Federal Register / Vol. 72, No.

72 / Monday, April 16, 2007 / Notices 18971

DEPARTMENT OF ENERGY study should be conducted in order to for inspection and reproduction at the
form an adequate factual basis for a address in item h above.
Federal Energy Regulatory complete analysis of the application on You may also register online at
Commission its merit, the resource agency, Indian http://www.ferc.gov/docs-filing/
[Project No. 2281–011] Tribe, or person must file a request for esubscription.asp to be notified via
a study with the Commission not later email of new filings and issuances
Pacific Gas and Electric Company; than 60 days from the date of filing of related to this or other pending projects.
Notice of Application Tendered for the application, and serve a copy of the For assistance, contact FERC Online
Filing With the Commission, Soliciting request on the applicant. Support.
Additional Study Requests, and l. Deadline for Filing Requests for p. Consultation: With this notice, we
Establishing Procedural Schedule for Cooperating Agency Status and are initiating consultation with the
Relicensing and a Deadline for Additional Study Requests: May 29, California State Historic Preservation
Submission of Final Amendments 2007. Officer (SHPO), as required by § 106,
All documents (original and eight National Historic Preservation Act, and
April 10, 2007. copies) should be filed with: Kimberly the regulations of the Advisory Council
Take notice that the following D. Bose, Secretary, Federal Energy on Historic Preservation, 36, CFR, at
transmission line only project Regulatory Commission, 888 First § 800.4.
application has been filed with the Street, NE., Washington, DC 20426. q. Procedural Schedule and Final
Commission and is available for public Additional study requests and Amendments: The application will be
inspection. requests for cooperating agency status processed according to the following
a. Type of Application: New License may be filed electronically via the Transmission Line Licensing Schedule.
for Transmission Line Only Project. Internet in lieu of paper. The Revisions to the schedule will be made
b. Project No: P–2281–011. Commission strongly encourages as appropriate.
c. Date Filed: March 30, 2007. electronic filings. See 18 CFR
Issue Deficiency or Acceptance letter: May
d. Applicant: Pacific Gas and Electric 385.2001(a)(1)(iii) and the instructions 2007.
Company. on the Commission’s Web site (http:// Issue Scoping Document for comments:
e. Name of Project: Woodleaf-Kanaka www.ferc.gov) under the ‘‘e-Filing’’ link. June 2007.
Junction Transmission Line Project. m. Status: This application has not Hold Scoping Meetings/Site Visit: June
f. Location: The project is located in been accepted for filing and is not ready 2007.
Butte County California, within the for environmental analysis. We are not Request Additional Information, if needed:
South Fork Feather River watershed. soliciting motions to intervene, protests, July 2007.
The project is not located within any or final terms and conditions at this Notice of application ready for
time. environmental analysis: August 2007
designated cities, towns, subdivisions or
n. Project Description: The Woodleaf- Notice of the availability of the EA:
Indian reservations. The project is February 2008.
located about 15 miles east of Oroville, Kanaka Junction Transmission Line
California. The project affects 31.79 Project is a transmission line only Final amendments to the application
acres of federal lands that is project that transmits electricity 6.2 must be filed with the Commission no
administered by the Plumas National miles from the Woodleaf Powerhouse later than 30 days from the issuance
Forest. (owned and operated by the South date of the notice of ready for
g. Filed Pursuant to: Federal Power Feather Water and Power Agency under environmental analysis.
Act 16 U.S.C. 791(a)–825(r). FERC Project No. 2088) to the Kanaka Kimberly D. Bose,
h. Applicant Contact: Forrest Junction. The Project also includes a Secretary.
Sullivan, Senior Project Manger, Pacific 0.02-mile long tap line extending to
[FR Doc. E7–7160 Filed 4–13–07; 8:45 am]
Gas & Electric Company, 5555 Florin- Forbestown Powerhouse (also under
BILLING CODE 6717–01–P
Perkins Road, Building 500, FERC Project No. 2088). The Woodleaf-
Sacramento, CA 95826. Tel: (916) 386– Kanaka Junction Transmission Line is
5580. composed of a single-circuit, 115-kV
DEPARTMENT OF ENERGY
i. FERC Contact: John Mudre, (202) transmission line, supported primarily
502–8902, or john.mudre@ferc.gov. on wood-pole, H-frame towers within a Federal Energy Regulatory
j. Cooperating Agencies: We are 75-foot wide right-of-way. The project is Commission
asking Federal, state, local, and tribal linked to the Licensee’s Sly Creek
agencies with jurisdiction and/or Transmission Line (FERC License No. [Project No. 4851–005]
special expertise with respect to 4851), via the Woodleaf Powerhouse
Pacific Gas and Electric Company;
environmental issues to cooperate with Switchyard, a component of FERC
Notice of Application Tendered for
us in the preparation of the Project No. 2088.
o. Application Availability: A copy of Filing With the Commission, Soliciting
environmental document. Agencies who
the application is available for review at Additional Study Requests, and
would like to request cooperating status
the Commission in the Public Reference Establishing Procedural Schedule for
should follow the instructions for filing
Room or may be viewed on the Relicensing and a Deadline for
such requests described in item l below.
Commission’s Web site at http:// Submission of Final Amendments
Cooperating agencies should note the
Commission’s policy that agencies that www.ferc.gov using the ‘‘eLibrary’’ link. April 10, 2007.
cooperate in the preparation of the Enter the docket number excluding the Take notice that the following
environmental document cannot also last three digits in the docket number
cprice-sewell on PROD1PC66 with NOTICES

transmission line only project


intervene. See, 94 FERC ¶ 61,076 (2001). field to access the document. For application has been filed with the
k. Study Request: Pursuant to Section assistance, contact FERC Online Commission and is available for public
4.32(b)(7) of 18 CFR of the Support at inspection.
Commission’s regulations, if any FERCOnlineSupport@ferc.gov or toll- a. Type of Application: New License
resource agency, Indian Tribe, or person free at 1–866–208–3676, or for TTY, for Transmission Line Only Project.
believes that an additional scientific (202) 502–8659. A copy is also available b. Project No.: P–4851–005.

VerDate Aug<31>2005 15:24 Apr 13, 2007 Jkt 211001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\16APN1.SGM 16APN1