Best Practices
Franois LAMY
PTC
Agenda
Introduction
!
Challenges
Process overview
Analyze eBOM
Looking forward :
BOM transformation with
Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information Subject to Change Without Notice
Agenda
Introduction
!
Challenges
Process overview
Analyze eBOM
Looking forward :
BOM transformation with
Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information Subject to Change Without Notice
Introduction - Challenges
Engineering and Manufacturing have
different perspectives of the product
(MANUFACTURING)
mBOM: Assembly
Process Perspective
Plants
Raw Materials /
eBOM
mBOM
equivalent
Assy 1100
Part 100
Assy 1300
Part 300
Assy 1500
Part 100
equivalent
Part 200
Sub-Assemblies
Parts
Assy 1200
Ensuring conformity
!
Control Systems
Hydraulics
Electrical
(ENGINEERING)
eBOM: Functional
System Perspective
Propulsion
eBOM mBOM
eBOM rarely fits mfg constraints
Structure
Part 700
Assy 1500
equivalent
Part 300
Assy 1600
PLANT 2
Part 400
Part 400
Part 500
Part 500
Part 800
2009 PTC
Introduction
Associative eBOM/mBOM Overview
Objective
!
Engineering
eBOM
(As Designed)
equivalent
Assy 1100
Assy 1500
Part 100
Assy 1200
Part 100
equivalent
Part 200
Part 700
Assy 1500
equivalent
Assy 1300
Capabilities:
!
Manufacturing
mBOM
(As Planned)
Part 300
Assy 1600
Part 300
Part 400
Part 400
Part 500
Part 500
PLANT 2
Part 800
Leverage 3D data
Create mBOM from engineering 3D mockup
Dynamically generate a mBOM 3D mockup
Flexibility
Mfg equivalent parts
Plant specific BOMs, alternate BOMs
eBOM
mBOM
Traceability
Bidirectional associativity
2009 PTC
Agenda
Introduction
!
Challenges
Process overview
Analyze eBOM
Looking forward :
BOM transformation with
Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information Subject to Change Without Notice
eBOM
Vehicle eBOM
Manufacturing
Engineer
Frame Assy
Part 1
Part 2
START
Rear Frame
mBOM
Vehicle mBOM
Sub-Assy
Part 1
Part 2
Part 9
Analyze eBOM
Restructure into mBOM
Part 8
Ensure BOM
conformity
Release to production
systems
Rear Frame
END
eBOM
mBOM
2009 PTC
Manufacturing
Engineer
1.2
Open eBOM structure in ProductView for MPMLink
START
1.3
1.0
Analyze eBOM
2.0
1.4
Identify an entire eBOM assembly
3.0Update
and Maintain
mBOM
4.0
End Step 1
Ensure BOM
conformity
5.0
Release to production
systems
END
Forward Looking Information Subject to Change Without Notice
1.4
End Step 1
1.1
Open multi-level eBOM in
MPSE
1.2
Open eBOM structure in
ProductView for MPMLink
1.3
Visualize and Interact with 3D
eBOM mockup
1.4
Identify an entire eBOM
assembly
End Step 1
End Step 1
End Step 1
Manufacturing
Engineer
Start Step 2
2.1
Highlight in ProductView for MPMLink
the parts of this assembly
START
1.0
Analyze eBOM
2.2
2.3
2.0
Build Mfg assembly and sub-assemblies
3.0Update
and Maintain
mBOM
4.0
Ensure BOM
conformity
5.0
Release to production
systems
2.4
Comparison report for BOM conformity
End Step 2
END
Forward Looking Information Subject to Change Without Notice
Start Step 2
2.1
2.2
Create equivalent assembly
2.3
Build Mfg assembly and subassemblies
2.4
End Step 2
Start Step 2
2.1
2.2
Create equivalent assembly
Select New Downstream action to
create an equivalent downstream
Manufacturing assembly
2.3
Build Mfg assembly and subassemblies
2.4
End Step 2
Start Step 2
2.1
2.2
Create equivalent assembly
2.3
Build Mfg assembly and subassemblies
2.4
End Step 2
Start Step 2
2.1
2.2
Create equivalent assembly
2.3
Build Mfg assembly and subassemblies
2.4
End Step 2
Start Step 2
2.1
2.2
Create equivalent assembly
2.3
Build Mfg assembly and subassemblies
2.4
End Step 2
2.1
2.2
Create equivalent assembly
2.3
Build Mfg assembly and subassemblies
2.4
Start Step 2
2.1
2.2
Create equivalent assembly
2.3
Build Mfg assembly and subassemblies
2.4
End Step 2
Start Step 2
2.1
2.2
Create equivalent assembly
2.3
Build Mfg assembly and subassemblies
2.4
End Step 2
Start Step 3
Manufacturing
Engineer
3.1
Select a part in the eBOM not updated
START
3.2
1.0
Analyze eBOM
2.0
and Maintain
mBOM
4.0
Ensure BOM
conformity
3.3
Analyze discrepancies
3.4
Update equivalent link
3.5
Incorporate EBOM changes
5.0
Release to production
systems
END
End Step 3
2009 PTC
3.1
Select a part in the eBOM not
updated
3.2
Launch equivalent compare
panel and report
3.3
Analyze discrepancies
3.4
Update equivalent link
3.5
Incorporate EBOM changes
End Step 3
2009 PTC
3.1
Select a part in the eBOM not
updated
3.2
Launch equivalent compare
panel and report
3.3
Analyze discrepancies
Corresponding clock out of sync
indicator on the downstream BOM
3.4
Update equivalent link
3.5
Incorporate EBOM changes
End Step 3
2009 PTC
3.1
Select a part in the eBOM not
updated
3.2
Launch equivalent compare
panel and report
3.3
Analyze discrepancies
3.4
Update equivalent link
3.5
Incorporate EBOM changes
End Step 3
2009 PTC
3.1
Select a part in the eBOM not
updated
3.2
Launch equivalent compare
panel and report
3.3
Analyze discrepancies
3.4
Update equivalent link
3.5
Incorporate EBOM changes
End Step 3
Downstream equivalent indicator is
updated..
2009 PTC
3.1
Select a part in the eBOM not
updated
3.2
Launch equivalent compare
panel and report
3.3
Analyze discrepancies
3.4
Update equivalent link
3.5
Incorporate EBOM changes
End Step 3
2009 PTC
Manufacturing
Engineer
START
1.0
Analyze eBOM
2.0
Start Step 4
4.1
Select discrepant parts from EBOM and
highlight in the engineering Mock-up
3.0Update
and Maintain
mBOM
4.0
Ensure BOM
conformity
5.0
Release to production
systems
4.2
End Step 4
END
Forward Looking Information Subject to Change Without Notice
Start Step 4
4.1
Select discrepant parts from
EBOM and highlight in the
engineering Mock-up
4.2
End Step 4
Start Step 4
4.1
Select discrepant parts from
EBOM and highlight in the
engineering Mock-up
4.2
End Step 4
Start Step 4
4.1
Select discrepant parts from
EBOM and highlight in the
engineering Mock-up
4.2
End Step 4
Manufacturing
Engineer
START
Start Step 5
5.1
Check in the mBOM
1.0
Analyze eBOM
5.2
2.0
and Maintain
mBOM
4.0
Ensure BOM
conformity
5.3
5.4
Release to ERP (workflow)
5.0
Release to production
systems
End Step 5
END
Forward Looking Information Subject to Change Without Notice
Start Step 5
5.1
Check in the mBOM
5.2
Navigate to the details page
5.3
Change State of the mBOM (top
part) to Released
5.4
Release to ERP (workflow)
End Step 5
Start Step 5
5.1
Check in the mBOM
5.2
Navigate to the details page
5.3
Change State of the mBOM (top
part) to Released
5.4
Release to ERP (workflow)
End Step 5
Start Step 5
5.1
Check in the mBOM
5.2
Navigate to the details page
Can also use Change Request /
Change Notice
5.3
Change State of the mBOM (top
part) to Released
5.4
Release to ERP (workflow)
End Step 5
Start Step 5
5.1
Check in the mBOM
5.2
Navigate to the details page
5.3
Change State of the mBOM (top
part) to Released
5.4
Release to ERP (workflow)
End Step 5
Start Step 5
5.1
Check in the mBOM
5.2
Navigate to the details page
5.3
Change State of the mBOM (top
part) to Released
5.4
Release to ERP (workflow)
End Step 5
eBOM
Vehicle eBOM
Manufacturing
Engineer
START
1.0
Analyze eBOM
2.0
and Maintain
mBOM
4.0
Frame Assy
Part 1
Part 2
Rear Frame
Release to production
systems
mBOM
Vehicle mBOM
Sub-Assy
Part 1
Part 2
Productivity TIPS:
Part 9
Re-use eBOM parts as much as possible Part 8
Rear Frame
Leverage
3D mockup to build the mBOM
Release to production
systems
Stay informed through change process
Standardcreating
integration
to leading
ERPs
When
the
mBOM,
open the eBOM
in themBOM
Selection
tab for
and update
accordingly
Flexible integration framework
side-by-side eBOM/mBOM display
Integral change &
configuration management
Use consume from upstream BOM while defining the
process plan
in order to automatically derive the mBOM
Visual indicators based on
traceability BOM links
Automatic propagation of part
attributes and CAD viewables
Ensure BOM
conformity
5.0
END
eBOM
mBOM
2009 PTC
Agenda
Introduction
!
Challenges
Process overview
Analyze eBOM
Looking forward :
BOM transformation with
Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information Subject to Change Without Notice
Looking Forward
BOM transformation with Windchill MPMLink 10.0
Streamline BOM transformations process
!
2009 PTC
Agenda
Introduction
!
Challenges
Process overview
Analyze eBOM
Looking forward :
BOM transformation with
Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information Subject to Change Without Notice
Summary
Associative eBOM to mBOM transformation
with Windchill MPMLink facilitates :
!
!
Thanks to the PTC cross functional Windchill MPMLink best practices team
for their support in developing this presentation
Pezel, Vladimir; De Nittis, Fabrizio; Farmer, Ed; Arisue, Shinya; Cilia, Giuseppe; Clarke, Roy; Cote, Christian; Fretz, Beat;
Graeb, Robert; Lamy, Francois; Lerch, Martin; Montangon, Pascal; Nien, Simon; Niyonkuru, Jean-Claude;
Rademacher, Klaus; Sambamurthy, Kumarappan; Thibault, Alain; Wetzels, Wolfgang; Yang, Dong; Hedrick, Kevin
Forward Looking Information Subject to Change Without Notice
2009 PTC