Vous êtes sur la page 1sur 3

Federal Register / Vol. 72, No.

84 / Wednesday, May 2, 2007 / Notices 24353

respective projects. Within the limits of 827–4565 to receive the toll free number SUPPLEMENTARY INFORMATION: Notice is
and adjacent to the study area, there are and pass code needed to participate in hereby given that FTA has taken final
biological resources, cultural resources, this meeting by telephone. agency actions by issuing certain
agricultural lands, cross-border STATUS: Open to the public. approvals for the public transportation
concerns, and potential growth issues. MATTERS TO BE CONSIDERED: The Unified projects listed below. The actions on
In addition to the no action Carrier Registration Plan Board of these projects, as well as the laws under
alternative, there are alternatives for two Directors (the Board) will continue its which such actions were taken, are
proposed corridors to two POE locations work in developing and implementing described in the documentation issued
under consideration. the Unified Carrier Registration Plan in connection with the project to
Letters describing the proposed action and Agreement and to that end, may comply with the National
and soliciting comments will be sent to consider matters properly before the Environmental Policy Act (NEPA), and
appropriate federal, state, and local Board. in other documents in the FTA
agencies, and to private organizations administrative record for the project.
and citizens who have previously FOR FURTHER INFORMATION CONTACT: Mr. The final agency environmental
expressed or are known to have interest Avelino Gutierrez, Chair, Unified decision documents—Records of
in this proposal. A public scoping Carrier Registration Board of Directors at Decision (ROD) or Findings of No
meeting will be held at an appropriate (505) 827–4565. Significant Impact (FONSI)—for the
location in or near Otay Mesa in June Dated: April 25, 2007. listed projects are available online at
2007. In addition, a public hearing will William A. Quade, http://www.fta.dot.gov/planning/
be held. Public notice will be given of Acting Associate Administrator for environment/
the time and place of the meeting and Enforcement and Program Delivery. planning_environment_documents.html
hearing. The draft PEIS will be available [FR Doc. 07–2181 Filed 4–30–07; 12:49 pm] or may be obtained by contacting the
for public and agency review prior to BILLING CODE 4910–EX–P
FTA Regional Office for the
the public hearing. metropolitan area where the project is
To ensure that the full range of issues located. Contact information for the
related to this proposed action are DEPARTMENT OF TRANSPORTATION FTA Regional Offices may be found at
addressed and all significant issues http://www.fta.dot.gov.
identified, comments and suggestions Federal Transit Administration This notice applies to all FTA
are invited from all interested parties. decisions on the listed projects as of the
Comments or questions concerning this Notice of Limitation on Claims Against issuance date of this notice and all laws
proposed action and the PEIS should be Proposed Public Transportation under which such actions were taken,
directed to FHWA and/or Caltrans at the Projects including, but not limited to, the
addresses provided above. The views of National Environmental Policy Act
AGENCY: Federal Transit Administration
the agencies having knowledge about (NEPA) [42 U.S.C. 4321–4375], Section
(FTA), DOT. 4(f) of the Department of Transportation
the historic resources potentially
ACTION: Notice of Limitation on Claims. Act of 1966 [49 U.S.C. 303], Section 106
affected by the proposal or interested in
the effects of the project on historic SUMMARY: This notice announces final of the National Historic Preservation Act
properties are solicited. environmental actions taken by the [16 U.S.C. 470f], and the Clean Air Act
Federal Transit Administration (FTA) [42 U.S.C. 7401–7671q].
(Catalog of Federal Domestic Assistance The projects and actions that are the
Program Number 20.205, Highway Planning for public transportation projects in the
subject of this notice are:
and Construction. The regulations following metropolitan areas: Eugene, 1. Project name and location: Bus
implementing Executive Order 12372 Oregon; Fort Myers, Florida; Houston,
regarding intergovernmental consultation of Rapid Transit System Improvements for
Texas; and New York, New York. The the Pioneer Parkway Corridor; Eugene,
federal programs and activities apply to this purpose of this notice is to announce
program.) Oregon. Project sponsor: Lane Transit
publicly the environmental decisions by District (LTD). Project description: The
Issued on: April 23, 2007. FTA on the subject projects and to Pioneer Parkway bus rapid transit (BRT)
Steve Healow, activate the limitation on any claims project consists of construction of 5.2
Project Development Engineer, Federal that may challenge these final miles of exclusive transit lanes and 14
Highway Administration, Sacramento, environmental actions. transit stations. The southern part of the
California. DATES: By this notice, FTA is advising project alignment would follow Pioneer
[FR Doc. E7–8444 Filed 5–1–07; 8:45 am] the public of final agency actions Parkway, utilizing portions of an
BILLING CODE 4910–22–P subject to Title 23, United States Code abandoned railroad right-of-way. The
(U.S.C.), section139(l). A claim seeking existing pedestrian and bicycle path in
judicial review of the FTA actions this corridor will be maintained. Along
DEPARTMENT OF TRANSPORTATION announced herein for the listed public the northern loop, a single lane will be
transportation projects will be barred located in the median of Martin Luther
Federal Motor Carrier Safety
unless the claim is filed on or before King Jr. Parkway. On RiverBend Drive
Administration
October 29, 2007. and International Way, the BRT buses
Sunshine Act Meetings; Unified Carrier FOR FURTHER INFORMATION CONTACT: will operate in the median. On Gateway
Registration Plan Board of Directors Joseph Ossi, Environmental Protection Street and Harlow Road, the BRT buses
Specialist, Office of Planning and will operate in mixed traffic. Final
AGENCY: Federal Motor Carrier Safety Environment, 202–366–1613, or agency actions: FONSI issued on
Administration (FMCSA), DOT. Christopher Van Wyk, Office of Chief December 22, 2006; Section 106 Finding
ycherry on PROD1PC64 with NOTICES

TIME AND DATE: May 21, 2007, 11 a.m. to Counsel, 202–366–1733. FTA is located of No Adverse Effect; project-level Air
2 p.m., Eastern Daylight Time. at 1200 New Jersey Avenue, SE., Quality Conformity determination.
PLACE: This meeting will take place Washington, DC 20590. Office hours are Supporting documentation:
telephonically. Any interested person from 9 a.m. to 5:30 p.m., e.t., Monday Environmental Assessment: Bus Rapid
may call Mr. Avelino Gutierrez at (505) through Friday, except Federal holidays. Transit System Improvements for the

VerDate Aug<31>2005 18:42 May 01, 2007 Jkt 211001 PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 E:\FR\FM\02MYN1.SGM 02MYN1
24354 Federal Register / Vol. 72, No. 84 / Wednesday, May 2, 2007 / Notices

Pioneer Parkway Corridor issued in at Burnett Street. Final agency actions: will be located on the south side of
September 2006. ROD issued on February 2, 2007; Liberty Street between Route 9A and
2. Project name and location: LeeTran Section 4(f) finding; Section 106 Greenwich Street. The roof of the
Transit Facility; Fort Myers, Florida. Memorandum of Agreement; project- facility will be at street-level and will be
Project sponsor: Lee County Transit level Air Quality Conformity the base of the future Liberty Park and
(LeeTran). Project description: The determination. Supporting St. Nicholas Church. The security center
project is the construction of a new documentation: North Corridor Fixed will be located underground on the B1
transit facility for LeeTran, which Guideway Project: Final Environmental level. Once vehicles have been properly
would house administrative functions, Impact Statement issued on December screened, those that comply with
service operations, and bus maintenance 29, 2006. security standards will be directed to a
functions and facilities. The facility 5. Project name and location: common ramp structure. The vehicles
would also accommodate passenger Southeast Corridor Fixed Guideway that do not meet the requirements of the
transfers and a customer service area. Transit Project; Houston, Texas. Project security screen will be exited onto
Final agency actions: FONSI issued on sponsor: Metropolitan Transit Authority
Liberty Street. Authorized trucks, buses,
August 31, 2006; Section 106 Finding of of Harris County (METRO). Project
and automobiles will continue
No Historic Property Affected. description: The project is the
downward through the B2 level to the
Supporting documentation: Final construction of a Bus Rapid Transit
Environmental Assessment: LeeTran (BRT) line that will operate between B3 level of the WTC site. The B3 level
Transit Facility, July 2006. downtown Houston and a terminus on will include a consolidated loading area
3. Project name and location: METRO Griggs Road at Beekman Road east of beneath Towers 3 and 4 as well as tour
Intermodal Terminal; Houston, Texas. Martin Luther King Boulevard, a bus parking. The project will also
Project sponsor: Metropolitan Transit distance of approximately 6 miles. The include ancillary facilities and systems,
Authority of Harris County (METRO). BRT line will connect downtown such as employee spaces, mechanical
Project description: The project is the Houston with the universities area rooms, emergency egress, and
construction of a multimodal, multi-use, including Texas Southern University ventilation structures. Final agency
multi-story transit facility adjacent to and the University of Houston, and the actions: FONSI issued on January 26,
the Near Northside neighborhood of Palm Center. The BRT service will 2007; Section 4(f) finding; Section 106
downtown Houston. It will act as a operate in diamond lanes in downtown Memorandum of Agreement. Supporting
major transit hub for the area, enabling from Louisiana to Polk Street and in documentation: Environmental
transit riders to transfer easily between exclusive transit lanes on Scott Street, Assessment: WTC Vehicular Security
the different modes of transit. The Wheeler Street, Martin Luther King Center and Tour Bus Parking Facility,
facility will house passenger waiting Boulevard, and Griggs Road to the November 2006.
and transfer facilities; bicycle storage terminus at Beekman Road. The project 7. Project name and location: Long
facilities; and passenger and driver includes 11 BRT stations. Final agency Island Rail Road East Side Access—50th
amenities, including parking, public actions: ROD issued on February 6, Street Facility; New York, New York.
restrooms, and retail space. Final agency 2007; Section 4(f) finding; Section 4(f) Project sponsors: Metropolitan
action: FONSI issued on January 10, de minimis impact finding; Section 106 Transportation Authority, Long Island
2007; Section 4(f) finding; Section 106 Memorandum of Agreement; project- Rail Road (LIRR). Project description:
Memorandum of Agreement. Supporting level Air Quality Conformity The project is a new above-ground
documentation: Final Environmental determination. Supporting structure on East 50th Street housing the
Assessment: Intermodal Terminal, documentation: Southeast Corridor ventilation equipment, ventilation
December 2006. Fixed Guideway Project: Final
4. Project name and location: North shafts and openings, emergency
Environmental Impact Statement issued generators, and a loading dock for the
Corridor Fixed Guideway Transit on January 5, 2007.
Project; Houston, Texas. Project name LIRR East Side Access (ESA) project.
6. Project name and location: World
and sponsor: Metropolitan Transit Trade Center Vehicular Security Center The facility is a modification of the
Authority of Harris County (METRO). and Tour Bus Parking Facility; New original design of the LIRR ESA project
Project description: The project is the York, New York. Project name and presented in its Final Environmental
construction of approximately 5.5 miles sponsor: Port Authority of New York Impact Statement of March 16, 2001. A
of fixed guideway transit consisting of: and New Jersey. Project description: The new building replacing the existing
(1) An extension of the existing light rail World Trade Center (WTC) Vehicular buildings at the project site will house
transit (LRT) Red line from the Security Center and Tour Bus Parking the ventilation facility, loading docks,
University of Houston-Downtown Facility to be constructed at Ground and freight elevators. The sub-
Station to the new Burnett Station Zero in Lower Manhattan will provide basements below the new surface
following the North Main Street right-of- security precautions to protect new structure will connect to the new LIRR
way; and (2) from the Burnett Station, public investments at the WTC site. The concourse and tunnels that are part of
a new Bus Rapid Transit (BRT) line, project will also include a subsurface the ESA project. At street level, an area
proceeding north on North Main Street parking facility to serve tour buses of open space and a through drive from
in mixed flow traffic for 0.3 mile and bringing visitors to the memorial at the 49th Street to 50th Street are included
then entering an exclusive guideway in WTC site. The security center will in the design. The project also includes,
the middle of North Main Street. The provide off-street screening of buses, on an adjacent building, a cooling tower
BRT line will continue north in the trucks, and automobiles entering the and a chase to house conduits and
North Main Street right-of-way to WTC site. The visible security location pipes. Final agency actions: FONSI
Boundary Street, where it will turn east will lend a level of protection against issued on July 27, 2006; Section 106
ycherry on PROD1PC64 with NOTICES

and follow Boundary Street to Fulton threats to the WTC site. The project will Amended Programmatic Agreement.
Street. At Fulton Street, the BRT Line also allow delivery truck access to Supporting documentation: Revised
will turn north and proceed to Northline subgrade loading areas for Towers 3, 4, Supplemental Environmental
Mall. The project includes six at-grade and 5 on the WTC site. The project will Assessment, LIRR East Side Access 50th
transit stations and one elevated station be built on 4 levels. The entrance/exit Street Facility, April 2006.

VerDate Aug<31>2005 18:42 May 01, 2007 Jkt 211001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\FR\FM\02MYN1.SGM 02MYN1
Federal Register / Vol. 72, No. 84 / Wednesday, May 2, 2007 / Notices 24355

Issued on: April 25, 2007. formal expressions of intent to file an By the Board, David M. Konschnik,
Susan Borinsky, OFA under 49 CFR 1152.27(c)(2),2 and Director, Office of Proceedings.
Associate Administrator for Planning and trail use/rail banking requests under 49 Vernon A. Williams,
Environment, Washington, DC. CFR 1152.29 must be filed by May 17, Secretary.
[FR Doc. E7–8446 Filed 5–1–07; 8:45 am] 2007. Petitions to reopen or requests for [FR Doc. E7–8352 Filed 5–1–07; 8:45 am]
BILLING CODE 4910–57–P public use conditions under 49 CFR BILLING CODE 4915–01–P
1152.28 3 must be filed by May 29, 2007,
with: Surface Transportation Board, 395
DEPARTMENT OF TRANSPORTATION E Street, SW., Washington, DC 20423– DEPARTMENT OF TRANSPORTATION
0001.
Surface Transportation Board A copy of any petition filed with the Surface Transportation Board
[STB Docket No. AB–6 (Sub-No. 455X)] Board should be sent to BNSF’s [STB Docket No. AB–290 (Sub-No. 287X)]
representative: Sidney L. Strickland, Jr.,
BNSF Railway Company— Sidney Strickland and Associates, Norfolk Southern Railway Company—
Abandonment Exemption—in Stearns PLLC, 3050 K Street, NW., Suite 101, Abandonment Exemption—in
County, MN Washington, DC 20007. Brunswick County, VA
If the verified notice contains false or Norfolk Southern Railway Company
BNSF Railway Company (BNSF) has
misleading information, the exemption (NSR) has filed a notice of exemption
filed a notice of exemption under 49
is void ab initio. under 49 CFR 1152 Subpart F—Exempt
CFR 1152 Subpart F—Exempt
BNSF has filed environmental and Abandonments to abandon a 5.00-mile
Abandonments to abandon a 0.79-mile
historic reports which address the line of railroad between mileposts FD
line of railroad between milepost 16.21
effects, if any, of the abandonment on 90.20 and FD 95.20, in Lawrenceville,
and milepost 17.00, near Cold Spring, in
the environment and historic resources. Brunswick County, VA. The line
Stearns County, MN. The line traverses
SEA will issue an environmental traverses United States Postal Service
United States Postal Service Zip Code
assessment (EA) by May 11, 2007. Zip Code 23868 and includes the former
56320.
Interested persons may obtain a copy of station of Lawrenceville.
BNSF has certified that: (1) No local
the EA by writing to SEA (Room 1100, NSR has certified that: (1) No local
traffic has moved over the line for at
Surface Transportation Board, traffic has moved over the line for at
least 2 years; (2) there is no overhead
Washington, DC 20423–0001) or by least 2 years; (2) any overhead traffic
traffic on the line; (3) no formal
calling SEA, at (202) 245–0305. can be rerouted over other lines; (3) no
complaint filed by a user of rail service
[Assistance for the hearing impaired is formal complaint filed by a user of rail
on the line (or by a state or local
available through the Federal service on the line (or by a State or local
government entity acting on behalf of
Information Relay Service (FIRS) at 1– government entity acting on behalf of
such user) regarding cessation of service
800–877–8339.] Comments on such user) regarding cessation of service
over the line either is pending with the
environmental and historic preservation over the line either is pending with the
Surface Transportation Board or with
matters must be filed within 15 days Surface Transportation Board or with
any U.S. District Court or has been
after the EA becomes available to the any U.S. District Court or has been
decided in favor of complainant within
public. decided in favor of complainant within
the 2-year period; and (4) the
Environmental, historic preservation, the 2-year period; and (4) the
requirements of 49 CFR 1105.7
public use, or trail use/rail banking requirements of 49 CFR 1105.7
(environmental report), 49 CFR 1105.8
conditions will be imposed, where (environmental report), 49 CFR 1105.8
(historic report), 49 CFR 1105.11
appropriate, in a subsequent decision. (historic report), 49 CFR 1105.11
(transmittal letter), 49 CFR 1105.12
Pursuant to the provisions of 49 CFR (transmittal letter), 49 CFR 1105.12
(newspaper publication), and 49 CFR
1152.29(e)(2), BNSF shall file a notice of (newspaper publication), and 49 CFR
1152.50(d)(1) (notice to governmental
consummation with the Board to signify 1152.50(d)(1) (notice to governmental
agencies) have been met.
As a condition to this exemption, any that it has exercised the authority agencies) have been met.
employee adversely affected by the granted and fully abandoned the line. If As a condition to this exemption, any
abandonment shall be protected under consummation has not been effected by employee adversely affected by the
Oregon Short Line R. Co.— BNSF’s filing of a notice of abandonment shall be protected under
Abandonment—Goshen, 360 I.C.C. 91 consummation by May 7, 2008, and Oregon Short Line R. Co.—
(1979). To address whether this there are no legal or regulatory barriers Abandonment—Goshen, 360 I.C.C. 91
condition adequately protects affected to consummation, the authority to (1979). To address whether this
employees, a petition for partial abandon will automatically expire. condition adequately protects affected
revocation under 49 U.S.C. 10502(d) Board decisions and notices are employees, a petition for partial
must be filed. available on our Web site at http:// revocation under 49 U.S.C. 10502(d)
Provided no formal expression of www.stb.dot.gov. must be filed.
intent to file an offer of financial Decided: April 26, 2007. Provided no formal expression of
assistance (OFA) has been received, this intent to file an offer of financial
exemption will be effective on June 6, of-Service Rail Lines, 5 I.C.C.2d 377 (1989). Any assistance (OFA) has been received, this
2007, unless stayed pending request for a stay should be filed as soon as possible exemption will be effective on June 1,
so that the Board may take appropriate action before 2007, unless stayed pending
reconsideration. Petitions to stay that do the exemption’s effective date.
not involve environmental issues,1 2 Each OFA must be accompanied by the filing reconsideration. Petitions to stay that do
fee, which currently is set at $1,300. See 49 CFR not involve environmental issues,1
ycherry on PROD1PC64 with NOTICES

1 The Board will grant a stay if an informed 1002.2(f)(25).


decision on environmental issues (whether raised 3 On November 27, 2006, the Minnesota 1 The Board will grant a stay if an informed

by a party or by the Board’s Section of Department of Transportation filed a request for decision on environmental issues (whether raised
Environmental Analysis (SEA) in its independent trail use/rail banking and for a public use condition. by a party or by the Board’s Section of
investigation) cannot be made before the These requests will be handled in a subsequent Environmental Analysis (SEA) in its independent
exemption’s effective date. See Exemption of Out- decision. Continued

VerDate Aug<31>2005 18:42 May 01, 2007 Jkt 211001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\FR\FM\02MYN1.SGM 02MYN1

Vous aimerez peut-être aussi