KVA RATING
SECONDARY VOLTAGE
METERING CT RATIO
H3 23000 Volts
Second
ary
X
1
H1 Internally grounded
Primary
4160 Volts
H2 16500 Volts
Y2 110 Volts
VISUAL INSPECTION
Tertiary
Yes
No
2. Inspect for oil leaks and any external damage to the transformer and bushings. Take oil
sample and send to Saudi Aramco lab for testing and evaluation.
3. Verify the correct bushings are used and terminations are correct.
4. Verify the exterior painting/coating is per Saudi Aramco specifications.
5. Perform visual inspection on feed through bushing and precipitator grid and
connections.
6. Make sure the man-way covers are open, place the off/on push button at the vessel in
the off position and lock and tag out the circuit breaker.
Witness
Signature & Date
PDD
Inspection
Operation/Maintenance
Contractor
Sheet 2 of 4
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
7. Make sure there is no combustible gas or vapor mixture inside the vessels.
8. Make sure no one is inside the vessel; post a guard or assign a safetyman outside the
vessel.
ELECTRICAL TESTS
Yes
No
1. Measure and record the resistance of each winding primary, secondary, and tertiary.
2. Measure and record the insulation resistance of each winding primary, secondary, and
tertiary.
3. Using primary voltage injection measure and record the induced voltage in the
secondary tertiary and the phase relationship between the secondary and the primary
and secondary.
4. Perform and record insulation resistance, ratio and magnetization tests on each C.T.
5. Megger, then perform high potential test on grid to test for dielectric breakdown.
6. Megger and high potential test feed through bushings
7. Perform impedance test on secondary and tertiary by energizing the primary with the
secondary and tertiary each separately short-circuited.
Witness
Signature & Date
PDD
Inspection
Operation/Maintenance
Contractor
Sheet 3 of 4
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
Note: The following forms are intended for a system consisting of three transformers, which
is generally a common configuration. The forms can be modified to satisfy the actual
system configuration.
Test Data
Metering CT's
Insulation Resistance test
Ratio
Transformer T1
Test Volts =___________
Megohms =__________
Primary____________
Secondary___________
Transformer T2
Test Volts =__________
Megohms =__________
Primary____________
Secondary___________
Transformer T3
Test Volts =_________
Megohms =__________
Primary____________
Secondary___________
Ammeter reading
CT Magnetization curve:
Voltage
Current ma T1
Current ma T2
Current ma T3
Impedance or Short Circuit Test
Transformer T1
Transformer T2
Transformer T3
Voltage
Current
Witness
Signature & Date
PDD
Inspection
Operation/Maintenance
Contractor
Sheet 4 of 4
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
Test Data
Transformer
Serial no.
Primary =
Secondary =
Tertiary =
Transformer
Serial no.
Primary =
Secondary =
Tertiary =
meg-ohms =
Transformer
Serial no.
Primary =
Secondary =
Tertiary =
meg-ohms =
meg-ohms =
meg-ohms =
meg-ohms =
meg-ohms =
meg-ohms =
meg-ohms =
Volts =
Volts =
Volts =
H2 to ground
Volts =
Volts =
Volts =
Y2 to ground
Volts =
Volts =
Volts =
H3 to X2
Volts =
Volts =
Volts =
H3 to Y2
Volts =
Volts =
Volts =
Y2 to X2
Volts =
Volts =
Volts =
Winding resistance
5 KV megger X1 &X2 to
ground
Megger primary to
secondary
Megger primary to
tertiary
Apply 20.8 volts between
X1 and X2 with X1 at
ground and measure voltage
on the following
H3 to ground
Witness