45038 Federal Register / Vol. 72, No.

154 / Friday, August 10, 2007 / Notices

Commission relating to the merits of an application allows an interested person and the number of copies provided by
issue that may affect the responsibilities to file the competing application no the Commission’s regulations to: The
of a particular resource agency, they later than 120 days after the specified Secretary, Federal Energy Regulatory
must also serve a copy of the document comment date for the particular Commission, 888 First Street, NE.,
on that resource agency. application. A competing license Washington, DC 20426. An additional
j. Description of the Proposed Project: application must conform with 18 CFR copy must be sent to: Director, Division
The proposed project, utilizing the 4.30 and 4.36. of Hydropower Administration and
existing U.S. Army Corps of Engineers’ o. Notice of Intent—A notice of intent Compliance, Federal Energy Regulatory
Cave Run Lake Dam and would consist must specify the exact name, business Commission, at the above-mentioned
of: (1) A proposed intake structure, (2) address, and telephone number of the address. A copy of any notice of intent,
a proposed 12,000-foot-long, 48-inch- prospective applicant, and must include competing application or motion to
diameter steel penstock, (3) a proposed an unequivocal statement of intent to intervene must also be served upon each
powerhouse containing two generator submit, if such an application may be representative of the Applicant
units with a total installed capacity of filed, either a preliminary permit specified in the particular application.
4.4 megawatts, (4) a quarter-mile-long application or a development s. Agency Comments—Federal, state,
transmission line interconnection, and application (specify which type of and local agencies are invited to file
(5) appurtenant facilities. The project application). A notice of intent must be comments on the described application.
would have an annual generation of 26 served on the applicant(s) named in this A copy of the application may be
GWh which would be sold to a local public notice. obtained by agencies directly from the
utility. p. Proposed Scope of Studies Under Applicant. If an agency does not file
k. Location of Applications: A copy of Permit—A preliminary permit, if issued, comments within the time specified for
the application is available for does not authorize construction. The filing comments, it will be presumed to
inspection and reproduction at the term of the proposed preliminary permit have no comments. One copy of an
Commission in the Public Reference would be 36 months. The work agency’s comments must also be sent to
Room or may be viewed on the proposed under the preliminary permit the Applicant’s representatives.
Commission’s Web site at http:// would include economic analysis,
www.ferc.gov using the ‘‘eLibrary’’ link. preparation of preliminary engineering Kimberly D. Bose,
Enter the docket number excluding the plans, and a study of environmental Secretary.
last three digits in the docket number impacts. Based on the results of these [FR Doc. E7–15643 Filed 8–9–07; 8:45 am]
field to access the document. For studies, the Applicant would decide BILLING CODE 6717–01–P
assistance, call toll-free 1–866–208– whether to proceed with the preparation
3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. DEPARTMENT OF ENERGY
call (202) 502–8659. A copy is also q. Comments, Protests, or Motions to
available for inspection and Intervene—Anyone may submit Federal Energy Regulatory
reproduction at the address in item g comments, a protest, or a motion to Commission
above. intervene in accordance with the [Project No. 12810–000]
l. Individuals desiring to be included requirements of Rules of Practice and
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Natural Currents Energy Services,
so indicate by writing to the Secretary In determining the appropriate action to LLC; Notice of Application Accepted
of the Commission. take, the Commission will consider all for Filing and Soliciting Motions To
m. Competing Preliminary Permit— protests or other comments filed, but Intervene, Protests, and Comments
Anyone desiring to file a competing only those who file a motion to
application for preliminary permit for a intervene in accordance with the August 6, 2007.
proposed project must submit the Commission’s Rules may become a Take notice that the following
competing application itself, or a notice party to the proceeding. Any comments, hydroelectric application has been filed
of intent to file such an application, to protests, or motions to intervene must with the Commission and is available
the Commission on or before the be received on or before the specified for public inspection:
specified comment date for the comment date for the particular a. Type of Application: Preliminary
particular application (see 18 CFR 4.36). application. Permit.
Submission of a timely notice of intent Comments, protests and interventions b. Project No.: 12810–000.
allows an interested person to file the may be filed electronically via the c. Date filed: July 10, 2007.
competing preliminary permit Internet in lieu of paper; See 18 CFR d. Applicant: Natural Currents Energy
application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions Services, LLC.
the specified comment date for the on the Commission’s Web site under ‘‘e- e. Name of Project: Housatonic Tidal
particular application. A competing filing’’ link. The Commission strongly Energy Plant.
preliminary permit application must encourages electronic filing. f. Location: The project would be
conform with 18 CFR 4.30 and 4.36. r. Filing and Service of Responsive located in the Housatonic River near the
n. Competing Development Documents—Any filings must bear in towns of Shelton and Derby,
Application—Any qualified all capital letters the title approximately one-half mile south of
development applicant desiring to file a ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Wooster Island, in Fairfield and New
competing development application TO FILE COMPETING APPLICATION’’, Haven Counties, Connecticut.
must submit to the Commission, on or ‘‘COMPETING APPLICATION’’, g. Filed Pursuant to: Federal Power
sroberts on PROD1PC70 with PROPOSALS

before a specified comment date for the ‘‘PROTEST’’, or ‘‘MOTION TO Act, 16 U.S.C. 791(a)–825(r).
particular application, either a INTERVENE’’, as applicable, and the h. Applicant Contact: Mr. Roger
competing development application or a Project Number of the particular Bason, Natural Currents Energy
notice of intent to file such an application to which the filing refers. Services, LLC, 24 Roxanne Boulevard,
application. Submission of a timely Any of the above-named documents Highland, NY 12561, phone (845)–691–
notice of intent to file a development must be filed by providing the original 4008.

VerDate Aug<31>2005 16:37 Aug 09, 2007 Jkt 211001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1
Federal Register / Vol. 72, No. 154 / Friday, August 10, 2007 / Notices 45039

i. FERC Contact: Chris Yeakel, (202) the specified comment date for the on the Commission’s Web site under ‘‘e-
502–8132. particular application. A competing filing’’ link. The Commission strongly
j. Deadline for filing comments, preliminary permit application must encourages electronic filing.
protests, and motions to intervene: 60 conform with 18 CFR 4.30 and 4.36. s. Filing and Service of Responsive
days from the issuance date of this o. Competing Development Documents—Any filings must bear in
notice. Application—Any qualified all capital letters the title
The Commission’s Rules of Practice development applicant desiring to file a ‘‘COMMENTS’’,
and Procedure require all intervenors competing development application ‘‘RECOMMENDATIONS FOR TERMS
filing documents with the Commission must submit to the Commission, on or AND CONDITIONS’’, ‘‘PROTEST’’,
to serve a copy of that document on before a specified comment date for the ‘‘COMPETING APPLICATION’’ OR
each person in the official service list particular application, either a ‘‘MOTION TO INTERVENE’’, as
for the project. Further, if an intervenor competing development application or a applicable, and the Project Number of
files comments or documents with the notice of intent to file such an the particular application to which the
Commission relating to the merits of an application. Submission of a timely filing refers. Any of the above-named
issue that may affect the responsibilities notice of intent to file a development documents must be filed by providing
of a particular resource agency, they application allows an interested person the original and the number of copies
must also serve a copy of the document to file the competing application no provided by the Commission’s
on that resource agency. later than 120 days after the specified regulations to: The Secretary, Federal
k. Description of Project: The comment date for the particular Energy Regulatory Commission, 888
proposed project would consist of: (1) application. A competing license First Street, NE., Washington, DC 20426.
One or several Tidal In-Stream Energy application must conform with 18 CFR A copy of any motion to intervene must
Conversion (TISEC) devices, using new 4.30 and 4.36. also be served upon each representative
technology, such as the Gorlov Helical p. Notice of Intent—A notice of intent of the Applicant specified in the
Turbine and/or Natural Currents Red must specify the exact name, business particular application.
Hawk TISEC technology, (2) anchoring address, and telephone number of the t. Agency Comments—Federal, state,
systems, (3) mooring lines, and (4) prospective applicant, and must include and local agencies are invited to file
interconnection transmission lines. The an unequivocal statement of intent to comments on the described application.
initial project installation is estimated to submit, if such an application may be A copy of the application may be
have an installed capacity up to 3 filed, either a preliminary permit obtained by agencies directly from the
megawatts, and an average annual application or a development Applicant. If an agency does not file
generation of 9,000 megawatt-hours per application (specify which type of comments within the time specified for
year, which would be sold to a local application). A notice of intent must be filing comments, it will be presumed to
utility. served on the applicant(s) named in this have no comments. One copy of an
l. Locations of Applications: A copy of public notice. agency’s comments must also be sent to
the application is available for q. Proposed Scope of Studies Under the Applicant’s representatives.
inspection and reproduction at the Permit—A preliminary permit, if issued,
Commission in the Public Reference Kimberly D. Bose,
does not authorize construction. The
Room, located at 888 First Street, NE., term of the proposed preliminary permit Secretary.
Room 2A, Washington DC 20426, or by would be 36 months. The work [FR Doc. E7–15644 Filed 8–9–07; 8:45 am]
calling (202) 502–8371. This filing may proposed under the preliminary permit BILLING CODE 6717–01–P
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental DEPARTMENT OF ENERGY
number excluding the last three digits in impacts. Based on the results of these
Federal Energy Regulatory
the docket number field to access the studies, the Applicant would decide
Commission
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to [Project No. 2365–040]
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Madison Paper Industries, Inc.; Notice
available for inspection and Intervene—Anyone may submit of Temporary Variance Request and
reproduction at the address in item h comments, a protest, or a motion to Soliciting Comments, Motions To
above. intervene in accordance with the Intervene, and Protests
m. Individuals desiring to be included requirements of Rules of Practice and August 6, 2007.
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Take notice that the following
so indicate by writing to the Secretary In determining the appropriate action to hydroelectric application has been filed
of the Commission. take, the Commission will consider all with the Commission and is available
n. Competing Preliminary Permit— protests or other comments filed, but for public inspection:
Anyone desiring to file a competing only those who file a motion to a. Type of Application: Request for
application for preliminary permit for a intervene in accordance with the temporary modification of the project
proposed project must submit the Commission’s Rules may become a operation to lower the water level in the
competing application itself, or a notice party to the proceeding. Any comments, project Forebay.
of intent to file such an application, to protests, or motions to intervene must b. Project No.: 2365–040.
the Commission on or before the be received on or before the specified c. Date Filed: August 1, 2007.
sroberts on PROD1PC70 with PROPOSALS

specified comment date for the comment date for the particular d. Applicant: Madison Paper
particular application (see 18 CFR 4.36). application. Industries, Inc.
Submission of a timely notice of intent Comments, protests and interventions e. Name of Project: Anson Project.
allows an interested person to file the may be filed electronically via the f. Location: On the Kennebec River, in
competing preliminary permit Internet in lieu of paper; see 18 C.F.R. Somerset County, Maine. The project
application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions does not utilize federal or tribal lands.