DLC
DIGITAL LOAD CONTROLLER
FOR
SYNCHRONOUS GENERATOR
KONSUMEN
MANUAL INSTRUCTIONS
RENERCONSYS
Small Hydro Power Engineering
CONTENTS
CONTENTS ........................................................................................................................ 2
1. LOAD CONTROLLER ................................................................................................... 3
2. POWER HOUSE WIRING ............................................................................................. 4
3. MAIN COMPONENTS OF DLC & SYNCHRONIZER ................................................. 6
5. GENERATOR OPERATING INSTRUCTION ............................................................. 11
6. TROUBLE SHOOTING INSTRUCTION ..................................................................... 13
7. SETUP SWITCH .......................................................................................................... 14
8. WEEKLY CHECK FORM ............................................................................................ 17
9. APPENDIXES .............................................................................................................. 18
2
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
1. LOAD CONTROLLER
Digital Load Control is the governor electronics that function as a frequency and voltage regulator on a generator. Load control is suitable for a micro hydro power plant applied on rivers (with
out a dam).
Some of the benefits of load control:
1. Can avoid mechanical equipment / electrical complex and expensive.
2. Load control equipment is relatively simple and inexpensive.
3. Load control can receive a large load changes.
4. Maintenance is very easy to do.
P [kW]
GENERATING POWER
MAIN LOAD
BALLAST LOAD
TIME
Seen from the graph above Generating power (power is still produced), the load change is
always offset by Ballast load. Thus, the amount of power and Ballast load main load will always be the same as Generating power.
3
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
Grounding
Put round bar copper minimum 4 point to yield resistance below 5 Ohm (Local Electric), each
bar is connected with the round cable that is connected with the BC ground terminal on the DLC
panel. The distance between the round bars that is planted minimum twice the length of round
bar to produce the optimal resistance. BC connected with concrete, penstock, turbine etc. (objects made of metal).
Customer Wire
Customer wiring that used is four wires, one as neutral and three as phase. Size of wire adjusted
on the big of power and the length of the network. Too long and thin wire network causes high
voltage droop. See the power house wiring figure.
4
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
MAINTENANCE WORKS
Check the cable ties in the terminal Generator, DLC Panel, MCB and Ballast Load, tighten if
loose. This examination should be conducted in Power Plan is stop/ switched off (OFF). Perform measurements OHM on the ballast load terminal on each heater once a month to ensure all
elements of Check immersion water heater elements to function properly. Control seal element
from the water heater to the leakage possibilities. Check immersion water heater elements from
leakage possibilities or control Air Heater Terminal from loosing and corrosion. When power
plant is stop, clean immersion water heater elements with cloths and add little of soap (dont
scrub). When the power plant is turned on, check rotary fan control on the panel to ensure the
rotary fan works properly, the fan does not work will damage the electronics components.
5
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
RENERCONSYS
Small Hydro Power Engineering
7
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
8
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
Before running out of CB Power plan, panel must be OFF position and CB AVR must be
ON (if use SX421-stamford)
Check AVR:
a. Excitation Switch must be ON position
b. Volt Trim on CCW full position
c. Stability on center position
d. UFRO on the center position then turn CCW a little
Open the turbine valve slowly until the maximum DLC voltage is 230V and frequency
meter is less than 50 Hz.
Measure the voltage for every phase by using Multi meter tester (Volt meter) and write
down the result on the table (table no.1)
Add more the opening of the turbine valve after the indicator lamp on DLC main board is
lights until DLC panel voltage reach 220V-240V and frequency meter is 50Hz.
Set Volt Trim on AVR until the Phase voltage is (225-230V)/ (390-400V). Write down
the result on the table (table no.2)
On this step, hold the turbine valve min. 4 hours to heat the spinning part and assure the
DLC is running well.
10
Add more the opening of the turbine valve until the ballast voltage no. 1,2,3 are 110V
and the ballast no. 2,4,6 are OFF. Write down the result on the table (table no.3)
11
Add more the opening of the turbine valve until ballast voltage no. 1,2,3 (STEP 1) is
220V and ballast no. 2,4,6 are still 0V. Write down all the result of the ballast voltage
(table no.4)
12
Add more the opening of the turbine valve until ballast voltage no. 1,3,5 is 220V and ballast no. 2,4,6 (STEP 2) 100V. Write down all the result of the ballast voltage (table no.5)
13
Add more the opening of the turbine valve until reaches the optimum position, (max. of
all ballast is 220V and frequency 50Hz). Write down all the result of the ballast voltage
(table no.6)
14
Turn on the customer load, check the line voltage, ampere ballast and the indicator lamp.
(Table no.7)
9
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
COMMISIONING TABLE
TEST NO
TURBIN OPENING
CM
FREQUENCY
[Hz]
R-S
[V]
R-T
[V]
LINE
S-T
[V]
VOLTAGE
R-N
[V]
R-N
[V]
S-N
[V]
R1-N
[V]
R2-N
[V]
S1-N
[V]
S2-N
[V]
T1-N
[V]
T2-N
[V]
[A]
[A]
[A]
[A]
[A]
[A]
BALLAST
LOAD
CURRENT
GENERATOR
CURRENT
MAIN LOAD
[H-M]
TIME
TEGANGAN
OUTPUT
[kW]
Date: ...........................
Checked by:
Approved by:
(..................................)
(..................................)
10
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
2. Open turbine valve slowly until PHASE VOLT (V) is 220V, hold a few minute as DLC
need more time to start.
3. Add the turbines opening valve slowly/gently, notice the conditions as follows:
4. Add the turbines opening valve slowly/gently until the optimum position. And the ballast
ampere indicates appropriate with the capacity of the power plant
5. On switch gear panel, press Push Button ON:
Ampere meter on the switch gear panel will pointed according to the load
11
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
2.
Close valve turbine slowly until close position then close valve until CLOSE position and
close bypass VALVE
3.
12
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
13
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
7. SETUP SWITCH
SW-8-7: I - parameter
SW-8
SW-7
OFF
OFF
OFF
ON
ON
OFF
ON
ON
: default
Note: decrease parameter I if hunting occurs after receiving an unexpected generator load.
SW-6-5: P - parameter
SW-6
SW-5
OFF
OFF
OFF
ON
ON
OFF
ON
ON
: default
Note: move position P to a smaller parameter if the generator frequency is not stable
RENERCONSYS
Small Hydro Power Engineering
SW-3: DROOP
Droop is used for the parallel with the work of others or isolated work. Of working with isolated
droop, Ballast load can be monitored remotely from the unit by adding one indicator Ballast
(Ballast remote indicator). From the graph below looks at the Ballast zero frequency generator
50 Hz and when the Ballast full 100% increase to the frequency of 52 Hz. And also to the main
load, without load (power to enter all Ballast) frequency generator 52 Hz when the main load
and the increased frequency of reduced until 50 Hz.
15
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
Setting P (Proportional):
Increase P when ballast response is
too slow, but decrease P when the
generator frequency is oscillated
Setting I (Integrator):
Decrease I when the generator frequency is oscillated after varying
load
16
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
2.7 Fuse
Yes
No
Yes
No
Yes
No
4.10 Others
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
4.7 Others,
Yes
No
2. PANEL ELC
3. GROUNDING
4. TRANSMISION LINE
17
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
9. APPENDIXES
1. A FEW IMPORTANT MEASUREMENT POINT
2. POWER PLANT OPERATING PROCEDURE
3. DLC MAIN CHART COMPONENTS
4. POWER PLANT SINGLE LINE DIAGRAM
5. POWER HOUSE WIRING DIAGRAM
6. DLC PANEL & COMPONENT LAYOUT
7. DLC PANEL WIRING DIAGRAM
18
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
19
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
2. Open turbine valve slowly until PHASE VOLT (V) is 220V, hold a few minute as DLC
need more time to start.
3. Add the turbines opening valve slowly/gently, notice the conditions as follows:
4. Add the turbines opening valve slowly/gently until the optimum position. And the ballast
ampere indicates appropriate with the capacity of the power plant
5. On switch gear panel, press Push Button ON:
Ampere meter on the switch gear panel will pointed according to the load
20
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
2.
Close valve turbine slowly until close position then close valve until CLOSE position and
close bypass VALVE
3.
21
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
RENERCONSYS
Small Hydro Power Engineering
22
Komp. Cimindi Raya AL-3 Cimahi, BANDUNG 40514
Telp/Fax: +62 (22) 6613119, Mobile: +62 8156223991, email: aji.subekti@renerconsys.com
Amt
Unit
Set
1
6
3
2
6
pc
pc
pc
pc
pc
6
1
1
6
6
1
2
3
1
1
1
1
2
13
1
1
1
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
pc
1
3
1
15
6
1
1
pc
pc
pc
pc
pc
pc
pc
Set
Remark