Vous êtes sur la page 1sur 4

Form No.

P- 052 Issue Date: March 2006

Sheet 1 of 4

SAUDI ARAMCO PRE-COMMISSIONING FORM


DEHYDRATOR-DESALTER TRANSFORMER
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:

FIELD INSTALLATION TESTS


TRANSFORMER NAMEPLATE DATA
MANUFACTURER
PRIMARY VOLTAGE
TERTIARY VOLTAGE

KVA RATING
SECONDARY VOLTAGE
METERING CT RATIO

TRANSFORMER CONNECTION DIAGRAM


Typical values used as reference only:

H3 23000 Volts
Second
ary

X
1

H1 Internally grounded

Primary

4160 Volts

H2 16500 Volts

Y2 110 Volts

VISUAL INSPECTION

Tertiary

Yes

No

1. Verify nameplate data of transformer is in accordance with job specifications.


Y1 Internally grounded

2. Inspect for oil leaks and any external damage to the transformer and bushings. Take oil
sample and send to Saudi Aramco lab for testing and evaluation.
3. Verify the correct bushings are used and terminations are correct.
4. Verify the exterior painting/coating is per Saudi Aramco specifications.
5. Perform visual inspection on feed through bushing and precipitator grid and
connections.
6. Make sure the man-way covers are open, place the off/on push button at the vessel in
the off position and lock and tag out the circuit breaker.

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor

Form No. P- 052 Issue Date: March 2006

Sheet 2 of 4

SAUDI ARAMCO PRE-COMMISSIONING FORM


DEHYDRATOR-DESALTER TRANSFORMER
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:

7. Make sure there is no combustible gas or vapor mixture inside the vessels.
8. Make sure no one is inside the vessel; post a guard or assign a safetyman outside the
vessel.

ELECTRICAL TESTS
Yes

No

1. Measure and record the resistance of each winding primary, secondary, and tertiary.
2. Measure and record the insulation resistance of each winding primary, secondary, and
tertiary.
3. Using primary voltage injection measure and record the induced voltage in the
secondary tertiary and the phase relationship between the secondary and the primary
and secondary.
4. Perform and record insulation resistance, ratio and magnetization tests on each C.T.
5. Megger, then perform high potential test on grid to test for dielectric breakdown.
6. Megger and high potential test feed through bushings
7. Perform impedance test on secondary and tertiary by energizing the primary with the
secondary and tertiary each separately short-circuited.

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor

Form No. P- 052 Issue Date: March 2006

Sheet 3 of 4

SAUDI ARAMCO PRE-COMMISSIONING FORM


DEHYDRATOR-DESALTER TRANSFORMER
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:

Note: The following forms are intended for a system consisting of three transformers, which
is generally a common configuration. The forms can be modified to satisfy the actual
system configuration.
Test Data
Metering CT's
Insulation Resistance test
Ratio

Transformer T1
Test Volts =___________
Megohms =__________
Primary____________
Secondary___________

Transformer T2
Test Volts =__________
Megohms =__________
Primary____________
Secondary___________

Transformer T3
Test Volts =_________
Megohms =__________
Primary____________
Secondary___________

Ammeter reading
CT Magnetization curve:
Voltage
Current ma T1
Current ma T2
Current ma T3
Impedance or Short Circuit Test
Transformer T1

Transformer T2

Transformer T3

Voltage
Current

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor

Form No. P- 052 Issue Date: March 2006

Sheet 4 of 4

SAUDI ARAMCO PRE-COMMISSIONING FORM


DEHYDRATOR-DESALTER TRANSFORMER
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:

Test Data
Transformer
Serial no.
Primary =
Secondary =
Tertiary =

Transformer
Serial no.
Primary =
Secondary =
Tertiary =
meg-ohms =

Transformer
Serial no.
Primary =
Secondary =
Tertiary =
meg-ohms =

meg-ohms =

meg-ohms =

meg-ohms =

meg-ohms =

meg-ohms =

meg-ohms =

X1 to X2= 20.8 volts

X1 to X2= 20.8 volts

X1 to X2= 20.8 volts

Volts =

Volts =

Volts =

H2 to ground

Volts =

Volts =

Volts =

Y2 to ground

Volts =

Volts =

Volts =

H3 to X2

Volts =

Volts =

Volts =

H3 to Y2

Volts =

Volts =

Volts =

Y2 to X2

Volts =

Volts =

Volts =

Winding resistance
5 KV megger X1 &X2 to
ground
Megger primary to
secondary
Megger primary to
tertiary
Apply 20.8 volts between
X1 and X2 with X1 at
ground and measure voltage
on the following
H3 to ground

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor