MICROWAVE EQUIPMENT

HUAWEI RTN
IMPLEMENTATION PROTOCOL

Site Code local: SiteA#


Site Code far end: SiteB#

(Fill in your site code plus candidate after the colon and change it in the Header and Footer as well)

(Fill in your site code plus candidate after the colon and change it in the Header and Footer as well)

Job number: JobNr#


(Fill in your job number after the colon and change it in the Header and Footer as well)

File name

Created by

Approved

Date

283149962.doc

Alcatel Lucent Schweiz AG


Network Rollout Mobile

Peter Schippel

18.07.2011

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

TABLE OF CONTENTS
1

INSTALLATION AND VERIFICATION DOCUMENTATION....................................................3

INDOOR UNIT INSTALLATION.............................................................................................. 4


2.1
2.2
2.3
2.4
2.5
2.6
2.7

OUTDOOR UNIT INSTALLATION.......................................................................................... 8


3.1
3.2
3.3
3.4
3.5

SYSTEM CONFIGURATION AND CHARACTERISTICS................................................................4


INDOOR UNIT INSTALLATION................................................................................................5
TRANSMISSION CABLING CHECKLIST....................................................................................5
INDOOR UNIT GROUNDING.................................................................................................. 5
INDOOR INSTALLATION CHECKLIST.......................................................................................6
SUPERVISION/RTN-FILES LOADED.......................................................................................7
IP-ADDRESS INDOOR UNIT.................................................................................................. 7
IF CABLE INSTALLATION...................................................................................................... 8
OUTDOOR UNIT AND CABLE INSTALLATION...........................................................................8
METHOD OF INSTALLATION (OUTDOOR UNIT).......................................................................8
DISH/ODU......................................................................................................................... 8
OUTDOOR INSTALLATION CHECKLIST...................................................................................9

HUAWEI RTNCOMMISSIONING LINE UP..........................................................................10


4.1
4.2
4.3
4.4
4.5
4.6

MODULATION SCHEME...................................................................................................... 10
FREQUENCY BAND............................................................................................................ 10
TX SETTINGS................................................................................................................... 10
RECEIVING LEVEL............................................................................................................. 10
LINK PERFORMANCE MONITORING (TIME SET 15MIN)..........................................................10
STATISTICS AND ERROR COUNTERS..................................................................................10

DOCUMENTATION IN NETSITE.......................................................................................... 11

CONFIRMATION................................................................................................................... 11

File name
283149962.doc

Created by
Huawei
Page 2 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

INSTALLATION AND VERIFICATION DOCUMENTATION

This HUAWEI-RTN Link is Installed and Commissioned according to the following Site Specific
Documentation:

OptiX RTN 910 Radio Transmission System IDU Quick Installation Guide (Indoor)
(V100R003_05)
HUAWEI
OptiX RTN 950 Radio Transmission System IDU Quick Installation Guide (Indoor)
(V100R003_05)
HUAWEI
OptiX RTN 980 Radio Transmission System IDU Quick Installation Guide (Indoor)
(V100R003_05)
HUAWEI
RTN 910 IDU Quick Installation Guide for Outdoor Cabinets (APM30H&TMC11H
Cabinets)(V100R003_01)
HUAWEI
RTN 910 IDU Quick Installation Guide for Outdoor Cabinets (OMB Cabinets)
(V100R003_01)
HUAWEI
RTN 950 IDU Quick Installation Guide for Outdoor Cabinets (APM30H&TMC11H
Cabinets)(V100R003_01)
HUAWEI
RTN 910 IDU Quick Installation Guide for Outdoor Cabinets (OMB Cabinets)
(V100R003_01)
HUAWEI
OptiX RTN 900 V100R003 Service Configuration(Weblct)
HUAWEI

File name
283149962.doc

Created by
Huawei
Page 3 of 13

Microwave Equipment
HUAWEI RTN

2
2.1

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

INDOOR UNIT INSTALLATION


System Configuration and Characteristics
RTN910 Classic

RTN950 Classic

RTN950A Classic

RTN905 2E Classic

CSHA Board for RTN910

CSHE Board for RTN910

CSH Board for RTN950

CSHU Board for RTN950

File name
283149962.doc

Created by
Huawei
Page 4 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

CSHO Board for RTN950A

RTN380Classic

RTN360 Classic

File name
283149962.doc

Created by
Huawei
Page 5 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

ISU2 Board

ISX2 Board

ISV3 Board

SP3S Board

SP3D Board

SL1D Board

EM6TA Board

EM6FA Board

EG4 Board

EG4P Board
File name
283149962.doc

Created by
Huawei
Page 6 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

AUX Board

2.2

Indoor Unit Installation


Is in accordance with the procedural document specified in section 1

2.3

Transmission Cabling Checklist

Description
How many E1 are connected from IDU-Interface
to DDF

checked
16

32

48

64

E1 Test loops removed


Ethernet Cable or optical fiber among IDU, BBU,
Router (if needed), [straight cable]

done

N/A

Notes on Transmission Cabling

2.4

Indoor Unit Grounding


Is in accordance with the procedural document specified in section 1

2.5

Indoor Installation checklist

Description

Checked

General Appearance of Indoor Unit


Indoor Unit correctly labelled with Link_ID, Frequency and IP-Address
IF cable correctly marked & connected to the Indoor unit
P&E cable and outdoor optical fiber correctly marked & connected to the
Indoor unit
Grounding of 19 Transmission Rack
Power cable connected to Indoor Unit
Checked Circuit Breaker Rating and Labelled at main DC supply
Cables arranged, secured to cable tray and labelled
File name
283149962.doc

Created by
Huawei
Page 7 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

Sync Cables on XPIC-Link connected


Notes on Indoor Installation Check

File name
283149962.doc

Created by
Huawei
Page 8 of 13

Microwave Equipment
HUAWEI RTN

2.6

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

Supervision/RTN-Files Loaded

Description

checked

RTN-Files are loaded to the Indoor Unit


Ethernet cabling is done a to the Switch/Router
GNOC can ping the RTN GNE if DCN is ready
Notes on RTN-Supervision

2.7

IP-Address Indoor Unit

IP-Address
_______ . _______ . _______ . _______ .
Sub-mask
_______ . _______ . _______ . _______ .

2.8

IP-Address for RTN380 (E-Band) or RTN360 (V-Band)

IP-Address
_______ . _______ . _______ . _______ .
Sub-mask
_______ . _______ . _______ . _______ .

File name
283149962.doc

Created by
Huawei
Page 9 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

OUTDOOR UNIT INSTALLATION

3.1

IF Cable installation

Length (m)

No. of
Grounding
Kits

5D cable
(up to
120m)

RG 214
cable (up to
100m)

Other (up to 300-350 m)


See below

Allowed cable types:


Up to:

Andrew

Eupen

NK Cable

RFS

300 m

3/8 Hiflex

FSJ2-50

EC2-50-HF

RFF 3/8 - 50

SCF38-50

350 m

1/2 Hiflex

FSJ4-50B

EC4-50-HF

RFF 1/2 - 50

SCF12-50

3.2

P&E Cable and outdoor optical fiber installation

Length (m)

3.3

No. of
Grounding
Kits

P&E cable (up to


100m)

Outdoor fiber (up to


150m)

Outdoor Unit and Cable Installation


Is in accordance with the procedural document specified in section 1

3.4

Method of Installation (Outdoor Unit)


Roof mounting

Wall mounting

Tower installation
3.5

Pole installation

Dish/ODU

Description
Dish Size

checked
30cm

Vendor
Polarisation
Hardware Attenuator 10dB
(52GHz)
File name
283149962.doc

60cm
RFS

120cm
Andrew

Horizontal
Vertical
Dual polarization
N/A

80cm

1 x 10dB

Horizontal
Vertical
Dual polarization
2 x 10dB

Created by
Huawei
Page 10 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

Outdoor Installation Checklist


Description

Checked

General appearance of outdoor Unit


IF cable correctly marked and connected to the outdoor unit
P&E cable and outdoor optical fiber correctly marked & connected to the
outdoor unit
Grounding kits are installed in the specified location
All external connectors and cables checked for correct sealing
Grounding of outdoor unit and alignment unit
Outdoor Unit is labelled, designating Direction and Link Information

File name
283149962.doc

Created by
Huawei
Page 11 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

HUAWEI RTNCOMMISSIONING LINE UP

4.1

Modulation Scheme
QPSK

16-QAM

512-QAM

1024-QAM

4.2

32-QAM

64-QAM

128-QAM

256-QAM

56 MHz

250 MHz

500 MHz

2048-QAM

Frequency Band
7MHz

4.3

14 MHz

28 MHz

TX Settings
adjusted to

expected

Checked

TX Frequency

TXMHz# MHz

TXMHz# MHz

TX Power

TXdBm# dBm

TXdBm# dBm

TX Power
Control
4.4

dBm

ATPC

MTPC

Receiving Level

Received Signal level should be +/- 2dB from calculated value provided by Transmission
Planning.
If the required level is not achievable, contact the transmission planner for further checks.

RX Level

4.5

indicated

expected

IndRXdBm# dBm

ExpRXdBm# dBm

o.k.

Link Performance Monitoring (Time set 15min)

ES

Error Second

Passed Ok

SES

Severely Error Second

Passed Ok

UAS

Unavailable Second

Passed Ok

BBE

Background Block Error

Passed Ok

OFS

Out of Frame Seconds

Passed Ok

DOCUMENTATION IN NETSITE

Implementation Protocol stored in NetSite (A- and B-End)

Checked

Photos from Indoorunit, TRM-Rack and Outdoorunit/Dish stored in NetSite (A- and BEnd)

Checked

File name
283149962.doc

Created by
Huawei
Page 12 of 13

Microwave Equipment
HUAWEI RTN

Site Code: SiteA#


Site Code B-side: SiteB#
Job number: JobNr#

Photos from DDF/ODF/EDF stored in NetSite (A- and B-End)

Checked

Photos from Monitor-Cabling stored in NetSite (Master)

Checked

CONFIRMATION

This is to confirm that all of the above listed points are done in order to the
current Guidelines, and that this document is filled in correctly.

ON BEHALF OF:

Implementation Subcontractor Company:

________________________________________________________________________

NAME: Klemen Kecman

File name
283149962.doc

SIGNED:

DATE:

Created by
Huawei
Page 13 of 13