Vous êtes sur la page 1sur 2

Federal Register / Vol. 72, No.

32 / Friday, February 16, 2007 / Notices 7651

event via television in the DC area and DEPARTMENT OF ENERGY ENVIRONMENTAL PROTECTION
via phone bridge for a fee. If you have AGENCY
any questions, visit http:// Federal Energy Regulatory
[ER–FRL–6684–2]
www.CapitolConnection.org or contact Commission
Danelle Perkowski or David Reininger at Environmental Impact Statements and
703–993–3100. [Docket No. RP01–503–007] Regulations; Availability of EPA
Commission conferences are Comments
accessible under section 508 of the Natural Gas Pipeline Company of
America; Notice of Technical Availability of EPA comments
Rehabilitation Act of 1973. For prepared pursuant to the Environmental
accessibility accommodations please Conference
Review Process (ERP), under section
send an e-mail to accessibility@ferc.gov, February 9, 2007. 309 of the Clean Air Act and Section
or call toll free 1–866–208–3372 (voice) 102(2)(c) of the National Environmental
or 202–208–1659 (TTY), or send a FAX Take notice that the Commission will
Policy Act as amended. Requests for
to 202–208–2106 with the required convene a technical conference on
copies of EPA comments can be directed
accommodations. Wednesday, March 14, 2007, at 10 am
to the Office of Federal Activities at
(EST), in a room to be designated at the 202–564–7167.
For more information about this offices of the Federal Energy Regulatory
conference, please contact: Moon Paul, An explanation of the ratings assigned
Commission, 888 First Street, NE., to draft environmental impact
Esq., Office of the General Counsel— Washington DC 20426. statements (EISs) was published in FR
Energy Markets, Federal Energy
The technical conference will address dated April 7, 2006 (71 FR 17845).
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, issues raised by Natural’s January 4, DRAFT EISs
(202) 502–6136, Moon.Paul@ferc.gov. 2007, filing in the referenced docket
related only to Natural’s gas EIS No. 20060045, ERP No. D–AFS–
Magalie R. Salas, interchangeability and maximum Btu L65504–ID, Payette National Forest
Travel Management Plan, Designate a
Secretary. limit tariff proposals.
System of Road, Trails and Areas Open
[FR Doc. E7–2706 Filed 2–15–07; 8:45 am] Natural and the other parties should to Motorized and Non-Motorized Use,
BILLING CODE 6717–01–P be prepared to address the following Implementation, Adam, Washington,
topics at the technical conference: Idaho, Valley Counties, ID
1. Are Natural’s tariff proposals Summary: EPA expressed
DEPARTMENT OF ENERGY environmental concern about impacts to
consistent with the Interim Guidelines
in the Natural Gas Council’s White the public water supply, impaired
Federal Energy Regulatory streams and aquatic habitat. Rating EC1.
Commission Paper on Natural Gas Interchangeability
EIS No. 20060401, ERP No. D–FRC–
and Non-Combustion End Use?
K05062–CA, Oroville Facilities Project,
[Project No. 2601–007] 2. To the extent Natural’s proposals Issuing an New Federal License to
are not consistent with the guidelines, Continue Hydroelectric Power (FERC
Duke Power Company LLC; Notice of has Natural supported any divergence No. 2100), Feather River, Sierra Nevada,
Meeting To Discuss the Effects of the from the interim guidelines? Butte County, CA
Continued Operation of the Bryson 3. Did Natural use the appropriate Summary: EPA expressed
Project on Tribal Resources of the methodology to determine the Wobbe environmental concerns about potential
Eastern Band of the Cherokee Indians index and Btu limits? If not, what water quality impacts and the method of
methodology should Natural have used? analysis used to assess impacts of the
February 9, 2007. no-action alternative, and requested
Any parties in this proceeding that additional information regarding
a. Date and Time of Meeting: March
wish to make a presentation at this consultation with tribal governments
7, 2007, from 1 to 4 p.m. (EST).
technical conference should notify the and the analysis of cumulative impacts.
b. Place: District Courtroom, Swain Commission prior to the conference. Rating EC2.
County Administration Building, 101 EIS No. 20060406, ERP No. D–BLM–
FERC conferences are accessible
Mitchell Street, Bryson City, North L65524–PA, Bay Resource Management
under section 508 of the Rehabilitation
Carolina 28713–2321. Plan, Implementation, Located within
Act of 1973. For accessibility
c. FERC Contact: Lee Emery at (202) accommodations please send an e-mail the Bristol Bay and Goodnews Bay
502–8379 or lee.emery@ferc.gov. to accessibility@ferc.gov or call toll free Areas, AK
Summary: EPA expressed
d. Purpose of Meeting: Discuss the (866) 208–3372 (voice) or 202–20801659
environmental concerns about the
effects of continued operation of the (TTY), or send a FAX to 202–208–2106 potential for adverse impacts regarding
Bryson Project on Tribal fishing and with the required accommodations. the limited number of special
boating rights on the Bryson reservoir All interested persons are permitted designations in the preferred alternative;
(Ela reservoir). to attend. For further information please effectiveness of proposed Required
Magalie R. Salas, contact Sandra Elliott at (202) 502–8694 Operating Procedures (ROPs) and
or e-mail sandra.elliott@ferc.gov. Stipulations, especially in regard to
Secretary.
future management of lands open to
[FR Doc. E7–2701 Filed 2–15–07; 8:45 am] Magalie R. Salas, mineral, oil, and gas exploration and
sroberts on PROD1PC70 with NOTICES

BILLING CODE 6717–01–P Secretary. development. Rating EC2.


[FR Doc. E7–2703 Filed 2–15–07; 8:45 am] EIS No. 20060449, ERP No. D–AFS–
BILLING CODE 6717–01–P L65526–ID, Salmon-Challis National
Forest, Lost River/Lemhi Grazing
Allotments, To Improve Range

VerDate Aug<31>2005 19:03 Feb 15, 2007 Jkt 211001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 E:\FR\FM\16FEN1.SGM 16FEN1
7652 Federal Register / Vol. 72, No. 32 / Friday, February 16, 2007 / Notices

Condition and Trend, Lost River and Decision and the remainder of the Operate and Maintain a New 25.6 mile
Challis Ranger Districts, Salmon-Challis licensing process. 500kV Transmission Line, Right-of-Way
National Forest, Butte, Clark, Custer and EIS No. 20060495, ERP No. F–FHW– Permit and Special Use Authorization,
Lemhi Counties, ID L40226–WA, WA–28 Angeles National Forest, Los Angeles
Summary: EPA expressed Eastside Corridor Project, Proposal to County, CA
environmental concerns about the Improve WA–28 (Sunset Highway) Summary: No formal comment letter
potential for adverse impacts to streams Corridor from WA–2–97 (Ocdabashian was sent to the preparing agency.
that are currently 303(d) listed for Bridge) to 9th Street NE. in East Dated: February 12, 2007.
temperature, sediment and other water Wenatcheee, City of East Wenatchee,
Robert W. Hargrove,
quality criteria. Rating EC2. Douglas County, WA
EIS No. 20060486, ERP No. D–NPS– Summary: EPA continues to express Director, NEPA Compliance Division, Office
of Federal Activities.
D65038–MD, White-Tailed Deer environmental concerns about the
Management Plan, Implementation, preferred alternative’s (3B) impacts on [FR Doc. E7–2734 Filed 2–15–07; 8:45 am]
Catoctin Mountain Park, Frederick and air quality and wetlands. BILLING CODE 6560–50–P

Washington Counties, MD EIS No. 20060515, ERP No. F–FHW–


Summary: EPA does not object to the C40161–NY, NY–17 Parksville/SH–
proposed action. Rating LO. 5223, Liberty-County Line, Part 1 ENVIRONMENTAL PROTECTION
EIS No. 20060274, ERP No. DD–AFS– Construction and Reconstruction to AGENCY
L65155–00, Northern Spotted Owl Interstate Standards, Funding and U.S.
Management Plan, Removal or the Army COE Permit Issuance, Town of [ER–FRL–6684–1]
Modification to the Survey and Manage Liberty, Sullivan County, NY
Mitigation Measures, Standards and Summary: EPA does not object to the Environmental Impacts Statements;
Guidelines (to the Northwest Forest preferred alternative. Notice of Availability
Plan) New Information to Address Three EIS No. 20060531, ERP No. F–FRC– Responsible Agency: Office of Federal
Deficiencies in Final Supplemental EIS L05236–0R, Clackamas River Activities, General Information (202)
(2004), Northwest Forest Plan, OR, WA, Hydroelectric Project, Application for 564–7167 or
and CA Relicensing of an Existing 173 http://www.epa.gov/compliance/
Summary: The analysis in EIS megawatt(MS) Project, (FERC No. 2195– nepa/ Weekly receipt of Environmental
provides adequate support for the 011) Clackamas River Basin, Clackamas Impact Statements Filed 02/05/2007
decision to add individual species to the County, OR through 02/09/2007 Pursuant to 40 CFR
agencies’ Special Status Species Summary: EPA continues to express 1506.9.
Program (SSSP) lists, and provides environmental concerns about
important information for developing temperature and dissolved oxygen EIS No. 20070038, Draft EIS, BLM, WY,
future land management and species impacts and recommends that FERC Pinedale Resource Management Plan
conservation decisions. EPA encourages work with ODEQ to assure water quality (RMP), Implementation of Public
the agencies to fully support and standards will be met. Lands Administered, Sublette and
regularly update the SSSP programs, EIS No. 20060545, ERP No. F–FTA– Lincoln Counties, WY, Comment
and consider the importance of the G40191–TX, Southeast Corridor Project, Period Ends: 05/17/2007, Contact:
current network of late successional Proposed Fixed-Guideway Transit Kellie Roadifer 307–367–5309.
forests in late-successional species’ System, Funding, Metropolitan Transit EIS No. 20070039, Draft EIS, WPA, CA,
persistence and viability. Rating LO. Authority (METRO) of Harris County, Trinity Public Utilities District Direct
EIS No. 20060307, ERP No. DS–FHW– Houston, Harris County, TX Interconnection Project, Construct
L40222–WA, WA–99 Alaskan Way Summary: EPA does not object to the and Operate a 16-mile Long 60-
Viaduct and Seawall Replacement proposed project. Kilovolt Power Transmission
Project, Additional Information and EIS No. 20070002, ERP No. F–FHW– Facilities, (DOE/EIS–0389, Trinity
Evaluation of Construction Plan, F40420–MN, I–94/TH–10 Interregional County, CA, Comment Period Ends:
Provide Transportation Facility and Connection from St. Cloud to Becker 04/02/2007, Contact: Mark Wieringa
Seawall with Improved Earthquake Transportation Improvements, Funding 7200–962–7448.
Resistence, U.S. Army COE Section 10 and U.S. Army COE Section 404 Permit, EIS No. 20070040, Final EIS, DOD, 00,
and 404 Permits, Seattle, WA Sherurne, Stearns, and Wright Counties, Programmatic—Missile Defense
Summary: EPA expressed MN Agency, To Incrementally Develop,
environmental concerns about impacts Summary: EPA continues to have Test, Deploy, and Plan for
to air quality and human health during environmental concerns about impacts Decommissioning of the Ballistic
construction, and recommends the to water quality, wetlands, wildlife and Missile Defense System (BMDS), Wait
development of an air quality wildlife habitat, and floodplains as well Period Ends: 03/19/2007, Contact:
construction mitigation plan. Rating as potential cumulative impacts to the Martin Duke 703–697–4248.
EC2. Mississippi Riverway. EIS No. 20070041, Draft EIS, AFS, OR,
EIS No. 20070005, ERP No. F–IBR– Five Buttes Project, Conduct
FINAL EISs K39082–AZ, Welton-Mohawk Title Vegetation Management Activities,
EIS No. 20060451, ERP No. F–CGD– Transfer Project, Transfer of the Implementation, Deschutes National
B03015–MA, Neptune Liquefied Natural Facilities, Works, and Lands of the Forest, Cresent Ranger District,
Gas (LNG), Construction and Operation, Welton Mohawk Division of the Gila Deschutes County, OR, Comment
Deepwater Port License Application, Project, Welton-Mohawk Irrigation and Period Ends: 04/02/2007, Contact:
(Docket Number USCG–2004–22611) Drainage District, Yuma County, AZ Marcy Boehme 541–433–3200.
sroberts on PROD1PC70 with NOTICES

Massachusetts Bay, Gloucester and Summary: No formal comment letter EIS No. 20070042, Draft EIS, BLM, CA,
Boston, MA was sent to the preparing agency. Truckhaven Geothermal Leasing Area,
Summary: EPA does not object to the EIS No. 20070009, ERP No. F–AFS– Addresses Leasing of Geothermal
proposed action, but offered comments K65317–CA, Antelope-Pardee 500kV Resources, El Centro Field Office,
that can be addressed in the Record of Transmission Project, Construct, Imperial County, CA, Comment

VerDate Aug<31>2005 19:03 Feb 15, 2007 Jkt 211001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\16FEN1.SGM 16FEN1

Vous aimerez peut-être aussi