Vous êtes sur la page 1sur 1

Federal Register / Vol. 72, No.

158 / Thursday, August 16, 2007 / Notices 46055

Any person desiring to intervene or to 58506–5601, filed with the Commission DEPARTMENT OF ENERGY
protest this filing must file in a request for a waiver of the
accordance with Rules 211 and 214 of disbursement of GRI refunds to its Federal Energy Regulatory
the Commission’s Rules of Practices and customers as required pursuant to a Commission
Procedure (18 CFR 385.211 and 1998 Settlement Agreement in Docket [Project No. 2179–038]
385.214). Protests will be considered by No. RP97–371–000, et al. In lieu of that
the Commission in determining the obligation, Williston Basin requests that Merced Irrigation District; Notice of
appropriate action to be taken, but will it be allowed to make donation of such Application for Amendment of License
not serve to make protestants parties to refund to the Low Income Home Energy and Soliciting Comments, Motions To
the proceeding. Any person wishing to Assistance Program (LIHEAP). Intervene, and Protests
become a party must file a notice of
intervention or motion to intervene, as Any person desiring to intervene or to August 9, 2007.
appropriate. Such notices, motions, or protest this filing must file in Take notice that the following
protests must be filed in accordance accordance with Rules 211 and 214 of application has been filed with the
with the provisions of § 154.210 of the the Commission’s Rules of Practices and Commission and is available for public
Commission’s regulations (18 CFR Procedure (18 CFR 385.211 and inspection:
154.210). Anyone filing an intervention 385.214). Protests will be considered by a. Application Type: Amendment of
or protest must serve a copy of that the Commission in determining the License.
document on the Applicant. Anyone appropriate action to be taken, but will b. Project No.: 2179–038.
filing an intervention or protest on or not serve to make protestants parties to c. Date Filed: March 19, 2007.
before the intervention or protest date d. Applicant: Merced Irrigation
the proceeding. Any person wishing to
need not serve motions to intervene or District.
become a party must file a notice of
e. Name of Project: Merced River
protests on persons other than the intervention or motion to intervene, as Hydroelectric Project.
Applicant. appropriate. Such notices, motions, or
The Commission encourages f. Location: The project is located on
protests must be filed in accordance the Merced River, in Mariposa County,
electronic submission of protests in lieu with the provisions of Section 154.210
of paper using the ‘‘eFiling’’ link at California. The project consists of two
of the Commission’s regulations (18 CFR developments: New Exchequer and Mc
http://www.ferc.gov. Persons unable to 154.210). Anyone filing an intervention
file electronically should submit an Swain.
or protest must serve a copy of that g. Filed Pursuant to: Federal Power
original and 14 copies of the protest to
document on the Applicant. Anyone Act, 16 U.S.C. 791a–825r.
the Federal Energy Regulatory
filing an intervention or protest on or h. Applicant Contact: Mr. Ted Selb,
Commission, 888 First Street, NE.,
before the intervention or protest date Deputy General Manager, Merced
Washington, DC 20426.
need not serve motions to intervene or Irrigation District, 744 West 20th Street,
The filing is accessible on-line at
protests on persons other than the Merced, CA 95340, tselb@mercedid.org,
http://www.ferc.gov, using the
Applicant. telephone: (209) 722–5761.
‘‘eLibrary’’ link and is available for
i. FERC Contact: Any questions on
review in the Commission’s Public The Commission encourages this notice should be addressed to Mrs.
Reference Room in Washington, DC. electronic submission of protests in lieu Anumzziatta Purchiaroni at (202) 502–
There is an ‘‘eSubscription’’ link on the of paper using the ‘‘eFiling’’ link at 6191, or e-mail address:
Web site that enables subscribers to http://www.ferc.gov. Persons unable to anumzziatta.purchiaroni@ferc.gov.
receive e-mail notification when a file electronically should submit an j. Deadline for filing comments and or
document is added to a subscribed original and 14 copies of the protest to motions: September 10, 2007.
docket(s). For assistance with any FERC the Federal Energy Regulatory k. Description of Request: The Merced
Online service, please e-mail Commission, 888 First Street, NE., Irrigation District (MID) is seeking
FERCOnlineSupport@ferc.gov, or call Washington, DC 20426. authorization to construct a 1.8
(866) 208–3676 (toll free). For TTY, call megawatt (MW) energy recovery
(202) 502–8659. The filing is accessible on-line at
http://www.ferc.gov, using the turbine-generator unit at its Mc Swain
Kimberly D. Bose, ‘‘eLibrary’’ link and is available for Development. The proposed unit would
Secretary. review in the Commission’s Public have a maximum capacity of 500 cubic
[FR Doc. E7–16041 Filed 8–15–07; 8:45 am] feet per second (cfs), and would be
Reference Room in Washington, DC.
enclosed in a new 28-foot-wide by 60
BILLING CODE 6717–01–P There is an ‘‘eSubscription’’ link on the
foot long, below-ground concrete
Web site that enables subscribers to building that would adjoin the north
receive e-mail notification when a wall of the existing powerhouse. MID is
DEPARTMENT OF ENERGY document is added to a subscribed proposing to install a new 50 foot long,
Federal Energy Regulatory docket(s). For assistance with any FERC 96 inch diameter steel pipe penstock
Commission Online service, please e-mail that would connect the unit with the
FERCOnlineSupport@ferc.gov, or call existing bypass. All construction work
[Docket No. RP07–562–000] (866) 208–3676 (toll free). For TTY, call is proposed to be within the project
(202) 502–8659. boundary on land owned by the
Williston Basin Interstate Pipeline
Company; Notice of Request for Kimberly D. Bose,
licensee. The proposed amendment
Waiver of Disbursement of GRI Funds would increase the authorized installed
Secretary. capacity of the project from 103.5 MW
rwilkins on PROD1PC63 with NOTICES

August 9, 2007. [FR Doc. E7–16028 Filed 8–15–07; 8:45 am] to 105.3 MW.
Take notice that on August 3, 2007, BILLING CODE 6717–01–P l. Locations of the Application: A
Williston Basin Interstate Pipeline copy of the application is available for
Company (Williston Basin or Company), inspection and reproduction at the
P.O. Box 5601, Bismarck, North Dakota Commission’s Public Reference Room,

VerDate Aug<31>2005 17:27 Aug 15, 2007 Jkt 211001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\16AUN1.SGM 16AUN1

Vous aimerez peut-être aussi