Vous êtes sur la page 1sur 86

REFERENCE DATA SERIES No.

2
2014 Edition

Nuclear
Power
Reactors
in the World

INTERNATIONAL ATOMIC ENERGY AGENCY


VIENNA
ISBN 9789201049148
ISSN 10112642

14-17621_PUB-RDS-2-34_cover.indd All Pages

@
2014-05-15 10:55:11

REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS


IN THE WORLD
2014 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY


VIENNA, 2014

NUCLEAR POWER REACTORS IN THE WORLD


IAEA, VIENNA, 2014
IAEA-RDS-2/34
ISBN 9789201049148
ISSN 10112642
Printed by the IAEA in Austria
May 2014

CONTENTS
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Table 1. Reactors in operation, in long term
shutdown and under construction,
31 Dec. 2013 . . . . . . . . . . . . . . . . . . . . . . .
Table 2. Type and net electrical power of reactors
connected to the grid, 31 Dec. 2013 . . . . .
Table 3. Type and net electrical power of reactors
under construction, 31 Dec. 2013 . . . . . . . .
Table 4. Reactor years of experience,
up to 31 Dec. 2013 . . . . . . . . . . . . . . . . . . .
Table 5. Operating reactors and net electrical
power, from 1985 to 2013 . . . . . . . . . . . . . .
Table 6. Nuclear electricity production and share,
from 1985 to 2013 . . . . . . . . . . . . . . . . . . . .
Table 7. Annual construction starts and
connections to the grid, 1954 to 2013 . . . .
Table 8. Number of new reactors connected
to the grid and median construction
time in months . . . . . . . . . . . . . . . . . . . . . .
Table 9. Construction starts during 2013 . . . . . . . . .
Table 10. Connections to the grid during 2013 . . . . . .
Table 11. Scheduled connections to the grid
during 2014 . . . . . . . . . . . . . . . . . . . . . . . . .
Table 12. Reactors planned for construction
as known on 31 Dec. 2013 . . . . . . . . . . . . .
Table 13. Reactors under construction,
31 Dec. 2013 . . . . . . . . . . . . . . . . . . . . . . .
Table 14. Reactors in operation, 31 Dec. 2013 . . . . .
Table 15. Reactors in long term shutdown,
31 Dec. 2013 . . . . . . . . . . . . . . . . . . . . . . .
Table 16. Reactors permanently shutdown,
31 Dec. 2013 . . . . . . . . . . . . . . . . . . . . . . .
Table 17. Reactors in decommissioning process or
decommissioned, 31 Dec. 2013 . . . . . . . . .

10
12
13
14
16
18
20

21
22
23
23
24
28
31
46
47
53

Table 18. Performance factors by reactor category,


2011 to 2013 . . . . . . . . . . . . . . . . . . . . . . . .
Table 19. Full outage statistics during 2013 . . . . . . . .
Table 20. Direct causes of full outages
during 2013 . . . . . . . . . . . . . . . . . . . . . . . . .
Table 21. Direct causes of full outages,
2009 to 2013 . . . . . . . . . . . . . . . . . . . . . . . .
Table 22. Countries: abbreviations and summary . . .
Table 23. Reactor types: abbreviations and
summary . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 24. Operators: abbreviations and summary . . .
Table 25. NSSS suppliers: abbreviations and
summary . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1. Number of operational reactors
by type and net electrical power
(as of 31 Dec. 2013) . . . . . . . . . . . . . . . . . .
Figure 2. Reactors under construction by type
and net electrical power
(as of 31 Dec. 2013) . . . . . . . . . . . . . . . . . .
Figure 3. Nuclear share of electricity generation
(as of 31 Dec. 2013) . . . . . . . . . . . . . . . . . .
Figure 4. Worldwide median construction time in
months (as of 31 Dec. 2013) . . . . . . . . . . .
Figure 5. Number of reactors in operation by age
(as of 31 Dec. 2013) . . . . . . . . . . . . . . . . . .
Figure 6. Annual construction starts and
connections to the grid, 1954 to 2013 . . . .

58
59
60
61
62
63
64
70

74

75
76
77
78
79

INTRODUCTION
Nuclear Power Reactors in the World is an annual publication
that presents the most recent data pertaining to nuclear
power reactors in IAEA Member States.
This thirty-fourth edition of Reference Data Series No. 2
provides a detailed comparison of various statistics up to
and including 31 December 2013. The tables and figures
contain the following information:
General statistics on nuclear reactors in IAEA Member
States;
Technical data on specific reactors that are either

planned, under construction or operational, or that have
been shut down or decommissioned;
Performance data on reactors operating in IAEA Member
States, as reported to the IAEA.
The data compiled in this publication is a product of the
IAEAs Power Reactor Information System (PRIS). The
PRIS database is a comprehensive source of data on all
nuclear power reactors in the world. It includes specification
and performance history data on operational reactors as
well as on reactors under construction or in the
decommissioning process. The IAEA collects this data
through designated national correspondents in Member
States.
PRIS outputs are available in the IAEAs annual publications
and on the PRIS web page (http://www.iaea.org/pris).
Detailed outputs are accessible to registered users through
on-line applications. Enquiries should be addressed to:
Director
Division of Nuclear Power
International Atomic Energy Agency
Vienna International Centre
PO Box 100
1400 Vienna, Austria
Email: PrisAdmin@iaea.org

DEFINITIONS
Performance factors
(REG PEL UEL XEL)
100
EAF (%) =


REG
(REG PEL UEL)
UCF (%) =
100


REG
UEL
100
UCL (%) =
REG
PEL
PCL (%) =
100
REG
EG
LF (%) =
100
REG
On-line Hours
100
OF (%) =

Total Hours
where
EAF is the energy availability factor, expressed in
per cent.
UCF is the unit capability factor, expressed in per cent.
UCL is the unplanned capability loss factor, expressed
in per cent.
PCL is the planned capability loss factor, expressed
in per cent.
LF
is the load factor, expressed in per cent.
OF is the operating factor, expressed in per cent.
REG Reference energy generation: The net electrical
energy (MWh), supplied by a unit continuously
operated at the reference unit power during the
entire reference period.

PEL Planned energy loss: The energy (MWh) that was


not supplied during the period because of planned
shutdowns or load reductions due to causes under
plant management control. Energy losses are considered to be planned if they are scheduled at least
four weeks in advance.
UEL Unplanned energy loss: The energy (MWh) that
was not supplied during the period because of
unplanned shutdowns, outage extensions or load
reductions due to causes under plant management
control. Energy losses are considered to be
unplanned if they are not scheduled at least four
weeks in advance.
XEL External energy loss: The energy (MWh) that was
not supplied owing to constraints beyond plant management control that reduced plant availability.
EG The net electrical energy supplied during the reference period as measured at the unit outlet terminals
after deducting the electrical energy taken by unit
auxiliaries and the losses in transformers that are
considered to be integral parts of the unit.
Planned Reactors
The IAEA considers a reactor as planned from the date
when a construction license application has been submitted
to the relevant national regulatory authorities until the
construction start date.
Construction Start
Date when first major placing of concrete, usually for the
base mat of the reactor building, takes place.
First Criticality
Date when the reactor is made critical for the first time.
Grid Connection
Date when the plant is first connected to the electrical grid
for the supply of power. After this date, the plant is
considered to be in operation.
Commercial Operation
Date when the plant is handed over by the contractors to
the owner and declared officially in commercial operation.
8

Permanent Shutdown
Date when the plant is officially declared to be shut down by
the owner and taken out of operation permanently.
Long Term Shutdown
A unit is considered to be long term shutdown if it has been
shut down for an extended period (usually several years)
without any firm recovery schedule initially, but with the
intention to restart the unit eventually.
Units and Energy Conversion
1 terawatt-hour (TWh) = 106 megawatt-hours (MWh)
For an average power plant,
1 TWh = 0.39 megatonnes of coal equivalent (input),

= 0.23 megatonnes of oil equivalent (input)

10

ARGENTINA
ARMENIA
BELARUS
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
JAPAN
KOREA, REP. OF
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN
SWITZERLAND

Country

935
375

5927
1884
1906
13500
15977
3884
2752
63130
12068
1889
5308
915
42388
20721
1330
482
690
1300
23643
1815
688
1860
7121
9474
3308

7
2
2
19
20
6
4
58
9
4
21
1
48
23
2
1
3
2
33
4
1
2
7
10
5

Total
MW(e)

2
1

No. of
units

Reactors in operation

246

446

Total
MW(e)

No. of
units

Reactors in long term shutdown

28774
1600
1630
3907

29
1
1
6

630
8382
880

2
10
2

1325
6370

1245

2
5

692

1109

Total
MW(e)

No. of
units

Reactors under construction

5.7
2.2
NA
40.6
13.8
13.3
94.3
104.8
29.0
22.7
405.9
92.1
14.5
30.0
3.9
13.9
132.5
11.4
2.7
4.4
10.7
161.7
14.6
5.0
13.6
54.3
63.7
25.0

4.4
29.2
NA
52.1
2.8
30.7
16.0
2.1
35.9
33.3
73.3
15.4
50.7
3.5
1.5
1.7
27.6
4.6
2.8
4.4
19.8
17.5
51.7
33.6
5.7
19.7
42.7
36.4

Nuclear electricity
supplied in 2013
% of
TW(e)h
total

TABLE 1. REACTORS IN OPERATION, IN LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2013

11

434

Total

No. of
units

692

Total
MW(e)

Reactors in long term shutdown

39.8 TW(e)h of nuclear electricity generation, representing 19.1% of the total electricity generated there.

6 units, 5032 MW in operation; 2 units, 2600 MW under construction;

The total includes the following data from Taiwan, China:

Note:

9243
13107
99081

16
15
100

UAE
UK
UKRAINE
USA

371733

Total
MW(e)

Reactors in operation

No. of
units

Country

69367

1900
5633

72

2690

2
5

Total
MW(e)

No. of
units

Reactors under construction

2358.9

NA
64.1
78.2
790.2

NA

NA
18.3
43.6
19.4

Nuclear electricity
supplied in 2013
% of
TW(e)h
total

TABLE 1. REACTORS IN OPERATION, IN LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2013 continued

12

12864
1815
688
1860
6057
2811
1715
1198
13107
64687

17
4
1
2
6
3
3
1
15
65

253031

482
600

1
2

273

14657
3884
992
63130
9496
1889
917
915
19284
18037

17
6
2
58
7
4
1
1
24
19

MW(e)

375
5927
1884
1906

PWR

1
7
2
2

No.

75958

34394

35

81

1064
6663
1593

1330

1
7
2

300

23104

24

2572

MW(e)

1760

BWR

No.

2. During 2013, 4 reactors, 3941 MW were newly connected to the grid.

1. The totals include 6 units, 5032 MW in Taiwan, China.

Notes:

TOTAL

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
JAPAN
KOREA, REP. OF
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN
SWITZERLAND
UK
UKRAINE
USA

Country

15

15

No.

GCR

8045

8045

MW(e)

48

1
2

23900

90
1300

2684

4091

13500
1300

19
2

18

935

PHWR
No.
MW(e)

15

15

10219

10219

LWGR
No.
MW(e)

No.

FBR

580

560

20

MW(e)

434

2
1
7
2
2
19
20
6
4
58
9
4
21
1
48
23
2
1
3
2
33
4
1
2
7
10
5
16
15
100

No.

TABLE 2. TYPE AND NET ELECTRICAL POWER OF REACTORS CONNECTED TO THE GRID, 31 DEC. 2013
Total

371733

935
375
5927
1884
1906
13500
15977
3884
2752
63130
12068
1889
5308
915
42388
20721
1330
482
690
1300
23643
1815
688
1860
7121
9474
3308
9243
13107
99081

MW(e)

13

60

60771

6370
630
7593
880
2690
1900
5633

5
2
9
2
2
2
5

MW(e)

1109
1245
28574
1600
1630
917

PWR

1
1
28
1
1
1

No.

2. During 2013, construction started on 10 reactors, 11252 MW.

1. The totals include 2 units (2 x BWR), 2600 MW in Taiwan, China.

Notes:

TOTAL

ARGENTINA
BELARUS
BRAZIL
CHINA
FINLAND
FRANCE
INDIA
JAPAN
KOREA, REP. OF
PAKISTAN
RUSSIA
SLOVAKIA
UAE
UKRAINE
USA

Country

(*) 4

No.

BWR

3925

1325

MW(e)

3212

2520

692

PHWR
No.
MW(e)

FBR
No.

1259

789

470

MW(e)

HTGR
No.

200

200

MW(e)

TABLE 3. TYPE AND NET ELECTRICAL POWER OF REACTORS UNDER CONSTRUCTION, 31 DEC. 2013

72

1
1
1
29
1
1
6
2
5
2
10
2
2
2
5

No.

Total

69367

692
1109
1245
28774
1600
1630
3907
1325
6370
630
8382
880
2690
1900
5633

MW(e)

14

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
ITALY
JAPAN
KAZAKHSTAN
KOREA, REP. OF
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN

Country

No.

935
375
5927
1884
1906
13500
15977
3884
2752
63130
12068
1889
5308
915

42388

20721

1330
482
690
1300
23643
1815
688
1860
7121

2
1
7
2
2
19
20
6
4
58
9
4
21
1

48

23

2
1
3
2
33
4
1
2
7

Operating
reactors
Net capacity
MW(e)

Reactors in long term


shutdown
Net capacity
No.
MW(e)

446

246

3789
14301

1423
6164
52
2370
55
786
909

12
27

4
11
1
2
1
5
3
621

1632
2143

4
6

376
10

1
1

Permanently shut down


reactors
Net capacity
No.
MW(e)

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2013

No.
2
2
8
2
6
25
20
6
4
70
36
4
21
1
4
60
1
23
2
2
2
3
2
38
7
1
2
10

935
751
5937
1884
3538
15643
15977
3884
2752
66919
26369
1889
5308
915
1423
48798
52
20721
2370
1330
537
690
1300
24429
2724
688
1860
8188

70
39
261
45
155
655
160
134
139
1932
799
114
397
2
80
1646
25
427
43
43
69
58
23
1124
148
32
58
301

8
11
2
7
3
3
1

10
4
3
1
2
6
4
8
4
10
1
6
11

7
8
7
3
3
7

Total, operating
and shut down
Operating experience
Net capacity
MW(e)
Years
Months

15

No.

434

10
5
16
15
100

371733

9474
3308
9243
13107
99081

Operating
reactors
Net capacity
MW(e)

Reactors in long term


shutdown
Net capacity
No.
MW(e)

2. Operating experience is counted from the grid connection excluding any long term shutdown period.

Experience: 194 years, 1 month.

Reactors connected to the grid: 6 units, 5032 MW

1. The total includes the following data from Taiwan, China:

Notes:

Total

SWEDEN
SWITZERLAND
UK
UKRAINE
USA

Country

692

149

3
1
29
4
32

1210
6
4225
3515
13340

56927

Permanently shut down


reactors
Net capacity
No.
MW(e)

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2013 continued

No.

585

13
6
45
19
132
429352

10684
3314
13468
16622
112421
15660

412
194
1527
428
3912

6
11
7
6
4

Total, operating
and shut down
Operating experience
Net capacity
MW(e)
Years
Months

16

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
ITALY
JAPAN
KAZAKHSTAN
KOREA, REP. OF
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN

Country

391
2300
37478
18110
825
1143

1273
23612
135
3692
1380

508
137

15841
1632
632
1840
5608
9455

3
33
1
5
1

2
1

28
4
1
2
8
12

935
816
5464
626
1632
9741

MW(e)

1
4
43
24
2
6

2
2
8
1
4
16

No.

1985

29
4
1
2
9
12

41
1
9
2
1
2
1

4
4
56
21
4
7

7
1
5
20

No.

1990

18898
1632
620
1840
7099
9826

30867
135
7220
2760
640
539
125

1632
2310
55808
21250
1710
1324

5501
626
2585
13993

935

30
4
1
2
9
12

50
1
11
2
2
2
1

2
1
7
1
6
21
3
4
4
56
19
4
10

19848
1632
620
1840
7097
10043

39625
50
9115
2370
1256
510
125

935
376
5631
626
3538
14902
2188
1782
2310
58573
20972
1729
1746

43245
12990
2370
1290
449
425
655
19848
2440
676
1840
7468
9412

16
2
2
1
2
1
30
6
1
2
9
11

978
376
5712
1976
3760
9998
2188
2611
2656
63080
21283
1729
2508

52

2
1
7
2
6
14
3
5
4
59
19
4
14

20
1
2
1
2
1
31
6
1
2
9
10

55

2
1
7
2
4
18
9
6
4
59
17
4
15

16810
1185
1360
450
425
655
21743
2442
656
1800
7591
8905

47593

935
376
5801
1901
2722
12584
6587
3373
2676
63260
20339
1755
2993

2
1
7
2
2
18
13
6
4
58
17
4
19

935
375
5926
1884
1906
12604
10065
3675
2716
63130
20490
1889
4189

18698
1300
482
425
1300
22693
1816
666
1800
7514
9303

2
1
2
2
32
4
1
2
8
10

46821

21

54

Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. of given year
1995
2000
2005
2010
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, FROM 1985 TO 2013

2
1
3
2
33
4
1
2
8
10

23

50

2
1
7
2
2
19
17
6
4
58
9
4
20
1

No.

2012

1530
482
725
1300
23643
1816
688
1860
7560
9395

20739

44215

935
375
5927
1884
1906
13500
12860
3804
2752
63130
12068
1889
4391
915

MW(e)

2
1
3
2
33
4
1
2
7
10

23

48

2
1
7
2
2
19
20
6
4
58
9
4
21
1

No.

2013

1330
482
690
1300
23643
1815
688
1860
7121
9474

20721

42388

935
375
5927
1884
1906
13500
15977
3884
2752
63130
12068
1889
5308
915

MW(e)

17

363

5
38
10
90

No.

1985

245779

2881
10077
8324
74401

MW(e)

416

5
37
15
108

No.

1990

318253

2942
11360
13020
96228

341402

3056
12910
13045
98068

435

5
33
13
103

349999

3170
12490
11195
96297

441

5
23
15
103

368125

3220
11852
13107
98145

441

5
19
15
104

375277

3238
10137
13107
101211
437

5
16
15
104

No.

2012

373263

3278
9231
13107
102330

MW(e)

1985: 6 units, 4890 MW; 1990: 6 units, 4828 MW; 1995: 6 units, 4884 MW; 2000: 6 units, 4884 MW; 2005: 6 units, 4884 MW; 2010: 6 units, 4982 MW; 2012: 6 units, 5028 MW; 2013: 6 units, 5032 MW.

434

5
35
15
108

Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. of given year
1995
2000
2005
2010
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)

Note: The world total includes the following data in Taiwan, China:

WORLD

SWITZERLAND
UK
UKRAINE
USA

Country

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, FROM 1985 TO 2013 continued

434

5
16
15
100

No.

2013

371733

3308
9243
13107
99081

MW(e)

18

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
ITALY
JAPAN
KAZAKHSTAN
KOREA, REP. OF
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN

Country

11.7

59.8
1.7
31.6
12.7

NA
38.2
64.8
31.2
23.6
2.2

3.8
22.7

23.2
NA

6.1
1.0

NA
NA
NA
4.2
24.0
42.3

5.25

29.25
3.17
12.17
59.47

1.99
17.98
213.28
119.59
6.10
3.87

6.46
145.37

12.36
8.75

3.69
0.26

88.26
8.70
3.85
5.39
26.83
55.89

109.62
11.16
4.39
8.47
51.98
65.27

50.26
15.70
2.78
3.29
0.38

187.19

11.77
18.13
297.61
139.37
12.89
5.29

40.59
2.06
13.51
69.87

6.72

NA
NA
NA
5.6
35.9
45.9

49.1
NA
2.6
4.9
1.1

27.1

NA
35.1
74.5
33.1
51.4
2.2

60.1
1.0
35.7
14.8

19.8

91.59
11.35
4.57
11.29
53.49
67.17

275.51
0.08
60.21
10.64
7.53
3.78
0.46

39.30
2.33
16.22
93.98
12.13
12.23
18.13
358.71
146.13
13.20
6.99

6.57

11.8
44.1
39.5
6.5
34.1
46.6

33.4
0.1
36.1
86.1
6.0
4.9
0.9

55.5
1.0
46.4
17.3
1.2
20.0
29.9
76.1
29.6
42.3
1.9

11.8

103.54
7.42
7.92
3.70
0.90
5.05
120.10
15.17
4.55
13.00
59.49
51.88

306.24

5.74
1.84
45.81
5.59
16.79
69.12
16.02
12.71
21.58
395.39
160.66
13.35
14.23

40.7
73.9
3.9
4.3
1.7
10.9
15.0
53.4
37.4
6.6
27.6
39.0

33.8

7.3
33.0
56.8
1.9
45.0
11.8
1.2
18.7
32.2
76.4
30.6
40.6
3.1

137.59
9.54
10.32
3.77
2.41
5.11
137.64
16.34
5.61
12.24
54.99
69.58

280.50

6.37
2.50
45.34
9.20
17.38
86.83
50.33
23.25
22.36
431.18
154.61
13.02
15.73

6.9
42.7
55.6
2.5
44.1
14.5
2.0
30.5
32.9
78.5
26.6
37.2
2.8

6.69
2.29
45.73
13.77
14.24
85.50
70.96
26.44
21.89
410.09
133.01
14.66
20.48

5.9
39.4
51.2
3.1
33.1
15.1
1.8
33.3
28.4
74.1
22.6
42.1
2.9

5.90
2.12
38.46
15.17
14.86
89.06
92.65
28.60
22.06
407.44
94.10
14.76
29.66
1.33

4.7
26.6
51.0
3.1
31.7
15.3
2.0
35.3
32.6
74.8
16.1
45.9
3.6
0.6

5.74
2.17
40.63
13.78
13.32
94.29
104.84
29.01
22.67
405.90
92.14
14.54
30.01
3.89

4.4
29.2
52.1
2.8
30.7
16.0
2.1
35.9
33.3
73.3
15.5
50.7
3.5
1.5

44.7
70.3
5.0
3.9
2.8
8.6
15.8
56.1
42.4
5.5
19.6
44.9

29.3
32.2
3.6
3.4
2.6
19.5
17.1
51.8
37.3
5.2
20.1
38.1

5.59
3.75
2.56
10.70
159.41
13.54
5.38
12.90
59.26
55.73

29.2

141.89

280.25

8.41
3.71
5.27
10.56
166.29
14.41
5.24
12.40
58.70
61.47

143.55

17.23

4.7
4.4
5.3
19.4
17.8
53.8
36.0
5.1
20.5
38.1

30.4

2.1

11.38
2.74
4.37
10.70
161.72
14.62
5.04
13.64
54.31
63.72

132.47

13.95

4.6
2.8
4.4
19.8
17.5
51.7
33.6
5.7
19.7
42.7

27.6

1.7

Nuclear capacity (TWEh) of reactors connected to the grid at 31 Dec. of given year
1985
1990
1995
2000
2005
2010
2012
2013
TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, FROM 1985 TO 2013

19

1327.63

21.28
53.73
35.81
378.90

39.8
19.6
NA
15.5

1890.35

22.40
58.77
71.26
578.08

42.6
19.7
NA
20.6

39.9
25.4
37.8
22.5

2440.92

25.05
72.99
72.56
755.55

2013: 39.82 TW(e)h of nuclear electricity generation, representing 19.1% of the total electricity generated there.

2012: 38.73 TW(e)h of nuclear electricity generation, representing 18.4% of the total electricity generated there;

2010: 39.89 TW(e)h of nuclear electricity generation, representing 19.3% of the total electricity generated there;

2005: 38.40 TW(e)h of nuclear electricity generation, representing 17.9% of the total electricity generated there;

2000: 37.00 TW(e)h of nuclear electricity generation, representing 21.2% of the total electricity generated there;

1995: 33.80 TW(e)h of nuclear electricity generation, representing 28.8% of the total electricity generated there;

1990: 31.54 TW(e)h of nuclear electricity generation, representing 38.3% of the total electricity generated there;

2190.94

23.58
70.64
65.78
673.52

38.2
21.9
47.3
19.8

2626.34

22.11
75.34
83.40
783.35

38.0
20.0
48.5
19.3

2629.82

25.34
56.85
83.95
807.08

38.0
15.5
48.1
19.6

24.45
63.96
84.89
770.72

35.9
18.7
46.2
19.0

24.99
64.13
78.17
790.19

36.4
18.3
43.6
19.4

2346.19

2358.86

NA

Nuclear capacity (TWEh) of reactors connected to the grid at 31 Dec. of given year
1985
1990
1995
2000
2005
2010
2012
2013
TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total

Note: The world total includes the following data from Taiwan, China:

WORLD

SWITZERLAND
UK
UKRAINE
USA

Country

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, FROM 1985 TO 2013 continued

TABLE 7. ANNUAL CONSTRUCTION STARTS AND


CONNECTIONS TO THE GRID, 1954 TO 2013
Construction
starts
Year

20

Number
of units

Connections
to the grid

Design
capacity
(MW(e))

Number
of units

Reactors
in operation

Design
capacity
(MW(e))

Number
of units

Updated
capacity
(MW(e))

1954
1955

1
8

60
260

1
1

5
5

1956
1957
1958
1959
1960

5
13
6
7
11

577
1836
476
976
1010

1
3
1
5
4

35
119
35
176
438

2
5
6
11
15

65
209
269
548
1087

1961
1962
1963
1964
1965

7
8
5
9
9

1529
1379
1722
2932
3291

1
9
9
8
8

15
955
500
1022
1879

16
25
33
40
48

1104
2223
2677
3686
5910

1966
1967
1968
1969
1970

15
25
37
13
37

7052
16287
26859
9277
25453

8
11
7
10
6

1528
2165
1086
3670
3410

55
64
69
78
84

7539
9595
10648
14121
17656

1971
1972
1973
1974
1975

18
29
29
38
38

12623
22328
23492
35222
36437

16
16
20
26
15

7711
8880
12727
17149
10236

99
113
132
154
169

24320
32797
43761
61021
70414

1976
1977
1978
1979
1980

43
23
23
27
20

41774
21895
21735
22909
19084

19
18
20
8
21

14196
13199
15782
6909
15088

186
199
218
225
245

83992
96202
111740
117814
133037

1981
1982
1983
1984
1985

17
19
16
11
19

16029
19765
12124
10478
15346

23
19
23
33
33

20355
15332
19266
30992
30963

267
284
306
336
363

153832
168317
187756
218452
245779

1986
1987
1988
1989
1990

8
13
7
6
5

7201
11117
7722
4018
3267

27
22
14
12
10

27134
22191
13574
10566
10543

389
407
416
420
416

272074
295812
305212
311942
318253

1991
1992
1993
1994
1995

2
3
4
2

2246
3107
3515
1330

4
6
9
5
5

3678
4809
9012
4332
3536

415
418
427
429
434

321924
325261
333914
336934
341402

1996
1997
1998
1999
2000

1
5
3
4
7

610
4410
2096
4540
5356

6
3
4
4
6

7080
3570
2952
2704
3063

438
434
430
432
435

347296
347895
344915
347368
349999

2001
2002
2003
2004
2005

1
6
1
2
3

1304
3440
202
1336
2907

3
6
2
5
4

2696
5022
1600
4785
3823

438
439
437
438
441

352730
357496
359842
364688
368125

2006
2007
2008
2009
2010

4
8
10
12
16

3356
6553
10630
13125
14517

2
3

1492
1842

2
5

1068
3719

435
439
438
437
441

369581
371645
371495
370702
375277

2011
2012
2013

4
7
10

1890
6984
11252

7
3
4

4004
2918
3986

435
437
434

368921
373263
371733

21

ARGENTINA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
JAPAN
KOREA, REP. OF
LITHUANIA
MEXICO
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN
SWITZERLAND
UK
UKRAINE

Country

109
80
132
104
98

74
68
100
112
154

46
65
80

73
99
80
102
112
74
125
186
57

1
4
1
1
7

1
24
7
2
2

10
4
1

9
2
1
2
5
4
1
6
7

1981
to
1985
No. Months

72

96

98
58

4
6

49
62
116
151

93
86
103
90
152

89
101

8
4
1
1

3
15
6
2
1

1
5

1986
to
1990
No. Months

1
1

80
113

109

210

120

46
61

93

10
2

113
97
73

1
2
3

1991
to
1995
No. Months

83
169
150

42
59

122

167
124

176

1
1

3
5

1
4

1996
to
2000
No. Months

4
4

6
1

227

233

47
54

64

59
191

2001
to
2005
No. Months

1
1

1
1

161
323

53
51

81

68

2006
to
2010
No. Months

108

64

54

2
1

105
222

60

1
1

2011
to
2012
No. Months

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS

140

67

No. Months

2013

22

25
131
131

126
84
84

1981
1981
to
to
1985
1985
No.
Months
25 Months
126
No.

22
85
85

146
93
93

1986
1986
to
to
1990
1990
No.
Months
22 Months
146
No.

1
29
29

221
82
82

1991
1991
to
to
1995
1995
No.
Months
1 Months
221
No.
1
23
23

CN -73
CN -46
CN -69

KR -28

AE -02

US -5027
US -5028
US -5025
US -5026

KOREA, REP. OF

UAE

USA

SUMMER-2
SUMMER-3
VOGTLE-3
VOGTLE-4

BARAKAH-2

SHIN-HANUL-2

TIANWAN-4
YANGJIANG-5
YANGJIANG-6

BELARUSIAN-1

Reactor

Name

Note: During 2013, construction started on 10 reactors (11252 MW).

BY -1

CHINA

Code

BELARUS

Country

PWR
PWR
PWR
PWR

PWR

PWR

PWR
PWR
PWR

PWR

Type

AP-1000
AP-1000
AP-1000
AP-1000

APR-1400

APR-1400

VVER V-428M
ACPR-1000
ACPR-1000

VVER V-491

Model

TABLE 9. CONSTRUCTION STARTS DURING 2013

1981 to 1985: 4 units, 72 months.

3400
3400
3400
3400

3983

3983

3000
2905
2905

3200

Thermal

1250
1250
1250
1250

1400

1400

1060
1087
1087

1194

Gross

Capacity (MW)

1.
time is
pouring
of concrete to the connection of the unit to the grid.
2. Construction
The totals include
themeasured
following from
data the
fromfirst
Taiwan,
China:
2. The
include
the following
data from Taiwan, China:

1981totals
to 1985:
4 units,
72 months.

278
121
121

1996
1996
to
to
2000
2000
No.
Months
1 Months
278
No.

Notes:
Notes:
1. Construction time is measured from the first pouring of concrete to the connection of the unit to the grid.

TOTAL

USA
USA
TOTAL

Country
Country

1117
1117
1117
1117

1345

1340

990
1000
1000

1109

Net

SCE&G
SCE&G
SOUTHERN
SOUTHERN

ENEC

KHNP

JNPC
YJNPC
YJNPC

DSAE

Operator

20
20

WH
WH
WH
WH

KEPCO

DHICKOPC

IZ
CFHI
CFHI

ASE

NSSS
supplier

59
59

2001
2001
to
to
2005
2005
No.
Months
No. Months
12
12

2013-3
2013-11
2013-3
2013-11

2013-5

2013-6

2013-9
2013-9
2013-12

2013-11

Construction
start

77
77

2006
2006
to
to
2010
2010
No.
Months
No. Months

2017-11

Grid
connection

10
10

62
62

2011
2011
to
to
2012
2012
No.
Months
No. Months
4
4

2017-6

68
68

2013
2013
No. Months
No. Months

Commercial
operation

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS continued
TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS continued

23

IN -25

INDIA

Reactor

KUDANKULAM-1

HONGYANHE-1
HONGYANHE-2
YANGJIANG-1

Name

VVER V-412

PWR

Model

CPR-1000
CPR-1000
CPR-1000

Type

PWR
PWR
PWR

3000

2905
2905
2905
1000

1119
1119
1086

Gross

Capacity (MW)

Thermal

IN -26

SK -10

SLOVAKIA

Reactor

MOCHOVCE-3

KUDANKULAM-2

NINGDE-2

Name

PWR

PWR

PWR

Type

Note: During 2014, 3 reactors (2375 MW) are expected to achieve connection to grid.

CN -19

INDIA

Code

CHINA

Country

1375

3000

2905

471

1000

1080

Gross

Capacity (MW)

Thermal

440

917

1018

Net

NPCIL

LHNPC
LHNPC
YJNPC

Operator

SE,plc

NPCIL

NDNP

Operator

917

1024
1024
1021

Net

TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2014

Note: During 2013, 4 reactors (3986 MW) were newly connected to the grid.

CN -16
CN -17
CN -22

Code

CHINA

Country

TABLE 10. CONNECTIONS TO THE GRID DURING 2013

SKODA

MAEP

SHE

NSSS
supplier

MAEP

DEC
DEC
CFHI

NSSS
supplier

1987-1

2002-7

2008-11

Construction
start

2002-3

2007-8
2008-3
2008-12

Construction
start

2014-10

2013-12

First
criticality

2013-7

2013-1
2013-10
2013-12

First
criticality

2014-10

2014-1

Grid
date

2013-10

2013-2
2013-11
2013-12

Grid connection

24

AR -4

CN -72
CN -53
CN -54
CN -57
CN -58
CN -59
CN -60
CN -49
CN -50
CN -76
CN -77
CN -51
CN -52
CN -80
CN -81
CN -65
CN -66
CN -67
CN -68
CN -61
CN -62
CN -63
CN -64
CN -78
CN -79
CN -70
CN -71

CHINA

Code

ARGENTINA

Country

Reactor

BAMAOSHAN
CHANGJIANG-3
CHANGJIANG-4
FANGCHENGGANG-3
FANGCHENGGANG-4
FANGCHENGGANG-5
FANGCHENGGANG-6
FUQING-5
FUQING-6
HAIYANG-3
HAIYANG-4
HONGSHIDING-1
HONGSHIDING-2
HONGYANHE-5
HONGYANHE-6
JIYANG-1
JIYANG-2
JIYANG-3
JIYANG-4
PENGZE-1
PENGZE-2
PENGZE-3
PENGZE-4
SANMEN-3
SANMEN-4
SANMING-1
SANMING-2

CAREM25

Name

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
FBR
FBR

PWR

Type

2905
2905
3415
3415
2905
2905

3400
3400
2100
2100

ACP-1000
ACP-1000
AP-1000
AP-1000

CPR-1000
CPR-1000

AP-1000
AP-1000
BN-800
BN-800

100
2905
1930
1930

1250
1250
860
860

1080
1080

1087
1087
1253
1253

1080
650
650

29

Gross

Capacity (MW)
Thermal

CPR-1000

CAREM Prototyp

Model

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013

900
610
610
1000
1000
1000
1000
1000
1000
1000
1000
0
0
1000
1000
1000
1000
1000
1000
1250
1250
1250
1250
1000
1000
800
800

25

Net

WH/MHI
WH/MHI

DEC
DEC
DEC

HONGYANH
LHNPC
LHNPC

SMNPC
SMNPC
FSNPC
FSNPC

NPIC
NPIC
WH
WH

CNEA

NSSS
supplier

FQNP
FQNP
SDNPC
SDNPC

CNEA

Operator

2014-10

2014-2

Expected construction
start

25

IN -35
IN -36

IR -2
IR -5
IR -9

JP -76
JP -69
JP -74
JP -72
JP -62
JP -63
JP -75
JP -67
JP -68

RU -171
RU -202
RU -203
RU -207

IRAN, ISL. REP.

JAPAN

RUSSIA

CN -55
CN -56
CN -74
CN -75
CN -47
CN -48
CN -82
CN -83

Code

INDIA

Country

Reactor

BALTIC-2
BASHKIR-1
BASHKIR-2
BELOYARSK-5

HAMAOKA-6
HIGASHI DORI-1 (TEPCO)
HIGASHI DORI-2 (TEPCO)
HIGASHI DORI-2 (TOHOKU)
KAMINOSEKI-1
KAMINOSEKI-2
SENDAI-3
TSURUGA-3
TSURUGA-4

BUSHEHR-2
BUSHEHR-3
DARKHOVAIN

KUDANKULAM-3
KUDANKULAM-4

TAOHUAJIANG-1
TAOHUAJIANG-2
TIANWAN-5
TIANWAN-6
XIANNING-1
XIANNING-2
XUDABU-1
XUDABU-2

Name

PWR
PWR
PWR
FBR

BWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR

PWR
PWR
PWR

PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

Type

VVER V-491
VVER V-510
VVER V-510
BN-1200

ABWR
ABWR
ABWR
ABWR
ABWR
ABWR
APWR
APWR
APWR

VVER V-446
IR-360

1194
1255
1255
1220

1373
1373
1590
1538
1538

3926
3926
4466
4466
4466
3200
3300
3300
3000

1400
1385
1385

1000
1000
360

1000
1000

1080
1080

1080
1080

3926
3926
3926

3000
3000
1113

3000
3000

2905
2905

CPR-1000
CPR-1000

VVER V-412
VVER V-412

2905
2905

Gross

Capacity (MW)
Thermal

CNP-1000
CNP-1000

Model

1109
1115
1115
0

1350
1343
1343
1067
1325
1325
1590
1538
1538

915
915
330

917
917

0
0
1000
1000
0
0
1000
1000

Net

REA
REA
REA
REA

CHUBU
TEPCO
TEPCO
TOHOKU
CHUGOKU
CHUGOKU
KYUSHU
JAPCO
JAPCO

NPPDCO
NPPDCO
NPPDCO

NPCIL
NPCIL

LNPC
LNPC

JNPC
JNPC

Operator

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013 continued

ROSATOM
ROSATOM
ROSATOM
ROSATOM

MHI
MHI

H/G

TBD
ASE

DEC
DEC

DEC
DEC

NSSS
supplier

Expected construction
start

26

AE -03
AE -04

US -5039
US -5016
US -5034
US -5035
US -5033
US -5022
US -5023
US -5029

USA

RU -177
RU -178
RU -175
RU -176
RU -166
RU -189
RU -190
RU -191
RU -165
RU -167
RU -181
RU -182
RU -187
RU -188
RU -198
RU -199
RU -204
RU -205

Code

UAE

Country

Reactor

BELL BEND
CALVERT CLIFFS-3
COMANCHE PEAK-3
COMANCHE PEAK-4
FERMI-3
HARRIS-2
HARRIS-3
LEVY COUNTY-1

BARAKAH-3
BARAKAH-4

CENTRAL-1
CENTRAL-2
KOLA 2-1
KOLA 2-2
KURSK 2-1
KURSK 2-2
KURSK 2-3
KURSK 2-4
LENINGRAD 2-3
LENINGRAD 2-4
NIZHEGORODSK-1
NIZHEGORODSK-2
SEVERSK-1
SEVERSK-2
SMOLENSK 2-1
SMOLENSK 2-2
SOUTH URALS-1
SOUTH URALS-2

Name

PWR
PWR
PWR
PWR
BWR
PWR
PWR
PWR

PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
FBR
FBR

Type

EPR
US-EPR
US-APWR
US-APWR
ESBWR
AP-1000
AP-1000
AP-1000

APR-1400
APR-1400

VVER V-510
VVER V-510
VVER V-510
VVER V-510
BN-1200
BN-1200

VVER V-510
VVER V-510
VVER V-510
VVER V-510
VVER V-510
VVER V-510
VVER V-491
VVER V-491

Model

1720
1720
1600
1250
1250
1250

4500
3750
3750
3750

1400
1400

1255
1255
1200
1200
1255
1255
1255
1255
1170
1170
1255
1255
1255
1255
1255
1255
1220
1220

Gross

4300
4300

3983
3983

3300
3300
3200
3200
3300
3300
3300
3300
3200
3200
3300
3300
3300
3300
3300
3200
3000
3000

Thermal

Capacity (MW)

1600
1600
1700
1700
1520
1117
1117
1117

1345
1345

1115
1115
1100
1100
1115
1115
1115
1115
1085
1085
1115
1115
1115
1115
1115
1115
1115
1115

Net

PROGRESS

ENEC
ENEC

REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA

Operator

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013 continued

WH

AREVA

KEPCO
KEPCO

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

NSSS
supplier

2014-6
2015-6

Expected construction
start

27

VN -1
VN -2

US -5030
US -5017
US -5012
US -5013
US -5040
US -5041
US -5018
US -5019

Code

Reactor

PHUOC DINH 1
PHUOC DINH 2

LEVY COUNTY-2
NORTH ANNA-3
SOUTH TEXAS-3
SOUTH TEXAS-4
TURKEY POINT-6
TURKEY POINT-7
WILLIAM STATES LEE III-1
WILLIAM STATES LEE III-2

Name

PWR
PWR

PWR
PWR
BWR
BWR
PWR
PWR
PWR
PWR

Type

Note: Status as of 31 December 2013, 92 reactors (94423 MW) were known as planned.

VIET NAM

Country

AP-1000
US-APWR
ABWR
ABWR
AP-1000
AP-1000
AP-1000
AP-1000

Model
1250

1400
1400
1250
1250
1250
1250

3926
3926
3750
3750
3750
3750

Gross

3750

Thermal

Capacity (MW)

1000
1000

1117
1500
1350
1350
1117
1117
1117
1117

Net

EVN
EVN

Operator

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013 continued

ROSATOM
ROSATOM

WH

NSSS
supplier

Expected construction
start

28

AR -3

BY -1

BR -3

CN -36
CN -37
CN -38
CN -39
CN -24
CN -25
CN -20
CN -21
CN -42
CN -43
CN -30
CN -31
CN -26
CN -27
CN -19
CN -34
CN -35
CN -28
CN -29
CN -44
CN -32
CN -33
CN -45

BELARUS

BRAZIL

CHINA

Code

ARGENTINA

Country

CHANGJIANG-1
CHANGJIANG-2
FANGCHENGGANG-1
FANGCHENGGANG-2
FANGJIASHAN-1
FANGJIASHAN-2
FUQING-1
FUQING-2
FUQING-3
FUQING-4
HAIYANG-1
HAIYANG-2
HONGYANHE-3
HONGYANHE-4
NINGDE-2
NINGDE-3
NINGDE-4
SANMEN-1
SANMEN-2
SHIDAO BAY-1
TAISHAN-1
TAISHAN-2
TIANWAN-3

ANGRA-3

BELARUSIAN-1

ATUCHA-2

Name

Reactor

Model

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
HTGR
PWR
PWR
PWR

PWR

PWR

CNP-600
CNP-600
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
AP-1000
AP-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
AP-1000
AP-1000
HTR-PM
EPR-1750
EPR-1750
VVER V-428M

PRE KONVOI

VVER V-491

PHWR PHWR KWU

Type

1930
1930
2905
2905
2905
2905
2905
2905
2905
2905
3451
3415
2905
2905
2905
2905
2905
3400
3400
500
4590
4590
3000

3765

3200

2160

Thermal
745

650
650
1080
1080
1080
1080
1080
1080
1080
1080
1250
1250
1080
1080
1080
1080
1080
1250
1250
211
1750
1750
1060

1350

1194

Gross

Capacity (MW)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2013

692

610
610
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1018
1018
1018
1000
1000
200
1660
1660
990

1245

1109

Net
ASE

SIEMENS

NSSS
supplier

HNPC
HNPC
GFNPC
GFNPC
QNPC
QNPC
FQNP
FQNP
FQNP
FQNP
SDNPC
SDNPC
LHNPC
LHNPC
NDNP
NDNP
NDNP
SMNPC
SMNPC
HSNPC
TNPC
TNPC
JNPC

DEC
DEC
DEC
DEC
NPIC
NPIC
NPIC
NPIC
NPIC
NPIC
WH
WH
DEC
DEC
SHE
CFHI
CFHI
WH/MHI
WH/MHI
Tsinghua
AREVA
AREVA
IZ

ELETRONU KWU

DSAE

NASA

Operator

2010-4
2010-11
2010-7
2010-12
2008-12
2009-7
2008-11
2009-6
2010-12
2012-11
2009-9
2010-6
2009-3
2009-8
2008-11
2010-1
2010-9
2009-4
2009-12
2012-12
2009-11
2010-4
2012-12

2010-6

2013-11

1981-7

Construction
start

2013-12

2014-5

First
criticality

2014-1

Grid
connection

2015-12

2015-7

2016-1

Commercial
operation

29

FI -5

FR -74

IN -30
IN -31
IN -26
IN -29
IN -21
IN -22

JP -66
JP -65

KR -27
KR -28
KR -25
KR -26
KR -24

PK -4
PK -5

RU -151

FRANCE

INDIA

JAPAN

KOREA, REP. OF

PAKISTAN

RUSSIA

CN -73
CN -23
CN -40
CN -41
CN -46
CN -69

Code

FINLAND

Country

AKADEMIK LOMONOSOV-1

CHASNUPP-3
CHASNUPP-4

SHIN-HANUL-1
SHIN-HANUL-2
SHIN-KORI-3
SHIN-KORI-4
SHIN-WOLSONG-2

OHMA
SHIMANE-3

KAKRAPAR-3
KAKRAPAR-4
KUDANKULAM-2
PFBR
RAJASTHAN-7
RAJASTHAN-8

FLAMANVILLE-3

OLKILUOTO-3

TIANWAN-4
YANGJIANG-2
YANGJIANG-3
YANGJIANG-4
YANGJIANG-5
YANGJIANG-6

Name

Reactor

PWR

PWR
PWR

PWR
PWR
PWR
PWR
PWR

BWR
BWR

PHWR
PHWR
PWR
FBR
PHWR
PHWR

PWR

PWR

PWR
PWR
PWR
PWR
PWR
PWR

Type

KLT-40S 'Float

CNP-300
CNP-300

APR-1400
APR-1400
APR-1400
APR-1400
OPR-1000

ABWR
ABWR

PHWR-700
PHWR-700
VVER V-412
Prototype
Horizontal Pre
Horizontal Pre

EPR

EPR

VVER V-428M
CPR-1000
CPR-1000
CPR-1000
ACPR-1000
ACPR-1000

Model

150

999
999

3938
3983
3983
3938
2825

3926
3926

2166
2166
3000
1253
2177
2177

4300

4300

3000
2905
2905
2905
2905
2905

Thermal

35

340
340

1400
1400
1400
1400
1000

1383
1373

700
700
1000
500
700
700

1650

1720

1060
1080
1080
1080
1087
1087

Gross

Capacity (MW)

32

315
315

1340
1340
1400
1340
950

0
1325

630
630
917
470
630
630

1630

1600

990
1000
1000
1000
1000
1000

Net

NPCIL
NPCIL

NPCIL
NPCIL
MAEP

AREVA

AREVA

IZ
CFHI
CFHI
CFHI
CFHI
CFHI

NSSS
supplier

REA

PAEC
PAEC

KHNP
KHNP
KHNP
KHNP
KHNP

ROSATOM

CNNC
CNNC

DHICKOPC
DHICKOPC
DHICKOPC
DHICKOPC
DHICKOPC

EPDC
H/G
CHUGOKU HITACHI

NPCIL
NPCIL
NPCIL
BHAVINI
NPCIL
NPCIL

EDF

TVO

JNPC
YJNPC
YJNPC
YJNPC
YJNPC
YJNPC

Operator

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2013 continued

2007-4

2011-5
2011-12

2012-7
2013-6
2008-10
2009-8
2008-9

2010-5
2007-10

2010-11
2010-11
2002-7
2004-10
2011-7
2011-9

2007-12

2005-8

2013-9
2009-6
2010-11
2012-11
2013-9
2013-12

Construction
start

2016-8
2017-6

2014-12
2015-6

2015-12
2016-6

2016-12

First
criticality

2016-9
2017-7

2015-3
2015-9

2016-3
2016-9

2016-12

Grid
connection

2019-12

2016-12
2017-10

2016-6
2017-6

2015-6
2015-12
2014-12

2016-6
2016-12

2016-1

Commercial
operation

30

AE -01
AE -02

UA -51
UA -52

US -5027
US -5028
US -5025
US -5026
US -391

UAE

UKRAINE

USA

SUMMER-2
SUMMER-3
VOGTLE-3
VOGTLE-4
WATTS BAR-2

KHMELNITSKI-3
KHMELNITSKI-4

BARAKAH-1
BARAKAH-2

MOCHOVCE-3
MOCHOVCE-4

AKADEMIK LOMONOSOV-2
BALTIC-1
BELOYARSK-4
LENINGRAD 2-1
LENINGRAD 2-2
NOVOVORONEZH 2-1
NOVOVORONEZH 2-2
ROSTOV-3
ROSTOV-4

Reactor

Name

PWR
PWR
PWR
PWR
PWR

PWR
PWR

PWR
PWR

PWR
PWR

PWR
PWR
FBR
PWR
PWR
PWR
PWR
PWR
PWR

Type

AP-1000
AP-1000
AP-1000
AP-1000
W (4-loop) (IC

VVER V-392B
VVER V-392B

APR-1400
APR-1400

VVER V-213
VVER V-213

KLT-40S 'Float
VVER V-491
BN-800
VVER V-491
VVER V-491
VVER V-392M
VVER V-392M
VVER V-320
VVER V-320

Model

3400
3400
3400
3400
3425

3200
3200

3983
3983

1375
1375

150
3200
2100
3200
3200
3200
3200
3000
3000

1250
1250
1250
1250
1218

1000
1000

1400
1400

471
471

35
1194
864
1170
1170
1199
1199
1100
1100

Gross

Capacity (MW)

Thermal

1117
1117
1117
1117
1165

950
950

1345
1345

440
440

32
1109
789
1085
1085
1114
1114
1011
1011

Net

SCE&G
SCE&G
SOUTHERN
SOUTHERN
TVA

NNEGC
NNEGC

ENEC
ENEC

SE,plc
SE,plc

REA
REA
REA
REA
REA
REA
REA
REA
REA

Operator

Note: Status as of 31 December 2013, 72 reactors (69367 MW) were under construction, including 2 units (2600 MW) in Taiwan, China.
TAIWAN, CN
TW -7
LUNGMEN 1
BWR ABWR
3926
1350
1300 TPC
TAIWAN, CN
TW -8
LUNGMEN 2
BWR ABWR
3926
1350
1300 TPC

SK -10
SK -11

RU -152
RU -170
RU -116
RU -163
RU -164
RU -161
RU -162
RU -63
RU -64

Code

SLOVAKIA

Country

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2013 continued

GE
GE

WH
WH
WH
WH
WH

ASE
ASE

KEPCO
KEPCO

SKODA
SKODA

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

NSSS
supplier

1999-3
1999-8

2013-3
2013-11
2013-3
2013-11
1972-12

1986-3
1987-2

2012-7
2013-5

1987-1
1987-1

2007-4
2012-2
2006-7
2008-10
2010-4
2008-6
2009-7
2009-9
2010-6

Construction
start

2016-10
2017-10

2014-10
2015-10

First
criticality

2015-8

2015-1
2016-1

2016-11
2017-11

2014-10
2015-10

2018-12

Grid
connection

2017-6

2014-12
2015-12

2019-12
2019-12
2015-12
2016-12
2018-12
2015-12
2017-12
2015-12
2018-12

Commercial
operation

31

BE -2
BE -4
BE -5
BE -7
BE -3
BE -6
BE -8

BR -1
BR -2

BG -5
BG -6

CA -8
CA -9
CA -10
CA -11
CA -18
CA -19
CA -20
CA -21
CA -22
CA -23

BELGIUM

BRAZIL

BULGARIA

CANADA

BRUCE-1
BRUCE-2
BRUCE-3
BRUCE-4
BRUCE-5
BRUCE-6
BRUCE-7
BRUCE-8
DARLINGTON-1
DARLINGTON-2

KOZLODUY-5
KOZLODUY-6

ANGRA-1
ANGRA-2

DOEL-1
DOEL-2
DOEL-3
DOEL-4
TIHANGE-1
TIHANGE-2
TIHANGE-3

ARMENIAN-2

Name

ATUCHA-1
EMBALSE

Reactor

Model

WE (2 loops)
WE (2 loops)
WE 3-loops
WE 3-loops
Framatome 3 lo
WE 3-loops
WE 3-loops

PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR

CANDU 791
CANDU 791
CANDU 750A
CANDU 750A
CANDU 750B
CANDU 750B
CANDU 750B
CANDU 750B
CANDU 850
CANDU 850

PWR VVER V-320


PWR VVER V-320

PWR 2-loop WE
PWR PRE KONVOI

PWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR VVER V-270

PHWR PHWR KWU


PHWR CANDU 6

Type

2575
2456
2832
2832
2832
2690
2832
2690
2776
2776

3000
3000

1882
3764

1311
1311
3054
2988
2873
3064
3000

1375

1179
2015

824
786
805
805
872
891
872
845
934
934

1000
1000

640
1350

454
454
1056
1090
1009
1055
1094

408

357
648

Thermal Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

AM -19

ARMENIA

Code

AR -1
AR -2

ARGENTINA

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013

772
734
730
730
817
817
817
817
878
878

953
953

609
1275

433
433
1006
1039
962
1008
1046

375

335
600

Net

BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
OPG
OPG

KOZNPP
KOZNPP

ELETRONU
ELETRONU

ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB

ANPPCJSC

NASA
NASA

Operator

OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL

AEE
AEE

WH
KWU

ACECOWEN
ACECOWEN
FRAMACEC
ACECOWEN
ACLF
FRAMACEC
ACECOWEN

FAEA

SIEMENS
AECL

NSSS
supplier

1971-6
1970-12
1972-7
1972-9
1978-6
1978-1
1979-5
1979-8
1982-4
1981-9

1980-7
1982-4

1971-5
1976-1

1969-7
1971-9
1975-1
1978-12
1970-6
1976-4
1978-11

1975-7

1968-6
1974-4

Construction
start

1977-1
1976-9
1977-12
1978-12
1984-12
1984-6
1986-2
1987-3
1990-12
1990-1

1987-11
1991-8

1982-4
2000-7

1974-8
1975-8
1982-6
1985-4
1975-3
1982-10
1985-6

1980-1

1974-3
1983-4

Grid
connection

1977-9
1977-9
1978-2
1979-1
1985-3
1984-9
1986-4
1987-5
1992-11
1990-10

1988-12
1993-12

1985-1
2001-2

1975-2
1975-12
1982-10
1985-7
1975-10
1983-6
1985-9

1980-5

1974-6
1984-1

Commercial
operation

77.3
87.8
74.8
78.3
93.8
88.5
94.3
87.3
91.5
85.3

87.5
87.0

78.4
91.5

89.5
90.4
73.4
85.8
85.0
77.2
88.1

68.8

84.8
75.1

77.4
87.9
75.1
78.6
93.9
88.6
94.4
87.4
92.6
86.2

88.0
87.6

78.4
91.8

89.7
90.5
73.7
85.8
86.5
77.5
88.8

70.7

85.1
75.2

DH
DH

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

32

CHINA

Country

CN -84
CN -2
CN -3
CN -16
CN -17
CN -6
CN -7
CN -12
CN -13
CN -18
CN -4
CN -5
CN -14
CN -15
CN -8
CN -9
CN -1
CN -10
CN -11
CN -22

CA -24
CA -25
CA -4
CA -7
CA -13
CA -14
CA -15
CA -16
CA -17

Code

CEFR
DAYA BAY-1
DAYA BAY-2
HONGYANHE-1
HONGYANHE-2
LING AO-1
LING AO-2
LING AO-3
LING AO-4
NINGDE-1
QINSHAN 2-1
QINSHAN 2-2
QINSHAN 2-3
QINSHAN 2-4
QINSHAN 3-1
QINSHAN 3-2
QINSHAN-1
TIANWAN-1
TIANWAN-2
YANGJIANG-1

DARLINGTON-3
DARLINGTON-4
PICKERING-1
PICKERING-4
PICKERING-5
PICKERING-6
PICKERING-7
PICKERING-8
POINT LEPREAU

Name

Reactor

FBR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PHWR
PHWR
PWR
PWR
PWR
PWR

PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR

Type

BN-20
M310
M310
CPR-1000
CPR-1000
M310
M310
CPR-1000
CPR-1000
CPR-1000
CNP-600
CNP-600
CNP-600
CNP 600
CANDU 6
CANDU 6
CNP-300
VVER V-428
VVER V-428
CPR-1000

CANDU 850
CANDU 850
CANDU 500A
CANDU 500A
CANDU 500B
CANDU 500B
CANDU 500B
CANDU 500B
CANDU 6

Model

65
2905
2905
2905
2905
2905
2905
2905
2905
2905
1930
1930
1930
1930
2064
2064
966
3000
3000
2905

2776
2776
1744
1744
1744
1744
1744
1744
2180

25
984
984
1119
1119
990
990
1080
1080
1080
650
650
650
650
700
700
310
1060
1060
1086

934
934
542
542
540
540
540
540
705

Thermal Gross

Capacity (MW)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

20
944
944
1024
1024
950
950
1007
1007
1018
610
610
610
610
650
650
298
990
990
1000

878
878
515
515
516
516
516
516
660

Net

CIAE
DNMC
DNMC
LHNPC
LHNPC
DNMC
DNMC
DNMC
DNMC
NDNP
NPQJVC
NPQJVC
NPQJVC
NPQJVC
TQNPC
TQNPC
CNNO
JNPC
JNPC
YJNPC

OPG
OPG
OPG
OPG
OPG
OPG
OPG
OPG
NBEPC

Operator

IZ
FRAM
FRAM
DEC
DEC
FRAM
FRAM
DEC
DEC
DEC
CNNC
CNNC
CNNC
CNNC
AECL
AECL
CNNC
IZ
IZ
CFHI

OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
AECL

NSSS
supplier

2000-5
1987-8
1988-4
2007-8
2008-3
1997-5
1997-11
2005-12
2006-6
2008-2
1996-6
1997-4
2006-4
2007-1
1998-6
1998-9
1985-3
1999-10
2000-9
2008-12

1984-9
1985-7
1966-6
1968-5
1974-11
1975-10
1976-3
1976-9
1975-5

Construction
start

2011-7
1993-8
1994-2
2013-2
2013-11
2002-2
2002-9
2010-7
2011-5
2012-12
2002-2
2004-3
2010-8
2011-11
2002-11
2003-6
1991-12
2006-5
2007-5
2013-12

1992-12
1993-4
1971-4
1973-5
1982-12
1983-11
1984-11
1986-1
1982-9

Grid
connection

1994-2
1994-5
2013-6

2002-5
2003-1
2010-9
2011-8
2013-4
2002-4
2004-5
2010-10
2011-12
2002-12
2003-7
1994-4
2007-5
2007-8

1993-2
1993-6
1971-7
1973-6
1983-5
1984-2
1985-1
1986-2
1983-2

Commercial
operation

90.1
92.9
99.5
90.3
91.0
82.7
87.3
99.9
83.8
86.8
88.9
90.0
92.1
93.7
88.0
85.1
85.5

90.2
90.9
82.5
86.9
99.9
83.8
86.8
88.8
90.0
92.1
93.6
87.8
85.1
85.5

90.5
86.2
67.5
64.3
71.2
80.0
83.5
80.5
16.1
89.9
92.8
97.6

89.6
85.4
67.2
64.0
70.3
79.4
82.9
79.9
16.1

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

33

FR -54
FR -55
FR -32
FR -33
FR -34
FR -35
FR -13
FR -14
FR -15
FR -16
FR -50
FR -53
FR -60
FR -65
FR -40
FR -41
FR -56
FR -57

FRANCE

BELLEVILLE-1
BELLEVILLE-2
BLAYAIS-1
BLAYAIS-2
BLAYAIS-3
BLAYAIS-4
BUGEY-2
BUGEY-3
BUGEY-4
BUGEY-5
CATTENOM-1
CATTENOM-2
CATTENOM-3
CATTENOM-4
CHINON B-1
CHINON B-2
CHINON B-3
CHINON B-4

LOVIISA-1
LOVIISA-2
OLKILUOTO-1
OLKILUOTO-2

Name

DUKOVANY-1
DUKOVANY-2
DUKOVANY-3
DUKOVANY-4
TEMELIN-1
TEMELIN-2

Reactor

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR
PWR
BWR
BWR

PWR
PWR
PWR
PWR
PWR
PWR

Type

P4 REP 1300
P4 REP 1300
CP1
CP1
CP1
CP1
CP0
CP0
CP0
CP0
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
CP2
CP2
CP2
CP2

VVER V-213
VVER V-213
BWR-2500
BWR-2500

VVER V-213
VVER V-213
VVER V-213
VVER V-213
VVER V-320
VVER V-320

Model

3817
3817
2785
2785
2785
2785
2785
2785
2785
2785
3817
3817
3817
3817
2785
2785
2785
2785

1500
1500
2500
2500

1444
1444
1444
1444
3120
3120

1363
1363
951
951
951
951
945
945
917
917
1362
1362
1362
1362
954
954
954
954

520
520
910
910

500
500
500
500
1056
1056

Thermal Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

FI -1
FI -2
FI -3
FI -4

FINLAND

Code

CZ -4
CZ -5
CZ -8
CZ -9
CZ -23
CZ -24

CZECH REP.

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

1310
1310
910
910
910
910
910
910
880
880
1300
1300
1300
1300
905
905
905
905

496
496
880
880

468
471
468
471
1003
1003

Net

EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF

FORTUMPH
FORTUMPH
TVO
TVO

CEZ
CEZ
CEZ
CEZ
CEZ
CEZ

Operator

FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM

AEE
AEE
ASEASTAL
ASEASTAL

SKODA
SKODA
SKODA
SKODA
SKODA
SKODA

NSSS
supplier

1980-5
1980-8
1977-1
1977-1
1978-4
1978-4
1972-11
1973-9
1974-6
1974-7
1979-10
1980-7
1982-6
1983-9
1977-3
1977-3
1980-10
1981-2

1971-5
1972-8
1974-2
1975-11

1979-1
1979-1
1979-3
1979-3
1987-2
1987-2

Construction
start

1987-10
1988-7
1981-6
1982-7
1983-8
1983-5
1978-5
1978-9
1979-3
1979-7
1986-11
1987-9
1990-7
1991-5
1982-11
1983-11
1986-10
1987-11

1977-2
1980-11
1978-9
1980-2

1985-2
1986-1
1986-11
1987-6
2000-12
2002-12

Grid
connection

1988-6
1989-1
1981-12
1983-2
1983-11
1983-10
1979-3
1979-3
1979-7
1980-1
1987-4
1988-2
1991-2
1992-1
1984-2
1984-8
1987-3
1988-4

1977-5
1981-1
1979-10
1982-7

1985-5
1986-3
1986-12
1987-7
2002-6
2003-4

Commercial
operation

79.8
74.6
73.0
75.5
82.4
74.3
72.5
48.8
80.7
75.1
74.4
78.2
71.4
76.5
64.1
77.7
72.9
74.1

91.3
91.9
93.9
93.4

89.1
87.7
83.9
85.3
79.4
80.5

81.1
78.1
76.4
78.7
85.7
77.9
74.7
53.9
83.4
78.3
76.7
81.3
72.9
78.2
69.0
79.9
75.4
78.2

91.8
92.7
94.6
94.3

89.6
88.4
84.9
86.1
79.6
80.9

DH
DH

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

34

Country

FR -62
FR -70
FR -72
FR -73
FR -42
FR -43
FR -44
FR -45
FR -22
FR -29
FR -30
FR -31
FR -11
FR -12
FR -46
FR -47
FR -61
FR -68
FR -20
FR -21
FR -27
FR -28
FR -51
FR -52
FR -58
FR -59
FR -36
FR -37
FR -38
FR -39

Code

CHOOZ B-1
CHOOZ B-2
CIVAUX-1
CIVAUX-2
CRUAS-1
CRUAS-2
CRUAS-3
CRUAS-4
DAMPIERRE-1
DAMPIERRE-2
DAMPIERRE-3
DAMPIERRE-4
FESSENHEIM-1
FESSENHEIM-2
FLAMANVILLE-1
FLAMANVILLE-2
GOLFECH-1
GOLFECH-2
GRAVELINES-1
GRAVELINES-2
GRAVELINES-3
GRAVELINES-4
GRAVELINES-5
GRAVELINES-6
NOGENT-1
NOGENT-2
PALUEL-1
PALUEL-2
PALUEL-3
PALUEL-4

Name

Reactor

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

Type

N4 REP 1450
N4 REP 1450
N4 REP 1450
N4 REP 1450
CP2
CP2
CP2
CP2
CP1
CP1
CP1
CP1
CP0
CP0
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
CP1
CP1
CP1
CP1
CP1
CP1
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300

Model

4270
4270
4270
4270
2785
2785
2785
2785
2785
2785
2785
2785
2785
2785
3817
3817
3817
3817
2785
2785
2785
2785
2785
2785
3817
3817
3817
3817
3817
3817

1560
1560
1561
1561
956
956
956
956
937
937
937
937
920
920
1382
1382
1363
1363
951
951
951
951
951
951
1363
1363
1382
1382
1382
1382

Thermal Gross

Capacity (MW)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

1500
1500
1495
1495
915
915
915
915
890
890
890
890
880
880
1330
1330
1310
1310
910
910
910
910
910
910
1310
1310
1330
1330
1330
1330

Net
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF

Operator
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM

NSSS
supplier
1984-1
1985-12
1988-10
1991-4
1978-8
1978-11
1979-4
1979-10
1975-2
1975-4
1975-9
1975-12
1971-9
1972-2
1979-12
1980-5
1982-11
1984-10
1975-2
1975-3
1975-12
1976-4
1979-10
1979-10
1981-5
1982-1
1977-8
1978-1
1979-2
1980-2

Construction
start
1996-8
1997-4
1997-12
1999-12
1983-4
1984-9
1984-5
1984-10
1980-3
1980-12
1981-1
1981-8
1977-4
1977-10
1985-12
1986-7
1990-6
1993-6
1980-3
1980-8
1980-12
1981-6
1984-8
1985-8
1987-10
1988-12
1984-6
1984-9
1985-9
1986-4

Grid
connection
2000-5
2000-9
2002-1
2002-4
1984-4
1985-4
1984-9
1985-2
1980-9
1981-2
1981-5
1981-11
1978-1
1978-4
1986-12
1987-3
1991-2
1994-3
1980-11
1980-12
1981-6
1981-10
1985-1
1985-10
1988-2
1989-5
1985-12
1985-12
1986-2
1986-6

Commercial
operation
77.6
72.7
75.5
74.1
74.4
74.2
79.2
74.3
74.4
80.2
76.2
79.8
71.3
58.6
76.9
81.3
83.9
87.5
67.3
72.1
68.2
82.6
79.9
83.8
79.3
79.8
77.0
84.1
65.7
81.1

78.4
81.1
78.5
83.2
79.6
77.9
84.5
78.3
77.2
81.7
78.6
85.2
72.1
62.0
79.6
84.1
85.3
88.8
69.4
73.7
69.9
84.3
81.3
84.2
83.4
80.7
82.3
86.2
67.6
82.6

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

35

HU -1
HU -2
HU -3
HU -4

IN -13
IN -14
IN -15
IN -16

HUNGARY

INDIA

KAIGA-1
KAIGA-2
KAIGA-3
KAIGA-4

PAKS-1
PAKS-2
PAKS-3
PAKS-4

BROKDORF
EMSLAND
GRAFENRHEINFELD
GROHNDE
GUNDREMMINGEN-B
GUNDREMMINGEN-C
ISAR-2
NECKARWESTHEIM-2
PHILIPPSBURG-2

Name

PENLY-1
PENLY-2
ST. ALBAN-1
ST. ALBAN-2
ST. LAURENT B-1
ST. LAURENT B-2
TRICASTIN-1
TRICASTIN-2
TRICASTIN-3
TRICASTIN-4

Reactor

PHWR
PHWR
PHWR
PHWR

PWR
PWR
PWR
PWR

PWR
PWR
PWR
PWR
BWR
BWR
PWR
PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

Type

Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre

VVER V-213
VVER V-213
VVER V-213
VVER V-213

PWR
Konvoi
PWR
PWR
BWR-72
BWR-72
Konvoi
Konvoi
PWR

P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
CP2
CP2
CP1
CP1
CP1
CP1

Model

801
801
800
800

1485
1485
1485
1485

3900
3850
3765
3900
3840
3840
3950
3850
3950

3817
3817
3817
3817
2785
2785
2785
2785
2785
2785

220
220
220
220

500
500
500
500

1480
1400
1345
1430
1344
1344
1485
1400
1468

1382
1382
1381
1381
956
956
955
955
955
955

Thermal Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

DE -32
DE -33
DE -23
DE -27
DE -26
DE -28
DE -31
DE -44
DE -24

Code

FR -63
FR -64
FR -48
FR -49
FR -17
FR -23
FR -18
FR -19
FR -25
FR -26

GERMANY

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

202
202
202
202

470
473
473
473

1410
1329
1275
1360
1284
1288
1410
1310
1402

Net

1330
1330
1335
1335
915
915
915
915
915
915

NPCIL
NPCIL
NPCIL
NPCIL

PAKS Zrt
PAKS Zrt
PAKS Zrt
PAKS Zrt

E.ON
KLE
E.ON
KWG
KGG
KGG
E.ON
EnKK
EnKK

EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF

Operator

NPCIL
NPCIL
NPCIL
NPCIL

AEE
AEE
AEE
AEE

KWU
KWU
KWU
KWU
KWU
KWU
KWU
KWU
KWU

FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM

NSSS
supplier

1989-9
1989-12
2002-3
2002-5

1974-8
1974-8
1979-10
1979-10

1976-1
1982-8
1975-1
1976-6
1976-7
1976-7
1982-9
1982-11
1977-7

1982-9
1984-8
1979-1
1979-7
1976-5
1976-7
1974-11
1974-12
1975-4
1975-5

Construction
start

2000-10
1999-12
2007-4
2011-1

1982-12
1984-9
1986-9
1987-8

1986-10
1988-4
1981-12
1984-9
1984-3
1984-11
1988-1
1989-1
1984-12

1990-5
1992-2
1985-8
1986-7
1981-1
1981-6
1980-5
1980-8
1981-2
1981-6

Grid
connection

2000-11
2000-3
2007-5
2011-1

1983-8
1984-11
1986-12
1987-11

1986-12
1988-6
1982-6
1985-2
1984-7
1985-1
1988-4
1989-4
1985-4

1990-12
1992-11
1986-5
1987-3
1983-8
1983-8
1980-12
1980-12
1981-5
1981-11

Commercial
operation

65.4
65.0
66.0
68.9

89.1
89.3
85.5
88.6

88.4
94.4
83.9
90.0
87.9
89.4
94.3
92.0
86.3

78.2
84.4
80.3
77.9
76.4
70.2
75.5
76.0
74.9
82.3

91.7
93.3
89.0
89.2

89.2
89.4
85.6
88.7

88.5
94.4
84.0
91.3
87.9
89.5
94.3
92.2
86.7

79.1
86.8
81.7
79.7
81.1
73.5
77.6
78.2
75.8
84.9

DH
DH
DH

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

36

JP -25
JP -26
JP -35
JP -38
JP -12
JP -27
JP -45
JP -46
JP -36
JP -49

FUKUSHIMA-DAINI-1
FUKUSHIMA-DAINI-2
FUKUSHIMA-DAINI-3
FUKUSHIMA-DAINI-4
GENKAI-1
GENKAI-2
GENKAI-3
GENKAI-4
HAMAOKA-3
HAMAOKA-4

BUSHEHR-1

KAKRAPAR-1
KAKRAPAR-2
KUDANKULAM-1
MADRAS-1
MADRAS-2
NARORA-1
NARORA-2
RAJASTHAN-1
RAJASTHAN-2
RAJASTHAN-3
RAJASTHAN-4
RAJASTHAN-5
RAJASTHAN-6
TARAPUR-1
TARAPUR-2
TARAPUR-3
TARAPUR-4

Reactor

Name

Horizontal Pre
Horizontal Pre
VVER V-412
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
BWR-1, Mark 2
BWR-1, Mark 2
Horizontal Pre
Horizontal Pre

Model

BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR
BWR

BWR-5
BWR-5
BWR-5
BWR-5
M (2-loop)
M (2-loop)
M (4-loop)
M (4-loop)
BWR-5
BWR-5

PWR VVER V-446

PHWR
PHWR
PWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
BWR
BWR
PHWR
PHWR

Type

3293
3293
3293
3293
1650
1650
3423
3423
3293
3293

3000

801
801
3000
801
801
801
801
346
693
801
801
801
801
530
530
1730
1730

1100
1100
1100
1100
559
559
1180
1180
1100
1137

1000

220
220
1000
220
220
220
220
100
200
220
220
220
220
160
160
540
540

Capacity (MW)

Thermal Gross

1067
1067
1067
1067
529
529
1127
1127
1056
1092

915

202
202
917
205
205
202
202
90
187
202
202
202
202
150
150
490
490

Net

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination, PH process heating.

IR -1

JAPAN

IN -9
IN -10
IN -25
IN -5
IN -6
IN -7
IN -8
IN -3
IN -4
IN -11
IN -12
IN -19
IN -20
IN -1
IN -2
IN -23
IN -24

Code

IRAN, ISL. REP.

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

TEPCO
TEPCO
TEPCO
TEPCO
KYUSHU
KYUSHU
KYUSHU
KYUSHU
CHUBU
CHUBU

NPPDCO

NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL

Operator

TOSHIBA
HITACHI
TOSHIBA
HITACHI
MHI
MHI
MHI
MHI
TOSHIBA
TOSHIBA

ASE

NPCIL
NPCIL
MAEP
NPCIL
NPCIL
NPCIL
NPCIL
AECL
AECL/DAE
NPCIL
NPCIL
NPCIL
NPCIL
GE
GE
NPCIL
NPCIL

NSSS
supplier

1976-3
1979-5
1981-3
1981-5
1971-9
1977-2
1988-6
1992-7
1983-4
1989-10

1975-5

1984-12
1985-4
2002-3
1971-1
1972-10
1976-12
1977-11
1965-8
1968-4
1990-2
1990-10
2002-9
2003-1
1964-10
1964-10
2000-5
2000-3

Construction
start

1981-7
1983-6
1984-12
1986-12
1975-2
1980-6
1993-6
1996-11
1987-1
1993-1

2011-9

1992-11
1995-3
2013-10
1983-7
1985-9
1989-7
1992-1
1972-11
1980-11
2000-3
2000-11
2009-12
2010-3
1969-4
1969-5
2006-6
2005-6

Grid
connection

1982-4
1984-2
1985-6
1987-8
1975-10
1981-3
1994-3
1997-7
1987-8
1993-9

2013-9

1993-5
1995-9
2014-4
1984-1
1986-3
1991-1
1992-7
1973-12
1981-4
2000-6
2000-12
2010-2
2010-3
1969-10
1969-10
2006-8
2005-9

Commercial
operation

34.2
38.2
40.0
33.6
50.0
36.6
34.8
51.3
32.0
63.7

35.3
39.3
41.2
34.7
50.0
36.6
34.8
51.3
32.0
65.8

95.1

90.0
83.2
88.2
61.2
0.0
80.1
93.5
91.4
92.6
79.0
79.3
81.1
91.0
87.9

60.5
51.6
56.2
38.5
0.0
78.6
84.6
83.1
92.2
78.4
79.0
80.4
77.8
68.0
95.1

57.2
92.4

57.2
74.9

DS
DS
-

DS
DS
PH
PH
PH
PH
-

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

37

Code

JP -60
JP -58
JP -23
JP -32
JP -47
JP -33
JP -39
JP -52
JP -53
JP -40
JP -55
JP -56
JP -4
JP -6
JP -14
JP -15
JP -19
JP -50
JP -51
JP -22
JP -54
JP -57
JP -28
JP -37
JP -48
JP -59
JP -7
JP -41
JP -8
JP -13

Name

HAMAOKA-5
HIGASHI DORI-1 (TOHOKU)
IKATA-1
IKATA-2
IKATA-3
KASHIWAZAKI KARIWA-1
KASHIWAZAKI KARIWA-2
KASHIWAZAKI KARIWA-3
KASHIWAZAKI KARIWA-4
KASHIWAZAKI KARIWA-5
KASHIWAZAKI KARIWA-6
KASHIWAZAKI KARIWA-7
MIHAMA-1
MIHAMA-2
MIHAMA-3
OHI-1
OHI-2
OHI-3
OHI-4
ONAGAWA-1
ONAGAWA-2
ONAGAWA-3
SENDAI-1
SENDAI-2
SHIKA-1
SHIKA-2
SHIMANE-1
SHIMANE-2
TAKAHAMA-1
TAKAHAMA-2

Reactor

BWR
BWR
PWR
PWR
PWR
BWR
BWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
PWR
PWR
BWR
BWR
BWR
BWR
PWR
PWR

Type

ABWR
BWR-5
M (2-loop)
M (2-loop)
M (3-loop)
BWR-5
BWR-5
BWR-5
BWR-5
BWR-5
ABWR
ABWR
W (2-loop)
M (2-loop)
M (3-loop)
W (4-loop)
W (4-loop)
M (4-loop)
M (4-loop)
BWR-4
BWR-5
BWR-5
M (3-loop)
M (3-loop)
BWR-5
ABWR
BWR-3
BWR-5
M (3-loop)
M (3-loop)

Model

3926
3293
1650
1650
2660
3293
3293
3293
3293
3293
3926
3926
1031
1456
2440
3423
3423
3423
3423
1593
2436
2436
2660
2660
1593
3926
1380
2436
2440
2440

1380
1100
566
566
890
1100
1100
1100
1100
1100
1356
1356
340
500
826
1175
1175
1180
1180
524
825
825
890
890
530
1150
460
820
826
826

Thermal Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination.

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued


Net

1325
1067
538
538
846
1067
1067
1067
1067
1067
1315
1315
320
470
780
1120
1120
1127
1127
498
796
796
846
846
505
1108
439
789
780
780

CHUBU
TOHOKU
SHIKOKU
SHIKOKU
SHIKOKU
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
TOHOKU
TOHOKU
TOHOKU
KYUSHU
KYUSHU
HOKURIKU
HOKURIKU
CHUGOKU
CHUGOKU
KEPCO
KEPCO

Operator
TOSHIBA
TOSHIBA
MHI
MHI
MHI
TOSHIBA
TOSHIBA
TOSHIBA
HITACHI
HITACHI
TOSHIBA
HITACHI
WH
MHI
MHI
WH
WH
MHI
MHI
TOSHIBA
TOSHIBA
TOSHIBA
MHI
MHI
HITACHI
HITACHI
HITACHI
HITACHI
WH/MHI
MHI

NSSS
supplier
2000-7
2000-11
1973-9
1978-8
1990-10
1980-6
1985-11
1989-3
1990-3
1985-6
1992-11
1993-7
1967-2
1968-5
1972-8
1972-10
1972-12
1987-10
1988-6
1980-7
1991-4
1998-1
1979-12
1981-10
1989-7
2001-8
1970-7
1985-2
1970-4
1971-3

Construction
start
2004-4
2005-3
1977-2
1981-8
1994-3
1985-2
1990-2
1992-12
1993-12
1989-9
1996-1
1996-12
1970-8
1972-4
1976-2
1977-12
1978-10
1991-6
1992-6
1983-11
1994-12
2001-5
1983-9
1985-4
1993-1
2005-7
1973-12
1988-7
1974-3
1975-1

Grid
connection
2005-1
2005-12
1977-9
1982-3
1994-12
1985-9
1990-9
1993-8
1994-8
1990-4
1996-11
1997-7
1970-11
1972-7
1976-12
1979-3
1979-12
1991-12
1993-2
1984-6
1995-7
2002-1
1984-7
1985-11
1993-7
2006-3
1974-3
1989-2
1974-11
1975-11

Commercial
operation
42.2
37.1
43.1
49.4
43.4
23.1
0.0
0.0
0.0
23.0
45.5
37.2
32.1
44.9
41.7
33.7
41.8
60.4
68.0
30.1
26.7
28.0
39.6
44.9
31.9
32.3
17.8
42.4
36.8
47.5

53.4
37.2
43.2
49.4
43.4
23.1
0.0
0.0
0.0
23.0
45.5
37.2
32.3
45.1
41.7
33.7
41.8
60.5
68.0
40.1
36.1
38.0
39.6
44.9
31.9
32.3
17.8
42.4
36.8
47.5

DS
DS
DS
DS
DS
-

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

38

Code

JP -29
JP -30
JP -21
JP -43
JP -44
JP -64
JP -3
JP -34

HANBIT-1
HANBIT-2
HANBIT-3
HANBIT-4
HANBIT-5
HANBIT-6
HANUL-1
HANUL-2
HANUL-3
HANUL-4
HANUL-5
HANUL-6
KORI-1
KORI-2
KORI-3
KORI-4
SHIN-KORI-1
SHIN-KORI-2
SHIN-WOLSONG-1
WOLSONG-1
WOLSONG-2

Name

TAKAHAMA-3
TAKAHAMA-4
TOKAI-2
TOMARI-1
TOMARI-2
TOMARI-3
TSURUGA-1
TSURUGA-2

Reactor

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PHWR
PHWR

PWR
PWR
BWR
PWR
PWR
PWR
BWR
PWR

Type

WH F
WH F
OPR-1000
OPR-1000
OPR-1000
OPR-1000
France CPI
France CPI
OPR-1000
OPR-1000
OPR-1000
OPR-1000
WH △60
WH F
WH F
WH F
OPR-1000
OPR-1000
OPR-1000
CANDU 6
CANDU 6

M (3-loop)
M (3-loop)
BWR-5
M (2-loop)
M (2-loop)
M (3-loop)
BWR-2
M (4-loop)

Model

2787
2787
2825
2825
2825
2825
2785
2775
2825
2825
2815
2825
1729
1882
2912
2912
2825
2825
2825
2061
2061

2660
2660
3293
1650
1650
2660
1070
3411

996
993
1050
1049
1053
1052
1003
1008
1050
1053
1051
1051
608
676
1042
1041
1048
1045
1043
687
678

870
870
1100
579
579
912
357
1160

Thermal Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination.

KOREA, REP. OF KR -7
KR -8
KR -11
KR -12
KR -17
KR -18
KR -9
KR -10
KR -13
KR -14
KR -19
KR -20
KR -1
KR -2
KR -5
KR -6
KR -21
KR -22
KR -23
KR -3
KR -4

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

960
958
997
997
997
995
960
962
994
998
996
996
576
639
1011
1010
1000
1000
991
657
655

830
830
1060
550
550
866
340
1108

Net

KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP

KEPCO
KEPCO
JAPCO
HEPCO
HEPCO
HEPCO
JAPCO
JAPCO

Operator

WH
WH
DHICKAEC
DHICKAEC
DHICKOPC
DHICKOPC
FRAM
FRAM
DHICKOPC
DHICKOPC
DHICKOPC
DHICKOPC
WH
WH
WH
WH
DHICKOPC
DHICKOPC
DHICKOPC
AECL
AECL/DHI

MHI
MHI
GE
MHI
MHI
MHI
GE
MHI

NSSS
supplier

1981-6
1981-12
1989-12
1990-5
1997-6
1997-11
1983-1
1983-7
1993-7
1993-11
1999-10
2000-9
1972-4
1977-12
1979-10
1980-4
2006-6
2007-6
2007-11
1977-10
1992-6

1980-12
1981-3
1973-10
1985-4
1985-6
2004-11
1966-11
1982-11

Construction
start

1986-3
1986-11
1994-10
1995-7
2001-12
2002-9
1988-4
1989-4
1998-1
1998-12
2003-12
2005-1
1977-6
1983-4
1985-1
1985-11
2010-8
2012-1
2012-1
1982-12
1997-4

1984-5
1984-11
1978-3
1988-12
1990-8
2009-3
1969-11
1986-6

Grid
connection

1986-8
1987-6
1995-3
1996-1
2002-5
2002-12
1988-9
1989-9
1998-8
1999-12
2004-7
2005-4
1978-4
1983-7
1985-9
1986-4
2011-2
2012-7
2012-7
1983-4
1997-7

1985-1
1985-6
1978-11
1989-6
1991-4
2009-12
1970-3
1987-2

Commercial
operation

90.6
90.4
82.8
90.5
89.3
92.4
88.8
91.3
90.4
57.9
92.3
94.2
76.1
88.9
91.4
90.1
67.2
58.0
54.8
52.3
92.1

53.5
44.9
26.3
42.3
43.3
54.3
19.7
36.7
91.0
90.6
83.1
90.7
89.5
92.7
89.0
91.3
90.5
57.9
92.4
94.3
76.2
88.9
91.4
90.2
67.4
58.1
55.0
52.3
92.2

53.5
44.9
30.2
42.3
43.3
54.3
19.8
36.7

DS
DS
-

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

39

NL -2

PK -2
PK -3
PK -1

RO -1
RO -2

RU -96
RU -97
RU -98
RU -99
RU -21
RU -141
RU -142
RU -143
RU -144
RU -30
RU -31
RU -36
RU -37
RU -12
RU -13

NETHERLANDS

PAKISTAN

ROMANIA

RUSSIA

BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
BELOYARSK-3
BILIBINO-1
BILIBINO-2
BILIBINO-3
BILIBINO-4
KALININ-1
KALININ-2
KALININ-3
KALININ-4
KOLA-1
KOLA-2

CERNAVODA-1
CERNAVODA-2

CHASNUPP-1
CHASNUPP-2
KANUPP

BORSSELE

LAGUNA VERDE-1
LAGUNA VERDE-2

Name

WOLSONG-3
WOLSONG-4

Reactor

Model

PWR
PWR
PWR
PWR
FBR
LWGR
LWGR
LWGR
LWGR
PWR
PWR
PWR
PWR
PWR
PWR

VVER V-320
VVER V-320
VVER V-320
VVER V-320
BN-600
EGP-6
EGP-6
EGP-6
EGP-6
VVER V-338
VVER V-338
VVER V-320
VVER V-320
VVER V-230
VVER V-230

PHWR CANDU 6
PHWR CANDU 6

PWR CNP-300
PWR CNP-300
PHWR CANDU-137 MW

PWR LWR - PWR

BWR BWR-5
BWR BWR-5

PHWR CANDU 6
PHWR CANDU 6

Type

3000
3000
3000
3200
1470
62
62
62
62
3000
3000
3200
3200
1375
1375

2180
2180

999
999
337

1366

2027
2027

2061
2061

1000
1000
1000
1000
600
12
12
12
12
1000
1000
1000
1000
440
440

706
705

325
325
100

515

700
700

698
703

Thermal Gross

Capacity (MW)

950
950
950
950
560
11
11
11
11
950
950
950
950
411
411

650
650

300
300
90

482

665
665

684
688

Net

REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA

SNN
SNN

PAEC
PAEC
PAEC

EPZ

CFE
CFE

KHNP
KHNP

Operator

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

AECL
AECL

CNNC
CNNC
CGE

S/KWU

GE
GE

AECL/DHI
AECL/DHI

NSSS
supplier

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.

MX -1
MX -2

Code

KR -15
KR -16

MEXICO

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

1980-12
1981-8
1982-11
1984-4
1969-1
1970-1
1970-1
1970-1
1970-1
1977-2
1982-2
1985-10
1986-8
1970-5
1970-5

1982-7
1983-7

1993-8
2005-12
1966-8

1969-7

1976-10
1977-6

1994-3
1994-7

Construction
start

1985-12
1987-10
1988-12
1993-4
1980-4
1974-1
1974-12
1975-12
1976-12
1984-5
1986-12
2004-12
2011-11
1973-6
1974-12

1996-7
2007-8

2000-6
2011-3
1971-10

1973-7

1989-4
1994-11

1998-3
1999-5

Grid
connection

1986-5
1988-1
1989-4
1993-12
1981-11
1974-4
1975-2
1976-2
1977-1
1985-6
1987-3
2005-11
2012-12
1973-12
1975-2

1996-12
2007-10

2000-9
2011-5
1972-12

1973-10

1990-7
1995-4

1998-7
1999-10

Commercial
operation

87.7
91.6
88.4
88.5
76.9
54.8
83.4
85.8
85.3
82.8
87.9
84.2
75.7
83.8
83.5

94.6
93.0

84.3
77.4
46.6

85.3

73.4
78.8

93.3
93.3

87.8
92.0
88.6
88.5
77.0
54.8
83.4
85.8
85.3
82.8
87.9
84.2
75.7
83.9
83.8

94.9
93.6

84.3
77.4
46.6

85.9

74.2
79.4

93.3
93.5

DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH
DH
DH
DH
DH, PH
DH, PH
PH
DH, PH
DH, PH

DH
DH

DS

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

40

SI -1

ZA -1
ZA -2

ES -6

SLOVENIA

SOUTH AFRICA

SPAIN

ALMARAZ-1

KOEBERG-1
KOEBERG-2

KRSKO

BOHUNICE-3
BOHUNICE-4
MOCHOVCE-1
MOCHOVCE-2

KOLA-3
KOLA-4
KURSK-1
KURSK-2
KURSK-3
KURSK-4
LENINGRAD-1
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH-3
NOVOVORONEZH-4
NOVOVORONEZH-5
ROSTOV-1
ROSTOV-2
SMOLENSK-1
SMOLENSK-2
SMOLENSK-3

Reactor

Name

VVER V-213
VVER V-213
VVER V-213
VVER V-213

VVER V-213
VVER V-213
RBMK-1000
RBMK-1000
RBMK-1000
RBMK-1000
RBMK-1000
RBMK-1000
RBMK-1000
RBMK-1000
VVER V-179
VVER V-179
VVER V-187
VVER V-320I
VVER V-320I
RBMK-1000
RBMK-1000
RBMK-1000

Model

PWR WE 3-loops

PWR CP1
PWR CP1

PWR Westinghouse 2

PWR
PWR
PWR
PWR

PWR
PWR
LWGR
LWGR
LWGR
LWGR
LWGR
LWGR
LWGR
LWGR
PWR
PWR
PWR
PWR
PWR
LWGR
LWGR
LWGR

Type

2947

2775
2775

1994

1471
1471
1471
1471

1375
1375
3200
3200
3200
3200
3200
3200
3200
3200
1375
1375
3000
3200
3200
3200
3200
3200

1049

970
970

727

505
505
470
470

440
440
1000
1000
1000
1000
1000
1000
1000
1000
417
417
1000
1000
1000
1000
1000
1000

Capacity (MW)

Thermal Gross

1011

930
930

688

472
471
436
436

411
411
925
925
925
925
925
925
925
925
385
385
950
950
950
925
925
925

Net

FRAM
FRAM
WH

CNAT

WH

SKODA
SKODA
SKODA
SKODA

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

NSSS
supplier

ESKOM
ESKOM

NEK

SE,plc
SE,plc
SE,plc
SE,plc

REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA

Operator

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating, PH process heating.

SK -13
SK -14
SK -6
SK -7

RU -32
RU -33
RU -17
RU -22
RU -38
RU -39
RU -15
RU -16
RU -34
RU -35
RU -9
RU -11
RU -20
RU -59
RU -62
RU -23
RU -24
RU -67

Code

SLOVAKIA

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

1973-7

1976-7
1976-7

1975-3

1976-12
1976-12
1983-10
1983-10

1977-4
1976-8
1972-6
1973-1
1978-4
1981-5
1970-3
1970-6
1973-12
1975-2
1967-7
1967-7
1974-3
1981-9
1983-5
1975-10
1976-6
1984-5

Construction
start

1981-5

1984-4
1985-7

1981-10

1984-8
1985-8
1998-7
1999-12

1981-3
1984-10
1976-12
1979-1
1983-10
1985-12
1973-12
1975-7
1979-12
1981-2
1971-12
1972-12
1980-5
2001-3
2010-3
1982-12
1985-5
1990-1

Grid
connection

1983-9

1984-7
1985-11

1983-1

1985-2
1985-12
1998-10
2000-4

1982-12
1984-12
1977-10
1979-8
1984-3
1986-2
1974-11
1976-2
1980-6
1981-8
1972-6
1973-3
1981-2
2001-12
2010-12
1983-9
1985-7
1990-10

Commercial
operation

85.9

75.8
84.1

89.6

88.3
89.1
90.1
90.1

75.6
83.1
80.5
69.2
83.5
74.3
53.1
74.9
84.4
75.2
74.8
85.6
67.9
90.3
90.2
74.7
76.8
81.5

87.1

76.2
84.9

89.9

91.1
91.5
90.6
91.1

75.8
83.2
80.8
69.3
83.8
74.6
53.9
75.2
84.6
75.4
75.5
86.8
68.4
90.4
90.5
75.1
77.1
81.6

DH, PH
DH, PH
-

DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

41

CH -1
CH -3
CH -4
CH -5
CH -2

GB -18A
GB -18B
GB -19A
GB -19B
GB -20A
GB -20B

SWITZERLAND

UK

DUNGENESS B-1
DUNGENESS B-2
HARTLEPOOL A-1
HARTLEPOOL A-2
HEYSHAM A-1
HEYSHAM A-2

BEZNAU-1
BEZNAU-2
GOESGEN
LEIBSTADT
MUEHLEBERG

FORSMARK-1
FORSMARK-2
FORSMARK-3
OSKARSHAMN-1
OSKARSHAMN-2
OSKARSHAMN-3
RINGHALS-1
RINGHALS-2
RINGHALS-3
RINGHALS-4

Name

ALMARAZ-2
ASCO-1
ASCO-2
COFRENTES
TRILLO-1
VANDELLOS-2

Reactor

GCR
GCR
GCR
GCR
GCR
GCR

PWR
PWR
PWR
BWR
BWR

BWR
BWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR

PWR
PWR
PWR
BWR
PWR
PWR

Type

AGR
AGR
AGR
AGR
AGR
AGR

WH - 2 loops
WH - 2 loops
PWR 3 Loop
BWR-6
BWR-4

BWR-75
BWR-75
BWR-3000
ABB BWR
ABB BWR
BWR-75
BWR
WE (3 loops)
WE (3 loops)
WE (3 loops)

WE 3-loops
WE 3-loops
WE 3-loops
BWR-6
PWR 3 loops
WE 3-loops

Model

1500
1500
1500
1500
1500
1500

1130
1130
3002
3600
1097

2928
3253
3300
1375
1800
3900
2540
2500
3135
2775

2947
2954
2941
3237
3010
2941

615
615
655
655
625
625

380
380
1035
1275
390

1022
1158
1212
492
661
1450
910
847
1117
990

1044
1033
1035
1102
1066
1087

Thermal Gross

Capacity (MW)

520
520
595
585
585
575

365
365
985
1220
373

984
1120
1170
473
638
1400
878
807
1064
940

Net

1006
995
997
1064
1003
1045

EDF UK
EDF UK
EDF UK
EDF UK
EDF UK
EDF UK

Axpo AG
Axpo AG
KKG
KKL
BKW

FKA
FKA
FKA
OKG
OKG
OKG
RAB
RAB
RAB
RAB

CNAT
ANAV
ANAV
ID
CNAT
ANAV

Operator

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating, PH process heating.

SE -9
SE -11
SE -14
SE -2
SE -3
SE -12
SE -4
SE -5
SE -7
SE -10

Code

ES -7
ES -8
ES -9
ES -10
ES -11
ES -16

SWEDEN

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

APC
APC
NPC
NPC
NPC
NPC

WH
WH
KWU
GETSCO
GETSCO

ABBATOM
ABBATOM
ABBATOM
ABBATOM
ABBATOM
ABBATOM
ABBATOM
WH
WH
WH

WH
WH
WH
GE
KWU
WH

NSSS
supplier

1965-10
1965-10
1968-10
1968-10
1970-12
1970-12

1965-9
1968-1
1973-12
1974-1
1967-3

1973-6
1975-1
1979-1
1966-8
1969-9
1980-5
1969-2
1970-10
1972-9
1973-11

1973-7
1974-5
1975-3
1975-9
1979-8
1980-12

Construction
start

1983-4
1985-12
1983-8
1984-10
1983-7
1984-10

1969-7
1971-10
1979-2
1984-5
1971-7

1980-6
1981-1
1985-3
1971-8
1974-10
1985-3
1974-10
1974-8
1980-9
1982-6

1983-10
1983-8
1985-10
1984-10
1988-5
1987-12

Grid
connection

1985-4
1989-4
1989-4
1989-4
1989-4
1989-4

1969-9
1971-12
1979-11
1984-12
1972-11

1980-12
1981-7
1985-8
1972-2
1975-1
1985-8
1976-1
1975-5
1981-9
1983-11

1984-7
1984-12
1986-3
1985-3
1988-8
1988-3

Commercial
operation

37.4
44.2
75.9
71.3
68.8
64.6

91.6
88.1
89.1
86.6
87.6

86.8
74.6
86.0
46.9
69.4
54.2
59.3
55.1
82.3
80.0

85.1
83.1
85.5
89.3
87.0
79.1

37.4
44.2
75.9
71.3
68.8
64.6

91.6
88.2
89.2
87.8
87.7

87.4
75.2
86.9
47.5
70.4
55.0
60.3
56.3
84.6
81.9

86.2
84.2
87.7
90.8
87.9
80.2

DH
DH
PH
-

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

42

VVER V-320
VVER V-320
VVER V-213
VVER V-213
VVER V-320
VVER V-320
VVER V-302
VVER V-338
VVER V-320
VVER V-320
VVER V-320
VVER V-320
VVER V-320
VVER V-320
VVER V-320

AGR
AGR
AGR
AGR
AGR
AGR
SNUPPS
AGR
AGR
MAGNOX

Model

PWR B&W (L-loop) D


PWR CE (2-loop) DR
PWR W (3-loop)

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

GCR
GCR
GCR
GCR
GCR
GCR
PWR
GCR
GCR
GCR

Type

2568
3026
2900

3000
3000
1375
1375
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000

1550
1550
1494
1494
1496
1496
3425
1623
1623
1920

903
1065
959

1000
1000
420
415
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000

680
680
655
655
644
644
1250
682
682
540

Capacity (MW)

Thermal Gross

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

US -313 ANO-1
US -368 ANO-2
US -334 BEAVER VALLEY-1

USA

KHMELNITSKI-1
KHMELNITSKI-2
ROVNO-1
ROVNO-2
ROVNO-3
ROVNO-4
SOUTH UKRAINE-1
SOUTH UKRAINE-2
SOUTH UKRAINE-3
ZAPOROZHYE-1
ZAPOROZHYE-2
ZAPOROZHYE-3
ZAPOROZHYE-4
ZAPOROZHYE-5
ZAPOROZHYE-6

HEYSHAM B-1
HEYSHAM B-2
HINKLEY POINT B-1
HINKLEY POINT B-2
HUNTERSTON B-1
HUNTERSTON B-2
SIZEWELL B
TORNESS-1
TORNESS-2
WYLFA-1

Reactor

Name

UA -40
UA -41
UA -27
UA -28
UA -29
UA -69
UA -44
UA -45
UA -48
UA -54
UA -56
UA -78
UA -79
UA -126
UA -127

GB -22A
GB -22B
GB -16A
GB -16B
GB -17A
GB -17B
GB -24
GB -23A
GB -23B
GB -13A

Code

UKRAINE

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

836
992
921

950
950
381
376
950
950
950
950
950
950
950
950
950
950
950

610
610
440
440
460
430
1198
590
595
490

Net

ENTERGY
ENTERGY
FENOC

NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC

EDF UK
EDF UK
EDF UK
EDF UK
EDF UK
EDF UK
EDF UK
EDF UK
EDF UK
ML

Operator

B&W
CE
WH

PAIP
PAIP
PAIP
PAIP
PAIP
PAA
PAA
PAA
PAA
PAIP
PAIP
PAIP
PAIP
PAIP
PAIP

NPC
NPC
TNPG
TNPG
TNPG
TNPG
PPC
NNC
NNC
EE/B&W/T

NSSS
supplier

1968-10
1968-12
1970-6

1981-11
1985-2
1973-8
1973-10
1980-2
1986-8
1976-8
1981-7
1984-11
1980-4
1981-1
1982-4
1983-4
1985-11
1986-6

1980-8
1980-8
1967-9
1967-9
1967-11
1967-11
1988-7
1980-8
1980-8
1963-9

Construction
start

1974-8
1978-12
1976-6

1987-12
2004-8
1980-12
1981-12
1986-12
2004-10
1982-12
1985-1
1989-9
1984-12
1985-7
1986-12
1987-12
1989-8
1995-10

1988-7
1988-11
1976-10
1976-2
1976-2
1977-3
1995-2
1988-5
1989-2
1971-1

Grid
connection

1974-12
1980-3
1976-10

1988-8
2005-12
1981-9
1982-7
1987-5
2006-4
1983-12
1985-4
1989-12
1985-12
1986-2
1987-3
1988-4
1989-10
1996-9

1989-4
1989-4
1978-10
1976-9
1976-2
1977-3
1995-9
1988-5
1989-2
1971-11

Commercial
operation

88.0
91.4
92.4

82.2
75.3
63.3
75.7
68.6
76.9
62.8
75.1
64.8
76.5
81.7
81.5
80.8
80.2
80.8

83.8
71.3
78.2
83.5
84.8
85.5
77.6
82.7
81.7
66.7

88.0
91.4
92.4

83.1
76.7
63.7
76.2
70.6
79.4
67.9
77.6
71.1
78.0
83.6
84.5
82.1
82.2
81.7

84.1
71.9
78.6
83.5
84.8
85.7
77.6
83.7
82.9
66.9

DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

43

Country

Code

US -412
US -456
US -457
US -259
US -260
US -296
US -325
US -324
US -454
US -455
US -483
US -317
US -318
US -413
US -414
US -461
US -397
US -445
US -446
US -315
US -316
US -298
US -346
US -275
US -323
US -237
US -249
US -331
US -348
US -364

Name

BEAVER VALLEY-2
BRAIDWOOD-1
BRAIDWOOD-2
BROWNS FERRY-1
BROWNS FERRY-2
BROWNS FERRY-3
BRUNSWICK-1
BRUNSWICK-2
BYRON-1
BYRON-2
CALLAWAY-1
CALVERT CLIFFS-1
CALVERT CLIFFS-2
CATAWBA-1
CATAWBA-2
CLINTON-1
COLUMBIA
COMANCHE PEAK-1
COMANCHE PEAK-2
COOK-1
COOK-2
COOPER
DAVIS BESSE-1
DIABLO CANYON-1
DIABLO CANYON-2
DRESDEN-2
DRESDEN-3
DUANE ARNOLD-1
FARLEY-1
FARLEY-2

Reactor

PWR
PWR
PWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR
PWR
PWR
PWR
BWR
BWR
BWR
PWR
PWR

Type

W (3-loop)
W (4-loop)
W (4-loop) DRY
BWR-4 (Mark 1)
BWR-4 (Mark 1)
BWR-4 (Mark 1)
BWR-4 (Mark 1)
BWR-4 (Mark 1)
W (4-loop) (DR
W (4-Loop) (DR
W (4-loop) DRY
CE (2-loop) (D
CE (2-loop) (D
W (4-loop) (IC
W (4-loop) (IC
BWR-6 (Mark 3)
BWR-5 (Mark 2)
W (4-loop) DRY
W (4-loop) DRY
W (4-loop) ICE
W (4-loop) ICE
BWR-4 (Mark 1)
B&W (R-loop)
W (4-loop)
W (4-loop)
BWR-3 (Mark 1)
BWR-3 (Mark 1)
BWR-4 (Mark 1)
W (3-loop)
W (3-loop) DRY

Model

2900
3587
3587
3458
3458
3458
2923
2923
3587
3587
3565
2737
2737
3411
3411
3473
3486
3612
3612
3304
3468
2419
2817
3411
3411
2957
2957
1912
2775
2775

958
1242
1210
1155
1155
1155
990
960
1242
1210
1275
918
911
1188
1188
1098
1173
1259
1250
1100
1151
801
925
1197
1197
926
890
624
918
928

Thermal Gross

Capacity (MW)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued


Net

885
1178
1152
1101
1104
1105
938
920
1164
1136
1215
866
850
1146
1146
1065
1107
1205
1195
1030
1077
766
894
1122
1118
883
867
601
874
883

FENOC
EXELON
EXELON
TVA
TVA
TVA
PROGRESS
PROGRESS
EXELON
EXELON
AmerenUE
EXELON
EXELON
DUKEENER
DUKEENER
EXELON
ENERGYNW
LUMINANT
LUMINANT
AEP
AEP
ENTERGY
FENOC
PG&E
PG&E
EXELON
EXELON
NEXTERA
SOUTHERN
SOUTHERN

Operator
WH
WH
WH
GE
GE
GE
GE
GE
WH
WH
WH
CE
CE
WH
WH
GE
GE
WH
WH
WH
WH
GE
B&W
WH
WH
GE
GE
GE
WH
WH

NSSS
supplier
1974-5
1975-8
1975-8
1967-5
1967-5
1968-7
1970-2
1970-2
1975-4
1975-4
1975-9
1968-6
1968-6
1974-5
1974-5
1975-10
1972-8
1974-12
1974-12
1969-3
1969-3
1968-6
1970-9
1968-4
1970-12
1966-1
1966-10
1970-6
1970-10
1970-10

Construction
start
1987-8
1987-7
1988-5
1973-10
1974-8
1976-9
1976-12
1975-4
1985-3
1987-2
1984-10
1975-1
1976-12
1985-1
1986-5
1987-4
1984-5
1990-4
1993-4
1975-2
1978-3
1974-5
1977-8
1984-11
1985-10
1970-4
1971-7
1974-5
1977-8
1981-5

Grid
connection
1987-11
1988-7
1988-10
1974-8
1975-3
1977-3
1977-3
1975-11
1985-9
1987-8
1984-12
1975-5
1977-4
1985-6
1986-8
1987-11
1984-12
1990-8
1993-8
1975-8
1978-7
1974-7
1978-7
1985-5
1986-3
1970-6
1971-11
1975-2
1977-12
1981-7

Commercial
operation
92.6
93.6
95.1
92.2
89.0
90.5
90.5
87.7
94.5
95.6
89.9
93.2
94.0
92.5
91.7
94.3
81.7
95.0
95.3
73.5
89.1
91.4
85.7
91.0
91.8
95.5
96.3
91.7
92.4
93.3

92.6
93.6
95.1
93.5
90.5
92.4
90.5
87.7
94.5
95.6
89.9
93.4
94.0
92.5
91.7
94.3
81.9
95.0
95.3
73.5
89.1
91.4
85.7
91.0
92.0
95.5
96.3
91.7
92.4
93.3

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

44

Country

US -341
US -333
US -285
US -244
US -416
US -400
US -321
US -366
US -354
US -247
US -286
US -373
US -374
US -352
US -353
US -369
US -370
US -336
US -423
US -263
US -220
US -410
US -338
US -339
US -269
US -270
US -287
US -219
US -255
US -528

Code

FERMI-2
FITZPATRICK
FORT CALHOUN-1
GINNA
GRAND GULF-1
HARRIS-1
HATCH-1
HATCH-2
HOPE CREEK-1
INDIAN POINT-2
INDIAN POINT-3
LASALLE-1
LASALLE-2
LIMERICK-1
LIMERICK-2
MCGUIRE-1
MCGUIRE-2
MILLSTONE-2
MILLSTONE-3
MONTICELLO
NINE MILE POINT-1
NINE MILE POINT-2
NORTH ANNA-1
NORTH ANNA-2
OCONEE-1
OCONEE-2
OCONEE-3
OYSTER CREEK
PALISADES
PALO VERDE-1

Name

Reactor

BWR
BWR
PWR
PWR
BWR
PWR
BWR
BWR
BWR
PWR
PWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
BWR
PWR
PWR

Type

BWR-4 (Mark 1)
BWR-4 (Mark 1)
CE (2-loop)
W (2-loop)
BWR-6 (Mark 3)
W (3-loop) DRY
BWR-4 (Mark 1)
BWR-4 (Mark 1)
BWR-4 (Mark 1)
W (4-loop) DRY
W (4-loop) DRY
BWR-5 (Mark 2)
BWR-5 (Mark 2)
BWR-4 (Mark 2)
BWR-4 (Mark 2)
W (4-loop) ICE
W (4-loop) (IC
COMB CE DRYAMB
W (4-loop) DRY
BWR-3
BWR-2 (Mark 1)
BWR-5 (Mark 2)
W (3-loop)
W (3-loop)
B&W (L-loop)
B&W (L-loop)
B&W (L-loop)
BWR-2 (Mark 1)
CE (2-loop) DR
CE (2-loop) DR

Model

3430
2536
1500
1775
4408
2900
2804
2804
3840
3216
3216
3546
3546
3515
3515
3411
3411
2700
3650
1775
1850
3988
2940
2940
2568
2568
2568
1930
2565
3990

1100
849
512
608
1500
960
911
921
1240
1067
1085
1207
1207
1194
1194
1215
1215
918
1280
613
642
1320
990
1011
891
891
891
652
845
1414

Thermal Gross

Capacity (MW)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

1037
813
482
581
1419
928
876
883
1172
1020
1041
1137
1140
1130
1134
1158
1158
869
1210
578
621
1277
943
943
846
846
846
619
793
1311

Net
DTEDISON
ENTERGY
OPPD
EXELON
ENTERGY
PROGRESS
SOUTHERN
SOUTHERN
PSEG
ENTERGY
ENTERGY
EXELON
EXELON
EXELON
EXELON
DUKEENER
DUKEENER
DOMINION
DOMINION
NSP
EXELON
EXELON
DOMINION
DOMINION
DUKEENER
DUKEENER
DUKEENER
EXELON
ENTERGY
APS

Operator
GE
GE
CE
WH
GE
WH
GE
GE
GE
WH
WH
GE
GE
GE
GE
WH
WH
CE
WH
GE
GE
GE
WH
WH
B&W
B&W
B&W
GE
CE
CE

NSSS
supplier
1972-9
1968-9
1968-6
1966-4
1974-5
1978-1
1968-9
1972-2
1976-3
1966-10
1968-11
1973-9
1973-9
1974-6
1974-6
1971-4
1971-4
1969-11
1974-8
1967-6
1965-4
1975-8
1971-2
1971-2
1967-11
1967-11
1967-11
1964-12
1967-3
1976-5

Construction
start
1986-9
1975-2
1973-8
1969-12
1984-10
1987-1
1974-11
1978-9
1986-8
1973-6
1976-4
1982-9
1984-4
1985-4
1989-9
1981-9
1983-5
1975-11
1986-2
1971-3
1969-11
1987-8
1978-4
1980-8
1973-5
1973-12
1974-9
1969-9
1971-12
1985-6

Grid
connection
1988-1
1975-7
1973-9
1970-7
1985-7
1987-5
1975-12
1979-9
1986-12
1974-8
1976-8
1984-1
1984-10
1986-2
1990-1
1981-12
1984-3
1975-12
1986-4
1971-6
1969-12
1988-3
1978-6
1980-12
1973-7
1974-9
1974-12
1969-12
1971-12
1986-1

Commercial
operation
83.2
94.8
43.0
94.1
89.5
90.4
93.3
87.5
92.9
93.8
93.5
96.3
95.8
95.2
94.5
93.7
91.5
90.0
92.2
82.0
92.3
93.5
86.2
87.8
89.4
93.3
93.2
92.7
87.4
91.6

83.2
94.8
43.0
94.1
89.5
90.4
93.3
87.5
92.9
93.8
93.7
96.3
95.8
95.2
94.5
93.7
91.5
90.2
92.2
82.0
92.3
93.5
90.7
92.9
89.4
93.3
93.2
92.8
87.4
91.6

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

45

Country

Code

US -529
US -530
US -277
US -278
US -440
US -293
US -266
US -301
US -282
US -306
US -254
US -265
US -458
US -261
US -272
US -311
US -443
US -327
US -328
US -498
US -499
US -335
US -389
US -395
US -280
US -281
US -387
US -388
US -289
US -250

Name

PALO VERDE-2
PALO VERDE-3
PEACH BOTTOM-2
PEACH BOTTOM-3
PERRY-1
PILGRIM-1
POINT BEACH-1
POINT BEACH-2
PRAIRIE ISLAND-1
PRAIRIE ISLAND-2
QUAD CITIES-1
QUAD CITIES-2
RIVER BEND-1
ROBINSON-2
SALEM-1
SALEM-2
SEABROOK-1
SEQUOYAH-1
SEQUOYAH-2
SOUTH TEXAS-1
SOUTH TEXAS-2
ST. LUCIE-1
ST. LUCIE-2
SUMMER-1
SURRY-1
SURRY-2
SUSQUEHANNA-1
SUSQUEHANNA-2
THREE MILE ISLAND-1
TURKEY POINT-3

Reactor

PWR
PWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
PWR
PWR

Type

COMB CE80 DRYA


COMB CE80 DRYA
BWR-4 (Mark 1)
BWR-4 (Mark 1)
BWR-6 (Mark 3)
BWR-3 (Mark 1)
W (2-loop) DRY
W (2-loop) DRY
W (2-loop) DRY
W (2-loop) DRY
BWR-3 (Mark 1)
BWR-3 (Mark 1)
BWR-6 (Mark 3)
W (3-loop) DRY
W (4-loop) DRY
W (4-loop) DRY
W (4-loop) DRY
W (4-loop) ICE
W (4-loop) (IC
W (4-loop)
W (4-loop) DRY
COMB CE DRYAMB
COMB CE DRYAMB
W (3-loop) DRY
W (3-loop) DRY
W (3-loop) DRY
BWR-4 (Mark 2)
BWR-4 (Mark 2)
B&W (L-loop)
W (3-loop) DRY

Model

3990
3990
3514
3514
3758
2028
1800
1800
1677
1677
2957
2957
3091
2339
3459
3459
3648
3455
3455
3853
3853
3020
3020
2900
2857
2857
3952
3952
2568
2644

1414
1414
1182
1182
1303
711
640
640
566
560
940
940
1016
780
1254
1200
1296
1221
1200
1354
1354
1045
1050
1006
890
890
1330
1330
880
829

Thermal Gross

Capacity (MW)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued


Net

1314
1312
1125
1138
1256
677
591
591
522
519
908
911
967
741
1168
1158
1246
1152
1126
1280
1280
982
987
971
838
838
1257
1257
819
802

APS
APS
EXELON
EXELON
FENOC
ENTERGY
NEXTERA
NEXTERA
NSP
NSP
EXELON
EXELON
ENTERGY
PROGRESS
PSEG
PSEG
NEXTERA
TVA
TVA
STP
STP
FPL
FPL
SCE&G
DOMINION
DOMINION
PPL SUSQ
PPL SUSQ
EXELON
FPL

Operator
CE
CE
GE
GE
GE
GE
WH
WH
WH
WH
GE
GE
GE
WH
WH
WH
WH
WH
WH
WH
WH
CE
CE
WH
WH
WH
GE
GE
B&W
WH

NSSS
supplier
1976-6
1976-6
1968-1
1968-1
1974-10
1968-8
1967-7
1968-7
1968-6
1969-6
1967-2
1967-2
1977-3
1967-4
1968-9
1968-9
1976-7
1970-5
1970-5
1975-12
1975-12
1970-7
1977-6
1973-3
1968-6
1968-6
1973-11
1973-11
1968-5
1967-4

Construction
start
1986-5
1987-11
1974-2
1974-9
1986-12
1972-7
1970-11
1972-8
1973-12
1974-12
1972-4
1972-5
1985-12
1970-9
1976-12
1981-6
1990-5
1980-7
1981-12
1988-3
1989-4
1976-5
1983-6
1982-11
1972-7
1973-3
1982-11
1984-7
1974-6
1972-11

Grid
connection
1986-9
1988-1
1974-7
1974-12
1987-11
1972-12
1970-12
1972-10
1973-12
1974-12
1973-2
1973-3
1986-6
1971-3
1977-6
1981-10
1990-8
1981-7
1982-6
1988-8
1989-6
1976-12
1983-8
1984-1
1972-12
1973-5
1983-6
1985-2
1974-9
1972-12

Commercial
operation
92.1
89.2
96.4
93.4
85.8
92.0
92.2
89.1
89.1
86.2
94.4
96.1
93.1
84.3
92.2
93.9
90.1
90.7
90.9
91.8
79.2
82.9
82.0
89.9
92.5
91.9
85.7
86.6
90.7
81.3

92.1
89.2
96.4
93.4
85.8
92.0
92.2
89.1
89.1
86.2
94.4
96.1
93.1
84.3
92.5
93.9
90.1
90.7
90.9
91.8
79.2
82.9
82.2
89.9
92.9
91.9
85.7
86.6
90.7
81.3

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

46

2644
1912
3626
3626
3716
3459
3565

829
635
1229
1229
1250
1210
1280

Capacity (MW)

Thermal Gross

Name

SANTA MARIA DE GARONA

MONJU

Reactor

BWR

FBR

Type

BWR-3

Model

Note: Status as of 31 December 2013, 2 reactors (692 MW) were in long term shutdown.

ES -2

SPAIN

Code

JP -31

JAPAN

Country

802
605
1150
1152
1168
1123
1195

Net

1381

714

Thermal
466

280

Gross

Capacity (MW)

TABLE 15. REACTORS IN LONG TERM SHUTDOWN , 31 DEC. 2013

W (3-loop) DRY
BWR-4 (Mark 1)
W (4-loop) DRY
W (4-loop) DRY
CE (2-loop)
W (4-loop) (IC
W (4-loop)

Model

Operator

NSSS
supplier

446

246

Net
NUCLENOR

JAEA

Operator

GE
GE
GE
GE
WH
WH

PWR
BWR
PWR
PWR
PWR
PWR
PWR

Type

Note: Status as of 31 December 2013, 434 reactors (371733 MW) were connected to the grid, including 6 units (5032 MW) in Taiwan, China.
TAIWAN, CN
TW -1
CHINSHAN-1
BWR BWR-4
1840
636
604 TPC
TAIWAN, CN
TW -2
CHINSHAN-2
BWR BWR-4
1840
636
604 TPC
TAIWAN, CN
TW -3
KUOSHENG-1
BWR BWR-6
2943
1020
985 TPC
TAIWAN, CN
TW -4
KUOSHENG-2
BWR BWR-6
2943
1020
985 TPC
TAIWAN, CN
TW -5
MAANSHAN-1
PWR WE 312 (3 loop
2822
951
926 TPC
TAIWAN, CN
TW -6
MAANSHAN-2
PWR WE 312 (3 loop
2822
951
928 TPC

TURKEY POINT-4
VERMONT YANKEE
VOGTLE-1
VOGTLE-2
WATERFORD-3
WATTS BAR-1
WOLF CREEK

Reactor

Name
WH
GE
WH
WH
CE
WH
WH

US -251
US -271
US -424
US -425
US -382
US -390
US -482

Code
FPL
ENTERGY
SOUTHERN
SOUTHERN
ENTERGY
TVA
WCNOC

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 continued

GE

T/H/F/M

NSSS
supplier

1972-6
1973-12
1975-11
1976-3
1978-8
1979-2

1967-4
1967-12
1976-8
1976-8
1974-11
1973-1
1977-5

1977-11
1978-12
1981-5
1982-6
1984-5
1985-2

1973-6
1972-9
1987-3
1989-4
1985-3
1996-2
1985-6

1966-9

1986-5

1978-12
1979-7
1981-12
1983-3
1984-7
1985-5

1973-9
1972-11
1987-6
1989-5
1985-9
1996-5
1985-9

1971-3

1995-8

88.2
91.5
88.2
91.8
90.6
93.0

84.8
95.3
94.3
94.5
89.7
91.9
80.5

1971-5

2013-7

1995-12

Long term
shutdown
date

88.3
91.6
88.9
93.0
90.8
93.2

84.8
95.3
94.3
94.5
90.0
92.0
80.5

EAF % UCF % Non2009- 2009- electrical


2013 2013 applics

Commercial
operation

Commercial
operation

Grid
connection

Grid
connection

Construction
start

Construction
start

47

AM -18

BE -1

BG -1
BG -2
BG -3
BG -4

CA -2
CA -3
CA -12
CA -5
CA -6
CA -1

FR -9
FR -2
FR -3
FR -4
FR -5
FR -6
FR -1B
FR -1
FR -10
FR -7
FR -8
FR -24

DE -4
DE -12

BELGIUM

BULGARIA

CANADA

FRANCE

GERMANY

Code

ARMENIA

Country

Reactor

AVR JUELICH
BIBLIS-A

BUGEY-1
CHINON A-1
CHINON A-2
CHINON A-3
CHOOZ-A (ARDENNES)
EL-4 (MONTS D'ARREE)
G-2 (MARCOULE)
G-3 (MARCOULE)
PHENIX
ST. LAURENT A-1
ST. LAURENT A-2
SUPER-PHENIX

DOUGLAS POINT
GENTILLY-1
GENTILLY-2
PICKERING-2
PICKERING-3
ROLPHTON NPD

KOZLODUY-1
KOZLODUY-2
KOZLODUY-3
KOZLODUY-4

BR-3

ARMENIAN-1

Name

HTGR
PWR

GCR
GCR
GCR
GCR
PWR
HWGCR
GCR
GCR
FBR
GCR
GCR
FBR

PHWR
HWLWR
PHWR
PHWR
PHWR
PHWR

PWR
PWR
PWR
PWR

PWR

PWR

Type

46
3517

1954
300
800
1170
1040
250
260
260
345
1650
1475
3000

704
792
2156
1744
1744
92

1375
1375
1375
1375

41

1375

Thermal

15
1225

555
80
230
480
320
75
43
43
142
500
530
1242

218
266
675
542
542
25

440
440
440
440

12

408

Gross

Capacity (MW)

13
1167

540
70
180
360
305
70
39
40
130
390
465
1200

206
250
635
515
515
22

408
408
408
408

10

376

Net

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013

AVR
RWE

EDF
EDF
EDF
EDF
SENA
EDF
COGEMA
COGEMA
CEA/EDF
EDF
EDF
EDF

OH
HQ
HQ
OPG
OPG
OH

KOZNPP
KOZNPP
KOZNPP
KOZNPP

CEN/SCK

ANPPCJSC

Operator

BBK
KWU

FRAM
LEVIVIER
LEVIVIER
GTM
A/F/W
GAAA
SACM
SACM
CNCLNEY
FRAM
FRAM
ASPALDO

AECL
AECL
AECL
OH/AECL
OH/AECL
CGE

AEE
AEE
AEE
AEE

WH

FAEA

NSSS
supplier

1961-8
1970-1

1965-12
1957-2
1959-8
1961-3
1962-1
1962-7
1955-3
1956-3
1968-11
1963-10
1966-1
1976-12

1960-2
1966-9
1974-4
1966-9
1967-12
1958-1

1970-4
1970-4
1973-10
1973-10

1957-11

1969-7

Construction
start

1967-12
1974-8

1972-4
1963-6
1965-2
1966-8
1967-4
1967-7
1959-4
1960-4
1973-12
1969-3
1971-8
1986-1

1967-1
1971-4
1982-12
1971-10
1972-5
1962-6

1974-7
1975-8
1980-12
1982-5

1962-10

1976-12

Grid
connection

1969-5
1975-2

1972-7
1964-2
1965-2
1966-8
1967-4
1968-6
1959-4
1960-4
1974-7
1969-6
1971-11
1986-12

1968-9
1972-5
1983-10
1971-12
1972-6
1962-10

1974-10
1975-11
1981-1
1982-6

1962-10

1977-10

Commercial
operation

1988-12
2011-8

1994-5
1973-4
1985-6
1990-6
1991-10
1985-7
1980-2
1984-6
2010-2
1990-4
1992-5
1998-12

1984-5
1977-6
2012-12
2007-5
2008-10
1987-8

2002-12
2002-12
2006-12
2006-12

1987-6

1989-2

Shut down

48

DE -18
DE -13
DE -502
DE -503
DE -504
DE -505
DE -506
DE -3
DE -7
DE -16
DE -8
DE -20
DE -6
DE -22
DE -2
DE -15
DE -11
DE -5
DE -14
DE -501
DE -10
DE -19
DE -17
DE -1
DE -9

IT -4
IT -3
IT -2
IT -1

JP -20

ITALY

JAPAN

Code

GERMANY

Country

Reactor

FUGEN ATR

CAORSO
ENRICO FERMI
GARIGLIANO
LATINA

BIBLIS-B
BRUNSBUETTEL
GREIFSWALD-1
GREIFSWALD-2
GREIFSWALD-3
GREIFSWALD-4
GREIFSWALD-5
GUNDREMMINGEN-A
HDR GROSSWELZHEIM
ISAR-1
KNK II
KRUEMMEL
LINGEN
MUELHEIM-KAERLICH
MZFR
NECKARWESTHEIM-1
NIEDERAICHBACH
OBRIGHEIM
PHILIPPSBURG-1
RHEINSBERG
STADE
THTR-300
UNTERWESER
VAK KAHL
WUERGASSEN

Name

HWLWR

BWR
PWR
BWR
GCR

PWR
BWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
FBR
BWR
BWR
PWR
PHWR
PWR
HWGCR
PWR
BWR
PWR
PWR
HTGR
PWR
BWR
BWR

Type

557

2651
870
506
660

3733
2292
1375
1375
1375
1375
1375
801
100
2575
58
3690
520
3760
200
2497
321
1050
2575
265
1900
760
3900
60
1912

Thermal

165

882
270
160
160

1300
806
440
440
440
440
440
250
27
912
21
1402
268
1302
57
840
106
357
926
70
672
308
1410
16
670

Gross

Capacity (MW)

148

860
260
150
153

1240
771
408
408
408
408
408
237
25
878
17
1346
183
1219
52
785
100
340
890
62
640
296
1345
15
640

Net

JAEA

SOGIN
SOGIN
SOGIN
SOGIN

RWE
KKB
EWN
EWN
EWN
EWN
EWN
KGB
HDR
E.ON
KBG
KKK
KWL
KGG
KBG
EnKK
KKN
EnBW
EnKK
EWN
E.ON
HKG
E.ON
VAK
PE

Operator

HITACHI

AMN/GETS
EL/WEST
GE
TNPG

KWU
KWU
AtEE
AtEE
AtEE
AtEE
AtEE
AEG,GE
AEG,KWU
KWU
IA
KWU
AEG
BBR
SIEMENS
KWU
SIEM,KWU
SIEM,KWU
KWU
AtEE
KWU
HRB
KWU
GE,AEG
AEG,KWU

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 continued

1972-5

1970-1
1961-7
1959-11
1958-11

1972-2
1970-4
1970-3
1970-3
1972-4
1972-4
1976-12
1962-12
1965-1
1972-5
1974-9
1974-4
1964-10
1975-1
1961-12
1972-2
1966-6
1965-3
1970-10
1960-1
1967-12
1971-5
1972-7
1958-7
1968-1

Construction
start

1978-7

1978-5
1964-10
1964-1
1963-5

1976-4
1976-7
1973-12
1974-12
1977-10
1979-9
1989-4
1966-12
1969-10
1977-12
1978-4
1983-9
1968-7
1986-3
1966-3
1976-6
1973-1
1968-10
1979-5
1966-5
1972-1
1985-11
1978-9
1961-6
1971-12

Grid
connection

1979-3

1981-12
1965-1
1964-6
1964-1

1977-1
1977-2
1974-7
1975-4
1978-5
1979-11
1989-11
1967-4
1970-8
1979-3
1979-3
1984-3
1968-10
1987-8
1966-12
1976-12
1973-1
1969-3
1980-3
1966-10
1972-5
1987-6
1979-9
1962-2
1975-11

Commercial
operation
Shut down

2003-3

1990-7
1990-7
1982-3
1987-12

2011-8
2011-8
1990-2
1990-2
1990-2
1990-7
1989-11
1977-1
1971-4
2011-8
1991-8
2011-8
1977-1
1988-9
1984-5
2011-8
1974-7
2005-5
2011-8
1990-6
2003-11
1988-9
2011-8
1985-11
1994-8

49

APS-1 OBNINSK
BELOYARSK-1
BELOYARSK-2
NOVOVORONEZH-1
NOVOVORONEZH-2

SK -1
SK -2
SK -3

ES -1
ES -3

SE -1

SLOVAKIA

SPAIN

SWEDEN

AGESTA

JOSE CABRERA-1
VANDELLOS-1

BOHUNICE A1
BOHUNICE-1
BOHUNICE-2

DODEWAARD

IGNALINA-1
IGNALINA-2

AKTAU

RU -1
RU -3
RU -6
RU -4
RU -8

LT -46
LT -47

LITHUANIA

RUSSIA

KZ -10

KAZAKHSTAN

Reactor

FUKUSHIMA-DAIICHI-1
FUKUSHIMA-DAIICHI-2
FUKUSHIMA-DAIICHI-3
FUKUSHIMA-DAIICHI-4
FUKUSHIMA-DAIICHI-5
FUKUSHIMA-DAIICHI-6
HAMAOKA-1
HAMAOKA-2
JPDR
TOKAI-1

Name

NETHERLANDS NL -1

JP -5
JP -9
JP -10
JP -16
JP -17
JP -18
JP -11
JP -24
JP -1
JP -2

Code

JAPAN

Country

PHWR

PWR
GCR

HWGCR
PWR
PWR

LWGR
LWGR
LWGR
PWR
PWR

BWR

LWGR
LWGR

FBR

BWR
BWR
BWR
BWR
BWR
BWR
BWR
BWR
BWR
GCR

Type

80

510
1670

560
1375
1375

30
286
530
760
1320

183

4800
4800

1000

1380
2381
2381
2381
2381
3293
1593
2436
90
587

Thermal

12

150
500

143
440
440

6
108
160
210
365

60

1300
1300

90

460
784
784
784
784
1100
540
840
13
166

Gross

Capacity (MW)

10

141
480

93
408
408

5
102
146
197
336

55

1185
1185

52

439
760
760
760
760
1067
515
806
12
137

Net

BKAB

UFG
HIFRENSA

JAVYS
JAVYS
JAVYS

MSM
REA
REA
REA
REA

BV GKN

INPP
INPP

MAEC-KAZ

TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
CHUBU
CHUBU
JAEA
JAPCO

Operator

ABBATOM

WH
CEA

SKODA
AEE
AEE

MSM
MSM
MSM
MSM
MSM

RDM

MAEP
MAEP

MAEC-KAZ

GE/GETSC
GE/T
TOSHIBA
HITACHI
TOSHIBA
GE/T
TOSHIBA
TOSHIBA
GE
GEC

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 continued

1957-12

1964-6
1968-6

1958-8
1972-4
1972-4

1951-1
1958-6
1962-1
1957-7
1964-6

1965-5

1977-5
1978-1

1964-10

1967-7
1969-6
1970-12
1973-2
1972-5
1973-10
1971-6
1974-6
1960-12
1961-3

Construction
start

1964-5

1968-7
1972-5

1972-12
1978-12
1980-3

1954-6
1964-4
1967-12
1964-9
1969-12

1968-10

1983-12
1987-8

1973-7

1970-11
1973-12
1974-10
1978-2
1977-9
1979-5
1974-8
1978-5
1963-10
1965-11

Grid
connection

1964-5

1969-8
1972-8

1972-12
1980-4
1981-1

1954-12
1964-4
1969-12
1964-12
1970-4

1969-3

1985-5
1987-12

1973-7

1971-3
1974-7
1976-3
1978-10
1978-4
1979-10
1976-3
1978-11
1965-3
1966-7

Commercial
operation

1974-6

2006-4
1990-7

1977-2
2006-12
2008-12

2002-4
1983-1
1990-1
1988-2
1990-8

1997-3

2004-12
2009-12

1999-4

2011-5
2011-5
2011-5
2011-5
2013-12
2013-12
2009-1
2009-1
1976-3
1998-3

Shut down

50

SE -6
SE -8

CH -8

GB -3A
GB -3B
GB -4A
GB -4B
GB -1A
GB -1B
GB -1C
GB -1D
GB -2A
GB -2B
GB -2C
GB -2D
GB -14
GB -15
GB -9A
GB -9B
GB -7A
GB -7B
GB -6A
GB -6B
GB -11A
GB -11B
GB -10A
GB -10B
GB -8A
GB -8B
GB -5

SWITZERLAND

UK

Code

SWEDEN

Country

Reactor

BERKELEY-1
BERKELEY-2
BRADWELL-1
BRADWELL-2
CALDER HALL-1
CALDER HALL-2
CALDER HALL-3
CALDER HALL-4
CHAPELCROSS-1
CHAPELCROSS-2
CHAPELCROSS-3
CHAPELCROSS-4
DOUNREAY DFR
DOUNREAY PFR
DUNGENESS A-1
DUNGENESS A-2
HINKLEY POINT A-1
HINKLEY POINT A-2
HUNTERSTON A-1
HUNTERSTON A-2
OLDBURY A-1
OLDBURY A-2
SIZEWELL A-1
SIZEWELL A-2
TRAWSFYNYDD-1
TRAWSFYNYDD-2
WINDSCALE AGR

LUCENS

BARSEBACK-1
BARSEBACK-2

Name

GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
FBR
FBR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR

HWGCR

BWR
BWR

Type

620
620
481
481
268
268
268
268
260
260
260
260
60
600
840
840
900
900
595
595
730
660
1010
1010
850
850
120

28

1800
1800

Thermal

166
166
146
146
60
60
60
60
60
60
60
60
15
250
230
230
267
267
173
173
230
230
245
245
235
235
36

615
615

Gross

Capacity (MW)

138
138
123
123
49
49
49
49
48
48
48
48
11
234
225
225
235
235
150
150
217
217
210
210
195
195
24

600
600

Net

ML
ML
ML
ML
SL
SL
SL
SL
ML
ML
ML
ML
UKAEA
UKAEA
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
UKAEA

EOS

BKAB
BKAB

Operator

TNPG
TNPG
TNPG
TNPG
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
TNPG
TNPG
TNPG
EE/B&W/T
EE/B&W/T
GEC
GEC
TNPG
TNPG
EE/B&W/T
EE/B&W/T
APC
APC
UKAEA

NGA

ASEASTAL
ABBATOM

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 continued

1957-1
1957-1
1957-1
1957-1
1953-8
1953-8
1955-8
1955-8
1955-10
1955-10
1955-10
1955-10
1955-3
1966-1
1960-7
1960-7
1957-11
1957-11
1957-10
1957-10
1962-5
1962-5
1961-4
1961-4
1959-7
1959-7
1958-11

1962-4

1971-2
1973-1

Construction
start

1962-6
1962-6
1962-7
1962-7
1956-8
1957-2
1958-3
1959-4
1959-2
1959-7
1959-11
1960-1
1962-10
1975-1
1965-9
1965-11
1965-2
1965-3
1964-2
1964-6
1967-11
1968-4
1966-1
1966-4
1965-1
1965-2
1963-2

1968-1

1975-5
1977-3

Grid
connection

1962-6
1962-10
1962-7
1962-11
1956-10
1957-2
1958-5
1959-4
1959-3
1959-8
1959-12
1960-3
1962-10
1976-7
1965-10
1965-12
1965-3
1965-5
1964-2
1964-7
1967-12
1968-9
1966-3
1966-9
1965-3
1965-3
1963-3

NA

1975-7
1977-7

Commercial
operation
Shut down

1989-3
1988-10
2002-3
2002-3
2003-3
2003-3
2003-3
2003-3
2004-6
2004-6
2004-6
2004-6
1977-3
1994-3
2006-12
2006-12
2000-5
2000-5
1990-3
1989-12
2012-2
2011-6
2006-12
2006-12
1991-2
1991-2
1981-4

1969-1

1999-11
2005-5

51

US -155
US -014
US -302
US -144
US -10
US -011
US -16
US -267
US -018
US -213
US -077
US -133
US -013
US -305
US -409
US -309
US -245
US -130
US -171
US -012
US -312
US -206
US -361
US -362

USA

BIG ROCK POINT


BONUS
CRYSTAL RIVER-3
CVTR
DRESDEN-1
ELK RIVER
FERMI-1
FORT ST. VRAIN
GE VALLECITOS
HADDAM NECK
HALLAM
HUMBOLDT BAY
INDIAN POINT-1
KEWAUNEE
LACROSSE
MAINE YANKEE
MILLSTONE-1
PATHFINDER
PEACH BOTTOM-1
PIQUA
RANCHO SECO-1
SAN ONOFRE-1
SAN ONOFRE-2
SAN ONOFRE-3

CHERNOBYL-1
CHERNOBYL-2
CHERNOBYL-3
CHERNOBYL-4

UA -25
UA -26
UA -42
UA -43

Reactor

UKRAINE

Name

GB -12
WINFRITH SGHWR
GB -13B WYLFA-2

Code

UK

Country

BWR
BWR
PWR
PHWR
BWR
BWR
FBR
HTGR
BWR
PWR
X
BWR
PWR
PWR
BWR
PWR
BWR
BWR
HTGR
X
PWR
PWR
PWR
PWR

LWGR
LWGR
LWGR
LWGR

SGHWR
GCR

Type

240
50
2568
65
700
58
200
842
50
1825
256
220
615
1772
165
2630
2011
220
115
46
2772
1347
3438
3438

3200
3200
3200
3200

318
1920

Thermal

71
18
890
19
207
24
65
342
24
603
84
65
277
595
55
900
684
63
42
12
917
456
1127
1127

800
1000
1000
1000

100
540

Gross

Capacity (MW)

67
17
860
17
197
22
61
330
24
560
75
63
257
566
48
860
641
59
40
12
873
436
1070
1080

740
925
925
925

92
490

Net

CPC
DOE/PRWR
PROGRESS
CVPA
EXELON
RCPA
DTEDISON
PSCC
GE
CYAPC
AEC/NPPD
PG&E
ENTERGY
DOMINION
DPC
MYAPC
DOMINION
NMC
EXELON
CofPiqua
SMUD
SCE
SCE
SCE

MTE
MTE
MTE
MTE

UKAEA
ML

Operator

GE
GNEPRWRA
B&W
WH
GE
AC
UEC
GA
GE
WH
GE
GE
B&W
WH
AC
CE
GE
AC
GA
GE
B&W
WH
CE
CE

FAEA
FAEA
FAEA
FAEA

ICL/FE
EE/B&W/T

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 continued

1960-5
1960-1
1968-9
1960-1
1956-5
1959-1
1956-12
1968-9
1956-1
1964-5
1959-1
1960-11
1956-5
1968-8
1963-3
1968-10
1966-5
1959-1
1962-2
1960-1
1969-4
1964-5
1974-3
1974-3

1970-3
1973-2
1976-3
1979-4

1963-5
1963-9

Construction
start

1962-12
1964-8
1977-1
1963-12
1960-4
1963-8
1966-8
1976-12
1957-10
1967-8
1963-9
1963-4
1962-9
1974-4
1968-4
1972-11
1970-11
1966-7
1967-1
1963-7
1974-10
1967-7
1982-9
1983-9

1977-9
1978-12
1981-12
1983-12

1967-12
1971-7

Grid
connection

1963-3
1965-9
1977-3
NA
1960-7
1964-7
NA
1979-7
1957-10
1968-1
1963-11
1963-8
1962-10
1974-6
1969-11
1972-12
1971-3
NA
1967-6
1963-11
1975-4
1968-1
1983-8
1984-4

1978-5
1979-5
1982-6
1984-3

1968-1
1972-1

Commercial
operation

1997-8
1968-6
2013-2
1967-1
1978-10
1968-2
1972-11
1989-8
1963-12
1996-12
1964-9
1976-7
1974-10
2013-5
1987-4
1997-8
1998-7
1967-10
1974-11
1966-1
1989-6
1992-11
2013-6
2013-6

1996-11
1991-10
2000-12
1986-4

1990-9
2012-4

Shut down

52

US -146
US -001
US -322
US -320
US -344
US -29
US -295
US -304

Code

Reactor

SAXTON
SHIPPINGPORT
SHOREHAM
THREE MILE ISLAND-2
TROJAN
YANKEE NPS
ZION-1
ZION-2

Name

PWR
PWR
BWR
PWR
PWR
PWR
PWR
PWR

Type

24
236
2436
2772
3411
600
3250
3250

3
68
849
959
1155
180
1085
1085

Gross

Capacity (MW)

Thermal

Note: Status as of 31 December 2013, 149 reactors (56927 MW) have been permanently shut down.

USA

Country
3
60
820
880
1095
167
1040
1040

Net
SNEC
DOE DUQU
LIPA
GPU
PORTGE
YAEC
EXELON
EXELON

Operator
GE
WH
GE
B&W
WH
WH
WH
WH

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 continued

1960-1
1954-1
1972-11
1969-11
1970-2
1957-11
1968-12
1968-12

Construction
start
1967-3
1957-12
1986-8
1978-4
1975-12
1960-11
1973-6
1973-12

Grid
connection
1967-3
1958-5
NA
1978-12
1976-5
1961-7
1973-12
1974-9

Commercial
operation
Shut down
1972-5
1982-10
1989-5
1979-3
1992-11
1991-10
1998-2
1998-2

53

GERMANY

FRANCE

CANADA

ARMENIA
BELGIUM
BULGARIA

Country

AM -18
BE -1
BG -1
BG -2
BG -3
BG -4
CA -1
CA -2
CA -3
FR -10
FR -2
FR -24
FR -3
FR -4
FR -5
FR -6
FR -7
FR -8
FR -9
DE -1
DE -10
DE -11
DE -17
DE -19
DE -2
DE -22
DE -3
DE -4
DE -501
DE -502
DE -503

Code

Reactor

ARMENIAN-1
BR-3
KOZLODUY-1
KOZLODUY-2
KOZLODUY-3
KOZLODUY-4
ROLPHTON NPD
DOUGLAS POINT
GENTILLY-1
PHENIX
CHINON A-1
SUPER-PHENIX
CHINON A-2
CHINON A-3
CHOOZ-A (ARDENNES)
EL-4 (MONTS D'ARREE)
ST. LAURENT A-1
ST. LAURENT A-2
BUGEY-1
VAK KAHL
STADE
NIEDERAICHBACH
UNTERWESER
THTR-300
MZFR
MUELHEIM-KAERLICH
GUNDREMMINGEN-A
AVR JUELICH
RHEINSBERG
GREIFSWALD-1
GREIFSWALD-2

Name

1989-2
1987-6
2002-12
2002-12
2006-12
2006-12
1987-8
1984-5
1977-6
2010-2
1973-4
1998-12
1985-6
1990-6
1991-10
1985-7
1990-4
1992-5
1994-5
1985-11
2003-11
1974-7
2011-8
1988-9
1984-5
1988-9
1977-1
1988-12
1990-6
1990-2
1990-2

Others
2,5
7,Others
7,Others
7,Others
7,Others
2
2
2
Others
1,2
Others
1,2
1,2
Others
1,2
1,2
1,2
1,2
Others
2
6
7
6,Others
Others
7
6,8
7
1,3,6,7
1,3,6,7
1,3,6,7

Shut down Shutdown reason


Other
ID
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+SE
Dd+PD+SE
ID
ID
ID
ID
ID
ID
ID
ID
ID
ID
Other
ID
Other
ID
Other
Other
Other
ID
ID
ID
ID
ID

Decom.
strategy

3,4,9
9
3,9
3,9

3,4,6

4,9
9

9
6

4,9
7
7
7
7
8
8
8

Current decom.
phase

4,7
3,7
3,7

3,6

7
7

4
3,7
3,7
3,7
3,7

Current fuel
managemt
phase

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013

ANPPCJSC
CEN/SCK
E-03492
E-03493
E-00174
E-0008
AECL
AECL
AECL/HQ
EDF
NERSA
EDF
EDF
SENA
EDF
EDF
EDF
EDF
VAK
E.ON
KIT
E.ON
HKG
WAK
RWE
KGG
xxxx
G 01 KKR
G 01 KGR
G 01 KGR

Decom.
licensee

2014

2019
2015
2027
2025
2020

2025

2036
2036
2036
2036

License
terminated

54

SWEDEN

SPAIN

SLOVAKIA

NETHERLANDS
RUSSIA

KAZAKHSTAN
LITHUANIA

JAPAN

ITALY

GERMANY

Country

DE -504
DE -505
DE -506
DE -6
DE -7
DE -8
DE -9
IT -1
IT -2
IT -3
IT -4
JP -1
JP -11
JP -2
JP -20
JP -24
KZ -10
LT -46
LT -47
NL -1
RU -3
RU -4
RU -6
RU -8
SK -1
SK -2
SK -3
ES -1
ES -3
SE -1
SE -6
SE -8

Code

Reactor

GREIFSWALD-3
GREIFSWALD-4
GREIFSWALD-5
LINGEN
HDR GROSSWELZHEIM
KNK II
WUERGASSEN
LATINA
GARIGLIANO
ENRICO FERMI
CAORSO
JPDR
HAMAOKA-1
TOKAI-1
FUGEN ATR
HAMAOKA-2
AKTAU
IGNALINA-1
IGNALINA-2
DODEWAARD
BELOYARSK-1
NOVOVORONEZH-1
BELOYARSK-2
NOVOVORONEZH-2
BOHUNICE A1
BOHUNICE-1
BOHUNICE-2
JOSE CABRERA-1
VANDELLOS-1
AGESTA
BARSEBACK-1
BARSEBACK-2

Name

1990-2
1990-7
1989-11
1977-1
1971-4
1991-8
1994-8
1987-12
1982-3
1990-7
1990-7
1976-3
2009-1
1998-3
2003-3
2009-1
1999-4
2004-12
2009-12
1997-3
1983-1
1988-2
1990-1
1990-8
1977-2
2006-12
2008-12
2006-4
1990-7
1974-6
1999-11
2005-5

1,3,6,7
1,3,6,7
1,3,6,7
2,5,6
5
5
2
7,Others
3,4,Others
7,Others
7,Others
Others
6
2
2
6
2,5
7,Others
7,Others
2,Others
Others
Others
Others
Others
4
7
7
Others
4
2,3
Others
Others

Shut down Shutdown reason


ID
ID
ID
Dd+PD+SE
Other
Other
ID
ID
ID
ID
ID
ID
Dd+SE
Dd+PD+SE
Dd+SE
Dd+SE
Dd+PD+SE
ID
ID
Dd+SE
Other
Other
Other
Other
Dd+PD+SE
ID
ID
ID
Dd+PD+SE
Dd+SE
Other
Other

Decom.
strategy

3,6
3,4,9
3,4,9
3,4,9
8
7

3,4,6
3,9
3,4,9
3,4,9,10
4,9
3
1,6,7
3,4,6,7,9
1,5
1,6,7
1,5,6
3,10
2,3
7

3,9
3
1,3,9
8

Current decom.
phase

4
4

3,7

2,5
2
4,7

3,5,6

3,7
3,7
3,7

Current fuel
managemt
phase
G 01 KGR
G 01 KGR
G 01 KGR
RWE AG
KIT
WAK
E.ON
SOGIN
SOGIN
SOGIN
SOGIN
JAERI
CHUBU DL
JAPCO
JAEA
CHUBU DL
MAEC-KAZ
INPP
INPP
BV GKN
EA
EA
EA
EA
JAVYS
JAVYS
JAVYS
UFG
ENRESA
BKAB
BKAB
BKAB

Decom.
licensee

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013 continued

2027
2027

2015
2032

2029
2030
2055

2014
2040
2021
2024
2026
2002
2037
2025
2034
2037

License
terminated

55

USA

SWITZERLAND
UK

Country

CH -8
GB -10A
GB -10B
GB -12
GB -14
GB -15
GB -1A
GB -1B
GB -1C
GB -1D
GB -2A
GB -2B
GB -2C
GB -2D
GB -3A
GB -3B
GB -4A
GB -4B
GB -5
GB -6A
GB -6B
GB -7A
GB -7B
GB -8A
GB -8B
GB -9A
GB -9B
US -001
US -011
US -012
US -013
US -014

Code

Reactor

LUCENS
SIZEWELL A-1
SIZEWELL A-2
WINFRITH SGHWR
DOUNREAY DFR
DOUNREAY PFR
CALDER HALL-1
CALDER HALL-2
CALDER HALL-3
CALDER HALL-4
CHAPELCROSS-1
CHAPELCROSS-2
CHAPELCROSS-3
CHAPELCROSS-4
BERKELEY-1
BERKELEY-2
BRADWELL-1
BRADWELL-2
WINDSCALE AGR
HUNTERSTON A-1
HUNTERSTON A-2
HINKLEY POINT A-1
HINKLEY POINT A-2
TRAWSFYNYDD-1
TRAWSFYNYDD-2
DUNGENESS A-1
DUNGENESS A-2
SHIPPINGPORT
ELK RIVER
PIQUA
INDIAN POINT-1
BONUS

Name

1969-1
2006-12
2006-12
1990-9
1977-3
1994-3
2003-3
2003-3
2003-3
2003-3
2004-6
2004-6
2004-6
2004-6
1989-3
1988-10
2002-3
2002-3
1981-4
1990-3
1989-12
2000-5
2000-5
1991-2
1991-2
2006-12
2006-12
1982-10
1968-2
1966-1
1974-10
1968-6

4
2,8
2,8
Others
Others
Others
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
Others
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
3
1,Others
4,5
5
5,6

Shut down Shutdown reason


Dd+SE
Dd+SE
Dd+SE
ID
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+SE
Dd+SE
Dd+SE
Dd+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
ID
ID
ISD
Dd+PD+SE
ISD

Decom.
strategy

11

1
3,5,6
3,5,6
3,4,9,10
5
5
8
8
8
8
3,5,6
3,5,6
3,5,6
3,5,6
3,8
3,8
3,5,6
3,5,6
2,3,5,6
3,5,6
3,5,6
3,5,6
3,5,6
8
8
3,5,6
3,5,6

Current decom.
phase

Current fuel
managemt
phase
EOS
Magnox S
Magnox S
UKAEA
DSR
Magnox N
SL
SL
SL
SL
Magnox N
Magnox N
Magnox N
Magnox N
Magnox S
Magnox S
Magnox S
Magnox S
SL
Magnox N
Magnox N
Magnox S
Magnox S
Magnox N
Magnox N
Magnox S
Magnox S
DOE DUQU
RCPA
CofPiqua
ENTERGY
DOE/PRWR

Decom.
licensee

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013 continued

1970

2004
2110
2110
2019
2333
2333
2117
2117
2117
2117
2128
2128
2128
2128
2083
2083
2104
2104
2065
2090
2090
2104
2104
2098
2098
2111
2111
1989
1974

License
terminated

56

USA

Country

US -018
US -077
US -10
US -130
US -133
US -144
US -146
US -155
US -16
US -171
US -206
US -213
US -245
US -267
US -29
US -295
US -304
US -305
US -309
US -312
US -320
US -322
US -344
US -409

Code

Reactor

GE VALLECITOS
HALLAM
DRESDEN-1
PATHFINDER
HUMBOLDT BAY
CVTR
SAXTON
BIG ROCK POINT
FERMI-1
PEACH BOTTOM-1
SAN ONOFRE-1
HADDAM NECK
MILLSTONE-1
FORT ST. VRAIN
YANKEE NPS
ZION-1
ZION-2
KEWAUNEE
MAINE YANKEE
RANCHO SECO-1
THREE MILE ISLAND-2
SHOREHAM
TROJAN
LACROSSE

Name

1963-12
1964-9
1978-10
1967-10
1976-7
1967-1
1972-5
1997-8
1972-11
1974-11
1992-11
1996-12
1998-7
1989-8
1991-10
1998-2
1998-2
2013-5
1997-8
1989-6
1979-3
1989-5
1992-11
1987-4

1
5
6
5
5
7,Others
Others
2,Others
4,5
1
Others
6
6
1,Others
5,7
5,6
5,6
2,6
6
5,6
4,5
7,Others
6
2

Shut down Shutdown reason


Dd+SE
Dd+SE
Dd+SE
Dd+SE
Dd+PD+SE
Dd+SE
ID
ID
Dd+SE
Dd+SE
Dd+PD+SE
ID
Dd+PD+SE
ID
ID
Dd+PD+SE
Dd+PD+SE
Dd+SE
ID
Dd+PD+SE
Other
ID
Dd+PD+SE
Dd+PD+SE

Decom.
strategy

4
7

Current fuel
managemt
phase

11

4,6
1
1

9,11
1
4
4,6

11
11
3,4,6,9,11

Current decom.
phase
GE&PGEC
AEC&NPPD
EXELON
NMC
PG&E
CVPA
GPUNC
CPC
DTEDISON
EXELON
SCE
CYAPC
DOMINRES
PSCC
YAEC
CommonEd
COMMED
DOMINRES
MYAPC
SMUD
GPU
LIPA
PORTGE
DPC

Decom.
licensee

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013 continued

1995
2005

2005
2009

1996
2005

2008
2007

2013
2009
2005
2007
2025

1971

License
terminated

57

Description
Drawing up the Final Decommissioning Plan
Reactor core defuelling
Waste conditioning on-site - only for decommissioning waste
Waste shipment off-site - only for decommissioning waste
Safe enclosure preparation
Partial dismantling
Active safe enclosure period
Passive safe enclosure period
Final dismantling
Final survey
Licence terminated (legal act at the end of the decommissioning process)

Current decommissioning phase


1
2
3
4
5
6
7
8
9
10
11

Description

Transfer to a reactor facility


Transfer away from a reactor facility
Storage in an on-site facility
Storage in an off-site facility
Shipment to a reprocessing plant
Underwater storage period
Dry storage period
Encapsulation

Fuel Management

1
2
3
4
5
6
7
8

Other

ISD

Description

ID
Dd+SE
Dd+PD+SE

The technology or process being used became obsolete


The process was no longer profitable
Changes in licensing requirements
After an operating incident
Other technological reasons
Other economical reasons
Public acceptance or political reasons
After major component failure or deterioration
None of the above
Immediate dismantling and removal of all radioactive materials
Deferred dismantling, placing all radiological areas into safe enclosure
Deferred dismantling, including partial dismantling and placing
remaining radiological areas into safe enclosure
In situ disposal, involving encapsulation of radioactive materials
and subsequent restriction of access
None of the above

Decommissioning strategy

Description

1
2
3
4
5
6
7
8
Other

TABLE 17. DEFINITIONS FOR REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED

Shutdown reason

58

72.8

49

26

23

15

PHWR

PHWR < 600 MWe

PHWR 600 MWe

18

GCR

FBR

Note: Reactors shut down during 2011 to 2013 (23 units) are considered.

453

11

LWGR 600 MWe

TOTAL

LWGR < 600 MWe

LWGR

84.5

81

BWR 600 MWe

64.3

75.3

78.5

74.3

72.7

84.0

75.8

81.7

65.7

37.9

92

11

BWR

BWR < 600 MWe

78.9

231

71.8

78.3

PWR 600 MWe

278

Availability
factor
(%)

47

PWR

Number
of
units

PWR < 600 MWe

Reactor category

19.4

18.3

11.2

24.6

15.9

24.5

11.7

10.2

11.2

29.5

48.7

30.5

16.0

24.9

16.7

76.3

78.6

74.5

73.0

84.0

73.1

85.0

82.3

84.1

66.8

40.8

65.5

79.9

72.2

79.2

3.5

2.4

1.5

2.3

2.9

3.3

10.6

2.9

0.2

2.8

2.6

6.5

3.9

3.0

17.4

Reactors reporting to IAEA PRIS (see note)


Planned
Capability
Forced loss
unavailability factor
factor
rate
(%)
(%)
(%)

TABLE 18. PERFORMANCE FACTORS BY REACTOR CATEGORY, 2011 to 2013


Operating
factor
(%)

75.8

82.8

80.5

75.6

71.7

74.6

84.2

83.1

83.6

65.4

43.2

62.8

79.3

73.4

78.3

Load
factor
(%)

74.1

80.0

74.4

74.1

35.7

74.0

82.5

75.4

80.2

63.4

37.6

62.1

77.9

70.2

77.3

59

2577

48

26

22

15

PHWR

PHWR < 600 MWe

PHWR 600 MWe

15

GCR

FBR

2. Reactors shut down during 2013 (7 units) are considered.

1. Only reactors in commercial operation are considered.

Notes:

437

11

LWGR 600 MWe

ALL REACTORS

LWGR < 600 MWe

LWGR

1425

74

BWR 600 MWe

2239

1362

1425

2887

1724

1573

1505

3167

5760

10

BWR < 600 MWe

3475

1888

2648

2018

84

227

PWR 600 MWe

Full outage hours


per operating
reactor

BWR

47

274

Number of
comm. operating
reactors

PWR < 600 MWe

PWR

Reactor type

TABLE 19. FULL OUTAGE STATISTICS DURING 2013


Planned
outages
(%)
80.3

81.4

100.0

46.2

96.1

82.3

93.7

43.7

55.9

50.6

92.6

88.4

91.8

79.2

84.3

Unplanned
outages
(%)

15.8

0.0

48.1

3.9

0.5

3.3

23.5

42.9

34.5

7.0

11.6

7.9

18.9

11.4

17.2

External
outages
(%)

2.8

0.0

5.7

0.0

17.2

3.0

32.8

1.2

14.9

0.4

0.0

0.3

1.9

4.3

2.5

60

Plant equipment problem/failure

0.23

Note: Only reactors which have achieved full commercial operation in or before 2013 are counted.

TOTAL

100.00

0.10

788
755165

0.25

1900
880421

8760

100.00

0.99

0.48

57353

779

707

Other

4259

1045

88

Fuel management limitation (including high flux tilt, stretch out or coast-down operation)

0.10

43.70

53884

284

892

384768

5.87

0.37

6.80

37.85

3.83

Fire

0.02

44.99

51645

3262

59892

333231

33712

100.00

1.36

1.23

0.50

0.99

1.82

0.15

93.95

73933

1528

544

488

783

1074

131

69385

100.00

2.07

0.74

0.66

1.06

1.45

0.18

93.85

Unplanned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

566

178

339712

4.99

1760
37656

5.41

39.35

4.65

40856

297172

35143

Planned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

Human factor related

Nuclear regulatory requirements

Major back-fitting, refurbishment or upgrading activities without refuelling

Major back-fitting, refurbishment or upgrading activities with refuelling

Testing of plant systems or components

Inspection, maintenance or repair without refuelling

Inspection, maintenance or repair combined with refuelling

Refuellling without maintenance

Direct cause

TABLE 20. DIRECT CAUSES OF FULL OUTAGES DURING 2013

61

Note: Only reactors which have achieved full commercial operation in or before 2013 are counted.

3030997

3158

Other

TOTAL

2431

Fuel management limitation (including high flux tilt, stretch out or coast-down operation)

External restrictions on supply and services

382

100.00

0.10

0.08

0.01

3610611

35066

5592

1909

100.00

0.97

0.15

0.05

0.03

27.44
23679

368139

1597

1911

2640

920

990678

831

332861

Fire

0.01

28.91

8.26

0.53

7.14

51.31

4.13

4620

182

876408

298148

18961

257704

1852580

149053

100.00

0.43

0.52

0.72

1.25

6.43

0.23

90.42

441486

3579

1677

4402

7080

32047

1513

391188

100.00

0.81

0.38

1.00

1.60

7.26

0.34

88.61

Unplanned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

Human factor related

Nuclear regulatory requirements

Major back-fitting, refurbishment or upgrading activities without refuelling

7.07

0.30

8943
214386

5.25

53.65

4.61

159134

1626173

139801

Planned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

Major back-fitting, refurbishment or upgrading activities with refuelling

Testing of plant systems or components

Inspection, maintenance or repair without refuelling

Inspection, maintenance or repair combined with refuelling

Refuellling without maintenance

Plant equipment problem/failure

Direct cause

TABLE 21. DIRECT CAUSES OF FULL OUTAGES, 2009 TO 2013

62

AR
AM
BY
BE
BR
BG
CA
CN
CZ
FI
FR
DE
HU
IN
IR
IT
JP
KZ
KR
LT
MX
NL
PK
RO
RU
SK
SI
ZA
ES
SE

ARGENTINA
ARMENIA
BELARUS
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REPUBLIC
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISLAMIC REPUBLIC OF
ITALY
JAPAN
KAZAKHSTAN
KOREA, REPUBLIC OF
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN

Full name

TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY

Country
code

10
2

2
1
3
2
33
4
1
2
7
10

23

1
1

29

2
3

5
3

4
11
1

12
27

4
6

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

48

7
2
2
19
20
6
4
58
9
4
21
1

2
1

Operational

22

2
3

35

Planned

63

SWITZERLAND
UKRAINE
UNITED ARAB EMIRATES
UNITED KINGDOM
UNITED STATES OF AMERICA
VIET NAM

TOTAL

BWR
FBR
GCR
HTGR
HWGCR
HWLWR
LWGR
PHWR
PWR
SGHWR
X

Type
code

Boiling Light-Water-Cooled and Moderated Reactor


Fast Breeder Reactor
Gas-Cooled, Graphite-Moderated Reactor
High-Temperature Gas-Cooled Reactor
Heavy-Water-Moderated, Gas-Cooled Reactor
Heavy-Water-Moderated, Boiling Light-Water-Cooled Reactor
Light-Water-Cooled, Graphite-Moderated Reactor
Pressurized Heavy-Water-Moderated and Cooled Reactor
Pressurized Light-Water-Moderated and Cooled Reactor
Steam-Generating Heavy-Water Reactor
Other

Full name

TABLE 23. REACTOR TYPES: ABBREVIATIONS AND SUMMARY

6 units in operation; 2 units under construction.

Note: The total includes the following data from Taiwan, China:

TOTAL

CH
UA
AE
GB
US
VN

Full name

TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY continued

Country
code

434

15
48
273

81
2
15

Operational

434

16
100

5
15

Operational

72

5
60

4
2

1
1

1
4

149

33
7
37
4
4
2
9
8
42
1
2

149

29
32

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

72

2
2

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

Planned

92

78

9
5

92

16
2

Planned

64

AEC/NPPD
AEP
AmerenUE
ANAV
ANPPCJSC
APS
AVR
Axpo AG
BHAVINI
BKAB
BKW
BRUCEPOW
BV GKN
CEA/EDF
CENSCK
CEZ
CFE
CHUBU
CHUGOKU
CIAE
CNAT
CNEA
CNNO
CofPiqua
COGEMA
CPC
CVPA
CYAPC
DNMC

ATOMIC ENERGY COMMISSION AND NEBRASKA PUBLIC POWER DISTRICT


AMERICAN ELECTRIC POWER COMPANY, INC.
AMEREN UE, UNION ELECTRIC COMPANY
ASOCIACION NUCLEAR ASCO-VANDELLOS A.I.E. (ENDESA / ID)
CLOSED JOINT STOCK COMPANY ARMENIAN NPP
ARIZONA PUBLIC SERVICE CO.
ARBEITSGEMEINSCHAFT VERSUCHSREAKTOR GMBH
KERNKRAFTWERK BEZNAU CH-5312 DTTINGEN
BHARATIYA NABHIKIYA VIDYUT NIGAM LIMITED
BARSEBCK KRAFT AB
BKW ENERGIE AG
BRUCE POWER
BV GEMEENSCHAPPELIJKE KERNENERGIECENTRALE NEDERLAND (BV GKN)
COMMISSARIAT L'ENERGIE ATOMIQUE (80%) / ELECTRICIT DE FRANCE (20%)
CENTRE D'ETUDE DE L'ENERGIE NUCLEAIRE / STUDIECENTRUM VOOR KERNENERGIE
CZECH POWER COMPANY, CEZ A.S.
COMISION FEDERAL DE ELECTRICIDAD
CHUBU ELECTRIC POWER CO., INC
THE CHUGOKU ELECTRIC POWER CO., INC.
CHINA INSTITUTE OF ATOMIC ENERGY
CENTRALES NUCLEARES ALMARAZ-TRILLO (ID / UFG / ENDESA / HC / NUCLENOR)
COMISION NACIONAL DE ENERGIA ATOMICA
CNNC NUCLEAR OPERARION MANAGEMENT COMPANY LIMITED
CITY OF PIQUA GOVERNMENT
COMPAGNIE GENERALE DES MATIERES NUCLEAIRES
CONSUMERS POWER CO.
CAROLINAS-VIRGINIA NUCLEAR POWER ASSOC.
CONNECTICUT YANKEE ATOMIC POWER CO.
DAYA BAY NUCLEAR POWER OPERATIONS AND MANAGEMENT CO, LTD.

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY

Operator
code

6
2
3
2
1
3

1
8

2
1
3
1
3

Operational

1
2
1
1
1

1
1
1

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down
Planned

1
2

65

DOE DUQU
DOE/PRWR
DOMINION
DPC
DSAE
DTEDISON
DUKEENER
E.ON
EDF
EDF UK
ELECTRAB
ELETRONU
EnBW
ENEC
ENERGYNW
EnKK
ENTERGY
EOS
EPDC
EPZ
ESKOM
EVN
EWN
EXELON
FENOC
FKA
FORTUMPH
FPL
FQNP
FSNPC
GE

DEPARTMENT OF ENERGY AND DUQUESNE LIGHT CO.


DOE & PUERTO RICO WATER RESOURCES
DOMINION GENERATION
DAIRYLAND POWER COOPERATIVE
STATE INSTITUTION DIRECTORATE FOR NUCLEAR POWER PLANT CONSTRUCTION
DETROIT EDISON CO.
DUKE ENERGY CORP.
E.ON KERNKRAFT GMBH
ELECTRICITE DE FRANCE
EDF ENERGY
ELECTRABEL M. V. NUCLEAIRE PRODUKTIE
ELETROBRAS ELETRONUCLEAR S.A.
ENBW KRAFTWERKE AG
EMIRATES NUCLEAR ENERGY CORPORATION
ENERGY NORTHWEST
ENBW KERNKRAFT GMBH (SITZ IN OBRIGHEIM)
ENTERGY NUCLEAR OPERATIONS, INC.
ENERGIE DE L'OUEST SUISSE
ELECTRIC POWER DEVELOPMENT CO., LTD.
N.V. ELEKTRICITEITS-PRODUKTIEMAATSCHAPPIJ ZUID-NEDERLAND
ESKOM
VIETNAM ELECTRICITY
ENERGIEWERKE NORD GMBH
EXELON GENERATION CO., LLC
FIRST ENERGY NUCLEAR OPERATING CO.
FORSMARK KRAFTGRUPP AB
FORTUM POWER AND HEAT OY (FORMER IVO)
FLORIDA POWER & LIGHT CO.
CNNC FUJIAN FUQING NUCLEAR POWER CO., LTD
FUJIAN SANMING NUCLEAR POWER CO., LTD.
GENERAL ELECTRIC

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

22
4
3
2
4

1
2

1
2
12

1
7
3
58
15
7
2

Operational

6
4

2
1
1

3
8

1
1
2
1

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down
Planned

2
2

66

GFNPC
GPU
HDR
HEPCO
HIFRENSA
HKG
HNPC
HOKURIKU
HONGYANH
HQ
HSNPC
ID
INPP
JAEA
JAPCO
JAVYS
JNPC
KBG
KEPCO
KGB
KGG
KHNP
KKB
KKG
KKK
KKL
KKN
KLE
KOZNPP
KWG
KWL

GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY LTD


GENERAL PUBLIC UTILITIES(OWNED BY FIRSTENERGY CORP.
HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH.
HOKKAIDO ELECTRIC POWER CO., INC.
HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A.
HOCHTEMPERATUR-KERNKRAFTWERK GMBH
HAINAN NUCLEAR POWER COMPANY
HOKURIKU ELECTRIC POWER CO.
HONGYANHE NUCLEAR POWER COMPANY
HYDRO QUEBEC
HUANENG SHANDONG SHIDAO BAY NUCLEAR POWER COMPANY, LTD.
IBERDROLA, S.A.
IGNALINA NUCLEAR POWER PLANT
JAPAN ATOMIC ENERGY AGENCY
JAPAN ATOMIC POWER CO.
JADROVA A VYRADOVACIA SPOLOCNOST / NUCLEAR AND DECOMMISSIONING COMPANY, PLC.
JIANGSU NUCLEAR POWER CORPORATION
KERNKRAFTWERK-BETRIEBSGESELLSCHAFT MBH
KANSAI ELECTRIC POWER CO.
KERNKRAFTWERKE GUNDREMMINGEN BETRIEBSGESELLSCHAFT MBH
KERNKRAFTWERK GUNDREMMINGEN GMBH
KOREA HYDRO AND NUCLEAR POWER CO.
KERNKRAFTWERK BRUNSBTTEL GMBH
KERNKRAFTWERK GOESGEN-DAENIKEN AG
KERNKRAFTWERK KRMMEL GMBH & CO. OHG
KERNKRAFTWERK LEIBSTADT
KERNKRAFTWERK NIEDERAICHBACH GMBH
KERNKRAFTWERKE LIPPE-EMS GMBH
KOZLODUY NPP-PLC
GEMEINSCHAFTSKERNKRAFTWERK GROHNDE GMBH & CO. OHG
KERNKRAFTWERK LINGEN GMBH

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

1
2
1

2
23

11

Operational

1
1

2
2
1
3

1
1

1
1

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down
Planned

67

KYUSHU
LHNPC
LIPA
LNPC
LUMINANT
MAEC-KAZ
ML
MSM
MTE
MYAPC
NASA
NBEPC
NDNP
NEK
NEXTERA
NMC
NNEGC
NPCIL
NPPDCO
NPQJVC
NSP
NUCLENOR
OH
OKG
OPG
OPPD
PAEC
PAKS Zrt
PE
PG&E
PORTGE

KYUSHU ELECTRIC POWER CO., INC.


LIAONING HONGYANHE NUCLEAR POWER CO. LTD. (LHNPC)
LONG ISLAND POWER AUTHORITY
LIAONIN NUCLEAR POWER COMPANY, LMT.
LUMINANT GENERATION COMPANY LLC
MANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY COMPANY
MAGNOX LIMITED
MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH)
MINTOPENERGO OF UKRAINE - MINISTRY OF FUEL AND ENERGY OF UKRAINE
MAINE YANKEE ATOMIC POWER CO.
NUCLEOELECTRICA ARGENTINA S.A.
NEW BRUNSWICK ELECTRIC POWER COMMISSION
FUJIAN NINGDE NUCLEAR POWER COMPANY LTD.
NUKLERANA ELEKTRARNA KRKO
NEXTERA ENERGY RESOURCES, LLC
NUCLEAR MANAGEMENT CO.
NATIONAL NUCLEAR ENERGY GENERATING COMPANY <ENERGOATOM>
NUCLEAR POWER CORPORATION OF INDIA LTD.
NUCLEAR POWER PRODUCTION & DEVELOPEMENT CO. OF IRAN
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
NORTHERN STATES POWER CO. (SUBSIDIARY OF XCEL ENERGY)
NUCLENOR, S.A.
ONTARIO HYDRO
OKG AKTIEBOLAG
ONTARIO POWER GENERATION
OMAHA PUBLIC POWER DISTRICT
PAKISTAN ATOMIC ENERGY COMMISSION
PAKS NUCLEAR POWER PLANT LTD
PREUSSENELEKTRA KERNKRAFT GMBH&CO KG
PACIFIC GAS AND ELECTRIC COMPANY
PORTLAND GENERAL ELECTRIC CO.

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

3
10
1
3
4

15
21
1
4
3

2
1
1
1
4

6
2

Operational

2
5

1
1
1

1
21
1
4
1

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down
Planned

2
3

1
2

68

PPL SUSQ
PROGRESS
PSCC
PSEG
QNPC
RAB
RCPA
REA
RWE
SCE
SCE&G
SDNPC
SE,plc
SENA
SHIKOKU
SL
SMNPC
SMUD
SNEC
SNN
SOGIN
SOUTHERN
STP
TEPCO
TNPC
TOHOKU
TPC
TQNPC
TVA
TVO
UFG

PPL SUSQUEHANNA, LLC


PROGRESS ENERGY
PUBLIC SERVICE CO. OF COLORADO
PSEG NUCLEAR LLCPUBLIC SERVICE ELECTRIC & GAS CO.
QINSHAN NUCLEAR POWER COMPANY
RINGHALS AB
RURAL COOPERATIVE POWER ASSOC.
JOINT STOCK COMPANY CONCERN ROSENERGOATOM
RWE POWER AG
SOUTHERN CALIFORNIA EDISON CO.
SOUTH CAROLINA ELECTRIC & GAS CO.
SHANDONG NUCLEAR POWER COMPANY LTD
SLOVENSK ELEKTRRNE, A.S.
SOCIETE D'ENERGIE NUCLEAIRE FRANCO-BELGE DES ARDENNES
SHIKOKU ELECTRIC POWER CO., INC.
SELLAFIELD LIMITED
SANMEN NUCLEAR POWER CO., LTD.
SACRAMENTO MUNICIPAL UTILITY DISTRICT
SAXTON NUCLEAR EXPIRAMENTAL REACTOR CORPORATION
SOCIETATEA NATIONALA NUCLEARELECTRICA S.A.
SOCIETA GESTIONE IMPANTI NUCLEARI S.P.A.
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
STP NUCLEAR OPERATING CO.
TOKYO ELECTRIC POWER CO., INC.
GUANGDONG TAISHAN NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (TNPC)
TOHOKU ELECTRIC POWER CO., INC.
TAIWAN POWER CO.
THE THIRD QINSHAN JOINTED VENTURE COMPANY LTDA.
TENNESSEE VALLEY AUTHORITY
TEOLLISUUDEN VOIMA OYJ
UNION FENOSA GENERATION S.A.

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

4
6
2
6
2

6
2
11

1
1

2
2
2

1
4

10

1
1

1
4
2
3

1
1

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

33

2
4

Operational

22

Planned

69

TOTAL

UKAEA
VAK
WCNOC
YAEC
YJNPC
not specified

UNITED KINGDOM ATOMIC ENERGY AUTHORITY


VERSUCHSATOMKRAFTWERK KAHL GMBH
WOLF CREEK NUCLEAR OPERATION CORP.
YANKEE ATOMIC ELECTRIC CO.
YANGJIANG NUCLEAR POWER COMPANY

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

434

Operational

72

5
2

149

4
1

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

92

35

Planned

70

A/F/W
ABBATOM
AC
ACECOWEN
ACLF
AECL
AECL/DAE
AECL/DHI
AEE
AEG
AEG,GE
AEG,KWU
AMN/GETS
APC
AREVA
ASE
ASEASTAL
ASPALDO
AtEE
B&W
BBK
BBR
CE
CEA
CFHI
CGE
CNCLNEY
CNEA
CNNC
DEC

ASSOCIATION ACEC, FRAMATOME ET WESTINGHOUSE


ABBATOM (FORMERLY ASEA-ATOM)
ALLIS CHALMERS
ACECOWEN (ACEC-COCKERILL-WESTINGHOUSE )
ACECOWEN - CREUSOT LOIRE - FRAMATOME
ATOMIC ENERGY OF CANADA LTD.
ATOMIC ENERGY OF CANADA LTDA AND DEPARTMENT OF ATOMIC ENERGY (INDIA)
ATOMIC ENERGY OF CANADA LTD. / DOOSAN HEAVY INDUSTRY & CONSTRUCTION
ATOMENERGOEXPORT
ALLGEMEINE ELEKTRICITAETS-GESELLSCHAFT
ALLGEMEINE ELECTRICITAETS-GESELLSCHAFT, GENERAL ELECTRIC COMPANY (US)
ALLGEMEINE ELEKTRICITAETS GESELLSCHAFT, KRAFTWERK UNION AG
ANSALDO MECCANICO NUCLEARE SPA / GENERAL ELECTRIC TECHNICAL SERVICES CO
ATOMIC POWER CONSTRUCTION LTD.
AREVA, 27-29, RUE LE PELETIER, 75433 PARIS CEDEX 09URL: WWW.AREVA.COM
JOINT-STOCK COMPANY ATOMSTROYEXPORT
ASEA-ATOM / STAL-LAVAL
ASPALDO
ATOMENERGOEXPORT
BABCOCK & WILCOX CO.
BROWN BOVERI-KRUPP REAKTORBAU GMBH
BROWN BOVERI REAKTOR GMBH
COMBUSTION ENGINEERING CO.
COMMISSARIAT A L'ENERGIE ATOMIQUE
CHINA FIRST HEAVY INDUSTRIES
CANADIAN GENERAL ELECTRIC
CNIM-CONSTRUCTIONS NAVALES ET INDUSTRIELLES DE MEDITERRANEE CL - CREUSOT LOI
COMISIN NACIONAL DE ENERGA ATMICA
CHINA NATIONAL NUCLEAR CORPORATION
DONGFANG ELECTRIC CORPORATIONDEC-NPIC-FANP

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY

NSSS supplier
code

2
6

7
5

4
3

1
1

1
1
6
4
1
1
3
1

6
1
1
2
1
2

1
2
3

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

1
1

12

1
2

4
1
8
1
3
8

Operational

Planned

1
1

71

DHICKAEC
DHICKOPC
EE/B&W/T
EL/WEST
FAEA
FRAM
FRAMACEC
GA
GAAA
GE
GE,AEG
GE/GETSC
GE/T
GEC
GETSCO
GNEPRWRA
GTM
H/G
HITACHI
HRB
IA
ICL/FE
IZ
KEPCO
KWU
LEVIVIER
MAEC-KAZ
MAEP
MHI
MSM
NGA

DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD. / KOREA ATOMIC ENERGY RESEARCH I
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD. / KOREA POWER ENGINEERING COMPA
THE ENGLISH ELECTRIC CO. LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTR.
ELETTRONUCLEARE ITALIANA / WESTINGHOUSE ELECTRIC CORP.
FEDERAL ATOMIC ENERGY AGENCY
FRAMATOME
FRAMACECO (FRAMATOME-ACEC-COCKERILL)
GENERAL ATOMIC CORP.
GROUPEMENT ATOMIQUE ALSACIENNE ATLANTIQUE
GENERAL ELECTRIC CO.
GENERAL ELECTRIC COMPANY (US), ALLGEMEINE ELEKTRICITAETS- GESELLSCHAFT
GENERAL ELECTRIC CO. / GENERAL ELECTRIC TECHNICAL SERVICES CO.
GENERAL ELECTRIC CO. / TOSHIBA CORPORATION
GENERAL ELECTRIC COMPANY (UK)
GENERAL ELECTRIC TECHNICAL SERVICES CO.
GENERAL NUCLEAR ENGINEERING & PUERTO RICO WATER RESOURCES AUTHORITY (US)
GRANDS TRAVAUX DE MARSEILLE
HITACHI GE NUCLEAR ENERGY, LTD.
HITACHI LTD.
HOCHTEMPERATUR-REAKTORBAU GMBH
INTERATOM INTERNATIONALE ATOMREAKTORBAU GMBH
INTERNATIONAL COMBUSTION LTD. / FAIREY ENGINEERING LTD.
IZHORSKIYE ZAVODY
KOREA ELECTRIC POWER CORPORATION
SIEMENS KRAFTWERK UNION AG
LEVIVIER
MAEC-KAZATOMPROMMANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LLC
MINATOMENERGOPROM, MINISTRY OF NUCLEAR POWER AND INDUSTRY
MITSUBISHI HEAVY INDUSTRIES LTD.
MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH)
NATIONALE GESELLSCHAFT ZUR FRDERUNG DER INDUSTRIELLEN ATOMTECHNIK

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY continued

NSSS supplier
code

1
20

12

2
2
1

1
1

5
1

9
2
1
2

2
1
1
1

1
1

2
1
11
1
1
2
3

5
1
5
3

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

46

1
66
2

2
9
1

Operational

Planned

72

TOTAL

NNC
NPC
NPCIL
NPIC
OH/AECL
PAA
PAIP
PPC
RDM
ROSATOM
S/KWU
SACM
SHE
SIEM,KWU
SIEMENS
SKODA
T/H/F/M
TBD
TNPG
TOSHIBA
Tsinghua
UEC
UKAEA
WH
WH/MHI
not specified

NATIONAL NUCLEAR CORPORATION


NUCLEAR POWER CO. LTD.
NUCLEAR POWER CORPORATION OF INDIA LTD. VIKRAM SARABHAI BHAVAN, ANUSHAKTI NAG
NUCLEAR POWER INSTITUTE OF CHINA
ONTARIO HYDRO / ATOMIC ENERGY OF CANADA LTD.
PRODUCTION AMALGAMATION 'ATOMMASH', VOLGODONSK
PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA
PWR POWER PROJECTS LTD
ROTTERDAMSE DROOGDOK MAATSCHAPPIJ (RDM) IN ROTTERDAM (NL)
STATE ATOMIC ENERGY CORPORATION ROSATOM
SIEMENS / KRAFTWERK UNION AG
SOCIETE ALSACIENNE DE CONSTRUCTIONS MECANIQUES
SHANGHAI ELECTRIC
SIEMENS AG, KRAFTWERK UNION AG
SIEMENS AG, POWER GENERATION - FRG
SKODA CONCERN NUCLEAR POWER PLANT WORKS
TOSHIBA / HITACHI / FUJI ELECTRIC HOLDINGS / MITSUBISHI HEAVY INDUSTRIES
TBD
THE NUCLEAR POWER GROUP LTD.
TOSHIBA CORPORATION
TSINGHUA UNIVERSITY
UNITED ENGINEERS AND CONTRACTORS
UNITED KINGDOM ATOMIC ENERGY AUTHORITY
WESTINGHOUSE ELECTRIC CORPORATION
WESTINGHOUSE ELECTRIC CORPORATION / MITSUBISHI HEAVY INDUSTRIES LTD.

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY continued

NSSS supplier
code

434

70
1

4
13

1
10

33
1

18
4
11
1

2
6
16

Operational

72

7
2
1

1
2

10

4
6

149

1
10
11

10
4

2
1
1

Number of reactors, as of 31 Dec. 2013


Construction LT shut down
Shut down

92

4
2
44

24

Planned

This page is intentionally left blank

300

Number of reactors

253.0

273

Net electrical power (GW(e))

Number of reactors / net electrical power (GW(e))

250

200

150

48

81

76.0

100

PWR

BWR

GCR

PHWR

LWGR

0.6

15

10.2

8.1

15

23.9

50

FBR

Reactor type
Figure 1. Number of operational reactors by type and
net electrical power (as of 31 Dec. 2013).

74

70

Number of reactors

60.8

60

Net electrical power (GW(e))

60

40

30

20

PWR

BWR

PHWR

FBR

0.2

2
0

1.3

3.2

10

3.9

Number of reactors / net electrical power (GW(e))

50

HTGR

Reactor type
Figure 2. Reactors under construction by type and
net electrical power (as of 31 Dec. 2013).

75

76

0%

10%

5.7%
4.6%
4.4%
4.4%
3.5%
2.8%
2.8%
2.1%
1.7%
1.5%

20%

19.8%
19.7%
19.4%
18.3%
17.5%
16.0%
15.4%

30%

Nuclear Share

40%

36.4%
35.9%
33.6%
33.3%
30.7%
29.2%
27.6%

43.6%
42.7%

Note: The nuclear share of electricity supplied in Taiwan, China was 19.1% of the total.

Figure 3. Nuclear share of electricity generation (as of 31 Dec. 2013).

FRANCE
BELGIUM
SLOVAKIA
HUNGARY
UKRAINE
SWEDEN
SWITZERLAND
CZECH REP.
SLOVENIA
FINLAND
BULGARIA
ARMENIA
KOREA REP.OF
ROMANIA
SPAIN
USA
UK
RUSSIA
CANADA
GERMANY
SOUTH AFRICA
MEXICO
ARGENTINA
PAKISTAN
INDIA
BRAZIL
NETHERLANDS
CHINA
JAPAN
IRAN,ISL.REP
50%

52.1%
51.7%
50.7%

60%

70%

73.3%

80%

Number of reactors

2013

2011-2012

10

12

59

62

68

77

80

2006-2010

20

23

29

60

2001-2005

1996-2000

1991-1995

1986-1990

1981-1985

82

85

84

93

Number of reactors / construction time (in months)

121

131

140

120

100

40

20

Construction time

Figure 4. Worldwide median construction time in months


(as of 31 Dec. 2013).

77

78

Number of reactors

10

15

20

25

30

35

6
4

33

19
16

22
19

11

12

14
11

19

13
10 10

Reactor age (in years)

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

10

Figure 5. Number of reactors in operation by age (as of 31 Dec. 2013).

11

14

21

24

32

79
Number of reactors
0

10

20

30

40

Figure 6. Annual construction starts and connections to the grid (1954 to 2013).

1
8

0
1

5
13

5
4

11
7

8
5

9
8
8

9
9
9
15

25

11
7

37
13

10

37

6
16

18
29

16

29

20

38

26

38

15
19
18
20
8

20
17

43
23
23
27
21
23

19
19

16

23

11

33

19

33

27

13
7

22
14

12

5
2

10

Construction starts

1
3
3
4

5
4
4

50

5
3
4
4

Grid connections

1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013

10

12

2
4

16

5
7
7

10

No. 23

ORDERING LOCALLY
In the following countries, IAEA priced publications may be purchased from the
sources listed below or from major local booksellers.
Orders for unpriced publications should be made directly to the IAEA. The contact
details are given at the end of this list.
AUSTRALIA

DA Information Services
648 Whitehorse Road, Mitcham, VIC 3132, AUSTRALIA
Telephone: +61 3 9210 7777 Fax: +61 3 9210 7788
Email: books@dadirect.com.au Web site: http://www.dadirect.com.au

BELGIUM

Jean de Lannoy
Avenue du Roi 202, 1190 Brussels, BELGIUM
Telephone: +32 2 5384 308 Fax: +32 2 5380 841
Email: jean.de.lannoy@euronet.be Web site: http://www.jean-de-lannoy.be

CANADA

Renouf Publishing Co. Ltd.


5369 Canotek Road, Ottawa, ON K1J 9J3, CANADA
Telephone: +1 613 745 2665 Fax: +1 643 745 7660
Email: order@renoufbooks.com Web site: http://www.renoufbooks.com
Bernan Associates
4501 Forbes Blvd., Suite 200, Lanham, MD 20706-4391, USA
Telephone: +1 800 865 3457 Fax: +1 800 865 3450
Email: orders@bernan.com Web site: http://www.bernan.com

CZECH REPUBLIC

Suweco CZ, spol. S.r.o.


Klecakova 347, 180 21 Prague 9, CZECH REPUBLIC
Telephone: +420 242 459 202 Fax: +420 242 459 203
Email: nakup@suweco.cz Web site: http://www.suweco.cz

FINLAND

Akateeminen Kirjakauppa
PO Box 128 (Keskuskatu 1), 00101 Helsinki, FINLAND
Telephone: +358 9 121 41 Fax: +358 9 121 4450
Email: akatilaus@akateeminen.com Web site: http://www.akateeminen.com

FRANCE

Form-Edit
5 rue Janssen, PO Box 25, 75921 Paris CEDEX, FRANCE
Telephone: +33 1 42 01 49 49 Fax: +33 1 42 01 90 90
Email: fabien.boucard@formedit.fr Web site: http://www.formedit.fr
Lavoisier SAS
14 rue de Provigny, 94236 Cachan CEDEX, FRANCE
Telephone: +33 1 47 40 67 00 Fax: +33 1 47 40 67 02
Email: livres@lavoisier.fr Web site: http://www.lavoisier.fr
LAppel du livre
99 rue de Charonne, 75011 Paris, FRANCE
Telephone: +33 1 43 07 50 80 Fax: +33 1 43 07 50 80
Email: livres@appeldulivre.fr Web site: http://www.appeldulivre.fr

GERMANY

Goethe Buchhandlung Teubig GmbH


Schweitzer Fachinformationen
Willsttterstrasse 15, 40549 Dsseldorf, GERMANY
Telephone: +49 (0) 211 49 8740 Fax: +49 (0) 211 49 87428
Email: s.dehaan@schweitzer-online.de Web site: http://www.goethebuch.de

HUNGARY

Librotade Ltd., Book Import


PF 126, 1656 Budapest, HUNGARY
Telephone: +36 1 257 7777 Fax: +36 1 257 7472
Email: books@librotade.hu Web site: http://www.librotade.hu

INDIA

Allied Publishers

1st Floor, Dubash House, 15, J.N. Heredi Marg, Ballard Estate, Mumbai 400001, INDIA
Telephone: +91 22 2261 7926/27 Fax: +91 22 2261 7928
Email: alliedpl@vsnl.com Web site: http://www.alliedpublishers.com
Bookwell

3/79 Nirankari, Delhi 110009, INDIA


Telephone: +91 11 2760 1283/4536
Email: bkwell@nde.vsnl.net.in Web site: http://www.bookwellindia.com

ITALY

Libreria Scientifica AEIOU

Via Vincenzo Maria Coronelli 6, 20146 Milan, ITALY


Telephone: +39 02 48 95 45 52 Fax: +39 02 48 95 45 48
Email: info@libreriaaeiou.eu Web site: http://www.libreriaaeiou.eu

JAPAN

Maruzen Co., Ltd.

1-9-18 Kaigan, Minato-ku, Tokyo 105-0022, JAPAN


Telephone: +81 3 6367 6047 Fax: +81 3 6367 6160
Email: journal@maruzen.co.jp Web site: http://maruzen.co.jp

NETHERLANDS

Martinus Nijhoff International

Koraalrood 50, Postbus 1853, 2700 CZ Zoetermeer, NETHERLANDS


Telephone: +31 793 684 400 Fax: +31 793 615 698
Email: info@nijhoff.nl Web site: http://www.nijhoff.nl
Swets Information Services Ltd.
PO Box 26, 2300 AA Leiden

Dellaertweg 9b, 2316 WZ Leiden, NETHERLANDS


Telephone: +31 88 4679 387 Fax: +31 88 4679 388
Email: tbeysens@nl.swets.com Web site: http://www.swets.com

SLOVENIA

Cankarjeva Zalozba dd

Kopitarjeva 2, 1515 Ljubljana, SLOVENIA


Telephone: +386 1 432 31 44 Fax: +386 1 230 14 35
Email: import.books@cankarjeva-z.si
Web site: http://www.mladinska.com/cankarjeva_zalozba

SPAIN

Diaz de Santos, S.A.

Librerias Bookshop Departamento de pedidos


Calle Albasanz 2, esquina Hermanos Garcia Noblejas 21, 28037 Madrid, SPAIN
Telephone: +34 917 43 48 90 Fax: +34 917 43 4023
Email: compras@diazdesantos.es Web site: http://www.diazdesantos.es

UNITED KINGDOM

The Stationery Office Ltd. (TSO)

PO Box 29, Norwich, Norfolk, NR3 1PD, UNITED KINGDOM


Telephone: +44 870 600 5552
Email (orders): books.orders@tso.co.uk (enquiries): book.enquiries@tso.co.uk
Web site: http://www.tso.co.uk

UNITED STATES OF AMERICA


Bernan Associates

4501 Forbes Blvd., Suite 200, Lanham, MD 20706-4391, USA


Telephone: +1 800 865 3457 Fax: +1 800 865 3450
Email: orders@bernan.com Web site: http://www.bernan.com
Renouf Publishing Co. Ltd.

812 Proctor Avenue, Ogdensburg, NY 13669, USA


Telephone: +1 888 551 7470 Fax: +1 888 551 7471
Email: orders@renoufbooks.com Web site: http://www.renoufbooks.com

United Nations

300 East 42nd Street, IN-919J, New York, NY 1001, USA


Telephone: +1 212 963 8302 Fax: 1 212 963 3489
Email: publications@un.org Web site: http://www.unp.un.org

Orders for both priced and unpriced publications may be addressed


directly to:
IAEA Publishing Section, Marketing and Sales Unit, International Atomic Energy Agency
Vienna International Centre, PO Box 100, 1400 Vienna, Austria
Telephone: +43 1 2600 22529 or 22488 Fax: +43 1 2600 29302
Email: sales.publications@iaea.org Web site: http://www.iaea.org/books

14-17621

REFERENCE DATA SERIES No. 2


2014 Edition

Nuclear
Power
Reactors
in the World

INTERNATIONAL ATOMIC ENERGY AGENCY


VIENNA
ISBN 9789201049148
ISSN 10112642

14-17621_PUB-RDS-2-34_cover.indd All Pages

@
2014-05-15 10:55:11

Vous aimerez peut-être aussi