Vous êtes sur la page 1sur 1

29142 Federal Register / Vol. 72, No.

100 / Thursday, May 24, 2007 / Notices

This training is sponsored by the of the protest or intervention to the Notice is hereby given that the
CAISO and is open to interested parties Federal Energy Regulatory Commission, deadline for filing protests is June 18,
and market participants. Commission 888 First Street, NE., Washington, DC 2007.
staff attendance is part of its ongoing 20426. Absent a request to be heard in
training activities. The training may This filing is accessible on-line at opposition to such blanket approvals by
discuss matters at issue in the above http://www.ferc.gov, using the the deadline above, CEI is authorized to
captioned docket. ‘‘eLibrary’’ link and is available for issue securities and assume obligations
For further information, contact review in the Commission’s Public or liabilities as a guarantor, indorser,
Steven Michals at Reference Room in Washington, DC. surety, or otherwise in respect of any
steven.michals@ferc.gov; (202) 502– There is an ‘‘eSubscription’’ link on the security of another person; provided
6373. Web site that enables subscribers to that such issuance or assumption is for
receive e-mail notification when a some lawful object within the corporate
Kimberly D. Bose,
document is added to a subscribed purposes of CEI, compatible with the
Secretary.
docket(s). For assistance with any FERC public interest, and is reasonably
[FR Doc. E7–9989 Filed 5–23–07; 8:45 am] Online service, please e-mail necessary or appropriate for such
BILLING CODE 6717–01–P FERCOnlineSupport@ferc.gov, or call purposes.
(866) 208–3676 (toll free). For TTY, call The Commission reserves the right to
(202) 502–8659. require a further showing that neither
DEPARTMENT OF ENERGY public nor private interests will be
Kimberly D. Bose,
adversely affected by continued
Federal Energy Regulatory Secretary. approvals of CEI’s issuance of securities
Commission [FR Doc. E7–9975 Filed 5–23–07; 8:45 am] or assumptions of liability.
[Docket No. RP00–305–033] BILLING CODE 6717–01–P Copies of the full text of the Director’s
Order are available from the
CenterPoint Energy—Mississippi River Commission’s Public Reference Room,
Transmission Corporation; Notice of DEPARTMENT OF ENERGY 888 First Street, NE., Washington, DC
Negotiated Rates 20426. The Order may also be viewed
Federal Energy Regulatory on the Commission’s Web site at
May 18, 2007. Commission
Take notice that on April 27, 2007, http://www.ferc.gov, using the eLibrary
CenterPoint Energy—Mississippi River link. Enter the docket number excluding
[Docket No. ER07–640–000] the last three digits in the docket
Transmission Corporation (MRT)
tendered for filing an amended number filed to access the document.
Citadel Energy Investments Ltd.; Comments, protests, and interventions
negotiated rate agreement for Rate Notice of Issuance of Order
Schedule PALS service between MRT may be filed electronically via the
and Laclede Energy Resources, Inc. May 18, 2007. Internet in lieu of paper. See, 18 CFR
MRT requests that the Commission Citadel Energy Investments Ltd. (CEI), 385.2001(a)(1)(iii) and the instructions
accept and approve the transaction to be filed a request for authorization to on the Commission’s Web site under the
effective May 1, 2007. engage in the resale of financially- ‘‘e-Filing’’ link. The Commission
Any person desiring to intervene or to settled financial transmission rights strongly encourages electronic filings.
protest this filing must file in with an accompanying rate schedule. Kimberly D. Bose,
accordance with Rules 211 and 214 of CEI also requested waivers of various Secretary.
the Commission’s Rules of Practice and Commission regulations. In particular, [FR Doc. E7–9978 Filed 5–23–07; 8:45 am]
Procedure (18 CFR 385.211 and CEI requested that the Commission
BILLING CODE 6717–01–P
385.214). Protests will be considered by grant blanket approval under 18 CFR
the Commission in determining the part 34 of all future issuances of
appropriate action to be taken, but will securities and assumptions of liability DEPARTMENT OF ENERGY
not serve to make protestants parties to by CEI.
the proceeding. Any person wishing to On May 17, 2007, pursuant to Federal Energy Regulatory
become a party must file a notice of delegated authority, the Director, Commission
intervention or motion to intervene, as Division of Tariffs and Market
[Docket No. QF07–11–000]
appropriate. Such notices, motions, or Development—West, granted the
protests must be filed in accordance requests for blanket approval under part EnviroDyne Inc.; Notice of Filing of
with the provisions of Section 154.210 34 (Director’s Order). The Director’s Notice of Self-Certification of
of the Commission’s regulations (18 CFR Order also stated that the Commission Qualifying Status of a Cogeneration
154.210). Anyone filing an intervention would publish a separate notice in the Facility
or protest must serve a copy of that Federal Register establishing a period of
document on the Applicant. Anyone time for the filing of protests. May 18, 2007.
filing an intervention or protest on or Accordingly, any person desiring to be Take notice that on October 13, 2006,
before the intervention or protest date heard concerning the blanket approvals EnviroDyne Inc., 10400 Overland Road
need not serve motions to intervene or of issuances of securities or assumptions #226, Boise, ID 83709 filed with the
protests on persons other than the of liability by CEI should file a protest Federal Energy Regulatory Commission
Applicant. with the Federal Energy Regulatory a notice of self-certification of a facility
The Commission encourages Commission, 888 First Street, NE., as a qualifying cogeneration facility
rmajette on PROD1PC67 with NOTICES

electronic submission of protests and Washington, DC 20426, in accordance pursuant to 18 CFR 292.207(a) of the
interventions in lieu of paper using the with Rules 211 and 214 of the Commission’s regulations.
‘‘eFiling’’ link at http://www.ferc.gov. Commission’s Rules of Practice and This cogeneration facility will be
Persons unable to file electronically Procedure. 18 CFR 385.211, 385.214 located at 3349 S. 1800 E., Wendell,
should submit an original and 14 copies (2004). Gooding County, Idaho.

VerDate Aug<31>2005 15:52 May 23, 2007 Jkt 211001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\24MYN1.SGM 24MYN1

Vous aimerez peut-être aussi