CRM
UDAAN
UDAAN has been implemented in
several non-CDR SSA of Orissa which
includes Cuttack, Sambalpur and
Balasore. As ascertained from TCS,
Udaan has not yet been incorporated
in CDR Platform. Since the facilities
has already been started in non-CDR
SSA it would invite public resentment
if the SSA are migrated to CDR
without UDAN.
TOP
24-4: Developed in NW. To be deployed.
OR02
T-PIN
Issues like generation of T-pin, NonBooking of faults for Broadband PT
customer, design of smaller size
Page 1
receipts, non-differntiation of
disconnected and shift customers etc.
Genaration of T-PIN. In absence of TPIN the requests lading at call center
for works like change of plan is taking
days to materialize whereas it would
be solved in minutes when T-PIN is
provided.
OR06
MP34
RCLVO
If for shifting , Disconnection order is
completed and reconnection order is
cancelled by field unit and
subsequently by commercial officer
then there is no way to regenerate
same shift order. If we issue
reconnection order then it generate
demand note of ARD and also reach
to outdoor staff as new connection
asking him to provide new extra
instrument. Also same number is not
available for that customer as number
is not visible in vacant phone number
list. Also if customer is having
Broadband connection then BB
reconnection order is not possible at
all. Same is the case of reconnection
after voluntary closure (Equivalent of
RCLVO of DOTSOFT).
Page 2
OR20
SHIFT-CENTREX
How to carry out shifting centrex no.
OR21
SULABH
Modification in local special package is
not allowing e.g.for e-Governance
sulabh to outgoing provision is not
coming .
SE available.
Implemented in NW. Outdoor feasibility
task appears before Disconnection for shift
of old numer
SE available. NW by 10-may (TCS 15-4
ltr)
Presently CENTREX shift with in exchange
(MSU) does not leads to Centrex facility
disconnection.
Centrex shift within exchange (MSU and
loosely coupled RSU) will be managed
without centrex facility disconnection. In
tightly coupled RSU CENTREX facility will
always have to be disconnected. This
amendment is scheduled in the month of
May'10.
RESOLVED
This is a plan reconfiguration request. Any
plan/package/tarriff configuration changes
can be handled by the O&M team through
the SM CR process. This is not to be
handled by the end users themselves.
ITPC has confirmed that the issue is
resolved as below:
RCLNP
MP32
OR23
PENDING IN NW
Solution implemneted in South and East.
To be deployed in North-West by 30th
April'10.
Address change request from Clarity is
implemented in NW
Page 3
OR25
WETTU
For North east employee rent free
service plan "WETTU" for their family
is not in CDR.
OR26
JK02
WAITING LIST
The waiting list provided in CDR
system is available exchange wise and
is in random order i.e., it is not
sorted.
We wish to have the Waiting List
listed in chronological order i.e, oldest
pendency at the top & ending with the
recent pendency at the bottom
exchange wise so that we can look
into and take necessary action to
clear old waiting list.
JK04
SHIFT-INTER EXCH
Inter-exchange shift of wire line
telephone connection:
JK06
USAGE CODE
MP33
MP42
RESOLVED
As per ITPC, issue resolved.
RESOLVED
As per ITPC, issue resolved.
PENDING
Waitlist can be sorted out in chronological
order.
Solution is being re-checked.
CLOSED
No change required.
PENDING
CSR can change the plan however, this
change is not reflected in CRM.
Usage code change is not reflected in CRM
(Assets)
JK10
INSTRUMENT TYPE
Type of Instruments available with
customer:- At the time of migration of
the data of customer from Dotsoft to
CDR system, the type of instrument
Page 4
JK12
FREE PHONE
CLOSED
Available in SE and NW
RESOLVED
While creation of shift order , If customer
exchange is urban and new exchange is
rural (or vice-versa) then there will be
prompt in service order which will prompt/
popup for creation of new billing account.
On confirmation of that popup, new billing
account will be created automatically and
will come in billing account field of shift
reconnection order.
SHIFT-URBAN-RURAL
Shift from urban to rural exchange
and vice versa:
It is observed that
when we enter the request received
for shift of telephone connection from
urban to rural area in CDR system,
the system gives installation type
mismatch error in place of issue of
work order. The work process in
system need be modified suitably so
that this type of shift work orders can
be issued and complied.
Misc09
RETENTION OFFICERS
PENDING
MP44
UW20
Page 5
Misc14
REFUND
PENDING
MP36
KA16
Misc30
CRM OUTAGE
Frequent outage of CRM application
has been observed
SMS ALERTS
IMPLEMENTED
Page 6
Misc31
PENDING
RA01
RA20
FTTH
RA02
WIMAX
CLOSED
RA20
UPE05
NTC
RESOLVED
LOCALITY SUBLOCALITY
MH03
RA07
MH05
Page 7
MH07
MH09
ISDN
RESOLVED
RESOLVED
MP01
RESOLVED
MP04
QUARANTINE NOS
RESOLVED
UW14
MH
MP05
Page 8
MP08
WRITE OFF
PENDING
TN05
MP09
MP16
MP11
CORAL EPABX
PENDING
BILLDESK 1% DISCOUNT
MP12
INACTIVE PLANS
RESOLVED
Page 9
MP14
RESOLVED
2.124
UW14
OLD OUTSTANDINGS
HUNTING CONTINUOUS
NUMBERS for Corporate Customers
PENDING IN NW
DSPT
PENDING IN NW
UW13
MP54
PENDING IN NW
Available in SE.
To be available in NW by 23-apr
PENDING IN NW
On Rental Basis
Available in SE.
At NW by 23-apr (TCS ltr 15-4)
Page 10
MP18
PENDING IN NW
Available in SE.
At NW by 10-may (TCS ltr 15-4)
PENDING IN NW
Available in SE.
At NW by 23-apr (TCS ltr 15-4)
WLL
CLOSED
Not to be available in CDR project.
Currently available only in HYD.
EVDO / NIC
CLOSED
Since MSC based WLL is being migrated to
GSM, this will not be available
UW19
AREA TRANSFER
PENDING
MP27
MP37
MP40
MP45
PENDING
PENDING
Page 11
RESOLVED
MP56
RESOLVED
MP62
PENDING
RA05
RA11
RESOLVED
PENDING
MP47
TN16
TN20
TN21
Page 12
TN22
BROADBAND
JK05
20% CONCESSION
MP06
UE03
MH08
UW18
PENDING
This scheme is available for new
connection.
For existing customers this scheme should
be available in "Modify Order". The
solution for the same shall be available
by 30th April'10.
The new account type/subtype and
scheme are under configuration. If the
eligibility changes due to account status
change, it requires creation of new
account and transfer of service and
transfer of outstanding through
adjustment process.
Page 13
MP50
PENDING
MP57
PENDING
MP51
PENDING
MP52
PENDING
UT
Meena to reply
JK13
MP10
UW02
Page 14
CLOSED
UW16
BBOVPN
Misc01
MP03
PENDING
Validation completed in NW. However for
NME plan advance 25% collection feature
is not implemented
(A) NME billing NOT implemented.
resolved
UPE01
KA24
MP07
BROADBAND PREPAID
PENDING ITPC
UT
UW09
Page 15
Portal ID is not
getting updated in Clarity ( error
message coming field can not be
updated ) further the user id
generated in CRM is having more
characters than required in manual
creation in Prepaid BB at NOC.
of Prepaid Broadband.
MP15
AP05
PENDING
PREPAID BB
Bothway conversion
OR24
RESOLVED
As below:
In NW Software bug identified and flow
corrected
MP02
PENDING
Page 16
MH06
OR09
OR10
CLOSED
MODEM SALE
No service order for sold modem in
deposite case(due to modem fault/out
of warranty)
CLOSED
BB Complaint can be booked regarding
faulty modem in case of any issues. The
outdoor person can verify the sale receipt
for warranty validation and replace the
modem if it is in warratny and necessary.
SHIFT-PORT BINDING
On shift across exchanges /same
exchange the port binding is not
getting refreshed.And for this BB
network change is getting "X"or"Y"
automatically in arbitrary manner.
BROADBAND OVER EPABX
Pending as on 24-04-10
PENDING
SE Available. At NW by 10-may(TCS ltr dt.
15-4)
UW09
UW03
CLOSED
SE and NW available.
PENDING
Page 17
COMPLAINT HANDLING
Last 3 months
SE Available. Implemented in NW
Validation pending
CLOSED
CLOSED
PENDING
MH12
UT
CLOSED
MP48
CLOSED
JK18
CLOSED
UW04
UT
UW05
UW21
SE and NW available
Page 18
TN18
TN12
UT
UT
Resolved in SE
12)Problem in viewing
usage/summary details in PMS
Module( especially in CSCs, this
facility is required for the supply of
details to customers)
OR18
RESOLVED
The reports on faults are refreshed
periodically every 2 hrs and hence there is
possibility to see different status between
the Clarity system and ER report.
However, if specific data is provided any
further issues can be investigated by Data
Page 19
Misc04
UT
UW01
MP58
PENDING
JK20
??
OR07
FAULT HANDLING
BB fault booking for PT customer(W/o
BB)is not possible.It must be taken
care of urgently.
CLOSED
JK11
UE04
PENDING
CLOSED
MH10
Page 20
required.
MP41
TN19
O&M ISSUE
Pending
REPORTS
MP21
PENDING
MP29
PENDING
24.4.10-CRM has to initiate the process to
generate the list. The module is developed
and likely to be deployed in NWSE.
OR04
CLOSED
Reports are available for NPC, Fault in ER. But
Plan change and Facility Activation are new
report requirements. ITPC to examine and
forward the requrirement to SI.
For daily fault, new provision,TRA Disc./Rec.,
reports are available for daily faults in Clarity,
New Provision in ER and Analytics and
DISC/Reconnection reports in ER.
Presently 88 reports are available and their
content is being published separately.
For taking care of the more reporting
requriement on Ad-HOC basis, it has been
decided to form one core group from BSNL side
at Hyderabad for South and East zone. TCS has
Page 21
Misc05
UPE07
MH01
MH02
MH11
There is no validation/consistency
check in CRM in realtime due to which
the Workorders are held up in CRM
and does not reach CLARITY. The rate
of failure is very high. This needs to
be reviewed and till it is not CLOSED,
the admin level front end may be
provided to SSA to Cancel/Resubmit
the held up orders to avoid delay in
work execution. It has been observed
that in many cases, order reach
CLARITY on resubmission without any
change in inputted data
CLOSED
CLOSED
CLOSED
CLOSED
Page 22
TN23
KA
UT
USO REPORTS
CLOSED
UT
UW07
PENDING
2.126
MP19
PENDING
KA12
PENDING
KA13
KA14
In the same
used.
AO Cash also can take a list of cases received for refund with split up of Cheques
CDR PROJECT-FEATURE_ISSUE List-TKS-V1_5.doc
Page 23
pending
KA19
KA22
Pending.
MP24
MP25
MP26
TN24
TN25
Pending.
TN26
d)Requirement of generation of
Reports on SDCA wise or DE wise.
(SD29610). This is important because
Page 24
TN27
TN28
TN29
TN30
OR13
UW12
OR17
TN03
JK03
JK09
UW10
TN11
UT
Misc12
PENDING
Misc17
JK
Misc25
Misc26
Page 26
feedback.
Misc28
Misc29
RESOLVED
KA23
Misc24
Page 27
Misc25
2.87
PCO BILL
PCO bills as generated cannot be sent
and manual bill will need to be
generated to overcome the
deficiencies. The issues pointed out
should be sorted out in the next week
if the same issue is not to repeat at
Hasan.
KA02
GROUP BILL
PENDING
UW17
KA04
PT BILL
CLOSED
Page 28
respect of PCOs.
KA05
RESOLVED
Text modified to exclude discount word.
KA06
KA07
CLOSED
Page 29
KA07
KA09
MP39
MP59
CLOSED
Page 30
MP60
MP61
charged.
CLOSED
PENDING
KA17
KA18
CLOSED
KA20
Not available
RA14
Page 31
accounting is in GSM.
TN04
CLOSED
TN08
TN09
Under progress.
UT
OR11
Misc03
RA17
BILLING COMPLAINTS
For the the Node-incharge: to comply with
billing complaints of CDR customers, it is
not getting possible to extract the billing
data along with VLAN and MAC as possible
in P3
No mention of telephone number on first
page of bill in BB cases
PENDING
Circle specific plans approved by BSNL CO
are being incorporated. During migration
SSA/ITPC/TCS to ensure that all such
plans are migrated.
Page 32
OR08
OR12
CLOSED
Instructions in respect of standardization of
format and size of receipt has been issued from
CFA-IT corporate office. Circles/SSAs to follow
the same.
CLOSED
In CDR, the customer has provision to pay more
or less than the invoiced amount. Therefore,
the system can not judge the change to be
returned unless the cashier enters both the
amounts (amount intended to be paid by the
customer and amount given by the customer)
leading to more cumbersome actions.
Requirement is not necessary and hence not
considered for deployment .
Misc11
RA16
KA25
CLOSED
CLOSED in CDR
around 10th
happens
database-wise.
already
been
made
available
Page 34
TN13
TN14
OR14
OR15
CLOSED
Issue of not openin
g a web-site is not related to CDR system. Circle
to take up with the concerned group.
PENDING
Solution shall be ready for validation by ITPC
before 23rd April'10. Same shall be deployed
before 27th April'10.
PENDING
Solution shall be ready for validation by ITPC
before 15th April'10. Same shall be deployed
before 25th April'10.
OR16
UPE06
CLOSED
CLOSED
RESOLVED
AP01
AP02
Page 35
MP30
AP03
BB USAGE DETAILS
CLOSED
AP04
AP07
UW11
PENDING
BB USAGE DETAILS
CLOSED
Page 36
MP43
Misc06
MP35
Misc07
Misc10
Misc02
PENDING
ITPC TO CHECK
This is available. To check in North zone by GM
ITPC.
CLOSED
This facility is available. ITPC to check in North
and East.
Large number of PRI are not required. The
requirement is of different DNIS from
different circles. Multiple DNIS can be
provided on the same PRI also, which will
help us in limiting the number of PRIs.
With different DNIS coming, system can
generate the report circle wise based on
the DNIS.
Page 37
Misc19
UNBILLED ACCOUNTS
Misc20
RECONCILIATION: CRM-BILLING
Pending Reconciliation of the CRM,
Billing, etc in the CDR system
Misc08
Page 38
Page 39