Vous êtes sur la page 1sur 1

17150 Federal Register / Vol. 72, No.

66 / Friday, April 6, 2007 / Notices

is reasonably necessary or appropriate the blanket approvals of issuances of Description: STI Capital Company and
for such purposes. securities or assumptions of liability by Pedricktown Plant Holdings submit an
The Commission reserves the right to Saguaro Power should file a motion to application for authorization to dispose
require a further showing that neither intervene or protest with the Federal of jurisdictional facilities.
public nor private interests will be Energy Regulatory Commission, 888 Filed Date: 03/28/2007.
adversely affected by continued First Street, NE., Washington, DC 20426, Accession Number: 20070330–0023.
approvals of CECU’s issuance of in accordance with Rules 211 and 214 Comment Date: 5 p.m. Eastern Time
securities or assumptions of liability. of the Commission’s Rules of Practice on Wednesday, April 18, 2007.
Copies of the full text of the Director’s and Procedure. 18 CFR 385.211, 385.214 Take notice that the Commission
Order are available from the (2004). received the following electric rate
Commission’s Public Reference Room, Notice is hereby given that the filings:
888 First Street, NE., Washington, DC deadline for filing motions to intervene Docket Numbers: ER97–4281–016;
20426. The Order may also be viewed or protest is April 30, 2007. ER99–2161–007; ER99–3000–006;
on the Commission’s Web site at http:// Absent a request to be heard in ER02–1572–004; ER02–1571–004;
www.ferc.gov, using the eLibrary link. opposition by the deadline above, ER99–1115–011; ER99–1116–011;
Enter the docket number excluding the Saguaro Power is authorized to issue ER00–2810–005; ER99–4359–004;
last three digits in the docket number securities and assume obligations or ER99–4358–004; ER99–2168–007;
filed to access the document. liabilities as a guarantor, indorser, ER98–1127–011; ER07–649–001; ER99–
Comments, protests, and interventions surety, or otherwise in respect of any 2162–007; ER00–2807–005; ER00–2809–
may be filed electronically via the security of another person; provided 005; ER98–1796–010; ER00–1259–006;
internet in lieu of paper. See, 18 CFR that such issuance or assumption is for ER99–4355–004; ER99–4356–004;
385.2001(a)(1)(iii) and the instructions some lawful object within the corporate ER00–3160–006; ER99–4357–004;
on the Commission’s Web site under the purposes of Saguaro Power, compatible ER00–3160–006; ER00–2313–006;
‘‘e-Filing’’ link. The Commission with the public interest, and is ER02–2/–004; ER02–1396–004; ER02–
strongly encourages electronic filings. reasonably necessary or appropriate for 1412–004; ER00–3718–005; ER99–3637–
such purposes. 005; ER07–486–002; ER99–1712–007;
Philis J. Posey, The Commission reserves the right to ER00–2808–006.
Acting Secretary. require a further showing that neither Applicants: NRG Power Marketing,
[FR Doc. E7–6440 Filed 4–5–07; 8:45 am] public nor private interests will be Inc.; Arthur Kill Power LLC; Astoria Gas
BILLING CODE 6717–01–P adversely affected by continued Turbines Power LLC; Bayou Cove
approvals of Saguaro Power’s issuances Peaking Power LLC; Big Cajun I Peaking
of securities or assumptions of liability. Power LLC; Cabrillo Power I LLC;
DEPARTMENT OF ENERGY Copies of the full text of the Director’s Cabrillo Power II LLC; Conemaugh
Order are available from the Power LLC; Connecticut Jet Power LLC;
Federal Energy Regulatory Commission’s Public Reference Room,
Commission Devon Power LLC; Dunkirk Power LLC;
888 First Street, NE., Washington, DC El Segundo Power, LLC; El Segundo
[Docket Nos. ER07–486–000; ER07–486– 20426. The Order may also be viewed Power II LLC; Huntley Power LLC;
001] on the Commission’s Web site at Indian River Power LLC; Keystone
http://www.ferc.gov, using the eLibrary Power LLC; Long Beach Generation
Saguaro Power Company, A Limited link. Enter the docket number excluding LLC; Louisiana Generating LLC;
Partnership; Notice of Issuance of the last three digits in the docket Middletown Power LLC; Montville
Order number filed to access the document. Power LLC; NEO Freehold-Gen LLC;
Comments, protests, and interventions Norwalk Power LLC; NRG Energy
April 2, 2007.
may be filed electronically via the Center Dover LLC; NRG Energy Center
Saguaro Power Company, A Limited internet in lieu of paper. See, 18 CFR
Partnership (Saguaro Power) filed an Paxton LLC; NRG New Jersey Energy
385.2001(a)(1)(iii) and the instructions Sales LLC; NRG Rockford LLC; NRG
application for market-based rate on the Commission’s Web site under the
authority, with an accompanying tariff. Rockford II LLC; NRG Sterlington Power
‘‘e-Filing’’ link. The Commission LLC; Oswego Harbor Power LLC;
The proposed market-based rate tariff strongly encourages electronic filings.
provide for the sale of energy and Saguaro Power Company, A Limited
capacity at market-based rates. Saguaro Philis J. Posey, Partnership; Somerset Power LLC;
Power also requested waivers of various Acting Secretary. Vienna Power LLC
Commission regulations. In particular, [FR Doc. E7–6438 Filed 4–5–07; 8:45 am] Description: NRG Power Marketing,
Saguaro Powerrequested that the BILLING CODE 6717–01–P
Inc and thirty-one affiliates most of
Commission grant blanket approval which own generating facilities submit
under 18 CFR Part 34 of all future a triennial market power update and
issuances of securities and assumptions DEPARTMENT OF ENERGY notice of change in status.
of liability by Saguaro Power. Filed Date: 03/26/2007.
On March 30, 2007, pursuant to Federal Energy Regulatory Accession Number: 20070330–0022.
delegated authority, the Director, Commission Comment Date: 5 p.m. Eastern Time
Division of Tariffs and Market on Monday, April 16, 2007.
Development—West, granted the Combined Notice of Filings # 1 Docket Numbers: ER99–2342–010.
requests for blanket approval under Part April 2, 2007. Applicants: Tampa Electric Company.
34. The Director’s order also stated that Take notice that the Commission Description: Tampa Electric Company
pwalker on PROD1PC71 with NOTICES

the Commission would publish a received the following electric corporate submits a refund report.
separate notice in the Federal Register filings: Filed Date: 03/19/2007.
establishing a period of time for the Docket Numbers: EC07–73–000. Accession Number: 20070319–5044.
filing of protests. Accordingly, any Applicants: STI Capital Company; Comment Date: 5 p.m. Eastern Time
person desiring to be heard or to protest Pedricktown Plant Holdings, LLC. on Monday, April 09, 2007.

VerDate Aug<31>2005 18:39 Apr 05, 2007 Jkt 211001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\06APN1.SGM 06APN1

Vous aimerez peut-être aussi