?’’ was attached to the project how to lessen or avoid impacts on the
eSubscription link on the Web site that notice that Northern provided to various resource areas.
enables subscribers to receive e-mail landowners. This fact sheet addresses a Our independent analysis of the
notification when a document is added number of typically asked questions, issues will be in the EA. Depending on
to a subscribed docket(s). For assistance including the use of eminent domain the comments received during the
with any FERC Online service, please e- and how to participate in the scoping process, the EA may be
mail FERCOnlineSupport@ferc.gov, or Commission’s proceedings. It is published and mailed to federal, state,
call (866) 208–3676 (toll free). For TTY, available for viewing on the FERC and local agencies, public interest
call (202) 502–8659. Internet Web site (http://www.ferc.gov). groups, interested individuals, affected
Summary of the Proposed Project landowners, newspapers, libraries, and
Nathaniel J. Davis, Sr.,
the Commission’s official service list for
Acting Deputy Secretary. Northern is proposing to extend its this proceeding. A comment period will
[FR Doc. E7–16536 Filed 8–21–07; 8:45 am] existing Cunningham Gas Storage Field be allotted for review if the EA is
BILLING CODE 6717–01–P by 4,800 acres in order to protect the published. We will consider all
integrity of the storage field. Northern comments on the EA before we make
believes that third party operators our recommendations to the
DEPARTMENT OF ENERGY outside of the storage field boundaries Commission.
are producing storage gas. The location To ensure your comments are
Federal Energy Regulatory of the proposed storage field extension considered, please carefully follow the
Commission is shown in Appendix 1.2 instructions in the public participation
[Docket No. CP07–107–000] Land Requirements section below.
No facilities would be constructed. Public Participation
Northern Natural Gas Company; Notice
Northern’s proposal is for extension of
of Intent To Prepare an Environmental You can make a difference by
the certificated Cunningham Storage
Assessment for the Proposed providing us with your specific
Field boundary by an additional 4,800
Cunningham Storage Boundary comments or concerns about the project.
acres. This area is located due north and
Extension Project and Request for By becoming a commentor, your
adjacent to the northern boundary of the
Comments on Environmental Issues concerns will be addressed in the EA
storage field.
and considered by the Commission. You
August 15, 2007. The EA Process should focus on the potential
The staff of the Federal Energy environmental effects of the proposal,
Regulatory Commission (FERC or The National Environmental Policy
Act (NEPA) requires the Commission to alternatives to the proposal, and
Commission) will prepare an measures to avoid or lessen
environmental assessment (EA) that will take into account the environmental
impacts that could result from an action environmental impact. The more
discuss the environmental impacts of specific your comments, the more useful
the Cunningham Storage Boundary whenever it considers the issuance of a
Certificate of Public Convenience and they will be. Please carefully follow
Extension Project involving Northern these instructions to ensure that your
Natural Gas Company’s (Northern) Necessity. NEPA also requires us to
discover and address concerns the comments are received in time and
extension of the certificated boundary of properly recorded:
the Cunningham Gas Storage Field in public may have about proposals. This
process is referred to as ‘‘scoping’’. The • Send an original and two copies of
Pratt and Kingman Counties, Kansas.1 your letter to: Kimberly D. Bose,
This EA will be used by the main goal of the scoping process is to
focus the analysis in the EA on the Secretary, Federal Energy Regulatory
Commission in its decision-making Commission, 888 First St., NE., Room
process to determine whether the important environmental issues. By this
Notice of Intent, the Commission staff 1A, Washington, DC 20426.
project is in the public convenience and • Label one copy of the comments for
necessity. requests public comments on the scope
of the issues to address in the EA. All the attention of Gas Branch 3.
If you are a landowner receiving this • Reference Docket No. CP07–107–
notice, you may be contacted by a gas comments received are considered
during the preparation of the EA. State 000.
storage company representative about • Mail your comments so that they
the acquisition of natural gas storage and local government representatives
are encouraged to notify their will be received in Washington, DC on
rights beneath your property. The gas or before September 17, 2007.
storage company would seek to 2 The appendices referenced in this notice are not The Commission strongly encourages
negotiate a mutually acceptable being printed in the Federal Register. Copies of all electronic filing of any comments or
agreement for the rights to operate a appendices, other than Appendix 1 (map), are interventions or protests to this
natural gas storage field beneath your available on the Commission’s Web site at the proceeding. See 18 CFR
jlentini on PROD1PC65 with NOTICES
property. It should be noted that the ‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington, 385.2001(a)(1)(iii) and the instructions
current proposal does not involve the DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of 3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
1 Northern’s
application was filed with the this notice. Copies of the appendices were sent to environmental staff of the Office of Energy Projects
Commission under Section 7 of the Natural Gas Act. all those receiving this notice in the mail. (OEP).
VerDate Aug<31>2005 16:26 Aug 21, 2007 Jkt 211001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\22AUN1.SGM 22AUN1