Requirement:
3.1-Audit balance sheets of the last 05 years
-Net worth calculated as the difference between total assets and total
liabilities should be positive for all the last 05 years
3.2Average Annual Construction Turnover
-Minimum average annual construction turnover of USD 200 million as total
certified payments received from contracts in progress and/or completed
within the last 05 years as single entity.
In case of JV must meet 25% of the requirement for each and/ or one member
with 40% of the requirement
II.
III.
IV.
V.
VI.
VII.
VIII.
In case of a JV, the value of contracts completed by ite members shall not be
aggregated to determine whether the requirement of the minimum value of a
single contract has been met. Instead, each member shall satisfy the
minimum value of a single contract as required for single entity
Satisfactorily completion shall be based on 100% of the works completed
under the contract, completion certificate issued by as employer shall be
provided
An EPC is a firm which takes on the role of contract management as a
general contractor of sort could do. It does not normally perform directly
the construction works associated with the contract. Rather, it manages the
works of other (Sub) contractors while bearing full responsibility and risk for
price, quality and timely performance of the work contract.
The phasing project in serial form (i.e. highly continuous and adjacent
projects in same line/highway) should be regarded as one single contract.
The project experience must belong to the transport sector (Railway, Highway
and bridges, airport and port). The project experience must include railways
or roads or bridges or highways or airports/airport terminal buildings or port
construction works as a substantial component of the project respectively.
The project experience for other sectors which partly include the above
construction component are not eligible
Substantial completion shall be based on 805 or more of the works completed
under the contract.
For contracts under which the applicant participated as a JV member, only the
applicants, share by value, shall be considered to meet this requirement.
The experience projects, as a minimum, must include workshop building
scum rail trucks for MRT or HSR or Intercity railway or Conventional railway or