Vous êtes sur la page 1sur 1

14800 Federal Register / Vol. 72, No.

60 / Thursday, March 29, 2007 / Notices

the original and the number of copies Hydropower, Inc.’s request to use the Canal in Middlesex County,
provided by the Commission’s Traditional Licensing Process. Massachusetts.
regulations to: The Secretary, Federal k. With this notice, we are initiating f. Filed Pursuant to: 18 CFR 6.4.
Energy Regulatory Commission, 888 informal consultation with: (a) The U.S. g. Licensee Contact Information: Mr.
First Street, NE., Washington, DC 20426. Fish and Wildlife Service under section James Lichoulas, Jr., 57 Mill Street,
A copy of any motion to intervene must 7 of the Endangered Species Act; and (b) Woburn, MA 01801.
also be served upon each representative the New Hampshire State Historic h. FERC Contact: Tom Papsidero,
of the Applicant specified in the Preservation Officer, as required by (202) 502–6002.
particular application. section 106, National Historical i. Deadline for filing comments,
t. Agency Comments—Federal, state, Preservation Act, and the implementing protests, and motions to intervene: April
and local agencies are invited to file regulations of the Advisory Council on 23, 2007.
comments on the described application. All documents (original and eight
Historic Preservation at 36 CFR 800.2.
A copy of the application may be copies) should be filed with Philis J.
l. Great Bear Hydropower, Inc. filed a
obtained by agencies directly from the Posey, Acting Secretary, Federal Energy
Pre-Application Document (PAD;
Applicant. If an agency does not file Regulatory Commission, 888 First
including a proposed process plan and
comments within the time specified for Street, NE., Washington, DC 20426.
schedule) with the Commission,
filing comments, it will be presumed to Comments, protests and interventions
pursuant to 18 CFR 5.6 of the
have no comments. One copy of an may be filed electronically via the
Commission’s regulations.
agency’s comments must also be sent to Internet in lieu of paper; see 18 CFR
m. A copy of the PAD is available for 385.2001(a)(1)(iii) and the instructions
the Applicant’s representatives. review at the Commission in the Public on the Commission’s Web site under the
Philis J. Posey, Reference Room or may be viewed on ‘‘e-Filing’’ link. The Commission
Acting Secretary.
the Commission’s Web site (http:// strongly encourages electronic filings.
www.ferc.gov), using the ‘‘eLibrary’’ Please include the project number (P–
[FR Doc. E7–5766 Filed 3–28–07; 8:45 am]
link. Enter the docket number, 9300–017) on any documents or
BILLING CODE 6717–01–P
excluding the last three digits in the motions filed.
docket number field to access the The Commission’s Rules of Practice
document. For assistance, contact FERC and Procedure require all intervenors
DEPARTMENT OF ENERGY
Online Support at filing documents with the Commission
Federal Energy Regulatory FERCONlineSupport@ferc.gov or toll to serve a copy of that document on
Commission free at 1–866–208–3676, or for TTY, each person in the official service list
(202) 502–8659. A copy is also available for the project. Further, if an intervenor
Notice of Intent To File License for inspection and reproduction at the files comments or documents with the
Application, Filing of Pre-Application address in paragraph h. Commission relating to the merits of an
Document, and Approval of Use of the Register online at http://ferc.gov/docs- issue that may affect the responsibilities
Traditional Licensing Process filing/esubscription.asp to be notified of a particular resource agency, they
via e-mail of new filing and issuances must also serve a copy of the document
March 23, 2007. related to this or other pending projects.
a. Type of Filing: Notice of Intent to on that resource agency.
For assistance, contact FERC Online j. Description of Existing Facilities:
File License Application and Request to Support.
Use the Traditional Licensing Process. The constructed project consists of the
b. Project No.: 12771–000. Philis Posey, following existing facilities: (1) An
c. Dated Filed: February 5, 2007. Acting Secretary. intake off the Hamilton Canal; (2) two
d. Submitted By: Great Bear 11-foot-wide and 160-foot-long open
[FR Doc. E7–5767 Filed 3–28–07; 8:45 am]
Hydropower, Inc. masonry flumes; (3) an 11-foot-wide and
BILLING CODE 6717–01–P
e. Name of Project: Upper Falls 20-foot-long steel penstock which
Hydroelectric Project. funnels the water into; (4) an existing
f. Location: The project would be DEPARTMENT OF ENERGY turbine chamber which contains two
located at the existing Riverside and turbine-generators with an installed
Kendrick-Davis Dams on the Mascoma Federal Energy Regulatory capacity of 346 kW; (5) two stone
River in Grafton County, New Commission masonry tailraces; (6) 480-volt generator
Hampshire. The project would not leads; (7) a 0.48/13.8-kV transformer; (8)
occupy United States lands. Notice of Termination of License by a 300-foot-long, 480-volt underground
g. Filed Pursuant to: 18 CFR 5.3 of the Implied Surrender and Soliciting cable; and (9) appurtenant facilities.
Commission’s regulations. Comments, Protests, and Motions To k. Description of Proceeding: 18 CFR
h. Applicant Contact: Mr. Terry Intervene 6.4 of the Commission’s regulations
McDonnell, President, Great Bear provides, among other things, that it is
Hydropower, Inc., 15 Brigham Hill March 23, 2007. deemed to be the intent of a licensee to
Road, Norwich, VT 05055, (802) 649– Take notice that the following surrender a license, if the licensee
9099. hydroelectric proceeding has been abandons a project for a period of three
i. FERC Contact: John Ramer, (202) initiated by the Commission: years.
502–8969 or john.ramer@ferc.gov. a. Type of Proceeding: Termination of A license for the Appleton Trust
j. Great Bear Hydropower, Inc. filed license by implied surrender. Project was issued by Order Issuing
its request to use the Traditional b. Project No.: 9300–017. License (Minor Project) on July 18, 1986
Licensing Process on February 5, 2007. c. Date Initiated: March 21, 2007. (36 FERC ¶ 62,047). The project has not
jlentini on PROD1PC65 with NOTICES

Great Bear Hydropower, Inc. filed d. Licensee: The licensee is James operated regularly since November 1994
public notice of its request on February Lichoulas Jr. and the licensee, James Lichoulas, Jr.,
20, 2007. In a letter dated March 16, e. Name and Location of Project: The has not made necessary repairs to
2007, the Director of the Office of constructed 346-kilowatt Appleton resume operations. By letter of March
Energy Projects approved Great Bear Trust Project is located on the Hamilton 17, 2003, the Commission’s Division of

VerDate Aug<31>2005 17:20 Mar 28, 2007 Jkt 211001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\29MRN1.SGM 29MRN1

Vous aimerez peut-être aussi