Académique Documents
Professionnel Documents
Culture Documents
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
3.30
3.05
Comment.
2.68
1.54
If there is an option for either reaction units or impulse units, select impulse if water silty, or if
reaction runner diameter less than about 1.4m. Also, if option available, reaction unit DOES INCLUDE
a turbine inlet valve for direct cost comparison.
89.69
76.51
Comment
Page 1.
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
PERENTAK
Comment
Reaction turbine selection to include powerhouse costs, ancilliary equipment and effect of
tailwater level.
Additional input data.
Unit cost of overburden excavation, $/m3.
25
Unit cost of rock excavation, $/m3.
100
Unit cost of concrete, including forms and reinforcing, $/m3.
750
Unit cost of walls and roof, $/m2.
100
Unit cost of steel in superstructure, $/ton.
5,000
Average rock level at powerhouse, elevation, m.
190.0 Comment
Average depth of overburden at powerhouse, m.
2.0
Powerhouse statistics.
Overburden excavation volume, m3.
Rock excavation volume, m3.
Concrete volume, m3.
Additional concrete required to counter floatation, m3.
Steel superstructure weight, metric tonnes.
Powerhouse length, m.
Powerhouse footprint area, m2.
Distance between unit centerlines, m.
Approximate turbine floor level, Elevation, m.
Draft tube sill level, elevation, m.
Comment
2.68 Comment
Reaction unit. Impulse unit.
2.87
1.67
3.30
3.05
Page 2.
If SAXO, shaft
slope, degrees
PERENTAK
Efficiencies of selected units. (reaction with powerhouse)
Percent of rated flow.
Calc. flow and efficiency at 100 % rated flow
=
Calc. flow and efficiency at 95 % rated flow
=
Calc. flow and efficiency at 90 % rated flow
=
Calc. flow and efficiency at 85 % rated flow
=
Calc. flow and efficiency at 80 % rated flow
=
Calc. flow and efficiency at 75 % rated flow
=
Calc. flow and efficiency at 70 % rated flow
=
Calc. flow and efficiency at 65 % rated flow
=
Calc. flow and efficiency at 60 % rated flow
=
Calc. flow and efficiency at 55 % rated flow
=
Calc. flow and efficiency at 50 % rated flow
=
Calc. flow and efficiency at 45 % rated flow
=
Calc. flow and efficiency at 40 % rated flow
=
Calc. flow and efficiency at 30 % rated flow
=
Calc. flow and efficiency at 20 % rated flow
=
Efficiency %
100
80
60
40
20
20
30
40
50
60
Comment
0
70
80
Flow ratio %
100
95
90
85
80
75
70
65
60
55
50
45
40
30 90
20
100
Efficiency %
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
85
75
65
20
30
40
50
60
Flow ratio %
70
80
90
100
Page 3.
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
PERENTAK
If the recommended turbine is not satisfactory, a second recommendation (based on cost) can be
obtained by eliminating the recommended turbine from consideration with a zero (0) placed opposite
the recommended turbine in Column E. Suitable turbines are shown in column D.
REACTION TURBINES
Column D
Column E
Propeller turbines
Horizontal axis "S" type propeller turbine.
Horizontal axis pit type propeller turbine.
Vertical axis propeller turbine, concrete casing.
Vertical axis propeller turbine, steel casing.
---------------------------------------------------------------------
1
1
1
1
Kaplan turbines
Inclined axis very low head Kaplan gear turbine.
Horizontal axis pit or mini bulb Kaplan turbine unit.
Horizontal axis "S" type Kaplan turbine.
Vertical axis small Kaplan turbine, elbow draft tube.
Vertical or inclined axis "Saxo" axial flow Kaplan turbine.
Vertical axis Kaplan turbine, concrete casing.
Vertical axis Kaplan turbine, steel casing.
------------------------------------------------------------------------------------------------------------------------
1
1
1
1
1
1
1
Francis turbines.
Horizontal axis Francis turbine.
Horizontal axis double runner Francis turbine.
Vertical axis Francis turbine, concrete casing.
Vertical axis Francis turbine, steel casing.
1
1
1
1
IMPULSE TURBINES
Horizontal axis low head impulse turbines.
Horizontal axis BANKI (Ossberger) turbine.
Horizontal axis, 1 jet, 1 turgo runer turbine.
Horizontal axis, 2 jet, 1 turgo runner turbine.
Comment
---- YES ------- YES ------- YES ----
Comment
--------------------- YES ------- YES ------- YES ----
-------------------------------------------------------------------------------------------------------
Comment
1
1
1
1
1
1
1
1
1
1
1
1
1
Page 4.
PERENTAK
290.00
288.00
186.00
4.00
2
Basic input
data
HYDROHELP 1
Reaction unit.
Impulse unit.
3.30
3.05
Reaction unit.
Impulse unit.
2.68
1.54
Transformer cost.
Powerplant capacity, MW.
Generator power factor.
Number of transformers
Transformer high voltage. kV
Transformer MVA
Number of phases.
Phase factor
Inflation index Transformer cost $M
Approximate weight, tons.
30.00
0.90
1
25
33
3
1
7.07
1.182
29
0.20
0.90
1.00
13.8
0.22
3
1
7.07
0.193
8
Transformer cost.
Powerplant capacity, MW.
Generator power factor.
Number of transformers
Transformer high voltage. kV
Transformer MVA
Number of phases.
Phase factor
Inflation index - (Mech equip L4)
Transformer cost $M
Approximate weight, tons.
30.00
0.90
1
25
33
3
1
7.07
1.182
29
0.20
0.90
1.00
13.8
0.22
3
Phase factor
Inflation index
Transformer cost $M
Approximate weight, tons.
1
7.07
0.193
8
104.00
3,500
0.6
17.4
This sheet is
protected. To
remove protection,
password is open
Estimated
cost
$M
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.68
0.00
0.00
0.00
1.54
6.04
4.70
0.00
4.90
6.29
5.40
Comment
Comment
Comment
0.00
0.00
0.00
0.00
0.00
0.00
Inflation
ratio
correction
factor
1.810 Comment