PRIMER MODULO
ALBAILERIA:
Levantar muros de ladrillo pandereta y columnas
S/. 5,200.00
Eternit transparente tragaluz
S/.
50.00
Completar parquet
S/.
100.00
Techo aligerado con material noble
S/. 10,200.00
Tarrajeo cielo raso y paredes
S/. 3,300.00
Piso vereda
S/.
400.00
Botar desmonte
S/.
300.00
Movilidad para llevar materiales
S/.
400.00
S/. 19,950.00
CERRAJERIA:
S/. 2,200.00
S/. 1,200.00
S/. 360.00
S/.
60.00
S/. 120.00
S/. 3,940.00
CARPINTERIA:
3 Puertas contra placadas
3 Chapas interiores
S/. 1,200.00
S/.
108.00
S/. 1,308.00
S/.
S/. 5,700.00
30,898.00
S/.31,896.00
MONTO TOTAL:
S/. 62,794.00 -
Descuento
S/.
294.00
S/. 62,500.00
S/.
S/.
S/.
S/.
S/.
2DO PISO:
1 Puerta con plancha y marcos de tubo
650.00
S/.
S/.
S/.
S/.
150.00
S/.
S/.
3ER PISO:
S/.
S/.
4TO PISO:
2 Ventanas sistema NOVA
580.00
2 Protectores de ventana
S/.
S/.
1 Puerta de fierro
650.00
Pasa mano escalera
S/.
S/.
480.00
850.00
S/.
S/.
690.00
5TO PISO:
1 Reja de seguridad con pas
650.00
S/.
S/.11,050.00
S/.
06 Chapas interiores
216.00
S/.
S/.
2,616.00
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.12,585.00
50 bolsas de pegamento
20 bolsas de fraguas
4to piso:
90 metros cuadrados de cermica para sala
45 metros lineales de zcalo
45 metros lineales de rodoplas
45 bolsas de pegamento
20 bolsas de fragua
4to piso azotea cermica y falso piso:
5 metros cbicos de arena gruesa
30 bolsas de cemento
100 metros cuadrados de cermica
45 metros lineales de zcalo
50 bolsas de pegamento
20 bolsas de fragua
5to piso azotea piso pulido
30 bolsas de cemento
05 metros de arena gruesa
MANO DE OBRA
1ER PISO: Cambiar cermica
S/.
120.00
S/.
420.00
S/.
3,500.00
S/.
3,500.00
S/.
1,500.00
S/.
3,500.00
S/.
1,050.00
S/.
1,800.00
S/.
S/. 19,290.00
3,900.00