Vous êtes sur la page 1sur 2

Federal Register / Vol. 72, No.

119 / Thursday, June 21, 2007 / Notices 34239

k. Description of Project: The p. Notice of Intent: A notice of intent of the Applicant specified in the
proposed project would consist of: (1) must specify the exact name, business particular application.
10 oscillating water column devices address, and telephone number of the t. Agency Comments: Federal, State,
having a total installed capacity of 10 prospective applicant, and must include and local agencies are invited to file
megawatts, (2) a proposed 3.4-mile-long, an unequivocal statement of intent to comments on the described application.
11 kilovolt transmission line; and (3) submit, if such an application may be A copy of the application may be
appurtenant facilities. The project is filed, either a preliminary permit obtained by agencies directly from the
estimated to have an annual generation application or a development Applicant. If an agency does not file
of 35 gigawatt-hours per-unit per-year, application (specify which type of comments within the time specified for
which would be sold to a local utility. application). A notice of intent must be filing comments, it will be presumed to
l. Locations of Applications: A copy of served on the applicant(s) named in this have no comments. One copy of an
the application is available for public notice. agency’s comments must also be sent to
inspection and reproduction at the q. Proposed Scope of Studies under the Applicant’s representatives.
Commission in the Public Reference Permit: A preliminary permit, if issued, Kimberly D. Bose,
Room, located at 888 First Street NE., does not authorize construction. The Secretary.
Room 2A, Washington, DC 20426, or by term of the proposed preliminary permit [FR Doc. E7–11950 Filed 6–20–07; 8:45 am]
calling (202) 502–8371. This filing may would be 36 months. The work
BILLING CODE 6717–01–P
also be viewed on the Commission’s proposed under the preliminary permit
Web site at http://www.ferc.gov using would include economic analysis,
the ‘‘eLibrary’’ link. Enter the docket preparation of preliminary engineering
number excluding the last three digits in plans, and a study of environmental ENVIRONMENTAL PROTECTION
the docket number field to access the impacts. Based on the results of these AGENCY
document. For assistance, call toll-free studies, the Applicant would decide [EPA–HQ–OECA–2006–0776; FRL–8329–4]
1–866–208–3676 or e-mail whether to proceed with the preparation
FERCOnlineSupport@ferc.gov. For TTY, of a development application to Agency Information Collection
call (202) 502–8659. A copy is also construct and operate the project. Activities; Submission to OMB for
available for inspection and r. Comments, Protests, or Motions to Review and Approval; Comment
reproduction at the address in item h Intervene: Anyone may submit Request; NESHAP for Stationary
above. comments, a protest, or a motion to Combustion Turbines (Renewal), EPA
m. Individuals desiring to be included intervene in accordance with the ICR Number 1967.03, OMB Control
on the Commission’s mailing list should requirements of Rules of Practice and Number 2060–0540
so indicate by writing to the Secretary Procedure, 18 CFR 385.210, 385.211, AGENCY: Environmental Protection
of the Commission. 385.214. In determining the appropriate Agency (EPA).
n. Competing Preliminary Permit: action to take, the Commission will ACTION: Notice.
Anyone desiring to file a competing consider all protests or other comments
application for preliminary permit for a filed, but only those who file a motion SUMMARY: In compliance with the
proposed project must submit the to intervene in accordance with the Paperwork Reduction Act (44 U.S.C.
competing application itself, or a notice Commission’s Rules may become a 3501 et seq.), this document announces
of intent to file such an application, to party to the proceeding. Any comments, that an Information Collection Request
the Commission on or before the protests, or motions to intervene must (ICR) has been forwarded to the Office
specified comment date for the be received on or before the specified of Management and Budget (OMB) for
particular application (see 18 CFR 4.36). comment date for the particular review and approval. This is a request
Submission of a timely notice of intent application. to renew an existing approved
allows an interested person to file the Comments, protests and interventions collection. The ICR which is abstracted
competing preliminary permit may be filed electronically via the below describes the nature of the
application no later than 30 days after Internet in lieu of paper. See 18 CFR collection and the estimated burden and
the specified comment date for the 385.2001 (a)(1)(iii) and the instructions cost.
particular application. A competing on the Commission’s web site under ‘‘e- DATES: Additional comments may be
preliminary permit application must filing’’ link. The Commission strongly submitted on or before July 23, 2007.
conform with 18 CFR 4.30(b) and 4.36. encourages electronic filing. ADDRESSES: Submit your comments,
o. Competing Development s. Filing and Service of Responsive referencing docket ID number EPA–HQ–
Application: Any qualified development Documents: Any filings must bear in all OECA–2006–0776 to (1) EPA online
applicant desiring to file a competing capital letters the title ‘‘COMMENTS’’, using www.regulations.gov (our
development application must submit to ‘‘RECOMMENDATIONS FOR TERMS preferred method), or by e-mail to
the Commission, on or before a AND CONDITIONS’’, ‘‘PROTEST’’, docket.oeca@epa.gov, or by mail to: EPA
specified comment date for the ‘‘COMPETING APPLICATION’’ OR Docket Center (EPA/DC), Environmental
particular application, either a ‘‘MOTION TO INTERVENE’’, as Protection Agency, Enforcement and
competing development application or a applicable, and the Project Number of Compliance Docket and Information
notice of intent to file such an the particular application to which the Center, mail code 2201T, 1200
application. Submission of a timely filing refers. Any of the above-named Pennsylvania Avenue, NW.,
notice of intent to file a development documents must be filed by providing Washington, DC 20460, and (2) OMB at:
application allows an interested person the original and the number of copies Office of Information and Regulatory
to file the competing application no provided by the Commission’s Affairs, Office of Management and
jlentini on PROD1PC65 with NOTICES

later than 120 days after the specified regulations to: The Secretary, Federal Budget (OMB), Attention: Desk Officer
comment date for the particular Energy Regulatory Commission, 888 for EPA, 725 17th Street, NW.,
application. A competing license First Street, NE., Washington, DC 20426. Washington, DC 20503.
application must conform with 18 CFR A copy of any motion to intervene must FOR FURTHER INFORMATION CONTACT:
4.30(b) and 4.36. also be served upon each representative Gregory Fried, Office of Compliance,

VerDate Aug<31>2005 18:22 Jun 20, 2007 Jkt 211001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\21JNN1.SGM 21JNN1
34240 Federal Register / Vol. 72, No. 119 / Thursday, June 21, 2007 / Notices

Mail Code 2223A, Environmental required to respond to, a collection of Estimated Number of Respondents:
Protection Agency, 1200 Pennsylvania information unless it displays a 31.
Avenue, NW., Washington, DC 20460; currently valid OMB control number. Frequency of Response: Initial and
telephone number: (202) 564–7016; fax The OMB control numbers for EPA’s Semi-Annual.
number: (202) 564–0050; e-mail address: regulations in title 40 of the CFR, after Estimated Total Annual Hour Burden:
fried.gregory@epa.gov. appearing in the Federal Register when 435.
SUPPLEMENTARY INFORMATION: EPA has approved, are listed in 40 CFR part 9, Estimated Total Annual Cost:
submitted the following ICR to OMB for and displayed either by publication in $40,008, includes $0 annualized Capital
review and approval according to the the Federal Register or by other Startup costs, $1,500 annualized
procedures prescribed in 5 CFR 1320.12. appropriate means, such as on the Operating and Maintenance Costs
On October 5, 2006 (71 FR 58853), EPA related collection instrument or form, if (O&M), and $38,508 annualized Labor
sought comments on this ICR pursuant applicable. The display of OMB control costs.
to 5 CFR 1320.8(d). EPA received no numbers in certain EPA regulations is Changes in the Estimates: There is a
comments. Any additional comments on consolidated in 40 CFR part 9. decrease of 2,013 hours in the total
this ICR should be submitted to EPA Abstract: These regulations apply to estimated burden currently identified in
and OMB within 30 days of this notice. stationary combustion turbines located the OMB Inventory of Approved ICR
EPA has established a public docket at major sources of hazardous air Burdens. The decrease in burden from
for this ICR under docket ID number pollutants. On August 18, 2004, EPA the most recently approved ICR is due
stayed the effectiveness of two to a change in the regulation. On August
EPA–HQ–OECA–2006–0776, which is
subcategories of turbines subject to 18, 2004 (69 FR 51184), the EPA stayed
available for public viewing online at
these regulations: lean pre-mix gas-fired the effectiveness of this standard for gas
http://www.regulations.gov, or in person
turbines and diffusion flame gas-fired fired turbines. As a result, only new oil
viewing at the Enforcement and
turbines. Thus, only oil-fired stationary fired turbines located at major HAP
Compliance Information Docket Center
combustion turbines are currently sources are subject to emission
in the EPA Docket Center (EPA/DC),
subject to emission limits under these standards under Subpart YYYY at this
EPA West, Room 3334, 1301
standards. In addition, these regulations time. New gas fired units are only
Constitution Avenue, NW., Washington,
apply only new sources that required to submit a one-time initial
DC. The EPA Docket Center Public
commenced construction or notification.
Reading Room is open from 8:30 a.m. to reconstruction after the date of the final
4:30 p.m., Monday through Friday, rule. Owners or operators of oil-fired Dated: June 14, 2007.
excluding legal holidays. The telephone stationary combustion turbines subject Sara Hisel-McCoy,
number for the Reading Room is (202) to these regulations are required to Acting Director, Collection Strategies
566–1744, and the telephone number for submit initial notifications, conduct Division.
the Enforcement and Compliance initial performance testing, submit [FR Doc. E7–12053 Filed 6–20–07; 8:45 am]
Information Docket Center is (202) 566– periodic compliance reports, and BILLING CODE 6560–50–P
1752. maintain records to demonstrate
Use EPA’s electronic docket and continuous compliance. New gas-fired
comment system at http:// stationary combustion turbines are only ENVIRONMENTAL PROTECTION
www.regulations.gov, to submit or view required to submit an initial AGENCY
public comments, access the index notification.
listing of the contents of the docket, and [FRL–8329–5]
Burden Statement: The annual public
to access those documents in the docket reporting and recordkeeping burden for Proposed Administrative Cost
that are available electronically. Once in this collection of information is Recovery Settlement Under Section
the system, select ‘‘docket search,’’ then estimated to average 8 (rounded) hours 122(h) of the Comprehensive
key in the docket ID number identified per response. Burden means the total Environmental Response,
above. Please note that EPA’s policy is time, effort, or financial resources Compensation, and Liability Act, as
that public comments, whether expended by persons to generate, Amended, 42 U.S.C. 9622(h), Part of
submitted electronically or in paper, maintain, retain, or disclose or provide PCB Treatment Inc. Superfund Site
will be made available for public information to or for a Federal agency.
viewing at http://www.regulations.gov, This includes the time needed to review AGENCY: Environmental Protection
as EPA receives them and without instructions; develop, acquire, install, Agency (Agency or EPA).
change, unless the comment contains and utilize technology and systems for ACTION: Notice; request for public
copyrighted material, CBI, or other the purposes of collecting, validating, comment.
information whose public disclosure is and verifying information, processing
restricted by statute. For further and maintaining information, and SUMMARY: In accordance with Section
information about the electronic docket, disclosing and providing information; 122(i) of the Comprehensive
go to http://www.regulations.gov. adjust the existing ways to comply with Environmental Response,
Title: NESHAP for Stationary any previously applicable instructions Compensation, and Liability Act, as
Combustion Turbines (Renewal). and requirements which have amended (CERCLA), 42 U.S.C. 9622(i),
ICR Numbers: EPA ICR Number subsequently changed; train personnel notice is hereby given of a proposed
1967.03, OMB Control Number 2060– to be able to respond to a collection of administrative settlement for recovery of
0540. information; search data sources; past response costs concerning part of
ICR Status: This ICR is scheduled to complete and review the collection of the PCB Treatment Inc. Superfund Site
expire on June 30, 2007. Under OMB information; and transmit or otherwise located at 2100 Wyandotte Street,
jlentini on PROD1PC65 with NOTICES

regulations, the Agency may continue to disclose the information. Kansas City, Jackson County, Missouri,
conduct or sponsor the collection of Respondents/Affected Entities: New with the following settling parties:
information while this submission is and Reconstructed Stationary Genova Enterprises, Inc. (Genova) and
pending at OMB. An Agency may not Combustion Turbines Located at Major Linda Long. The settlement requires
conduct or sponsor, and a person is not Sources of Hazardous Air Pollutants. Genova to pay to the Hazardous

VerDate Aug<31>2005 18:22 Jun 20, 2007 Jkt 211001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\21JNN1.SGM 21JNN1

Vous aimerez peut-être aussi