Federal Register / Vol. 72, No.

100 / Thursday, May 24, 2007 / Notices 29155

DEPARTMENT OF ENERGY k. This application has been accepted forth in the heading the name of the
for filing, but is not ready for applicant and the project number of the
Federal Energy Regulatory environmental analysis at this time. application to which the filing
Commission l. The proposed project would utilize responds; (3) furnish the name, address,
the existing U.S. Army Corps of and telephone number of the person
[Project No. 12658–001] Engineers’ Captain Anthony Meldahl protesting or intervening; and (4)
Locks and Dam, and would consist of: otherwise comply with the requirements
E.ON U.S. Hydro 1 LLC; Notice of (1) An intake channel; (2) a combined of 18 CFR 385.2001 through 385.2005.
Application Accepted for Filing and 225-foot-long by 205-foot-wide Agencies may obtain copies of the
Soliciting Motions To Intervene and powerhouse and intake section application directly from the applicant.
Protests containing three generating units having A copy of any protest or motion to
May 18, 2007. a total installed capacity of 99 intervene must be served upon each
Take notice that the following megawatts; (3) a tailrace channel; (4) a representative of the applicant specified
hydroelectric application has been filed substation; (5) a 1.7-mile-long, 138- in the particular application.
with the Commission and is available kilovolt transmission line; and (6) o. Procedural schedule: The
for public inspection. appurtenant facilities. The project application will be processed according
a. Type of Application: Original Major would have an annual generation of 500 to the following revised Hydro
License. gigawatt-hours, which would be sold to Licensing Schedule. Revisions to the
a local utility. schedule will be made if the
b. Project No.: 12658–001.
m. A copy of the application is Commission determines it necessary to
c. Date Filed: October 10, 2006.
available for review at the Commission do so:
d. Applicant: E.ON U.S. Hydro 1 LLC. in the Public Reference Room or may be
e. Name of Project: Meldahl viewed on the Commission’s Web site at Tentative
Hydroelectric Project. http://www.ferc.gov using the Action date
f. Location: On the Ohio River, near ‘‘eLibrary’’ link. Enter the docket
the City of Augusta, Bracken County, number, excluding the last three digits Scoping Document for com- July 2007.
Kentucky. The existing dam is owned in the docket number field to access the ments.
and operated by the U.S. Army Corps of document. For assistance, contact FERC
Notice of application is ready Aug. 2007.
Engineers (Corps). The project would for environmental analysis.
Online Support at Notice of the availability of the Feb. 2008.
occupy approximately 16 acres of FERCOnlineSupport@ferc.gov or toll-
United States lands administered by the draft EA.
free at 1–866–208–3676, or for TTY, Notice of the availability of the June 2008.
Corps. (202) 502–8659. A copy is also available final EA.
g. Filed Pursuant to: Federal Power for inspection and reproduction at the
Act 16 U.S.C. 791(a)–825(r). address in item h above.
h. Applicant Contact: Mr. Michael S. Kimberly D. Bose,
You may also register online at Secretary.
Beer, E.ON U.S. Hydro 1 LLC, 220 West http://www.ferc.gov/docs-filing/
Main Street, Louisville, KY 40202, (502) [FR Doc. E7–9976 Filed 5–23–07; 8:45 am]
esubscription.asp to be notified via e-
627–3547; e-mail—mike.beer@eon- mail of new filings and issuances BILLING CODE 6717–01–P
us.com. related to this or other pending projects.
i. FERC Contact: Peter Leitzke at (202) For assistance, contact FERC Online
502–6059; or e-mail at DEPARTMENT OF ENERGY
Support.
peter.leitzke@ferc.gov. n. Competing development
j. Deadline for filing motions to Federal Energy Regulatory
applications, notices of intent to file Commission
intervene and protests: 60 days from the such an application, and applications
issuance date of this notice. for preliminary permits will not be [Project No. P–12754–000]
All documents (original and eight accepted in response to this notice.
copies) should be filed with: Magalie R. Anyone may submit a protest or a Bost1 Hydroelectric LLC; Notice of
Salas, Secretary, Federal Energy motion to intervene in accordance with Application Accepted for Filing and
Regulatory Commission, 888 First the requirements of Rules of Practice Soliciting Motions To Intervene,
Street, NE., Washington, DC 20426. and Procedure, 18 CFR 385.210, Protests and Comments
The Commission’s Rules of Practice 385.211, and 385.214. In determining May 17, 2007.
and Procedures require all intervenors the appropriate action to take, the Take notice that the following
filing documents with the Commission Commission will consider all protests hydroelectric application has been filed
to serve a copy of that document on filed, but only those who file a motion with the Commission and is available
each person on the official service list to intervene in accordance with the for public inspection:
for the project. Further, if an intervenor Commission’s Rules may become a a. Type of Application: Preliminary
files comments or documents with the party to the proceeding. Any protests or Permit.
Commission relating to the merits of an motions to intervene must be received b. Project No.: 12754–000.
issue that may affect the responsibilities on or before the specified deadline date c. Date Filed: December 12, 2006.
of a particular resource agency, they for the particular application. d. Applicant: Bost1 Hydroelectric
must also serve a copy of the document When the application is ready for LLC.
on that resource agency. environmental analysis, the e. Name of Project: Red River Lock &
Motions to intervene and protests may Commission will issue a public notice Dam #1 Hydroelectric Project.
be filed electronically via the Internet in requesting comments, f. Location: The proposed project
rmajette on PROD1PC67 with NOTICES

lieu of paper. The Commission strongly recommendations, terms and would utilize the existing U.S. Army
encourages electronic filing. See 18 CFR conditions, or prescriptions. Corps of Engineers’ Red River Lock &
385.2001(a)(1)(iii) and the instructions All filings must: (1) Bear in all capital Dam #1 and would be located on the
on the Commission’s Web site (http:// letters the title ‘‘PROTEST’’ or Red River, in Catahoula Parish,
www.ferc.gov) under the ‘‘e-Filing’’ link. ‘‘MOTION TO INTERVENE;’’ (2) set Louisiana.