SUBJECT CODE & NAME- MI0033 SOFTWARE ENGINEERING

Qus:1 Explain the overall agile process in detail

Process of agile : 5 steps

Ans:
Process of agile : 5 steps:

The authorised development team then makes an approximate calculation of the time required to
develop the user story into a software increment. The estimates are expressed in weeks and are
often approximate figures that are imprecise. Once these estimates are ready along with the user

Qus:2 a. What is software project estimation?


b. Explain COCOMO in a nutshell
Ans:
a. Defining software project estimation and mentioning 5 different models:
Software project estimation is the first phase of project planning and it is the process of
predicting a cost for developing a software product and solving the problem associated with the
software project. Many technical and environmental variables can affect the cost and the effort
involved in a software project. In order to ensure that we arrive at reliable cost and effort

Qus:3 a. Explain function oriented metrics


b. How do you calculate function points?
Ans:
a. Explaining the meaning of function-oriented metrics along with their types and the five
information domain value calculation terminology:
The function-oriented metrics are indirect software metrics. Instead of the number of LOC, the
emphasis is more on the functionality of the product. The function-oriented metrics were first
proposed by Albrecht. He suggested a productivity measurement approach known as the

Qus:4 a. Explain the system architecture specification


b. Explain System specification review
Ans:
a. Explaining the four main components of system architecture:

These components are as follows:

Processing power The processing power depends on the computer or the server. The
correct processor must be selected and installed on to a system. The selection of the
processor is based on the software specifications, number of concurrent users and the

Qus:5 Explain the 12-step program design process of software engineering that is followed
to get the organizations back on track.

Explaining atleast 12 steps of Stellar software design process

Ans:
Explaining atleast 12 steps of Stellar software design process:
1. Admit that there is a problem This is the first step in stellar software design process. This
step talks about the program. It is not always possible to develop good usability program.
2. Believe in a power greater than the designers power This is the second step of the design

Qus:6 a. Elaborate on Capability Maturity Model components.


b. Define Quality control and Cost of quality with the types of cost.
Ans:
Explaining CM model:
This model can be applied as a generally applicable model to assist in gaining knowledge
about the process capability maturity of organisations in areas such as software engineering,
system engineering, proje

SMU MBA SUMMER 2015 -2016

Dear Students,

SMU MBA SUMMER


Booking

,Kindly

2015-2016 Assignments are available. For


mail

us

on kvsude@gmail.com OR call

us to +91 9995105420 or S M S your Email ID us in the


following Format On +91 9995105420 we will reach back you
with in 24H

Vous aimerez peut-être aussi