BOILER INSTALLATION PROJECT


A. Excavation of foundations (boiler,
feed
water tank,
oil tank) foundation
B. Excavation
of chimney

Start

Finish

79 days

Wed 15/07/15

Mon 02/11/15

7 days

Wed 15/07/15

Thu 23/07/15

3 days

Wed 15/07/15

Fri 17/07/15
Wed 12/08/15

C. Laying out - steam line to process

21 days

Wed 15/07/15

D. Laying out of main power cable


from
substationof electrical panels
E. Construction

21 days

Wed 15/07/15

Wed 12/08/15

21 days

Thu 13/08/15

Thu 10/09/15

and
distribution
F. Make
electricalgear
connection on
boiler
G. Prepare steel matting for boiler

15 days

Fri 11/09/15

Thu 01/10/15

5 days

Fri 24/07/15

Thu 30/07/15

foundation
H.
Prepare steel matting for tank
foundation
I. Prepare steel matting for chimney

10 days

Fri 24/07/15

Thu 06/08/15

15 days

Mon 20/07/15

Fri 07/08/15

4 days

Mon 10/08/15

Thu 13/08/15

12

foundation
J. Cast all foundations after matting is
completed
K. Allow concrete to set for 28 days

28 days

Fri 14/08/15

Tue 22/09/15

13

L. Construct chimney

21 days

Wed 23/09/15

Wed 21/10/15
Fri 25/09/15

6
7
8
9
10
11

14

M. Install feed and fuel tanks

3 days

Wed 23/09/15

15

N. Remove and reinstall existing fuel


tank
O. Place boiler on foundation, level,

3 days

Mon 28/09/15

Wed 30/09/15

3 days

Wed 23/09/15

Fri 25/09/15

7 days

Mon 28/09/15

Tue 06/10/15

18

and
groutgauges, oil and steam
P. Attach
valves,
high and low
Q.
Placesight
flue glasses,
gas ducting,

15 days

Thu 13/08/15

Wed 02/09/15

19

forced-draught
induced
draught
R.
Connect flue fan,
gas duct
to chimney

3 days

Thu 22/10/15

Mon 26/10/15

20

21 days

Thu 01/10/15

Thu 29/10/15

21

S. Install feed and chemical closing


pumps
T. Connect pipes and dosing lines

14 days

Wed 07/10/15

Mon 26/10/15

22

U. Test boiler

2 days

Fri 30/10/15

Mon 02/11/15

16
17

Project: Project1
Date: Tue 25/08/15

13 Jul '15
M T W

Task

Inactive Summary

External Tasks

Split

Manual Task

External Milestone

Milestone

Duration-only

Deadline

Summary

Manual Summary Rollup

Progress

Project Summary

Manual Summary

Manual Progress

Inactive Task

Start-only

Inactive Milestone

Finish-only

Page 1

20 Jul '15
M T W

27 Jul '15
M T W

03 Aug '15
M T W

Project: Project1
Date: Tue 25/08/15

10 Aug '15
M T W

17 Aug '15
M T W

24 Aug '15
M T W

31 Aug '15
M T W

Task

Inactive Summary

External Tasks

Split

Manual Task

External Milestone

Milestone

Duration-only

Deadline

Summary

Manual Summary Rollup

Progress

Project Summary

Manual Summary

Manual Progress

Inactive Task

Start-only

Inactive Milestone

Finish-only

Page 2

07 Sep '15
M T W

14 Sep '15
M T W

p '15
T

21 Sep '15
M T W

Project: Project1
Date: Tue 25/08/15

28 Sep '15
M T W

05 Oct '15
M T W

12 Oct '15
M T W

19 Oct '15
M T W

Task

Inactive Summary

External Tasks

Split

Manual Task

External Milestone

Milestone

Duration-only

Deadline

Summary

Manual Summary Rollup

Progress

Project Summary

Manual Summary

Manual Progress

Inactive Task

Start-only

Inactive Milestone

Finish-only

Page 3

26 Oct '15
M T W

02 Nov '15
M T W

Vous aimerez peut-être aussi