Actividad 3
15/07/27
15/08/03
15/08/10
15/08/17
15/08/24
15/08/31
$324,564.86
$246,874.66
$42,149.34
Fin de preliminares
Cimentacin
Viga de cimentacin
$2,184,669.12
Hierro de cimentacin
$1,779,017.44
$728,223.04
Fin de cimentacion
Instalacin Sanitaria
Tubera PVC 4 sanitaria
$85,977.00
$106,802.50
$472,024.00
$472,024.00
$919,870.00
$666,490.00
$2,278,500.00
Muros
$2,055,550.08
$2,642,850.08
Fin de mamposteria
Estructura
Columnas de confinamiento
$126,851.66
Dinteles
$1,612,828.32
$38,620.40
Formaleta de losa
$110,158.12
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
$1,148,791.92
15/08/03
15/08/10
Colocacin losa
Fraguado losa
Fin de estructura
Paetes
Revoques
Desencofrado de losa
Fin de paetes
Terraza
Mortero impermeabilizado en losa
Ladrillo en losa
Fin de terraza
Instalacin Hidrulica
Puntos hidrulicos Piso 1
Puntos sanitarios Piso 1
Instalacin Ducha
Instalacin W.C.
Instalacin lavamanos
Instalacin Lavadero
Instalacin Tanque
Fin de inst. hidraulicas
Instalacin Elctrica
Instalacin Calentador
Puntos elctricos Piso 1
Cableado y aparatiado Piso 1
Fin de inst. electricas
Acabados
Estuco y pintura
Colocacin Puertas y Ventanas
Pgina 2
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
15/08/17
15/08/24
15/08/31
15/08/03
15/08/10
15/08/17
15/08/24
Aseo General
Retiro de escombros
Fin de acabados
Fin de proyecto
Total
$571,439.52
$4,670,639.36
$7,120,657.28
Pgina 3
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
$2,879,859.84
$2,800,240.64
15/08/31
15/09/07
15/09/14
$226,205.20
Formaleta de losa
Armado de refuerzo de losa
$2,948,859.52
$482,540.60
Puntos hidrulicos
$49,122.00
Puntos sanitarios
$313,715.98
Puntos elctricos
$288,385.50
Pgina 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
15/09/21
15/09/28
15/10/05
Colocacin losa
Fraguado losa
15/09/07
15/09/14
15/09/21
15/09/28
15/10/05
$4,193,884.16
$20,125.00
$49,875.00
Fin de estructura
Paetes
Revoques
$6,506,915.84
Desencofrado de losa
$52,000.00
Fin de paetes
Terraza
Mortero impermeabilizado en losa
$347,985.76
Ladrillo en losa
$1,242,806.24
$149,957.50
Fin de terraza
Instalacin Hidrulica
Puntos hidrulicos Piso 1
$158,244.00
$576,440.40
Instalacin Ducha
$225,563.64
$84,785.00
Instalacin W.C.
$187,662.00
Instalacin lavamanos
$108,965.00
Instalacin Lavadero
$538,586.00
Instalacin Tanque
$198,041.00
$1,850,000.00
$554,587.52
$528,162.48
$3,087,211.84
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
15/09/07
15/09/14
15/09/21
15/09/28
Aseo General
Retiro de escombros
Fin de acabados
Fin de proyecto
Total
$3,175,064.64
$5,347,773.44
$6,956,776.96
Pgina 6
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
$2,127,448.00
$7,363,564.80
15/10/05
15/10/12
15/10/19
Total
$324,564.86
$289,024.00
Fin de preliminares
Cimentacin
Viga de cimentacin
$2,912,892.16
Hierro de cimentacin
$1,779,017.44
Fin de cimentacion
Instalacin Sanitaria
Tubera PVC 4 sanitaria
$85,977.00
$106,802.50
$944,048.00
$919,870.00
$666,490.00
$2,278,500.00
Muros
$4,698,400.00
Fin de mamposteria
Estructura
Columnas de confinamiento
$1,739,680.00
Dinteles
$264,825.60
Formaleta de losa
$1,258,950.08
$3,431,400.00
Puntos hidrulicos
$49,122.00
Puntos sanitarios
$313,715.98
Puntos elctricos
$288,385.50
Pgina 7
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
15/10/12
15/10/19
Colocacin losa
Total
$4,193,884.16
Fraguado losa
$70,000.00
Fin de estructura
Paetes
Revoques
$6,506,915.84
Desencofrado de losa
$52,000.00
Fin de paetes
Terraza
Mortero impermeabilizado en losa
$1,590,792.00
Ladrillo en losa
$149,957.50
Fin de terraza
Instalacin Hidrulica
Puntos hidrulicos Piso 1
$158,244.00
$802,004.00
Instalacin Ducha
$84,785.00
Instalacin W.C.
$187,662.00
Instalacin lavamanos
$108,965.00
Instalacin Lavadero
$538,586.00
Instalacin Tanque
$198,041.00
$1,850,000.00
$554,587.52
$528,162.48
$1,403,278.08
$2,144,910.08
$4,490,489.92
$271,890.00
Pgina 8
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
$2,416,800.00
15/10/12
15/10/19
Total
Aseo General
$80,000.00
$80,000.00
Retiro de escombros
$65,000.00
$65,000.00
$416,890.00
$46,978,539.52
Fin de acabados
Fin de proyecto
Total
$3,548,188.16
Pgina 9